Waste gas treatment equipment, system and method for large-flow combustible waste gas

By sucking the external air and heat exchange technology in the high-flow combustible exhaust gas treatment equipment using the open structure in the reaction chamber in the reaction chamber, the high consumption of combustible exhaust gas and water resources in the treatment of large-flow combustible exhaust gas in the prior art is solved. The problem has achieved efficient and low-cost waste gas treatment effect.

CN118882091APending Publication Date: 2024-11-01BEIJING JINGYI AUTOMATION EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411034729.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

When handling large flow combustible exhaust gases, the prior art requires a large amount of combustible gases and water resources, resulting in high costs and large equipment volume.

Method used

A large flow combustible exhaust gas treatment equipment is designed, using the open structure in the reaction chamber to suck out external air as a combustion gas, and combined with the heat exchange tube in the heat exchange chamber to exchange heat with the heat exchange medium to reduce the gas temperature after combustion. Reduce water use and extract the treated gas through a negative press.

Benefits of technology

It reduces the consumption of combustion-stimulating gas and the use of water resources, reduces the cost and volume of waste gas treatment equipment, improves the cooling effect, and achieves efficient waste gas treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118882091A_ABST
    Figure CN118882091A_ABST
Patent Text Reader

Abstract

The invention relates to waste gas treatment equipment, system and method for large-flow combustible waste gas. The waste gas treatment equipment comprises a cabinet body, a waste gas treatment cavity and a negative pressure machine, the cabinet body is provided with a waste gas inlet and a gas outlet. The waste gas treatment cavity is arranged in the cabinet body and comprises a reaction cavity and a heat exchange cavity; the reaction cavity is communicated with the waste gas inlet, the top end of the reaction cavity is of an open structure, waste gas input into the reaction cavity through the waste gas inlet is combusted in the reaction cavity, and combusted gas is generated. The heat exchange cavity is communicated with the reaction cavity and the gas exhaust port, a heat exchange pipe is arranged in the heat exchange cavity, and a heat exchange medium is arranged in the heat exchange pipe so as to reduce the temperature of the combusted gas. The negative pressure machine is communicated with the gas exhaust port, and gas in the waste gas treatment cavity is pumped out from the gas exhaust port.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of semiconductor equipment, and more particularly to an exhaust gas treatment device, system and method for large-flow combustible exhaust gas. Background Art

[0002] Waste gas is continuously generated in semiconductor processes (such as integrated circuit wafer manufacturing processes), and there are often a variety of flammable and explosive byproducts in the waste gas, such as hydrogen, silicon compounds, chlorides, and hydrides. These waste gases are very prone to explosion and are extremely destructive.

[0003] In the prior art, the treatment of combustible waste gas (such as waste gas with a large hydrogen content) is often carried out by providing a sufficient amount of combustion-supporting gas through the gas supply system, so that the combustible waste gas is burned by the combustion-supporting gas, and then the post-combustion gas is cooled and washed by circulating water spraying and new water washing to complete the treatment of the waste gas.

[0004] However, the inventors have found that in the process of treating a large flow of combustible waste gas (such as combustible waste gas with a flow of not less than 200 slm), a large amount of combustion-supporting gas is consumed. In the prior art, the combustion-supporting gas is provided by a gas supply system specifically for the waste gas treatment equipment, which makes the waste gas treatment costly.

[0005] In addition, the inventors have also found that most of the prior art uses water spraying to cool down after gas combustion. This cooling method requires continuous control of circulating water for spraying and continuous supply of new water for washing, which consumes a large amount of water resources. Moreover, these water resources are provided by the water supply system, resulting in high operating costs for the water supply system. Summary of the invention

[0006] The present application aims to provide a waste gas treatment device, system and method for large-flow combustible waste gas.

[0007] According to one aspect of the present application, the present application provides an exhaust gas treatment device for large-flow combustible exhaust gas. The exhaust gas treatment device includes a cabinet, an exhaust gas treatment chamber and a negative pressure machine. The cabinet is provided with an exhaust gas inlet and a gas outlet. The exhaust gas treatment chamber is arranged in the cabinet, including a reaction chamber and a heat exchange chamber. The reaction chamber is connected to the exhaust gas inlet, and the top of the reaction chamber is an open structure. The exhaust gas input into the reaction chamber through the exhaust gas inlet burns in the reaction chamber to produce post-combustion gas; the heat exchange chamber is connected to the reaction chamber and the gas outlet, and a heat exchange tube is arranged in the heat exchange chamber, and a heat exchange medium is arranged in the heat exchange tube to reduce the temperature of the post-combustion gas. The negative pressure machine is connected to the gas outlet to extract the gas in the exhaust gas treatment chamber from the gas outlet.

[0008] According to some embodiments, a heat exchange medium inlet and a heat exchange medium outlet are provided on the side wall of the heat exchange cavity, and both the heat exchange medium inlet and the heat exchange medium outlet are connected to the heat exchange tube.

[0009] According to some embodiments, the heat exchange chamber includes a first heat exchange chamber, a transition chamber, and a second heat exchange chamber. The top of the first heat exchange chamber is connected to the bottom of the reaction chamber to receive the post-combustion gas from the reaction chamber. The transition chamber is connected to the bottom of the first heat exchange chamber to receive the gas passing through the first heat exchange chamber. One end of the second heat exchange chamber is connected to the transition chamber to receive the gas passing through the transition chamber, and the other end of the second heat exchange chamber is connected to the gas discharge port to discharge the gas passing through the second heat exchange chamber. At least one S-shaped space for gas to pass through is formed in the transition chamber.

