Cooling water side flow treatment system for production line for preparing potassium chloride from sintering fly ash

By setting up water vapor transmission channels of side plates and plywood around the cooling tower, and using the variable frequency-controlled side suction fan to retrieve the water vapor to the cooling water pool, the problem of water source loss in the cooling tower is solved, and efficient cooling of circulating water and water source is achieved. Savings reduce production costs and environmental corrosion.

CN118882274APending Publication Date: 2024-11-01SHAANXI IRON & STEEL GRP YUHONG ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410899076.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In the cooling tower of the sintered dust removal ash to produce potassium chloride production line, part of the water source will be lost during the cooling process, resulting in a large amount of replenishment of circulating water, which increases production costs.

Method used

Design a cooling water side flow treatment system, which uses the side plates and ply plates surrounding the cooling tower to form a water vapor transmission channel, install a high-power variable frequency control side suction fan to suck water vapor into the transmission channel, and passes the filter and drain pipe to cool it The water is recovered to the cooling pool to reduce water source losses.

Benefits of technology

It effectively reduces the water source loss during the cooling tower circulating water cooling process, reduces production costs, and reduces the corrosion impact on equipment and the environment through water vapor recycling and filtration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118882274A_ABST
    Figure CN118882274A_ABST
Patent Text Reader

Abstract

The invention discloses a cooling water side flow treatment system for a production line for preparing potassium chloride from sintering fly ash. The cooling water side flow treatment system comprises a side plate arranged around an air outlet of a cooling tower; clamping plates are arranged on the inner sides of the side plates. Water vapor transmission channels are formed between the clamping plates and the side plates. A side suction fan is mounted on the clamping plate, and is used for sucking water vapor discharged from the air outlet into the transmission channel; the bottom of the transmission channel communicates with the cooling pool; water vapor discharged from the cooling tower can be sucked into the transmission channel through the side suction fan, then the water vapor in the transmission channel is recycled, water source loss in the circulating water cooling process of the cooling tower can be effectively reduced, and therefore the production cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of cooling water treatment, and in particular relates to a cooling water side stream treatment system for a production line for preparing potassium chloride from sintering dust removal ash. Background Art

[0002] In the production line of potassium chloride produced from sintering dust ash, a large amount of production wastewater is generated. The wastewater contains some chemical elements that cannot be discharged directly and needs to be cooled in a cooling tower before subsequent treatment.

[0003] During the cooling process of the cooling tower, there is an exhaust fan at the top of the cooling tower, which can discharge the high-temperature water vapor inside from the top of the cooling tower, thereby achieving the purpose of cooling.

[0004] However, some water will be lost in the process of discharging water vapor, resulting in the need for a large amount of water to be supplemented frequently for the production of circulating water. Summary of the invention

[0005] The purpose of the present invention is to provide a cooling water side stream treatment system for a production line for preparing potassium chloride from sintering dust removal ash, so as to reduce the water loss in the process of cooling the circulating water in the cooling tower.

[0006] The present invention adopts the following technical scheme: a cooling water side stream treatment system for a production line for preparing potassium chloride from sintering dust removal ash, comprising a side plate arranged around the air outlet of a cooling tower, the side plate being made of a light and corrosion-resistant plastic insulation material;

[0007] A clamping plate is provided on the inner side of the side plate, and a water vapor transmission channel is formed between the clamping plate and the side plate;

[0008] A side suction fan is installed on the splint. The side suction fan adopts high-power frequency conversion control to absorb the water vapor discharged from the air outlet into the transmission channel.

[0009] The bottom of the transmission channel is connected to the cooling water pool.

[0010] Furthermore, a filter is installed in the transmission channel.

[0011] Furthermore, a blocking plate is provided at the bottom of the transmission channel, the blocking plate is connected to a drain pipe, and the other end of the drain pipe is connected to a cooling water pool.

[0012] Furthermore, the water outlet end of the drain pipe is located below the liquid surface in the cooling water pool.

