Prefabricated concrete beam dry type connecting joint and connecting method thereof

Through the dry connection nodes of precast concrete beams, high-strength bolts and reinforced oblique braces can achieve fast and low-cost connection between the beam and the structural body, solving the problems of slow connection speed and high cost in the existing technology, and improving construction efficiency and load Bearable.

CN118881014AActive Publication Date: 2024-11-01SHANGHAI TANDD TECHNOLOGY CO LTD

Patent Information

Application Number
CN202411128178.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-01
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

In prefabricated concrete structures, the connecting nodes between the beam and the main building need to be cast in place, resulting in slow construction speed and high cost. The existing full-bolt connection method requires high accuracy and high worker skills, making it difficult to achieve fast and low-cost connections. .

Method used

The dry-type connection node of precast concrete beam is adopted, and the upper and lower embedded sleeves and support seats are combined with high-strength bolts. The reinforced oblique braces and pressure-bearing adjustment nuts are used to achieve tensile and compressive force resistance, reduce the shear force of the bolts, and simplify the Installation process.

Benefits of technology

The rapid connection between the beam and the structural body is achieved, the skill requirements of workers are reduced, the amount of steel used by nodes and the construction cost is reduced, the installation convenience and load bearing capacity are improved, and the cast-in-place and post-casting steps are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118881014A_ABST
    Figure CN118881014A_ABST
Patent Text Reader

Abstract

The invention provides a prefabricated concrete beam dry-type connecting joint and a connecting method thereof, and belongs to the field of prefabricated buildings. An upper high-strength bolt is arranged above the top face of a prefabricated concrete beam (within the height of a floor), so that the connecting force arm of the upper high-strength bolt is increased; therefore, equal-strength joint connection with the reinforcing steel bars in the beam is achieved through the single large-diameter high-strength bolt, and installation convenience is greatly improved. The upper high-strength bolt and the lower high-strength bolt are combined for clamping, so that tensile and compression-resistant bidirectional force transmission is realized (in a normal state, the upper high-strength bolt is tensile, and the lower high-strength bolt is compression-resistant; ), so as to cope with the bending moment change of the precast concrete beam under the action of the reciprocating load.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of prefabricated buildings, and in particular relates to a prefabricated concrete beam dry connection node and a connection method thereof. Background Art

[0002] In prefabricated concrete structures, the connection nodes between beams and building bodies (such as columns or shear walls) need to be cast in situ, which requires scaffolding during beam construction, slow node connection speed, and high cost. For example, Chinese patent CN 108049633 A discloses a method for construction of precast concrete frame beam-column nodes, which involves the connection of precast columns and composite beams. Although it realizes a simple and fast on-site connection between precast columns and composite beams, it does not get rid of the wet work during the installation of beams and columns, and requires steel bar connection, with a large number of connections.

[0003] In recent years, some concrete beams have built-in steel sections at the ends of the beams, and the bolt-welding method has been adopted. The exposed steel nodes need to be cast twice, the nodes use a large amount of steel, and the welding has high requirements for workers. The full bolt connection has high precision requirements. How to achieve the full bolt connection of beams and columns, especially the quick connection with a very small number of bolts, has always been a problem that the project hopes to solve. Summary of the invention

[0004] The object of the present invention is a fully bolted concrete beam quick connection node. To this end, the present invention provides a precast concrete beam dry connection node, comprising a structural body, a precast concrete beam and an installation component, wherein the precast concrete beam is assembled and connected to the structural body through the installation component; characterized in that the installation component comprises:

[0005] A first mounting member, the first mounting member at least comprises an upper embedded sleeve, a lower embedded sleeve and a support seat, the upper embedded sleeve and the lower embedded sleeve are embedded in the structural main body and arranged vertically; the elevation of the upper embedded sleeve is higher than the top surface of the precast concrete beam, and the elevation of the lower embedded sleeve is higher than the bottom surface of the precast concrete beam; the support seat is arranged on the structural main body;

[0006] The second mounting member at least includes a second end plate, an upper high-strength bolt and a lower high-strength bolt, the second end plate is fixed to the end of the precast concrete beam, the second end plate is supported on the support seat, the top of the second end plate extends above the precast concrete beam to form an extension section corresponding to the position of the upper embedded sleeve, the upper high-strength bolt and the lower high-strength bolt pass through the second end plate and are correspondingly installed on the upper embedded sleeve and the lower embedded sleeve.

[0007] Preferably, a steel cage is provided in the precast concrete beam, and the steel cage includes longitudinal bars and stirrups; and the second end plate is connected to the longitudinal bars.

[0008] Preferably, a reinforcing diagonal brace is formed between the extension section and the precast concrete beam, and the reinforcing diagonal brace is connected between the extension section and the longitudinal reinforcement.

[0009] Preferably, the reinforcing brace is a triangular plate; one of the right-angled sides of the triangular plate is connected to the extension section, and the other right-angled side is connected to the longitudinal reinforcement; and the steel cage has stirrups at least near the triangular plate.

