Real-time monitoring system and method for grid-connected operation of generator sets

Through real-time monitoring and influencing factor analysis, a grid-connected operation monitoring system for generator sets with adaptive monitoring intervals is formulated, which solves the problems of data redundancy and monitoring intervention in traditional monitoring methods, improves monitoring efficiency and data effectiveness, and ensures generator sets Parameter stability.

CN118868420BActive Publication Date: 2024-12-06SHANDONG SULI POWER TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411336882.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-12-06
Estimated Expiration
2044-09-25

AI Technical Summary

Technical Problem

The monitoring methods of traditional generator sets are subject to data redundancy and shortening of the life of monitoring instruments, and some monitoring methods will interfere with the grid connection process, making it difficult to deal with grid parameter fluctuations and abnormal situations in real time.

Method used

The grid-connected operation parameter acquisition module, generator set parameter monitoring response module, correlation factor timing monitoring module and correlation impact model planning module are adopted. Through real-time data acquisition and influencing factor analysis, an impact status determination module is established, and monitoring intervals that adapt to different influencing factors are formulated. time, improve monitoring efficiency and data effectiveness.

Benefits of technology

It reduces the redundancy of monitoring data, improves the timeliness and effectiveness of monitoring data, adapts to the degree of influence of different influencing factors, ensures that the generator set parameters are within the normal range, and avoids monitoring intervention and shortening of equipment life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118868420B_ABST
    Figure CN118868420B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of generator set operation monitoring, and specifically, to a real-time monitoring system for grid-connected operation of a generator set and a monitoring method thereof. The system comprises a generator set parameter monitoring response module, a correlation factor timing monitoring module, a correlation influence model planning module and an influence state determination module. The present invention determines the influence state of the current influence factor by combining the real-time data collected by each influence factor and the corresponding influence score through the influence state determination module, and feeds back the influence state to the generator set parameter monitoring response module. The generator set parameter monitoring response module combines the influence state, matches the corresponding unit interval time, and performs generator set matching parameter monitoring work according to the matched unit interval time, thereby adapting the influence degree of different influence factors, formulating the adapted unit interval time to perform generator set parameter monitoring work, improving the monitoring effect, reducing the amount of redundant data, and improving the validity of the monitoring data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of generator set operation monitoring, in particular to a real-time monitoring system and a monitoring method for a generator set grid-connected operation. Background Art

[0002] Grid connection technically refers to the physical connection between a generator set, power plant or direct dispatch user and the power grid. From a management perspective, it refers to the establishment of a dispatch relationship between it and the power grid dispatching organization.

[0003] During the process of connecting the generator set to the grid, in order to ensure that the generator set can be connected to the public network synchronously, it is necessary to ensure that its various parameters are consistent with the public network parameters or within the normal difference range. First of all, its operating state must remain stable, that is, the range of changes in various data displayed by the instrument tends to be stable. For example, when the generator is connected to the grid, it is necessary to adjust its output voltage and frequency to be consistent with the public power grid. Generally, the voltage error is required to be less than 1% and the frequency error is less than 0.5%. The voltage and frequency can be accurately adjusted by adjusting the excitation current and speed of the generator. Therefore, during the process of connecting to the grid, the parameters of the generator set need to be monitored in real time to prevent fluctuations in grid parameters, improper operation, and no-load connection after connecting to the grid.

[0004] The traditional method for monitoring the parameters of generator sets after grid connection is mainly to collect real-time data through various monitoring instruments. Under normal conditions, the parameters of various generator sets are stable, which leads to redundancy in the collected data. At the same time, long-term operation of monitoring instruments will also affect their service life, and some monitoring instruments will interfere with the grid connection process. In most cases, changes in the factors around the generator set will cause changes in the corresponding parameters. For example, an increase in the temperature around the generator set will affect the output voltage, current and power of the generator set.

[0005] In order to address the above problems, there is an urgent need for a real-time monitoring system and a monitoring method for the grid-connected operation of a generator set. Summary of the invention

[0006] The object of the present invention is to provide a real-time monitoring system and a monitoring method for the grid-connected operation of a generator set, so as to solve the problems raised in the above-mentioned background technology.

