Garbage treatment equipment and treatment method thereof

By introducing ash suction assembly, crushing assembly and control assembly into the cinder treatment equipment, the problems of coal powder loss and screening plate blockage are solved, and the effective collection and discharge speed of coal powder is achieved, and the processing efficiency is improved.

CN118874609AInactive Publication Date: 2024-11-01SHANXI MINSHENG ENERGY CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411208008.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing cinder crushing treatment equipment can easily lead to loss of coal powder and blockage of screening plates, and the discharge speed cannot be controlled.

Method used

A garbage disposal equipment is designed, including ash suction assembly, crushing assembly, servo motor, control assembly and strike assembly, through self-priming ash suction machine, gathering tube, guide parts, linkage blocks, down plates, and extrusion plates. , knock blocks and segmented plates to achieve the control of coal dust collection and discharge speed.

Benefits of technology

It effectively reduces the loss of coal powder, prevents clogging of the screen plate, improves the efficiency of the crushing and screening process, and ensures the controllability of the cutting speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118874609A_ABST
    Figure CN118874609A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal cinder treatment, and discloses garbage treatment equipment and a treatment method thereof.The garbage treatment equipment comprises a weighting base, six supporting columns, an isolation pipe, a screening box, a round pipe, a PLC and a conical pipe. Through cooperative use of a dust suction assembly, a crushing assembly, a servo motor, a control assembly and a knocking assembly, a pressing plate moves to drive an extrusion plate to extrude a control plate to move on the top of a supporting plate, the size of a discharging opening of a gathering pipe can be reduced through movement of the control plate, and therefore the discharging speed can be controlled; the coal cinder crushing device solves the problems that existing coal cinder crushing equipment crushes coal cinder through two crushing wheels, the crushing mode easily causes coal ash to rise, a large amount of coal dust is lost, the discharging speed cannot be controlled during crushing and screening, the discharging speed is still unchanged when too much coal cinder is accumulated on the top of a screening plate, and the coal cinder cannot be crushed. And therefore, the problem that the screening plate is easily blocked is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal slag treatment, and in particular relates to a garbage treatment device and a treatment method thereof. Background Art

[0002] Coal slag is a solid waste. After being crushed and screened, the coal slag can be used as raw material for building materials, such as masonry mortar, wall materials, bricks, tiles and other building materials, or as light concrete aggregate such as highway subgrade materials, concrete aggregate, etc. Medium-sized coal slag particles can be used to prepare garden soil to increase soil drainage and air permeability, while supplementing minerals for plants. The proportion of coal slag in the culture soil of succulents can reach 30%~40% to adapt to different climatic conditions. The pulverized coal produced when coal slag is crushed has a wider range of uses. Pulverized coal can be used in new boilers to increase the combustion power of coal-fired boilers, save fuel, and reduce harmful gas and dust emissions, meeting national energy conservation and emission reduction standards.

[0003] However, the above device still has the following problems during implementation: The existing technology makes it possible to use coal slag in different sizes for different purposes, and coal powder has a wider range of uses. However, the equipment currently used to crush coal slag uses two crushing wheels to crush the coal slag. This crushing method can easily cause the coal ash to rise, which will cause a large amount of coal powder to be lost. In addition, the feeding speed cannot be controlled during crushing and screening. When too much material accumulates on the top of the screen plate, the feeding speed remains unchanged, which can easily cause the screen plate to be blocked. Therefore, a garbage disposal equipment and a treatment method thereof are proposed to solve the above problems. Summary of the invention

[0004] In view of the problems existing in the prior art, the present invention provides a garbage disposal equipment and a disposal method thereof, which has the advantages of collecting coal powder and preventing clogging, and can overcome the above-mentioned problems or at least partially solve the problem that the current equipment for crushing coal slag crushes the coal slag by two crushing wheels. This crushing method can easily cause the coal ash to rise, which will cause a large amount of coal powder to be lost, and the feeding speed cannot be controlled during crushing and screening. When too much accumulation occurs on the top of the screen plate, the feeding speed remains unchanged, which can easily cause the screen plate to be blocked.

[0005] The present invention is implemented as follows: a garbage treatment device and a treatment method thereof, comprising a weighted base, six pillars, an isolation pipe, a screening box, a round pipe, a PLC controller and a tapered pipe, wherein the top of the weighted base is fixedly connected to the bottom of the pillar, the top of the weighted base is fixedly connected to the bottom of the isolation pipe, the screening box is sleeved on the surface of the isolation pipe, the bottom of the screening box is fixedly connected to the weighted base, the top of the screening box is fixedly connected to the bottom of the round pipe, the front side of the round pipe is fixedly installed to the rear side of the PLC controller, and the top of the round pipe is fixedly connected to the bottom of the tapered pipe; An ash suction component for sucking coal ash in the screening box, the ash suction component is arranged on the right side of the circular tube, the ash suction component comprises a self-priming ash suction machine, the top of the self-priming ash suction machine is fixedly connected with an L-shaped pipe, the left side of the L-shaped pipe is fixedly connected with a U-shaped pipe, and the front and rear sides of the screening box are fixedly connected with the U-shaped pipe; A crushing assembly for crushing coal slag, the crushing assembly is arranged on the left and right sides of the inner cavity of a circular tube, the crushing assembly includes a fixed rod, the surface of the fixed rod is sleeved with a rotating tube, and the surface protrusion of the fixed tube is in contact with the inner wall of the rotating tube, the surface of the rotating tube is fixedly connected with a crushing tooth, and the number of crushing teeth is multiple, the opposite sides of the two rotating tubes are fixedly connected with gears, the top of the gear is meshed with teeth, the side of the teeth close to the circular tube is fixedly connected to the circular tube, and the number of teeth is multiple; The inner cavity of the screening box is movably connected with a screening plate, and the sizes of the holes on the top of the screening box and the holes on the top of the screening plate are different. The left and right sides of the screening plate are fixedly connected with linkage parts. The left and right sides of the inner cavity of the screening box are provided with linkage grooves used in conjunction with the linkage parts. The linkage parts are slidably connected to the inner cavity of the linkage grooves. The top of the linkage grooves is provided with connecting holes, and the top of the connecting holes extends to the inside of the round tube. The top of the connecting holes is provided with matching grooves. The top of the linkage parts is fixedly connected with a connecting rod. The top of the weighted base is fixedly installed with a servo motor, and the output end of the servo motor is fixedly connected with a rotating rod. A control component for controlling the coal slag feeding speed, wherein the control component is arranged on the left and right sides of the inner cavity of the circular tube; Two knocking components are used to prevent the screening box from being blocked, and the knocking components are arranged in the inner cavity of the isolation tube.

