Remote control vertical shaft construction rock drilling machine device and operation method thereof
Through the remotely controlled vertical well construction rock drilling rig device, wireless communication and video transmission technology are used, combined with multi-sensor monitoring, remote monitoring and automated control of rock drilling rigs is achieved, and rock drilling is solved in the ordinary drilling and blasting method of short-section excavation and masonry The safety and efficiency of the drilling process have improved the construction safety and management level.
Patent Information
- Application Number
- CN202410922340.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-01
AI Technical Summary
During the construction of a straight well with ordinary drilling and blasting method for short-section excavation, the rock drilling process is highly risky, and the lack of systematic mechanization and automation control technology leads to personnel safety and efficiency problems.
Design a remotely controlled vertical well construction rock drilling rig device, including rock drilling rig body, remote remote control operating platform, airborne control subsystem, audio and video subsystem, communication transmission system, equipment anti-collision system and equipment attitude monitoring subsystem, Remote monitoring and automated control are achieved through wireless communication, video transmission and multi-sensor fusion perception technologies.
It has achieved unmanned operation on the work surface, improved drilling operation efficiency, reduced accident rates, improved mine management level, kept operators away from dangerous environments, and reduced dust pollution and mechanical operation risks.
Smart Images

Figure CN118881371A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of vertical shaft construction rock drilling rig device, in particular to a remote-controlled vertical shaft construction rock drilling rig device and an operation method thereof. Background Art
[0002] Statistics of engineering cases show that the short-section excavation and ordinary drilling and blasting method commonly used in various shaft construction projects involving coal mines, non-coal mines, tunnel ventilation and other underground projects has the highest proportion and is the most widely used, especially for shafts with complex engineering geology and hydrogeology. The short-section excavation and ordinary drilling and blasting method vertical shaft construction technology lacks systematic and complete technical equipment in terms of mechanization and automatic control, and the operation of the equipment is mainly based on on-site manual operation.
[0003] Ordinary drilling and blasting method for short-section excavation and vertical shaft construction requires rock drilling and blasting. The rock drilling process is the key process of this construction method. During the operation of the rock drill in the rock drilling process of vertical shaft construction, due to the complex environment and high risk factor of the vertical shaft working face, high requirements are placed on the safety and efficiency of the personnel. The traditional hydraulic umbrella drill is a vertical shaft rock drilling equipment. At present, the equipment is mainly manually operated, and the working environment is dusty and highly polluted, which affects the health of the operators. In addition, there are risks of the drill rig tipping over, damaging the support arm, boom, or squeezing and injuring people. It is urgent to use technical means to realize unmanned operation of the rock drilling rig working face, improve drilling operation efficiency, reduce accidents, and improve the management level of mines. It is of great significance. Summary of the invention
[0004] Therefore, the technical problem to be solved by the present invention is to provide a remote-controlled vertical shaft construction rock drilling rig device and an operating method thereof.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] A remote-controlled vertical shaft construction rock drilling rig device, comprising a rock drilling rig body, a remote control operation platform, an airborne control subsystem, an audio and video subsystem, a communication transmission system, an equipment anti-collision system and an equipment attitude monitoring subsystem; the remote control operation platform is arranged in a ground control room, the rock drilling rig body is arranged on a shaft working surface, the communication transmission system is arranged in the shaft, and the airborne control subsystem, the audio and video subsystem, the equipment anti-collision system and the equipment attitude monitoring subsystem are arranged on the rock drilling rig body;
[0007] The signal output ends of the rock drilling rig body, audio and video subsystem, equipment anti-collision system and equipment attitude monitoring subsystem are communicatively connected with the signal input end of the airborne control subsystem, and the airborne control subsystem sends the received signal to the remote control operation platform through the communication transmission system; the operator in the ground control room grasps the working face scene status according to the data obtained by the remote control operation platform, and operates the remote control operation platform to issue control commands, which are transmitted to the airborne control subsystem through the communication transmission system, and the airborne control subsystem controls the rock drilling rig body to perform relevant operations and carry out rock drilling operations on the working face; and monitors the working face through the audio and video subsystem, equipment anti-collision system and equipment attitude monitoring subsystem.
[0008] The above-mentioned remote-controlled vertical shaft construction rock drilling rig device, the remote control operation platform includes: a desktop operation platform and a video monitoring curved display screen; the desktop operation platform includes an input control device, an embedded core controller, a hard disk burner and a remote control transmitter; wherein the input control device includes a control handle and an input keyboard, and the control signal is input through the handle and the input keyboard; the video monitoring curved display screen is connected to the embedded core controller through VGA or HDMI; the embedded core controller is embedded with video processing display software and status information display software; the embedded core controller displays the working face data transmitted from the communication transmission system on the video monitoring curved display screen through the video processing display software and the status information display software, and the staff sends control signals through the remote control transmitter according to the on-site video and rock drilling rig status parameter information displayed on the video monitoring curved display screen, and then remotely controls the rock drilling rig body through the communication transmission system.
[0009] The above-mentioned remote-controlled vertical shaft construction rock drilling rig device, the airborne control subsystem includes a remote control receiving unit, an equipment monitoring unit and an interface control unit, and the airborne control subsystem is centrally installed in the airborne control box of the rock drilling rig body;
[0010] Remote control receiving unit: operating voltage is 24VDC; operating current is less than 300mA; wireless communication signal frequency is 2.4GHz; communication signal transmission rate is 1Mbps; provides 16-way switch control signal output and 8-way PWM proportional control signal output;
[0011] The remote control receiving unit receives information from the rock drilling rig body, audio and video subsystem, equipment anti-collision system and equipment posture monitoring subsystem, and then monitors the received information through the equipment monitoring unit to realize real-time monitoring of various working states; the interface control unit is used to access other hardware devices or software.
