Reinforcing device and method for shield to pass through existing operating railway bridge in short distance

By using reinforcement devices in shield construction, including bridge piles, reinforced piles, reinforced concrete temporary bearings and steel structure support, combined with intelligent lifting device and wedge-shaped steel plate, the problem of deformation control of railway bridges is solved and railway operation is realized safety and stability.

CN118880765APending Publication Date: 2024-11-01CHINA RAILWAY DESIGN GRP CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410921169.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively control the deformation of railway bridges during shield construction, resulting in the inability to guarantee the safety of railway operations, especially when high-speed trains operate at high speeds, there are problems of high settlement requirements and high safety risks.

Method used

A reinforcement device for shield structure crossing existing operating railway bridges at close range was designed, including existing bridge piles, reinforced piles, reinforced concrete temporary bearings and steel structure support, and the intelligent lifting device and wedge-shaped steel plates are used for top support. Structure, by monitoring the bearing reaction force, pre-grouting, construction of reinforced piles, reinforcement of top tightening, excavation of foundation pits and real-time monitoring, we determine whether active reinforcement is needed, and finally dismantle the temporary support and support roof.

Benefits of technology

It effectively ensures that the railway bridge structure does not cause staggering movement when the shield passes through, ensures the safe operation of existing lines, reduces the risk of settlement, and ensures the normal operation of bridge transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880765A_ABST
    Figure CN118880765A_ABST
Patent Text Reader

Abstract

The invention discloses a reinforcing device and method for a shield to pass through an existing operating railway bridge in a close range, the device comprises an existing bridge pile, a reinforcing pile is arranged on the outer side of the existing bridge pile, a reinforced concrete temporary bearing platform is arranged on the reinforcing pile, and a steel structure support top is arranged on the reinforced concrete temporary bearing platform. A jacking structure used for jacking the existing operating railway bridge is arranged at the upper end of the steel structure supporting top, and the method comprises the following steps that the counter force of a supporting seat of the existing operating railway bridge is monitored; grouting parameters are measured, and pre-grouting is conducted; reinforcing piles are constructed; constructing a reinforced concrete temporary bearing platform; steel structure supports are constructed, and reinforcing and jacking are conducted; a foundation pit is excavated, and data are monitored in real time; judging whether complete replacement is needed or not; constructing a reinforcing bearing platform; and the reinforced concrete temporary bearing platform and the steel structure support top are dismantled. It can be effectively guaranteed that an upper railway bridge structure does not generate dislocation during shield crossing, and safe operation of an existing line is effectively guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of urban underground facility construction, and in particular relates to a reinforcement device and method for a shield machine to pass through an existing operating railway bridge at a close distance. Background Art

[0002] As the urban economy develops faster and faster, the construction of subways has also developed rapidly, and subways have been built in major cities in China. The construction of subways will inevitably have a certain degree of impact on the dense buildings in large cities, and even endanger the safety and use of buildings; especially in large cities with complex traffic environments and various viaducts, it is common for subways to cross existing railway bridges, posing a threat to the normal operation of railway bridges. With the development of subway construction, more and more subways will cross the lower part of railway bridges. In order to ensure operational safety, the existing lines will often be slowed down or stopped, and the original traffic bridge will be restored to a stable state after the shield passes. This will affect the normal bridge transportation. In order not to affect the normal operation of the bridge, some protective structures will be added during the shield construction process. However, the speed of high-speed trains is generally higher, and the requirements for settlement are higher. Most existing technologies cannot control the deformation within the required range, and the safety of railway operation cannot be guaranteed. Safety risks such as safety. Summary of the invention

[0003] The present invention is proposed to solve the problems existing in the prior art, and its purpose is to provide a reinforcement device and method for a shield machine to cross an existing operating railway bridge at a close distance.

[0004] The technical solution of the present invention is: a reinforcement device for a shield machine to cross an existing operating railway bridge at close range, comprising an existing bridge pile, a reinforcement pile is arranged on the outer side of the existing bridge pile, a reinforced concrete temporary pedestal is arranged on the reinforcement pile, a steel structure support is arranged on the temporary reinforced concrete pedestal, and a supporting structure for supporting the existing operating railway bridge is arranged on the upper end of the steel structure support.