[0006] As a preferred embodiment of the present invention, the inner cavity of the circular tube is fixedly connected with a gathering tube, the bottom of the gathering tube is provided with a material guide piece, the top of the material guide piece is conical, and the bottom is fixedly connected with the rotating rod.

[0007] As a preferred embodiment of the present invention, the control component includes a support plate, and opposite sides of the two support plates are fixedly connected to the circular tube, the top of the support plate is movably connected to the control plate, the front and rear sides of the support plate are provided with positioning holes, the inner cavity of the positioning hole is slidably connected with a positioning block, the side of the positioning block close to the control plate is fixedly connected to the control plate, and the control plate is at the bottom of the gathering tube.

[0008] As a preferred embodiment of the present invention, the top of the connecting rod passes through the connecting hole and is fixedly connected to a lower pressure plate, the lower pressure plate is movably connected to the inner cavity of the matching groove, the bottom of the lower pressure plate is fixedly connected to a first spring, and the number of the first springs is multiple, the top of the lower pressure plate is rotatably connected to an extrusion plate via a rotating shaft, and the top of the extrusion plate is rotatably connected to the control plate via a rotating shaft.

[0009] As a preferred embodiment of the present invention, the knocking assembly includes a mounting shell, which is movably connected to the inner cavity of the isolation tube, the top of the rotating rod passes through the two mounting shells and extends to the outside of the mounting shells, the left and right sides of the rotating rod are fixedly connected with protrusions, the inner cavity of the mounting shell is movably connected with an arc plate, and the number of the arc plates is six, the side of the arc plate away from the protrusion is fixedly connected with a movable rod, the side of the movable rod away from the arc plate passes through the mounting shell and is fixedly connected with a knocking block, the top of the mounting shell is fixedly connected with a mounting rod, and the number of the mounting rods is multiple and evenly fixedly connected to the inner cavity of the isolation tube.

[0010] As a preferred embodiment of the present invention, an extrusion ring is fixedly connected to the surface of the movable rod, a matching tube is sleeved on the surface of the movable rod, the matching tube is fixedly connected to the mounting shell on the side close to the mounting shell, a second spring is sleeved on the surface of the movable rod, and the second spring is located on the opposite side of the extrusion ring and the matching tube.

[0011] As a preferred embodiment of the present invention, both sides of the front and rear sides of the screening box are provided with feeding holes, the top of the feeding hole is provided with a lifting groove, the inner cavity of the lifting groove is slidably connected with a baffle, and the side of the baffle away from the circular tube is fixedly connected with a handle.

[0012] As a preferred embodiment of the present invention, the front and rear sides of the screening box are fixedly connected with a material guide shell, and the inner cavity of the material guide shell is inclined, the bottom of the material guide shell is fixedly connected with a connecting pipe, the front and rear sides of the weighted base are movably connected with a half-enclosed material receiving shell, and the shapes of the opposite sides of the two half-enclosed material receiving shells are consistent with the counterweight base.

[0013] As a preferred embodiment of the present invention, the inner cavity of the screening box is fixedly connected with a segmented plate, and the number of the segmented plates is four, and they are evenly fixedly connected to the inner cavity of the screening box.

