Fault monitoring system and method based on communication transmission equipment

By obtaining data in the communication transmission equipment fault monitoring system to calculate the fault coefficient and constructing image fuzzy Petri net rules for diagnosis, the problems of limited monitoring range and slow response speed in the existing technology are solved, and more efficient fault identification and monitoring are achieved.

CN118869447AInactive Publication Date: 2024-10-29GUANGZHOU XINGZE INFORMATION TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411119710.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing communication transmission equipment fault monitoring technology has problems such as limited monitoring range, low fault recognition rate, and slow response speed, making it difficult to achieve real-time monitoring and early warning.

Method used

A fault monitoring system based on communication transmission equipment is designed, including an equipment node data acquisition module, a fault index calculation module, a fault diagnosis module and a fault alarm module. It calculates the fault coefficient by acquiring operating data and transmission data, and constructs image fuzzy Petri net rules. Perform fault diagnosis and issue alarms based on fault reasoning results.

Benefits of technology

The monitoring scope is expanded, the fault identification rate and response speed are improved, and the efficiency of fault monitoring of communication transmission equipment is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118869447A_ABST
    Figure CN118869447A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of communication transmission equipment fault monitoring, in particular to a fault monitoring system and method based on communication transmission equipment. The method comprises the following steps: acquiring data of a communication transmission equipment node; an equipment operation fault coefficient YXS is obtained based on the operation data, an equipment transmission fault coefficient CSS is obtained based on the transmission data, an equipment fault index is obtained based on the equipment operation fault coefficient YXS and the equipment transmission fault coefficient CSS, and whether the communication transmission equipment node meets the equipment fault diagnosis requirement is judged based on the equipment fault index; constructing an image fuzzy Petri network rule, and performing fault diagnosis on the communication transmission equipment nodes meeting the equipment fault diagnosis requirements based on the image fuzzy Petri network rule to obtain a fault reasoning result; and carrying out equipment fault alarm based on a fault reasoning result. According to the invention, when the fault of the communication transmission equipment is monitored, the fault identification rate is improved, the fault response speed is improved, and the fault monitoring efficiency of the communication transmission equipment is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of communication transmission equipment fault monitoring, and in particular to a fault monitoring system and method based on communication transmission equipment. Background Art

[0002] With the rapid development of modern communication technology, communication transmission equipment, as the core infrastructure of information transmission, has a direct impact on the overall performance of the communication network and user experience due to its stability and reliability. However, in actual operation, communication transmission equipment often fails due to various reasons, such as equipment aging, environmental factors, human error, etc. These failures not only lead to communication interruptions and affect the normal operation of business, but may also cause huge economic losses and social impacts.

[0003] At present, there are many fault monitoring technologies for communication transmission equipment on the market, but most of these technologies have problems such as limited monitoring range, low fault recognition rate, and slow response speed. Traditional fault monitoring methods mainly rely on manual inspections and regular maintenance, which is not only inefficient, but also difficult to achieve real-time monitoring and early warning.

[0004] Therefore, there is an urgent need for a fault monitoring system and method based on communication transmission equipment to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a fault monitoring system and method based on communication transmission equipment: to solve the technical problems of limited monitoring range, low fault recognition rate and slow response speed in existing solutions when monitoring faults of communication transmission equipment.

[0006] The purpose of the present invention can be achieved through the following technical solutions: On the one hand, a fault monitoring system based on communication transmission equipment includes a device node data acquisition module, a device fault index calculation module, a device fault diagnosis module and a device fault alarm module; The device node data acquisition module is used to acquire the data of the communication transmission device node, wherein the data of the communication transmission device node includes operation data and transmission data; The equipment failure index calculation module is used to obtain the equipment operation failure coefficient YXS based on the operation data, obtain the equipment transmission failure coefficient CSS based on the transmission data, obtain the equipment failure index based on the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS, and judge whether the communication transmission equipment node meets the equipment failure diagnosis requirements based on the equipment failure index; The equipment fault diagnosis module is used to construct image fuzzy Petri net rules, and perform fault diagnosis on the communication transmission equipment nodes that meet the equipment fault diagnosis requirements based on the image fuzzy Petri net rules to obtain fault reasoning results; The equipment fault alarm module is used to issue equipment fault alarms based on fault inference results.

