Construction method of deep soft foundation box girder composite support
Through the prestressed pipe piles and composite bracket system, combined with the efficient vibration mechanism, the foundation treatment and bracket design challenges in box beam construction under deep soft base geological conditions are solved, and the safety, quality and progress of box beam construction are improved. .
Patent Information
- Application Number
- CN202411048822.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-01
AI Technical Summary
Under deep soft base geological conditions, there are challenges in foundation treatment and support design during box girder construction, which makes it difficult to meet the requirements of construction safety, quality and progress.
The composite bracket system of prestressed pipe piles + strip foundation and Bere + full-door bracket + door opening is adopted, and concrete pouring is combined with an efficient vibration mechanism to ensure the foundation bearing capacity and the uniform stress of the bracket structure.
The foundation treatment speed and bearing capacity are improved, the bracket settlement amount and deformation are reduced, the quality and progress of box beam construction are ensured, and the foundation treatment costs and construction period are saved.
Smart Images

Figure CN118880741A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of box girder composite support construction, and in particular to a method for constructing a deep soft foundation box girder composite support. Background Art
[0002] As a prestressed concrete structure bridge that spans roads and lines, box girders are widely used in bridge structures in the transportation industry because of their large span, safe structure, convenient construction, beautiful appearance, and low cost. Box girder construction is based on the bridge structure and the site conditions of the bridge, and often uses the block hanging basket suspension casting method or the bracket cast-in-place method for construction. The whole bracket is cast-in-place. Due to the geological differences at the bridge site, the bracket structure is also different. Common bracket types include full-span brackets and steel structure brackets with few support points. Such brackets have reasonable force, are easy to erect, safe and economical, and are widely used in box girder construction.
[0003] When designing the support structure, it is necessary to comprehensively consider the geological conditions of the bridge location, the conditions of the construction site, etc., and select a reasonable foundation treatment method and structural layout form to ensure that the support is stressed while meeting the actual construction needs. As a design point of the box girder support, the support foundation treatment also needs to comprehensively consider the geological conditions, structural form, safety, economy, etc., and adopt a reasonable treatment method. Among them, deep soft foundation is a typical weak geology. When the box girder is constructed by the support cast-in-place method, the foundation treatment and support layout become the key control points. In order to further meet the requirements of the box girder construction for support safety and deformation, a deep soft foundation box girder composite support construction method is proposed, focusing on the foundation treatment and support design, so as to ensure the safety, quality and progress of the box girder construction under such geological conditions. Summary of the invention
[0004] Based on the existing technical problems, the present invention proposes a construction method for a composite support of a deep soft foundation box girder.
[0005] The invention provides a method for constructing a composite support for a deep soft foundation box beam, comprising the following steps: step 1, construction preparation and measurement and layout; laying out the prestressed pipe pile points according to the pile position design drawing, spreading lime to mark the pile positions, and verifying the measurement data.
[0006] Step 2: Driving of prestressed pipe piles and construction of strip foundations; single-row pipe piles are driven symmetrically from the middle to both sides according to the pipe pile design drawing. The main process flow is: marking the pile position → positioning the pile driver → adjusting the pile body horizontally → hanging the pile → welding the pile tip → driving the first section of the pile → pouring C20 concrete → welding the second section of the pile → continuing to drive the pile to the designed pile length → cutting the pile head.
[0007] Step three: Erect Bailey beams and door opening supports; lay out the main control points for Bailey installation according to the designed spacing, and use a crane to assist in the installation of Bailey beams; lay out the plane positions of the steel pipe columns that ensure the passage of the door opening according to the designed dimensions, and strictly control the column top elevation and verticality.
[0008] Step 4: Set up the spiral frame; The construction process of the spiral frame: draw lines on a solid foundation, position the poles → erect the poles → install the first large cross bar and fasten it to the poles → install the first small cross bar → install the second large cross bar → install the second small cross bar → add vertical diagonal braces → install ladders, lay scaffolding → connect the poles, and install layer by layer according to the construction process of the spiral frame.
[0009] Step 5: Installation of square timber and formwork; the outer formwork, bottom formwork, inner formwork and end formwork of the box girder are all assembled with bamboo plywood and square timber, and acceptance is carried out after the scaffolding is erected.
[0010] Step six: Construction of box girder reinforcement: The box girder reinforcement is centrally processed and manufactured on-site, transported to the site by flatbed trucks, and hoisted and installed by truck cranes in conjunction with manual labor.
[0011] Step seven, pouring of box girder concrete; the cast-in-place box girder adopts a two-time pouring process, the first pouring of the bottom plate and the web plate, the second pouring of the top plate, prepare sand, gravel and cement bulk materials before pouring, and use three truck pumps for continuous pouring, the first pouring is 2,600 cubic meters, and the second pouring is 1,400 cubic meters. During the pouring process, a high-efficiency vibration mechanism is used to achieve uniform pouring during pouring.
[0012] Step 8. After pouring, carry out maintenance and prestressing operations, then carry out anchor sealing, grouting, formwork removal and support removal operations.
[0013] Preferably, the high-efficiency vibration mechanism includes a power drive tube, the material of the power drive tube is soft rubber, and multiple power drive tubes are arranged linearly. One end of the power drive tube at the head end position is provided with a vibration rotation and telescopic device, and each of the power drive tubes in the middle is provided with a rotation adjustment vibration device, a multi-section swing adjustment device, a multi-section swing limit device and a vibration hydraulic telescopic adjustment device.