[0013] Furthermore, a top plate is arranged on the top of the side plate, the top plate and the side plate form a barrel shape, and the top plate is made of a lightweight, corrosion-resistant plastic insulating material.

[0014] Further, the bottom end of the transmission channel is located at the bottom of the cooling tower.

[0015] The beneficial effects of the present invention are:

[0016] The present invention can suck the water vapor discharged from the cooling tower into the transmission channel through the variable frequency automatic control of the side suction fan speed, and through the effect of forced air cooling, the initial water vapor with an outlet temperature of about 60°C of the cooling tower is cooled to 30°C, thereby strengthening the cooling and recovery of high-temperature steam and water, and then recovering the water vapor in the transmission channel, which can effectively reduce the water loss in the process of cooling the circulating water in the cooling tower, thereby reducing production costs. The technical solution can be implemented in a relatively wide area around the factory building. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic structural diagram of a cooling water side stream treatment system for a production line for preparing potassium chloride from sintering dust ash according to an embodiment of the present invention;

[0018] Figure 2 The present invention is a schematic cross-sectional structure diagram of a cooling water side stream treatment system of a production line for preparing potassium chloride from sintering dust ash according to an embodiment of the present invention.

[0019] Among them: 10. Side plate; 11. Clamp plate; 12. Drain pipe; 13. Side suction fan; 14. Filter; 15. Top plate;

[0020] 20. Cooling water pool; 30. Circulating water pipe; 40. Cooling tower. DETAILED DESCRIPTION

[0021] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0022] The invention discloses a cooling water side stream treatment system for a production line for preparing potassium chloride from sintering dust removal ash. Figure 1 As shown, it includes a side plate 10 arranged around the air outlet of the cooling tower 40; a clamping plate 11 is arranged on the inner side of the side plate 10, and a water vapor transmission channel is formed between the clamping plate 11 and the side plate 10; a side suction fan 13 is installed on the clamping plate 11, and the side suction fan 13 is used to suck the water vapor discharged from the air outlet into the transmission channel; the bottom of the transmission channel is connected to the cooling water pool 20.

[0023] The present invention can suck the water vapor exhausted from the cooling tower 40 into the transmission channel through the side suction fan 13, and then recover the water vapor in the transmission channel, which can effectively reduce the water loss in the process of cooling the circulating water in the cooling tower 40, thereby reducing production costs.

[0024] In the embodiment of the present invention, the surfaces of the side plates 10 and the clamping plates 11 are coated with an anti-corrosion layer to prevent the chemical components in the circulating water from corroding them, thereby increasing the operating time of the entire system.

[0025] The axial height of the side suction fan 13 is close to the highest height of the water vapor discharged from the cooling tower 40. This is because when the water vapor rises to the highest height, its rising force basically disappears. At this time, under the suction force of the side suction fan 13 (the minimum suction force can achieve the maximum effect), the water vapor can be easily sucked into the transmission channel.

[0026] When water vapor enters the transmission channel, due to the high temperature of the water vapor and the low temperature of the clamping plate 11 and the side plate 10, the water vapor will liquefy when it contacts the clamping plate 11 and the side plate 10, and then the liquefied water will flow downward under the action of gravity.

[0027] In one embodiment, a filter 14 is installed in the transmission channel. The filter is preferably an activated carbon filter, which can absorb toxic and harmful substances in water vapor, reduce the corrosiveness of water vapor to the system, and reduce the corrosion to production line equipment during subsequent recycling.

[0028] A plugging plate is provided at the bottom of the transmission channel, and a drain pipe 12 is connected to the plugging plate, and the other end of the drain pipe 12 is connected to the cooling water pool 20. The filtered water passing through the filter 14 can be controlled through the bottom plate to control the amount of water in the transmission channel.

