Through the calculation of load and ground grouting reinforcement technology, the bearing capacity of the underworld tunnel is improved, and the impact of viaduct construction on the underworld tunnel is solved, the shield subsidence and deformation are avoided, and construction safety and smooth tracks are ensured.
Patent Information
- Application Number
- CN202410918012.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-11-01
AI Technical Summary
During the construction of the viaduct, the underlying tunnel is easily affected, resulting in damage to the formation, multi-section stacked subway operation and superimposed formation disturbance. In severe cases, shield structure subsidence deformation will occur, resulting in uneven subway tracks and safety risks. A kind of Scientific and reasonable construction methods to protect the underlying tunnel.
By calculating the load transferred from the viaduct pile foundation to the soil reinforcement area, ground grouting is used to reinforce the soil layer above the tunnel, and reinforce reinforced concrete lining is reinforced in the tunnel structure to enhance the bearing capacity of the underlying tunnel and meet the requirements of viaduct construction and operation.
It effectively avoids uneven subsidence and deformation of the overpass pile and the shield structure of the underpass tunnel, ensures the safety of the underpass tunnel, and ensures the smooth progress of the overpass construction. It has a scientific and reasonable design, simple operation, and is safe and reliable.
Smart Images

Figure CN118880737A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of stratum reinforcement and viaduct construction, in particular to a viaduct construction method involving underlying tunnel protection. Background Art
[0002] With the continuous increase in the size of cities in my country, subways and viaducts are the main channels for realizing three-dimensional urban transportation. The density of urban subway networks and viaduct networks is also getting higher and higher. Both have strict requirements on the operating environment and deformation control. If the underlying tunnel cannot be well protected during the construction of the viaduct, it is easy for the stratum to be damaged and the ground disturbance superimposed by the operation of multiple subway sections. In severe cases, the shield will sink and deform, leading to safety risks such as uneven subway tracks. Therefore, it is necessary to formulate corresponding construction methods and prevention and control measures to ensure that the viaduct can be constructed safely and smoothly when the underlying tunnel is in place, so as to avoid uneven sinking and deformation of the viaduct piles and the shield of the underlying tunnel.
[0003] Since the subway is easily affected by changes in the surrounding environment, when it comes to the construction of the subway's underlying tunnel, rigorous and scientific design is required to meet the requirements of construction safety and to effectively protect the underlying tunnel during the construction of the viaduct. Therefore, there is an urgent need for a scientific and reasonable viaduct construction method involving the protection of the underlying tunnel. Summary of the invention
[0004] In order to solve the problem that viaduct construction affects the underlying tunnel and ensure the smooth construction of the viaduct, the purpose of the present invention is to provide a viaduct construction method involving the protection of the underlying tunnel, which can effectively protect the underlying tunnel during the viaduct construction.
[0005] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0006] A method for constructing an elevated bridge involving protection of an underlying tunnel comprises the following steps:
[0007] ① Calculate the load P0 transferred from the viaduct pile foundation to the soil reinforcement area;
[0008]
[0009] Where: F is the vertical force acting on the top surface of the pile foundation cap, kN; a0 is the length of the long side of the outer rectangular surface of a single pile or a pile group, m; b0 is the length of the short side of the outer rectangular surface of a single pile or a pile group, m; is the average value of the internal friction angle of the soil layer; 1 is the depth of the pile into the soil, m; G is the deadweight of the cap and the soil covering the cap, where the specific gravity of the concrete is 20kN / m 3 Calculation, deduct buoyancy of underwater part, kN; P c0is the self-weight pressure of the foundation soil at the bottom elevation of the cap, where the specific gravity of the foundation soil is 14kN / m 3 Calculation, deduct the buoyancy of the underwater part, kPa; a is the length of the base bottom, b is the width of the base bottom, m;
[0010] The accidental load P1 is 5 to 20 kPa; the accidental load is the load of earthquake or impact;
[0011] The combination coefficient is α, which is 1.2 for the combination controlled by the variable load effect and 1.35 for the combination controlled by the permanent load effect; the adjustment coefficient of the design service life of the viaduct is p, which is 1.0 when the design service life is 50 years and 1.1 when the design service life is 100 years;
[0012] Load requirement P transferred from viaduct pile foundation to soil reinforcement area 总 =(P0+P1)×α×β;
[0013] ② Reinforce the existing reinforced concrete lining of the underlying tunnel with a 20-40 mm thick steel ring lining to improve the bearing capacity of the underlying tunnel;
[0014] ③ Carry out ground grouting reinforcement on the soil layer above the tunnel, and the soil reinforcement strength meets the load requirements of the viaduct pile foundation transferred to the soil reinforcement area;
[0015] ④ Carry out construction of viaduct pile foundation, abutment and viaduct piers.
