Horizontal grouting device for steel pipe pile and using method of horizontal grouting device

The horizontal grouting device and method for steel pipe piles have solved the problem of uniform and tight filling of concrete grout into the steel pipe pile body, improving grouting efficiency and pile strength, and are suitable for land construction.

CN118880888APending Publication Date: 2024-11-01GUANGXI WENZHOU HEAVY IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411106416.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

Existing technologies cannot efficiently and cost-effectively fill the steel pipe pile with concrete grout in a uniform and tight manner, which affects the strength of the pile.

Method used

A horizontal grouting device for steel pipe piles is adopted, which includes a detachable steel mold and a movable concrete pouring pipe. Combined with vibrators and pressure grouting technology, it can achieve uniform distribution and compaction of concrete.

Benefits of technology

It improves the efficiency and effectiveness of concrete pouring, ensures the stability of steel pipe piles, is suitable for land construction, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880888A_ABST
    Figure CN118880888A_ABST
Patent Text Reader

Abstract

The invention discloses a steel pipe pile horizontal grouting device and a using method thereof. The steel pipe pile horizontal grouting device comprises a steel pipe body. One end of the steel pipe body is an end A, and the other end of the steel pipe body is an end B; the end A is positioned at the tail end of the steel pipe body; the end B is positioned in the steel pipe body; a steel mould I is detachably arranged at the end A; a steel mould II is welded at the end B; a concrete pouring hole I is formed in the steel mould I; a concrete pouring pipe I penetrates into the concrete pouring hole I; a guide rail is arranged on the inner wall of the steel pipe body; a pulley block lifting ring is arranged on the guide rail; the concrete pouring pipe I is movably connected with the guide rail through a pulley block hanging ring. According to the device and method, concrete grout can be efficiently poured into the steel pipe pile body on the land, the poured concrete is compact and firm, and the strength of the steel pipe pile body is well guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of infrastructure, and in particular relates to a horizontal grouting device for a steel pipe pile and a use method thereof. Background Art

[0002] Concrete cast-in-place piles are a technology that pours concrete of a specific grade into steel pipe piles to strengthen the strength of the pile body. Due to the high strength and good stability of the pile body, concrete cast-in-place piles are widely used in the field of civil engineering. For example, the construction of offshore wind power stations or oil platforms requires the piles to be planted on the seabed first. Piling at sea must take into account the influence of factors such as seawater, wind and waves, and temperature. Piling and pouring concrete are difficult and the steps are cumbersome, which affects the construction of offshore platforms. Pouring concrete into steel pipe piles on land avoids the influence of adverse factors at sea, which brings inspiration to improving the difficulty of offshore pile planting. Since the offshore working platform needs to have strong stability to resist the influence of wind and waves, a pile with a larger diameter is required. Taking the common offshore pile body as an example, the inner diameter of the pile body is about 2.5 meters, and special working platforms require a larger pile body. The current technology and equipment cannot efficiently and cost-effectively fill and pour concrete slurry into the steel pipe pile body evenly and tightly, which affects the strength of the pile body. Summary of the invention

[0003] The purpose of the present invention is to solve the problem that the existing technology cannot efficiently and cost-effectively fill and pour concrete slurry into the steel pipe pile body evenly and tightly, which affects the strength of the pile body, and proposes a horizontal grouting device for steel pipe piles and a method for using the same. The device and method of the present invention can efficiently pour concrete slurry into the steel pipe pile body on land, and the poured concrete is compact and strong, so that the strength of the steel pipe pile body is well guaranteed.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A horizontal grouting device for steel pipe piles comprises a steel pipe body; one end of the steel pipe body is set as end A, and the other end is set as end B; end A is located at the end of the steel pipe body; end B is located inside the steel pipe body; a steel mold I is detachably provided at end A; a steel mold II is welded at end B; a concrete pouring hole I is provided on steel mold I; a concrete pouring pipe I is penetrated through concrete pouring hole I; a guide rail is provided on the inner wall of the steel pipe body; a pulley block lifting ring is provided on the guide rail; the concrete pouring pipe I is movably connected to the guide rail via the pulley block lifting ring.

[0006] The A end is located at the end of the steel pipe body, so that the steel mold I can be removed and reused, and the B end is located inside the steel pipe body. The steel mold II is welded to the inside of the steel pipe body and does not need to be removed; the concrete pouring pipe I penetrates into the steel pipe body from the concrete pouring hole I, and can move along the guide rail through the pulley block lifting ring to change the position of the pipe mouth, which is conducive to the uniform distribution of concrete slurry in the steel pipe body.