[0012] The above-mentioned remote-controlled vertical shaft construction rock drilling rig device, the audio and video subsystem includes a high-definition infrared camera, a pan-tilt controller and an airborne wireless bridge; the number of high-definition infrared cameras is 3, which are evenly installed along the circumference on the top plate of the rock drilling rig body; the pan-tilt controller is used to control the rotation and zoom of the high-definition infrared camera; the high-definition infrared camera and the pan-tilt controller are connected to the airborne wireless bridge by wire, and the airborne wireless bridge transmits the video signal to the remote control operation platform for display through the communication transmission system.
[0013] The above-mentioned remote-controlled vertical shaft construction rock drilling rig device has a communication transmission system including a switch and a base station; a switch is set on the ground to build a gigabit wired ring network; a wireless base station is set in the underground wellbore to build a wireless network; the airborne control subsystem obtains the signal first through the wireless base station, then transmits it to the switch through the wired ring network, and then transmits it to the remote control operation platform, realizing wired + wireless network transmission.
[0014] The above-mentioned remote-controlled vertical shaft construction rock drilling rig device, the equipment anti-collision system includes an airborne UWB positioning base station, a positioning tag and a positioning algorithm processor; the airborne UWB positioning base station and the positioning algorithm processor are installed on the rock drilling rig body, and the positioning tag is set to one or more of a hat card, a chest card or a waist card, and is worn on the body of the underground worker; the airborne UWB positioning base station sends out a pulse signal, and the positioning algorithm processor performs positioning analysis and processing based on the received pulse signal, identifies the distance between the worker and the boom of the rock drilling rig body, transmits the processed result to the airborne control subsystem, and transmits it to the remote control operation platform through the communication transmission system.
[0015] The above-mentioned remote-controlled vertical shaft construction rock drilling rig device, the equipment posture monitoring subsystem includes an onboard monitoring module, a high-precision built-in cylinder stroke sensor, a proximity switch, an angle sensor, and a speed sensor;
[0016] The onboard monitoring module is installed on the rock drilling rig body to obtain the attitude data of the angle sensor, proximity switch, high-precision built-in cylinder stroke sensor and speed sensor, and save the data in local storage and display it on the LCD screen of the rock drilling rig body;
[0017] The angle sensor is installed at the articulated joint of the mechanical arm of the rock drilling rig body to measure the posture change of the joint; an absolute value rotary encoder is provided in the angle sensor, and the posture change of the joint drives the rotation of the absolute value rotary encoder shaft to collect the mobile posture change data;
[0018] The proximity switch is installed at the grab hook of the mechanical arm of the rock drilling rig body to monitor whether the mechanical arm is opened and closed in place;
[0019] The high-precision built-in cylinder stroke sensor is embedded in the cylinder of the rock drill body to measure the displacement of the rock drill body;
[0020] The speed sensor is installed on the drill rod of the rock drilling rig body to measure the rotation speed of the drill rod.
[0021] The above-mentioned remote-controlled vertical shaft construction rock drilling rig device, the rock drilling rig body includes a support arm system, a boom system, a propulsion system, an instrument monitoring system, a flushing water control system and a pneumatic control system arranged on the rock drilling rig body;
[0022] Each support arm system consists of one support arm cylinder, three support cylinders and one height adjustment cylinder. Each support arm system is controlled by a five-way multi-way reversing valve of the support arm system.
[0023] The boom system includes boom cylinders, lifting cylinders, tilt cylinders, boom swing cylinders and thrust cylinders. Each boom system is controlled by a five-way multi-way reversing valve.
[0024] The instrument monitoring system installs temperature sensors, hydraulic oil level sensors, cylinder hydraulic pressure sensors, and voltage and current sensors on the hydraulic cylinder of the rock drilling rig to read relevant signals and monitor instrument values;
[0025] The propulsion system includes an oil pump motor, and an oil pump electronic pressure monitoring sensor is installed to adjust and monitor the pressure and control the start and stop of the oil pump motor;
[0026] Flushing water control system: Install a water pump solenoid valve on the pipeline of the water pump motor to control the start and stop of the water pump;
[0027] Pneumatic control system: Install an air compressor solenoid valve on the air compressor pipeline to control the start and stop of the air compressor;
[0028] The five-link multi-way reversing valve control of the support arm system, the five-link multi-way reversing valve control of the boom system, the temperature sensor, the hydraulic oil level sensor, the cylinder hydraulic pressure sensor, the voltage and current sensor, the oil pump electronic control pressure monitoring sensor, the water pump solenoid valve, and the air compressor solenoid valve are all connected to the remote control receiving unit of the airborne control subsystem, and then the communication transmission system is connected to the remote control operation platform to realize the remote control operation platform to remotely control the rotation, impact and propulsion of the rock drilling rig body.
[0029] A remote-controlled vertical shaft construction rock drilling rig operation method comprises the following steps:
[0030] (A) Arrange a remote control operation platform in the ground control room;
[0031] (B) An airborne control subsystem, an audio and video subsystem, an equipment anti-collision system and an equipment attitude monitoring subsystem are arranged on the rock drilling rig body;
[0032] (C) A communication transmission system is provided for remote control of the onboard control subsystem, audio and video subsystem, equipment anti-collision system and equipment attitude monitoring subsystem in the wellbore by the remote control operation platform.