[0014] As a preferred embodiment of the present invention, the first step is: the staff turns on the self-priming dust suction machine and the servo motor through the PLC controller, and the output end of the servo motor rotates, the output end rotation drives the rotating rod to rotate, the rotating rod rotation drives the material guide member to rotate, the material guide member rotation drives the two fixed rods to rotate, the fixed rod rotation drives the gear to mesh with the teeth of the inner cavity of the round tube, then the gear drives the rotating tube to rotate, and the rotating tube rotation drives the crushing teeth to rotate; Step 2: Then the staff can put the coal slag into the conical tube. The coal slag will fall through the gathering tube and fall to the top of the guide piece. At this time, the coal slag will fall to the top of the screening box. At this time, the rotating rod will drive the crushing teeth to crush the coal slag. When the rotating rod rotates, it will drive the convex block to squeeze the arc plate. The arc plate is squeezed and drives the movable rod to move in the inner cavity of the matching tube. The squeezing ring on the surface of the movable rod squeezes the second spring to drive the knocking block to knock the isolation tube. The shock force generated by knocking the isolation tube will be transmitted to the screening box. At this time, the broken coal slag will pass through the screening box and enter the screening box due to the vibration. Step 3: The coal slag will then fall to the top of the segmented plate, and the impact force will lift up the coal powder on the surface of the coal slag. At this time, the suction force generated by the self-priming ash sucker will suck the coal powder into the self-priming ash sucker through the L-shaped pipe and the U-shaped pipe; Step 4: When the coal slag falls to the top of the screening plate, secondary screening can be carried out. After screening, it will drop to the bottom of the screening box. When there is too much coal slag on the top of the screening plate, the screening plate will drop to drive the linkage block to drop in the linkage slot. The linkage block will drop, which will drive the connecting rod to drop. The lowering of the connecting rod will drive the lower pressure plate to squeeze the spring in the matching slot. The movement of the lower pressure plate will drive the squeezing plate to squeeze the control plate to move on the top of the support plate. The movement of the control plate can reduce the size of the feeding port of the gathering pipe, so that the feeding speed can be controlled; Step 5: When there is too much coal slag accumulated in the screening box, hold the handle tightly to drive the baffle to rise in the lifting trough. At this time, the coal slag can be separated from the screening box, and the top coal slag will fall into the material guide shell. The coal slag in the material guide shell will be discharged through the connecting pipe. At this time, place a conveyor belt at the bottom of the connecting pipe to send the coal slag away, and the bottom coal slag will fall into the semi-bag-shaped material receiving shell.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. The new invention sets an ash suction component, a crushing component, a servo motor, a control component and a knocking component for coordinated use. The movement of the lower pressure plate will drive the extrusion plate to squeeze the control plate to move on the top of the support plate. The movement of the control plate can reduce the size of the discharge opening of the gathering pipe, so that the discharge speed can be controlled, which solves the problem that the current equipment for crushing coal slag uses two crushing wheels to crush the coal slag. This crushing method can easily cause the coal ash to rise, which will cause a large amount of coal powder to be lost, and the discharge speed cannot be controlled during crushing and screening. When too much dust accumulates on the top of the screening plate, the discharge speed remains unchanged, which can easily cause the screening plate to be blocked.

[0016] 2. The present invention provides a gathering tube and a material guide member to put the coal slag into the conical tube. The coal slag will fall through the gathering tube and fall to the top of the material guide member. The gathering tube can gather the coal slag at the falling place, and the material guide member can quickly disperse the falling coal slag.

[0017] 3. The present invention sets a control component. When a large amount of coal slag is accumulated on the top of the screening plate, the control plate can be moved to reduce the size of the feeding port of the gathering pipe, so that the feeding speed can be controlled. When the feeding speed is slowed down, the broken coal slag on the top of the screening box will be reduced. The reduction of coal slag can reduce the screening burden of the screening plate.

[0018] 4. The present invention arranges a lower pressure plate, a first spring and an extrusion plate. When the coal slag on the top of the screening plate becomes less, the first spring will drive the lower pressure plate to rise. The rising lower pressure plate will drive the linkage block to move through the connecting rod, and the linkage block can drive the screening plate back to its original position.

[0019] 5. The present invention provides a knocking assembly. When coal slag is accumulated on the top of the screening plate and the screening box, the movable rod drives the knocking block to knock the isolation tube. The shock force generated by knocking the isolation tube will be transmitted to the screening box. At this time, the broken coal slag will pass through the screening box due to the vibration and enter the screening box.

[0020] 6. The present invention provides an extrusion ring, a matching tube and a second spring. When the protrusion is no longer in contact with the arc plate, the second spring will undergo elastic deformation to drive the movable rod back to its original position. The movement of the movable rod can drive the knocking block back to its original position, and the matching tube can control the moving position of the movable rod.

[0021] 7. The present invention provides a discharge hole, a lifting slot, a baffle and a handle. When the coal slag in the screening box needs to be discharged, the handle is held tightly to drive the baffle to rise in the lifting slot, and the coal slag can be separated from the screening box.

[0022] 8. The present invention provides a material guide shell, a connecting pipe and a half-package material receiving shell. When the baffle rises, the top coal slag will fall into the material guide shell, and the coal slag in the material guide shell will be discharged through the connecting pipe. At this time, a conveyor belt is placed at the bottom of the connecting pipe to transport the coal slag away, and the bottom coal slag will fall into the half-package material receiving shell.

[0023] 9. The present invention sets segmented plates. When the coal slag descends, it will collide with multiple segmented plates. The impact force will lift up the coal powder on the surface of the coal slag. At this time, the suction force generated by the self-priming ash sucker will suck the coal powder into the self-priming ash sucker through the L-shaped tube and the U-shaped tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 is a schematic diagram of a three-dimensional structure provided by an embodiment of the present invention; Figure 2 is a top perspective schematic diagram provided by an embodiment of the present invention; Figure 3 is a three-dimensional cross-sectional view provided by an embodiment of the present invention; Figure 4 is a three-dimensional cross-sectional view of a screening box provided by an embodiment of the present invention; Figure 5 is a three-dimensional cross-sectional view of a circular tube provided by an embodiment of the present invention; Figure 6 is a three-dimensional schematic diagram of a striking assembly provided by an embodiment of the present invention; Figure 7 is a three-dimensional schematic diagram of a breaking component provided by an embodiment of the present invention; Figure 8 is a three-dimensional schematic diagram of a control component provided by an embodiment of the present invention; Fig. 9 It is a three-dimensional schematic diagram of a material guiding shell and a half-enclosed material receiving shell provided by an embodiment of the present invention.

