Method for treating fracture of casing pipe of continuous casting machine without flow blockage

Marking and cutting the casting blanks by cold material marking method solves the problem of difficult to judge the fracture position of the continuous casting machine casing, improves production efficiency and safety, avoids production interruptions and secondary accidents, and achieves efficient treatment effects.

CN118875233APending Publication Date: 2024-11-01SHANDONG IRON & STEEL GRP YONGFENG LINGANG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410981283.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In the prior art, it is difficult to accurately determine the position when the casing of the continuous casting machine is broken, resulting in production interruption, affecting output and safety. The existing treatment methods have problems of risks and low efficiency.

Method used

Using the cold material marking method, 15 rebars with a length of 23cm and a diameter of 12mm are placed into the casting flow crystallizer, mark the broken position of the sleeve, and cut and throw away at the fire cutting machine to avoid trough swing and reconnection. risk.

Benefits of technology

The rapid and accurate location of the casing is found, which reduces safety risks, avoids production interruptions and secondary accidents, and improves production and processing efficiency.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention belongs to the technical field of iron and steel smelting, and particularly relates to a method for treating fracture of a casing pipe of a continuous casting machine without flow blockage. Comprising the following steps: (1) preparing a cold material; (2) after the casing pipe is fractured, a cold material is put into the casing pipe for marking; and (3) cutting the marked position of the casting blank in a flame cutting machine procedure to throw waste. According to the method, the falling position of the sleeve is marked by utilizing the characteristic that the casting blank in which the cold charge is put can generate black marks after passing through the secondary cooling chamber, so that the marked position can be easily found out, and then the casting blank at the marked position is cut and discarded by a flame cutting machine, so that the aim of preventing the sleeve from being broken and falling into the crystallizer during flow blockage treatment is fulfilled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of steel smelting, and in particular relates to a method for processing a continuous casting machine casing fracture without blocking flow. Background Art

[0002] The existing continuous casting machines all use protective pouring. Long shroud protection pouring is used from the ladle to the tundish, and casing protection pouring is used from the tundish to the crystallizer. The casing used now is 710mm aluminum-carbon in length. During the production process, the casing is sleeved on the bowl of the lower shroud, and the lower part is inserted 70-140mm below the molten steel level of the crystallizer. The purpose of adding the casing is to prevent the secondary oxidation of the molten steel, promote the floating of inclusions, and use protective slag for lubrication to reduce the resistance to billet drawing.

[0003] The replacement cycle of the casing is generally 6-8 hours. During use, due to quality problems or long use time, the slag line is severely eroded. When replacing, the slag line breaks and falls into the crystallizer. If not handled in time, the casing will stick to the shell and follow the ingot into the interior, making it difficult to find. After entering the next process, it affects the production progress and product quality. The part mixed with the casing needs to be discarded.

[0004] In order to accurately determine the position of the sleeve in the billet, the existing method is to stop pouring by swinging the slot, kill the flow with a blind block, and then fish out the sleeve in the crystallizer after blocking the flow or directly reconnect it, replace the 15mm diameter water nozzle, and re-drain and start pouring. This process has many risks. In terms of safety, molten steel splashes during the swinging of the slot, which can easily cause burns to personnel. In the reconnection process, the joint may not solidify well and break, causing steel leakage. If the reconnection process takes too long, more than 10 minutes, there may be great resistance, and the billet cannot be pulled. If it is not handled properly, the flow will be pulled out and the ingot will be re-sent to start pouring, affecting production time by 30-60 minutes and output by 30 tons. Summary of the invention

[0005] The purpose of the present invention is to provide a method for treating the fracture of a continuous casting machine casing without blocking the flow, so as to solve the problems existing in the prior art.

[0006] The technical solution adopted by the present invention to solve the technical problem is: a method for treating the fracture of a continuous casting machine casing without blocking the flow, comprising the following steps:

[0007] (1) Prepare cold material;

[0008] (2) After the casing is broken, cold material is placed in it for marking;

[0009] (3) In the process of fire cutting, the marked position of the ingot is cut and discarded.

[0010] Furthermore, the method for preparing the cold material in step (1) is to place 15 rebars with a length of 23 cm and a diameter of 12 mm as cold materials on site for standby use.

[0011] Furthermore, the marking method in step (2) is as follows: when replacing the sleeve, if the lower part of the slag line breaks and falls into the crystallizer, the flow does not need to be swung or blocked. The prepared cold material is placed in the casting crystallizer for marking. The sleeve is rapidly solidified with the billet shell through the extrusion of the rebar and follows the billet into the second cooling chamber. The billet discharging personnel under the stage are notified to track the billet. After the billet comes out of the second cooling chamber, an obvious black mark will appear at the marked position due to the quenching. This position is the position where the sleeve falls.

