Fabricated pier and construction method

By cooperating with the positioning sleeve and the positioning pin shaft, the bridge pier and the support are quickly connected, and the connections are fixed by bolts, the problems of the connection accuracy and construction time of the prefabricated bridge pier are solved, and efficient concrete connection and construction efficiency are achieved.

CN118880756APending Publication Date: 2024-11-01四川铁拓科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411285175.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The connection form of prefabricated bridge piers requires high precision and long-term concrete pouring, which affects the construction progress.

Method used

The positioning sleeve and positioning pin shaft are used to quickly connect the prefabricated piers and the bearings, and the connections are fixed by bolts to reduce the cast-in-place workload and increase the precompression stress of concrete connections.

Benefits of technology

It improves the reliability of the bridge pier connection, shortens the construction period, reduces construction time and costs, and avoids the sleeve grouting process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880756A_ABST
    Figure CN118880756A_ABST
Patent Text Reader

Abstract

The fabricated pier comprises a prefabricated pier body and a bearing platform, a step is arranged at the lower end of the prefabricated pier body, a connecting piece a is arranged on the step, a boss is arranged on the inner side of the step, a positioning sleeve is arranged in the middle of the boss, a connecting piece b corresponding to the connecting piece a is arranged on the upper surface of the bearing platform, and the connecting piece a and the connecting piece b are fixed through bolts. Grooves corresponding to the bosses are formed in the surface of the bearing platform, the grooves are located between the connecting pieces b, and positioning pin shafts corresponding to the positioning sleeves are arranged on the grooves. The positioning sleeve and the positioning pin shaft are matched with each other to achieve quick butt joint of the prefabricated pier and the bearing platform, then the connecting piece a and the connecting piece b are fixedly connected through the bolt, and post-pouring is conducted on the reserved space, so that the pier connecting reliability is improved, meanwhile, pre-compressive stress is generated on a concrete connecting interface, the sleeve grouting process is avoided, and the construction cost is reduced. And the cast-in-place workload after pier assembly is minimized, so that the construction efficiency is improved, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridges, and in particular to an assembled bridge pier and a construction method. Background Art

[0002] Prefabricated bridge construction technology is a new technical means, the purpose is to build bridges quickly, green bridges, and build safe, comfortable and durable bridge projects. By changing the traditional construction concept, taking local conditions into consideration in the design process, and making full use of prefabrication and assembly technology, the on-site construction process can be reduced as much as possible, large temporary projects can be reduced, the interference with the surrounding environment can be reduced, the construction period can be shortened, and the cost can be reduced. Compared with traditional cast-in-place construction, prefabrication and assembly construction can achieve standardized, factory-based, intelligent mass production, mechanized transportation and installation, and has many advantages such as controllable quality, low carbon energy saving and environmental protection, low cost, and short cycle.

[0003] However, the various connection forms between the current prefabricated piers and abutments, pier segments, and piers and cap beams require higher installation accuracy or longer concrete strengthening times, which places high demands on construction and affects the construction progress of the entire project. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a prefabricated bridge pier and a construction method.

[0005] The objective of the present invention is achieved through the following technical scheme: an assembled pier, comprising a prefabricated pier and a cap, a step is provided at the lower end of the prefabricated pier, a connector a is provided on the step, a boss is provided on the inner side of the step, a positioning sleeve is provided in the middle of the boss, a connector b corresponding to the connector a is provided on the upper surface of the cap, the connector a and the connector b are fixed by bolts, a groove corresponding to the boss is provided on the surface of the cap, and the groove is located between the connector b, and a positioning pin corresponding to the positioning sleeve is provided on the groove.

[0006] Preferably, the connecting member a includes an upper anchoring assembly, an upper anchor plate, an upper support plate and an upper reinforcing rib. The upper anchoring assembly is embedded in the prefabricated pier. The upper anchoring assembly is connected to the upper anchor plate through the bolt holes of the upper anchor plate. The upper anchor plate is located on the step. An upper reinforcing rib is installed below the upper anchor plate. The end of the upper reinforcing rib is connected to the upper support plate. A threaded hole a is provided on the upper support plate, and the threaded hole a is used to install bolts.

[0007] Preferably, the connecting member b includes a lower anchor assembly, a lower anchor plate, a lower support plate and a lower reinforcing rib. The lower anchor assembly is pre-buried in the pedestal. The lower anchor assembly is connected to the lower anchor plate through the bolt holes of the lower anchor plate. The lower anchor plate is located on the surface of the pedestal. A lower reinforcing rib is installed above the lower anchor plate. The end of the lower reinforcing rib is connected to the lower support plate. The lower support plate is provided with a threaded hole b corresponding to the threaded hole a.