[0007] Furthermore, obtaining the equipment operation failure coefficient YXS based on the operation data specifically includes the following process: Based on the operation data, the operation temperature of the communication transmission equipment node in the management period is obtained, the preset operation temperature of the communication transmission equipment node in the management period is obtained, and the difference between the average operation temperature and the preset operation temperature is calculated. , where the management period is the preset communication transmission device node operation time; Based on the operation data, the operating environment humidity of the communication transmission device node within the management period is obtained, the preset operating environment humidity of the communication transmission device node within the management period is obtained, and the difference between the operating environment humidity and the preset operating environment humidity is calculated. ; Based on the operation data, the operation current of the communication transmission device node in the management period is obtained, the preset operation current of the communication transmission device node in the management period is obtained, and the difference between the operation current and the preset operation current is calculated. ; Based on the operation data, the operation voltage of the communication transmission device node in the management period is obtained, the preset operation voltage of the communication transmission device node in the management period is obtained, and the difference between the operation voltage and the preset operation voltage is calculated. ; Will , , and Substitute into the equipment operation failure coefficient calculation formula to obtain the equipment operation failure coefficient YXS, which is as follows: ; in, , , , are weight coefficients, which are 0.2, 0.15, 0.25, 0.1 and 0.3 respectively. is a constant coefficient, set by the system, The total number of communication transmission device nodes.

[0008] Furthermore, obtaining the device transmission failure coefficient CSS based on the transmission data specifically includes the following process: The data transmission memory amount of the communication transmission device node within the management period is obtained based on the transmission data, and the data transmission memory amount is marked as the actual load value. Several detection points are preset within the management period, and the transmission rate of the communication transmission device node is detected. A rectangular coordinate system is established with the execution time of the management period as the X-axis and the transmission rate of the communication transmission device node as the Y-axis. The transmission curve of the management period is drawn in the rectangular coordinate system through the transmission rate value of the management period, and two truncated line segments are obtained by drawing perpendicular lines from the two end points of the transmission curve to the X-axis. A transmission graph is formed by the transmission curve, the two truncated line segments and the X-axis, and the area value of the transmission graph is marked as the table load value. The ratio of the actual load value to the table load value is calculated, and the ratio is used as the equipment transmission failure coefficient CSS, wherein the management period is the preset operation time of the communication transmission device node.

[0009] Furthermore, the equipment failure index is obtained based on the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS. The process of judging whether the communication transmission equipment node meets the equipment failure diagnosis requirements based on the equipment failure index specifically includes the following steps: Substitute the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS into the equipment failure index calculation formula to obtain the equipment failure index LMO. The equipment failure index calculation formula is as follows: ; in, , are weight coefficients, which are 0.3 and 0.7 respectively, and R is a constant coefficient, which is 2.72; Loading device fault index threshold, which is stored in the system and set by the system; It is determined whether the equipment failure index LMO is greater than the equipment failure index threshold. If so, the communication transmission equipment node meets the equipment failure diagnosis requirement. If not, the communication transmission equipment node does not meet the equipment failure diagnosis requirement.