[0012] The present invention has the following beneficial effects:

[0013] 1. The present invention utilizes the characteristic that a black mark will appear on the ingot after passing through the second cooling chamber after being placed in the cold material to mark the position where the sleeve falls in, so that the marked position can be easily found, and then the ingot at the marked position is cut and discarded by a fire cutting machine, thereby achieving the purpose of handling the broken sleeve falling into the crystallizer without blocking the flow.

[0014] 2. No need to swing the trough, which avoids the phenomenon of steel flipping and scalding personnel during pouring, reducing safety risks.

[0015] 3. It avoids the situation of interruption of casting flow due to blockage of casing breakage, reconnection of joints, and secondary accidents such as steel leakage and steel bursting during the reconnection process, ensuring smooth production.

[0016] 4. Compared with the blocking treatment method, the present invention increases the output of the casting machine by about 30 tons per hour while ensuring smooth production.

[0017] 5. During the operation, the process of handling abnormal accidents is reduced, making the operation safer. DETAILED DESCRIPTION

[0018] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0019] A method for treating a continuous casting machine casing fracture without blocking flow, comprising the following steps:

[0020] (1) Prepare cold material: Place 15 rebars with a length of 23 cm and a diameter of 12 mm as cold material on site for future use.

[0021] (2) After the casing breaks, put the cold material in for marking: When replacing the casing, if the lower part of the slag line breaks and falls into the crystallizer, do not swing the trough or block the flow. Put the prepared cold material into the casting crystallizer for marking. The casing is quickly solidified with the billet shell through the extrusion of the rebar and follows the billet into the second cooling chamber. Notify the billet discharging personnel under the stage to track the billet. After the billet leaves the second cooling chamber, an obvious black mark will appear at the marked position due to the quenching. This position is where the casing falls.

[0022] (3) In the process of fire cutting, the marked position of the ingot is cut and discarded.

[0023] It should be noted that since the billet is cut and discarded at the marked position, the length of this billet is shortened, but its performance is not affected and this billet can be sold out. For example, the billet needs to be cut into several 12m long billets at the fire cutting machine. After the billet at the marked position is cut and discarded, the length of this billet is less than 12m. This billet can be sold out without affecting normal production.

[0024] The working principle of the present invention is:

[0025] The position where the sleeve falls is marked by using the characteristic that the billet after being placed in the cold material will have a black mark after passing through the second cooling chamber, so that the marked position can be easily found, and then the billet at the marked position can be cut and discarded by the fire cutting machine. Compared with the treatment method of blocking flow, the present invention does not affect the production process, only needs to put the cold material into the place where the sleeve falls, the safety risk is small, there is no need to reopen or reconnect, and there is no risk of re-sending the ingot for pouring. Although a part of the billet is discarded, and a section of the billet is sold out due to its short size, it is also cheaper than the method of salvaging the sleeve after blocking flow and reopening or reconnecting.

[0026] The above-described embodiments are merely descriptions of preferred implementations of the present invention, and are not intended to limit the concept and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by ordinary persons in the art to the technical solution of the present invention should all fall within the scope of protection of the present invention.

[0027] The techniques, shapes, and structural parts not described in detail in the present invention are all well-known techniques.

Claims

1. A method for treating a broken casing of a continuous casting machine without blocking the flow, characterized in that: The following steps are involved: (1) Prepare cold material; (2) After the casing is broken, cold material is placed in it for marking; (3) In the process of fire cutting, the marked position of the ingot is cut and discarded.

2. The method for treating the fracture of the continuous casting machine casing without blocking the flow according to claim 1, characterized in that: The method for preparing the cold material in step (1) is to place 15 rebars with a length of 23 cm and a diameter of 12 mm as cold materials on site for standby use.

3. The method for treating the fracture of the continuous casting machine casing without blocking the flow according to claim 1, characterized in that: The marking method described in step (2) is as follows: when replacing the sleeve, if the lower part of the slag line breaks and falls into the crystallizer, the flow does not need to be swung or blocked. The prepared cold material is placed in the casting crystallizer for marking. The sleeve is quickly solidified with the billet shell through the extrusion of the rebar and follows the billet into the second cooling chamber. The billet discharging personnel under the stage are notified to track the billet. After the billet comes out of the second cooling chamber, an obvious black mark will appear at the marked position due to the quenching. This position is the position where the sleeve falls.