[0007] As a further technical improvement, it also includes a concrete pouring pipe II; a concrete pouring hole II is provided on the steel mold II at the B end of the steel pipe body; the concrete pouring pipe II passes into the steel pipe body from the concrete pouring hole II; the concrete pouring hole II is connected to a concrete pump. The concrete pouring pipe II is connected to the steel pipe body through the concrete pouring hole II for pouring the second layer of concrete; the concrete pump can pump concrete into the steel pipe body through the concrete pouring pipe II for pressure grouting.

[0008] As a further technical improvement, a surrounding clamp is distributed outside the steel pipe body; a vibrator is provided on the clamp. The vibrator can vibrate to make the concrete in the steel pipe body more compact and promote the discharge of gas.

[0009] As a further technical improvement, the steel mold I is also provided with an air outlet inspection hole; the portion of the steel pipe body below the air outlet inspection hole is set as the first layer of concrete pouring area; the portion of the steel pipe body above the air outlet inspection hole is set as the second layer of concrete pouring area. The air outlet inspection hole is used to exhaust the air in the steel pipe body and to observe the inside of the pipe.

[0010] As a further technical improvement, the steel mold I is also provided with an entry observation port I and an entry observation port II. The entry observation port I and the entry observation port II are used for workers to lean in and check the concrete condition in the steel pipe body.

[0011] As a further technical improvement, the distance between the lowest point of the entrance observation port I and the bottom of the steel pipe body is 1 to 1.2 meters; the distance between the lowest point of the entrance observation port II and the bottom of the steel pipe body is 1.7 to 1.9 meters.

[0012] As a further technical improvement, the steel molds I and II are both provided with reinforcing channel steels.

[0013] As a further technical improvement, a reinforcing bracket is provided between the reinforcing channel steel of the steel mold II and the inner wall of the steel tube body. The reinforcing channel steel and the reinforcing bracket both play a role in reinforcing the stability of the steel mold I and the steel mold II; rubber pads are also provided on the edges of the steel mold I and the steel mold II to ensure the seal between the steel tube body.

[0014] The method of using the above-mentioned horizontal grouting device for steel pipe piles is as follows:

[0015] Prepare pipes: connect pipe sections by welding to form a steel pipe body; weld shear keys at end A of the steel pipe body to increase strength; transport the steel pipe body to the concrete pouring area;

[0016] Connecting steel molds: Place the steel pipe body upside down and connect the flange at the A end of the steel pipe body; detachably connect the steel mold I to the A end of the steel pipe body through bolts; weld the steel mold II to the B end of the steel pipe body;

[0017] The first layer of concrete grouting is poured; the concrete pouring pipe I is extended from the concrete pouring hole I; at this time, the concrete pouring pipe I can move along the guide rail through the pulley ring; the concrete of the corresponding grade is poured into the steel pipe body through the concrete pouring pipe I; at this time, the concrete pouring pipe I is controlled to move along the guide rail, so that the outlet position of the concrete pouring pipe I changes, so that the concrete in the steel pipe body is evenly distributed; the vibrator is installed and turned on to make the concrete slurry flat by vibration; the grouting can be suspended during this period, and the staff can safely lean into the entry observation port I to observe the concrete level inside the steel pipe body; when the concrete height reaches the vicinity of the lowest point of the entry observation port I, the grouting is suspended, the entry observation port I is blocked, and then the grouting is continued; when the concrete height reaches the vicinity of the lowest point of the entry observation port II, the grouting is suspended, and at this time the first layer of concrete pouring is completed, the entry observation port II is blocked, the concrete pouring pipe I is taken out, and the concrete pouring hole I is blocked;

[0018] Second layer of concrete grouting: Before the initial setting of the first layer of concrete, use a concrete pump to pump concrete of the corresponding grade from the concrete pouring pipe II into the steel pipe body for pressure grouting; until the concrete overflows from the air outlet inspection hole. To ensure that the concrete in the steel pipe body is dense, the concrete slurry needs to continue to overflow from the air outlet inspection hole for at least one minute without air discharge; test the concentration of the concrete slurry. When the concentration of the outflowing concrete slurry is consistent with that of the inlet end, it means that the second layer of concrete has been poured densely; seal the concrete pouring pipe II and cut off the concrete pouring pipe II at an appropriate position;

[0019] Finishing: After the concrete in the steel pipe body has solidified, remove the steel formwork I and roughen the exposed concrete at the A end of the steel pipe body to complete the grouting of the steel pipe body.

[0020] The technical solution of the present invention has the following beneficial effects:

[0021] 1. The present invention can block the A end and the B end of the steel pipe body through the steel mold I and the steel mold II, and perform concrete grouting after the steel pipe body is placed upside down. There is no need to pour concrete at the pile planting point at sea, so that the concrete pouring operation in the pile is simple, the work efficiency is high, and the pouring effect is good.