[0005] Furthermore, the supporting structure includes a temporary support, a wedge-shaped steel plate is provided on the top of the temporary support, and the wedge-shaped steel plate is in contact with the web of the beam of the existing operating railway bridge.

[0006] Furthermore, the supporting structure includes an intelligent jacking device, which is arranged vertically, and the telescopic end of the intelligent jacking device supports the existing operating railway bridge.

[0007] Furthermore, the steel structure support top on the reinforced concrete temporary foundation is arranged inclined, and the inclination direction of the steel structure support top is inclined toward the bottom of the existing operating railway bridge.

[0008] Furthermore, the steel structure supports on both sides of the existing bridge piles are symmetrically arranged.

[0009] Furthermore, the steel structure support top is connected to the column foot on the reinforced concrete temporary foundation through bolts.

[0010] Furthermore, the connection between the reinforced concrete temporary foundation and the bracket is a bolt connection.

[0011] Furthermore, the adjacent reinforced concrete temporary caps are connected to the existing bridge pile caps by embedding reinforcement.

[0012] A method for a shield machine to pass through a reinforcement device of an existing operating railway bridge at a close distance comprises the following steps: A. Monitor the bearing reaction forces of existing railway bridges in operation; B. Measure the grouting parameters and perform pre-grouting; C. Construction reinforcement piles; D. Construction of temporary reinforced concrete foundation; E. Construct the steel structure support and reinforce it; F. Excavate foundation pit and monitor data in real time; G. Determine whether active reinforcement is needed; H. Construction reinforcement foundation; I. Remove the temporary reinforced concrete foundation and steel structure support.

[0013] The beneficial effects of the present invention are as follows: The present invention provides a reinforcement and protection measure for a shield machine to pass under an existing railway bridge at a close distance, which can effectively ensure that the upper railway bridge structure does not dislocate when the shield machine passes through, thereby effectively ensuring the safe operation of the existing line. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the working state of the present invention; Figure 2 It is a schematic diagram of the structure of the present invention; Figure 3 It is a detailed diagram of the existing bridge pile in the present invention; Figure 4 It is a schematic diagram of the connection between the reinforcement cap and the reinforcement pile in the present invention; Figure 5 This is a schematic diagram of the connection between the column foot of the reinforcement cap and the reinforcement pile in the present invention. Figure 6 This is a schematic diagram of the reinforcing cap and the existing cap connection in the present invention. in: 1Reinforcement pile 2Steel structure support top 3Reinforced concrete temporary foundation 4Intelligent synchronous lifting device 5 Temporary support 6 Existing bridge piles 7Reinforcement piles 8Wedge-shaped steel plate 9 Existing bridge pile caps DETAILED DESCRIPTION

[0015] Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and embodiments: like Figures 1 to 6 As shown, a reinforcement device for a shield machine to cross an existing operating railway bridge at close range comprises an existing bridge pile 6, a reinforcement pile 1 is arranged on the outer side of the existing bridge pile 6, a reinforced concrete temporary pedestal 3 is arranged on the reinforcement pile 1, a steel structure support top 2 is arranged on the reinforced concrete temporary pedestal 3, and a supporting structure for supporting the existing operating railway bridge is arranged on the upper end of the steel structure support top 2.

[0016] The supporting structure includes a temporary support 5 , which is connected to the top of the steel structure support 2 .

[0017] The supporting structure includes an intelligent lifting device 4, which is arranged vertically, and the telescopic end of the intelligent lifting device 4 supports the existing operating railway bridge.

[0018] A wedge-shaped steel plate 8 is provided on the top of the temporary support 5, and the wedge-shaped steel plate 8 is in contact with the web of the beam of the existing railway bridge in operation.

[0019] The steel structure support top 2 on the reinforced concrete temporary foundation 3 is arranged in an inclined direction, and the inclination direction of the steel structure support top 2 is inclined toward the bottom of the existing operating railway bridge.

[0020] The steel structure supports 2 on both sides of the existing bridge piles 6 are arranged symmetrically.

[0021] The steel structure support top 2 is connected with bolts on the reinforced concrete temporary foundation 3.