[0010] According to some embodiments, the heat exchange medium inlet and the heat exchange medium outlet are arranged on the side wall of the second heat exchange cavity, and the heat exchange medium inlet is arranged on the side wall of the other end of the second heat exchange cavity, and the heat exchange medium outlet is arranged on the side wall of one end of the second heat exchange cavity.

[0011] According to some embodiments, the exhaust gas treatment device further includes a pressure relief device and a pressure relief exhaust gas discharge pipe. The pressure relief device is arranged on the side wall of the reaction chamber, and when the pressure of the pressure relief device exceeds the first preset pressure limit, the pressure relief device ruptures. One end of the pressure relief exhaust gas discharge pipe is connected to the pressure relief device, and the other end is connected to the gas discharge port. When the pressure relief device ruptures, the gas in the reaction chamber is discharged from the gas discharge port.

[0012] According to some embodiments, the exhaust gas treatment device further includes an air intake pipeline, an air intake valve, a spare pipeline, a spare valve and a pressure detection device. The air intake pipeline is arranged outside the cabinet and is connected to the exhaust gas inlet to transmit the exhaust gas to the exhaust gas inlet. The air intake valve is arranged on the air intake pipeline to control the on-off of the air intake pipeline. The spare pipeline is arranged outside the cabinet and is connected to the air intake pipeline. The spare pipeline is arranged on the air intake pipeline section between the air intake of the air intake pipeline and the air intake valve. The air intake is an inlet in the air intake pipeline connected to an external device to receive exhaust gas. The spare valve is arranged on the spare pipeline. The pressure detection device detects the intra-cavity pressure in the reaction chamber. When the intra-cavity pressure exceeds the second preset pressure limit, the spare valve is controlled to open, and the air intake valve is controlled to close.

[0013] According to some embodiments, the exhaust gas treatment device further includes a cabinet exhaust fan. The cabinet exhaust fan includes an air inlet and an air outlet. The air inlet is arranged in the cabinet, and the air outlet is arranged outside the cabinet. When the cabinet exhaust fan is in operation, the cabinet exhaust fan discharges the gas in the cabinet. When the pressure in the cavity exceeds the second preset pressure limit, the pressure detection device controls the cabinet exhaust fan to operate so as to discharge the gas in the cabinet.

[0014] According to some embodiments, the exhaust gas treatment device further comprises a variable frequency fan. A combustion-supporting gas inlet is also provided on the cabinet. The variable frequency fan is provided in the cabinet, connected to the reaction chamber, and inputs air into the reaction chamber. The reaction chamber is communicated with the combustion-supporting gas inlet, and receives the combustion-supporting gas delivered by the gas supply system through the combustion-supporting gas inlet.

[0015] According to one aspect of the present application, the present application provides a semiconductor process system, which includes the waste gas treatment equipment for large-flow combustible waste gas described above.

[0016] According to one aspect of the present application, the present application provides a method for treating waste gas, which is applied to the waste gas treatment equipment for large-flow combustible waste gas described above. The method includes burning waste gas in a reaction chamber to obtain burnt gas. Performing heat exchange and cooling treatment on the burnt gas in a heat exchange chamber to obtain cooled gas. Discharging the cooled gas from a gas outlet.

[0017] Beneficial Effects

[0018] The waste gas enters the waste gas treatment chamber from the waste gas inlet, and under the action of the negative pressure machine, the waste gas passes through the reaction chamber and the heat exchange chamber in turn for combustion and cooling, and then is discharged from the gas outlet to achieve the purpose of waste gas treatment.

[0019] By setting an open structure in the reaction chamber, the combustion-supporting gas used for the combustion of exhaust gas in the reaction chamber can be provided by the outside air sucked in from the open structure, thereby reducing the amount of combustion-supporting gas provided by the gas supply system and thus reducing the cost of the combustion-supporting gas.

[0020] The heat exchange tubes in the heat exchange chamber and the heat exchange medium in the heat exchange tubes exchange heat with the burned gas, thereby reducing the temperature of the burned gas. In this way, there is no need to use circulating water to spray and cool the burned gas, nor is there any need to use new water to wash the burned gas, thereby reducing the amount of water resources used.

[0021] The waste gas treatment method of the present application also does not require the installation of drainage pipes, new water pipes and other piping systems outside the waste gas treatment chamber, which is also beneficial to reducing the volume of the waste gas treatment equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0023] Figure 1 This is a schematic diagram of a module of an exhaust gas treatment device according to an embodiment of the present application;

[0024] Figure 2 This is a schematic diagram of the structure of the exhaust gas treatment chamber according to an embodiment of the present application;

[0025] Figure 3 This is a schematic diagram of the process of the waste gas treatment method according to an embodiment of the present application.

[0026] Description of reference numerals:

[0027] 01. Cabinet; 11. Waste gas inlet; 12. Gas outlet; 02. Waste gas treatment chamber; 21. Reaction chamber; 211. Open structure; 22. Heat exchange chamber; 221. Heat exchange tube; 222. Heat exchange medium inlet; 223. Heat exchange medium outlet; 224. First heat exchange chamber; 225. Transition chamber; 2251. S-shaped space; 2252. First baffle; 2253. Second baffle; 226. Second heat exchange chamber; 03. Negative pressure machine; 04. Pressure relief device; 05. Pressure relief exhaust gas discharge pipe; 06. Air intake pipeline; 07. Air intake valve; 08. Spare pipeline; 09. Spare valve; 010. Variable frequency fan; 011. Combustion-supporting gas inlet. DETAILED DESCRIPTION

[0028] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in many forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this application will be comprehensive and complete and will fully convey the concepts of the example embodiments to those skilled in the art. The same reference numerals in the figures represent the same or similar parts, and thus their repeated description will be omitted.

