Distributed photovoltaic hierarchical regulation and control method and system
Through the distributed photovoltaic layered control method, the output power of distributed photovoltaic clusters and the operation of photovoltaic inverters are optimized, which solves the problem of photovoltaic consumption loss in the distribution network, improves the stability of the power grid and energy utilization efficiency, and reduces power loss.
Patent Information
- Application Number
- CN202410913938.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-29
AI Technical Summary
The penetration rate of existing distributed photovoltaic systems in the distribution network has increased, resulting in the inability to effectively monitor and adjust the operating status, causing difficulties in grid load prediction and challenges to safe and economical operation. There are also major problems in the process of photovoltaic consumption across distribution areas. Power loss.
The distributed photovoltaic layered control method is adopted to collect distribution network operation data, establish loss models and operating constraints, calculate the output power control instructions of each distributed photovoltaic cluster, and optimize the output power of photovoltaic inverters to reduce power distribution Grid losses are reduced, and energy storage and loads are adjusted at the photovoltaic cluster level to maximize photovoltaic consumption capabilities.
It improves the sustainability and stability of the system, optimizes energy utilization efficiency, reduces transmission line losses, enhances the ability to support the power grid, and reduces unnecessary energy waste.
Smart Images

Figure CN118868263A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid regulation, and more specifically, to a distributed photovoltaic layered regulation method and system. Background Art
[0002] With the vigorous development of distributed photovoltaics, the penetration rate of distributed photovoltaics in distribution networks is getting higher and higher. The operating status of a large number of distributed photovoltaics cannot be monitored and adjusted, which brings challenges to the accurate prediction of grid load and safe and economical operation. In serious cases, it will have an impact on the grid, which not only threatens the safety of the grid itself, but also affects the safe use of electricity by residents.
[0003] After searching, the patent document with the existing publication number CN109450001B provides a method for allocating photovoltaic output in distribution station areas. The method divides the distribution station areas into first-class distribution station areas and second-class distribution station areas; collects distribution data of the first-class distribution station areas and the second-class distribution station areas respectively at preset intervals; screens out the distribution stations with excess photovoltaic output in the two types of distribution station areas respectively; allocates the excess photovoltaic output of the distribution stations with excess photovoltaic output in the first-class distribution station areas to the distribution stations with no excess photovoltaic output for consumption, and allocates the excess photovoltaic output in the second-class distribution station areas to the distribution stations with no excess photovoltaic output for consumption; allocates the excess photovoltaic output in the first-class distribution station areas to the distribution stations with no excess photovoltaic output in the second-class distribution station areas for consumption.
[0004] The above method uses multiple distribution stations to achieve photovoltaic consumption, but does not consider the loss in the process of photovoltaic consumption across distribution stations, which leads to large power loss. In view of this, we propose a distributed photovoltaic hierarchical control method and system. Summary of the invention
[0005] 1. Technical issues to be solved
[0006] The purpose of the present invention is to provide a distributed photovoltaic layered control method and system to solve the problems raised in the above background technology.
[0007] 2. Technical solution
[0008] The present invention is achieved through the following technical solutions:
[0009] A distributed photovoltaic layered control method and system, comprising the following steps:
[0010] S1. Collect distribution network operation data parameters and establish distribution network operation constraints;
[0011] S2. Establish a distribution network operation loss model;
[0012] S3, with the goal of minimizing the operating loss of the distribution network, calculate the output power control instructions of each distributed photovoltaic cluster;
[0013] S4. Regulating each photovoltaic cluster according to the output power control instruction of each distributed photovoltaic cluster;
[0014] S5. Collect the operating parameters of transformers, energy storage equipment, loads and photovoltaic inverters in the photovoltaic cluster, and establish operating constraints for the distributed photovoltaic cluster;
[0015] S6. Establishing a photovoltaic cluster output power model;
[0016] S7, with the goal of maximizing the output power of the photovoltaic cluster, calculating the output power control instructions of each photovoltaic inverter;
[0017] S8. According to the output power control instruction of each photovoltaic inverter, the output power of each photovoltaic inverter is adjusted.