[0033] In the above-mentioned remote-controlled vertical shaft construction rock drilling rig operation method, in step (C),
[0034] The remote control receiving unit of the airborne control subsystem receives signals obtained by the rock drilling rig body, the audio and video subsystem, the equipment anti-collision system and the equipment attitude monitoring subsystem, and monitors them through the equipment monitoring unit;
[0035] The airborne control subsystem transmits the acquired signals to the remote control operation platform on the ground through the communication transmission system, and displays them on the video monitoring curved display screen. The ground staff inputs control signals through the handle and input keyboard based on the acquired signals to achieve remote control.
[0036] The technical solution of the present invention achieves the following beneficial technical effects:
[0037] The present invention mainly relates to a remote-controlled vertical shaft construction rock drilling rig device, which can be applied to the rock drilling process of short-section excavation and ordinary drilling and blasting vertical shaft construction to realize unmanned operation on the working face. In response to this demand, a remote-controlled rock drilling rig system is designed. The system is based on the latest technologies such as wireless communication technology, video transmission technology, multi-sensor fusion perception technology, and automatic control technology. The operator can issue control instructions on the operating platform by controlling the handles, switches, and buttons on the professional remote control operating platform, and use the WLAN network to connect the on-board (airborne) control unit and multi-channel infrared high-definition cameras on the on-site equipment to monitor the equipment and perform remote wireless remote control work, so that the operator is away from dangerous working environments.
[0038] The remote control range of the remote control operation platform is not limited by distance, and it controls the start and stop of the oil pump motor of the propulsion system, controls the start and stop of the air compressor through the air compressor solenoid valve, controls the start and stop of the water pump through the water pump solenoid valve, controls the emergency shutdown of the equipment, and controls the height adjustment of the rock drilling rig, the extension and retraction of the support arm cylinder, the switching between the folded position and the working position, and the extension and retraction of the support cylinder through the five-way reversing valve of the support arm system; controls the radial displacement of the boom, the swing action of the boom, the tilt action of the boom, the lifting and lowering of the thruster, and the parallel movement of the thruster through the five-way reversing valve of the boom system; finally, it controls the (propulsion, rotation, impact, feeding) actions of the rock drill, controls the flushing actions, etc.
[0039] The video monitoring curved display screen of the remote control operation platform obtains and monitors the following information through the communication transmission system: the audio and video subsystem obtains the audio and video signals, the equipment anti-collision system obtains the distance signal of the staff from the boom of the rock drilling rig body, and the equipment attitude monitoring subsystem obtains the attitude information of the rock drilling rig body through the high-precision built-in cylinder stroke sensor, proximity switch, angle sensor, absolute rotary encoder, and speed sensor. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 A schematic diagram of the system structure of a remote-controlled vertical shaft construction rock drilling rig device of the present invention;
[0041] Figure 2 A schematic diagram of the arrangement of a remote-controlled vertical shaft construction rock drilling rig device of the present invention;
[0042] Figure 3 A partial enlarged view of the remote-controlled vertical shaft construction rock drilling rig device of the present invention.
[0043] The reference numerals in the figure are as follows: 1- rock drilling rig body, 2- remote control operation platform, 3- airborne control subsystem, 4- audio and video subsystem, 5- communication transmission system, 6- equipment anti-collision system, 7- equipment attitude monitoring subsystem; 8- ground control room; 9- shaft working face; 10- shaft. DETAILED DESCRIPTION
[0044] Example 1, a remote-controlled vertical shaft construction rock drilling rig device of the present application, such as Figure 1-Figure 3 As shown, the drilling rig includes a rock drilling rig body 1, a remote control operation platform 2, an onboard control subsystem 3, an audio and video subsystem 4, a communication transmission system 5, an equipment anti-collision system 6 and an equipment posture monitoring subsystem 7.
[0045] The remote control operation platform 2 is arranged in the ground control room, the rock drilling rig body 1 is arranged on the working surface of the wellbore, the communication transmission system 5 is arranged in the wellbore, and the airborne control subsystem 3, the audio and video subsystem 4, the equipment anti-collision system 6 and the equipment posture monitoring subsystem 7 are arranged on the rock drilling rig body 1.
[0046] The signal output ends of the rock drilling rig body 1, the audio and video subsystem 4, the equipment anti-collision system 6 and the equipment posture monitoring subsystem 7 are connected to the airborne control subsystem 3, and the airborne control subsystem 3 sends the received signal to the remote control operation platform 2 through the communication transmission system 5; the operator in the ground control room grasps the working face scene status based on the data obtained by the remote control operation platform 2, and operates the remote control operation platform 2 to issue control commands, and the control commands are transmitted to the airborne control subsystem 3 through the communication transmission system 5, and the airborne control subsystem 3 controls the rock drilling rig body 1 to perform related operations and carry out rock drilling operations on the working face; and monitors the working face through the audio and video subsystem 4, the equipment anti-collision system 6 and the equipment posture monitoring subsystem 7.
[0047] The equipment anti-collision system prevents the rock drill from rubbing and colliding with the well wall, equipment, personnel, etc., to avoid safety accidents. The equipment posture monitoring system monitors the posture of the rock drill to avoid accidents such as posture deviation and tipping of the rock drill.
[0048] The relevant systems of this application are introduced below.
[0049] (1) Rock drilling rig body: The rock drilling rig body is a device for performing rock drilling operations.