[0010] Preferably, the number of the reinforcing diagonal braces is two, and the upper high-strength bolt is located between the two reinforcing diagonal braces.

[0011] Preferably, the number of the support seats is two; the two support seats are located on both sides of the second end plate, a lap joint is formed on the side of the second end plate, and the support seats are supported on the lap joint.

[0012] Preferably, the second mounting member also includes an installation box for installing the lower high-strength bolt; the installation box is arranged on the second end plate and embedded in the precast concrete beam, and the installation box has an installation chamber inside, the bottom has an opening corresponding to the bottom of the precast concrete beam, and the position of the side corresponds to the lower embedded sleeve.

[0013] Preferably, a post-filling distance adjustment gap is formed between the structural body and the second end plate, and pressure-bearing adjustment nuts are provided on the upper high-strength bolts and the lower high-strength bolts, and the pressure-bearing adjustment nuts are located in the post-filling distance adjustment gap.

[0014] Preferably, the first mounting member further comprises a first end plate, the first end plate is fixed to the structural main body through an embedded member, and the support seat is arranged on the first end plate;

[0015] The upper embedded sleeve is positioned at the top of the first end plate, and the lower embedded sleeve is positioned at the bottom of the first end plate.

[0016] Preferably, the two precast concrete beams are connected to two sides of a structural body; the upper high-strength bolts and the lower high-strength bolts respectively penetrate the structural body and are pulled against the second end plates of the two precast concrete beams.

[0017] The present invention also provides a connection method for a precast concrete beam dry connection node, which is characterized by comprising:

[0018] The main structure is formed, and an upper embedded sleeve, a lower embedded sleeve and a support seat are embedded and fixed in the main structure; the upper embedded sleeve and the lower embedded sleeve are arranged vertically;

[0019] The precast concrete beam is formed, and a second end plate is fixed to the end of the precast concrete beam, wherein the beam height of the precast concrete beam is less than the distance between the upper embedded sleeve and the lower embedded sleeve, and the top of the second end plate extends above the precast concrete beam to form an extension section corresponding to the position of the upper embedded sleeve, and a through hole for the upper high-strength bolt and the lower high-strength bolt to pass through is opened on the second end plate;

[0020] Dry connection, the precast concrete beam is hoisted to the support seat and supported by the support seat, and the upper high-strength bolts and the lower high-strength bolts are correspondingly installed on the upper embedded sleeve and the lower embedded sleeve.

[0021] Preferably, a floor slab is formed on the precast concrete beam, and the cast-in-place layer of the floor slab at least covers the upper high-strength bolts and the extension section.

[0022] The technical effects produced by the above technical solution of the present invention come from one or more of the following combinations:

[0023] The upper high-strength bolts are set above the top surface of the precast concrete beam (within the floor height) to increase the upper high-strength bolt connection force arm, so that a single large-diameter high-strength bolt can be used to achieve a strong node connection with the steel bars in the beam, greatly improving the installation convenience; high-strength bolts are used for connection, and their strength is greater than the strength of the steel bars, so that the bearing capacity of a single bolt is greater than the sum of the bearing capacities of all steel bars, and a single-bolt connection of upper and lower layers of steel bars can be achieved; and a support seat is set to resist shear, and combined with the upper and lower high-strength bolts to clamp, bidirectional force transmission in tension and compression is achieved (the upper high-strength bolts resist tension and the lower high-strength bolts resist compression when vertical loads act; the opposite may be true when seismic loads act) to cope with the change in sign of the bending moment of the precast concrete beam under reciprocating loads.

[0024] The beam nodes are connected by bolts, which has fast construction speed, no welding is required and low requirements on workers.

[0025] The shear resistance of the reinforced diagonal brace is utilized to realize the support-free installation of the beam, and the shear force at the beam end is connected by the reinforced diagonal brace. The bolts do not need to bear the shear force, so that the bolts can have large holes to adjust the error, and there is no need to use pre-tightening force.

[0026] The double bolt connection on both sides of the end makes the screw part both compressive and tensile resistant, so that the connection between the beam and the main structure can bear the negative bending moment under the action of gravity load, and can withstand the positive bending moment that may be generated under the action of earthquake reciprocating load.

[0027] The traditional bolt connection scheme has poor ability to adjust errors in the length direction of the component. This node uses bolts on both sides of the end plate to adjust the errors caused by inaccurate beam length. The pressure-bearing adjusting nut can be used to adjust and fill the spacing gap.

[0028] The node connection does not need to be cast in place or wrapped with post-cast concrete. It only needs to be caulked with polymer mortar and then filled with the spacing gap.

[0029] The nodes use less steel and have low cost.

[0030] The upper high-strength bolts are exposed for easy connection. After the construction is completed, they are buried in the cast-in-place part of the floor slab and are not exposed. The lower high-strength bolts are set above the height of the bottom of the beam, which can also be achieved without being exposed after the construction is completed. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 A schematic diagram of the structure of the present invention is expressed.