[0018] As an optional solution of the technical solution of this application document, in S1, the distribution network operation constraints include: distributed photovoltaic cluster operation constraints, energy storage fixed operation constraints, distribution network line operation constraints, and distribution network voltage safety margin constraints;
[0019] The operating constraints of distributed photovoltaic clusters are:
[0020]
[0021] In the formula, NK is the number of distributed photovoltaic clusters; and They are respectively the active power of the distributed photovoltaic cluster nk in period t and the reactive power of the distributed photovoltaic cluster nk suitable for grid peak regulation in period t; are respectively the upper limits of active and reactive power of distributed photovoltaic cluster nk in period t; is the total peak load demand of NK distributed photovoltaic clusters in period t;
[0022] The fixed operation constraints of energy storage are:
[0023]
[0024] In the formula, is the operation plan of the grid-connected energy storage device ne at the distribution network node n during the period t;
[0025] The operation constraints of the distribution network lines are:
[0026]
[0027] In the formula, and are the rated apparent powers of the injection power line nle and the outflow power line nls at the distribution network node n respectively; and are the active powers of the injected power line nle and the outflow power line nls at the node n of the distribution network in period t; and They are the reactive power of the injected power line nle and the outflow power line nls at the distribution network node n during period t;
[0028] The safe operation constraints of the distribution network are:
[0029]
[0030] In the formula, u n,t is the effective value of the voltage at the distribution network node n in period t; are the lower limit and upper limit of the effective value of the voltage at the distribution network node n in time period t, respectively.
[0031] As an optional solution of the technical solution of this application document, in S2, the distribution network operation loss model is:
[0032]
[0033] Where, T and L are the calculation time length and the number of distribution network lines respectively; P loss is the active power loss of the distribution network; is the active power loss of the lth line in period t;
[0034] The active power loss of the lth line in period t is The calculation formula is as follows:
[0035]
[0036]
[0037] In the formula, and are the active power transmitted at the head and end of distribution network line l in time period t; and are the reactive power transmitted at the head and end of distribution network line l during time period t; and are the effective values of the voltage transmitted at the beginning and end of the distribution network line l during the period t; r l is the resistance of the distribution network line l;
[0038] The distribution network lines include the injection power interconnection lines and the outflow power interconnection lines at each distribution network node. At each node of the distribution network, the active power and reactive power of the injection power interconnection lines and the outflow power interconnection lines need to meet the power balance constraints:
[0039]
[0040] Where NLE, NLS, NE, and NK are the number of injected power interconnection lines, the number of outflow power interconnection lines, the number of grid-connected energy storage devices, and the number of distributed photovoltaic clusters at the distribution network node n, respectively; They are the active powers of the injection power interconnection line nle, outflow power interconnection line nls, grid-connected energy storage equipment ne, and distributed photovoltaic cluster nk in period t; They are the reactive power of the injection power interconnection line nle, outflow power interconnection line nls, grid-connected energy storage equipment ne, and distributed photovoltaic cluster nk in period t; They are respectively the active power and reactive power demands of the grid-connected load at distribution network node n in period t.