[0010] Furthermore, constructing the image fuzzy Petri net rules specifically includes the following processes: Construct the association matrix F of each communication transmission equipment failure type: ; in, is the image fuzzy number set transformed from multiple data segments corresponding to each fault type, , , is a 0 / 1 matrix, 1 means the The fault type and A data segment is associated, and the data segment is the performance data corresponding to the fault type of the communication transmission device node within the management period; The data segments represented by the image fuzzy value are fused. The state of each fault type requires an image fuzzy value to uniquely determine it. The faults associated with multiple data segments are fused to obtain the state vector of each fault type: : ; Construction of image fuzzy Petri net: Assumptions It is defined in the global domain The set of all image fuzzy numbers on the image, then the image fuzzy Petri net It is expressed as follows: ; in, is a finite set of places, representing the type of equipment failure; It is a finite set of transitions, representing the process of transmission from fault A to fault B; It is a finite set of propositions, i.e., the different nodes of the communication transmission equipment corresponding to the fault; is a The input correlation matrix, if there is a fault from the input To the transfer process If there is a directed arc of , otherwise, ,in, , ; is a The output incidence matrix of To output fault If there is a directed arc of , otherwise, ,in, , ; A state vector representing each fault type; Indicates the fault trigger threshold Assigned to each fault; is a vector, which is the fault transmission process The confidence level indicates the strength of the correlation between the two faults; is the set of local weights when the fault is triggered forward, is a true value between 0 and 1, indicating a faulty input Transfer process the relative importance of the contribution made; is the set of global weights during fault backward propagation, is a truth value between 0 and 1 that indicates the degree to which the transfer process affects the faults in its output.

[0011] Furthermore, based on the image fuzzy Petri net rules, the communication transmission equipment nodes that meet the equipment fault diagnosis requirements are diagnosed, and the fault reasoning results are obtained, which specifically include the following processes: Based on the data segment of the communication transmission device node and the image fuzzy Petri net rule construction Dimension Matrix and , Dimensional vector ; Step 1, let k = 1, parameter k represents the number of iterations; Step 2: Calculate the state vector of the input fault ,like is a non-zero matrix, then The calculation of is as follows: ; in, Represents the matrix The average of the non-zero values ​​in each column of represents the Kronecker product operation; like If it is a zero matrix, execute step 6; Step 3: Calculate the triggered transfer process vector : ; ; Step 4: Calculate the state vector of the output fault : ; Step 5: Calculate the new status of all faults : ; Represents the matrix Take the average of each column of non-zero values; Step 6: Diagnosis is complete and output is , is a binary vector with 0 / 1 elements. A fault with state 1 indicates that the first or subsequent fault mode has occurred. Recorded as the fault inference result.

[0012] Furthermore, the equipment fault alarm based on the fault reasoning result specifically includes the following process: The system sends an alarm notification of the fault reasoning results to relevant personnel, including equipment managers and operation and maintenance personnel, and searches for historical cases similar to the current fault, compares the similarity between the current fault and historical cases, determines the most matching case, and infers the cause and solution of the current fault based on the solution of the matching case.

[0013] On the other hand, a method for fault monitoring based on communication transmission equipment includes: Acquire data of a communication transmission device node, wherein the data of the communication transmission device node includes operation data and transmission data; Based on the operation data, the equipment operation failure coefficient YXS is obtained; based on the transmission data, the equipment transmission failure coefficient CSS is obtained; based on the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS, the equipment failure index is obtained; based on the equipment failure index, it is determined whether the communication transmission equipment node meets the equipment failure diagnosis requirements; Construct image fuzzy Petri net rules, and perform fault diagnosis on communication transmission equipment nodes that meet the equipment fault diagnosis requirements based on image fuzzy Petri net rules to obtain fault reasoning results; Equipment fault alarm is issued based on fault inference results.