[0050] The rock drilling rig body 1 includes a support arm system, a boom system, a propulsion system, an instrument monitoring system, a flushing water control system and a pneumatic control system arranged on the steel structure of the rock drilling rig body 1;
[0051] Each support arm system consists of one support arm cylinder, three support cylinders and one height adjustment cylinder. Each support arm system is controlled by a five-way multi-way reversing valve of the support arm system, which can realize remote control operation.
[0052] Each boom system includes a boom cylinder, a lifting cylinder, a tilt cylinder, a boom swing cylinder and a thrust cylinder. Each boom system is controlled by a five-way multi-way reversing valve of the boom system, and remote control operation can be achieved.
[0053] The five-way directional control valves of the support arm system and the five-way directional control valves of the boom system both use high-precision proportional valves. Installing high-precision proportional valves is one of the key measures to improve the control accuracy of the system. High-precision proportional valves can continuously adjust the oil flow according to the input electrical signal to achieve fine control of the action of the actuator (such as the cylinder).
[0054] Flushing water control system: install a water pump solenoid valve on the pipeline of the water pump motor to control the start and stop of the water pump; pneumatic control system: install an air compressor solenoid valve on the air compressor to control the start and stop of the air compressor; to achieve remote control.
[0055] The operation of rock drilling rigs requires monitoring of various status values of the system. For some mechanical instruments, instrument pressure sensors are installed in the instrument monitoring system to obtain electrical signals and monitor the instrument values. That is, the instrument monitoring system installs temperature sensors, hydraulic oil level sensors, cylinder hydraulic pressure sensors, and voltage and current sensors on the hydraulic cylinder of the rock drilling rig body 1 to read relevant signals and monitor the instrument values. The remote control receiving unit can collect the hydraulic oil level, temperature, and cylinder pressure of the equipment, monitor the voltage and current value information of the motor (based on existing sensor data), and display the equipment working conditions in real time on the operating platform interface. At the same time, it displays equipment faults and alarm information. It has the function of collecting and displaying key status information to assist operators.
[0056] The propulsion system includes an oil pump motor, and an oil pump electronically controlled pressure monitoring sensor is installed to adjust and monitor the propulsion pressure, control the start and stop of the oil pump motor, and realize remote propulsion pressure control of the remote operation platform.
[0057] The five-link multi-way reversing valve control of the support arm system, the five-link multi-way reversing valve control of the boom system, the temperature sensor, the hydraulic oil level sensor, the cylinder hydraulic pressure sensor, the voltage and current sensor, the oil pump electronic control pressure monitoring sensor, the water pump solenoid valve and the air compressor solenoid valve are all connected to the remote control receiving unit of the airborne control subsystem 3, and are monitored through the equipment monitoring unit. Then the communication transmission system 5 is connected to the remote control operation platform 2 for communication, so that the remote control operation platform 2 can remotely control the rotation, impact and propulsion of the rock drilling rig body 1.
[0058] By installing an audio and video subsystem 4, an equipment anti-collision system 6 and an equipment posture monitoring subsystem 7 on the rock drilling rig body 1, and utilizing a communication transmission system 5 to collect sensor information and transmit it to a ground remote control operation platform 2, an operator can monitor the posture of the rock drilling rig and remotely control the rock drilling rig based on the collected information.
[0059] The specific controllable basic functions are as follows: The remote control range of the remote control operation platform 2 is not limited by distance, controls the start and stop of the oil pump motor of the propulsion system, controls the start and stop of the air compressor through the air compressor solenoid valve, controls the start and stop of the water pump through the water pump solenoid valve, controls the emergency shutdown of the rock drilling rig, controls the height adjustment of the rock drilling rig through the five-way multi-way reversing valve of the support arm system, controls the extension and retraction of the support arm cylinder, realizes the switching between the folded position and the working position, and controls the extension and retraction of the support cylinder; controls the radial displacement of the boom, the swing action of the boom, the tilt action of the boom, the lifting and lowering of the thruster, and the parallel movement of the thruster through the five-way multi-way reversing valve of the boom system; finally controls the (propulsion, rotation, impact, feeding) actions of the rock drill, controls the flushing action, etc.
[0060] (2) Remote control operation platform
[0061] The remote control operation platform of the remote operation center is set on the ground, and the operator remotely controls the rock drilling rig through the remote control operation platform. The remote control operation platform of the monitoring center in the ground control room can realize the operation of the entire device, view the video and detect the equipment status. As the operating unit of the entire remote control system, the remote control operation platform mainly completes the functions of wireless remote control, video monitoring, equipment working status monitoring and recording of the rock drilling rig body.
[0062] The remote control operation platform 2 includes: a desktop operation platform and a video monitoring curved display screen;
[0063] The video surveillance curved display screen is connected to the embedded core controller via VGA or HDMI; the video surveillance curved display screen can display the video, status indication, equipment data, fault alarm, network status and other information of the on-site equipment.
[0064] The desktop operation platform is designed in combination with the original equipment operation habits and the convenience of desktop operation, and specifically includes an input control device, an embedded core controller, a hard disk burner and a remote control transmitter; wherein the input control device includes a control handle and an input keyboard, and control signals are input through the handle and the input keyboard;
[0065] The embedded core controller is embedded with video processing display software and status information display software; the embedded core controller displays the working face data transmitted from the communication transmission system on the video monitoring curved display screen through the video processing display software and the status information display software. The staff sends control signals through the remote control transmitter according to the on-site video and rock drilling rig status parameter information displayed on the video monitoring curved display screen, and then remotely controls the rock drilling rig body through the communication transmission system 5.