[0032] Figure 2 A front view of the present invention is presented.

[0033] Figure 3 A perspective assembly schematic diagram of the present invention is expressed.

[0034] Figure 4 Another perspective assembly schematic diagram of the present invention is expressed.

[0035] Figure 5 A schematic diagram of the steel structure of the precast concrete beam in the present invention is expressed.

[0036] Figure 6 A schematic diagram of steel structure assembly of structural columns and precast concrete beams in the present invention is expressed. DETAILED DESCRIPTION

[0037] The following description is given to enable those skilled in the art to implement and use the invention and incorporate it into a specific application context. Various modifications, as well as various uses in different applications will be readily apparent to those skilled in the art, and the general principles defined herein are applicable to a wide range of embodiments. Thus, the present invention is not limited to the embodiments given herein, but should be granted the broadest scope consistent with the principles and novel features disclosed herein.

[0038] In the following detailed description, many specific details are set forth to provide a more thorough understanding of the present invention. However, it will be apparent to those skilled in the art that the practice of the present invention need not be limited to these specific details. In other words, known structures and devices are shown in block diagram form without detailed display to avoid obscuring the present invention.

[0039] The reader is reminded of all documents and literature filed simultaneously with this specification and open to public inspection, and the contents of all such documents and literature are incorporated herein by reference. Unless otherwise directly stated, all features disclosed in this specification (including any attached claims, abstracts and drawings) can be replaced by alternative features for achieving the same, equivalent or similar purposes. Therefore, unless otherwise explicitly stated, each feature disclosed is only an example of a group of equivalent or similar features.

[0040] Note that, where used, the symbols left, right, front, back, top, bottom, forward, reverse, clockwise and counterclockwise are used only for convenience and do not imply any specific fixed direction. In fact, they are used to reflect the relative position and / or direction between the various parts of the object. In addition, the terms "first" and "second" are used only for descriptive purposes and should not be understood as indicating or implying relative importance.

[0041] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0042] Note that, in the case of use, further, preferably, further and more preferably are simple beginnings for explaining another embodiment based on the previous embodiment, and the content of further, preferably, further or more preferably followed by the above embodiment is combined with the previous embodiment as a complete composition of another embodiment. Several further, preferably, further or more preferably settings followed by the same embodiment can be arbitrarily combined to form another embodiment.

[0043] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. Note that the aspects described below in conjunction with the accompanying drawings and specific embodiments are only exemplary and should not be construed as limiting the scope of protection of the present invention in any way.

[0044] Structural embodiment:

[0045] Please refer to Figure 1 to Figure 6 The present invention provides a precast concrete beam dry connection node, comprising a structural body, a precast concrete beam 2 and an installation component 3, wherein the precast concrete beam 2 is assembled and connected to the structural body through the installation component 3. The structural body may be a structural column 1 or a shear wall, and this embodiment is described in detail by taking the structural column 1 as an object.

[0046] For details, please combine Figure 2 , Figure 3 and Figure 4 The mounting assembly 3 includes a first mounting member and a second mounting member. The first mounting member at least includes an upper embedded sleeve 313, a lower embedded sleeve 314 and a support seat 312. The upper embedded sleeve 313 and the lower embedded sleeve 314 are embedded in the main structure and arranged vertically. The elevation of the upper embedded sleeve 313 is higher than the top surface of the precast concrete beam 2, and the elevation of the lower embedded sleeve 314 is higher than the bottom surface of the precast concrete beam 2. The support seat 312 is arranged on the main structure. The second mounting member at least includes a second end plate 321, an upper high-strength Bolts 322 and lower high-strength bolts 323, the second end plate 321 is fixed to the end of the precast concrete beam 2, the second end plate 321 is supported on the support seat 312, the top of the second end plate 321 extends above the precast concrete beam 2 to form an extension section 3211 corresponding to the position of the upper embedded sleeve 313, the upper high-strength bolts 322 and the lower high-strength bolts 323 pass through the second end plate 321 and are correspondingly installed on the upper embedded sleeve 313 and the lower embedded sleeve 314. In this embodiment, the upper high-strength bolts are arranged above the top surface of the precast concrete beam 2 (within the floor height) to increase the upper high-strength bolt connection arm, thereby using a single large-diameter high-strength bolt to achieve a strong node connection with the steel bars in the beam, and the installation convenience is greatly improved; and a support seat 312 is arranged to resist shear, and combined with the upper and lower high-strength bolts to clamp, a two-way force transmission of tension and compression is achieved (under normal conditions, the upper high-strength bolts 322 resist tension, and the lower high-strength bolts 323 resist compression; the opposite may be true during an earthquake) to cope with the change in sign of the bending moment of the precast concrete beam 2 under the action of reciprocating loads.