[0016] Preferably, in step ③, the ground grouting reinforcement of the soil layer above the tunnel is carried out in the order of first the periphery and then the interior.
[0017] Preferably, the specific steps of step ③ are:
[0018] Determine the plane reinforcement range of ground grouting, where the length and width of the plane of ground grouting are 20 to 50 cm larger than the viaduct cap, 24 to 48 grouting holes are set for ground grouting, the reinforcement thickness is 2 to 3 meters deeper than the pile bottom, and the distance to the tunnel arch should be greater than 4 meters.
[0019] Preferably, the grouting material is 1:1 cement slurry; the grouting rate range is 5 to 110 L / min, and the diffusion radius is 2 to 3 meters.
[0020] Preferably, in step ③, a grouting test is performed on site before grouting.
[0021] Preferably, in step ③, the grouting effect is tested after the grouting is completed, and the unconfined compressive strength of the reinforced soil layer is greater than 5MPa, and the permeability coefficient is less than 1×10 -3 m / d.
[0022] Preferably, the distance from the bottom of the bored pile to the tunnel arch is greater than 5m, the pile length is 15-40m, the pile diameter is 0.8-2.0m, the pile foundation casing is formed by rolling steel plates, the inner diameter of the casing is the pile diameter D+20-25cm, a rotary drilling rig is used for drilling, and the steel cage is hoisted after the hole is formed. The pile body material is C30-C40 underwater cast concrete.
[0023] Preferably, the foundation pit excavation is supported by steel pipe piles, and the steel pipes used are seamless steel pipes with outer diameters of φ168mm, φ219mm and φ273mm and wall thicknesses of 8mm to 14mm. The manufactured steel pipe piles are sunk into the boreholes by a drilling rig.
[0024] Preferably, the foundation is made of C30-C40 concrete, and the foundation is 4-6m long, 1.2-3.6m wide, and 0.8-2m high.
[0025] Preferably, during the construction of viaduct piers, piers with a height less than 10m are cast in one go, and piers with a height greater than 10m are cast in two gospels, with the first cast being 10m high and the second cast being H-10m (H being the pier height). The pier concrete grade is C40-C50 concrete.
[0026] Compared with the prior art, the present invention has the following advantages:
[0027] The present invention relates to a method for constructing an elevated bridge for protecting an underlying tunnel, which can ensure that the elevated bridge can be constructed safely and smoothly when the underlying tunnel is present, avoid uneven subsidence and deformation of elevated bridge piles and the shield of the underlying tunnel, effectively protect the underlying tunnel, and avoid the underlying tunnel being affected by the construction environment.