[0025] In the figure: 1. weighted base; 2. pillar; 3. isolation tube; 4. screening box; 5. round tube; 6. PLC controller; 7. conical tube; 8. ash suction assembly; 81. self-priming ash suction machine; 82. L-shaped tube; 83. U-shaped tube; 9. crushing assembly; 91. fixed rod; 92. rotating tube; 93. crushing teeth; 94. gear; 95. teeth; 10. screening plate; 11. linkage; 12. linkage slot; 13. connecting hole; 14. matching slot; 15. connecting rod; 16. servo motor; 17. rotating rod; 18. control assembly; 19. knocking assembly; 2 0. Gathering tube; 21. Material guide; 181. Support plate; 182. Control board; 183. Positioning hole; 184. Positioning block; 22. Lower pressure plate; 23. First spring; 24. Extrusion plate; 191. Mounting shell; 192. Bump; 193. Arc plate; 194. Movable rod; 195. Knocking block; 196. Mounting rod; 25. Extrusion ring; 26. Matching tube; 27. Second spring; 28. Material discharge hole; 29. ​​Lifting slot; 30. Baffle; 31. Handle; 32. Material guide shell; 33. Connecting pipe; 34. Semi-enclosed material receiving shell; 35. Segmented plate. DETAILED DESCRIPTION

[0026] In order to further understand the content, features and effects of the present invention, the following embodiments are given as examples and described in detail with reference to the accompanying drawings.

[0027] The structure of the present invention is described in detail below in conjunction with the accompanying drawings.

[0028] like Figures 1 to 9 As shown, a garbage treatment device and a treatment method thereof provided by an embodiment of the present invention include a weighted base 1, six pillars 2, an isolation pipe 3, a screening box 4, a circular pipe 5, a PLC controller 6 and a conical pipe 7, the top of the weighted base 1 is fixedly connected to the bottom of the pillar 2, the top of the weighted base 1 is fixedly connected to the bottom of the isolation pipe 3, the screening box 4 is sleeved on the surface of the isolation pipe 3, the bottom of the screening box 4 is fixedly connected to the weighted base 1, the top of the screening box 4 is fixedly connected to the bottom of the circular pipe 5, the front side of the circular pipe 5 is fixedly installed to the rear side of the PLC controller 6, and the top of the circular pipe 5 is fixedly connected to the bottom of the conical pipe 7; An ash suction assembly 8 for sucking the coal ash in the screening box 4 is arranged on the right side of the circular tube 5. The ash suction assembly 8 includes a self-priming ash suction machine 81. The top of the self-priming ash suction machine 81 is fixedly connected with an L-shaped pipe 82. The left side of the L-shaped pipe 82 is fixedly connected with a U-shaped pipe 83. The front and rear sides of the screening box 4 are fixedly connected with the U-shaped pipe 83. A crushing assembly 9 for crushing coal slag, the crushing assembly 9 is arranged on the left and right sides of the inner cavity of the circular tube 5, and the crushing assembly 9 includes a fixed rod 91, the surface of the fixed rod 91 is sleeved with a rotating tube 92, and the surface protrusion of the fixed tube fits with the inner wall of the rotating tube 92, the surface of the rotating tube 92 is fixedly connected with a crushing tooth 93, and the number of the crushing teeth 93 is multiple, the opposite sides of the two rotating tubes 92 are fixedly connected with a gear 94, the top of the gear 94 is meshed with a tooth 95, the tooth 95 is fixedly connected to the circular tube 5 on the side close to the circular tube 5, and the number of the tooth 95 is multiple; The inner cavity of the screening box 4 is movably connected with a screening plate 10, and the sizes of the holes on the top of the screening box 4 and the holes on the top of the screening plate 10 are different. The left and right sides of the screening plate 10 are fixedly connected with linkage parts 11. The left and right sides of the inner cavity of the screening box 4 are provided with linkage grooves 12 used in conjunction with the linkage parts 11. The linkage parts 11 are slidably connected to the inner cavity of the linkage grooves 12. A connecting hole 13 is provided at the top of the linkage grooves 12, and the top of the connecting hole 13 extends to the inside of the circular tube 5. A matching groove 14 is provided at the top of the connecting hole 13. A connecting rod 15 is fixedly connected to the top of the linkage part 11. A servo motor 16 is fixedly installed on the top of the weighted base 1, and a rotating rod 17 is fixedly connected to the output end of the servo motor 16. A control component 18 for controlling the coal slag feeding speed, the control component 18 is arranged on the left and right sides of the inner cavity of the circular tube 5; Two knocking components 19 are used to prevent the screening box 4 from being blocked. The knocking components 19 are arranged in the inner cavity of the isolation tube 3.

[0029] refer to Figure 3 The inner cavity of the circular tube 5 is fixedly connected with a gathering tube 20 , and a material guide 21 is provided at the bottom of the gathering tube 20 . The top of the material guide 21 is conical, and the bottom is fixedly connected with the rotating rod 17 .

[0030] The above scheme is adopted: by setting a gathering tube 20 and a material guide 21, the coal slag is put into the conical tube 7, and the coal slag falls through the gathering tube 20 and falls to the top of the material guide 21. The gathering tube 20 can gather the falling coal slag, and the material guide 21 can quickly disperse the falling coal slag.

[0031] refer to Figure 8 The control assembly 18 includes a support plate 181, and the opposite sides of the two support plates 181 are fixedly connected to the circular tube 5. The top of the support plate 181 is movably connected to a control plate 182. The front and rear sides of the support plate 181 are provided with positioning holes 183. The inner cavity of the positioning hole 183 is slidably connected to a positioning block 184. The side of the positioning block 184 close to the control plate 182 is fixedly connected to the control plate 182, and the control plate 182 is at the bottom of the gathering tube 20.

[0032] The above scheme is adopted: by setting the control component 18, when a large amount of coal slag is accumulated on the top of the screening plate 10, the control plate 182 can be moved to reduce the size of the discharge port of the gathering pipe 20, so that the discharge speed can be controlled, and the discharge speed is slowed down, and the crushed coal slag on the top of the screening box 4 will be reduced. In this way, the reduction of coal slag can reduce the screening burden of the screening plate 10.