[0041] As an optional solution of the technical solution of this application document, in S5, the distributed photovoltaic cluster operation constraints include: power balance constraints of the power grid within the cluster, voltage deviation constraints within the cluster, transformer capacity constraints, line current carrying capacity constraints, photovoltaic operation constraints within the cluster, and energy storage regulation potential constraints within the cluster;
[0042] The power balance constraint of the grid within the cluster is:
[0043]
[0044] Where: P T (t) is the active power transmitted by the transformer; P PV,n' (t), Q PV,n' (t) are the active power and reactive power of the PV inverter n' in the PV cluster nk at time t; P ESS,ch,m (t), P ESS,dis,m (t) are the charging and discharging power of the energy storage m in the photovoltaic cluster nk at time t; P L,i (t) is the active power of load i in PV cluster nk at time t; Q L,i (t) is the reactive power of load i in PV cluster nk at time t; Q SVG (t) is the reactive power of SVG in PV cluster nk at time t; P loss (t) is the network active power loss in the photovoltaic cluster nk at time t; Q loss (t) is the network reactive power loss in the photovoltaic cluster nk at time t; N', M, and I are the number of photovoltaic inverters, energy storage, and load nodes in the photovoltaic cluster nk, respectively;
[0045] Voltage deviation constraint:
[0046] 0.9U N ≤U i (t)≤1.07U N ;
[0047] Where: U N For 220V, U i (t) is the voltage at node i in the PV cluster nk at time t;
[0048] Transformer capacity constraints:
[0049] -0.8S T ≤P T (t)≤S T
[0050] Where: S T is the transformer capacity limit within the PV cluster nk, P T (t) is the transformer capacity in the PV cluster nk at time t;
[0051] Line current carrying capacity constraints:
[0052] I ij,min ≤I ij (t)≤I ij,max
[0053] Where: I ij,min , I ij,max are the lower and upper limits of the current of line ij in PV cluster nk, respectively. ij (t) is the current of line ij in PV cluster nk at time t;
[0054] PV operation constraints within the cluster:
[0055]
[0056] Where P PV is the active power of the photovoltaic inverter in the photovoltaic cluster nk, Q PV is the reactive power of the photovoltaic inverter in the photovoltaic cluster nk, S PV is the rated capacity of the PV inverter in the PV cluster nk;
[0057] Constraints on the energy storage regulation potential within the cluster:
[0058] 0≤P ESS,dis (t)≤P ESS,out B dis (t)
[0059] 0≤P ESS,ch (t)≤P ESS,out B ch(t)
[0060] Where: P ESS,ch (t), P ESS,dis (t) are the charging power and discharging power of the energy storage in the photovoltaic cluster nk at time t; P ESS,out B is the maximum charging and discharging power of energy storage in the photovoltaic cluster nk; dis (t), B ch (t) are all 0-1 variables and must satisfy B dis (t)+B ch (t)≤1.
[0061] As an optional solution of the technical solution of this application document, in S5, the output power model of the distributed photovoltaic cluster is:
[0062]
[0063] Where: P PV is the active power of the photovoltaic inverter in the photovoltaic cluster nk, P PV,n' (t) is the active power of PV inverter n' in PV cluster nk at time t, and N' is the number of PV inverters in PV cluster nk.
[0064] As an optional solution of the technical solution of this application document, it also includes: S9, repeating S7 and S8.
[0065] 3. Beneficial effects
[0066] Compared with the prior art, the present invention has the following beneficial effects:
[0067] 1. The present invention adopts a hierarchical optimization method to first allocate control targets to each distributed photovoltaic cluster according to the peak-shaving demand at the distribution network layer; then allocate control targets to each photovoltaic inverter at the distributed photovoltaic cluster layer according to the control targets; by allocating control targets at different levels, the sustainability and stability of the system can be improved, the synergy between different photovoltaic clusters can be ensured, the overall energy utilization efficiency can be optimized, and the photovoltaic system's support capacity for grid peak-shaving can be maximized.
[0068] 2. The present invention adopts the goal of minimizing the loss of distribution network operation, and regulates the output power of each distributed photovoltaic cluster, which reduces the need for long-distance energy transmission, thereby reducing the loss on the transmission line. This optimization helps to improve the energy distribution efficiency of the power grid and reduce unnecessary energy waste.
[0069] 3. The present invention takes the maximum output power of the photovoltaic cluster as the goal, and regulates the transformers, energy storage equipment, loads, photovoltaic inverters and other equipment in the photovoltaic cluster, which can fully utilize the solar energy and the photovoltaic absorption capacity in the photovoltaic cluster and increase the utilization rate of energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0070] Figure 1 It is a flow chart of a distributed photovoltaic layered control method;
[0071] Figure 2 It is a block diagram of a distributed photovoltaic hierarchical control system. DETAILED DESCRIPTION
[0072] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings.