[0028] The present invention relates to a method for constructing an elevated bridge with underlying tunnel protection. The load transmitted from the pile foundation of the elevated bridge to the stratum reinforcement area is obtained by calculation, and the overlying soil layer of the tunnel is reinforced by ground grouting. At the same time, the tunnel structure is reinforced by lining, so that the tunnel structure and the overlying stratum can meet the requirements of the construction and operation of the elevated bridge. The design is scientific and reasonable, the steps are easy to operate, safe and reliable, and the bearing requirements of the underlying tunnel can be met, so as to achieve the purpose of reinforcement. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 Schematic diagram for calculating the load P0 transferred from the viaduct pile foundation to the soil reinforcement area;
[0030] Figure 2 for Figure 1 A top view of DETAILED DESCRIPTION
[0031] The object of the present invention is to provide a method for constructing an elevated bridge involving protection of an underlying tunnel, which is achieved by the following technical solutions:
[0032] The present invention is further described below in conjunction with specific embodiments.
[0033] Example 1
[0034] A method for constructing a viaduct involving protection of an underlying tunnel, such as Figure 1 and Figure 2 As shown, the following steps are included:
[0035] ① Calculate the load P0 transferred from the viaduct pile foundation to the soil reinforcement area;
[0036]
[0037] Where: F is the vertical force acting on the top surface of the pile foundation cap, kN; a0 is the length of the long side of the outer rectangular surface of a single pile or a pile group, m; b0 is the length of the short side of the outer rectangular surface of a single pile or a pile group, m; is the average value of the internal friction angle of the soil layer; 1 is the depth of the pile into the soil, m; G is the deadweight of the cap and the soil covering the cap, and the specific gravity of the concrete is 20kN / m 3 Calculation, deduct buoyancy of underwater part, kN; P c0 is the self-weight pressure of the foundation soil at the bottom elevation of the cap. The specific gravity of the foundation soil is 14kN / m 3 Calculation: deduct the buoyancy of the underwater part, kPa; a is the length of the bottom of the pedestal, b is the width of the bottom of the pedestal, m.
[0038] The accidental load P1 is 5 to 20 kPa; the accidental load is the load of earthquake or impact;
[0039] The combination coefficient is α, which is 1.2 for the combination controlled by the variable load effect and 1.35 for the combination controlled by the permanent load effect; the adjustment coefficient of the design service life of the viaduct is β, which is 1.0 when the design service life is 50 years and 1.1 when the design service life is 100 years;
[0040] Load requirement P transferred from viaduct pile foundation to soil reinforcement area 总 =(P0+P1)×α×β;
[0041] ② Reinforce the existing reinforced concrete lining of the underlying tunnel with a 20-40 mm thick steel ring lining to improve the bearing capacity of the underlying tunnel;
[0042] ③ The soil layer above the tunnel is reinforced by ground grouting, and the soil reinforcement strength meets the load requirements of the viaduct pile foundation transferred to the soil reinforcement area; the soil layer above the tunnel is reinforced by ground grouting in the order of first the periphery and then the interior; the plane reinforcement range of ground grouting is determined, where the length and width of the plane of ground grouting are both 20 to 50 cm larger than the viaduct cap, 24 to 48 grouting holes are set for ground grouting, the reinforcement thickness is 2 to 3 meters deeper than the pile bottom, and the distance to the tunnel vault should be greater than 4 meters; the grouting material is 1:1 cement slurry; the grouting rate range is 5 to 110L / min; the grouting pressure should be determined by the geological conditions and the surrounding environment control requirements, and is 0.2 to 2MPa, and the slurry diffusion radius is 2 to 3 meters;
[0043] Before grouting, a grouting test is carried out on site; after grouting, the grouting effect is tested. The unconfined compressive strength of the reinforced soil layer is greater than the total load value, and the permeability coefficient is less than 1×10 -3 m / d;
[0044] ④ Carry out construction of viaduct pile foundation, abutment and viaduct piers.
[0045] The distance from the bottom of the bored pile to the tunnel vault is greater than 5m, the pile length is 15-40m, the pile diameter is 0.8-2.0m, the pile foundation casing is made of rolled steel plate, the inner diameter of the casing is the pile diameter D+20-25cm, and the drilling is done by a rotary drilling rig. After the hole is drilled, the steel cage is hoisted. The pile body material is C30-C40 underwater cast concrete;
[0046] The foundation pit excavation is supported by steel pipe piles. The steel pipes used are seamless steel pipes with outer diameters of φ168mm, φ219mm and φ273mm and wall thicknesses of 8mm to 14mm. The finished steel pipe piles are sunk into the boreholes using a drilling rig.