[0047] The above solutions are necessary for the implementation of this embodiment, and are described in detail below with reference to the accompanying drawings:

[0048] Please combine Figure 3 , Figure 5 and Figure 6 The precast concrete beam 2 is formed in the factory and installed by hoisting on site. Further, a steel cage is provided in the precast concrete beam 2, and the steel cage includes longitudinal bars 21 and stirrups 22. The second mounting member is provided at the end plate of the precast concrete beam 2. Specifically, the second end plate 321 is connected to the longitudinal bars 21.

[0049] The top of the second end plate 321 extends upward to form an extension section 3211, and the extension section 3211 is preferably an extension plate body, which is regarded as a part of the second end plate 321. In layman's terms, the height of the second end plate 321 can be regarded as higher than the precast concrete beam 2, and the part with the top higher than the precast concrete beam 2 is defined as the extension section 3211, which is convenient for the description of the subsequent structure. The extension section 3211 serves as a mounting component for the upper high-strength bolt, which increases the connection force arm of the upper high-strength bolt, so that the installation with the upper embedded sleeve 313 can be achieved only by a single large-diameter high-strength bolt. The height of the extension section 3211 should be lower than the height of the floor slab, and it is best to submerge it through the cast-in-place layer of the floor slab later, so as to achieve the effect of hiding the high-strength bolts on the nodes.

[0050] Furthermore, a reinforcing brace 325 is formed between the precast concrete beams 2, and the reinforcing brace 325 is connected between the extension section 3211 and the longitudinal reinforcement 21 to play a shearing role. Preferably, the reinforcing brace 325 is a triangular plate; one of the right-angled sides of the triangular plate is connected to the extension section 3211, and the other right-angled side is connected to the longitudinal reinforcement 21. Here, the extension section 3211 and the triangular plate are both steel plates, and the connection method is welding. Furthermore, the number of the reinforcing braces 325 is two, and the upper high-strength bolt 322 is located between the two reinforcing braces 325, which play a balanced support, tensioning and shearing role. Preferably, a circle of stirrups 22 is directly provided at the connection between the triangular plate and the longitudinal reinforcement 21. The anti-bending node formed by the stirrups 22, the longitudinal reinforcement 21 and the triangular plate can prevent the high-strength bolts from pulling the second end plate 321. The second end plate 321 will bend, thereby driving the longitudinal reinforcement 21 upward, and the stirrups 22 can be used to prevent deformation and displacement. Because the high-strength bolts 322 and the longitudinal reinforcement 22 are not on the same axis, the axial force of the longitudinal reinforcement 22 can be reliably transmitted by reinforcing the diagonal braces 325 and the stirrups 22.

[0051] Furthermore, in order to facilitate the pre-installation of the position of the precast concrete beam 2, in this embodiment, the number of the support seats 312 is two; the two support seats 312 are located on both sides of the second end plate 321 to support and position the second end plate 321. Correspondingly, a lap joint 3212 is formed on the side of the second end plate 321, and the support seat 312 is supported on the lap joint 3212. Preferably, the lap joint 3212 is an L-shaped notch, so that the entire second end plate 321 presents an inverted convex shape. The support seat 312 is preferably a triangular plate, one right angle side of which is welded to the second end plate 321, and the other right angle side forms a supporting portion.

[0052] As another preferred implementation of this embodiment, the support seat 312 can also be a corbel embedded and fixed in the structural body, and this embodiment is not the only limitation.

[0053] To conceal the high-strength bolts and facilitate installation; refer to Figure 5 and Figure 6, the second mounting part also includes an installation box 34 for installing the lower high-strength bolt 323; the installation box 34 is arranged on the second end plate 321 and embedded in the precast concrete beam 2, and the installation box 34 has an installation chamber inside, the bottom has an opening and corresponds to the bottom of the precast concrete beam 2, and the position of the side corresponds to the lower embedded sleeve 314. Preferably, the installation box 34 is composed of a metal plate, the side is open and the bottom is also open, so that the side opening corresponds to the perforation position of the lower high-strength bolt in the second end plate 321, and the bottom opening corresponds to the bottom surface of the precast concrete beam 2, which is convenient for installation. As a result, the bottom of the second end plate 321, the bottom of the precast concrete beam 2 and the bottom opening of the installation box 34 are at the same elevation, forming a flat structure. On the one hand, the lower high-strength bolt can be hidden, and the bolt hiding of the node is realized by cooperating with the hiding of the upper high-strength bolt mentioned above; on the other hand, it is also convenient for the subsequent ceiling installation at the bottom.

[0054] See also Figure 2 In actual installation, there may be a slight error between the beam installation spacing between the two structural bodies and the actual length of the beam. Therefore, a post-filling spacing adjustment gap 33 is formed between the first end plate 311 and the second end plate 321 to eliminate this error. Furthermore, a pressure-bearing adjustment nut 324 is provided on both the upper high-strength bolt 322 and the lower high-strength bolt 323, and the pressure-bearing adjustment nut 324 is located in the post-filling spacing adjustment gap 33. On the one hand, the spacing between the second end plate 321 and the structural body is adjusted by cooperating with the nut part of the high-strength bolt through the pressure-bearing adjustment nut 324; on the other hand, the second end plate 321 and the structural body clamping the pressure-bearing adjustment nut 324 also makes the pressure-bearing adjustment nut 324 play a role in bearing pressure, sharing the pull-out resistance of the upper high-strength bolt 322 and the compression resistance of the lower high-strength bolt 323.

