Semiconductor process chamber and control method thereof
By combining the closed-loop processing of air extraction components and gas purification components in the semiconductor process chamber, the corrosion problem of stainless steel pipes caused by halogen-containing gases during the plasma etching process is solved, the gas in the chamber is purified, and metal contamination is prevented. Ensure the purity of the etching process and the long life of the equipment.
Patent Information
- Application Number
- CN202310466133.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-26
- Publication Date
- 2024-10-29
AI Technical Summary
During the plasma etching process, halogen-containing gases easily corrode stainless steel gas pipelines, causing metal elements to detach and contaminate the wafer.
A semiconductor process chamber is designed, including a chamber body, a first exhaust component and a gas purification component. By detecting the water and oxygen content in the chamber, when it exceeds the preset value, the exhaust component and purification component are opened to form a closed loop. loop to purify the gas to reduce the water and oxygen content and avoid corrosion.
It effectively reduces the risk of corrosion of gas pipelines in the chamber, prevents metal contamination, and ensures the purity of the etching process and the long life of the equipment.
Smart Images

Figure CN118866735A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of semiconductor process technology, and specifically relates to a semiconductor process chamber and a control method thereof. Background Art
[0002] Plasma etching equipment has important applications in integrated circuits, micro-electromechanical systems, and advanced packaging. During the operation of plasma etching equipment, halogen-containing gases such as sulfur hexafluoride, chlorine, and hydrogen bromide are commonly used etching gases.
[0003] For example, various schemes of plasma etching are performed by reacting oxygen-, fluorine- or chlorine-containing gases with silicon; HBr and He are used as reaction gases for ion etching, SiO2 is used as a trench mask, and deep silicon trenches are etched, and HBr can make the bottom of the formed deep silicon trench flatter; for another example, chlorine-containing gases such as Cl2 and BCl3 are necessary gases for plasma etching of metals. The melting and boiling points of metal chlorides are generally low, and they can be promptly extracted in a vacuum environment and separated from the chamber body of the semiconductor process chamber.
[0004] However, when the humidity in the chamber body reaches above 1ppm, the halogen-containing gas will easily corrode the stainless steel gas pipeline, and the metal elements produced by the corrosion of the pipeline will leave the pipeline and reach the wafer to form metal contamination. Summary of the invention
[0005] The purpose of the embodiments of the present application is to provide a semiconductor process chamber and a control method thereof, which can solve the problem that halogen-containing gases are prone to corrode gas pipelines during the current etching process.
[0006] In order to solve the above technical problems, this application is implemented as follows:
[0007] In the first aspect, the present application provides a semiconductor process chamber, characterized in that it includes a chamber body, a first exhaust component and a gas purification component, the chamber body is provided with a first vent and a second vent, the first end of the first exhaust component is connected to the first vent, the first end of the gas purification component is connected to the second vent, and the first vent can be connected to the two vents through the first exhaust component and the gas purification component.
[0008] In a second aspect, an embodiment of the present application further provides a control method for a semiconductor process chamber, which is applied to the above-mentioned semiconductor process chamber, comprising:
[0009] obtaining the water oxygen content in the chamber body;
[0010] When the water oxygen content is greater than or equal to a preset value, the first exhaust component is turned on to exhaust the chamber body;
[0011] The operation of obtaining the water-oxygen content in the chamber body is performed at preset time intervals until the water-oxygen content is less than the preset value or the total pumping time reaches a preset threshold.
[0012] In the embodiment of the present application, when the water and oxygen content of the gas in the chamber body is high, the first vent hole of the chamber body is connected to the second vent hole through the first exhaust assembly and the gas purification assembly, that is, a closed loop is formed between the first exhaust assembly, the gas purification assembly and the chamber body, and the gas in the chamber body is purified by the gas purification assembly to reduce its water and oxygen content, thereby avoiding corrosion of the gas pipeline in the chamber body. Therefore, the embodiment of the present application can solve the problem that the halogen-containing gas is easy to corrode the gas pipeline in the current etching process. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 A schematic diagram of the structure of a semiconductor process chamber disclosed in an embodiment of the present application;
[0014] Figure 2 A schematic structural diagram of a semiconductor process chamber disclosed in another embodiment of the present application;
[0015] Figure 3 A flow chart of a method for controlling a semiconductor process chamber disclosed in an embodiment of the present application;
[0016] in, Figure 1 and Figure 2 The arrows in the figure indicate the direction of gas flow.