[0066] (3) Aircraft control subsystem
[0067] The onboard control subsystem 3 is installed on the rock drilling rig body and is the execution component for the equipment to realize remote control and automation work; it specifically includes a remote control receiving unit, an equipment monitoring unit and an interface control unit. The onboard control subsystem 3 is centrally installed in the onboard control box of the rock drilling rig body;
[0068] 3.1. Remote control receiving unit: working voltage is 24VDC; working current is less than 300mA (without load, the current depends on the load when loaded); wireless communication signal frequency is 2.4GHz; communication signal transmission rate is 1Mbps; provides 16-way switch control signal output and 8-way PWM proportional control signal output;
[0069] 3.2. Equipment monitoring unit: to realize real-time monitoring of various working states of the equipment; the remote control receiving unit receives information from the rock drilling rig body 1, the audio and video subsystem 4, the equipment anti-collision system 6 and the equipment posture monitoring subsystem 7, and then monitors the received information through the equipment monitoring unit to realize real-time monitoring of various working states;
[0070] 3.3. The interface control unit is used to access other hardware devices or software.
[0071] (4) Audio and video subsystem
[0072] The video subsystem 4 includes a high-definition infrared camera, a pan-tilt controller and an airborne wireless bridge; there are three high-definition infrared cameras, which are evenly installed on the top plate of the rock drilling rig body 1 along the circumference; the high-definition infrared camera is a wide-angle zoom camera with 4 million pixels, supporting 23x optical zoom and 16x digital zoom, which meets the industrial and mining working environment and solves the problem of not being able to see the working conditions of the working surface from a long distance. One high-definition infrared camera can see two drill arms, forming a 360-degree all-round video monitoring around the rock drilling rig body. Combined with video splicing technology, a 360-degree panoramic real-time video can be presented on the operation plane interface. The pan-tilt controller is used to control the rotation and zoom of the high-definition infrared camera; the high-definition infrared camera and the pan-tilt controller are connected to the airborne wireless bridge by wire, and the airborne wireless bridge transmits the video signal to the remote control operation platform 2 for display through the communication transmission system 5.
[0073] The high-definition infrared camera can be operated to rotate and zoom the camera through the PTZ controller, so that the six arms from the drill arm to the drill rod head can be clearly observed, such as the drilling position, operation status, whether there are workers around, working status and safety distance. The video of the scene can be recorded synchronously, with large-capacity storage space, and the video can be stored for 1 month. The video signal of the high-definition infrared camera is connected to the onboard wireless bridge via a wired connection. During the operation of the equipment, the wireless network transmits the video signal to the network system so that it can reach the remote control operation platform for display.
[0074] On the operating platform, the operator can use the onboard video to see the situation around the equipment and the location of the holes from the operator's perspective, and can also use the environmental video to see the overall picture of the work site to assist the operator in remote drilling. With the help of audio equipment, work surface broadcasting, intercom and environmental sound monitoring can be realized.
[0075] (5) Communication transmission system
[0076] The communication transmission system 5 includes switches and base stations, forming a wired + wireless network; a switch is set up on the ground to build a gigabit wired ring network; a wireless base station is set up in the wellbore underground to build a wireless network; the airborne control subsystem 3 obtains the signal first through the wireless base station, then transmits it to the switch through the wired ring network, and then transmits it to the remote control operation platform 2, realizing wired + wireless network transmission.
[0077] It is used to ensure that the control signals, video data and detection data of the remote control transmitter's transmission system, the remote control receiving unit of the airborne control subsystem are transmitted in real time and accurately between the remote control operation platform and the working face rock drilling rig body, and the communication system based on the high-power wired + wireless long-distance transmission dedicated network realizes remote control of the rock drilling rig operation. In order to meet the needs of wellbore monitoring, the network architecture adopts a gigabit wired ring network composed of switches on the ground, and a wireless network is used for coverage in the wellbore, giving full play to the advantages of the two networks and realizing a wired + wireless method. There is a high-power communication module in the wireless base station, which can cover the wireless signal to the entire shaft working face, and at the same time ensure that there is enough bandwidth to ensure the transmission of video image data, so that the operator can see the scene in real time and make accurate judgments, thereby controlling the rock drilling rig to perform various operations.
[0078] The operating platform is connected to the underground network with an optical cable. The working area is covered by a wireless base station. The number of base stations is determined according to the size and shape of the working area. The area to be covered by the base station must be visible and unobstructed.
[0079] (6) Equipment anti-collision system
[0080] There are intersections of personnel, support arms, drill arms, lifting equipment, etc. in the working area of the rock drilling rig. In order to protect the life and property of personnel, equipment, this system is equipped with a safety protection function. The anti-collision system of the equipment can identify personnel and equipment in the operating area of the rock drilling rig.
[0081] The equipment anti-collision system 6 includes an airborne UWB positioning base station, a positioning tag and a positioning algorithm processor; the airborne UWB positioning base station and the positioning algorithm processor are installed on the rock drilling rig body 1, and the positioning tag is set as one or more of a cap card, a chest card or a waist card, and is worn on the underground workers; the airborne UWB positioning base station sends out a pulse signal, and the positioning algorithm processor performs positioning analysis and processing according to the received pulse signal, identifies the distance between the worker and the boom of the rock drilling rig body, transmits the processed result to the airborne control subsystem 3, and transmits it to the remote control operation platform 2 through the communication transmission system 5. The positioning algorithm processor is installed on the equipment, and it communicates with other airborne UWB positioning base stations or positioning tags through the communication network to obtain the positioning data of personnel and equipment, and then performs positioning analysis and processing, and sends the processed result to the vehicle-mounted (airborne) airborne control subsystem and the embedded core controller of the remote control platform.