[0033] refer to Figure 8 The top of the connecting rod 15 passes through the connecting hole 13 and is fixedly connected to a lower pressure plate 22. The lower pressure plate 22 is movably connected to the inner cavity of the matching groove 14. The bottom of the lower pressure plate 22 is fixedly connected to a first spring 23, and the number of the first springs 23 is multiple. The top of the lower pressure plate 22 is rotatably connected to an extrusion plate 24 via a rotating shaft. The top of the extrusion plate 24 is rotatably connected to the control plate 182 via a rotating shaft.

[0034] The above scheme is adopted: by setting the lower pressure plate 22, the first spring 23 and the extrusion plate 24, when the coal slag on the top of the screening plate 10 becomes less, the first spring 23 will drive the lower pressure plate 22 to rise, and the rising of the lower pressure plate 22 will drive the linkage block to move through the connecting rod 15, and the linkage block can drive the screening plate 10 back to its original position.

[0035] refer to Figure 6 The knocking assembly 19 includes a mounting shell 191, which is movably connected to the inner cavity of the isolation tube 3. The top of the rotating rod 17 passes through the two mounting shells 191 and extends to the outside of the mounting shells 191. Both sides of the left and right sides of the rotating rod 17 are fixedly connected with protrusions 192. The inner cavity of the mounting shell 191 is movably connected with an arc plate 193, and the number of the arc plates 193 is six. The side of the arc plate 193 away from the protrusion 192 is fixedly connected with a movable rod 194, and the side of the movable rod 194 away from the arc plate 193 passes through the mounting shell 191 and is fixedly connected with a knocking block 195. The top of the mounting shell 191 is fixedly connected with a mounting rod 196, and the number of the mounting rods 196 is multiple and is evenly fixedly connected to the inner cavity of the isolation tube 3.

[0036] The above scheme is adopted: by setting the knocking component 19, when coal slag is accumulated on the top of the screening plate 10 and the screening box 4, the movable rod 194 drives the knocking block 195 to knock on the isolation tube 3, and the shock force generated by knocking on the isolation tube 3 will be transmitted to the screening box 4. At this time, the broken coal slag will pass through the screening box 4 and enter the screening box 4 due to the vibration.

[0037] refer to Figure 6 A squeezing ring 25 is fixedly connected to the surface of the movable rod 194, a matching tube 26 is sleeved on the surface of the movable rod 194, and the matching tube 26 is fixedly connected to the mounting shell 191 on the side close to the mounting shell 191, a second spring 27 is sleeved on the surface of the movable rod 194, and the second spring 27 is located on the opposite side of the squeezing ring 25 and the matching tube 26.

[0038] The above scheme is adopted: by setting the extrusion ring 25, the matching tube 26 and the second spring 27, when the protrusion 192 is no longer in contact with the arc plate 193, the second spring 27 will undergo elastic deformation to drive the movable rod 194 back to its original position. The movement of the movable rod 194 can drive the knocking block 195 back to its original position, and the matching tube 26 can control the moving position of the movable rod 194.

[0039] refer to Figure 4 A material discharge hole 28 is provided on both sides of the front and rear sides of the screening box 4, a lifting groove 29 is provided on the top of the material discharge hole 28, a baffle 30 is slidably connected to the inner cavity of the lifting groove 29, and a handle 31 is fixedly connected to the side of the baffle 30 away from the round tube 5.

[0040] The above scheme is adopted: by setting the discharge hole 28, the lifting groove 29, the baffle 30 and the handle 31, when the coal slag in the screening box 4 needs to be discharged, the handle 31 is held tightly to drive the baffle 30 to rise in the lifting groove 29, and the coal slag can be separated from the screening box 4.

[0041] refer to Figure 4 The front and rear sides of the screening box 4 are fixedly connected with a material guide shell 32, and the inner cavity of the material guide shell 32 is inclined, and the bottom of the material guide shell 32 is fixedly connected with a connecting pipe 33, and the front and rear sides of the weighted base 1 are movably connected with a semi-enclosed material receiving shell 34, and the shape of the opposite side of the two semi-enclosed material receiving shells 34 is consistent with the counterweight base.

[0042] The above scheme is adopted: by setting the material guide shell 32, the connecting pipe 33 and the half-package material receiving shell, when the baffle 30 rises, the top coal slag will fall into the material guide shell 32, and the coal slag in the material guide shell 32 will be discharged through the connecting pipe 33. At this time, a conveyor belt is placed at the bottom of the connecting pipe 33 to transport the coal slag away, and the bottom coal slag will fall into the half-package material receiving shell 34.

[0043] refer to Figure 3 The inner cavity of the screening box 4 is fixedly connected with a segmented plate 35 , and the number of the segmented plates 35 is four, and they are evenly fixedly connected to the inner cavity of the screening box 4 .

[0044] The above scheme is adopted: by setting the segmented plates 35, when the coal slag descends, the coal slag will collide with multiple segmented plates 35, and the impact force will cause the coal powder on the surface of the coal slag to be lifted up. At this time, the suction force generated by the self-priming ash sucker 81 will suck the coal powder into the self-priming ash sucker 81 through the L-shaped tube 82 and the U-shaped tube 83.