[0007] To achieve the above-mentioned object, one of the objects of the present invention is to provide a real-time monitoring system for the grid-connected operation of a generator set, including a grid-connected operation parameter acquisition module, a generator set parameter monitoring response module, a correlation factor timing monitoring module, a correlation influence model planning module and an influence state determination module;

[0008] The grid-connected operation parameter acquisition module is used to acquire various operation parameters of the public power grid after the generator set is connected to the grid;

[0009] The generator set parameter monitoring response module combines various operating parameters of the public power grid to establish unit monitoring time rules, performs regular monitoring of corresponding parameters of the generator set, and formulates the generator set matching parameter difference range in combination with the operating reference data in the grid-connected industry;

[0010] The correlation factor timing monitoring module obtains the influencing factors of the generator set matching parameter operation, and configures the corresponding monitoring equipment to collect real-time data of each influencing factor;

[0011] The correlation impact model planning module combines the influence degree of each influencing factor in the industry, obtains the influence value of each influencing factor, establishes the correlation impact model, calculates the influence score of each influencing factor, and sorts them;

[0012] The impact status determination module determines the impact status of the current impact factor in combination with the real-time data collected from each impact factor and the corresponding impact score, and feeds back the impact status to the generator set parameter monitoring response module. The generator set parameter monitoring response module matches the corresponding unit interval time in combination with the impact status, and performs generator set matching parameter monitoring according to the matched unit interval time.

[0013] As a further improvement of the present technical solution, the generator set parameter monitoring response module includes an influencing state range matching unit and a unit monitoring time division unit. The influencing state range matching unit is used to receive feedback on the influencing state factor state and divide the influencing factor stage range. The unit monitoring time division unit combines the influencing factor state stage ranges divided into each item, matches the corresponding unit monitoring time, and establishes the unit monitoring time rule.

[0014] As a further improvement of the technical solution, the method for the unit monitoring time division unit to establish the unit monitoring time rule comprises the following steps:

[0015] Step 1: Specify unit impact score , develop an initial impact score range;

[0016] Step 2: Unit influence score As a superposition value of adjacent influence score ranges;

[0017] Step 3: Obtain the impact score threshold in the monitoring experiment , which will affect the threshold As the maximum value of the impact score range.

[0018] As a further improvement of the technical solution, the generator set parameter monitoring response module also includes a matching parameter abnormal response unit, which combines the various operating parameters of the public power grid and the generator set matching parameter difference range to obtain the minimum parameter threshold of each generator set matching parameter. and the highest parameter threshold , and combined with the matching unit interval time, a matching parameter response model is established to respond to the matching parameters of the monitored generator sets.

[0019] As a further improvement of the technical solution, the method for the matching parameter abnormal response unit to establish a matching parameter response model comprises the following steps:

[0020] The first step is to obtain the minimum parameter threshold of the generator set matching parameters under the influence of different influencing factors during the industry experiment. and the highest parameter threshold ;

[0021] Step 2: Determine if the minimum parameter threshold is exceeded and the highest parameter threshold The normal duration of the internal value is marked as normal fluctuation time ;

[0022] Step 3: Calculate the sum of the monitoring time of adjacent units where abnormal values ​​are detected, and mark it as the abnormal duration and with normal fluctuation time Make a comparison;

[0023] When the abnormality lasts Lower than normal fluctuation time , it indicates that the current minimum parameter threshold is exceeded and the highest parameter threshold The situation of inner value belongs to normal value fluctuation;

[0024] When the abnormality lasts Not less than normal fluctuation time , it indicates that the current minimum parameter threshold is exceeded and the highest parameter threshold The case of internal values ​​belongs to abnormal value changes.

[0025] As a further improvement of the technical solution, the impact assignment of each influencing factor in the association impact model planning module includes the impact weight of the association factor, the normal data range specification and the continuous abnormal time threshold, wherein:

[0026] The influence weight of the associated factors is the weight of each influencing factor affecting the matching parameters of the generator set;

[0027] The normal data range is defined as the normal value variation range of each operating component of the generator set under the operating state;

[0028] The continuous abnormal time threshold is the duration when the operating status of each operating component of the generator set exceeds the normal value variation range.

[0029] As a further improvement of the technical solution, the weight matching algorithm is used to calculate the influence scores of various influencing factors in the associated influence model planning module, and the algorithm formula is as follows:

[0030] ;

[0031] in To influence the score, is the influence weight of each influencing factor, Influencing factors and minimum parameter thresholds Or the highest parameter threshold The difference between The abnormal duration.