[0082] UWB technology is used to identify the distance between people and the boom of the rock drill, and based on the relative distance, sound and light alarms are used to stop the drilling and shutdown of the rock drill. In addition, nearby workers and other equipment are reminded to avoid them in time, and the operator is informed that there are people and equipment nearby.
[0083] (7) Equipment posture monitoring subsystem
[0084] The equipment attitude monitoring subsystem 7 includes an onboard monitoring module, a high-precision built-in cylinder stroke sensor, a proximity switch, an angle sensor, and a speed sensor;
[0085] 7.1、Airborne monitoring module
[0086] The onboard monitoring module is installed on the rock drilling rig body to obtain the attitude data of the angle sensor, proximity switch, high-precision built-in cylinder stroke sensor and speed sensor, and save the data in local storage and display it on the LCD screen of the rock drilling rig body.
[0087] The onboard monitoring module obtains the posture data of each part of the rock drilling rig by collecting various analog quantities and switch quantities. It will save this data to the local storage at regular intervals and display it in real time on the local LCD screen to guide the operator to perform correct operations.
[0088] 7.2 Angle Sensor
[0089] The angle sensor is installed at the joint of the mechanical arm of the rock drilling rig body to measure the posture change of the joint; an absolute value rotary encoder is provided in the angle sensor, and the posture change of the joint drives the rotation of the absolute value rotary encoder shaft to collect the mobile posture change data;
[0090] When the acquisition unit is working, the encoder is installed at the joint position of the rock drill mechanical arm, and the posture change of the joint drives the rotation of the encoder shaft. The shaft diameter of the absolute encoder is fixed, and the position change data of the moving pair is collected through the rotation variable of the encoder shaft. When the joint stops moving, the encoder completes the collection of the posture change data of each joint. At this time, the encoder outputs the corresponding unique digital quantity according to the position of the shaft. This digital quantity is only related to the starting and ending positions, and has nothing to do with the rotation process. There is no need to remember and find a reference point.
[0091] 7.3. High-precision built-in cylinder stroke sensor
[0092] The high-precision built-in cylinder stroke sensor is embedded in the cylinder of the rock drill body to measure the displacement of the rock drill body;
[0093] Due to the particularity of the equipment structure and working environment, the sensor installation protection requirements are high, and the use of external sensors has a lot of maintenance risks. Therefore, the installation of the high-precision built-in cylinder stroke sensor in this scheme adopts the built-in type. By customizing the cylinder, the required stroke sensor is pre-buried in the cylinder. This not only ensures the stability of data acquisition but also avoids external damage to the sensor. At the same time, it does not occupy any external space and has no effect on the equipment function.
[0094] The high-precision built-in cylinder stroke sensor is equipped with a proximity switch and is installed at the grab hook of the mechanical arm of the rock drilling rig body to monitor whether the mechanical arm is opened and closed in place;
[0095] The high-precision built-in cylinder stroke sensor is designed for hydraulic cylinders. The pressure-resistant outer tube and hexagonal flange are 100% stainless steel and can be directly installed into the hydraulic cylinder. The electronic part and the pressure-resistant outer tube are modular assembly design, that is, the two can be completely separated. In special cases, only the electronic part needs to be pulled out for calibration, and the pressure-resistant outer tube does not need to be separated from the hydraulic cylinder.
[0096] 7.4 Speed Sensor
[0097] The speed sensor is installed on the drill rod of the rock drill body to measure the rotation speed of the drill rod. Also known as the Hall speed sensor, the Hall speed sensor is a magnetic sensor composed of a voltage regulator, a Hall generator, a differential amplifier, a Schmitt trigger and an open collector output pole. Its input is the magnetic induction intensity and its output is an NPN normally open signal. It has the characteristics of high detection frequency, small size, long life and easy installation. It can be used for bidirectional forward and reverse detection instruments, counters, meter counters, speed detection, steering detection, position switches, etc.
[0098] Example 2: Use the remote-controlled vertical shaft construction rock drilling rig device in Example 1 to perform remote-controlled rock drilling.
[0099] (A) Arranging a remote control operation platform 2 in the ground control room;
[0100] (B) An onboard control subsystem 3, an audio and video subsystem 4, an equipment anti-collision system 6 and an equipment attitude monitoring subsystem 7 are arranged on the rock drilling rig body 1;
[0101] (C) A communication transmission system 5 is provided for remotely controlling the airborne control subsystem 3, the audio and video subsystem 4, the equipment anti-collision system 6 and the equipment attitude monitoring subsystem 7 in the wellbore by the remote control operation platform 2.
[0102] The remote control receiving unit of the airborne control subsystem 3 receives the signals obtained by the rock drilling rig body 1, the audio and video subsystem 4, the equipment anti-collision system 6 and the equipment posture monitoring subsystem 7, and monitors them through the equipment monitoring unit; the airborne control subsystem 3 transmits the obtained signals to the remote control operation platform 2 on the ground through the communication transmission system 5, and displays them on the video monitoring curved display screen. The ground staff inputs control signals through the handle and input keyboard according to the obtained signals to realize remote control.