[0017] Description of reference numerals:
[0018] 100 - chamber body, 110 - first vent hole, 120 - second vent hole, 130 - third vent hole, 140 - fourth vent hole, 150 - bottom wall, 160 - side wall, 170 - air inlet hole, 171 - central air inlet hole, 172 - edge air inlet hole;
[0019] 200-first pumping assembly, 210-first molecular pump, 220-first mechanical pump;
[0020] 300-gas purification components;
[0021] 400-exhaust pipeline;
[0022] 500-intake pipe;
[0023] 610 - first vacuum valve, 620 - second vacuum valve, 630 - third vacuum valve, 640 - fourth vacuum valve, 650 - fifth vacuum valve;
[0024] 700-circulation pipeline;
[0025] 800 - second air extraction component, 810 - second molecular pump, 820 - second mechanical pump;
[0026] 910 - radio frequency coil, 920 - electrostatic chuck, 930 - lower electrode. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0028] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.
[0029] The semiconductor process chamber and the control method thereof provided in the embodiments of the present application are described in detail below through specific embodiments and their application scenarios in combination with the accompanying drawings.
[0030] like Figure 1 to Figure 2As shown, the embodiment of the present application provides a semiconductor process chamber, including a chamber body 100, a first exhaust assembly 200 and a gas purification assembly 300. Optionally, the first exhaust assembly 200 can be a vacuum pump, and of course it can also be other types of exhaust pumps, which are not specifically limited here; optionally, the gas purification assembly 300 can be a device such as a plasma purifier, and of course it can also be other types of gas purification assemblies 300, which are not specifically limited here. The chamber body 100 is provided with a first vent 110 and a second vent 120, the first end of the first exhaust assembly 200 is connected to the first vent 110, the first end of the gas purification assembly 300 is connected to the second vent 120, and the first vent 110 can be connected to the second vent 120 through the first exhaust assembly 200 and the gas purification assembly 300. In this solution, when the water and oxygen content of the gas in the chamber body 100 is high, a closed loop is formed between the first gas extraction component 200, the gas purification component 300 and the chamber body 100, and the water and oxygen content of the gas in the chamber body 100 is purified by the gas purification component 300, thereby avoiding corrosion of the gas pipeline in the chamber body 100. Therefore, the embodiment of the present application can solve the problem that the halogen-containing gas is easy to corrode the gas pipeline in the current etching process.
[0031] Optionally, a gas inlet 170 is provided at the top of the chamber body 100 for introducing process gas into the chamber body 100. The semiconductor process chamber further includes a radio frequency coil 910, which is embedded in the side wall 160 of the chamber body 100. When the radio frequency coil 910 is energized, it acts on the process gas entering the chamber body 100, thereby generating plasma.
[0032] Optionally, the number of the air inlet holes 170 is at least two, including a central air inlet hole 171 and an edge air inlet hole 172 , and the edge air inlet holes 172 are arranged at intervals around the central air inlet hole 171 , thereby increasing the air intake amount of the chamber body 100 and improving the air intake uniformity of the chamber body 100 .
[0033] Optionally, the semiconductor process chamber also includes an electrostatic chuck 920 and a lower electrode 930. The electrostatic chuck 920 is used to support the wafer. The lower electrode 930 is arranged below the electrostatic chuck 920. The lower electrode 930 is used to provide radio frequency voltage for plasma so that the plasma bombards the wafer, and can provide adsorption voltage for the electrostatic chuck 920 at the same time.
[0034] In an optional embodiment, Figure 1As shown, the semiconductor process chamber also includes an exhaust pipeline 400 and an air inlet pipeline 500. The first end of the exhaust pipeline 400 is connected to the first air vent 110. The first exhaust component 200 includes a first molecular pump 210 and a first mechanical pump 220. The first molecular pump 210 and the first mechanical pump 220 are both arranged on the exhaust pipeline 400, and the first molecular pump 210 is located upstream of the first mechanical pump 220. The first end of the air inlet pipeline 500 is connected to the second air vent 120, and the second end of the air inlet pipeline 500 is connected to the exhaust pipeline 400, and the second end of the air inlet pipeline 500 is located between the first molecular pump 210 and the first mechanical pump 220. The gas purification component 300 is arranged on the air inlet pipeline 500. During the process of performing a processing on the wafer, the first mechanical pump 220 extracts the gas in the chamber body 100 through the first molecular pump 210 to make the process gas in the chamber body 100 in a dynamic equilibrium state; when the gas in the chamber body 100 needs to be purified, the suction force of the first molecular pump 210 is greater than the suction force of the first mechanical pump 220. At this time, part of the gas is backflowed into the chamber body 100 after being purified by the gas purification component 300 to reduce the water and oxygen content of the gas in the chamber body 100, and the other part of the gas is discharged through the first mechanical pump 220. In this solution, by setting the gas purification component 300 on the air inlet pipeline 500 and using the first mechanical pump 220 in the prior art as the exhaust pump of the gas purification component 300, the gas in the chamber body 100 is purified, which is conducive to saving equipment costs.