[0032] The second object of the present invention is to provide a monitoring method using a real-time monitoring system for grid-connected operation of a generator set, comprising the following method steps:

[0033] S1. Obtain various operating parameters of the public power grid after the generator set is connected to the grid;

[0034] S2. Combined with the various operating parameters of the public power grid, establish unit monitoring time rules, conduct regular monitoring of the corresponding parameters of the generator set, and formulate the difference range of matching parameters of the generator set in combination with the operating reference data within the grid-connected industry;

[0035] S3. Obtain the influencing factors of the generator set matching parameters and configure the corresponding monitoring equipment to collect real-time data of each influencing factor;

[0036] S4. Combine the influence degree of each influencing factor in the industry, obtain the influence value of each influencing factor, establish a correlation influence model, calculate the influence score of each influencing factor, and rank them;

[0037] S5. Determine the current impact status of the impact factor based on the real-time data collected from each impact factor and the corresponding impact score, match the corresponding unit interval time based on the impact status, and monitor the matching parameters of the generator set according to the matched unit interval time.

[0038] Compared with the prior art, the present invention has the following beneficial effects:

[0039] In the real-time monitoring system and monitoring method for the grid-connected operation of a generator set, the influence state of the current influencing factor is determined by combining the real-time data collected by various influencing factors and the corresponding influence scores through the influence state determination module, and the influence state is fed back to the generator set parameter monitoring response module. The generator set parameter monitoring response module combines the influence state, matches the corresponding unit interval time, and performs the generator set matching parameter monitoring work according to the matched unit interval time, so as to adapt the influence degree of different influencing factors, formulate an adapted unit interval time to perform the generator set parameter monitoring work, improve the monitoring effect, reduce the amount of redundant data, and improve the validity of the monitoring data. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 This is a flowchart of the overall structure of Embodiment 1 of the present invention;

[0041] Figure 2 This is a structural flow chart of the generator set parameter monitoring response module of Example 1 of the present invention.

[0042] The meaning of each number in the figure is:

[0043] 10. Grid-connected operation parameter acquisition module;

[0044] 20. Generator set parameter monitoring response module; 210. Impact state range matching unit; 220. Unit monitoring time division unit; 230. Matching parameter abnormal response unit;

[0045] 30. Related factors timing monitoring module;

[0046] 40. Correlation impact model planning module;

[0047] 50. Impact status determination module. DETAILED DESCRIPTION

[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] See also Figure 1-Figure 2 As shown, one of the purposes of this embodiment is to provide a real-time monitoring system for the grid-connected operation of a generator set, including a grid-connected operation parameter acquisition module 10, a generator set parameter monitoring response module 20, a correlation factor timing monitoring module 30, a correlation influence model planning module 40 and an influence state determination module 50;

[0050] The grid-connected operation parameter acquisition module 10 is used to obtain various operation parameters of the public power grid after the generator set is connected to the grid;

[0051] The generator set parameter monitoring response module 20 combines various operating parameters of the public power grid to establish unit monitoring time rules, conducts regular monitoring of the corresponding parameters of the generator set, and formulates the generator set matching parameter difference range in combination with the operating reference data in the grid-connected industry;

[0052] The correlation factor timing monitoring module 30 obtains the influencing factors of the generator set matching parameter operation, and configures the corresponding monitoring equipment to collect real-time data of each influencing factor;

[0053] The associated impact model planning module 40 combines the impact degree of each impact factor in the industry, obtains the impact value of each impact factor, establishes an associated impact model, calculates the impact score of each impact factor, and sorts them;

[0054] The impact status determination module 50 determines the impact status of the current impact factor based on the real-time data collected from each impact factor and the corresponding impact score, and feeds back the impact status to the generator set parameter monitoring response module 20. The generator set parameter monitoring response module 20 matches the corresponding unit interval time based on the impact status, and performs the generator set matching parameter monitoring work according to the matched unit interval time.