[0029] The described features, structures or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced without one or more of these specific details, or other modes, components, materials, devices, etc. may be adopted. In these cases, known structures, methods, devices, implementations, materials or operations will not be shown or described in detail.

[0030] In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units that are inherent to these processes, methods, products or devices.

[0031] The terms "first", "second" and the like in the specification and claims of this application and the above drawings are used to distinguish different objects rather than to describe a specific order.

[0032] The following is a clear and complete description of the technical solution of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.

[0033] According to one aspect of the present application, the present application provides a waste gas treatment device for large-flow combustible waste gas. Figure 1 The exhaust gas treatment equipment includes a cabinet 01, an exhaust gas treatment chamber 02 and a negative pressure machine 03. The cabinet 01 is provided with an exhaust gas inlet 11 and a gas outlet 12, and the exhaust gas treatment chamber 02 is arranged in the cabinet 01. The negative pressure machine 03 is connected to the gas outlet 12 to extract the gas in the exhaust gas treatment chamber 02 from the gas outlet 12.

[0034] Reference Figure 2 The waste gas treatment chamber 02 includes a reaction chamber 21 and a heat exchange chamber 22. The reaction chamber 21 is connected to the waste gas inlet 11, and receives the waste gas inputted into the reaction chamber 21 by the waste gas inlet 11. The waste gas burns in the reaction chamber 21 to generate the burned gas. The heat exchange chamber 22 is connected to the reaction chamber 21 and is also connected to the gas outlet 12, and performs heat exchange and cooling treatment on the burned gas from the reaction chamber 21 to obtain the cooled gas. The cooled gas is discharged from the gas outlet 12.

[0035] According to an example embodiment, referring to Figure 2 The top of the reaction chamber 21 is an open structure 211. The exhaust gas burns in the reaction chamber 21, and combustion-supporting gas, such as air, oxygen, etc., needs to be introduced. Under the action of the negative pressure machine 03, the reaction chamber 21 is in a negative pressure state, so that the outside air will flow into the reaction chamber 21 from the open structure 211 at the top of the reaction chamber 21 to provide the reaction chamber 21 with combustion-supporting gas.

[0036] Reference Figure 2 The top of the reaction chamber 21 can be connected to the exhaust gas inlet port 11 through an exhaust gas inlet pipe, one end of the exhaust gas inlet pipe is connected to the exhaust gas inlet port 11, and the other end of the exhaust gas inlet pipe can pass through the open structure 211 to be set in the cavity of the reaction chamber 21.

[0037] According to some embodiments, the reaction chamber 21 in the present application is configured as a short reaction chamber structure. For large-flow combustible waste gas (such as large-flow hydrogen waste gas), such waste gas is flammable and has low ignition energy and high heat release.

[0038] Therefore, the embodiment of the present application shortens the length of the reaction chamber 21 in the prior art without changing the overall size of the exhaust gas treatment chamber 02, which is equivalent to moving the bottom end of the original reaction chamber 21 upward compared with the prior art.

[0039] In this way, due to the shortening of the reaction chamber 21, a part of the remaining space is formed below the bottom of the reaction chamber 21. In the embodiment of the present application, the part of the remaining space is also used as a part of the heat exchange chamber 22 to cool the gas after combustion. Therefore, compared with the prior art, the exhaust gas treatment equipment of the present application can extend the cooling space, thereby improving the cooling effect of the exhaust gas treatment equipment.

[0040] According to an example embodiment, referring to Figure 2 The heat exchange chamber 22 is provided with a heat exchange tube 221, and a heat exchange medium 222 is provided in the heat exchange tube 221. The heat exchange medium 222 in the heat exchange tube 221 can be a low-temperature heat exchange medium 222.

[0041] The combusted gas generated in the reaction chamber 21 is transmitted to the heat exchange chamber 22 and contacts the outer wall of the heat exchange tube 221 in the heat exchange chamber 22 .

[0042] The heat exchange medium 222 in the heat exchange tube 221 can exchange heat with the combusted gas outside the heat exchange tube 221 to absorb the heat in the combusted gas, thereby reducing the temperature of the combusted gas. The cooled gas is then discharged from the gas outlet 12 to complete the treatment of the exhaust gas.

[0043] According to some embodiments, the heat exchange medium 222 is a substance used to transfer heat during the heat exchange process. In order to reduce the temperature of the gas after combustion, the heat exchange medium 222 can specifically be low-temperature water, refrigerant, and low-temperature air, etc., which are not limited here.

[0044] In the prior art, the exhaust gas after combustion is often cooled by spraying cooling water. The cooled gas obtained by spraying cooling water will contain some solid or liquid products, which need to be removed by washing. Therefore, in the prior art, after obtaining the gas after combustion, it is necessary to process the gas after combustion through cooling spraying, washing, water vapor separation, defoaming and other processes before discharging.

[0045] In the existing technology for treating waste gas, cooling spraying, washing, etc. require real-time and continuous supply of circulating cooling water and new water.