[0103] The remote control range of the remote control operation platform 2 is not limited by distance, controls the start and stop of the oil pump motor of the propulsion system, controls the start and stop of the air compressor through the air compressor solenoid valve, controls the start and stop of the water pump through the water pump solenoid valve, controls the emergency shutdown of the equipment, controls the height adjustment of the rock drilling rig through the support arm system five-way multi-way reversing valve, controls the extension and retraction of the support arm cylinder, realizes the switching between the folded position and the working position, and controls the extension and retraction of the support cylinder; controls the radial displacement of the boom, the swing action of the boom, the tilt action of the boom, the lifting and lowering of the thruster, and the parallel movement of the thruster through the five-way multi-way reversing valve of the boom system; finally controls the (propulsion, rotation, impact, feeding) actions of the rock drill, controls the flushing action, etc.
[0104] The video monitoring curved display screen of the remote control operation platform obtains and monitors the following information through the communication transmission system: the audio and video subsystem obtains the audio and video signals, the equipment anti-collision system obtains the distance signal between the operator and the boom of the rock drilling rig body, and the equipment attitude monitoring subsystem obtains the attitude information of the rock drilling rig body through the high-precision built-in cylinder stroke sensor, proximity switch, angle sensor, absolute rotary encoder, and speed sensor.
[0105] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the claims of this patent application.
Claims
1. A remote-controlled vertical shaft construction rock drilling rig device, characterized in that: The invention comprises a rock drilling rig body (1), a remote control operation platform (2), an onboard control subsystem (3), an audio and video subsystem (4), a communication transmission system (5), an equipment anti-collision system (6) and an equipment attitude monitoring subsystem (7); the remote control operation platform (2) is arranged in a ground control room (8), the rock drilling rig body (1) is arranged on a wellbore working surface (9), the communication transmission system (5) is arranged in the wellbore (10), and the onboard control subsystem (3), the audio and video subsystem (4), the equipment anti-collision system (6) and the equipment attitude monitoring subsystem (7) are arranged on the rock drilling rig body (1); The signal output ends of the rock drilling rig body (1), the audio and video subsystem (4), the equipment anti-collision system (6) and the equipment attitude monitoring subsystem (7) are connected to the signal input end of the airborne control subsystem (3), and the airborne control subsystem (3) sends the received signal to the remote control operation platform (2) through the communication transmission system (5); the operator in the ground control room grasps the working face scene status based on the data obtained by the remote control operation platform (2), and operates the remote control operation platform (2) to issue a control command, which is transmitted to the airborne control subsystem (3) through the communication transmission system (5); the airborne control subsystem (3) controls the rock drilling rig body (1) to perform relevant operations and carry out rock drilling operations on the working face; and monitors the working face through the audio and video subsystem (4), the equipment anti-collision system (6) and the equipment attitude monitoring subsystem (7).
2. A remote-controlled vertical shaft construction rock drilling rig device according to claim 1, characterized in that: The remote control operation platform (2) comprises: a desktop operation platform and a video monitoring curved display screen; the desktop operation platform comprises an input control device, an embedded core controller, a hard disk recorder and a remote control transmitter; the input control device comprises a control handle and an input keyboard, and control signals are input through the handle and the input keyboard; the video monitoring curved display screen is connected to the embedded core controller through VGA or HDMI; the embedded core controller is embedded with video processing display software and status information display software; the embedded core controller displays the working face data transmitted from the communication transmission system on the video monitoring curved display screen through the video processing display software and the status information display software, and the staff sends control signals through the remote control transmitter according to the on-site video and rock drilling rig status parameter information displayed on the video monitoring curved display screen, and then remotely controls the rock drilling rig body through the communication transmission system (5).
3. A remote-controlled vertical shaft construction rock drilling rig device according to claim 1, characterized in that: The onboard control subsystem (3) comprises a remote control receiving unit, an equipment monitoring unit and an interface control unit, and the onboard control subsystem (3) is centrally installed in an onboard control box of the rock drilling rig body; Remote control receiving unit: operating voltage is 24VDC; operating current is less than 300mA; wireless communication signal frequency is 2.4GHz; communication signal transmission rate is 1Mbps; provides 16-way switch control signal output and 8-way PWM proportional control signal output; The remote control receiving unit receives information from the rock drilling rig body (1), the audio and video subsystem (4), the equipment anti-collision system (6) and the equipment posture monitoring subsystem (7), and then monitors the received information through the equipment monitoring unit to achieve real-time monitoring of various working states; the interface control unit is used to access other hardware devices or software.
4. A remote-controlled vertical shaft construction rock drilling rig device according to claim 1, characterized in that: The audio and video subsystem (4) includes a high-definition infrared camera, a pan-tilt controller and an airborne wireless bridge; the number of high-definition infrared cameras is 3, which are evenly installed along the circumference of the top plate of the rock drilling rig body (1); the pan-tilt controller is used to control the rotation and zoom of the high-definition infrared camera; the high-definition infrared camera and the pan-tilt controller are connected to the airborne wireless bridge via a wired method, and the airborne wireless bridge transmits the video signal to the remote control operation platform (2) for display via the communication transmission system (5).
5. A remote-controlled vertical shaft construction rock drilling rig device according to claim 1, characterized in that: The communication transmission system (5) includes a switch and a base station; a switch is set up on the ground to build a gigabit wired ring network; a wireless base station is set up in the wellbore underground to build a wireless network; the airborne control subsystem (3) obtains the signal first through the wireless base station, then transmits it to the switch through the wired ring network, and then transmits it to the remote control operation platform (2), realizing wired + wireless network transmission.