[0055] In order to improve the monitoring efficiency of various monitoring instruments and avoid long-term continuous monitoring work, when monitoring the grid-connected operation process of the generator set, firstly, the various operating parameters of the public power grid after the generator set is connected to the grid are obtained through the grid-connected operation parameter acquisition module 10, such as the voltage, frequency and power of the public power grid, as the parameter values ​​of the generator set connected to the grid later;

[0056] In order to obtain various parameters of the generator set after connecting to the public power grid and determine whether they are within the normal range, it is necessary to establish a unit monitoring time rule through the generator set parameter monitoring response module 20 in combination with various operating parameters of the public power grid, conduct regular monitoring of the corresponding parameters of the generator set, and formulate a generator set matching parameter difference range in combination with the operating reference data in the grid-connected industry, that is, different unit monitoring times correspond to different factors under different influence states, respond to the monitoring work of various monitoring instruments according to the unit monitoring time, and feedback the monitoring parameter data according to the unit monitoring time;

[0057] In order to effectively control the monitoring effect of the monitoring instrument, ensure the timeliness of the monitoring data, and reduce data redundancy, the operating influencing factors of the generator set matching parameters, such as the ambient temperature and the lubrication degree of the generator set shaft, are obtained through the associated factor timing monitoring module 30, and corresponding monitoring equipment, such as a temperature sensor, is configured to capture the ambient temperature around the generator set in real time, and collect real-time data of various influencing factors;

[0058] During the parameter monitoring process, different influencing factors have different degrees of influence, and the influencing factors are related to the influence assignments. For example, a short-term change in ambient temperature will not affect the parameters of the generator set, and only when the abnormal temperature persists for a period of time will it affect the parameters of the generator set. Therefore, it is necessary to use the associated influence model planning module 40 to combine the influence degrees of various influencing factors in the industry, obtain the influence assignments of various influencing factors, establish an associated influence model, calculate the influence scores of various influencing factors, and sort them. The influence scores are used as reference values ​​for later response monitoring. Subsequently, the influence status determination module 50 combines the real-time data collected by various influencing factors and the corresponding influence scores to determine the influence status of the current influencing factors, and The impact status is fed back to the generator set parameter monitoring response module 20. The generator set parameter monitoring response module 20 matches the corresponding unit interval time in combination with the impact status, and performs generator set matching parameter monitoring according to the matched unit interval time, that is, each unit interval time corresponds to an impact score value range. When the impact score calculated by the associated impact model planning module 40 is within a certain impact score value range, its corresponding unit interval time will be used as the response unit interval time of the generator set parameter monitoring, so as to adapt to the impact degree of different influencing factors, formulate an adaptive unit interval time to carry out generator set parameter monitoring, improve the monitoring effect, reduce the amount of redundant data, and improve the validity of the monitoring data.

[0059] Furthermore, the generator set parameter monitoring response module 20 includes an influencing state range matching unit 210 and a unit monitoring time division unit 220. The influencing state range matching unit 210 is used to receive feedback on the influencing state factor state and divide the influencing factor stage range. The unit monitoring time division unit 220 combines the influencing factor state stage ranges divided into each item, matches the corresponding unit monitoring time, and establishes the unit monitoring time rule.

[0060] In the process of monitoring the matching parameters of the generator set, if the conventional monitoring interval is set to be short, a large amount of redundancy will appear in the matching parameter data monitored under normal operating conditions, that is, the monitored matching parameter data are the same. If it is set to be long, for abnormal situations, its monitoring frequency cannot adapt to the changing speed of abnormal data, resulting in a significant reduction in the timeliness of the monitoring data, and it is easy to miss the remedial time. In order to deal with the above problems, the influencing factor state feedback is received through the influencing state range matching unit 210, and the influencing factor state stage range is divided. Then, the unit monitoring time division unit 220 combines the divided influencing factor state stage ranges for each item, matches the corresponding unit monitoring time, and establishes a unit monitoring time rule, that is, each influencing factor state stage range matches a unit monitoring time. When the feedback influencing factor state completes the influencing factor state stage range, that is, it belongs to the value within the current influencing factor state stage range, and its matched unit monitoring time will be used as the unit time of the generator set monitoring equipment to monitor the matching parameters, that is, the monitoring value of each matching parameter is fed back once every unit time.