[0047] The pedestal is made of C30-C40 concrete, with a length of 4-6m, a width of 1.2-3.6m and a height of 0.8-2m.
[0048] During the construction of viaduct piers, piers with a height of less than 10m are cast in one go, and piers with a height of more than 10m are cast in two steps. The first casting height is 10m, and the second casting height is H-10m (H is the pier height). The pier concrete grade is C40~C50 concrete.
[0049] Example 2
[0050] A method for constructing a viaduct involving protection of an underlying tunnel, such as Figure 1 and Figure 2 As shown, the following steps are included:
[0051] ① Calculate the load P0 transferred from the viaduct pile foundation to the soil reinforcement area;
[0052]
[0053] Where: F is the vertical force acting on the top surface of the pile foundation cap, kN; a0 is the length of the long side of the outer rectangular surface of a single pile or a pile group, m; b0 is the length of the short side of the outer rectangular surface of a single pile or a pile group, m; is the average value of the internal friction angle of the soil layer; 1 is the depth of the pile into the soil, m; G is the deadweight of the cap and the soil covering the cap, and the specific gravity of the concrete is 20kN / m 3 Calculation, deduct buoyancy of underwater part, kN; P c0 is the self-weight pressure of the foundation soil at the bottom elevation of the cap. The specific gravity of the foundation soil is 14kN / m 3 Calculation, deduct the buoyancy of the underwater part, kPa; a is the length of the base bottom, b is the width of the base bottom, m;
[0054] The dead load of the viaduct and pier structure is 1700kN, and the dynamic load of the vehicle is 400kN. Through calculation, the vertical force acting on the top surface of the pile foundation cap is:
[0055] F=2100kN
[0056] The concrete density is 20kN / m 3 Calculate the deadweight of the foundation and the soil covering it:
[0057] G = 5 × 2 × 1.5 × 20 = 300 kN
[0058] The specific gravity of foundation soil is 1.4g / cm 3 , the self-weight pressure of the foundation soil at the bottom elevation of the cap:
[0059] P c0 =1.5×14=21kPa
[0060] The internal friction angle of the foundation soil is 20°, the diameter of the bored pile is 1.5m, there are two bored piles under each cap, the distance between the piles is 3m, a0=4.5m, b0=1.5m, then:
[0061]
[0062] The final load value of the dead load of the viaduct and pier structure and the dynamic load of the vehicle is 42.1kPa, the accidental load such as earthquake and impact is 10kPa, and the total load value is 52.1kPa.
[0063] The load partial coefficient of the basic combination is 1.2. Considering that the design service life of the viaduct is 100 years, the adjustment coefficient is 1.1. It is calculated that the unconfined compressive strength after reinforcement should be greater than 68.8 kPa, which meets the requirements after bearing capacity verification.
[0064] ② Reinforce the existing reinforced concrete lining of the underlying tunnel with a 20-40 mm thick steel ring lining to improve the bearing capacity of the underlying tunnel;
[0065] ③ The soil layer above the tunnel is reinforced by ground grouting. The soil reinforcement strength meets the load requirements of the viaduct pile foundation transferred to the soil reinforcement area. The ground grouting reinforcement of the soil layer above the tunnel is carried out in the order of first the periphery and then the interior. The plane reinforcement range of the ground grouting is determined. According to the size of the viaduct pile foundation, the plane reinforcement range is determined to be 5.5m×2.5m wide. 32 grouting holes are set for ground grouting, and the reinforcement thickness is 28m.