6. A remote-controlled vertical shaft construction rock drilling rig device according to claim 1, characterized in that: The equipment anti-collision system (6) includes an airborne UWB positioning base station, a positioning tag and a positioning algorithm processor; the airborne UWB positioning base station and the positioning algorithm processor are installed on the rock drilling rig body (1), and the positioning tag is set as one or more of a cap card, a chest card or a waist card, and is worn on the body of the underground worker; the airborne UWB positioning base station sends out a pulse signal, and the positioning algorithm processor performs positioning analysis and processing based on the received pulse signal, identifies the distance between the worker and the boom of the rock drilling rig body, transmits the processed result to the airborne control subsystem (3), and transmits it to the remote control operation platform (2) through the communication transmission system (5).
7. A remote-controlled vertical shaft construction rock drilling rig device according to claim 1, characterized in that: The equipment attitude monitoring subsystem (7) includes an onboard monitoring module, a high-precision built-in cylinder stroke sensor, a proximity switch, an angle sensor, and a speed sensor; The onboard monitoring module is installed on the rock drilling rig body to obtain the attitude data of the angle sensor, proximity switch, high-precision built-in cylinder stroke sensor and speed sensor, and save the data in local storage and display it on the LCD screen of the rock drilling rig body; The angle sensor is installed at the articulated joint of the mechanical arm of the rock drilling rig body to measure the posture change of the joint; an absolute value rotary encoder is provided in the angle sensor, and the posture change of the joint drives the rotation of the absolute value rotary encoder shaft to collect the mobile posture change data; The proximity switch is installed at the grab hook of the mechanical arm of the rock drill body. When something touches the proximity, the background data is displayed as 1, and if nothing touches it, the background data is displayed as 0. The proximity switch is usually used to monitor whether some machines are opened and closed in place. It is used to monitor whether the mechanical arm is opened and closed in place. The high-precision built-in cylinder stroke sensor is embedded in the cylinder of the rock drill body to measure the displacement of the rock drill body; The speed sensor is installed on the drill rod of the rock drilling rig body to measure the rotation speed of the drill rod.
8. A remote-controlled vertical shaft construction rock drilling rig device according to claim 1, characterized in that: The rock drilling rig body (1) comprises a support arm system, a boom system, a propulsion system, an instrument monitoring system, a flushing water control system and a pneumatic control system which are arranged on the rock drilling rig body (1); Each support arm system consists of one support arm cylinder, three support cylinders and one height adjustment cylinder. Each support arm system is controlled by a five-way multi-way reversing valve of the support arm system. The boom system includes boom cylinders, lifting cylinders, tilt cylinders, boom swing cylinders and thrust cylinders. Each boom system is controlled by a five-way multi-way reversing valve. The instrument monitoring system installs a temperature sensor, a hydraulic oil level sensor, a cylinder hydraulic pressure sensor, and a voltage and current sensor on the hydraulic cylinder of the rock drilling rig body (1), reads relevant signals, and realizes the monitoring of instrument values; The propulsion system includes an oil pump motor, and an oil pump electronically controlled pressure monitoring sensor is installed to adjust and monitor the pressure and control the start and stop of the oil pump motor; Flushing water control system: Install a water pump solenoid valve on the pipeline of the water pump motor to control the start and stop of the water pump; Pneumatic control system: Install an air compressor solenoid valve on the air compressor pipeline to control the start and stop of the air compressor; The five-link multi-way reversing valve control of the support arm system, the five-link multi-way reversing valve control of the boom system, the temperature sensor, the hydraulic oil level sensor, the cylinder hydraulic pressure sensor, the voltage and current sensor, the oil pump electronic pressure monitoring sensor, the water pump solenoid valve, and the air compressor solenoid valve are all connected to the remote control receiving unit of the airborne control subsystem (3) and monitored by the equipment monitoring unit. Then, the communication transmission system (5) is connected to the remote control operation platform (2) for communication, so that the remote control operation platform (2) can remotely control the rotation, impact, and propulsion of the rock drilling rig body (1).
9. The operating method of a remote-controlled vertical shaft construction rock drilling rig device according to any one of claims 1 to 8, characterized in that: The steps include: (A) Arranging a remote control operation platform (2) in the ground control room; (B) An onboard control subsystem (3), an audio and video subsystem (4), an equipment anti-collision system (6) and an equipment attitude monitoring subsystem (7) are arranged on the rock drilling rig body (1); (C) A communication transmission system (5) is provided to remotely control the onboard control subsystem (3), the audio and video subsystem (4), the equipment anti-collision system (6) and the equipment attitude monitoring subsystem (7) in the wellbore by the remote control operation platform (2).
10. The operating method of a remote-controlled vertical shaft construction rock drilling rig device according to claim 9, characterized in that: In step (C), The remote control receiving unit of the onboard control subsystem (3) receives signals obtained by the rock drilling rig body (1), the audio and video subsystem (4), the equipment anti-collision system (6) and the equipment attitude monitoring subsystem (7), and performs monitoring through the equipment monitoring unit; The airborne control subsystem (3) transmits the acquired signal to the remote control operation platform (2) on the ground through the communication transmission system (5), and displays it on the video monitoring curved display screen. The ground staff inputs the control signal through the handle and input keyboard according to the acquired signal to realize remote control.
Citation Information
Cited By
Automatic blasthole patrolling and finding device of vertical shaft construction hydraulic drilling rig and operation method of automatic blasthole patrolling and finding device
CN119933509A