[0014] Compared with the existing solutions, the present invention achieves the following beneficial effects: The present invention obtains data of a communication transmission device node, wherein the data of the communication transmission device node includes operation data and transmission data; obtains a device operation fault coefficient YXS based on the operation data, obtains a device transmission fault coefficient CSS based on the transmission data, obtains a device fault index based on the device operation fault coefficient YXS and the device transmission fault coefficient CSS, and judges whether the communication transmission device node meets the device fault diagnosis requirements based on the device fault index; constructs an image fuzzy Petri net rule, and performs fault diagnosis on the communication transmission device node that meets the device fault diagnosis requirements based on the image fuzzy Petri net rule to obtain a fault reasoning result; and performs a device fault alarm based on the fault reasoning result. The present invention can expand the monitoring range, improve the fault recognition rate, and improve the response speed to the fault when monitoring the fault of the communication transmission device, thereby improving the fault monitoring efficiency of the communication transmission device. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0016] Figure 1 is a system block diagram of a fault monitoring system based on communication transmission equipment according to an embodiment of the present invention; Figure 2 This is a working flow chart of a fault monitoring system based on communication transmission equipment according to an embodiment of the present invention; Figure 3is another work flow chart of a fault monitoring system based on communication transmission equipment according to an embodiment of the present invention; Figure 4 It is a working flow chart of a fault monitoring method based on communication transmission equipment according to an embodiment of the present invention. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] In addition, the described features, structures or characteristics may be combined in one or more example embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the example embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced while omitting one or more of the specific details, or other methods, components, steps, etc. may be adopted. In other cases, well-known structures, methods, implementations or operations are not shown or described in detail to avoid obscuring various aspects of the present disclosure.

[0019] This embodiment provides a fault monitoring system based on communication transmission equipment. Figure 1 is a system block diagram of a fault monitoring system based on communication transmission equipment according to an embodiment of the present invention. Figure 1 As shown, the system includes a device node data acquisition module, a device fault index calculation module, a device fault diagnosis module and a device fault alarm module; The device node data acquisition module is used to acquire the data of the communication transmission device node, wherein the data of the communication transmission device node includes operation data and transmission data; The equipment failure index calculation module is used to obtain the equipment operation failure coefficient YXS based on the operation data, obtain the equipment transmission failure coefficient CSS based on the transmission data, obtain the equipment failure index based on the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS, and judge whether the communication transmission equipment node meets the equipment failure diagnosis requirements based on the equipment failure index; The equipment fault diagnosis module is used to construct image fuzzy Petri net rules, and perform fault diagnosis on the communication transmission equipment nodes that meet the equipment fault diagnosis requirements based on the image fuzzy Petri net rules to obtain fault reasoning results; The equipment fault alarm module is used to issue equipment fault alarms based on fault inference results.

[0020] In summary, the present invention obtains data of communication transmission equipment nodes, wherein the data of communication transmission equipment nodes include operation data and transmission data; obtains equipment operation fault coefficient YXS based on operation data, obtains equipment transmission fault coefficient CSS based on transmission data, obtains equipment fault index based on equipment operation fault coefficient YXS and equipment transmission fault coefficient CSS, and judges whether the communication transmission equipment node meets the equipment fault diagnosis requirements based on the equipment fault index; constructs image fuzzy Petri net rules, and performs fault diagnosis on communication transmission equipment nodes that meet the equipment fault diagnosis requirements based on image fuzzy Petri net rules to obtain fault reasoning results; and performs equipment fault alarm based on the fault reasoning results. The present invention can expand the monitoring range, improve the fault recognition rate, and improve the response speed to faults when monitoring the faults of communication transmission equipment, thereby improving the fault monitoring efficiency of communication transmission equipment.