[0014] The vibration, rotation and telescopic device realizes the rotation, telescopic and vibration action of the head end position of the power driving pipe during concrete pouring.
[0015] The rotation adjustment vibration device realizes the rotation adjustment action of the vibration rotation telescopic device.
[0016] The multi-section swing adjustment device realizes the segmental swing adjustment of the multi-section power drive pipe during concrete pouring.
[0017] The multi-section swing limiting device realizes the limiting action during the swing operation of the multi-section swing adjusting device.
[0018] The vibration hydraulic expansion and contraction adjustment device enables the multi-section power drive pipe to perform the expansion and contraction movement of the internal structure during the concrete vibration during concrete pouring.
[0019] Preferably, the rotation adjustment vibration device includes a circular stop block, and a plurality of the circular stop blocks are arranged linearly. The arc surfaces of every two circular stop blocks are respectively fixedly installed on the inner walls at both ends of the power drive tube, and the middle part of the circular stop block is rotatably connected to a multi-section rotating shaft through a bearing. Both ends of the multi-section rotating shaft are provided with hinge grooves, and the inner wall of the hinge groove is rotatably connected to a horizontal pin shaft through a bearing.
[0020] Preferably, a vertical pin is fixedly installed in the middle of the horizontal pin, and the horizontal pin and the vertical pin are distributed vertically in a cross shape. A hinge module is arranged between the relative surfaces of every two multi-section rotating shafts, and the hinge module is composed of a left hinge block and a right hinge block. The spline shaft at one end of the left hinge block is slidingly plugged into the spline tube of the right hinge block. The inner wall of the groove at the other end of the left hinge block and the inner wall of the groove at the other end of the right hinge block are rotatably connected to the two ends of the vertical pin through bearings, and multiple circular stop blocks, multiple multi-section rotating shafts and multiple hinge modules are connected end to end to form an integral vibration rod.
[0021] Preferably, a fixing frame is fixedly mounted on one side of the circular stopper at the tail end, a rotating motor is fixedly mounted on an inner wall of one side of the fixing frame, and an output shaft of the rotating motor is fixedly mounted on the surface of one end of the opposite multi-section rotating shaft through a coupling.
[0022] Preferably, the multi-section swing limit device includes a connecting rod, both ends of the connecting rod are rotatably connected to a connecting rod shaft through bearings, a connecting plate is fixedly installed on the top of the connecting rod shaft, the surface of the connecting plate is fixedly installed on the surface of the circular stop block, and the two ends of the connecting plate are respectively located on both sides of the circular stop block, and a first arc-shaped tooth block is fixedly installed on the top of the left end of the connecting plate.
[0023] Preferably, the multi-section swing adjustment device includes a driving gear, a self-locking servo motor is fixedly installed on the top of the right end of the connecting plate, the output shaft of the self-locking servo motor is fixedly installed with a gear shaft through a coupling, and the top of the gear shaft is fixedly installed with the bottom of the driving gear.
[0024] Preferably, the top right end of the connecting plate is also rotatably connected to a fixed shaft through a bearing, a rotating gear is fixedly installed on the top of the fixed shaft, the tooth groove of the rotating gear is meshed with the gear teeth of the driving gear, a second arc-shaped tooth block is fixedly installed on the arc surface of the bottom end of the fixed shaft, the gear teeth of the second arc-shaped tooth block are meshed with the tooth grooves of the first arc-shaped tooth block, a plurality of the multi-section swing adjustment devices are respectively arranged at the bottom of a plurality of articulated modules, and a plurality of the self-locking servo motors are independently controlled and driven by a controller.
[0025] Preferably, the vibrating hydraulic telescopic adjustment device includes a fan-shaped seat, one side surface of each fan-shaped seat is fixedly mounted on the surface of the circular stop block, a pressure chamber is opened inside the fan-shaped seat, a pressure piston is slidably inserted into the inner wall of the pressure chamber through a sealing ring, a vibrating telescopic rod is fixedly mounted on the surface of the pressure piston, one end of the vibrating telescopic rod is slidably inserted into the inner wall of the pressure chamber, and passes through and extends to the outside of the fan-shaped seat, and contacts with the inner wall of the power drive pipe.
[0026] Springs are also provided at both ends of the vibrating telescopic rod, one end of the spring is fixedly installed on the surface of the pressure piston, and the other end of the spring is fixedly installed on the inner wall of the pressure chamber, and an air intake pipe is fixedly installed on the inner wall of the groove of multiple circular blocks, one end of the air intake pipe passes through and extends to the outside of the fixed frame, and is connected with the air outlet end of the air pump, and connecting pipes are installed in a linear array on the surface of the air intake pipe, one end of multiple connecting pipes is fixedly connected to the inside of the air intake pipe, and the other end of the connecting pipe is fixedly connected to the inside of the pressure chamber.
[0027] Preferably, the vibrating, rotating and telescopic device includes a vibrating tube, one side surface of the vibrating tube is fixedly installed with the relative surface of the multi-section rotating shaft at the head end position, the top of the vibrating tube is arranged in a cone shape, and the inner wall of the vibrating tube is also fixedly installed with a vibration motor and a power motor, respectively. The two vibration motors are respectively located on both sides of the power motor, and the two vibration motors and the power motor are electrically connected to the power supply by using carbon brushes.