[0055] The first mounting member also includes a first end plate 311, which is fixed to the main structure through an embedded member 315, and a support seat 312 is provided on the first end plate 311. The upper embedded sleeve 313 is positioned at the top of the first end plate 311, and the lower embedded sleeve 314 is positioned at the bottom of the first end plate 311. Specifically, the embedded member 315 is an embedded steel bar, one end of which is welded to the first end plate 311, and the whole is embedded in the structural column 1 and fixed. Furthermore, grooves adapted to the positioning of the upper embedded sleeve 313 and the lower embedded sleeve 314 are formed at the top and bottom of the first end plate 311, and the shape of the grooves should be adapted to the outer periphery of the two embedded sleeves to facilitate the positioning of the embedded sleeves when the structural column 1 is cast. The support seat 312 can be welded to the first end plate 311.

[0056] This embodiment can also be implemented with the installation of double-sided beams. Specifically, two precast concrete beams 2 are connected to both sides of the structural column 1. Among them, the upper high-strength bolts 322 and the lower high-strength bolts 323 respectively penetrate the structural column 1 and are pulled against the second end plates 321 of the two precast concrete beams 2. At this time, the installation components 3 on both sides only need one upper high-strength bolt 322 and one lower high-strength bolt 323. Because it is a pulling structure, the upper embedded sleeve 313 and the lower embedded sleeve 314 can be omitted.

[0057] Beneficial effects of this embodiment:

[0058] The upper high-strength bolt is set above the top surface of the precast concrete beam 2 (within the floor height) to increase the upper high-strength bolt connection force arm, so that a single large-diameter high-strength bolt is used to achieve a strong node connection with the steel bars in the beam, and the installation convenience is greatly improved; and a support seat 312 is set to resist shear, and combined with the upper and lower high-strength bolts to clamp, a two-way force transmission of tension and compression is achieved (the upper high-strength bolt 322 resists tension and the lower high-strength bolt 323 resists compression under normal conditions; the opposite may be true during an earthquake) to cope with the change in sign of the bending moment of the precast concrete beam 2 under the action of reciprocating loads.

[0059] The beam nodes are connected by bolts, which has fast construction speed, no welding is required and low requirements on workers.

[0060] The shear resistance of the reinforced diagonal brace 325 is utilized to realize the support-free installation of the beam, and the shear force at the beam end is connected by the reinforced diagonal brace 325, and the bolts do not need to bear the shear force, so that the bolts can have large holes to adjust the error, and there is no need to use pre-tightening force.

[0061] The double bolt connection on both sides of the end makes the screw part both compressive and tensile resistant, so that the connection between the beam and the main structure can bear the negative bending moment under the action of gravity load, and can withstand the positive bending moment that may be generated under the action of earthquake reciprocating load.

[0062] The traditional bolt connection scheme has poor ability to adjust errors in the length direction of the component. This node uses bolts on both sides of the end plate to adjust the errors caused by inaccurate beam length. The pressure-bearing adjustment nut 324 can be used to adjust and fill the distance adjustment gap 33.

[0063] The node connection does not need to be cast in situ or wrapped with post-cast concrete. It only needs to be caulked with polymer mortar and then filled with the spacing gap 33.

[0064] The nodes use less steel and have low cost.

[0065] Method Example:

[0066] Please refer to Figure 1 to Figure 6 This embodiment provides a method for connecting a precast concrete beam dry connection node, comprising the following steps:

[0067] S1: Structural body molding:

[0068] Specifically, an upper embedded sleeve 313, a lower embedded sleeve 314 and a support seat 312 are embedded and fixed in the main structure; the upper embedded sleeve 313 and the lower embedded sleeve 314 are arranged vertically. The main structure can be a structural column 1 or a shear wall. This embodiment is described in detail with the structural column 1 as the object. When the structural column 1 is cast, the upper embedded sleeve, the lower embedded sleeve and the support seat are arranged in the casting mold and are integrally formed with the structural column 1.

[0069] Further, in order to facilitate the pre-installation of the position of the precast concrete beam 2, in this embodiment, there are two support seats 312. As another preferred implementation of this embodiment, the support seat 312 can also be a corbel embedded and fixed to the structural body, and this embodiment is not the only limitation.

[0070] The main structure is also provided with a first end plate 311, which is fixed to the main structure by an embedded part 315, and a support seat 312 is provided on the first end plate 311. The upper embedded sleeve 313 is positioned at the top of the first end plate 311, and the lower embedded sleeve 314 is positioned at the bottom of the first end plate 311. Specifically, the embedded part 315 is an embedded steel bar, one end of which is welded to the first end plate 311, and the whole is embedded in the structural column 1 and fixed. Furthermore, the top and bottom of the first end plate 311 are formed with grooves adapted to the positioning of the upper embedded sleeve 313 and the lower embedded sleeve 314, and the shape of the grooves should be adapted to the outer periphery of the two embedded sleeves, so as to facilitate the positioning of the embedded sleeves when the structural column 1 is cast. The support seat 312 can be welded to the first end plate 311.