[0022] The adjacent reinforced concrete temporary caps 3 are connected to the existing bridge pile caps 9 by embedding reinforcement.

[0023] Specifically, the temporary support 5 should be a support that is not lower than the existing support of the bridge.

[0024] A method for a shield machine to pass through a reinforcement device of an existing operating railway bridge at a close distance comprises the following steps: A. Monitor the bearing reaction forces of existing railway bridges in operation; B. Measure the grouting parameters and perform pre-grouting; C. Construction reinforcement pile 1; D. Construction of reinforced concrete temporary foundation 3; E. Construct steel structure support 2 and reinforce it; F. Excavate foundation pit and monitor data in real time; G. Determine whether it needs to be completely replaced; H. Construction reinforcement foundation; I. Remove the temporary reinforced concrete foundation 3 and the steel structure support top 2.

[0025] Specifically, step A monitors the bearing reaction force of an existing operating railway bridge, and the specific process is as follows: First, a PLC intelligent jacking device is installed on the existing bridge pile 6 to tighten the bridge structure. When the bridge pile sinks, the intelligent jacking device can be used to increase the jacking force synchronously to ensure that the bridge superstructure does not sink synchronously when the bridge pile and pier sink. Attention should be paid to the reaction force of each support at all times. Then, the support reaction forces are recorded parametrically.

[0026] Specifically, step B measures the grouting parameters and performs pre-grouting. The specific process is as follows: First, the grouting parameters were measured experimentally; Then, the influence range of the soil around the pile foundation is determined by the type of pile foundation, and the sand layer (if any) within the influence range of pile 1 is reinforced by pre-grouting.

[0027] Specifically, step C constructs the reinforcement pile 1, and the specific process is as follows: After the grouting is completed, reinforcement piles 1 are constructed. The dynamics of the bridge are closely observed during the construction process, and adjustments are made through the PLC intelligent jacking device 4. The grouting process avoids grouting disturbance of the existing bridge piles 6.

[0028] Specifically, step D is to construct the reinforced concrete temporary cap 3, and the specific process is as follows: Based on the completed reinforcement piles 1, a reinforced concrete temporary foundation 3 is constructed, and the reinforced concrete temporary foundation 3 serves as a reinforced bottom platform.

[0029] Specifically, step E constructs the steel structure support top 2 to reinforce and tighten it. The specific process is as follows: First, a steel structure support top 2 is constructed above the reinforced concrete temporary foundation 3; Then, the steel structure support 2 uses a temporary support 5 and a PLC intelligent jacking device 4 to support the bridge; Afterwards, a 10 cm thick wedge-shaped steel plate 8 is used at the bottom of the beam to fill the gap between the temporary support 5 and the bridge, so that the steel structure support top 2 is tightly connected to the bridge.

[0030] Specifically, step F excavates the foundation pit and monitors the data in real time. The specific process is as follows: Carry out foundation pit excavation, conduct integrity check on the existing foundation cap during excavation, treat any defects on the foundation cap, and continuously monitor the foundation cap during construction, including its vertical displacement and deformation.

[0031] Specifically, step G determines whether active reinforcement is needed, and the specific process is as follows: According to the monitored parameters, when the displacement exceeds the design warning value, the existing structure is actively reinforced. Active reinforcement measures include permanent reinforcement piles and cross-section expansion and reinforcement of existing caps. When the calculation results do not meet the bearing capacity requirements, a temporary steel structure support is set up to support the existing bridge structure during construction.

[0032] Specifically, step H is to construct a reinforced cap, and the specific process is as follows: First, the existing cap is roughened to expose the reinforcement of the piles, and then the reinforcement of the piles can be anchored into the cap by bending. After processing, the reinforcement is planted to reinforce the cap. Then, after the construction of the reinforced foundation is completed, the foundation pit soil is backfilled, the sand layer is pre-grouted and the tracking grouting pipe is pre-buried.

[0033] Specifically, the specific process of removing the reinforced concrete temporary cap 3 and the steel structure support top 2 in step 1 is as follows: First, remove the reinforced concrete temporary cap 3 and the steel structure support top 2; Then, during the shield tunneling process, tracking grouting is carried out based on the monitoring results.