[0045] refer to Figures 1 to 9The method comprises the following steps: the first step: the staff turns on the self-priming dust suction machine 81 and the servo motor 16 through the PLC controller 6, and the output end of the servo motor 16 rotates, and the rotation of the output end drives the rotating rod 17 to rotate, and the rotation of the rotating rod 17 drives the material guide 21 to rotate, and the rotation of the material guide 21 drives the two fixed rods 91 to rotate, and the rotation of the fixed rod 91 drives the gear 94 to mesh with the teeth 95 of the inner cavity of the round tube 5, and then the gear 94 drives the rotating tube 92 to rotate, and the rotation of the rotating tube 92 drives the crushing teeth 93 to rotate; Step 2: Then the staff can put the coal slag into the conical tube 7, and the coal slag will fall through the gathering tube 20 and fall to the top of the guide member 21, and then the coal slag will fall to the top of the screening box 4, and the rotating rod 17 will drive the crushing teeth 93 to crush the coal slag, and the rotating rod 17 will drive the protrusion 192 to squeeze the arc plate 193 when rotating, and the arc plate 193 will be squeezed and drive the movable rod 194 to move in the inner cavity of the matching tube 26, and the squeezing ring 25 on the surface of the movable rod 194 squeezes the second spring 27 to drive the knocking block 195 to knock the isolation tube 3, and the shock force generated by knocking the isolation tube 3 will be transmitted to the screening box 4, and then the broken coal slag will pass through the screening box 4 and enter the screening box 4 due to the vibration; Step 3: The coal slag will then fall to the top of the segmented plate 35, and the impact force will lift up the coal powder on the surface of the coal slag. At this time, the suction force generated by the self-priming ash sucker 81 will suck the coal powder into the self-priming ash sucker 81 through the L-shaped pipe 82 and the U-shaped pipe 83; Step 4: After the coal slag falls to the top of the screening plate 10, secondary screening can be performed. After screening, it will drop to the bottom of the screening box 4. When too much coal slag is accumulated on the top of the screening plate 10, the screening plate 10 will drop to drive the linkage block to drop in the linkage slot 12. The descent of the linkage block will drive the connecting rod 15 to drop. The descent of the connecting rod 15 will drive the lower pressure plate 22 to squeeze the spring in the matching slot 14. The movement of the lower pressure plate 22 will drive the squeezing plate 24 to squeeze the control plate 182 to move on the top of the supporting plate 181. The movement of the control plate 182 can reduce the size of the unloading port of the gathering pipe 20, so that the unloading speed can be controlled; Step 5: When there is too much coal slag accumulated in the screening box 4, hold the handle 31 tightly to drive the baffle 30 to rise in the lifting groove 29. At this time, the coal slag can be separated from the screening box 4, and the top coal slag will fall into the material guide shell 32. The coal slag in the material guide shell 32 will be discharged through the connecting pipe 33. At this time, a conveyor belt is placed at the bottom of the connecting pipe 33 to transport the coal slag away, and the bottom coal slag will fall into the semi-packaged material receiving shell 34.

[0046] Working principle of the present invention: When in use, the staff turns on the self-priming ash sucker 81 and the servo motor 16 through the PLC controller 6, and the output end of the servo motor 16 rotates, and the rotation of the output end drives the rotating rod 17 to rotate, and the rotation of the rotating rod 17 drives the material guide 21 to rotate, and the rotation of the material guide 21 drives the two fixed rods 91 to rotate, and the rotation of the fixed rod 91 drives the gear 94 to mesh with the teeth 95 of the inner cavity of the circular tube 5, then the gear 94 drives the rotating tube 92 to rotate, and the rotation of the rotating tube 92 drives the crushing teeth 93 to rotate, and then the staff can put the coal slag into the conical tube 7, and the coal slag will drop through the gathering tube 20 and fall to the top of the material guide 21. The coal cinder will fall to the top of the screening box 4. At this time, the rotating rod 17 will drive the crushing teeth 93 to crush the coal cinder. When the rotating rod 17 rotates, it will drive the protrusion 192 to squeeze the arc plate 193. The arc plate 193 is squeezed and drives the movable rod 194 to move in the inner cavity of the matching tube 26. The extrusion ring 25 on the surface of the movable rod 194 squeezes the second spring 27 to drive the knocking block 195 to knock the isolation tube 3. The shock force generated by knocking the isolation tube 3 will be transmitted to the screening box 4. At this time, the broken coal cinder will be vibrated and pass through the screening box 4 into the screening box 4. Then the coal cinder will fall to the top of the segmented plate 35. At this time, the impact force will cause the coal powder on the surface of the coal cinder to rise. At this time, the suction force generated by the self-priming ash sucker 81 when it is turned on will suck the coal powder into the self-priming ash sucker 81 through the L-shaped tube 82 and the U-shaped tube 83. When the coal slag falls to the top of the screening plate 10, secondary screening can be carried out. After screening, it will drop to the bottom of the screening box 4. When too much coal slag is accumulated on the top of the screening plate 10, the screening plate 10 will drop and drive the linkage block to drop in the linkage groove 12. The descent of the linkage block will drive the connecting rod 15 to drop. The descent of the connecting rod 15 will drive the lower pressure plate 22 to squeeze the spring in the matching groove 14. The movement of the lower pressure plate 22 will drive the squeezing plate 24 to squeeze the control plate 182 to move on the top of the support plate 181. The control plate 182 moves The size of the feeding opening of the gathering tube 20 can be reduced by moving, so that the feeding speed can be controlled. When the coal slag in the screening box 4 is accumulated too much, hold the handle 31 tightly to drive the baffle 30 to rise in the lifting groove 29. At this time, the coal slag can be separated from the screening box 4, and the top coal slag will fall into the guide shell 32. The coal slag in the guide shell 32 will be discharged through the connecting pipe 33. At this time, a conveyor belt is placed at the bottom of the connecting pipe 33 to send the coal slag away, and the bottom coal slag will fall into the semi-bag-shaped receiving shell 34. The above steps complete the crushing and screening of the coal slag and the collection of coal powder, thereby improving the creativity of the garbage disposal equipment and facilitating the use of users.