[0028] A guide ring is also fixedly installed on the inner wall of the conical end of the vibration tube, and a turntable is rotatably connected to the inner wall of one end of the guide ring. One side surface of the turntable is fixedly installed on the output shaft of the power motor, and a track slide is fixedly installed on the other end surface of the turntable. A sliding rod is slidably inserted into the inner wall of the track slide, and one end of the sliding rod is rotatably connected to a vibration plug rod through a bearing. The two vibration plug rods are symmetrically arranged, and the repelling ends of the two vibration plug rods are slidably inserted into the surface of the guide ring, and the telescopic end of the vibration plug rod also penetrates and extends to the outside of the vibration tube.
[0029] The beneficial effects of the present invention are:
[0030] 1. Through the operation of prestressed pipe piles + strip foundation, the foundation treatment method is faster than conventional steel pipe piles, the construction is convenient, the foundation bearing capacity is high, and the overall settlement of the bracket is small during the cast-in-place construction of the box girder, the deformation is small, the stability is high, and no uneven settlement occurs, ensuring the construction quality of the box girder.
[0031] 2. The composite support system structure of Bailey + full-bridge support + door opening is evenly stressed, which meets the overall cast-in-place construction process of the support, while ensuring the accessibility of the footpath under the bridge and the village road, meeting the actual construction needs; this method has achieved better results in the same type of soft-base geological box girder support structure by studying the deep soft-base geological support and adopting this support form, saving foundation treatment costs, saving temporary land rental, and shortening the box girder construction period.
[0032] 3. By setting up an efficient vibration mechanism, the vibrating rod can be put into the concrete after pouring, and the vibration force and the telescopic movement of the vibration plug-in rod are coordinated with the rotational movement, and the surfaces of multiple soft power drive tubes are vibrated under the telescopic movement of the vibration telescopic rod, so that all-round vibration operation can be performed in the concrete, and the multi-section swing angle adjustment can be controlled during movement in the concrete, so that the vibration position can be adjusted when entering the concrete during pouring, thereby enhancing the vibration effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 The present invention is a construction flow chart of a method for constructing a composite support for a box girder on a thick soft foundation;
[0034] Figure 2 A three-dimensional diagram of a high-efficiency vibration mechanism for a construction method of a composite support for a box girder on a deep soft foundation;
[0035] Figure 3 A three-dimensional diagram of a fixed frame structure for a construction method of a composite support for a box girder on a deep soft foundation;
[0036] Figure 4 A three-dimensional diagram of a power-driven pipe structure for a construction method of a composite support for a box girder on a deep soft foundation;
[0037] Figure 5 A three-dimensional diagram of the articulated module structure of a method for constructing a composite support for a box girder on a deep soft foundation;
[0038] Figure 6 A three-dimensional diagram of a rotating and adjusting vibration device for a construction method of a composite support for a box girder on a deep soft foundation;
[0039] Figure 7 A three-dimensional diagram of a multi-section swing adjustment device for a construction method of a composite support for a box girder on a deep soft foundation;
[0040] Figure 8A three-dimensional diagram of a multi-section swing limit device for a construction method of a composite support for a box girder on a deep soft foundation;
[0041] Fig. 9 An exploded view of a vibrating hydraulic expansion and contraction adjustment device for a construction method of a composite support for a box girder on a deep soft foundation;
[0042] Fig.10 An exploded view of a vibration rotation and telescopic device for a construction method of a composite support for a box girder on a deep soft foundation;
[0043] Fig.11 A three-dimensional diagram of the track slide structure of a method for constructing a composite support for a box girder on a deep soft foundation;
[0044] Fig.12 This is a cross-sectional view of a vibration tube structure for a method of constructing a composite support for a box girder on a thick soft foundation.
[0045] In the figure: 1. High-efficiency vibration mechanism; 2. Power drive tube; 3. Vibration rotation and telescopic device; 31. Vibration tube; 32. Vibration motor; 33. Power motor; 34. Guide ring; 35. Turntable; 36. Track slide; 37. Slide rod; 38. Vibration plug rod; 4. Rotation adjustment vibration device; 41. Round stop block; 42. Multi-section rotating shaft; 43. Articulation groove; 44. Horizontal pin shaft; 45. Vertical pin shaft; 46. Articulation module; 461. Left articulation block; 462. Right articulation block; 47. Fixed frame; 48. Rotating motor; 5. Multi-section swing adjustment device; 51. Driving gear; 52. Self-locking servo motor; 53. Gear shaft; 54. Fixed shaft; 55. Rotating gear; 56. Second arc-shaped tooth block; 6. Multi-section swing limit device; 61. Connecting rod; 62. Connecting rod shaft; 63. Connecting plate; 64. First arc-shaped tooth block; 7. Vibrating hydraulic telescopic adjustment device; 71. Fan-shaped seat; 72. Pressure chamber; 73. Pressure piston; 74. Vibrating telescopic rod; 75. Spring; 76. Inlet pipe; 77. Connecting pipe. DETAILED DESCRIPTION
[0046] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0047] Reference Figure 1-Figure 12 A method for constructing a composite support for a deep soft foundation box girder comprises the following steps: Step 1, construction preparation and measurement and layout; laying out the prestressed pipe pile points according to the pile position design drawing, spreading lime to mark the pile positions, and verifying the measurement data.
[0048] Step 2: Driving of prestressed pipe piles and construction of strip foundations; single-row pipe piles are driven symmetrically from the middle to both sides according to the pipe pile design drawing. The main process flow is: marking the pile position → positioning the pile driver → adjusting the pile body horizontally → hanging the pile → welding the pile tip → driving the first section of the pile → pouring C20 concrete → welding the second section of the pile → continuing to drive the pile to the designed pile length → cutting the pile head.