[0021] In some embodiments, Figure 2 is a work flow chart of a fault monitoring system based on communication transmission equipment according to an embodiment of the present invention. Figure 2 As shown, obtaining the equipment operation failure coefficient YXS based on the operation data specifically includes the following steps: Step S201: Based on the operation data, the operation temperature of the communication transmission device node in the management period is obtained, the preset operation temperature of the communication transmission device node in the management period is obtained, and the difference between the average operation temperature and the preset operation temperature is calculated. ; It is worth noting that the management period is the preset communication transmission device node operation time; Step S202: Based on the operation data, the operating environment humidity of the communication transmission device node within the management period is obtained, the preset operating environment humidity of the communication transmission device node within the management period is obtained, and the difference between the operating environment humidity and the preset operating environment humidity is calculated. ; Step S203: Based on the operation data, the operation current of the communication transmission device node in the management period is obtained, the preset operation current of the communication transmission device node in the management period is obtained, and the difference between the operation current and the preset operation current is calculated. ; Step S204: Obtain the operating voltage of the communication transmission device node within the management period based on the operating data, obtain the preset operating voltage of the communication transmission device node within the management period, and calculate the difference between the operating voltage and the preset operating voltage ; Step S205: , , and Substitute into the equipment operation failure coefficient calculation formula to obtain the equipment operation failure coefficient YXS, which is as follows: ; in, , , , are weight coefficients, which are 0.2, 0.15, 0.25, 0.1 and 0.3 respectively. is a constant coefficient, set by the system, The total number of communication transmission device nodes.

[0022] In some embodiments, obtaining the device transmission failure coefficient CSS based on the transmission data specifically includes the following process: The data transmission memory amount of the communication transmission device node within the management period is obtained based on the transmission data, and the data transmission memory amount is marked as the actual load value. Several detection points are preset within the management period, and the transmission rate of the communication transmission device node is detected. A rectangular coordinate system is established with the execution time of the management period as the X-axis and the transmission rate of the communication transmission device node as the Y-axis. The transmission curve of the management period is drawn in the rectangular coordinate system through the transmission rate value of the management period, and two truncated line segments are obtained by drawing perpendicular lines from the two end points of the transmission curve to the X-axis. A transmission graph is formed by the transmission curve, the two truncated line segments and the X-axis, and the area value of the transmission graph is marked as the table load value. The ratio of the actual load value to the table load value is calculated, and the ratio is used as the equipment transmission failure coefficient CSS, wherein the management period is the preset operation time of the communication transmission device node.

[0023] In some embodiments, Figure 3 FIG. 1 is another work flow chart of a fault monitoring system based on a communication transmission device according to an embodiment of the present invention. Figure 3 As shown, the device failure index is obtained based on the device operation failure coefficient YXS and the device transmission failure coefficient CSS, and judging whether the communication transmission device node meets the device failure diagnosis requirements based on the device failure index specifically includes the following steps: Step S301: Substitute the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS into the equipment failure index calculation formula to obtain the equipment failure index LMO. The equipment failure index calculation formula is as follows: ; in, , are weight coefficients, which are 0.3 and 0.7 respectively, and R is a constant coefficient, which is 2.72; Step S302: Loading a device fault index threshold value, which is stored in the system and is set by the system; Step S303: determine whether the equipment failure index LMO is greater than the equipment failure index threshold, if so, proceed to step S304, if not, proceed to step S305; Step S304: the communication transmission device node meets the device fault diagnosis requirements; Step S305: The communication transmission device node does not meet the device fault diagnosis requirements.

[0024] In some embodiments, constructing the image fuzzy Petri net rule specifically includes the following process: Construct the correlation matrix F of each communication transmission equipment failure type: ; in, is the image fuzzy number set transformed from multiple data segments corresponding to each fault type, , , is a 0 / 1 matrix, 1 means the The fault type and A data segment is associated, and the data segment is the performance data corresponding to the fault type of the communication transmission device node within the management period; The data segments represented by the image fuzzy value are fused. The state of each fault type requires an image fuzzy value to uniquely determine it. The faults associated with multiple data segments are fused to obtain the state vector of each fault type: : ; Construction of image fuzzy Petri net: Assumptions It is defined in the global domain The set of all image fuzzy numbers on the image, then the image fuzzy Petri net It is expressed as follows: ; in, is a finite set of places, representing the type of equipment failure; It is a finite set of transitions, representing the process of transmission from fault A to fault B; It is a finite set of propositions, i.e., the different nodes of the communication transmission equipment corresponding to the fault; is a The input correlation matrix, if there is a fault from the input To the transfer process If there is a directed arc of , otherwise, ,in, , ; is a The output incidence matrix of To output fault If there is a directed arc of , otherwise, ,in, , ; A state vector representing each fault type; Indicates the fault trigger threshold Assigned to each fault; is a vector, which is the fault transmission process The confidence level indicates the strength of the correlation between the two faults; is the set of local weights when the fault is triggered forward, is a true value between 0 and 1, indicating a faulty input Transfer process the relative importance of the contribution made; is the set of global weights during fault backward propagation, is a truth value between 0 and 1 that indicates the degree to which the transfer process affects the faults in its output.