[0035] Optionally, the flow rate of gas extracted from the chamber body 100 and the flow rate of gas entering the chamber body 100 after purification can be determined by the cross-sectional area of the first vent hole 110 and the cross-sectional area of the second vent hole 120, respectively, but the cross-sectional area of the first vent hole 110 and the cross-sectional area of the second vent hole 120 are relatively fixed and cannot be adjusted. Based on this, in other optional embodiments, the semiconductor process chamber further includes a first vacuum valve 610 and a second vacuum valve 620, wherein the first vacuum valve 610 is disposed in the exhaust pipeline 400 and is located between the first vent hole 110 and the first molecular pump 210, and the first vacuum valve 610 is used to adjust the flow rate of the gas in the chamber body 100 entering the first molecular pump 210 through the first vent hole 110, and the second vacuum valve 620 is disposed in the air inlet pipeline 500 and is located between the second vent hole 120 and the gas purification component 300, and the second vacuum valve 620 is used to adjust the flow rate of the gas purified by the gas purification component 300 entering the chamber body 100. Therefore, the scheme accurately controls the flow rate of the gas extracted from the chamber body 100 and the flow rate of the gas entering the chamber body 100 after purification by respectively setting the first vacuum valve 610 and the second vacuum valve 620.
[0036] In another optional embodiment, the first vent hole 110 and the second vent hole 120 are both provided on the bottom wall 150 of the chamber body 100, in which case the gas in the chamber body 100 can be fully extracted, and the gas introduced from the second vent hole 120 can be fully mixed with the gas in the chamber body 100 to reduce the water oxygen content in the gas in the chamber body 100. Of course, at least one of the first vent hole 110 and the second vent hole 120 can be provided on the side wall or the top of the chamber body 100, but in this case, when the gas capacity in the chamber body 100 is small, the working efficiency of the first exhaust assembly 200 is low.
[0037] In another optional embodiment, Figure 2 As shown, the semiconductor process chamber also includes a circulation pipeline 700 and a second exhaust assembly 800, the first end of the circulation pipeline 700 is connected to the first ventilation hole 110, the second end of the circulation pipeline 700 is connected to the second ventilation hole 120, the first exhaust assembly 200 and the gas purification assembly 300 are arranged at intervals in the circulation pipeline 700, and the first exhaust assembly 200 is located downstream of the gas purification assembly 300, the chamber body 100 is also provided with a third ventilation hole 130 and a fourth ventilation hole 140, and the second exhaust assembly 800 is respectively connected to the third ventilation hole 130 and the fourth ventilation hole 140. In this solution, by additionally setting up a circulation pipeline 700 and a first exhaust assembly 200, and setting a gas purification assembly 300 on the circulation pipeline 700, when the gas in the chamber body 100 needs to be purified, the gas in the chamber body 100 is drawn into the circulation pipeline 700 from the first vent 110 through the first exhaust assembly 200, and then enters the chamber body 100 from the second vent 120 after being purified by the gas purification assembly 300, thereby reducing the water and oxygen content in the gas in the chamber body 100; the second exhaust assembly 800 is used to extract the gas in the chamber body 100 when performing a processing on the wafer, so that the process gas in the chamber body 100 is in a dynamic equilibrium state. This solution is easy to operate by setting the first exhaust assembly 200 and the second exhaust assembly 800 separately and controlling them separately.