[0046] However, due to the small cooling space in the prior art and the large heat released by the combustion of large-flow exhaust gas, the amount of circulating cooling water used is large. For example, for hydrogen exhaust gas with a flow rate of 600slm, the heat generated by combustion is about 7476KJ. If the gas after combustion is cooled to 50℃, a circulating cooling water flow of about 69.7L / min is required.

[0047] Meanwhile, in the prior art, new water is usually provided by a water supply system in real time and continuously, and the new water cannot be recycled, resulting in a large amount of water resources used and a high cost of the water supply system.

[0048] It can be seen that the waste gas treatment method of the existing technology consumes a large amount of water resources.

[0049] In addition, in the waste gas treatment method in the prior art, it is also necessary to set up a pipeline system such as a drainage pipeline and a new water pipeline outside the waste gas treatment chamber 02, which makes the waste gas treatment equipment larger in size and higher in cost.

[0050] The waste gas treatment equipment for large-flow combustible waste gas provided in the present application uses the spray water cooling and washing cavities in the prior art as the heat exchange chamber 22, and uses the heat exchange medium 222 in the heat exchange tube 221 to exchange heat with the burnt gas to cool the burnt gas, so that the cooled gas can be directly discharged from the gas exhaust port 12, without the need to cool it by water spraying, nor the need to wash the cooled gas.

[0051] In this way, when the heat exchange medium 222 is not a water medium, there is no need to use circulating cooling water, thereby reducing the burden on the water supply system.

[0052] When the heat exchange medium 222 is a water medium, since the waste gas treatment equipment of the present application uses the spray water cooling and washing cavities in the prior art as the heat exchange chamber 22, which is equivalent to lengthening the cooling space, the water flow rate of the heat exchange medium 222 will also be smaller than the original circulating cooling water flow rate, which is also beneficial to reduce the use of circulating cooling water.

[0053] Since the waste gas treatment equipment of the present application does not need to use new water to wash the cooled gas, the waste gas treatment equipment of the present application also reduces the amount of new water used.

[0054] The waste gas treatment equipment of the present application also does not need to set up drainage pipes, new water pipes and other piping systems outside the waste gas treatment chamber 02, which is also conducive to reducing the volume of the waste gas treatment equipment.

[0055] Through the exhaust gas treatment equipment described above, the exhaust gas enters the exhaust gas treatment chamber 02 from the exhaust gas inlet 11, and under the action of the negative pressure machine 03, the exhaust gas passes through the reaction chamber 21 and the heat exchange chamber 22 in turn for combustion and cooling, and then is discharged from the gas exhaust port 12 to achieve the purpose of exhaust gas treatment.

[0056] By setting the open structure 211 in the reaction chamber 21, the combustion-supporting gas used for the combustion of the exhaust gas in the reaction chamber 21 can be provided by the outside air sucked in from the open structure 211, thereby reducing the amount of combustion-supporting gas provided by the gas supply system, thereby reducing the cost of the combustion-supporting gas.

[0057] The heat exchange tube 221 in the heat exchange chamber 22 and the heat exchange medium 222 in the heat exchange tube 221 exchange heat with the combusted gas, thereby reducing the temperature of the combusted gas. In this way, there is no need to use circulating water to spray and cool the combusted gas, nor is there any need to use new water to wash the combusted gas, thereby reducing the amount of water resources used.

[0058] The waste gas treatment method of the present application also does not require the installation of drainage pipes, new water pipes and other piping systems outside the waste gas treatment chamber 02, which is also beneficial to reducing the volume of the waste gas treatment equipment.

[0059] According to some embodiments, reference Figure 2 A heat exchange medium inlet 222 and a heat exchange medium outlet 223 are provided on the side wall of the heat exchange chamber 22. The heat exchange medium inlet 222 is used to receive the heat exchange medium, and the heat exchange medium outlet 223 is used to discharge the heat exchange medium.

[0060] Reference Figure 2 The heat exchange medium inlet 222 and the heat exchange medium outlet 223 are both connected to the heat exchange tube 221. The heat exchange medium flows into the heat exchange tube 221 from the heat exchange medium inlet 222, and then the heat exchange medium in the heat exchange tube 221 flows along the flow path of the heat exchange tube 221 and flows out from the heat exchange medium outlet 223.

[0061] According to the exemplary embodiment, the heat exchange tube 221 is evenly arranged between the cavity inlet side and the cavity outlet side of the heat exchange cavity 22. The cavity inlet side of the heat exchange cavity 22 is the inlet side where the combusted gas flows into the heat exchange cavity 22, and the cavity outlet side of the heat exchange cavity 22 is the side where the heat exchange cavity 22 is connected to the gas outlet 12, and is used to discharge the cooled gas.

[0062] During the process from flowing into the heat exchange chamber 22 to being discharged from the heat exchange chamber 22 , the combusted gas continuously contacts the outer wall of the heat exchange tube 221 to exchange heat with the heat exchange medium in the heat exchange tube 221 , thereby achieving a better cooling effect.

[0063] According to some embodiments, reference Figure 2The heat exchange chamber 22 may specifically include a first heat exchange chamber 224 , a transition chamber 225 and a second heat exchange chamber 226 .

