Construction method for dispersing side load of elevator shaft foundation pit
By using force-partitioning plates and telescopic parts to support multiple steel sheet piles in the elevator shaft foundation pit construction, the problems of steel sheet piles inclination and single-point stress deformation are solved, and the uniform dispersion of the side loads of the elevator shaft foundation pit is achieved and Steady straightening of steel sheet piles.
Patent Information
- Application Number
- CN202410952555.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-01
AI Technical Summary
In the construction of elevator shaft foundation pits, steel sheet piles are prone to inclination due to silt extrusion, which makes it difficult for excavators to enter and straighten. The single-point stress causes the steel sheet piles to deform, and the prior art is difficult to effectively disperse the side load.
Multiple force-partition plates and telescopic parts are used to support multiple steel sheet piles to build a stress system that disperse the load on the side of the foundation pit of the elevator shaft. The pressure load is dispersed through rotatable hinged support beams and force-partition plates to avoid single point of exposure. Force deformation.
Effectively disperse the pressure load of the silt foundation on the side of the elevator shaft foundation pit, prevent the steel sheet pile from tilting and solve the problem of single-point stress deformation, and realize the uniform stress of multiple steel sheet piles, ensuring the stability of construction.
Smart Images

Figure CN118880901A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a construction method for dispersing the side load of an elevator shaft foundation pit, and belongs to the technical field of building construction. Background Art
[0002] When digging the elevator pit under the silt foundation, in order to resist the pressure of the silt flowing and collapsing inward, it is necessary to first press steel sheet piles into the silt foundation to enclose it. After the excavation of the elevator pit is completed, due to environmental factors such as rain, some steel sheet piles will be squeezed by the silt and tilted into the pit. In subsequent construction, the steel sheet piles that are tilted into the pit need to be straightened.
[0003] Since the steel sheet piles enclose the foundation pit of the elevator shaft, it is inconvenient for the excavator to enter and carry out the straightening construction. When the steel sheet pile support (see Chinese patent announcement number CN219568906U) is used as the reference for the straightening of the steel support, the straightening is carried out with the opposite single steel sheet pile as the force basis, and the steel sheet pile that needs to be straightened is deformed when the single point force is too great. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a construction method for dispersing the side load of an elevator shaft foundation pit.
[0005] The present invention is achieved through the following technical solutions.
[0006] The present invention provides a construction method for dispersing the side load of an elevator shaft foundation pit, comprising:
[0007] A plurality of force component plates A and a plurality of force component plates B are supported on a plurality of steel sheet piles in opposite directions to construct a force system for dispersing the load on the side of the elevator shaft foundation pit; the plurality of telescopic parts A and the plurality of telescopic parts B are controlled to extend to different lengths to press against the steel sheet piles, so that the plurality of force component plates A and the plurality of force component plates B are in contact with the steel sheet piles at a plurality of locations to bear force, and when the inclined steel sheet piles are straightened, the pressure load generated by the mud foundation on the side of the elevator shaft foundation pit is dispersed to the plurality of steel sheet piles.
[0008] The force bearing system for dispersing the side load of the elevator shaft foundation pit includes:
[0009] Steel sheet piles,
[0010] Support beam A and support beam B, support beam A and support beam B are rotatably hinged;
[0011] The support beam A supports multiple steel sheet piles through multiple support blocks distributed at intervals;
[0012] The support beam B supports a plurality of steel sheet piles correspondingly through a plurality of support blocks B distributed at intervals;
[0013] The plurality of steel sheet piles supported by the plurality of support blocks A and the plurality of steel sheet piles supported by the plurality of support blocks B are in opposite directions.
[0014] It also includes a silt foundation. The steel sheet piles are alternately distributed and interlocked with each other in the silt foundation to form an enclosed area. There is a concave space inside the steel sheet piles to form an elevator shaft foundation pit.
[0015] The support beam A is fixed with a force distribution plate A, and the force distribution plate A is fixedly connected to a support block A via a plurality of retractable retractable members A, and the plurality of support blocks are distributed at intervals corresponding to the steel sheet piles to provide multiple supports.
[0016] The support beam B is fixed with a force distribution plate B, and the force distribution plate B is fixedly connected to a support block B via a plurality of retractable retractable parts B. The plurality of support blocks B are distributed at intervals and correspond to steel sheet piles for multiple supports.
[0017] The beneficial effects of the present invention are as follows: a plurality of force distribution plates A and a plurality of force distribution plates B contact a plurality of steel sheet piles to obtain a force foundation, so that the pressure load generated by the mud foundation on the side of the elevator shaft foundation pit is dispersed, and the inclined steel sheet piles are straightened, thus solving the problem of how much force a single point of the steel sheet pile that needs to be straightened will cause deformation. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the structure of the present invention;
[0019] Figure 2 It is a schematic diagram of the structure of the force distribution plate A and the force distribution plate B of the present invention when they are in use;
[0020] In the figure: 1- steel sheet pile; 11- elevator shaft foundation pit; 2- mud foundation; 3- support beam A; 31- force distribution plate A; 32- telescopic member A; 33- support block A; 4- support beam B; 41- force distribution plate B; 42- telescopic member B; 43- support block B. DETAILED DESCRIPTION
[0021] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.
[0022] like Figure 1 to Figure 2 shown.
[0023] A force bearing system for dispersing the side load of an elevator shaft foundation pit in the present application includes:
[0024] There are a plurality of steel sheet piles 1, which are alternately distributed and interlocked with each other in the silt foundation 2 to form an enclosed area, and a concave space is provided inside the steel sheet piles 1 to form an elevator shaft foundation pit 11.