[0038] Optionally, the flow rate of the gas extracted from the chamber body 100 and the flow rate of the gas entering the chamber body 100 after purification are respectively determined by the cross-sectional area of the first vent 110 and the cross-sectional area of the second vent 120, but the cross-sectional area of the first vent 110 and the cross-sectional area of the second vent 120 are relatively fixed and cannot be adjusted. Based on this, in a further optional embodiment, the semiconductor process chamber also includes a third vacuum valve 630 and a fourth vacuum valve 640, and the third vacuum valve 630 and the fourth vacuum valve 640 are both arranged on the circulation pipeline 700, and the third vacuum valve 630 is located between the first vent 110 and the gas purification component 300, and the third vacuum valve 630 is used to adjust the flow rate of the gas in the chamber body 100 entering the gas purification component 300 through the first vent 110, and the fourth vacuum valve 640 is located between the second vent 120 and the first exhaust component 200, and the fourth vacuum valve 640 is used to adjust the flow rate of the purified gas entering the chamber body 100 through the second vent 120. This solution precisely controls the flow rate of the gas extracted from the chamber body 100 and the flow rate of the gas entering the chamber body 100 after purification by setting the third vacuum valve 630 and the fourth vacuum valve 640 respectively.
[0039] Optionally, the semiconductor process chamber also includes a fifth vacuum valve 650, which is arranged in the circulation pipeline 700. The fifth vacuum valve 650 is located between the gas purification component 300 and the first vacuum component 200. The fifth vacuum valve 650 is used to adjust the flow rate of the gas purified by the gas purification component 300 entering the first vacuum component 200.
[0040] In another optional embodiment, the semiconductor process chamber further includes a first vacuum valve 610, a second vacuum valve 620, an exhaust pipeline 400 and an air intake pipeline 500, the first end of the exhaust pipeline 400 is connected to the third air vent 130, the second exhaust assembly 800 includes a second molecular pump 810 and a second mechanical pump 820, the second molecular pump 810 and the second mechanical pump 820 are both arranged in the exhaust pipeline 400, and the second molecular pump 810 is located upstream of the second mechanical pump 820, the first end of the air intake pipeline 500 is connected to the fourth air vent 140, and the first end of the air intake pipeline 500 is connected to the fourth air vent 140. The two ends are connected to the exhaust pipeline 400, and the second end of the intake pipeline 500 is located between the second molecular pump 810 and the second mechanical pump 820. The first vacuum valve 610 is arranged on the exhaust pipeline 400, and the first vacuum valve 610 is located between the third vent hole 130 and the second molecular pump 810. The first vacuum valve 610 is used to adjust the flow rate of the gas in the chamber body 100 entering the second molecular pump 810 through the third vent hole 130. The second vacuum valve 620 is arranged on the intake pipeline 500, and the second vacuum valve 620 is used to put the second molecular pump 810 in a pre-vacuum state. In this scheme, in the process of performing a processing technology on the wafer, the second mechanical pump 820 acts as an exhaust pump to pump the gas in the chamber body 100 to the second molecular pump 810 through the third vent hole 130, and then discharge it from the exhaust pipeline 400, so that the process gas in the chamber body 100 is in a dynamic equilibrium state to meet the process conditions for processing the wafer.
[0041] In another optional embodiment, the first ventilation hole 110 and the second ventilation hole 120 are both opened on the side wall 160 of the chamber body 100, so as to avoid affecting the structural parts arranged below the chamber body 100, and at the same time facilitate the installation of the first exhaust assembly 200 and the gas purification assembly 300.
[0042] Optionally, the third vent hole 130 and the fourth vent hole 140 are both opened on the bottom wall 150 of the chamber body 100. In this case, the third vent hole 130 and the fourth vent hole 140 are closer to the wafer, so that the second exhaust assembly 800 can extract the reacted gas in time.
[0043] In another optional embodiment, the gas purification component 300 includes an activated carbon adsorbent, a molecular sieve and a copper catalyst. The activated carbon adsorbent is used to adsorb large particles in the gas. Optionally, the activated carbon adsorbent can adsorb about 6 kg of large particles. Of course, the volume of the activated carbon adsorbent can also be flexibly set according to actual needs, and there is no specific restriction here; the molecular sieve is used to remove moisture from the gas. Optionally, the molecular sieve can adsorb about 16 kg of water. Of course, the volume of the molecular sieve can also be flexibly set according to actual needs, and there is no specific restriction here; the copper catalyst is used to remove oxygen from the gas. Optionally, the copper catalyst can consume about 8 kg of oxygen. Of course, the volume of the copper catalyst can also be flexibly set according to actual needs, and there is no specific restriction here. The activated carbon adsorbent is connected to the second vent 120, and the molecular sieve is arranged between the activated carbon adsorbent and the copper catalyst. After the gas enters the gas purification component 300, the large particles in the gas are first adsorbed by the activated carbon adsorbent, and then the moisture in the gas is removed by the molecular sieve, and then the oxygen in the gas is removed by the copper catalyst and discharged. Activated carbon, molecular sieves and copper catalysts can all be regenerated to restore their purification capabilities after reaching their purification capacity limits.