[0008] Preferably, the inner diameter of the positioning sleeve is larger than the outer diameter of the positioning pin.

[0009] Preferably, the depth of the positioning sleeve is greater than the height of the positioning pin.

[0010] A method for constructing an assembled bridge pier, comprising the assembled bridge pier, and further comprising the following steps: S1: the reserved space outside the prefabricated pier; S2: The upper anchor assembly is connected to the upper anchor plate through the bolt holes of the upper anchor plate, and the lower anchor assembly is connected to the lower anchor plate through the bolt holes of the lower anchor plate; S3: Align the threaded hole a with the threaded hole b, and fix the connecting piece a with the connecting piece b by bolts; S4: Post-pour the reserved space.

[0011] The present invention has the following advantages: the present invention realizes the rapid docking of the prefabricated bridge pier and the abutment by the cooperation of the positioning sleeve and the positioning pin shaft; after the positioning is completed, the connecting member a and the connecting member b are fixedly connected by bolts and the reserved space is post-cast, thereby increasing the reliability of the bridge pier connection and generating pre-compression stress on the concrete connection interface, avoiding the sleeve grouting process, minimizing the workload of casting in situ after the bridge pier is assembled, thereby improving the construction efficiency and shortening the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a structural diagram of the assembled bridge piers after docking; Figure 2 This is a structural diagram of the prefabricated bridge piers before docking; Figure 3 It is a structural schematic diagram of the installation position of the connector a and the connector b; Figure 4 This is a structural schematic diagram of the cross section of the installation position of the connecting member a; Figure 5 This is a schematic diagram of the structure of the bridge pier after post-cast concrete; Figure 6 It is a structural schematic diagram of the installation relationship between the connector a and the connector b; In the figure, 1-connector a, 2-connector b, 3-bolt, 4-post-cast concrete, 5-precast pier, 6-cap, 11-upper anchor assembly, 12-upper anchor plate, 13-upper support plate, 14-upper reinforcing rib, 21-lower anchor assembly, 22-lower anchor plate, 23-lower support plate, 24-lower reinforcing rib, 51-boss, 52-positioning sleeve, 61-groove, 62-positioning pin. DETAILED DESCRIPTION

[0013] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0014] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0015] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.

[0016] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0017] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the invention is usually placed when in use, or the positions or positional relationships commonly understood by those skilled in the art, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0018] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0019] In this embodiment, if Figure 1 and Figure 2As shown, an assembled pier includes a prefabricated pier 5 and a cap 6. A step is provided at the lower end of the prefabricated pier 5, a connecting piece a1 is arranged on the step, a boss 51 is provided on the inner side of the step, a positioning sleeve 52 is provided in the middle of the boss 51, a connecting piece b2 corresponding to the connecting piece a1 is provided on the upper surface of the cap 6, the connecting piece a1 and the connecting piece b2 are fixed by bolts 3, a groove 61 corresponding to the boss 51 is provided on the surface of the cap 6, and the groove 61 is located between the connecting pieces b2, and a positioning pin shaft 62 corresponding to the positioning sleeve 52 is provided on the groove 61. The positioning sleeve 52 and the positioning pin 62 cooperate with each other to achieve quick docking of the prefabricated pier 5 and the abutment 6. After the positioning is completed, the connecting piece a1 and the connecting piece b2 are fixedly connected by the bolt 3 and the reserved space is post-cast, thereby increasing the reliability of the pier connection and generating pre-compression stress on the concrete connection interface, avoiding the sleeve grouting process, minimizing the workload of cast-in-place after the pier assembly, thereby improving the construction efficiency and shortening the construction period.

[0020] Further, such as Figure 3 , Figure 4 and Figure 6 As shown, the connecting member a1 includes an upper anchoring assembly 11, an upper anchor plate 12, an upper support plate 13 and an upper reinforcing rib 14. The upper anchoring assembly 11 is embedded in the prefabricated pier 5. The upper anchoring assembly 11 is connected to the upper anchor plate 12 through the bolt holes of the upper anchor plate 12. The upper anchor plate 12 is located on the step. An upper reinforcing rib 14 is installed below the upper anchor plate 12. The end of the upper reinforcing rib 14 is connected to the upper support plate 13. The upper support plate 13 is provided with a threaded hole a, which is used to install the bolt 3. Furthermore, the connecting member b2 includes a lower anchor assembly 21, a lower anchor plate 22, a lower support plate 23 and a lower reinforcing rib 24. The lower anchor assembly 21 is pre-buried in the pedestal 6. The lower anchor assembly 21 is connected to the lower anchor plate 22 through the bolt holes of the lower anchor plate 22. The lower anchor plate 12 is located on the surface of the pedestal 6. The lower reinforcing rib 24 is installed above the lower anchor plate 22. The end of the lower reinforcing rib 24 is connected to the lower support plate 23. The lower support plate 23 is provided with a threaded hole b corresponding to the threaded hole a. Specifically, first, the upper anchor assembly 11 is connected to the upper anchor plate 12 through the bolt holes of the upper anchor plate 12, and the lower anchor assembly 21 is connected to the lower anchor plate 22 through the bolt holes of the lower anchor plate 22. Then, the threaded hole a and the threaded hole b are aligned, and the upper support plate 13 and the lower support plate 23 are fixedly connected by the bolts 3. The main functions of the upper reinforcing rib 14 and the lower reinforcing rib 24 are to connect the corresponding anchor plates and support plates and provide support, so as to facilitate post-casting.