[0066] Grouting reinforcement construction, grouting pressure should be determined by geological conditions and surrounding environment control requirements. The geological conditions of this embodiment are sandy soil, and the final grouting pressure is determined to be 0.8MPa. The grouting material uses 1:1 cement slurry, the grouting rate is 50L / min, and the diffusion radius is 3.0m. Before grouting, a field grouting test should be conducted in a representative area. The grouting amount shall be based on on-site measurement;
[0067] After grouting is completed, the grouting effect should be tested to ensure the reinforcement effect. The unconfined compressive strength of the reinforced stratum is 150kPa (greater than 68.8kPa) and the permeability coefficient is 0.8×10 -3 m / d, meets the requirements.
[0068] Bored cast-in-place pile construction is carried out, with a pile length of 25m and a pile diameter of 1.5m. The pile foundation casing is formed by rolling steel plates, and the inner diameter of the casing is the pile diameter D+20cm. A rotary drilling rig is used for drilling, and the steel cage is hoisted after the hole is formed. The pile body material is C30 underwater cast concrete.
[0069] The foundation is constructed with a length of 5.0m × width of 2.0m × height of 1.5m. The foundation pit of the foundation is excavated with steel pipe piles for support. The steel pipes are of outer diameter The seamless steel pipe with a wall thickness of 10mm is used to make the steel pipe piles, which are sunk into the holes by drilling rigs. The foundation is made of C35 concrete.
[0070] When the earth backfill construction reaches 50cm below the steel support, the steel support removal construction is carried out.
[0071] The bridge pier construction is carried out. The height of the pier is 14m. It is cast in two times. The first casting height is 10m, and the second casting height is 4m. The pier concrete grade is C40 concrete.
[0072] Example 3
[0073] A method for constructing a viaduct involving protection of an underlying tunnel, such as Figure 1 and Figure 2 As shown, the following steps are included:
[0074] ① Calculate the load P0 transferred from the viaduct pile foundation to the soil reinforcement area;
[0075]
[0076] Where: F is the vertical force acting on the top surface of the pile foundation cap, kN; a0 is the length of the long side of the outer rectangular surface of a single pile or a pile group, m; b0 is the length of the short side of the outer rectangular surface of a single pile or a pile group, m; is the average value of the internal friction angle of the soil layer; 1 is the depth of the pile into the soil, m; G is the deadweight of the cap and the soil covering the cap, and the specific gravity of the concrete is 20kN / m 3 Calculation, deduct buoyancy of underwater part, kN; P c0 is the self-weight pressure of the foundation soil at the bottom elevation of the cap. The specific gravity of the foundation soil is 14kN / m 3 Calculation, deduct the buoyancy of the underwater part, kPa; a is the length of the base bottom, b is the width of the base bottom, m;
[0077] The dead load of the viaduct and pier structure is 1600kN, and the dynamic load of the vehicle is 300kN. Through calculation, the vertical force acting on the top surface of the pile foundation cap is:
[0078] F=1900kN
[0079] The concrete density is 20kN / m 3 Calculate the deadweight of the foundation and the soil covering it:
[0080] G = 4.8 × 1.8 × 1.6 × 20 = 276 kN
[0081] The specific gravity of foundation soil is 1.4g / cm 3 , the self-weight pressure of the foundation soil at the bottom elevation of the cap:
[0082] P c0 =1.6×14=22.4kPa
[0083] The internal friction angle of the foundation soil is 20°, the diameter of the bored pile is 1.6m, there are two bored piles under each cap, the pile spacing is 3m, a0=4.6m, b0=1.6m, then:
[0084]
[0085] Finally, the dead load of the viaduct and pier structure and the dynamic load of vehicles are 29.36 kPa, the accidental loads such as earthquake and impact are 10 kPa, and the total load value is 39.36 kPa.
[0086] The load partial coefficient of the basic combination is taken as 1.2. Considering that the design service life of the viaduct is 100 years, the adjustment coefficient is taken as 1.1. It is calculated that the unconfined compressive strength after stratum reinforcement should be greater than 51.96 kPa, which meets the requirements after bearing capacity verification.