[0047] It should be noted that the PLC controller 6, the self-priming dust collector 81 and the servo motor 16 are devices or equipment existing in the prior art, or are devices or equipment that can be realized in the prior art, and the specific composition and principle of the power supply of the PLC controller 6, the self-priming dust collector 81 and the servo motor 16 are clear to those skilled in the art, so they will not be described in detail.

[0048] To sum up: the garbage disposal equipment and its disposal method, by setting the ash suction component 8, the crushing component 9, the servo motor 16, the control component 18 and the knocking component 19 for coordinated use, the movement of the lower pressure plate 22 will drive the extrusion plate 24 to squeeze the control plate 182 to move on the top of the support plate 181, and the movement of the control plate 182 can reduce the size of the discharge port of the gathering pipe 20, so that the discharge speed can be controlled, which solves the problem that the current equipment for crushing coal slag uses two crushing wheels to crush the coal slag. This crushing method can easily cause the coal ash to rise, which will cause a large amount of coal powder to be lost, and the discharge speed cannot be controlled during crushing and screening. When too much accumulation occurs on the top of the screen plate 10, the discharge speed remains unchanged, which can easily cause the screen plate 10 to be blocked.

[0049] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0050] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A garbage disposal device, comprising a weighted base (1), six pillars (2), an isolation pipe (3), a screening box (4), a round pipe (5), a PLC controller (6) and a conical pipe (7), characterized in that: The top of the weighted base (1) is fixedly connected to the bottom of the support (2), the top of the weighted base (1) is fixedly connected to the bottom of the isolation tube (3), the screening box (4) is sleeved on the surface of the isolation tube (3), the bottom of the screening box (4) is fixedly connected to the weighted base (1), the top of the screening box (4) is fixedly connected to the bottom of the circular tube (5), the front side of the circular tube (5) is fixedly installed to the rear side of the PLC controller (6), and the top of the circular tube (5) is fixedly connected to the bottom of the conical tube (7); an ash suction component (8) for sucking coal ash in the screening box (4), the ash suction component (8) being arranged on the right side of the circular tube (5), the ash suction component (8) comprising a self-priming ash suction machine (81), the top of the self-priming ash suction machine (81) being fixedly connected to an L-shaped tube (82), the left side of the L-shaped tube (82) being fixedly connected to a U-shaped tube (83), and the front side and the rear side of the screening box (4) being fixedly connected to the U-shaped tube (83); A crushing assembly (9) for crushing coal slag, the crushing assembly (9) being arranged on the left and right sides of the inner cavity of a circular tube (5), the crushing assembly (9) comprising a fixed rod (91), a rotating tube (92) being sleeved on the surface of the fixed rod (91), and a protrusion on the surface of the fixed tube being in contact with the inner wall of the rotating tube (92), a crushing tooth (93) being fixedly connected to the surface of the rotating tube (92), and the number of the crushing teeth (93) being multiple, a gear (94) being fixedly connected to the opposite sides of the two rotating tubes (92), a tooth (95) being meshingly connected to the top of the gear (94), and the tooth (95) being fixedly connected to the circular tube (5) on the side close to the circular tube (5), and the number of the tooth (95) being multiple; The inner cavity of the screening box (4) is movably connected to a screening plate (10), and the size of the hole on the top of the screening box (4) and the hole on the top of the screening plate (10) are different. The left and right sides of the screening plate (10) are fixedly connected to linkage members (11). The left and right sides of the inner cavity of the screening box (4) are provided with linkage grooves (12) for use with the linkage members (11). The linkage members (11) are slidably connected to the inner cavity of the linkage grooves (12). The top of the linkage grooves (12) is provided with a connecting hole (13), and the top of the connecting hole (13) extends to the inside of the circular tube (5). The top of the connecting hole (13) is provided with a matching groove (14). The top of the linkage member (11) is fixedly connected to a connecting rod (15). The top of the weighted base (1) is fixedly mounted with a servo motor (16), and the output end of the servo motor (16) is fixedly connected to a rotating rod (17). A control component (18) for controlling the coal slag feeding speed, wherein the control component (18) is arranged on the left and right sides of the inner cavity of the circular tube (5); Two knocking components (19) for preventing the screening box (4) from being blocked, wherein the knocking components (19) are arranged in the inner cavity of the isolation tube (3).

2. A garbage disposal device as claimed in claim 1, characterized in that: The inner cavity of the circular tube (5) is fixedly connected to a gathering tube (20), and a material guide piece (21) is provided at the bottom of the gathering tube (20). The top of the material guide piece (21) is conical, and the bottom is fixedly connected to the rotating rod (17).

3. A garbage disposal device as claimed in claim 2, characterized in that: The control assembly (18) comprises a support plate (181), the opposite sides of the two support plates (181) are fixedly connected to the circular tube (5), the top of the support plate (181) is movably connected to a control plate (182), the front and rear sides of the support plate (181) are provided with positioning holes (183), the inner cavity of the positioning hole (183) is slidably connected to a positioning block (184), the side of the positioning block (184) close to the control plate (182) is fixedly connected to the control plate (182), and the control plate (182) is located at the bottom of the gathering tube (20).

4. A garbage disposal device as claimed in claim 3, characterized in that: The top of the connecting rod (15) passes through the connecting hole (13) and is fixedly connected to a lower pressure plate (22); the lower pressure plate (22) is movably connected to the inner cavity of the matching groove (14); the bottom of the lower pressure plate (22) is fixedly connected to a first spring (23), and the number of the first springs (23) is multiple; the top of the lower pressure plate (22) is rotatably connected to an extrusion plate (24) via a rotating shaft; the top of the extrusion plate (24) is rotatably connected to a control plate (182) via a rotating shaft.