[0025] Furthermore, based on the image fuzzy Petri net rules, the communication transmission equipment nodes that meet the equipment fault diagnosis requirements are diagnosed, and the fault reasoning results are obtained, which specifically include the following processes: Based on the data segment of the communication transmission device node and the image fuzzy Petri net rule construction Dimension Matrix and , Dimensional vector ; Step 1, let k = 1, parameter k represents the number of iterations; Step 2: Calculate the state vector of the input fault ,like is a non-zero matrix, then The calculation of is as follows: ; in, Represents the matrix The average of the non-zero values ​​in each column of represents the Kronecker product operation; like If it is a zero matrix, execute step 6; Step 3: Calculate the triggered transfer process vector : ; ; Step 4: Calculate the state vector of the output fault : ; Step 5: Calculate the new status of all faults : ; Represents the matrix Take the average of each column of non-zero values; Step 6: Diagnosis is complete and output is , is a binary vector with 0 / 1 elements. A fault with state 1 indicates that the first or subsequent fault mode has occurred. Recorded as the fault inference result.

[0026] In some embodiments, performing equipment fault alarm based on the fault inference result specifically includes the following process: The system sends an alarm notification of the fault reasoning results to relevant personnel, including equipment managers and operation and maintenance personnel, and searches for historical cases similar to the current fault, compares the similarity between the current fault and historical cases, determines the most matching case, and infers the cause and solution of the current fault based on the solution of the matching case.

[0027] This embodiment also provides a fault monitoring method based on communication transmission equipment. Figure 4 FIG. 1 is a flowchart of a fault monitoring method based on a communication transmission device according to an embodiment of the present invention. Figure 4 As shown, the method includes: Step S401: Acquire data of a communication transmission device node, wherein the data of the communication transmission device node includes operation data and transmission data; Step S402: obtaining the equipment operation fault coefficient YXS based on the operation data, obtaining the equipment transmission fault coefficient CSS based on the transmission data, obtaining the equipment fault index based on the equipment operation fault coefficient YXS and the equipment transmission fault coefficient CSS, and judging whether the communication transmission equipment node meets the equipment fault diagnosis requirements based on the equipment fault index; Step S403: constructing image fuzzy Petri net rules, and performing fault diagnosis on communication transmission device nodes that meet the equipment fault diagnosis requirements based on the image fuzzy Petri net rules to obtain fault reasoning results; Step S404: issuing an equipment fault alarm based on the fault inference result.

[0028] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website, computer, server or data center to another website, computer, server or data center by wired (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0029] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0030] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0031] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only some logical function divisions. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0032] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0033] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A fault monitoring system based on communication transmission equipment, characterized in that: The system includes a device node data acquisition module, a device fault index calculation module, a device fault diagnosis module and a device fault alarm module; The device node data acquisition module is used to acquire the data of the communication transmission device node, wherein the data of the communication transmission device node includes operation data and transmission data; The equipment failure index calculation module is used to obtain the equipment operation failure coefficient YXS based on the operation data, obtain the equipment transmission failure coefficient CSS based on the transmission data, obtain the equipment failure index based on the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS, and judge whether the communication transmission equipment node meets the equipment failure diagnosis requirements based on the equipment failure index; The equipment fault diagnosis module is used to construct image fuzzy Petri net rules, and perform fault diagnosis on the communication transmission equipment nodes that meet the equipment fault diagnosis requirements based on the image fuzzy Petri net rules to obtain fault reasoning results; The equipment fault alarm module is used to issue equipment fault alarms based on fault inference results.