[0087] ② Reinforce the original reinforced concrete lining of the underlying tunnel with a 35mm thick steel ring lining to improve the bearing capacity of the underlying tunnel;
[0088] ③ The soil layer above the tunnel is reinforced by ground grouting. The soil reinforcement strength meets the load requirements of the viaduct pile foundation transferred to the soil reinforcement area. The ground grouting reinforcement of the soil layer above the tunnel is carried out in the order of first the periphery and then the interior. The plane reinforcement range of the ground grouting is determined. According to the size of the viaduct pile foundation, the plane reinforcement range is determined to be 5.0m×2.0m wide. 32 grouting holes are set for ground grouting, and the reinforcement thickness is 27m.
[0089] Grouting reinforcement construction, the geological conditions of this embodiment are sandy soil, the final grouting pressure is determined to be 1.0MPa, the grouting material is 1:1 cement slurry, the grouting rate is 55L / min, and the diffusion radius is 2.5m. Before grouting, a field grouting test should be conducted in a representative area. The grouting amount shall be based on the on-site measurement;
[0090] After grouting is completed, the grouting effect should be tested to ensure the reinforcement effect. The unconfined compressive strength of the reinforced stratum is 200kPa (>51.96kPa), and the permeability coefficient is 0.7×10- 3 m / d.
[0091] Bored cast-in-place pile construction is carried out, with a pile length of 30m and a pile diameter of 1.6m. The casing of the bored cast-in-place pile foundation is formed by rolling steel plates, and the inner diameter of the casing is the pile diameter D+25cm. A rotary drilling rig is used for drilling, and the steel cage is hoisted after the hole is formed. The pile body material is C40 underwater cast concrete.
[0092] The foundation is constructed with a length of 4.8m × width of 1.8m × height of 1.6m. The foundation pit of the foundation is excavated with steel pipe piles for support. The steel pipes are of outer diameter The seamless steel pipe with a wall thickness of 12mm is used to make the finished steel pipe piles which are sunk into the boreholes by a drilling rig. The cap is made of C40 concrete.
[0093] When the earth backfill construction reaches 50cm below the steel support, the steel support removal construction is carried out.
[0094] The bridge pier construction is carried out. The height of the pier is 14m. It is cast in two times. The first casting height is 10m, and the second casting height is 4m. The pier concrete grade is C40 concrete.
[0095] Example 4
[0096] A method for constructing a viaduct involving protection of an underlying tunnel, such as Figure 1 and Figure 2 As shown, the following steps are included:
[0097] ① Calculate the load P0 transferred from the viaduct pile foundation to the soil reinforcement area;
[0098]
[0099] Where: F is the vertical force acting on the top surface of the pile foundation cap, kN; a0 is the length of the long side of the outer rectangular surface of a single pile or a pile group, m; b0 is the length of the short side of the outer rectangular surface of a single pile or a pile group, m; is the average value of the internal friction angle of the soil layer; 1 is the depth of the pile into the soil, m; G is the deadweight of the cap and the soil covering the cap, and the specific gravity of the concrete is 20kN / m 3 Calculation, deduct buoyancy of underwater part, kN; P c0 is the self-weight pressure of the foundation soil at the bottom elevation of the cap. The specific gravity of the foundation soil is 14kN / m 3 Calculation, deduct the buoyancy of the underwater part, kPa; a is the length of the base bottom, b is the width of the base bottom, m;
[0100] The dead load of the viaduct and pier structure is 2000kN, and the dynamic load of the vehicle is 600kN. Through calculation, the vertical force acting on the top surface of the pile foundation cap is:
[0101] F=2600kN
[0102] The concrete density is 20kN / m 3 Calculate the deadweight of the foundation and the soil covering it:
[0103] G = 6 × 3.6 × 2 × 20 = 864 kN
[0104] The specific gravity of foundation soil is 1.4g / cm 3 , the self-weight pressure of the foundation soil at the bottom elevation of the cap:
[0105] P c0 =2×14=28kPa
[0106] The internal friction angle of the foundation soil is 20°, the diameter of the bored pile is 2.0m, there are two bored piles under each cap, the pile spacing is 3m, a0=5.0m, b0=2.0m, then:
[0107]
[0108] Finally, the dead load of the viaduct and pier structure and the dynamic load of vehicles are 38.48 kPa, the accidental loads such as earthquake and impact are 20 kPa, and the total load value is 58.48 kPa.