[0064] According to the exemplary embodiment, the top of the first heat exchange chamber 224 is connected to the bottom of the reaction chamber 21, and receives the combusted gas from the reaction chamber 21. The combusted gas contacts the outer wall of the heat exchange tube 221 in the first heat exchange chamber 224 to perform a first temperature reduction process, thereby obtaining a gas after preliminary temperature reduction.

[0065] According to an exemplary embodiment, the transition chamber 225 is in communication with the bottom of the first heat exchange chamber 224 and is also in communication with the bottom of the second heat exchange chamber 226. Figure 2 The bottom of the transition chamber 225 is a closed structure, the bottom of the first heat exchange chamber 224 is directly connected to the top of the transition chamber 225 , and the bottom of the second heat exchange chamber 226 is directly connected to the top of the transition chamber 225 .

[0066] The transition chamber 225 is used to receive the gas after the initial cooling from the first heat exchange chamber 224. The gas after the initial cooling flows through the transition chamber 225, and contacts the outer wall of the heat exchange tube 221 in the transition chamber 225 during the process of flowing through the transition chamber 225, so as to undergo a second cooling process in the transition chamber 225, thereby obtaining the gas after the second cooling.

[0067] According to some embodiments, reference Figure 2 , there is at least one S-shaped space 2251 for gas to pass through in the transition chamber 225. The heat exchange tube 221 in the transition chamber 225 is also arranged along the S-shaped space 2251, that is, the heat exchange tube 221 passes through the transition chamber 225 through the S-shaped space 2251. The gas after preliminary temperature reduction is transmitted through the S-shaped space 2251 in the transition chamber 225, and contacts the outer wall of the heat exchange tube 221 in the S-shaped space 2251 to achieve temperature reduction.

[0068] The method of setting the S-shaped space 2251 in the transition chamber 225 is conducive to extending the total flow path of the gas in the transition chamber 225, thereby helping to extend the time that the gas after the initial cooling stays in the transition chamber 225, that is, it is conducive to increasing the contact time between the gas after the initial cooling and the heat exchange tube 221, and further helps to improve the cooling effect of the gas after the initial cooling.

[0069] According to some embodiments, the S-shaped space 2251 in the transition cavity 225 can be realized by disposing a baffle set in the transition cavity 225. Figure 2 The baffle set includes a first baffle 2252 and a second baffle 2253 . The first baffle 2252 has a first height smaller than the cavity height of the transition cavity 225 . The second baffle 2253 has a second height smaller than the cavity height of the transition cavity 225 .

[0070] The bottom of the first baffle plate 2252 is vertically connected to the bottom of the transition chamber 225 to form a first gap between the top of the transition chamber 225 and the top of the first baffle plate 2252 .

[0071] The top of the second baffle plate 2253 is vertically connected to the top of the transition chamber 225 to form a second gap between the bottom of the transition chamber 225 and the bottom of the second baffle plate 2253 .

[0072] The first baffle plate 2252 and the second baffle plate 2253 are parallel to each other and are separated by a preset third gap.

[0073] The first gap, the second gap and the third gap form the S-shaped space 2251. The gas after preliminary cooling is transmitted in the transition chamber 225 through the S-shaped space 2251.

[0074] According to some embodiments, reference Figure 2 One end of the second heat exchange chamber 226 is connected to the top of the transition chamber 225 to receive the gas after the temperature is reduced again from the transition chamber 225, so that the gas after the temperature is reduced again in the second heat exchange chamber 226 to obtain the reduced temperature gas. The other end of the second heat exchange chamber 226 is connected to the gas outlet 12 to discharge the reduced temperature gas from the gas outlet 12.

[0075] According to some embodiments, reference Figure 2 The heat exchange medium inlet 222 and the heat exchange medium outlet 223 may be disposed on the side wall of the second heat exchange cavity 226 , and the heat exchange medium inlet 222 is located above the heat exchange medium outlet 223 .

[0076] According to an example embodiment, referring to Figure 2 The heat exchange medium inlet 222 is arranged on the side wall of one end of the second heat exchange chamber 226. One end of the second heat exchange chamber 226 is an end connected to the transition chamber 225. The heat exchange medium inlet 222 is arranged on the side wall of the other end of the second heat exchange chamber 226. The other end of the second heat exchange chamber 226 is an end connected to the gas outlet 12.

[0077] According to some embodiments, a large amount of heat is generated during the combustion of a large amount of exhaust gas in the reaction chamber, which may cause the reaction chamber to be over-pressurized and thus explode. Therefore, in order to reduce the loss caused by the explosion of the reaction chamber, reference is made to Figure 2 The exhaust gas treatment equipment may also include a pressure relief device 04 and a pressure relief exhaust gas discharge pipe 05.

[0078] Reference Figure 2 The pressure relief device 04 is arranged on the side wall of the reaction chamber 21. When the pressure of the pressure relief device 04 exceeds the first preset pressure limit, the pressure relief device 04 ruptures.

[0079] Optionally, the pressure relief device 04 may specifically be a bursting disc.

[0080] Optionally, the first preset pressure limit value may be specifically determined according to the explosion pressure of the reaction chamber 21. For example, the reaction chamber 21 may explode when the pressure inside the chamber is 80, that is, the explosion pressure of the reaction chamber 21 is greater than or equal to 80, and the first preset pressure limit value may specifically be 80, or may be the explosion pressure minus the preset value, for example, 75.

[0081] One end of the pressure relief waste gas discharge pipe 05 is connected to the pressure relief device 04 , and the other end is connected to the gas discharge port 12 . When the pressure relief device 04 ruptures, the gas in the reaction chamber 21 is transmitted to the gas discharge port 12 .