[0073] Embodiment 1:
[0074] See also Figure 1 , the present invention provides a technical solution:
[0075] A distributed photovoltaic layered control method and system, comprising the following steps:
[0076] S1. Collect distribution network operation data parameters and establish distribution network operation constraints;
[0077] S2. Establish a distribution network operation loss model;
[0078] S3, with the goal of minimizing the operating loss of the distribution network, calculate the output power control instructions of each distributed photovoltaic cluster;
[0079] S4. Regulating each photovoltaic cluster according to the output power control instruction of each distributed photovoltaic cluster;
[0080] S5. Collect the operating parameters of transformers, energy storage equipment, loads and photovoltaic inverters in the photovoltaic cluster, and establish operating constraints for the distributed photovoltaic cluster;
[0081] S6. Establishing a photovoltaic cluster output power model;
[0082] S7, with the goal of maximizing the output power of the photovoltaic cluster, calculating the output power control instructions of each photovoltaic inverter;
[0083] S8. According to the output power control instruction of each photovoltaic inverter, the output power of each photovoltaic inverter is adjusted.
[0084] The above method will be demonstrated below with a specific implementation case:
[0085] S1. Obtain the peak load demand of the distribution network through the smart grid dispatching and control system, and establish the distribution network operation constraints according to the attributes of the distribution network; the distribution network operation constraints include: distributed photovoltaic cluster operation constraints, energy storage fixed operation constraints, distribution network line operation constraints, and distribution network voltage safety margin constraints.
[0086] The operating constraints of distributed photovoltaic clusters are:
[0087]
[0088] In the formula, NK is the number of distributed photovoltaic clusters; and They are respectively the active power of the distributed photovoltaic cluster nk in period t and the reactive power of the distributed photovoltaic cluster nk suitable for grid peak regulation in period t; are respectively the upper limits of active and reactive power of distributed photovoltaic cluster nk in period t; is the total peak load demand of NK distributed photovoltaic clusters in period t;
[0089] The fixed operation constraints of energy storage are:
[0090]
[0091] In the formula, is the operation plan of the grid-connected energy storage device ne at the distribution network node n during the period t;
[0092] The operation constraints of the distribution network lines are:
[0093]
[0094] In the formula, and are the rated apparent powers of the injection power line nle and the outflow power line nls at the distribution network node n respectively; and are the active powers of the injected power line nle and the outflow power line nls at the node n of the distribution network in period t; and They are the reactive power of the injected power line nle and the outflow power line nls at the distribution network node n during period t;
[0095] The safe operation constraints of the distribution network are:
[0096]
[0097] In the formula, u n,t is the effective value of the voltage at the distribution network node n in period t; are the lower limit and upper limit of the effective value of the voltage at the distribution network node n in time period t, respectively.
[0098] S2. Establish the operation loss model of the distribution network:
[0099]
[0100] Where, T and L are the calculation time length and the number of distribution network lines respectively; Ploss is the active power loss of the distribution network; is the active power loss of the lth line in period t;
[0101] The active power loss of the lth line in period t is The calculation formula is as follows:
[0102]
[0103] In the formula, and are the active power transmitted at the head and end of distribution network line l in time period t; and are the reactive power transmitted at the head and end of distribution network line l during time period t; and are the effective values of the voltage transmitted at the beginning and end of the distribution network line l during the period t; r l is the resistance of the distribution network line l;
[0104] The distribution network lines include the injection power interconnection lines and the outflow power interconnection lines at each distribution network node. At each node of the distribution network, the active power and reactive power of the injection power interconnection lines and the outflow power interconnection lines need to meet the power balance constraints:
[0105]
[0106] Where NLE, NLS, NE, and NK are the number of injected power interconnection lines, the number of outflow power interconnection lines, the number of grid-connected energy storage devices, and the number of distributed photovoltaic clusters at the distribution network node n, respectively; They are the active powers of the injection power interconnection line nle, outflow power interconnection line nls, grid-connected energy storage equipment ne, and distributed photovoltaic cluster nk in period t; They are the reactive power of the injection power interconnection line nle, outflow power interconnection line nls, grid-connected energy storage equipment ne, and distributed photovoltaic cluster nk in period t; They are respectively the active power and reactive power demands of the grid-connected load at distribution network node n in period t.