[0044] Optionally, the gas purification component 300 further includes a water analyzer and an oxygen analyzer to obtain the water and oxygen content in the gas entering the gas purification component 300 in real time.
[0045] like Figure 3 As shown, based on the semiconductor process chamber disclosed in the above embodiment of the present application, the embodiment of the present application further provides a control method for a semiconductor process chamber, which is applied to the semiconductor process chamber described in any of the above embodiments, and the control method includes:
[0046] S110 , obtaining the water oxygen content in the chamber body 100 .
[0047] Optionally, the water oxygen content in the chamber body 100 may be detected by a water analyzer and an oxygen analyzer respectively, so as to improve the detection accuracy.
[0048] S120 , when the water oxygen content is greater than or equal to a preset value, start the first exhaust assembly 200 to exhaust the chamber body 100 .
[0049] The preset value here may be a certain value or a certain range of values. Optionally, the preset value may be 1 ppm. Of course, it may also be flexibly selected according to actual needs, and no specific limitation is made here.
[0050] S130, executing the operation of step S130 at preset time intervals until the water oxygen content is less than a preset value or the total pumping time reaches a preset threshold.
[0051] The preset duration here can be flexibly selected according to actual usage needs, and there is no specific restriction here.
[0052] In the embodiment of the present application, when the water-oxygen content is greater than or equal to a preset value, it indicates that the water-oxygen content of the gas in the chamber body 100 is relatively high. At this time, the first gas extraction component 200 is turned on, and the first air vent 110 of the chamber body 100 is connected to the second air vent 120 through the first gas extraction component 200 and the gas purification component 300, that is, a closed loop is formed between the first gas extraction component 200, the gas purification component 300 and the chamber body 100, so that the chamber body 100 is evacuated, and at the same time, the water-oxygen content in the gas extracted from the chamber body 100 is purified by the gas purification component 300, so as to avoid corrosion of the gas pipeline in the chamber body 100, and the operation of obtaining the water-oxygen content in the chamber body 100 is performed at preset time intervals until the water-oxygen content in the chamber body 100 is less than the preset value or the total extraction time reaches the preset threshold value, and the water-oxygen content in the gas in the chamber body 100 is maintained below the preset value for a long time through multiple extractions. Therefore, the embodiments of the present application can solve the problem that halogen-containing gases are prone to corrode gas pipelines during the current etching process.
[0053] In an optional embodiment, the semiconductor process chamber further includes an exhaust pipeline 400, an air intake pipeline 500, a first vacuum valve 610 and a second vacuum valve 620, the first end of the exhaust pipeline 400 is connected to the first vent 110, the first exhaust assembly 200 includes a first molecular pump 210 and a first mechanical pump 220, the first molecular pump 210 and the first mechanical pump 220 are both arranged in the exhaust pipeline 400, and the first molecular pump 210 is located upstream of the first mechanical pump 220, the first end of the air intake pipeline 500 is connected to the second vent 120, the second end of the air intake pipeline 500 is connected to the exhaust pipeline 400, and the second end of the air intake pipeline 500 is located upstream of the first molecular pump 2 10 and the first mechanical pump 220, the gas purification component 300 is arranged in the air intake line 500, the first vacuum valve 610 is arranged in the exhaust line 400, and the first vacuum valve 610 is located between the first vent 110 and the first molecular pump 210, the first vacuum valve 610 is used to adjust the flow rate of the gas in the chamber body 100 entering the first molecular pump 210 through the first vent 110, the second vacuum valve 620 is arranged in the air intake line 500, and the second vacuum valve 620 is located between the second vent 120 and the gas purification component 300, and the second vacuum valve 620 is used to adjust the flow rate of the gas purified by the gas purification component 300 entering the chamber body 100. Before opening the first exhaust component 200 in step S120, the control method also includes:
[0054] S140 , adjusting the opening of the first vacuum valve 610 to the maximum opening, and opening the second vacuum valve 620 .