[0071] S2: Precast concrete beam forming:

[0072] Specifically, a second end plate 321 is fixed to the end of the precast concrete beam 2, the beam height of the precast concrete beam 2 is less than the distance between the upper embedded sleeve 313 and the lower embedded sleeve 314, the top of the second end plate 321 extends above the precast concrete beam 2 to form an extension section 3211 corresponding to the position of the upper embedded sleeve 313, and through holes are opened on the second end plate 321 for the upper high-strength bolts 322 and the lower high-strength bolts 323 to pass through.

[0073] The beam height of the precast concrete beam 2 is smaller than the distance between the upper embedded sleeve 313 and the lower embedded sleeve 314 , which can be implemented as follows: the elevation of the upper embedded sleeve 313 is higher than the top surface of the precast concrete beam 2 , and the elevation of the lower embedded sleeve 314 is higher than the bottom surface of the precast concrete beam 2 .

[0074] The support seat 312 is arranged on the main body of the structure; the second end plate 321 is fixed to the end of the precast concrete beam 2, the second end plate 321 is supported on the support seat 312, the top of the second end plate 321 extends above the precast concrete beam 2 to form an extension section 3211 corresponding to the position of the upper embedded sleeve 313, the upper high-strength bolts 322 and the lower high-strength bolts 323 pass through the through holes of the second end plate 321 and are correspondingly installed on the upper embedded sleeve 313 and the lower embedded sleeve 314.

[0075] The precast concrete beam 2 is formed in the factory and installed by hoisting on site. Furthermore, a steel cage is provided inside the precast concrete beam 2, and the steel cage includes longitudinal bars 21 and stirrups 22, and the second end plate 321 is connected to the longitudinal bars 21. If both ends of the precast concrete beam 2 are installed through the nodes of this embodiment, both ends of the precast concrete beam 2 are provided with a second end plate 321, and the distance between the end plates at both ends is the length of the beam. The longitudinal bars 21 are welded to the second end plate 321 to form a steel cage, and then cast in a mold.

[0076] The top of the second end plate 321 extends upward to form an extension section 3211, and the extension section 3211 is preferably an extension plate body, which is regarded as a part of the second end plate 321. In layman's terms, the height of the second end plate 321 can be regarded as higher than the precast concrete beam 2, and the part with the top higher than the precast concrete beam 2 is defined as the extension section 3211, which is convenient for the description of the subsequent structure. The extension section 3211 serves as a mounting component for the upper high-strength bolt, which increases the connection force arm of the upper high-strength bolt, so that the installation with the upper embedded sleeve 313 can be achieved only by a single large-diameter high-strength bolt. The height of the extension section 3211 should be lower than the height of the floor slab, and it is best to submerge it through the cast-in-place layer of the floor slab later, so as to achieve the effect of hiding the high-strength bolts on the nodes.

[0077] Furthermore, a reinforcing brace 325 is formed between the precast concrete beams 2, and the reinforcing brace 325 is connected between the extension section 3211 and the longitudinal reinforcement 21 to play a shearing role. Preferably, the reinforcing brace 325 is a triangular plate; one of the right-angled sides of the triangular plate is connected to the extension section 3211, and the other right-angled side is connected to the longitudinal reinforcement 21. Here, the extension section 3211 and the triangular plate are both steel plates, and the connection method is welding. Furthermore, the number of the reinforcing braces 325 is two, and the upper high-strength bolt 322 is located between the two reinforcing braces 325, which play a balanced support, tensioning and shearing role. Preferably, a circle of stirrups 22 is directly provided at the connection between the triangular plate and the longitudinal reinforcement 21. The anti-bending node formed by the stirrups 22, the longitudinal reinforcement 21 and the triangular plate can prevent the high-strength bolts from pulling the second end plate 321. The second end plate 321 will bend, so as to drive the longitudinal reinforcement 21 upward, and the stirrups 22 are used to prevent deformation and displacement. Since the high-strength bolts 322 and the longitudinal reinforcement 22 are not on the same axis, the axial force of the longitudinal reinforcement 22 can be reliably transmitted by reinforcing the diagonal brace 325 and the stirrups 22. Preferably, when the above-mentioned precast concrete beam 2 is cast, the longitudinal reinforcement 21 is welded to the second end plate 321 to form a steel cage, and the triangular plate is also welded to the longitudinal reinforcement 21 for casting the precast concrete beam 2.