[0107] S3. Considering the losses generated during the power dispatching process at the distribution network level and the operating constraints of the distribution network, the output power of each distributed photovoltaic cluster is optimized to reduce the line losses of the distribution network and achieve the goal of minimizing the operating losses of the distribution network; according to the calculation results, output power control instructions are assigned to each distributed photovoltaic cluster.
[0108] S4. The output power control instructions of each distributed photovoltaic cluster are used to adjust each photovoltaic cluster. The adjustment methods include adjusting the charging or discharging power of the energy storage device, adjusting the output power of the photovoltaic inverter, the load operating status, etc., to ensure the stable operation of the distribution network.
[0109] S5. The adjustment method in step S4 cannot fully utilize the photovoltaic absorption capacity in the photovoltaic cluster. It is necessary to collect the operating parameters of the transformer, energy storage equipment, load and photovoltaic inverter in the photovoltaic cluster, establish the operating constraints of the distributed photovoltaic cluster, and optimize the adjustment method of the photovoltaic cluster.
[0110] Distributed photovoltaic cluster operation constraints include: power balance constraints of the power grid within the cluster, voltage deviation constraints within the cluster, transformer capacity constraints, line current carrying capacity constraints, photovoltaic operation constraints within the cluster, and energy storage regulation potential constraints within the cluster;
[0111] The power balance constraint of the grid within the cluster is:
[0112]
[0113] Where: P T (t) is the active power transmitted by the transformer; P PV,n' (t), Q PV,n' (t) are the active power and reactive power of the PV inverter n' in the PV cluster nk at time t; P ESS,ch,m (t), P ESS,dis,m (t) are the charging and discharging power of the energy storage m in the photovoltaic cluster nk at time t; P L,i (t) is the active power of load i in PV cluster nk at time t; Q L,i (t) is the reactive power of load i in PV cluster nk at time t; Q SVG (t) is the reactive power of SVG in PV cluster nk at time t; P loss (t) is the network active power loss in the photovoltaic cluster nk at time t; Q loss (t) is the network reactive power loss in the photovoltaic cluster nk at time t; N', M, and I are the number of photovoltaic inverters, energy storage, and load nodes in the photovoltaic cluster nk, respectively;
[0114] Voltage deviation constraint:
[0115] 0.9U N ≤U i (t)≤1.07U N ;
[0116] Where: U N For 220V, U i (t) is the voltage at node i in the PV cluster nk at time t;
[0117] Transformer capacity constraints:
[0118] -0.8S T ≤P T (t)≤S T
[0119] Where: S T is the transformer capacity limit within the PV cluster nk, P T (t) is the transformer capacity in the PV cluster nk at time t;
[0120] Line current carrying capacity constraints:
[0121] I ij,min ≤I ij (t)≤I ij,max
[0122] Where: I ij,min , I ij,max are the lower and upper limits of the current of line ij in PV cluster nk, respectively. ij (t) is the current of line ij in PV cluster nk at time t;
[0123] PV operation constraints within the cluster:
[0124]
[0125] Where P PV is the active power of the photovoltaic inverter in the photovoltaic cluster nk, Q PV is the reactive power of the photovoltaic inverter in the photovoltaic cluster nk, S PV is the rated capacity of the PV inverter in the PV cluster nk;
[0126] Constraints on the energy storage regulation potential within the cluster:
[0127] 0≤P ESS,dis (t)≤P ESS,out B dis (t)
[0128] 0≤P ESS,ch (t)≤P ESS,out B ch (t)
[0129] Where: P ESS,ch (t), P ESS,dis (t) are the charging power and discharging power of the energy storage in the photovoltaic cluster nk at time t; P ESS,out B is the maximum charging and discharging power of energy storage in the photovoltaic cluster nk; dis (t), B ch (t) are all 0-1 variables and must satisfy B dis (t)+B ch(t)≤1.