[0082] According to the exemplary embodiment, a large flow of combustible waste gas is introduced into the reaction chamber 21, and energy is released during the combustion of the waste gas, which results in a relatively high pressure in the reaction chamber 21. If the pressure in the reaction chamber 21 is too high, the reaction chamber 21 may be at risk of explosion.

[0083] In the embodiment of the present application, a pressure relief device 04 is provided on the side wall of the reaction chamber 21. When the pressure in the reaction chamber 21 is high and there is a risk of explosion, the pressure of the pressure relief device 04 exceeds the first preset pressure limit, and then the pressure relief device 04 will automatically rupture. Afterwards, the combustible waste gas and the post-combustion gas in the reaction chamber 21 will be transmitted to the pressure relief waste gas discharge pipe 05 through the side wall position where the pressure relief device 04 is located. Afterwards, the gas in the reaction chamber 21 is transmitted to the gas discharge port 12 through the pressure relief waste gas discharge pipe 05, so as to be discharged from the gas discharge port 12, and the staff will perform corresponding processing.

[0084] The embodiment of the present application provides a pressure relief device 04 and a pressure relief waste gas discharge pipe 05 so that when there is an explosion risk, timely response actions can be taken to reduce the explosion probability of the reaction chamber 21, thereby also helping to reduce the losses caused by the explosion of the reaction chamber 21.

[0085] According to some embodiments, reference Figure 2 The exhaust gas treatment equipment also includes an intake pipeline 06, an intake valve 07, a spare pipeline 08, a spare valve 09 and a pressure detection device.

[0086] Reference Figure 1 and Figure 2 The air intake pipe 06 is arranged outside the cabinet 01. One end of the air intake pipe 06 is connected to the exhaust gas inlet port 11, and the other end is an air intake port, which is an inlet for the air intake pipe 06 to connect with an external device to receive exhaust gas.

[0087] That is, the exhaust gas generated by the external device is transmitted to the intake pipe 06 through the intake port, and then transmitted to the exhaust gas intake port 11 through the intake pipe 06, and then transmitted to the reaction chamber 21 for processing.

[0088] The intake valve 07 is arranged on the intake pipe 06 to control the on-off of the intake pipe 06 and further control the transmission of the exhaust gas in the intake pipe 06 .

[0089] When the intake valve 07 is opened so that the intake pipe 06 is in a connected state, the exhaust gas received by the intake pipe 06 is transmitted to the exhaust gas inlet port 11 to be transmitted to the reaction chamber 21. When the intake valve 07 is closed, the exhaust gas received by the intake pipe 06 cannot be transmitted to the exhaust gas inlet port 11, that is, cannot be transmitted to the reaction chamber 21.

[0090] Reference Figure 1 and Figure 2 The standby pipeline 08 is arranged outside the cabinet 01. One end of the standby pipeline 08 is connected to the air intake pipeline 06, and one end of the standby pipeline 08 is arranged in the air intake pipeline 06 section between the air inlet of the air intake pipeline 06 and the air intake valve 07. The standby valve 09 is arranged on the standby pipeline 08, which can control the on and off of the standby pipeline 08.

[0091] Optionally, the end of the backup pipeline 08 that is not connected to the intake pipeline 06 can be connected to a backup exhaust gas treatment device or an exhaust gas collection device, which is not limited here.

[0092] According to some embodiments, the pressure detection device is connected to the air inlet valve 07 and the backup valve 09. The pressure detection device can detect the intracavity pressure in the reaction chamber 21, and when the intracavity pressure exceeds the second preset pressure limit, control the backup valve 09 to open and control the air inlet valve 07 to close.

[0093] According to the exemplary embodiment, when the pressure in the reaction chamber 21 exceeds the second preset pressure limit, it indicates that the pressure in the reaction chamber 21 is too high and there is a risk of explosion. In this case, the pressure detection device controls the air intake valve 07 to close, so that the air intake pipeline 06 is in a cut-off state, thereby preventing the exhaust gas transmitted by the external device from being transmitted to the reaction chamber 21 through the air intake pipeline 06.

[0094] Furthermore, in this case, the pressure detection device controls the standby valve 09 to open, so that the standby pipeline 08 is in a connected state, so that the exhaust gas transmitted by the external device can be transmitted to the standby pipeline 08 through the intake pipeline 06, and output through the standby pipeline 08. For example, the exhaust gas transmitted by the external device is transmitted to the standby exhaust gas treatment device through the intake pipeline 06 and the standby pipeline 08, and is processed by the standby exhaust gas treatment device.

[0095] According to some embodiments, the second preset pressure limit value may be equal to the first preset pressure limit value, may be smaller than the first preset pressure limit value, or may be larger than the first preset pressure limit value, which is not limited herein.

[0096] The present application provides an air intake pipeline 06, an air intake valve 07, a spare pipeline 08, a spare valve 09 and a pressure detection device, so that when the pressure in the reaction chamber 21 is too high, the exhaust gas transmitted by the external equipment can be transmitted to other equipment for corresponding treatment, and will not be transmitted to the reaction chamber 21 with explosion risk, so as to reduce the explosion risk of the reaction chamber 21. And when the reaction chamber 21 has exploded, such a setting can reduce the harm caused by the explosion of the reaction chamber 21.

[0097] According to some embodiments, the exhaust gas treatment equipment may further include a cabinet exhaust fan.