[0055] During the wafer processing, the first vacuum valve 610 is in an open state so that the process gas in the chamber body 100 enters the first molecular pump 210 through the first vacuum valve 610; when the gas in the chamber body 100 needs to be purified, the suction force of the first molecular pump 210 is greater than the suction force of the first mechanical pump 220. At this time, part of the gas is purified by the gas purification component 300 and flows back into the chamber body 100. The opening of the first vacuum valve 610 is adjusted to the maximum opening to improve the working efficiency of the gas purification component 300. Of course, the opening of the first vacuum valve 610 can also be adjusted to three-quarters or two-thirds, etc., which can be flexibly selected according to actual needs and is not limited here. In addition, the first vacuum valve 610 and the second vacuum valve 620 are used to accurately control the gas flow rate extracted from the chamber body 100 and the gas flow rate entering the chamber body 100 after purification.
[0056] In another optional embodiment, after the first air extraction component 200 is turned on in step S120, the control method further includes:
[0057] S150, obtaining the working time of the first air extraction component 200.
[0058] S160 , when the working time of the first vacuum component 200 is greater than or equal to a preset threshold value, and the water oxygen content is greater than or equal to a preset value, close the second vacuum valve 620 and check the gas purification component 300 .
[0059] The preset threshold here can be a specific value or a range of values, and is not specifically limited here.
[0060] In this scheme, when the working time of the first vacuum component 200 is greater than or equal to the preset threshold value, and the water oxygen content in the chamber body 100 is still greater than or equal to the preset value, it indicates that the gas purification component 300 has a fault. At this time, it is necessary to close the second vacuum valve 620 to check the gas purification component 300 to avoid equipment waste.
[0061] In another optional embodiment, the control method further includes:
[0062] S170: When the water oxygen content is less than a preset value, close the second vacuum valve 620.
[0063] In this scheme, when the water-oxygen content is less than the preset value, it means that the water-oxygen content in the gas in the chamber body 100 is low and is not enough to cause corrosion to the gas pipeline arranged in the chamber body 100, or the degree of corrosion is small and can be ignored. Therefore, the second vacuum valve 620 is closed to improve the vacuum efficiency.
[0064] In another optional embodiment, the semiconductor process chamber further includes a third vacuum valve 630 and a fourth vacuum valve 640, both of which are disposed on the circulation pipeline 700, the third vacuum valve 630 is located between the first vent hole 110 and the gas purification component 300, and the fourth vacuum valve 640 is located between the second vent hole 120 and the first exhaust component 200. Before opening the first exhaust component 200 in step S120, the control method further includes:
[0065] S180 , opening the third vacuum valve 630 and the fourth vacuum valve 640 .
[0066] This solution sets a third vacuum valve 630 and a fourth vacuum valve 640 to respectively accurately control the flow rate of gas extracted from the chamber body 100 and the flow rate of gas entering the chamber body 100 after purification, so as to accurately control the working status of the first vacuum assembly 200 and the gas purification assembly 300.
[0067] In a further optional embodiment, after the first air extraction component 200 is turned on in step S120, the control method further includes:
[0068] S190, obtaining the working time of the first air extraction component 200.
[0069] S210. When the working time of the first vacuum component 200 is greater than or equal to a preset threshold value and the water oxygen content is greater than or equal to a preset value, close the first vacuum component 200, the third vacuum valve 630 and the fourth vacuum valve 640, and check the gas purification component 300.
[0070] The preset threshold here can be a specific value or a range of values, and is not specifically limited here.
[0071] In this scheme, when the working time of the first vacuum assembly 200 is greater than or equal to the preset threshold value, and the water oxygen content in the gas in the chamber body 100 is still greater than or equal to the preset value, it indicates that the gas purification assembly 300 has a fault. At this time, it is necessary to close the first vacuum assembly 200, the third vacuum valve 630 and the fourth vacuum valve 640 to check the gas purification assembly 300, so as to avoid equipment waste.
[0072] In another optional embodiment, the control method further includes:
[0073] S220 , when the water oxygen content is less than a preset value, close the first vacuum assembly 200 , the third vacuum valve 630 , and the fourth vacuum valve 640 .