[0130] S6. Establish a distributed photovoltaic cluster output power model:
[0131]
[0132] Where: P PV is the active power of the photovoltaic inverter in the photovoltaic cluster nk, P PV,n' (t) is the active power of PV inverter n' in PV cluster nk at time t, and N' is the number of PV inverters in PV cluster nk.
[0133] S7. According to the operating constraints of the distributed photovoltaic cluster, the active power of the photovoltaic inverters in the photovoltaic cluster is optimized, the maximum active power of the photovoltaic inverter allowed by the photovoltaic absorption capacity in the photovoltaic cluster is calculated, and the output power control instructions of each photovoltaic inverter in the photovoltaic cluster are generated.
[0134] S8. According to the output power control instructions of each photovoltaic inverter, the output power of each photovoltaic inverter in the photovoltaic cluster is adjusted to make full use of the solar energy and the photovoltaic absorption capacity in the photovoltaic cluster to increase the utilization rate of energy;
[0135] After optimizing the photovoltaic cluster through the above steps, the operating state of the photovoltaic cluster will also change, resulting in the output power of the photovoltaic inverter no longer matching the photovoltaic absorption capacity in the photovoltaic cluster. Therefore, step S9 needs to be set after the above steps.
[0136] S9. Adopt a rolling optimization approach and repeat S7-S8, so that the output power of the photovoltaic inverter can dynamically adapt to the dynamic changes of the photovoltaic absorption capacity within the photovoltaic cluster.
[0137] Embodiment 2:
[0138] The present invention provides a distributed photovoltaic layered control system, which adopts a distributed photovoltaic layered control method described in Example 1; comprising:
[0139] A front-end collection server, which is used to collect operating data of transformers, energy storage devices, loads and photovoltaic inverters in a photovoltaic cluster;
[0140] An edge controller, which is used to control the operating parameters of the transformer, energy storage device, load and photovoltaic inverter in the photovoltaic cluster, and is connected to the front-end acquisition server for communication;
[0141] A basic control server, the basic control server is communicatively connected with the front-end acquisition server;
[0142] A master station application server, wherein the master station application server is communicatively connected with the basic control server.
[0143] The edge controller and the front-end acquisition server, the basic control server and the front-end acquisition server, the main station application server and the basic control server are all connected in communication using encryption methods, and there is at least one encryption method.
[0144] In this system, the master application server obtains static ledger data, real-time operation data and historical operation data of the main distribution network bus, equipment, feeder, power supply, load, etc. through the smart grid dispatching system; stores load, distributed photovoltaic short-term forecast and ultra-short-term forecast data, and generates and issues distributed photovoltaic related control instruction data;
[0145] The basic control server uses a forward and reverse isolation device to interact with the main station application server to obtain distributed photovoltaic related control instruction data;
[0146] The front-end acquisition server uses a forward and reverse isolation device to interact with the basic control server for data collection, which is used to collect the measured data sent by the edge terminal controller and distributed photovoltaics, realize the unified processing of distributed photovoltaic data, and forward the control instructions of the basic control server to the corresponding edge controller;
[0147] The edge controller uses vertical encryption to exchange data with the basic control server and is responsible for the autonomous operation of the connected distributed photovoltaics.
[0148] The basic control server is also used to receive and classify the photovoltaic operation information sent by the front-end acquisition server, synchronize the main distribution network operation information of the master station application server, and realize the classification and configuration management of different types of data such as static ledger data, real-time operation data, historical operation data, forecast data, control instruction data, etc.