[0098] The cabinet exhaust fan includes an air inlet and an air outlet, wherein the air inlet is arranged inside the cabinet 01 and the air outlet is arranged outside the cabinet 01. When the cabinet exhaust fan is working, the cabinet exhaust fan can discharge the gas in the cabinet 01 through the air inlet and the air outlet.

[0099] When the pressure in the cavity exceeds the second preset pressure limit, the pressure detection device can control the cabinet exhaust fan to operate so as to exhaust the gas in the cabinet 01.

[0100] According to the exemplary embodiment, when the pressure in the reaction chamber 21 is too high, the reaction chamber 21 may explode, or the pressure relief device 04 may rupture and discharge the gas in the reaction chamber 21 from the gas outlet 12. In these cases, the gas in the reaction chamber 21 may overflow from the reaction chamber 21 through the open structure 211 of the reaction chamber 21 and overflow into the cabinet 01, so that a certain amount of gas is filled in the cabinet 01.

[0101] Therefore, when the pressure detection device detects that the pressure in the cavity exceeds the second preset pressure limit, the pressure detection device can control the cabinet exhaust fan to operate so that the cabinet exhaust fan discharges the gas overflowing from the reaction chamber 21 in the cabinet 01 from the cabinet 01, thereby reducing the occurrence of major accidents.

[0102] According to some embodiments, reference Figure 1 and Figure 2 The exhaust gas treatment equipment may further include a variable frequency fan 010 , which is disposed in the cabinet 01 and communicated with the reaction chamber 21 , and may input air into the reaction chamber 21 .

[0103] The cabinet 01 is also provided with a combustion-supporting gas inlet 011. The reaction chamber 21 is communicated with the combustion-supporting gas inlet 011. The combustion-supporting gas inlet 011 can receive the combustion-supporting gas provided by the gas supply system.

[0104] According to an example embodiment, referring to Figure 2 The combustion-supporting gas inlet 011 is connected to the reaction chamber 21 through a pipeline, one end of the pipeline is the combustion-supporting gas inlet 011, and the other end extends into the reaction chamber 21 through an opening at the top of the reaction chamber 21.

[0105] According to the exemplary embodiment, the combustion-supporting gas in the reaction chamber 21 can be provided by three parts. On the one hand, air can be sucked from the outside of the reaction chamber 21 by the open structure 211 of the reaction chamber 21, and the air is used as the combustion-supporting gas in the reaction chamber 21. On the other hand, air from the external environment outside the cabinet 01 can be introduced into the reaction chamber 21 through the variable frequency fan 010, and the air is used as the combustion-supporting gas. On the other hand, the combustion-supporting gas can also be introduced into the reaction chamber 21 by the gas supply system through the combustion-supporting gas inlet 011.

[0106] According to an exemplary embodiment, the combustion-supporting gas blown into the reaction chamber 21 by the gas supply system may specifically be CDA (Clean Dry Air).

[0107] The present application provides an open structure 211, a variable frequency fan 010 and a combustion-supporting gas inlet 011, so that there is sufficient combustion-supporting gas in the reaction chamber 21 to provide combustion for a large flow of combustible waste gas and dilute the concentration of the waste gas in the reaction chamber 21. This can reduce the amount of combustion-supporting gas provided by the gas supply system.

[0108] According to some embodiments, the exhaust gas treatment device may further include a controller. The controller may collect the exhaust gas flow rate in the reaction chamber 21, determine the gas supply amount of the variable frequency fan 010 according to the exhaust gas flow rate, the preset open intake air flow rate and the preset gas supply amount of the gas supply system, and control the variable frequency fan 010 to input air into the reaction chamber 21 according to the gas supply amount.

[0109] The preset open intake air flow rate may specifically be the air flow rate absorbed by the open structure 211 when the flow rate of the exhaust gas in the reaction chamber 21 is the exhaust gas flow rate.

[0110] The preset gas supply amount of the gas supply system is the gas flow rate provided by the gas supply system.

[0111] The controller determines the required amount of combustion-supporting gas according to the exhaust gas flow rate. For example, the oxygen content in air is about 1 / 5. In order to ensure that the exhaust gas can be completely burned and to reduce the risk of explosion caused by excessive exhaust gas content, the required amount of combustion-supporting gas should be three times the exhaust gas flow rate. That is, 1slm hydrogen consumes about 3slm air, and processing 600slm hydrogen requires about 1800slm air.

[0112] The controller can then determine the gas supply amount of the variable frequency fan 010 based on the demand, the preset open intake air flow rate and the preset gas supply amount of the gas supply system, so as to control the variable frequency fan 010 to input the gas supply amount of air into the reaction chamber 21 according to the gas supply amount, so as to ensure the complete combustion of the exhaust gas and reduce the explosion probability of the reaction chamber 21.

[0113] According to another aspect of the present application, the present application also provides a semiconductor process system, which includes the waste gas treatment equipment for large-flow combustible waste gas described in the above embodiments.

[0114] According to another aspect of the present application, the present application also provides a waste gas treatment method. The waste gas treatment method is applied to the waste gas treatment equipment for large flow of combustible waste gas described in the above embodiment. Figure 3 The method includes steps S31 to S33.

[0115] In step S31 , the exhaust gas is burned in the reaction chamber 21 to obtain a burned gas.

[0116] In step S32, heat exchange and temperature reduction treatment is performed on the combusted gas in the heat exchange chamber 22 to obtain cooled gas.