[0021] In this embodiment, the inner diameter of the positioning sleeve 52 is greater than the outer diameter of the positioning pin 62. Further, the depth of the positioning sleeve 52 is greater than the height of the positioning pin 62. Specifically, the greater than here means slightly greater than, so as to facilitate the rapid docking of the prefabricated pier 5 and the cap 6.

[0022] A method for constructing an assembled bridge pier, comprising the assembled bridge pier, and further comprising the following steps: S1: the outer reserved space of the prefabricated pier 5; S2: The upper anchor assembly 11 is connected to the upper anchor plate 12 through the bolt holes of the upper anchor plate 12, and the lower anchor assembly 21 is connected to the lower anchor plate 22 through the bolt holes of the lower anchor plate 22; S3: Align the threaded hole a with the threaded hole b, and fix the connecting piece a1 and the connecting piece b2 together with the bolt 3; S4: Post-cast the reserved space to form post-cast concrete 4.

[0023] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An assembled bridge pier, characterized in that: The invention comprises a prefabricated bridge pier (5) and a cap (6), wherein a step is provided at the lower end of the prefabricated bridge pier (5), a connecting member a (1) is provided on the step, a boss (51) is provided on the inner side of the step, a positioning sleeve (52) is provided in the middle of the boss (51), a connecting member b (2) corresponding to the connecting member a (1) is provided on the upper surface of the cap (6), the connecting member a (1) and the connecting member b (2) are fixed by bolts (3), a groove (61) corresponding to the boss (51) is provided on the surface of the cap (6), and the groove (61) is located between the connecting members b (2), and a positioning pin shaft (62) corresponding to the positioning sleeve (52) is provided on the groove (61).

2. The assembled bridge pier according to claim 1, characterized in that: The connecting member a (1) comprises an upper anchoring assembly (11), an upper anchor plate (12), an upper support plate (13) and an upper reinforcing rib plate (14); the upper anchoring assembly (11) is pre-buried in the prefabricated pier (5); the upper anchoring assembly (11) is connected to the upper anchor plate (12) via bolt holes of the upper anchor plate (12); the upper anchor plate (12) is located on the step; the upper reinforcing rib plate (14) is installed below the upper anchor plate (12); the end of the upper reinforcing rib plate (14) is connected to the upper support plate (13); the upper support plate (13) is provided with a threaded hole a; the threaded hole a is used to install the bolt (3).

3. The assembled bridge pier according to claim 2, characterized in that: The connecting member b (2) comprises a lower anchoring assembly (21), a lower anchor plate (22), a lower support plate (23) and a lower reinforcing rib plate (24); the lower anchoring assembly (21) is pre-buried in the pedestal (6); the lower anchoring assembly (21) is connected to the lower anchor plate (22) via bolt holes of the lower anchor plate (22); the lower anchor plate (12) is located on the surface of the pedestal (6); the lower reinforcing rib plate (24) is installed above the lower anchor plate (22); the end of the lower reinforcing rib plate (24) is connected to the lower support plate (23); and the lower support plate (23) is provided with a threaded hole b corresponding to the threaded hole a.

4. The assembled bridge pier according to claim 3, characterized in that: The inner diameter of the positioning sleeve (52) is greater than the outer diameter of the positioning pin shaft (62).

5. The assembled bridge pier according to claim 4, characterized in that: The depth of the positioning sleeve (52) is greater than the height of the positioning pin shaft (62).

6. A method for constructing an assembled bridge pier, comprising the assembled bridge pier according to any one of claims 1 to 5, characterized in that: The following steps are also included: S1: the outer reserved space of the prefabricated bridge pier (5); S2: the upper anchor assembly (11) is connected to the upper anchor plate (12) through the bolt holes of the upper anchor plate (12), and the lower anchor assembly (21) is connected to the lower anchor plate (22) through the bolt holes of the lower anchor plate (22); S3: Align the threaded hole a with the threaded hole b, and securely connect the connecting member a (1) and the connecting member b (2) with the bolt (3); S4: Post-pour the reserved space.