[0049] The bearing capacity of the deep soft ground is poor, and it is difficult to meet the foundation bearing capacity requirements of the cast-in-place box girder constructed by the support method, so the foundation needs to be further treated. PC400 pipe piles are driven in, and the friction between the pile head driving into the hard rock layer and the pile wall and the soil is comprehensively utilized to improve the soil bearing capacity. When driving the pipe piles, the pipe pile points are controlled, and the pile top elevation is unified. At the same time, reinforced concrete strip foundations are set on the pile tops to connect the same row of pipe piles as a whole, further improving the bearing capacity of the pipe piles, reducing uneven foundation settlement, and making foundation preparations for the support erection.
[0050] Step three: Erect Bailey beams and door opening supports; lay out the main control points for Bailey installation according to the designed spacing, and use a crane to assist in the installation of Bailey beams; lay out the plane positions of the steel pipe columns that ensure the passage of the door opening according to the designed dimensions, and strictly control the column top elevation and verticality.
[0051] The support adopts 321 type Bailey as the load distribution beam along the bridge direction, which is set on the top surface of the strip foundation, arranged at a certain distance along the bridge direction, and encrypted at the web of the box beam. I-beams are set on the top surface of the Bailey beam to distribute the load vertically to the Bailey beam, while meeting the installation of the full-frame bottom support. The full-frame adopts 60 disc buckle frames with a step distance of 60 / 90cm and a maximum step distance of 150cm. The door opening adopts 630 steel pipe column + Bailey + 60 disc buckles to meet the upper load transmission requirements and ensure the accessibility of the sidewalk and village roads.
[0052] Step 4: Set up the spiral frame; The construction process of the spiral frame: draw lines on a solid foundation, position the poles → erect the poles → install the first large cross bar and fasten it to the poles → install the first small cross bar → install the second large cross bar → install the second small cross bar → add vertical diagonal braces → install ladders, lay scaffolding → connect the poles, and install layer by layer according to the construction process of the spiral frame.
[0053] Step 5: Installation of square timber and formwork; the outer formwork, bottom formwork, inner formwork and end formwork of the box girder are all assembled with bamboo plywood and square timber, and acceptance is carried out after the scaffolding is erected.
[0054] Step six: Construction of box girder reinforcement: The box girder reinforcement is centrally processed and manufactured on-site, transported to the site by flatbed trucks, and hoisted and installed by truck cranes in conjunction with manual labor.
[0055] Step seven, pouring of box girder concrete; the cast-in-place box girder adopts a two-time pouring process, the first pouring of the bottom plate and the web plate, the second pouring of the top plate, preparation of sand, gravel and cement bulk materials before pouring, pouring using three truck pumps for continuous pouring, the first pouring of 2,600 cubic meters, the second pouring of 1,400 cubic meters, and the use of a high-efficiency vibration mechanism 1 during the pouring process to achieve uniform pouring action.
[0056] The high-efficiency vibration mechanism 1 includes a power drive tube 2, which is made of soft rubber. Multiple power drive tubes 2 are arranged linearly. A vibration rotation and telescopic device 3 is provided at one end of the power drive tube 2 at the head end position, and a rotation adjustment vibration device 4, a multi-section swing adjustment device 5, a multi-section swing limit device 6 and a vibration hydraulic telescopic adjustment device 7 are provided inside each power drive tube 2 in the middle.
[0057] Specifically implemented in this way, through vibration, bubbles in the concrete can be effectively removed, its density can be increased, thereby improving the strength and durability of the concrete; the power drive tube 2 is made of soft rubber material, has good elasticity and flexibility, can adapt to different construction environments and conditions, and reduce damage to the concrete structure; multiple power drive tubes 2 are linearly arranged and distributed, which can ensure that the vibration energy is evenly transmitted to all parts of the concrete, thereby ensuring the overall casting quality.
[0058] In order to realize the rotation adjustment action of the vibration rotation telescopic device 3; a rotation adjustment vibration device 4 is set to include a circular stopper 41, and multiple circular stoppers 41 are arranged linearly. The arc surfaces of every two circular stoppers 41 are respectively fixed to the inner walls at both ends of the power drive tube 2, and the middle part of the circular stopper 41 is rotatably connected to a multi-section rotating shaft 42 through a bearing. Both ends of the multi-section rotating shaft 42 are provided with hinge grooves 43, and the inner wall of the hinge groove 43 is rotatably connected to a horizontal pin shaft 44 through a bearing.
[0059] Specifically implemented in this way, through the combination of the circular stopper 41 and the multi-section rotating shaft 42, the rotation angle of the vibration device can be fine-tuned and accurately controlled to meet the needs under different construction conditions.
[0060] A vertical pin shaft 45 is fixedly installed in the middle of the horizontal pin shaft 44, and the horizontal pin shaft 44 and the vertical pin shaft 45 are distributed vertically in a cross shape. A hinge module 46 is arranged between the relative surfaces of every two multi-section rotating shafts 42. The hinge module 46 is composed of a left hinge block 461 and a right hinge block 462. The spline shaft at one end of the left hinge block 461 is slidably inserted into the spline tube of the right hinge block 462. The inner wall of the groove at the other end of the left hinge block 461 and the inner wall of the groove at the other end of the right hinge block 462 are rotatably connected to the two ends of the vertical pin shaft 45 through bearings. Multiple circular stop blocks 41, multiple multi-section rotating shafts 42 and multiple hinge modules 46 are connected end to end to form an integral vibration rod.