Claims
1. A distributed photovoltaic layered control method, characterized in that: The following steps are involved: S1. Collect distribution network operation data parameters and establish distribution network operation constraints; S2. Establishing the distribution network operation loss model; S3, with the goal of minimizing the operating loss of the distribution network, calculate the output power control instructions of each distributed photovoltaic cluster; S4. Regulating each photovoltaic cluster according to the output power control instruction of each distributed photovoltaic cluster; S5. Collect the operating parameters of transformers, energy storage equipment, loads and photovoltaic inverters in the photovoltaic cluster, and establish operating constraints for the distributed photovoltaic cluster; S6. Establishing a photovoltaic cluster output power model; S7, with the goal of maximizing the output power of the photovoltaic cluster, calculating the output power control instructions of each photovoltaic inverter; S8. According to the output power control instruction of each photovoltaic inverter, the output power of each photovoltaic inverter is adjusted.
2. A distributed photovoltaic layered control method according to claim 1, characterized in that: In S1, the distribution network operation constraints include: distributed photovoltaic cluster operation constraints, energy storage fixed operation constraints, distribution network line operation constraints, and distribution network voltage safety margin constraints; The operating constraints of distributed photovoltaic clusters are: In the formula, NK is the number of distributed photovoltaic clusters; and They are respectively the active power of the distributed photovoltaic cluster nk in period t and the reactive power of the distributed photovoltaic cluster nk suitable for grid peak regulation in period t; are respectively the upper limits of active and reactive power of distributed photovoltaic cluster nk in period t; is the total peak load demand of NK distributed photovoltaic clusters in period t; The fixed operation constraints of energy storage are: In the formula, is the operation plan of the grid-connected energy storage device ne at the distribution network node n during the period t; The operation constraints of the distribution network lines are: In the formula, and are the rated apparent powers of the injection power line nle and the outflow power line nls at the distribution network node n respectively; and are the active powers of the injected power line nle and the outflow power line nls at the node n of the distribution network in period t; and They are the reactive power of the injected power line nle and the outflow power line nls at the distribution network node n during period t; The safe operation constraints of the distribution network are: In the formula, u n,t is the effective value of the voltage at the distribution network node n in period t; are the lower limit and upper limit of the effective value of the voltage at the distribution network node n in time period t, respectively.
3. A distributed photovoltaic layered control method according to claim 1, characterized in that: In S2, the distribution network operation loss model is: Where, T and L are the calculation time length and the number of distribution network lines respectively; P loss is the active power loss of the distribution network; is the active power loss of the lth line in period t; The active power loss of the lth line in period t is The calculation formula is as follows: In the formula, and are the active power transmitted at the head and end of distribution network line l in time period t; and are the reactive power transmitted at the head and end of distribution network line l during time period t; and are the effective values of the voltage transmitted at the head and end of the distribution network line l during time period t; r l is the resistance of the distribution network line l; The distribution network lines include the injection power interconnection lines and the outflow power interconnection lines at each distribution network node. At each node of the distribution network, the active power and reactive power of the injection power interconnection lines and the outflow power interconnection lines need to meet the power balance constraints: Where NLE, NLS, NE, and NK are the number of injected power interconnection lines, the number of outflow power interconnection lines, the number of grid-connected energy storage devices, and the number of distributed photovoltaic clusters at the distribution network node n, respectively; They are the active powers of the injection power interconnection line nle, outflow power interconnection line nls, grid-connected energy storage equipment ne, and distributed photovoltaic cluster nk in period t; They are the reactive power of the injection power interconnection line nle, outflow power interconnection line nls, grid-connected energy storage equipment ne, and distributed photovoltaic cluster nk in period t; They are respectively the active power and reactive power demands of the grid-connected load at distribution network node n in period t.