[0078] Two support seats 312 are located on both sides of the second end plate 321 to support and position the second end plate 321. Correspondingly, a lap joint 3212 is formed on the side of the second end plate 321, and the support seat 312 is supported on the lap joint 3212. Preferably, the lap joint 3212 is an L-shaped notch, so that the entire second end plate 321 presents an inverted convex shape. The support seat 312 is preferably a triangular plate, one right angle side of which is welded to the second end plate 321, and the other right angle side forms a supporting portion.

[0079] To conceal the high-strength bolts and facilitate installation; refer to Figure 5 and Figure 6 , the precast concrete beam 2 also includes an installation box 34 for installing the lower high-strength bolt 323; the installation box 34 is arranged on the second end plate 321 and embedded in the precast concrete beam 2, and the installation box 34 has an installation chamber inside, the bottom has an opening and corresponds to the bottom of the precast concrete beam 2, and the position of the side corresponds to the lower embedded sleeve 314. Preferably, the installation box 34 is composed of a metal plate, the side is open and the bottom is also open, so that the side opening corresponds to the perforation position of the lower high-strength bolt in the second end plate 321, and the bottom opening corresponds to the bottom surface of the precast concrete beam 2, which is convenient for installation. As a result, the bottom of the second end plate 321, the bottom of the precast concrete beam 2 and the bottom opening of the installation box 34 are at the same elevation, forming a flat structure. On the one hand, the lower high-strength bolt can be hidden, and the bolt hiding of the node is realized by cooperating with the hiding of the upper high-strength bolt mentioned above; on the other hand, it is also convenient for the subsequent ceiling installation at the bottom.

[0080] S3: Dry connection:

[0081] Specifically, the precast concrete beam 2 is hoisted to the support seat 312 and supported by the support seat 312 , and the upper high-strength bolts 322 and the lower high-strength bolts 323 are installed in the upper embedded sleeve 313 and the lower embedded sleeve 314 correspondingly.

[0082] See also Figure 2 In actual installation, there may be a slight error between the beam installation spacing between the two structural bodies and the actual length of the beam. Therefore, a post-filling spacing adjustment gap 33 is formed between the first end plate 311 and the second end plate 321 to eliminate this error. Furthermore, a pressure-bearing adjustment nut 324 is provided on both the upper high-strength bolt 322 and the lower high-strength bolt 323, and the pressure-bearing adjustment nut 324 is located in the post-filling spacing adjustment gap 33. On the one hand, the spacing between the second end plate 321 and the structural body is adjusted by cooperating with the nut part of the high-strength bolt through the pressure-bearing adjustment nut 324; on the other hand, the second end plate 321 and the structural body clamping the pressure-bearing adjustment nut 324 also makes the pressure-bearing adjustment nut 324 play a role in bearing pressure, sharing the pull-out resistance of the upper high-strength bolt 322 and the compression resistance of the lower high-strength bolt 323.

[0083] Finally, the post-casting floor slab is carried out:

[0084] A floor slab (not shown) is formed on the precast concrete beam 2, and the cast-in-place layer of the floor slab at least covers the high-strength bolts and the extension section to complete the complete concealment design of the upper part of the installation component.

[0085] Beneficial effects of this embodiment:

[0086] The upper high-strength bolt is set above the top surface of the precast concrete beam 2 (within the floor height) to increase the upper high-strength bolt connection force arm, so that a single large-diameter high-strength bolt is used to achieve a strong node connection with the steel bars in the beam, and the installation convenience is greatly improved; and a support seat 312 is set to resist shear, and combined with the upper and lower high-strength bolts to clamp, a two-way force transmission of tension and compression is achieved (the upper high-strength bolt 322 resists tension and the lower high-strength bolt 323 resists compression under normal conditions; the opposite may be true during an earthquake) to cope with the change in sign of the bending moment of the precast concrete beam 2 under the action of reciprocating loads.

[0087] The beam nodes are connected by bolts, which has fast construction speed, no welding is required and low requirements on workers.

[0088] The shear resistance of the reinforced diagonal brace 325 is utilized to realize the support-free installation of the beam, and the shear force at the beam end is connected by the reinforced diagonal brace 325, and the bolts do not need to bear the shear force, so that the bolts can have large holes to adjust the error, and there is no need to use pre-tightening force.

[0089] The double bolt connection on both sides of the end makes the screw part both compressive and tensile resistant, so that the connection between the beam and the main structure can bear the negative bending moment under the action of gravity load, and can withstand the positive bending moment that may be generated under the action of earthquake reciprocating load.

[0090] The traditional bolt connection scheme has poor ability to adjust errors in the length direction of the component. This node uses bolts on both sides of the end plate to adjust the errors caused by inaccurate beam length. The pressure-bearing adjustment nut 324 can be used to adjust and fill the distance adjustment gap 33.

[0091] The node connection does not need to be cast in situ or wrapped with post-cast concrete. It only needs to be caulked with polymer mortar and then filled with the spacing gap 33.

[0092] The nodes use less steel and have a low cost.

[0093] Furthermore, the present invention is described in detail above in conjunction with the embodiments of the accompanying drawings, and a person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the present invention shall be protected by the scope defined by the attached claims.