[0061] Specifically implemented in this way, the cross-design of the horizontal pin 44 and the vertical pin 45 increases the stability of the structure, making the vibration rod more stable during operation; the addition of the vertical pin 45 allows the vibration to be adjusted in multiple directions, increasing the freedom and flexibility of adjustment; multiple circular blocks 41, multi-section rotating shafts 42 and hinged modules 46 are connected end to end to form an integral vibration rod, forming a continuous vibration transmission system.
[0062] A fixing frame 47 is fixedly mounted on one side of the tail end circular stopper 41 , and a rotating motor 48 is fixedly mounted on the inner wall of one side of the fixing frame 47 . The output shaft of the rotating motor 48 is fixedly mounted on the surface of one end of the opposite multi-section rotating shaft 42 through a coupling.
[0063] Specifically, the installation of the rotating motor 48 enables automatic rotation during vibration, thereby improving the uniformity and efficiency of the vibration; the rotating motor 48 drives the multi-section rotating shaft 42 to rotate, so that vibration can be carried out in multiple directions, which helps to discharge the bubbles in the concrete more evenly; during the vibration operation, the rotating motor 48 is used to drive the multi-section rotating shaft 42 to rotate, thereby realizing the operation of rotating vibration in the concrete, controlling the concrete pouring density to enhance the effect of reducing bubbles.
[0064] In order to realize the limiting action during the swing operation of the multi-section swing adjusting device 5, a multi-section swing limiting device 6 is set, which includes a connecting rod 61, both ends of which are rotatably connected to a connecting rod shaft 62 through bearings, and a connecting plate 63 is fixedly installed on the top of the connecting rod shaft 62. The surface of the connecting plate 63 is fixedly installed on the surface of the circular stop block 41, and the two ends of the connecting plate 63 are respectively located on both sides of the circular stop block 41, and a first arc-shaped tooth block 64 is fixedly installed on the top of the left end of the connecting plate 63.
[0065] Specifically implemented as follows, the connecting rod 61 and the connecting rod shaft 62 rotatably connected by the bearing constitute the basic structure of the swing adjustment, allowing the vibration device to swing within a certain range; the first arc-shaped tooth block 64 can cooperate with other tooth blocks or gears to form an engagement limit system to further accurately control the swing range; the design of the first arc-shaped tooth block 64 allows swinging within a certain angle range. When the preset angle is reached, the engagement between the tooth blocks limits further swinging to achieve precise limiting.
[0066] The multi-section swing adjustment device 5 realizes the segmental swing adjustment action of the multi-section power drive pipe 2 during concrete pouring; the multi-section swing adjustment device 5 includes a driving gear 51, a self-locking servo motor 52 is fixedly installed on the top of the right end of the connecting plate 63, and the output shaft of the self-locking servo motor 52 is fixedly installed with a gear shaft 53 through a coupling, and the top of the gear shaft 53 is fixedly installed with the bottom of the driving gear 51.
[0067] Specifically implemented in this way, the setting of the driving gear 51 enables the multi-section power drive tube 2 to perform segmental swing adjustment to adapt to concrete structures of different shapes and depths; through the driving gear 51, independent or coordinated control of each segment of the power drive tube 2 can be achieved, thereby improving the targetedness and efficiency of vibration; the self-locking characteristic enables the motor to maintain the current position after power failure, thereby preventing adjustment failure caused by sudden power failure.
[0068] The top right end of the connecting plate 63 is also rotatably connected to a fixed shaft 54 through a bearing, a rotating gear 55 is fixedly installed on the top of the fixed shaft 54, the tooth groove of the rotating gear 55 meshes with the gear teeth of the driving gear 51, and a second arc-shaped tooth block 56 is fixedly installed on the arc surface of the bottom end of the fixed shaft 54, the gear teeth of the second arc-shaped tooth block 56 mesh with the tooth groove of the first arc-shaped tooth block 64, a plurality of multi-section swing adjustment devices 5 are respectively arranged at the bottom of a plurality of hinge modules 46, and a plurality of self-locking servo motors 52 are independently controlled and driven by a controller.
[0069] Specifically implemented in this way, the meshing of the rotating gear 55 and the driving gear 51 forms a transmission system, so that the power of the self-locking servo motor 52 can be effectively transmitted to the entire vibration device to achieve swing adjustment; the meshing of the second arc-shaped tooth block 56 and the first arc-shaped tooth block 64 provides additional limit protection to prevent the vibration device from swinging excessively; multiple swing adjustment devices are distributed at the bottom of the articulated module 46 to achieve distributed control and better adapt to the concrete pouring needs of different areas; multiple adjustment devices can work together to improve the efficiency and effect of the entire vibration system; each self-locking servo motor 52 can be independently controlled by a controller to achieve individual or joint adjustment of each segment.
[0070] In order to realize the action of the multi-section power drive tube 2 performing the telescopic movement of the internal structure during the vibration of concrete during concrete pouring; a vibrating hydraulic telescopic adjustment device 7 is provided, including a fan-shaped seat 71, one side surface of each fan-shaped seat 71 is fixedly installed with the surface of the circular stopper 41, and a pressure chamber 72 is opened inside the fan-shaped seat 71. A pressure piston 73 is slidably inserted into the inner wall of the pressure chamber 72 through a sealing ring, and a vibrating telescopic rod 74 is fixedly installed on the surface of the pressure piston 73. One end of the vibrating telescopic rod 74 is slidably inserted into the inner wall of the pressure chamber 72, and passes through and extends to the outside of the fan-shaped seat 71, and contacts with the inner wall of the power drive tube 2.