[0034] Specifically, the reinforcement pile 1 adopts 800mm bored pile, the pile bottom is located in the soil-like and block-like strongly weathered strata, the pile length is 19m~23m, the vertical distance between the pile bottom and the line is 2.86~6m, and the minimum distance on the plane is about 0.3m. Consider the full sleeve follow-up drilling process to reduce the disturbance to the stratum. Closely monitor the dynamics of the bridge during construction, and dynamically adjust the state of the PLC intelligent jacking system according to the monitoring results to ensure the safety of the bridge structure.

[0035] Specifically, the reinforced concrete temporary foundation 3 adopts C35 reinforced concrete structure. The steel structure support top 2 adopts Q345qD steel.

[0036] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. For those skilled in the art, improvements and changes obtained without departing from the technical concept of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. A reinforcement device for a shield machine to pass through an existing railway bridge at close range, comprising an existing bridge pile (6), Features: A reinforcement pile (7) is arranged outside the existing bridge pile (6), a reinforced concrete temporary pedestal (3) is arranged on the reinforcement pile (7), a steel structure support (2) is arranged on the reinforced concrete temporary pedestal (3), and a supporting structure for supporting the existing operating railway bridge is arranged at the upper end of the steel structure support (2).

2. A reinforcement device for a shield machine to pass through an existing railway bridge at close range according to claim 1, Features: The jacking structure comprises a temporary support (5), a wedge-shaped steel plate (8) is arranged on the top of the temporary support (5), and the wedge-shaped steel plate (8) is in contact with the web of the beam of an existing railway bridge in operation.

3. A reinforcement device for a shield machine to pass through an existing railway bridge at close range according to claim 2, Features: The supporting structure comprises an intelligent lifting device (4), wherein the intelligent lifting device (4) is arranged vertically at the top of an existing bridge pier (6), and the telescopic end of the intelligent lifting device (4) supports the existing operating railway bridge.

4. According to claim 1, a reinforcement device for a shield machine to pass through an existing railway bridge at a close distance, Features: The steel structure support top (2) on the reinforced concrete temporary foundation (3) is arranged in an inclined direction, and the inclination direction of the steel structure support top (2) is towards the bottom of the existing operating railway bridge.

5. According to claim 1, a reinforcement device for a shield machine to pass through an existing railway bridge at a close distance, Features: The steel structure supports (2) on both sides of the existing bridge pier (6) are arranged symmetrically.

6. According to claim 1, a reinforcement device for a shield machine to pass through an existing railway bridge at a close distance, Features: The steel structure support top (2) is connected to a bracket on a reinforced concrete temporary foundation (3).

7. A reinforcement device for a shield machine to pass through an existing railway bridge at close range according to claim 6, Features: The column foot of the steel structure support top (2) is provided with a plurality of bolts, and is bolt-connected to the reinforced concrete temporary foundation (3) through the bolts.

8. According to claim 1, a reinforcement device for a shield machine to pass through an existing railway bridge at a close distance, Features: The adjacent reinforced concrete temporary caps (3) are connected to the existing bridge pile caps (9) by planting reinforcement bars.

9. A method for a shield machine to pass through the reinforcement device of an existing railway bridge at close range. Features: The following steps are involved: A. Monitor the bearing reaction forces of existing railway bridges in operation; B. Measure the grouting parameters and perform pre-grouting; C. Construction reinforcement piles (1); D. Construction of temporary reinforced concrete foundation (3); E. Construct the steel structure support (2) and reinforce it; F. Excavate foundation pit and monitor data in real time; G. Determine whether it needs to be completely replaced; H. Construction reinforcement foundation; I. Remove the temporary reinforced concrete foundation (3) and the steel structure support (2).

Citation Information

Patent Citations

  • Pile foundation replacement method for high-speed railway continuous rigid frame bridges

    CN102277885A

  • Method for controlling deformation of bridge during construction of tunnel close to foundation of bridge

    CN102966122A

  • Novel pile foundation underpinning structure and method

    CN106065577A

  • Open cut tunnel and bridge combined underpinning integrated construction method

    CN114718104A

  • Friction pile protection structure for shield to pass through existing operating railway bridge in short distance

    CN217107029U