4. A distributed photovoltaic layered control method according to claim 3, characterized in that: In S5, the distributed photovoltaic cluster operation constraints include: power balance constraints of the power grid within the cluster, voltage deviation constraints within the cluster, transformer capacity constraints, line current carrying capacity constraints, photovoltaic operation constraints within the cluster, and energy storage regulation potential constraints within the cluster; The power balance constraint of the grid within the cluster is: Where: P T (t) is the active power transmitted by the transformer; P PV,n' (t), Q PV,n' (t) are the active power and reactive power of the PV inverter n' in the PV cluster nk at time t; P ESS,ch,m (t), P ESS,dis,m (t) are the charging and discharging power of the energy storage m in the photovoltaic cluster nk at time t; P L,i (t) is the active power of load i in PV cluster nk at time t; Q L,i (t) is the reactive power of load i in PV cluster nk at time t; Q SVG (t) is the reactive power of SVG in PV cluster nk at time t; P loss (t) is the network active power loss in the photovoltaic cluster nk at time t; Q loss (t) is the network reactive power loss in the photovoltaic cluster nk at time t; N', M, and I are the number of photovoltaic inverters, energy storage, and load nodes in the photovoltaic cluster nk, respectively; Voltage deviation constraint: 0.9U N ≤U i (t)≤1.07U N ; Where: U N For 220V, U i (t) is the voltage at node i in the PV cluster nk at time t; Transformer capacity constraints: -0.8S T ≤P T (t)≤S T Where: S T is the transformer capacity limit within the PV cluster nk, P T (t) is the transformer capacity in the PV cluster nk at time t; Line current carrying capacity constraints: I ij,min ≤I ij (t)≤I ij,max Where: I ij,min , I ij,max are the lower and upper limits of the current of line ij in PV cluster nk, respectively. ij (t) is the current of line ij in PV cluster nk at time t; PV operation constraints within the cluster: Where P PV is the active power of the photovoltaic inverter in the photovoltaic cluster nk, Q PV is the reactive power of the photovoltaic inverter in the photovoltaic cluster nk, S PV is the rated capacity of the PV inverter in the PV cluster nk; Constraints on the energy storage regulation potential within the cluster: 0≤P ESS,dis (t)≤P ESS,out B dis (t) 0≤P ESS,ch (t)≤P ESS,out B ch (t) Where: P ESS,ch (t), P ESS,dis (t) are the charging power and discharging power of the energy storage in the photovoltaic cluster nk at time t; P ESS,out B is the maximum charging and discharging power of energy storage in the photovoltaic cluster nk; dis (t), B ch (t) are all 0-1 variables and must satisfy B dis (t)+B ch (t)≤1.
5. A distributed photovoltaic layered control method according to claim 1, characterized in that: In S5, the distributed photovoltaic cluster output power model is: Where: P PV is the active power of the photovoltaic inverter in the photovoltaic cluster nk, P PV,n' (t) is the active power of PV inverter n' in PV cluster nk at time t, and N' is the number of PV inverters in PV cluster nk.
6. A distributed photovoltaic layered control method according to claim 1, characterized in that: Also includes: S9. Repeat S7 and S8.
7. A distributed photovoltaic hierarchical control system, characterized in that: A distributed photovoltaic layered control method as described in any one of claims 1 to 6 is adopted; comprising: A front-end collection server, which is used to collect operating data of transformers, energy storage devices, loads and photovoltaic inverters in a photovoltaic cluster; An edge controller, which is used to control the operating parameters of the transformer, energy storage device, load and photovoltaic inverter in the photovoltaic cluster, and is connected to the front-end acquisition server for communication; A basic control server, the basic control server is communicatively connected with the front-end acquisition server; A master station application server, wherein the master station application server is communicatively connected with the basic control server.
8. A distributed photovoltaic hierarchical control system according to claim 7, characterized in that: The edge controller and the front-end acquisition server, the basic control server and the front-end acquisition server, and the main station application server and the basic control server are all connected in encrypted communication.
9. A distributed photovoltaic hierarchical control system according to claim 8, characterized in that: The encryption method is at least one.
Citation Information
Cited By
Voltage control method and device for cluster in power distribution network and computer equipment
CN120109824A
Instruction issuing method and system based on regulation and control cloud development distributed group regulation and group control
CN121791304A