[0109] The load partial coefficient of the basic combination is taken as 1.2. Considering that the design service life of the viaduct is 100 years, the adjustment coefficient is taken as 1.1. It is calculated that the unconfined compressive strength after stratum reinforcement should be greater than 77.19 kPa, which meets the requirements after bearing capacity verification.
[0110] ② Reinforce the original reinforced concrete lining of the underlying tunnel with a 35mm thick steel ring lining to improve the bearing capacity of the underlying tunnel;
[0111] ③ The soil layer above the tunnel is reinforced by ground grouting. The soil reinforcement strength meets the load requirements of the viaduct pile foundation transferred to the soil reinforcement area. The ground grouting reinforcement of the soil layer above the tunnel is carried out in the order of first the periphery and then the interior. The plane reinforcement range of the ground grouting is determined. According to the size of the viaduct pile foundation, the plane reinforcement range is determined to be 5.0m×2.0m wide. 32 grouting holes are set for ground grouting, and the reinforcement thickness is 27m.
[0112] Grouting reinforcement construction, the geological conditions of this embodiment are loess, the final grouting pressure is determined to be 1.0MPa, the grouting material is 1:1 cement slurry, the grouting rate is 55L / min, and the diffusion radius is 2.5m. Before grouting, a field grouting test should be conducted in a representative area. The grouting amount shall be based on the on-site measurement;
[0113] After grouting is completed, the grouting effect should be tested to ensure the reinforcement effect. The unconfined compressive strength of the reinforced stratum is 220kPa (>77.19kPa), and the permeability coefficient is 0.9×10 -3 m / d.
[0114] Bored cast-in-place pile construction is carried out, with a pile length of 30m and a pile diameter of 2.0m. The casing of the bored cast-in-place pile foundation is formed by rolling steel plates, and the inner diameter of the casing is the pile diameter D+25cm. A rotary drilling rig is used for drilling, and the steel cage is hoisted after the hole is formed. The pile body material is C40 underwater cast concrete.
[0115] The foundation is constructed with a length of 6.0m × width of 3.6m × height of 2.0m. The foundation pit of the foundation is supported by steel pipe piles, and the steel pipes are of outer diameter The seamless steel pipe with a wall thickness of 12mm is used to make the finished steel pipe piles which are sunk into the boreholes by a drilling rig. The cap is made of C40 concrete.
[0116] When the earth backfill construction reaches 50cm below the steel support, the steel support removal construction is carried out.
[0117] The bridge pier construction is carried out. The height of the pier is 14m. It is cast in two times. The first casting height is 10m, and the second casting height is 4m. The pier concrete grade is C40 concrete.