[0022] 2. The concrete pouring pipe I of the present invention can move inside the steel pipe body and change the position of the pipe mouth so that the concrete is evenly distributed and falls on the steel pipe body. At the same time, it cooperates with the vibrator to ensure that the concrete in the steel pipe body is compacted and the stability of the steel pipe body pile is enhanced.

[0023] 3. The present invention adopts a two-layer pouring method when pouring concrete into the steel pipe body. When pouring the first layer of concrete, a mobile pipe is used to make the concrete uniform, and the pouring situation is manually observed to ensure the pouring effect. When pouring the second layer of concrete, a pressure grouting method is adopted to make the concrete fully fill the interior of the steel pipe body, making the steel pipe body pile more firm, which is conducive to the needs of pile planting in offshore environments. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 Schematic diagram of the steel pipe body and its internal structure.

[0025] Figure 2 It is a structural schematic diagram of the concrete pump, the first-layer concrete pouring area and the second-layer concrete pouring area.

[0026] Figure 3 This is a schematic diagram of the structure in which the clamp and vibrator are installed on the steel pipe body.

[0027] Figure 4 It is a schematic diagram of the structure of the steel mold I on the A end of the steel tube body.

[0028] Figure 5 It is a schematic diagram of the structure of steel mold II on the B end of the steel tube body.

[0029] Figure 6 The figure is a flow chart of the method for using the device of the present invention.

[0030] Figure numerals: 1-steel pipe body, 2-steel mold I, 3-steel mold II, 4-guide rail, 5-concrete pouring pipe I, 6-pulley block lifting ring, 7-reinforced bracket, 8-reinforced channel steel, 9-first layer concrete pouring area, 10-second layer concrete pouring area, 11-concrete pouring pipe II, 12-concrete pump, 13-hoop, 14-vibrator, 15-air outlet inspection hole, 16-concrete pouring hole I, 17-concrete pouring hole II, 18-entrance observation port I, 19-entrance observation port II. DETAILED DESCRIPTION

[0031] The present invention will be further described below in conjunction with the accompanying drawings.

[0032] Embodiment 1:

[0033] like Figures 1 to 6As shown, a horizontal grouting device for steel pipe piles comprises a steel pipe body 1; one end of the steel pipe body 1 is set as end A, and the other end is set as end B; the A end is located at the end of the steel pipe body 1; the B end is located inside the steel pipe body 1; a steel mold Ⅰ2 is detachably provided at the A end; a steel mold Ⅱ3 is welded at the B end; a concrete pouring hole Ⅰ16 is provided on the steel mold Ⅰ2; the concrete pouring hole Ⅰ16 penetrates into the concrete pouring pipe Ⅰ5; a guide rail 4 is provided on the inner wall of the steel pipe body 1; a pulley block lifting ring 6 is provided on the guide rail 4; the concrete pouring pipe Ⅰ5 is movably connected to the guide rail 4 through the pulley block lifting ring 6.

[0034] It also includes a concrete pouring pipe II11; a concrete pouring hole II17 is provided on the steel mold II3 at the B end of the steel pipe body 1; the concrete pouring pipe II11 passes into the steel pipe body 1 from the concrete pouring hole II17; and the concrete pouring hole II17 is connected to a concrete pump 12.

[0035] A surrounding clamp 13 is disposed outside the steel pipe body 1 ; a vibrator 14 is disposed on the clamp 13 .

[0036] The steel mold Ⅰ2 is also provided with an air outlet inspection hole 15; the portion of the steel pipe body 1 below the air outlet inspection hole 15 is set as the first layer concrete pouring area 9; the portion of the steel pipe body 1 above the air outlet inspection hole 15 is set as the second layer concrete pouring area 10.

[0037] The steel mold Ⅰ2 is also provided with an entry observation port Ⅰ18 and an entry observation port Ⅱ19.