[0117] In step S33 , the gas after the temperature reduction is discharged from the gas outlet 12 .

[0118] Finally, it should be noted that the above is only a preferred embodiment of the present application and is not intended to limit the present application. Although the present application is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions of the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.

Claims

1. A waste gas treatment device for large-flow combustible waste gas, It is characterized in that The device comprises: The cabinet is provided with an exhaust gas inlet and a gas outlet; The exhaust gas treatment chamber is arranged in the cabinet and includes: A reaction chamber is connected to the exhaust gas inlet, the top of the reaction chamber is an open structure, and the exhaust gas input into the reaction chamber through the exhaust gas inlet burns in the reaction chamber to generate post-combustion gas; A heat exchange chamber is communicated with the reaction chamber and the gas outlet, a heat exchange tube is arranged in the heat exchange chamber, and a heat exchange medium is arranged in the heat exchange tube to reduce the temperature of the gas after combustion; A negative pressure machine is connected to the gas outlet to extract the gas in the waste gas treatment chamber from the gas outlet.

2. The waterless waste gas treatment equipment for large-flow combustible waste gas according to claim 1, It is characterized in that A heat exchange medium inlet and a heat exchange medium outlet are arranged on the side wall of the heat exchange cavity, and both the heat exchange medium inlet and the heat exchange medium outlet are communicated with the heat exchange pipe.

3. The waterless waste gas treatment equipment for large-flow combustible waste gas according to claim 2, It is characterized in that The heat exchange chamber comprises: a first heat exchange chamber, wherein the top of the first heat exchange chamber is connected to the bottom of the reaction chamber and receives the combusted gas from the reaction chamber; a transition chamber, connected to the bottom of the first heat exchange chamber, and receiving the gas passing through the first heat exchange chamber; a second heat exchange cavity, wherein one end of the second heat exchange cavity is communicated with the transition cavity to receive the gas passing through the transition cavity, and the other end of the second heat exchange cavity is communicated with the gas discharge port to discharge the gas passing through the second heat exchange cavity; At least one S-shaped space is formed in the transition chamber for gas to pass through.

4. The waterless waste gas treatment equipment for large-flow combustible waste gas according to claim 3, It is characterized in that The heat exchange medium inlet and the heat exchange medium outlet are arranged on the side wall of the second heat exchange cavity, and the heat exchange medium inlet is arranged on the side wall of the other end of the second heat exchange cavity, and the heat exchange medium outlet is arranged on the side wall of the one end of the second heat exchange cavity.

5. The waterless waste gas treatment equipment for large-flow combustible waste gas according to claim 1, It is characterized in that The device also includes: A pressure relief device is arranged on the side wall of the reaction chamber, and when the pressure of the pressure relief device exceeds a first preset pressure limit, the pressure relief device ruptures; A pressure relief waste gas discharge pipe has one end connected to the pressure relief device and the other end connected to the gas discharge port. When the pressure relief device ruptures, the gas in the reaction chamber is discharged from the gas discharge port.

6. The waterless waste gas treatment equipment for large-flow combustible waste gas according to claim 1 or 5, It is characterized in that The device also includes: an air intake pipeline, disposed outside the cabinet and connected to the exhaust gas inlet to transmit the exhaust gas to the exhaust gas inlet; An air intake valve is arranged on the air intake pipeline to control the on-off of the air intake pipeline; A spare pipeline is arranged outside the cabinet and communicated with the air intake pipeline. The spare pipeline is arranged in the air intake pipeline section between the air intake port of the air intake pipeline and the air intake valve. The air intake port is an inlet in the air intake pipeline connected to an external device to receive exhaust gas. A spare valve, arranged on the spare pipeline; The pressure detection device detects the intra-cavity pressure in the reaction chamber, and controls the backup valve to open and the air inlet valve to close when the intra-cavity pressure exceeds a second preset pressure limit.

7. The waterless waste gas treatment equipment for large-flow combustible waste gas according to claim 6, It is characterized in that The device also includes: A cabinet exhaust fan, comprising an air inlet and an air outlet, wherein the air inlet is arranged in the cabinet, and the air outlet is arranged outside the cabinet, and when the cabinet exhaust fan is in operation, the cabinet exhaust fan discharges the gas in the cabinet; When the pressure in the cavity exceeds a second preset pressure limit, the pressure detection device controls the cabinet exhaust fan to operate so as to exhaust the gas in the cabinet.

8. The waste gas treatment equipment for large-flow combustible waste gas according to claim 1, It is characterized in that The device also includes: A variable frequency fan is disposed in the cabinet, connected to the reaction chamber, and inputs air into the reaction chamber; The cabinet is also provided with a combustion-supporting gas inlet; The reaction chamber is communicated with the combustion-supporting gas inlet, and receives the combustion-supporting gas delivered by the gas supply system through the combustion-supporting gas inlet.

9. A semiconductor process system, It is characterized in that The system includes the waterless waste gas treatment equipment for large-flow combustible waste gas as described in any one of claims 1 to 8.

10. A method for treating waste gas applied to a waste gas waterless treatment device for treating large-flow combustible waste gas as described in any one of claims 1 to 8, It is characterized in that The method comprises: Burning the waste gas in the reaction chamber to obtain a burned gas; Performing heat exchange and cooling treatment on the combusted gas in the heat exchange chamber to obtain cooled gas; The gas after cooling is discharged from the gas outlet.