Claims
1. A method for constructing an elevated bridge involving protection of an underlying tunnel, Features: The following steps are involved: ① Calculate the load P transferred from the viaduct pile foundation to the soil reinforcement area 0 ; Where: F is the vertical force acting on the top surface of the pile foundation, kN; a 0 b is the length of the long side of the outer rectangular surface of a single pile or pile group, m; 0 is the length of the short side of the outer rectangular surface of a single pile or a pile group, m; is the average value of the internal friction angle of the soil layer; 1 is the depth of the pile into the soil, m; G is the deadweight of the cap and the soil covering the cap, minus the buoyancy of the underwater part, kN; P c0 is the deadweight pressure of the foundation soil at the bottom elevation of the cap, minus the buoyancy of the underwater part, kPa; a is the length of the cap bottom, b is the width of the cap bottom, m; The accidental load P 1 Take 5~20kPa; the accidental load is the load of earthquake or impact; The combination coefficient is α, which is 1.2 for the combination controlled by the variable load effect and 1.35 for the combination controlled by the permanent load effect; the adjustment coefficient of the design service life of the viaduct is β, which is 1.0 when the design service life is 50 years and 1.1 when the design service life is 100 years; Load requirement P transferred from viaduct pile foundation to soil reinforcement area 总 =(P 0 +P 1 )×α×β; ② Reinforce the existing reinforced concrete lining of the underlying tunnel with a 20-40 mm thick steel ring lining to improve the bearing capacity of the underlying tunnel; ③ Carry out ground grouting reinforcement on the soil layer above the tunnel, and the soil reinforcement strength meets the load requirements of the viaduct pile foundation transferred to the soil reinforcement area; ④ Carry out construction of viaduct pile foundation, abutments and viaduct piers.
2. A method for constructing an elevated bridge involving protection of an underlying tunnel according to claim 1, Features: In step ③, the ground grouting reinforcement of the soil layer above the tunnel is carried out in the order of first the outer periphery and then the inner periphery.
3. A method for constructing an elevated bridge involving protection of an underlying tunnel according to claim 2, Features: The specific steps of step ③ are: Determine the plane reinforcement range of ground grouting, where the length and width of the plane of ground grouting are 20 to 50 cm larger than the viaduct cap, 24 to 48 grouting holes are set for ground grouting, the reinforcement thickness is 2 to 3 meters deeper than the pile bottom, and the distance to the tunnel arch should be greater than 4 meters.
4. A method for constructing an elevated bridge involving protection of an underlying tunnel according to claim 2, Features: The grouting material is 1:1 cement slurry; the grouting rate range is 5 to 110L / min, and the diffusion radius is 2 to 3 meters.
5. A method for constructing an elevated bridge involving protection of an underlying tunnel according to claim 1, Features: Step ③ Carry out grouting test on site before grouting.
6. A method for constructing an elevated bridge involving protection of an underlying tunnel according to claim 1, Features: Step ③ After the grouting is completed, the grouting effect is tested. The unconfined compressive strength of the reinforced soil layer is greater than 5MPa and the permeability coefficient is less than 1×10 -3 m / d.
7. A method for constructing an elevated bridge involving protection of an underlying tunnel according to claim 1, Features: The distance from the bottom of the bored pile to the tunnel arch is greater than 5m, the pile length is 15 to 40m, the pile diameter is 0.8 to 2.0m, the pile foundation casing is formed by rolling steel plates, the inner diameter of the casing is the pile diameter D + 20 to 25cm, and a rotary drilling rig is used for drilling. After the hole is drilled, the steel cage is hoisted. The pile body material is C30 to C40 underwater cast concrete.
8. A method for constructing an elevated bridge involving protection of an underlying tunnel according to claim 1, Features: The excavation of the foundation pit is supported by steel pipe piles. The steel pipes used are seamless steel pipes with outer diameters of φ168mm, φ219mm and φ273mm and wall thicknesses of 8mm to 14mm. The finished steel pipe piles are sunk into the boreholes using a drilling rig.
9. A method for constructing an elevated bridge involving protection of an underlying tunnel according to claim 1, Features: The pedestal is made of C30-C40 concrete, with a length of 4-6m, a width of 1.2-3.6m and a height of 0.8-2m.
10. A method for constructing an elevated bridge involving protection of an underlying tunnel according to claim 1, Features: During the construction of viaduct piers, piers with a height of less than 10m are cast in one go, and piers with a height of more than 10m are cast in two steps. The first casting height is 10m, and the second casting height is H-10m (H is the pier height). The pier concrete grade is C40~C50 concrete.