[0038] The method of use of the present invention is as follows:

[0039] Preparation of pipes: connecting pipe segments by welding to form a steel pipe body 1; welding a shear key at the end A of the steel pipe body 1 to increase strength; transporting the steel pipe body 1 to the concrete pouring area;

[0040] Connecting steel molds: The steel pipe body 1 is placed upside down, and a flange is connected to the end A of the steel pipe body 1; the steel mold Ⅰ2 is detachably connected to the end A of the steel pipe body 1 by bolts; the steel mold Ⅱ3 is welded to the end B inside the steel pipe body 1;

[0041] The first layer of concrete grouting is poured; the concrete pouring pipe Ⅰ5 is extended from the concrete pouring hole Ⅰ16; at this time, the concrete pouring pipe Ⅰ5 can move along the guide rail 4 through the pulley block ring 6; the concrete of the corresponding number is poured into the steel pipe body 1 through the concrete pouring pipe Ⅰ5; at this time, the concrete pouring pipe Ⅰ5 is controlled to move along the guide rail 4, so that the outlet position of the concrete pouring pipe Ⅰ5 is changed, so that the concrete in the steel pipe body 1 is evenly distributed; the vibrator 14 is installed and turned on to make the concrete slurry flat by vibration; the grouting can be suspended during this period, and the staff can safely lean into the entry observation port Ⅰ18 to observe the concrete level inside the steel pipe body 1; when the concrete height reaches the vicinity of the lowest point of the entry observation port Ⅰ18, the grouting is suspended, the entry observation port Ⅰ18 is blocked, and then the grouting is continued; when the concrete height reaches the vicinity of the lowest point of the entry observation port Ⅱ19, the grouting is suspended, and at this time the first layer of concrete pouring is completed, the entry observation port Ⅱ19 is blocked, the concrete pouring pipe Ⅰ5 is taken out, and the concrete pouring hole Ⅰ16 is blocked;

[0042] Second layer of concrete grouting: Before the first layer of concrete sets, concrete of the corresponding grade is pumped from the concrete pouring pipe II11 into the steel pipe body 1 through the concrete pump 12 for pressure grouting; until the concrete overflows from the air outlet inspection hole 15. To ensure that the concrete in the steel pipe body 1 is dense, the concrete slurry needs to continue to overflow from the air outlet inspection hole 15 for at least one minute without air discharge; the concentration of the concrete slurry is tested. When the concentration of the outflowing concrete slurry is consistent with that of the inlet end, it means that the second layer of concrete has been poured densely; the concrete pouring pipe II11 is blocked and the concrete pouring pipe II11 is cut off at an appropriate position;

[0043] Finishing: After the concrete in the steel pipe body 1 has solidified, the steel formwork Ⅰ2 is removed, and the concrete exposed at the end of the steel pipe body 1A is roughened to complete the grouting of the steel pipe body 1.

[0044] Embodiment 2:

[0045] The difference between this embodiment and the first embodiment is that the lowest point of the entrance observation port I 19 is 1.1 meters away from the bottom of the steel tube body 1 ; the lowest point of the entrance observation port II 20 is 1.8 meters away from the bottom of the steel tube body 1 .

[0046] The method of use of this embodiment is the same as that of the first embodiment.

[0047] Embodiment three:

[0048] The difference between this embodiment and the second embodiment is that the steel mold I2 and the steel mold II3 are both provided with a reinforcing channel steel 8. A reinforcing bracket 7 is provided between the reinforcing channel steel 8 of the steel mold II3 and the inner wall of the steel pipe body 1.

[0049] The method of use of this embodiment is the same as that of the first embodiment.

[0050] Embodiment 4:

[0051] The difference between this embodiment and the third embodiment is that the lowest point of the entrance observation port I 19 is 1.1 meters away from the bottom of the steel tube body 1; the lowest point of the entrance observation port II 20 is 1.8 meters away from the bottom of the steel tube body 1. The steel mold I 2 and the steel mold II 3 are both provided with a reinforcing channel steel 8. A reinforcing bracket 7 is provided between the reinforcing channel steel 8 of the steel mold II 3 and the inner wall of the steel tube body 1.

[0052] The method of use of this embodiment is the same as that of the first embodiment.

[0053] The above embodiments are only exemplary embodiments of the present invention and are not intended to limit the present invention. The protection scope of the present invention is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present invention, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present invention.

[0054] In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "inside", "front", "back", "left", "right", etc. are based on the directions or positional relationships shown in the accompanying drawings, or are the directions or positional relationships in which the inventive product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0055] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "disposed" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

Claims

1. A horizontal grouting device for steel pipe piles, comprising a steel pipe body (1); characterized in that: One end of the steel tube body (1) is set as end A, and the other end is set as end B; end A is located at the end of the steel tube body (1); end B is located inside the steel tube body (1); end A is provided with a detachable steel mold I (2); end B is welded with a steel mold II (3); steel mold I (2) is provided with a concrete pouring hole I (16); concrete pouring hole I (16) penetrates into concrete pouring pipe I (5); guide rails (4) are provided on the inner wall of the steel tube body (1); pulley block lifting rings (6) are provided on the guide rails (4); concrete pouring pipe I (5) is movably connected to the guide rails (4) via the pulley block lifting rings (6).