[0071] Specifically, by implementing this, the surface of the soft power driving tube 2 can be controlled to vibrate through telescopic movement, so as to control the internal vibration force to be effectively transmitted inside the concrete; the uniformity of the vibration is improved and bubbles are further eliminated.
[0072] Springs 75 are also provided at both ends of the vibrating telescopic rod 74, one end of the spring 75 is fixedly installed on the surface of the pressure piston 73, and the other end of the spring 75 is fixedly installed on the inner wall of the pressure chamber 72, and the inner walls of the grooves of multiple circular blocks 41 are fixedly installed with air inlet pipes 76, one end of the air inlet pipe 76 passes through and extends to the outside of the fixed frame 47, and is connected to the air outlet end of the air pump, and connecting pipes 77 are installed in a linear array on the surface of the air inlet pipe 76, one end of the multiple connecting pipes 77 are fixedly connected to the inside of the air inlet pipe 76, and the other end of the connecting pipe 77 is fixedly connected to the inside of the pressure chamber 72.
[0073] Specifically, during operation, the air outlet end of the air pump is used to control the flow of air pressure inside the air inlet pipe 76 to achieve pressurization or decompression operation, thereby controlling the air pressure to flow into the air pressure chamber through multiple connecting pipes 77, and using the air pressure to synchronously drive multiple vibrating telescopic rods 74 to perform telescopic movement, so that the vibrating telescopic rods 74 squeeze the surface of the power drive tube 2, control its surface to shake and generate vibration force, and eliminate bubbles in the concrete pouring vibration.
[0074] The vibration rotation and telescopic device 3 realizes the rotation, telescopic and vibration action of the head end position of the power driving tube 2 during concrete pouring; the vibration rotation and telescopic device 3 includes a vibration tube 31, one side surface of the vibration tube 31 is fixedly installed relative to the surface of the multi-section rotating shaft 42 at the head end position, the top of the vibration tube 31 is set in a cone shape, and the inner wall of the vibration tube 31 is also fixedly installed with a vibration motor 32 and a power motor 33, respectively, the two vibration motors 32 are respectively located on both sides of the power motor 33, and the two vibration motors 32 and the power motor 33 are electrically connected to the power supply using carbon brushes.
[0075] Specifically, the setting of the vibration tube 31 enables the head end of the power drive tube 2 to perform rotational telescopic vibration. This movement helps to penetrate the concrete more deeply and improve the density; the conical top design of the vibration tube 31 helps to concentrate the vibration energy and transmit it to the concrete more effectively; the carbon brush is electrically connected to the power supply to provide power to the vibration motor 32 and the power motor 33 to achieve rotation and vibration.
[0076] A guide ring 34 is also fixedly installed on the inner wall of the conical end of the vibration tube 31, and a turntable 35 is rotatably connected to the inner wall of one end of the guide ring 34. One side surface of the turntable 35 is fixedly installed on the output shaft of the power motor 33, and a track slide 36 is fixedly installed on the other end surface of the turntable 35. A slide rod 37 is slidably inserted into the inner wall of the track slide 36, and one end of the slide rod 37 is rotatably connected to a vibration plug-in rod 38 through a bearing. The two vibration plug-in rods 38 are symmetrically arranged, and the repelling ends of the two vibration plug-in rods 38 are slidably inserted into the surface of the guide ring 34, and the telescopic ends of the vibration plug-in rods 38 also penetrate and extend to the outside of the vibration tube 31.
[0077] Specifically, the power motor 33 is used to drive the turntable 35 to rotate, thereby controlling the track slide 36 to rotate, driving the slide rod 37 sliding on the inner wall to slide, and then driving the vibration plug-in rod 38 to slide and plug in motion, cooperating with the vibration motor 32, and performing plug-in motion while vibrating in the concrete, and cooperating with the rotation adjustment vibration device 4, and synchronously performing the rotation motion of the vibration tube 31, so as to enhance the vibration and eliminate bubbles, make the concrete pouring uniform, and improve the work efficiency and construction quality.
[0078] The working principle of the vibration operation after pouring: After the concrete is poured, the device is driven and placed inside the concrete. After being placed inside, the rotating motor 48 is controlled to drive the multi-section rotating shaft 42 to rotate, thereby realizing the front end vibration tube 31 to perform a rotational circular motion. At the same time, the internal power motor 33 and the vibration motor 32 operate synchronously to realize the vibration of the vibration tube 31 while the internal vibration plug-in rod 38 telescopic motion, and the air pressure of the air pump is increased or decreased to increase or decrease the air pressure inside the driving cavity, thereby realizing the telescopic motion of multiple vibration telescopic rods 74, and controlling the surface of multiple power drive tubes 2 to perform a vibration operation, thereby performing a high-efficiency vibration operation on the poured concrete.
[0079] By setting up a high-efficiency vibration mechanism 1, the vibration rod set can be used to put it into the concrete after pouring, and the vibration force and the telescopic movement of the vibration plug-in rod 38 are coordinated with the rotational movement, and the surfaces of multiple flexible power drive tubes 2 are vibrated under the telescopic movement of the vibration telescopic rod 74, so that all-round vibration operation can be performed in the concrete, and the multi-section swing angle adjustment can be controlled during movement in the concrete, so that the vibration position can be adjusted when entering the concrete during pouring, thereby enhancing the vibration effect.
[0080] Step 8. After pouring, carry out maintenance and prestressing operations, then carry out anchor sealing, grouting, formwork removal and support removal operations.