[0074] In this scheme, when the water-oxygen content is less than the preset value, it means that the water-oxygen content of the gas in the chamber body 100 is low and is not enough to cause corrosion to the gas pipeline arranged in the chamber body 100, or the degree of corrosion is small and can be ignored. Therefore, the first vacuum valve 200, the third vacuum valve 630 and the fourth vacuum valve 640 are closed to improve the vacuum efficiency.
[0075] In another optional embodiment, before obtaining the water oxygen content in the chamber body 100, the control method further includes:
[0076] S230 , inputting a process recipe, performing a processing process on the wafer, and transferring the wafer out of the chamber body 100 .
[0077] Optionally, the process recipe may contain corrosive gases such as Cl2 or HBr.
[0078] S240, executing a dry cleaning process, and setting a preset value and a preset threshold.
[0079] In this solution, after the processing of each wafer is completed, the chamber body 100 needs to be dry cleaned so that the environment in the chamber body 100 meets the process conditions for processing the next wafer.
[0080] Optionally, the process formula is as shown in Table 1.
[0081] Table 1
[0082]
[0083] Among them, the gas pressure range in the chamber body 100 is 1 to 200 mTorr, the upper electrode power range is 500 to 15000 W, the O2 flow range is 10 to 1000 sccm, the edge H2 flow range is 10 to 1000 sccm, the SF6 flow range is 10 to 1000 sccm, and the coolant temperature range of the electrostatic chuck 920 is -15 to 100°C (preferably 20°C). No specific limitation is made for each step of the process in Table 1.
[0084] In addition, in actual applications, the metal content of the gas in the gas pipeline in the prior art, the metal content of the gas in the gas pipeline after using the semiconductor process chamber disclosed in the embodiment of the present application, and the metal content of the gas in the gas pipeline after the semiconductor process chamber disclosed in the embodiment of the present application is no longer used after being used for a period of time are respectively shown in Table 2.
[0085] Table 2
[0086]
[0087] Based on Table 2, it can be seen that if the semiconductor process chamber disclosed in the present application is not used, the chromium and iron content in the gas in the gas pipeline exceeds the standard (chromium and iron are important components of stainless steel), which is easy to cause pipeline corrosion; while the embodiment of the present application uses the gas purification component 300 to purify the gas in the chamber body 100, thereby reducing the water and oxygen content in the gas, avoiding corrosion to the gas pipeline, and further reducing the metal elements in the gas.
[0088] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.
Claims
1. A semiconductor process chamber, characterized in that: The invention comprises a chamber body (100), a first air extraction component (200) and a gas purification component (300); the chamber body (100) is provided with a first air vent (110) and a second air vent (120); a first end of the first air extraction component (200) is connected to the first air vent (110); a first end of the gas purification component (300) is connected to the second air vent (120); the first air vent (110) can be connected to the two air vents (120) through the first air extraction component (200) and the gas purification component (300).
2. The semiconductor process chamber according to claim 1, characterized in that: The semiconductor process chamber further comprises an exhaust pipeline (400), an air inlet pipeline (500), a first vacuum valve (610) and a second vacuum valve (620); the first end of the exhaust pipeline (400) is connected to the first vent hole (110); the first exhaust component (200) comprises a first molecular pump (210) and a first mechanical pump (220); the first molecular pump (210) and the first mechanical pump (220) are both arranged on the exhaust pipeline (400), and the first molecular pump (210) is located upstream of the first mechanical pump (220); the first vacuum valve (610) is located upstream of the first mechanical pump (220); Between the first air vent (110) and the first molecular pump (210), the first end of the air intake pipeline (500) is connected to the second air vent (120), the second end of the air intake pipeline (500) is connected to the exhaust pipeline (400), and the second end of the air intake pipeline (500) is located between the first molecular pump (210) and the first mechanical pump (220), the gas purification component (300) is arranged on the air intake pipeline (500), and the second vacuum valve (620) is located between the second air vent (120) and the gas purification component (300).
3. The semiconductor process chamber according to claim 2, characterized in that: The first ventilation hole (110) and the second ventilation hole (120) are both opened on the bottom wall (150) of the chamber body (100).
4. The semiconductor process chamber according to claim 1, wherein: The semiconductor process chamber also includes a circulation pipeline (700) and a second exhaust assembly (800), wherein the first end of the circulation pipeline (700) is connected to the first vent hole (110), and the second end of the circulation pipeline (700) is connected to the second vent hole (120). The first exhaust assembly (200) and the gas purification assembly (300) are arranged at intervals on the circulation pipeline (700), and the first exhaust assembly (200) is located downstream of the gas purification assembly (300). The chamber body (100) is also provided with a third vent hole (130) and a fourth vent hole (140), and the second exhaust assembly (800) is respectively connected to the third vent hole (130) and the fourth vent hole (140).