2. A fault monitoring system based on communication transmission equipment according to claim 1, characterized in that: Based on the operation data, the equipment operation failure coefficient YXS is obtained. The process includes: Based on the operation data, the operation temperature of the communication transmission equipment node in the management period is obtained, the preset operation temperature of the communication transmission equipment node in the management period is obtained, and the difference between the average operation temperature and the preset operation temperature is calculated. , where the management period is the preset communication transmission device node operation time; Based on the operation data, the operating environment humidity of the communication transmission device node within the management period is obtained, the preset operating environment humidity of the communication transmission device node within the management period is obtained, and the difference between the operating environment humidity and the preset operating environment humidity is calculated. ; Based on the operation data, the operation current of the communication transmission device node in the management period is obtained, the preset operation current of the communication transmission device node in the management period is obtained, and the difference between the operation current and the preset operation current is calculated. ; Based on the operation data, the operation voltage of the communication transmission device node in the management period is obtained, the preset operation voltage of the communication transmission device node in the management period is obtained, and the difference between the operation voltage and the preset operation voltage is calculated. ; Will , , and Substitute into the equipment operation failure coefficient calculation formula to obtain the equipment operation failure coefficient YXS, which is as follows: ; in, , , , are weight coefficients, which are 0.2, 0.15, 0.25, 0.1 and 0.3 respectively. is a constant coefficient, set by the system, The total number of communication transmission device nodes.

3. A fault monitoring system based on communication transmission equipment according to claim 1, characterized in that: Based on the transmission data, the equipment transmission failure coefficient CSS is obtained. The process includes: The data transmission memory amount of the communication transmission device node within the management period is obtained based on the transmission data, and the data transmission memory amount is marked as the actual load value. Several detection points are preset within the management period, and the transmission rate of the communication transmission device node is detected. A rectangular coordinate system is established with the execution time of the management period as the X-axis and the transmission rate of the communication transmission device node as the Y-axis. The transmission curve of the management period is drawn in the rectangular coordinate system through the transmission rate value of the management period, and two truncated line segments are obtained by drawing perpendicular lines from the two end points of the transmission curve to the X-axis. A transmission graph is formed by the transmission curve, the two truncated line segments and the X-axis, and the area value of the transmission graph is marked as the table load value. The ratio of the actual load value to the table load value is calculated, and the ratio is used as the equipment transmission failure coefficient CSS, wherein the management period is the preset operation time of the communication transmission device node.

4. A fault monitoring system based on communication transmission equipment according to claim 1, characterized in that: The equipment failure index is obtained based on the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS. Based on the equipment failure index, it is determined whether the communication transmission equipment node meets the equipment failure diagnosis requirements. The process includes: Substitute the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS into the equipment failure index calculation formula to obtain the equipment failure index LMO. The equipment failure index calculation formula is as follows: ; in, , are weight coefficients, which are 0.3 and 0.7 respectively, and R is a constant coefficient, which is 2.72; Loading device fault index threshold, which is stored in the system and set by the system; It is determined whether the equipment failure index LMO is greater than the equipment failure index threshold. If so, the communication transmission equipment node meets the equipment failure diagnosis requirement. If not, the communication transmission equipment node does not meet the equipment failure diagnosis requirement.