[0025] A support beam A3 and a support beam B4 which are rotatably hinged to each other are installed in the space of the elevator shaft foundation pit 11.
[0026] The support beam A3 is fixed with a force distribution plate A31, and the force distribution plate A31 is fixedly connected to a support block A33 via a plurality of retractable retractable members A32. The plurality of support blocks 33 are distributed at intervals corresponding to the steel sheet piles 1 to provide multiple supports.
[0027] The support beam B4 is fixed with a force distribution plate B41, and the force distribution plate B41 is fixedly connected to a support block B43 via a plurality of retractable retractable parts B42. The plurality of support blocks B43 are distributed at intervals corresponding to the steel sheet piles 1 to provide multiple supports; the plurality of support blocks A33 and the plurality of support blocks B43 are supported on a plurality of steel sheet piles 1 in relative directions.
[0028] For example, when a steel sheet pile 1 at a certain location tilts toward the elevator shaft foundation pit 11, the force component plate A31 on the telescopic member A32 is controlled to support the tilted steel sheet pile 1 itself and the adjacent steel sheet piles 1, and the force component plate B41 on the telescopic member B42 is controlled to support multiple steel sheet piles 1 opposite to the steel sheet pile 1 to be straightened. The multiple telescopic members A32 and the multiple telescopic members B42 are controlled to extend to different lengths to press against the steel sheet pile 1, so that the multiple force component plates A31 and the multiple force component plates B41 contact the multiple steel sheet piles 1 to obtain a force foundation, so that the pressure load generated by the mud foundation 2 on the side of the elevator shaft foundation pit 11 is dispersed, and the tilted steel sheet pile 1 is straightened, thereby solving the problem of how much force is applied to a single point of the steel sheet pile to be straightened and causing deformation.
[0029] A construction method for dispersing the side load of an elevator shaft foundation pit in the present application includes:
[0030] A plurality of force distribution plates A31 and a plurality of force distribution plates B41 are supported on a plurality of steel sheet piles 1 in opposite directions, so as to construct a force bearing system for dispersing the side load of the elevator shaft foundation pit.
[0031] Control multiple telescopic parts A32 and multiple telescopic parts B42 to extend to different lengths to press against the steel sheet piles 1, and the support beams A3 and B4 that are rotatably hinged to each other transmit force, so that multiple force distribution plates A31 and multiple force distribution plates B41 contact and bear force on multiple steel sheet piles 1. When the inclined steel sheet piles 1 are straightened, the pressure load generated by the mud foundation 2 on the side of the elevator shaft pit 11 is dispersed to the multiple steel sheet piles 1.
Claims
1. A construction method for dispersing the side load of an elevator shaft foundation pit, characterized in that: include: A plurality of force distribution plates A (31) and a plurality of force distribution plates B (41) are supported on a plurality of steel sheet piles (1) in opposite directions, so as to construct a force bearing system for dispersing the load on the side of the elevator shaft foundation pit; a plurality of telescopic parts A (32) and a plurality of telescopic parts B (42) are controlled to extend to different lengths to press against the steel sheet piles (1), so that the plurality of force distribution plates A (31) and the plurality of force distribution plates B (41) are in contact with the steel sheet piles (1) at a plurality of locations to bear force, and when the inclined steel sheet piles (1) are straightened, the pressure load generated by the silt foundation (2) on the side of the elevator shaft foundation pit (11) is dispersed onto the plurality of steel sheet piles (1).
2. The construction method for dispersing the side load of the elevator shaft foundation pit according to claim 1, characterized in that: The force bearing system for dispersing the side load of the elevator shaft foundation pit includes: Steel sheet pile (1), A support beam A (3) and a support beam B (4), wherein the support beam A (3) and the support beam B (4) are rotatably hinged; The support beam A (3) supports a plurality of steel sheet piles (1) correspondingly via a plurality of support blocks (33) distributed at intervals; The support beam B (4) supports a plurality of steel sheet piles (1) correspondingly through a plurality of support blocks B (43) distributed at intervals; The plurality of steel sheet piles (1) supported by the plurality of support blocks A (33) and the plurality of steel sheet piles (1) supported by the plurality of support blocks B (43) are in opposite directions.
3. The construction method for dispersing the side load of the elevator shaft foundation pit according to claim 2, characterized in that: It also includes a mud foundation (2), steel sheet piles (1) are alternately distributed and interlocked with each other in the mud foundation (2) to form an enclosed area, and there is a concave space inside the steel sheet piles (1) to form an elevator shaft foundation pit (11).
4. The construction method for dispersing the side load of the elevator shaft foundation pit according to claim 2, characterized in that: The support beam A (3) is fixed with a force distribution plate A (31), and the force distribution plate A (31) is fixedly connected to a support block A (33) via a plurality of retractable retractable parts A (32), and the plurality of support blocks (33) are distributed at intervals corresponding to the steel sheet piles (1) to provide multiple supports.
5. The construction method for dispersing the side load of the elevator shaft foundation pit according to claim 2, characterized in that: The support beam B (4) is fixed with a force distribution plate B (41), and the force distribution plate B (41) is fixedly connected to a support block B (43) via a plurality of retractable retractable parts B (42), and the plurality of support blocks B (43) are distributed at intervals corresponding to the steel sheet piles (1) to provide multiple supports.