5. The semiconductor process chamber according to claim 4, characterized in that: The semiconductor process chamber also includes a third vacuum valve (630) and a fourth vacuum valve (640), and the third vacuum valve (630) and the fourth vacuum valve (640) are both arranged on the circulation pipeline (700), the third vacuum valve (630) is located between the first ventilation hole (110) and the gas purification component (300), and the fourth vacuum valve (640) is located between the second ventilation hole (120) and the first exhaust component (200).
6. The semiconductor process chamber according to claim 4, characterized in that: The semiconductor process chamber further comprises a first vacuum valve (610), a second vacuum valve (620), an exhaust pipeline (400) and an air intake pipeline (500), wherein the first end of the exhaust pipeline (400) is connected to the third vent hole (130), the second exhaust assembly (800) comprises a second molecular pump (810) and a second mechanical pump (820), the second molecular pump (810) and the second mechanical pump (820) are both arranged on the exhaust pipeline (400), and the second molecular pump (810) is located upstream of the second mechanical pump (820), and the air intake pipeline (500) is connected to the third vent hole (130). The first end of the air intake pipe (500) is connected to the fourth air vent (140), the second end of the air intake pipe (500) is connected to the air exhaust pipe (400), and the second end of the air intake pipe (500) is located between the second molecular pump (810) and the second mechanical pump (820), the first vacuum valve (610) is arranged on the air exhaust pipe (400), the first vacuum valve (610) is located between the third air vent (130) and the second molecular pump (810), and the second vacuum valve (620) is arranged on the air intake pipe (500).
7. The semiconductor process chamber according to claim 4, characterized in that: The first vent hole (110) and the second vent hole (120) are both opened on the side wall (160) of the chamber body (100); The third ventilation hole (130) and the fourth ventilation hole (140) are both opened on the bottom wall (150) of the chamber body (100).
8. The semiconductor process chamber according to claim 1, wherein: The gas purification component (300) comprises an activated carbon adsorbent, a molecular sieve and a copper catalyst, the activated carbon adsorbent is connected to the second vent hole (120), and the molecular sieve is arranged between the activated carbon adsorbent and the copper catalyst.
9. A control method for a semiconductor process chamber, applied to the semiconductor process chamber according to any one of claims 1 to 8, characterized in that: include: obtaining the water oxygen content in the chamber body; When the water oxygen content is greater than or equal to a preset value, the first exhaust component is turned on to exhaust the chamber body; The operation of obtaining the water-oxygen content in the chamber body is performed at preset time intervals until the water-oxygen content is less than the preset value or the total pumping time reaches a preset threshold.
10. The control method according to claim 9, characterized in that: The semiconductor process chamber also includes an exhaust pipeline, an air intake pipeline, a first vacuum valve and a second vacuum valve, the first end of the exhaust pipeline is connected to the first vent, the first exhaust component includes a first molecular pump and a first mechanical pump, the first molecular pump and the first mechanical pump are both arranged in the exhaust pipeline, and the first molecular pump is located upstream of the first mechanical pump, the first end of the intake pipeline is connected to the second vent, the second end of the intake pipeline is connected to the exhaust pipeline, and the second end of the intake pipeline is located between the first molecular pump and the first mechanical pump, the gas purification component is arranged in the intake pipeline, the first vacuum valve is arranged in the exhaust pipeline, and the first vacuum valve is located between the first vent and the molecular pump, the second vacuum valve is arranged in the intake pipeline, and the second vacuum valve is located between the second vent and the gas purification component; Before starting the first air extraction component, the control method further includes: The opening of the first vacuum valve is adjusted to a maximum opening, and the second vacuum valve is opened.
11. The control method according to claim 9, characterized in that: The semiconductor process chamber further comprises a third vacuum valve and a fourth vacuum valve, both of which are arranged on the circulation pipeline, the third vacuum valve is located between the first vent hole and the gas purification component, and the fourth vacuum valve is located between the second vent hole and the first exhaust component; Before starting the first air extraction component, the control method further includes: The third vacuum valve and the fourth vacuum valve are opened.