[0061] Furthermore, the method for the unit monitoring time division unit 220 to establish the unit monitoring time rule includes the following steps:

[0062] Step 1: Specify unit impact score , develop an initial impact score range;

[0063] Step 2: Unit influence score As a superposition value of adjacent influence score ranges;

[0064] Step 3: Obtain the impact score threshold in the monitoring experiment , which will affect the threshold As the maximum value of the impact score range.

[0065] In the process of establishing unit monitoring time rules, the first thing to do is to specify the unit impact score , set the initial impact score range, and convert the unit impact score As the superposition value of adjacent influence score ranges, that is, the interval unit influence score between adjacent influence score ranges , for example, the initial impact score range is , then the adjacent influence score range is , and finally obtain the impact score impact threshold in the monitoring experiment That is, during the industry experiment, when the impact score of the monitored influencing factors reaches a certain value, it will directly affect the matching parameters of the generator set, causing the difference between its matching parameter value and the public network parameter value to exceed the normal difference range. The impact score will be used as the impact threshold , that is, when the monitored impact score exceeds the impact threshold At this time, the monitoring interval for monitoring the generator set is the shortest monitoring interval, that is, the monitoring frequency is the fastest.

[0066] Specifically, the generator set parameter monitoring response module 20 also includes a matching parameter abnormal response unit 230, which combines various operating parameters of the public power grid and the generator set matching parameter difference range to obtain the minimum parameter threshold of each generator set matching parameter. and the highest parameter threshold , and combined with the matching unit interval time, a matching parameter response model is established to respond to the matching parameters of the monitored generator sets.

[0067] In the process of monitoring the matching parameters of the generator set, abnormal values ​​may appear in some cases, such as short-term voltage fluctuations or frequency deviations. This is because the fuel supply is excessive or too low during the fuel power generation process, resulting in short-term value fluctuations. These are all normal fluctuations. In order to distinguish normal value fluctuations from abnormal value fluctuations, the matching parameter abnormality response unit 230 is combined with various operating parameters of the public power grid and the difference range of the matching parameters of the generator set to obtain the minimum parameter threshold of each generator set matching parameter. and the highest parameter threshold , and combined with the matching unit interval time, a matching parameter response model is established to respond to the monitored generator set matching parameters. This is because the fluctuation value lasts for a short time. When abnormal matching parameter values ​​are not continuously monitored in a short period of time, it indicates that this is a normal value fluctuation. When the interval time exceeds a certain value, if abnormal matching parameter values ​​are still monitored, it indicates that this is not a normal value fluctuation and timely response feedback is required.

[0068] In addition, the method for the matching parameter abnormal response unit 230 to establish a matching parameter response model includes the following steps:

[0069] The first step is to obtain the minimum parameter threshold of the generator set matching parameters under the influence of different influencing factors during the industry experiment. and the highest parameter threshold ;

[0070] Step 2: Determine if the minimum parameter threshold is exceeded and the highest parameter threshold The normal duration of the internal value is marked as normal fluctuation time ;

[0071] Step 3: Calculate the sum of the monitoring time of adjacent units where abnormal values ​​are detected, and mark it as the abnormal duration and with normal fluctuation time Make a comparison;

[0072] When the abnormality lasts Lower than normal fluctuation time , it indicates that the current minimum parameter threshold is exceeded and the highest parameter threshold The situation of inner value belongs to normal value fluctuation;

[0073] When the abnormality lasts Not less than normal fluctuation time , it indicates that the current minimum parameter threshold is exceeded and the highest parameter threshold The case of internal values ​​belongs to abnormal value changes.

[0074] In specific use, since the industry stipulates that the parameters between the generator set and the public network after being connected to the grid need to be consistent or within the normal difference range, in order to distinguish normal value fluctuations from abnormal value changes during the monitoring process, normal value fluctuations do not require response feedback, while abnormal value changes require timely data feedback. Therefore, it is first necessary to obtain the minimum parameter threshold of the generator set matching parameters under the influence of different influencing factors during the industry experiment process. and the highest parameter threshold , that is, during the experiment, when the parameters of the generator set change beyond a certain range, it will affect the grid connection status between the generator set and the public network;

[0075] However, since different factors affect the matching parameters for different normal durations, it is necessary to determine in advance whether the minimum parameter threshold is exceeded. and the highest parameter threshold The normal duration of the internal value is marked as normal fluctuation time Finally, select the corresponding normal fluctuation time according to the monitored influencing factors , and calculate the sum of the monitoring time of adjacent units where the abnormal value is detected, marked as the abnormal duration , and matched with the normal fluctuation time Make a comparison;

[0076] When the abnormality lasts Lower than normal fluctuation time , it indicates that the current minimum parameter threshold is exceeded and the highest parameter threshold The situation of inner value belongs to normal value fluctuation;

[0077] When the abnormality lasts Not less than normal fluctuation time , it indicates that the current minimum parameter threshold is exceeded and the highest parameter threshold The case of internal values ​​belongs to abnormal value changes.