5. A fault monitoring system based on communication transmission equipment according to claim 1, characterized in that: The construction of image fuzzy Petri net rules specifically includes the following processes: Construct the association matrix F of each communication transmission equipment failure type: ; in, is the image fuzzy number set transformed from multiple data segments corresponding to each fault type, , , is a 0 / 1 matrix, 1 means the The fault type and A data segment is associated, and the data segment is the performance data corresponding to the fault type of the communication transmission device node within the management period; The data segments represented by the image fuzzy value are fused. The state of each fault type requires an image fuzzy value to uniquely determine it. The faults associated with multiple data segments are fused to obtain the state vector of each fault type: : ; Construction of image fuzzy Petri net: Assumptions It is defined in the global domain The set of all image fuzzy numbers on the image, then the image fuzzy Petri net It is expressed as follows: ; in, is a finite set of places, representing the type of equipment failure; It is a finite set of transitions, representing the process of transmission from fault A to fault B; It is a finite set of propositions, i.e., the different nodes of the communication transmission equipment corresponding to the fault; is a The input correlation matrix, if there is a fault from the input To the transfer process If there is a directed arc of , otherwise, ,in, , ; is a The output incidence matrix of To output fault If there is a directed arc of , otherwise, ,in, , ; A state vector representing each fault type; Indicates the fault trigger threshold Assigned to each fault; is a vector, which is the fault transmission process The confidence level indicates the strength of the correlation between the two faults; is the set of local weights when the fault is triggered forward, is a true value between 0 and 1, indicating a faulty input Transfer process the relative importance of the contribution made; is the set of global weights during fault backward propagation, is a truth value between 0 and 1 that indicates the degree to which the transfer process affects the faults in its output.

6. A fault monitoring system based on communication transmission equipment according to claim 5, characterized in that: Based on the image fuzzy Petri net rules, the communication transmission equipment nodes that meet the equipment fault diagnosis requirements are diagnosed and the fault reasoning results are obtained, which specifically include the following process: Based on the data segment of the communication transmission device node and the image fuzzy Petri net rule construction Dimension Matrix and , Dimensional vector ; Step 1, let k = 1, parameter k represents the number of iterations; Step 2: Calculate the state vector of the input fault ,like is a non-zero matrix, then The calculation of is as follows: ; in, Represents the matrix The average of the non-zero values ​​in each column of represents the Kronecker product operation; like If it is a zero matrix, execute step 6; Step 3: Calculate the triggered transfer process vector : ; ; Step 4: Calculate the state vector of the output fault : ; Step 5: Calculate the new status of all faults : ; Represents the matrix Take the average of the non-zero values ​​in each column; Step 6: Diagnosis is complete and output is , is a binary vector with 0 / 1 elements. A fault with state 1 indicates that the first or subsequent fault mode has occurred. Recorded as the fault inference result.

7. A fault monitoring system based on communication transmission equipment according to claim 1, characterized in that: The specific process of equipment fault alarm based on fault inference results includes the following: The system sends an alarm notification of the fault reasoning results to relevant personnel, including equipment managers and operation and maintenance personnel, and searches for historical cases similar to the current fault, compares the similarity between the current fault and historical cases, determines the most matching case, and infers the cause and solution of the current fault based on the solution of the matching case.

8. A method for fault monitoring based on communication transmission equipment, applicable to a fault monitoring system based on communication transmission equipment as claimed in any one of claims 1 to 7, characterized in that: Methods include: Acquire data of a communication transmission device node, wherein the data of the communication transmission device node includes operation data and transmission data; Based on the operation data, the equipment operation failure coefficient YXS is obtained; based on the transmission data, the equipment transmission failure coefficient CSS is obtained; based on the equipment operation failure coefficient YXS and the equipment transmission failure coefficient CSS, the equipment failure index is obtained; based on the equipment failure index, it is determined whether the communication transmission equipment node meets the equipment failure diagnosis requirements; Construct image fuzzy Petri net rules, and perform fault diagnosis on communication transmission equipment nodes that meet the equipment fault diagnosis requirements based on image fuzzy Petri net rules to obtain fault reasoning results; Equipment fault alarm is issued based on fault inference results.