5. A garbage disposal device as claimed in claim 1, characterized in that: The knocking assembly (19) comprises a mounting shell (191), wherein the mounting shell (191) is movably connected to the inner cavity of the isolation tube (3); the top of the rotating rod (17) passes through the two mounting shells (191) and extends to the outside of the mounting shells (191); both sides of the left and right sides of the rotating rod (17) are fixedly connected with protrusions (192); the inner cavity of the mounting shell (191) is movably connected with an arc plate (193), and the number of the arc plates (193) is six; the side of the arc plate (193) away from the protrusion (192) is fixedly connected with a movable rod (194); the side of the movable rod (194) away from the arc plate (193) passes through the mounting shell (191) and is fixedly connected with a knocking block (195); the top of the mounting shell (191) is fixedly connected with a mounting rod (196), and the number of the mounting rods (196) is multiple and uniformly fixedly connected to the inner cavity of the isolation tube (3).

6. A garbage disposal device as claimed in claim 5, characterized in that: The surface of the movable rod (194) is fixedly connected to an extrusion ring (25), the surface of the movable rod (194) is sleeved with a matching tube (26), the side of the matching tube (26) close to the mounting shell (191) is fixedly connected to the mounting shell (191), and the surface of the movable rod (194) is sleeved with a second spring (27), and the second spring (27) is located on the opposite side of the extrusion ring (25) and the matching tube (26).

7. A garbage disposal device as claimed in claim 1, characterized in that: Both sides of the front and rear sides of the screening box (4) are provided with material discharge holes (28), the top of the material discharge hole (28) is provided with a lifting groove (29), the inner cavity of the lifting groove (29) is slidably connected to a baffle (30), and the side of the baffle (30) away from the circular tube (5) is fixedly connected to a handle (31).

8. A garbage disposal device as claimed in claim 1, characterized in that: The front and rear sides of the screening box (4) are both fixedly connected to a material guide shell (32), and the inner cavity of the material guide shell (32) is inclined. The bottom of the material guide shell (32) is fixedly connected to a connecting pipe (33). The front and rear sides of the weighted base (1) are both movably connected to a semi-enclosed material receiving shell (34), and the shapes of the opposite sides of the two semi-enclosed material receiving shells (34) match those of the counterweight base.

9. A garbage disposal device as claimed in claim 1, characterized in that: The inner cavity of the screening box (4) is fixedly connected with a segmented plate (35), and the number of the segmented plates (35) is four, and they are evenly fixedly connected to the inner cavity of the screening box (4).

10. A garbage disposal device and a disposal method and a use method thereof as claimed in claims 1 to 9, the use method comprising the following steps: Step 1: A staff member turns on the self-priming ash suction machine (81) and the servo motor (16) through the PLC controller (6), and the output end of the servo motor (16) rotates, and the rotation of the output end drives the rotating rod (17) to rotate, and the rotation of the rotating rod (17) drives the material guide (21) to rotate, and the rotation of the material guide (21) drives the two fixed rods (91) to rotate, and the rotation of the fixed rod (91) drives the gear (94) to mesh with the teeth (95) in the inner cavity of the circular tube (5), and then the gear (94) drives the rotating tube (92) to rotate, and the rotation of the rotating tube (92) drives the crushing teeth (93) to rotate; Step 2: The staff can then put the coal slag into the conical tube (7). The coal slag will descend and pass through the gathering tube (20) to fall to the top of the guide member (21). At this time, the coal slag will fall to the top of the screening box (4). At this time, the rotating rod (17) will drive the crushing teeth (93) to crush the coal slag. When the rotating rod (17) rotates, it will drive the protrusion (192) to squeeze the arc plate (193). The arc plate (193) is squeezed and drives the movable rod (194) to move in the inner cavity of the matching tube (26). The squeezing ring (25) on the surface of the movable rod (194) squeezes the second spring (27) to drive the knocking block (195) to knock the isolation tube (3). The shock force generated by knocking the isolation tube (3) is transmitted to the screening box (4). At this time, the crushed coal slag is vibrated and passes through the screening box (4) into the screening box (4); Step 3: The coal slag then falls to the top of the segmented plate (35), and the impact force causes the coal powder on the surface of the coal slag to be lifted up. At this time, the suction force generated by the self-priming ash sucker (81) is turned on and the coal powder is sucked into the self-priming ash sucker (81) through the L-shaped pipe (82) and the U-shaped pipe (83); Step 4: After the coal slag falls to the top of the screening plate (10), secondary screening can be performed. After screening, the coal slag will drop to the bottom of the screening box (4). When too much coal slag is accumulated on the top of the screening plate (10), the screening plate (10) will drop and drive the linkage block to drop in the linkage groove (12). The descent of the linkage block will drive the connecting rod (15) to drop. The descent of the connecting rod (15) will drive the lower pressure plate (22) to squeeze the spring in the matching groove (14). The movement of the lower pressure plate (22) will drive the squeezing plate (24) to squeeze the control plate (182) to move on the top of the supporting plate (181). The movement of the control plate (182) can reduce the size of the unloading opening of the gathering pipe (20), so that the unloading speed can be controlled; Step 5: When too much coal slag is accumulated in the screening box (4), the handle (31) is held tightly to drive the baffle (30) to rise in the lifting groove (29). At this time, the coal slag can be separated from the screening box (4), and the top coal slag will fall into the guide shell (32). The coal slag in the guide shell (32) will be discharged through the connecting pipe (33). At this time, a conveyor belt is placed at the bottom of the connecting pipe (33) to transport the coal slag away, and the bottom coal slag will fall into the semi-packaged material receiving shell (34).

Citation Information

Cited By

  • Raw coal screening and impurity removing device

    CN119368418A