Claims

1. A precast concrete beam dry connection node, comprising a structural body, a precast concrete beam and an installation assembly, wherein the precast concrete beam is assembled and connected to the structural body through the installation assembly; It is characterized in that The installation assembly includes: A first mounting member, the first mounting member at least comprises an upper embedded sleeve, a lower embedded sleeve and a support seat, the upper embedded sleeve and the lower embedded sleeve are embedded in the structural main body and arranged vertically; the elevation of the upper embedded sleeve is higher than the top surface of the precast concrete beam, and the elevation of the lower embedded sleeve is higher than the bottom surface of the precast concrete beam; the support seat is arranged on the structural main body; The second mounting member at least includes a second end plate, an upper high-strength bolt and a lower high-strength bolt, the second end plate is fixed to the end of the precast concrete beam, the second end plate is supported on the support seat, the top of the second end plate extends above the precast concrete beam to form an extension section corresponding to the position of the upper embedded sleeve, the upper high-strength bolt and the lower high-strength bolt pass through the second end plate and are correspondingly installed on the upper embedded sleeve and the lower embedded sleeve.

2. The precast concrete beam dry connection node according to claim 1, Features: A steel cage is arranged inside the precast concrete beam, and the steel cage includes longitudinal bars and stirrups; the second end plate is connected to the longitudinal bars.

3. The precast concrete beam dry connection node according to claim 2, Features: A reinforcing diagonal brace is formed between the extension section and the precast concrete beam, and the reinforcing diagonal brace is connected between the extension section and the longitudinal reinforcement.

4. The precast concrete beam dry connection node according to claim 3, Features: The reinforcing diagonal brace is a triangular plate; one right-angle side of the triangular plate is connected to the extension section, and the other right-angle side is connected to the longitudinal reinforcement; the steel cage has stirrups at least near the triangular plate.

5. The precast concrete beam dry connection node according to claim 4, Features: The number of the reinforcing diagonal braces is two, and the upper high-strength bolt is located between the two reinforcing diagonal braces.

6. The precast concrete beam dry connection node according to claim 1, Features: The number of the support seats is two; the two support seats are located on both sides of the second end plate, and a lap joint is formed on the side of the second end plate, and the support seats are supported on the lap joint.

7. The precast concrete beam dry connection node according to claim 1, Features: The second mounting member also includes an installation box for installing the lower high-strength bolt; the installation box is arranged on the second end plate and embedded in the precast concrete beam, and the installation box has an installation chamber inside, the bottom has an opening corresponding to the bottom of the precast concrete beam, and the position of the side corresponds to the lower embedded sleeve.

8. The precast concrete beam dry connection node according to claim 1, Features: A post-filling distance adjustment gap is formed between the structural main body and the second end plate, and pressure-bearing adjustment nuts are provided on the upper high-strength bolts and the lower high-strength bolts, and the pressure-bearing adjustment nuts are located in the post-filling distance adjustment gap.

9. The precast concrete beam dry connection node according to claim 1, Features: The first mounting member further comprises a first end plate, the first end plate is fixed to the structural body through an embedded member, and the support seat is arranged on the first end plate; The upper embedded sleeve is positioned at the top of the first end plate, and the lower embedded sleeve is positioned at the bottom of the first end plate.

10. The method for connecting a precast concrete beam dry connection node according to any one of claims 1 to 9, It is characterized in that include: The main structure is formed, and an upper embedded sleeve, a lower embedded sleeve and a support seat are embedded and fixed in the main structure; the upper embedded sleeve and the lower embedded sleeve are arranged vertically; The precast concrete beam is formed, and a second end plate is fixed to the end of the precast concrete beam, wherein the beam height of the precast concrete beam is less than the distance between the upper embedded sleeve and the lower embedded sleeve, and the top of the second end plate extends above the precast concrete beam to form an extension section corresponding to the position of the upper embedded sleeve, and a through hole for the upper high-strength bolt and the lower high-strength bolt to pass through is opened on the second end plate; Dry connection, the precast concrete beam is hoisted to the support seat and supported by the support seat, and the upper high-strength bolts and the lower high-strength bolts are correspondingly installed on the upper embedded sleeve and the lower embedded sleeve.

11. The connection method according to claim 10, It is characterized in that A floor slab is formed on the precast concrete beam, and the cast-in-place layer of the floor slab at least covers the upper high-strength bolts and the extension section.

Citation Information

Patent Citations

  • Detachable prefabricated concrete-filled square steel tubular column and steel girder combination joint

    CN108086471A

  • Detachable connecting joint of steel beam and reinforced concrete column

    CN112942569A

  • Dry type connecting piece of prefabricated parts and connecting joint of prefabricated parts

    CN215630682U

  • Precast concrete beam dry-type connection node

    CN222936176U

  • Beam-column joint structure of prefabricated steel structure building

    US20210395996A1

Cited By

  • Dry connection joint for precast concrete beam and connection method therefor

    WO2026036923A1