[0081] Through the operation of prestressed pipe piles + strip foundation, the foundation treatment method is faster, more convenient to construct, and has a higher foundation bearing capacity than conventional steel pipe piles. During the cast-in-place construction of the box girder, the overall settlement of the bracket is small, the deformation is small, the stability is high, and no uneven settlement occurs, ensuring the construction quality of the box girder.
[0082] The composite support system structure of Bailey + full-bridge support + door opening is evenly stressed, which meets the overall cast-in-place construction process of the support, while ensuring the accessibility of the footpath under the bridge and the village road to meet the actual construction needs.
[0083] This method has achieved better results in the same type of soft-base geological box girder support structure by studying the deep soft-base geological support and adopting this support form, saving foundation treatment costs, saving temporary land rental, and shortening the box girder construction period.
[0084] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A method for constructing a composite support for a box beam on a thick soft foundation, characterized in that: The method includes the following steps: Step 1: construction preparation and measurement and setting out; laying out the prestressed pipe pile points according to the pile position design drawing, spreading lime to mark the pile positions, and checking the measurement data; Step 2: Prestressed pipe piles and strip foundation construction; single-row pipe piles are driven symmetrically from the middle to both sides according to the pipe pile design drawing. The main process flow is: mark the pile position → put the pile driver in place → adjust the pile body horizontally → hang the pile → weld the pile tip → drive the first section of the pile → pour C20 concrete → weld the second section of the pile → continue driving the pile to the designed pile length → cut the pile head; Step 3: Set up Bailey beams and door opening brackets; lay out the main control points for Bailey installation according to the designed spacing, and use a crane to manually assist in the installation of Bailey beams; lay out the plane position of the steel pipe column for the door opening according to the designed dimensions, and strictly control the column top elevation and verticality; Step 4: Set up the scaffolding frame; The construction process of the scaffolding frame: Draw lines on a solid foundation, position the poles → erect the poles → install the first large horizontal bar and fasten it with the poles → install the first small horizontal bar → install the second large horizontal bar → install the second small horizontal bar → add vertical diagonal braces → install ladders, lay scaffolding boards → connect the poles, and install them layer by layer according to the construction process of the scaffolding frame; Step 5: Install the square timber and formwork; the outer formwork, bottom formwork, inner formwork and end formwork of the box beam are all assembled with bamboo plywood and square timber, and the inspection is carried out after the support is erected; Step 6: Construction of box girder reinforcement: The box girder reinforcement is centrally processed and manufactured on site, transported to the site by flatbed trucks, and hoisted and installed by truck cranes in cooperation with manual labor; Step 7: pouring concrete of the box beam; the cast-in-place box beam adopts a two-time pouring process, the first pouring of the bottom plate and the web plate, the second pouring of the top plate, the preparation of sandstone and cement bulk materials before pouring, the pouring adopts 3 truck pumps for continuous pouring, the first pouring is 2600 cubic meters, the second pouring is 1400 cubic meters, and the high-efficiency vibration mechanism (1) is used during the pouring process to achieve uniform pouring action during pouring; Step 8. After pouring, carry out maintenance and prestressing operations, then carry out anchor sealing, grouting, formwork removal and support removal operations.
2. The method for constructing a deep soft foundation box beam composite support according to claim 1, characterized in that: The high-efficiency vibration mechanism (1) comprises a power drive tube (2), the material of the power drive tube (2) is soft rubber, a plurality of the power drive tubes (2) are linearly arranged and distributed, one end of the power drive tube (2) at the head end is provided with a vibration rotation telescopic device (3), and each of the power drive tubes (2) in the middle is provided with a rotation adjustment vibration device (4), a multi-section swing adjustment device (5), a multi-section swing limit device (6) and a vibration hydraulic telescopic adjustment device (7); The vibration, rotation and telescopic device (3) enables the head end of the power drive pipe (2) to perform a rotation, telescopic and vibrating action during concrete pouring; The rotation adjustment vibration device (4) realizes the rotation adjustment action of the vibration rotation telescopic device (3); The multi-section swing adjustment device (5) realizes the segmental swing adjustment of the multi-section power drive pipe (2) during concrete pouring; The multi-section swing limiting device (6) realizes the limiting action during the swing operation of the multi-section swing adjusting device (5); The vibrating hydraulic expansion and contraction adjustment device (7) enables the multi-section power drive pipe (2) to perform expansion and contraction movements of the internal structure during concrete pouring while the concrete is vibrating.
3. The method for constructing a deep soft foundation box beam composite support according to claim 2, characterized in that: The rotation adjustment vibration device (4) comprises a circular stopper (41), wherein a plurality of the circular stoppers (41) are linearly arranged and distributed, and the arc surfaces of every two of the circular stoppers (41) are respectively fixedly mounted on the inner walls at both ends of the power drive tube (2), and the middle of the circular stopper (41) is rotatably connected to a multi-section rotating shaft (42) via a bearing, and both ends of the multi-section rotating shaft (42) are provided with hinge grooves (43), and the inner wall of the hinge groove (43) is rotatably connected to a horizontal pin shaft (44) via a bearing.
4. The method for constructing a deep soft foundation box beam composite support according to claim 3, characterized in that: A vertical pin shaft (45) is fixedly installed in the middle of the horizontal pin shaft (44), and the horizontal pin shaft (44) and the vertical pin shaft (45) are vertically distributed in a cross shape. A hinge module (46) is arranged between the relative surfaces of every two multi-section rotating shafts (42), and the hinge module (46) is composed of a left hinge block (461) and a right hinge block (462). The spline shaft at one end of the left hinge block (461) is slidably plugged into the spline tube of the right hinge block (462). The inner wall of the groove at the other end of the left hinge block (461) and the inner wall of the groove at the other end of the right hinge block (462) are rotatably connected to the two ends of the vertical pin shaft (45) through bearings. A plurality of circular stop blocks (41), a plurality of multi-section rotating shafts (42) and a plurality of hinge modules (46) are connected end to end to form an integral vibration rod.