[0078] In addition, the impact assignment of each impact factor in the correlation impact model planning module 40 includes the impact weight of the correlation factor, the normal data range specification and the continuous abnormal time threshold, among which:

[0079] The impact weight of the associated factors is the weight of each factor affecting the matching parameters of the generator set;

[0080] The normal data range is defined as the normal value variation range of each operating component of the generator set under the operating state;

[0081] The continuous abnormal time threshold is the duration when the operating status of each operating component of the generator set exceeds the normal value variation range.

[0082] Furthermore, the influence scores of various influence factors are calculated in the associated influence model planning module 40 using a weight matching algorithm, and the algorithm formula is as follows:

[0083] ;

[0084] in To influence the score, is the influence weight of each influencing factor, Influencing factors and minimum parameter thresholds Or the highest parameter threshold The difference between the two values ​​may be lower than the minimum parameter threshold due to the influence of the factors exceeding the corresponding value. or above the highest parameter threshold , The abnormal duration.

[0085] The second purpose of this embodiment is to provide a monitoring method using a real-time monitoring system for grid-connected operation of a generator set, including the following method steps:

[0086] S1. Obtain various operating parameters of the public power grid after the generator set is connected to the grid;

[0087] S2. Combined with the various operating parameters of the public power grid, establish unit monitoring time rules, conduct regular monitoring of the corresponding parameters of the generator set, and combine the operating reference data within the grid-connected industry to formulate the difference range of the matching parameters of the generator set;

[0088] S3. Obtain the influencing factors of the generator set matching parameters and configure the corresponding monitoring equipment to collect real-time data of each influencing factor;

[0089] S4. Combine the influence degree of each influencing factor in the industry, obtain the influence value of each influencing factor, establish a correlation influence model, calculate the influence score of each influencing factor, and rank them;

[0090] S5. Determine the current impact status of the impact factor based on the real-time data collected from each impact factor and the corresponding impact score, match the corresponding unit interval time based on the impact status, and monitor the matching parameters of the generator set according to the matched unit interval time.

[0091] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. Generator grid-connected operation real-time monitoring system, characterized by: It comprises a grid-connected operation parameter acquisition module (10), a generator set parameter monitoring response module (20), a correlation factor timing monitoring module (30), a correlation influence model planning module (40) and an influence state determination module (50); The grid-connected operation parameter acquisition module (10) is used to acquire various operation parameters of the public power grid after the generator set is connected to the grid; The generator set parameter monitoring response module (20) combines various operating parameters of the public power grid to establish unit monitoring time rules, performs regular monitoring of corresponding parameters of the generator set, and formulates a generator set matching parameter difference range in combination with operating reference data within the grid-connected industry; The correlation factor timing monitoring module (30) obtains the influencing factors of the generator set matching parameter operation, configures corresponding monitoring equipment, and performs real-time data collection on each influencing factor; The associated impact model planning module (40) combines the impact degree of each impact factor in the industry, obtains the impact value of each impact factor, establishes an associated impact model, calculates the impact score of each impact factor, and sorts them; The influence status determination module (50) determines the influence status of the current influence factor in combination with the real-time data collected from each influence factor and the corresponding influence score, and feeds back the influence status to the generator set parameter monitoring response module (20). The generator set parameter monitoring response module (20) matches the corresponding unit interval time in combination with the influence status, and performs generator set matching parameter monitoring work according to the matched unit interval time.

2. The real-time monitoring system for grid-connected operation of a generator set according to claim 1 is characterized by: The generator set parameter monitoring response module (20) comprises an impact state range matching unit (210) and a unit monitoring time division unit (220), wherein the impact state range matching unit (210) is used to receive the feedback impact state factor state and divide the impact factor stage range, and the unit monitoring time division unit (220) combines the impact factor state stage ranges divided for each item, matches the corresponding unit monitoring time, and establishes a unit monitoring time rule.