2. The horizontal grouting device for steel pipe piles according to claim 1 is characterized in that: It also includes a concrete pouring pipe II (11); a concrete pouring hole II (17) is provided on the steel mold II (3) at the B end of the steel pipe body (1); the concrete pouring pipe II (11) passes into the steel pipe body (1) from the concrete pouring hole II (17); and the concrete pouring hole II (17) is connected to a concrete pump (12).

3. The horizontal grouting device for steel pipe piles according to claim 1 is characterized in that: A surrounding clamp (13) is arranged outside the steel pipe body (1); a vibrator (14) is arranged on the clamp (13).

4. The horizontal grouting device for steel pipe piles according to claim 1, characterized in that: The steel mold I (2) is also provided with a gas outlet inspection hole (15); the portion of the steel pipe body (1) below the gas outlet inspection hole (15) is set as a first layer concrete pouring area (9); and the portion of the steel pipe body (1) above the gas outlet inspection hole (15) is set as a second layer concrete pouring area (10).

5. The horizontal grouting device for steel pipe piles according to claim 1 is characterized in that: The steel mold I (2) is also provided with an entry observation port I (18) and an entry observation port II (19).

6. The horizontal grouting device for steel pipe piles according to claim 5, characterized in that: The lowest point of the entrance observation port I (19) is 1 to 1.2 meters away from the bottom of the steel tube body (1); the lowest point of the entrance observation port II (20) is 1.7 to 1.9 meters away from the bottom of the steel tube body (1).

7. The horizontal grouting device for steel pipe piles according to claim 1, characterized in that: The steel mold I (2) and the steel mold II (3) are both provided with reinforcing channel steel (8).

8. The horizontal grouting device for steel pipe piles according to claim 7, characterized in that: A reinforcing bracket (7) is provided between the reinforcing channel steel (8) of the steel mold II (3) and the inner wall of the steel pipe body (1).

9. The method for using the horizontal grouting device for steel pipe piles according to any one of claims 1 to 8, characterized in that: The following steps are involved: 1) Pipe preparation: connecting pipe segments by welding to form a steel pipe body (1); welding a shear key at end A of the steel pipe body (1) to increase strength; and transporting the steel pipe body (1) to a concrete pouring area; 2) Connecting the steel mold: the steel pipe body (1) is placed upside down, and a flange is connected to the A end of the steel pipe body (1); the steel mold I (2) is detachably connected to the A end of the steel pipe body (1) by bolts; and the steel mold II (3) is welded to the B end of the steel pipe body (1); 3) First layer of concrete grouting: Extend the concrete pouring pipe I (5) from the concrete pouring hole I (16); at this time, the concrete pouring pipe I (5) can move along the guide rail (4) through the pulley ring (6); pour the concrete of the corresponding number into the steel pipe body (1) through the concrete pouring pipe I (5); at this time, control the concrete pouring pipe I (5) to move along the guide rail (4) so ​​that the outlet position of the concrete pouring pipe I (5) changes, so that the concrete in the steel pipe body (1) is evenly distributed; install and turn on the vibrator (14) to vibrate the concrete. The concrete slurry is leveled; during this period, the grouting can be suspended, and the staff can lean into the observation port I (18) to observe the concrete level inside the steel pipe body (1) under safe conditions; when the concrete height reaches the vicinity of the lowest point of the observation port I (18), the grouting is suspended, the observation port I (18) is blocked, and then the grouting is continued; when the concrete height reaches the vicinity of the lowest point of the observation port II (19), the grouting is suspended, at which time the first layer of concrete pouring is completed, the observation port II (19) is blocked, the concrete pouring pipe I (5) is taken out, and the concrete pouring hole I (16) is blocked; 4) Second layer concrete grouting: Before the first layer of concrete begins to set, concrete of the corresponding grade is pumped from the concrete pouring pipe II (11) into the steel pipe body (1) through a concrete pump (12) to perform pressure grouting; until the concrete overflows from the air outlet inspection hole (15). To ensure that the concrete in the steel pipe body (1) is dense, the concrete slurry needs to continue to overflow from the air outlet inspection hole (15) for at least one minute without air being discharged; the concentration of the concrete slurry is tested. When the concentration of the outflowing concrete slurry is consistent with that of the inlet end, it means that the second layer of concrete has been poured densely; the concrete pouring pipe II (11) is blocked, and the concrete pouring pipe II (11) is cut off at an appropriate position; 5) Finishing: After the concrete in the steel tube body (1) has solidified, the steel form I (2) is removed and the exposed concrete at the A end of the steel tube body (1) is roughened, thus completing the grouting of the steel tube body (1).