5. The method for constructing a composite support for a deep soft foundation box beam according to claim 3, characterized in that: A fixed frame (47) is also fixedly mounted on one side of the circular stopper (41) at the rear end, a rotating motor (48) is fixedly mounted on an inner wall of one side of the fixed frame (47), and an output shaft of the rotating motor (48) is fixedly mounted on an end surface of the opposite multi-section rotating shaft (42) via a coupling.
6. The method for constructing a composite support for a deep soft foundation box beam according to claim 3, characterized in that: The multi-section swing limit device (6) comprises a connecting rod (61), both ends of the connecting rod (61) are rotatably connected to a connecting rod shaft (62) via bearings, a connecting plate (63) is fixedly mounted on the top end of the connecting rod shaft (62), the surface of the connecting plate (63) is fixedly mounted on the surface of the circular stop block (41), and the two ends of the connecting plate (63) are respectively located on both sides of the circular stop block (41), and a first arc-shaped tooth block (64) is fixedly mounted on the top of the left end of the connecting plate (63).
7. The method for constructing a composite support for a deep soft foundation box beam according to claim 6, characterized in that: The multi-section swing adjustment device (5) comprises a driving gear (51), a self-locking servo motor (52) is fixedly mounted on the top of the right end of the connecting plate (63), the output shaft of the self-locking servo motor (52) is fixedly mounted with a gear shaft (53) via a coupling, and the top of the gear shaft (53) is fixedly mounted with the bottom of the driving gear (51).
8. The method for constructing a deep soft foundation box beam composite support according to claim 7, characterized in that: The top right end of the connecting plate (63) is also rotatably connected to a fixed shaft (54) via a bearing, a rotating gear (55) is fixedly installed on the top of the fixed shaft (54), the tooth groove of the rotating gear (55) meshes with the gear teeth of the driving gear (51), a second arc-shaped tooth block (56) is fixedly installed on the arc surface at the bottom end of the fixed shaft (54), the gear teeth of the second arc-shaped tooth block (56) mesh with the tooth groove of the first arc-shaped tooth block (64), a plurality of the multi-section swing adjustment devices (5) are respectively arranged at the bottom of a plurality of hinge modules (46), and a plurality of the self-locking servo motors (52) are independently controlled and driven by a controller.
9. The method for constructing a composite support for a deep soft foundation box beam according to claim 3, characterized in that: The vibrating hydraulic telescopic adjustment device (7) comprises a sector seat (71), one side surface of each sector seat (71) is fixedly mounted on the surface of the circular stopper (41), a pressure chamber (72) is provided inside the sector seat (71), a pressure piston (73) is slidably inserted into the inner wall of the pressure chamber (72) via a sealing ring, a vibrating telescopic rod (74) is fixedly mounted on the surface of the pressure piston (73), one end of the vibrating telescopic rod (74) is slidably inserted into the inner wall of the pressure chamber (72), and penetrates and extends to the outside of the sector seat (71), and contacts the inner wall of the power drive pipe (2); Springs (75) are also provided at both ends of the vibrating telescopic rod (74), one end of the spring (75) is fixedly mounted on the surface of the pressure piston (73), and the other end of the spring (75) is fixedly mounted on the inner wall of the pressure chamber (72). An air intake pipe (76) is fixedly mounted on the inner wall of the groove of the plurality of circular stoppers (41), one end of the air intake pipe (76) passes through and extends to the outside of the fixed frame (47) and is connected to the air outlet of the air pump. Connecting pipes (77) are installed in a linear array on the surface of the air intake pipe (76), one end of the plurality of connecting pipes (77) is fixedly connected to the inside of the air intake pipe (76), and the other end of the connecting pipe (77) is fixedly connected to the inside of the pressure chamber (72).
10. The method for constructing a composite support for a deep soft foundation box beam according to claim 3, characterized in that: The vibrating, rotating and telescopic device (3) comprises a vibrating tube (31), one side surface of the vibrating tube (31) is fixedly mounted on the surface opposite to the multi-section rotating shaft (42) at the head end, the top end of the vibrating tube (31) is arranged in a conical shape, and a vibrating motor (32) and a power motor (33) are fixedly mounted on the inner wall of the vibrating tube (31), the two vibrating motors (32) are respectively located on both sides of the power motor (33), and the two vibrating motors (32) and the power motor (33) are both electrically connected to a power source by means of carbon brushes; A guide ring (34) is also fixedly installed on the inner wall of the conical end of the vibration tube (31), and a turntable (35) is rotatably connected to the inner wall of one end of the guide ring (34). One side surface of the turntable (35) is fixedly installed with the output shaft of the power motor (33), and a track slide (36) is fixedly installed on the other end surface of the turntable (35). A slide rod (37) is slidably inserted into the inner wall of the track slide (36), and one end of the slide rod (37) is rotatably connected to a vibration plug rod (38) through a bearing. The two vibration plug rods (38) are symmetrically arranged, and the repelling ends of the two vibration plug rods (38) are both slidably inserted into the surface of the guide ring (34), and the telescopic ends of the vibration plug rods (38) also penetrate and extend to the outside of the vibration tube (31).