3. The real-time monitoring system for grid-connected operation of a generator set according to claim 2 is characterized in that: The method for the unit monitoring time division unit (220) to establish the unit monitoring time rules comprises the following steps: Step 1: Specify unit impact score , develop an initial impact score range; Step 2: Unit influence score As a superposition value of adjacent influence score ranges; Step 3: Obtain the impact score threshold in the monitoring experiment , which will affect the threshold As the maximum value of the impact score range.

4. The real-time monitoring system for grid-connected operation of a generator set according to claim 2 is characterized in that: The generator set parameter monitoring response module (20) further comprises a matching parameter abnormality response unit (230), wherein the matching parameter abnormality response unit (230) combines various operating parameters of the public power grid and the generator set matching parameter difference range to obtain the lowest parameter threshold value of each generator set matching parameter. and the highest parameter threshold , and combined with the matching unit interval time, a matching parameter response model is established to respond to the matching parameters of the monitored generator sets.

5. The real-time monitoring system for grid-connected operation of a generator set according to claim 4 is characterized in that: The method for the matching parameter abnormal response unit (230) to establish a matching parameter response model comprises the following steps: The first step is to obtain the minimum parameter threshold of the generator set matching parameters under the influence of different influencing factors during the industry experiment. and the highest parameter threshold ; Step 2: Determine if the minimum parameter threshold is exceeded and the highest parameter threshold The normal duration of the internal value is marked as normal fluctuation time ; Step 3: Calculate the sum of the monitoring time of adjacent units where abnormal values ​​are detected, and mark it as the abnormal duration and with normal fluctuation time Make a comparison; When the abnormality lasts Lower than normal fluctuation time , it indicates that the current minimum parameter threshold is exceeded and the highest parameter threshold The situation of inner value belongs to normal value fluctuation; When the abnormality lasts Not less than normal fluctuation time , it indicates that the current minimum parameter threshold is exceeded and the highest parameter threshold The case of internal values ​​belongs to abnormal value changes.

6. The real-time monitoring system for grid-connected operation of a generator set according to claim 1 is characterized by: The impact assignment of each impact factor in the correlation impact model planning module (40) includes the impact weight of the correlation factor, the normal data range specification and the continuous abnormal time threshold, wherein: The influence weight of the associated factors is the weight of each influencing factor affecting the matching parameters of the generator set; The normal data range is defined as the normal value variation range of each operating component of the generator set under the operating state; The continuous abnormal time threshold is the duration when the operating status of each operating component of the generator set exceeds the normal value variation range.

7. The real-time monitoring system for grid-connected operation of a generator set according to claim 6 is characterized by: The influence scores of various influencing factors in the association influence model planning module (40) are calculated using a weight matching algorithm, and the algorithm formula is as follows: ; in To influence the score, is the influence weight of each influencing factor, Influencing factors and minimum parameter thresholds Or the highest parameter threshold The difference between The abnormal duration.

8. A monitoring method using the real-time monitoring system for grid-connected operation of a generator set as claimed in any one of claims 1 to 7, characterized in that: The method comprises the following steps: S1. Obtain various operating parameters of the public power grid after the generator set is connected to the grid; S2. Combined with the various operating parameters of the public power grid, establish unit monitoring time rules, conduct regular monitoring of the corresponding parameters of the generator set, and formulate the difference range of matching parameters of the generator set in combination with the operating reference data within the grid-connected industry; S3. Obtain the influencing factors of the generator set matching parameters and configure the corresponding monitoring equipment to collect real-time data of each influencing factor; S4. Combine the influence degree of each influencing factor in the industry, obtain the influence value of each influencing factor, establish a correlation influence model, calculate the influence score of each influencing factor, and rank them; S5. Determine the current impact status of the impact factor based on the real-time data collected from each impact factor and the corresponding impact score, match the corresponding unit interval time based on the impact status, and monitor the matching parameters of the generator set according to the matched unit interval time.

Citation Information

Patent Citations

  • Photovoltaic micro-grid power generation method and system based on diesel generating set

    CN117175695A

  • Power grid information management system based on cloud computing big data

    CN117335397A