[0029] In one embodiment, the outlet end of the drain pipe 12 is located below the liquid level in the cooling water pool 20. In this way, the filtered water can be directly discharged into the large amount of cooling water in the cooling water pool 20 to further cool it. In addition, some residual water vapor will be discharged with the filtered water. When this water vapor enters the cooling water, it will be further liquefied, greatly reducing the amount discharged into the air, so as to prevent the water vapor from falling on the equipment or green plants around the cooling tower 40, thereby avoiding corrosion of the surrounding equipment and damage to the green plants.

[0030] A top plate 15 is provided on the top of the side plate 10, and the top plate 15 and the side plate 10 form a barrel shape. The top plate 15 can prevent water vapor from rising and scattering around the cooling tower, thereby avoiding affecting the surrounding environment of the cooling tower.

[0031] As a specific implementation manner, the bottom end of the transmission channel is located at the bottom of the cooling tower 40 , thereby preventing water vapor from diffusing from the bottom of the cooling tower 40 .

[0032] In this practical embodiment, the treatment system can bring economic benefits in terms of environmental protection and water conservation. The comprehensive economic benefit considerations are as follows.

[0033] 1. Environmental benefits:

[0034] The present invention can change the corrosion of the colored steel tiles around the factory building by the free escape of water vapor from the original cooling tower, and reduce the maintenance cost by 137,800 yuan. Color steel tile maintenance cost = spray-painted colored steel tile area * unit price + construction cost = 1,500 square meters * 25 yuan / square meter + 8,400 yuan = 45,900 yuan. Update once every six months. The annual maintenance cost is 91,800 yuan. After the implementation of this plan, it is replaced once every two years, and the cost savings are 45,900*3 = 137,700 yuan.

[0035] 2. Water-saving benefits:

[0036] In this embodiment, the equipment used for processing steam condensate in the production line is one DFNDP-200 cooling tower and three square countercurrent FRP cooling towers. The actual production water treatment capacity is 168 tons / h, and the annual production time is 300 days*24 hours=7200 hours.

[0037] According to the statistical data analysis in the actual production process, after adopting the technical solution of the present invention, the water vapor recovery rate of the cooling tower is significantly improved by 4-10%. The recovered water vapor is collected in the condensate water pool for cleaning dust and ash in the front-end process, which can replace the same amount of industrial water for production.

[0038] Specific benefit calculation: Annual cooling water treatment volume = 168*7200 = 1209600 tons. Calculated based on 8% of the evaporation steam-water loss (same water replacement), the production water saved = 1209600*0.04 = 48384 tons. The current production water settlement price is 2.69 yuan / ton (tax included), and the calculated cost savings = 48384*2.69 = 130152.96 yuan.

[0039] 3. Construction cost of the scheme of the present invention:

[0040] Side panels*4+top*1+plywood*2+drain pipes*2+side suction fans*2+filters+circulating water pipes*2+construction and installation costs=2000+500+500+4000*2+100+200+1000=12300 yuan;

[0041] Annual electricity cost of side suction fan: 2 kW / h*24 hours / day*300 days / year*0.5 yuan / kWh=7200 yuan;

[0042] 4. Total economic benefits: 137700+130152.96-12300-7200=248352.96 yuan.

Claims

1. A cooling water side stream treatment system for a production line for preparing potassium chloride from sintering dust removal ash, characterized in that: It comprises a side plate (10) arranged around an air outlet of a cooling tower (40); A clamping plate (11) is provided inside the side plate (10), and a water vapor transmission channel is formed between the clamping plate (11) and the side plate (10); A side suction fan (13) is installed on the clamping plate (11), and the side suction fan (13) is used to suck the water vapor discharged from the air outlet into the transmission channel; The bottom of the transmission channel is in communication with a cooling water pool (20).

2. A cooling water side stream treatment system for a sintering dust removal ash production line for preparing potassium chloride as claimed in claim 1, characterized in that: A filter (14) is installed in the transmission channel.

3. A cooling water side stream treatment system for a sintering dust removal ash production line for preparing potassium chloride as claimed in claim 2, characterized in that: A blocking plate is provided at the bottom of the transmission channel, the blocking plate is connected to a drainage pipe (12), and the other end of the drainage pipe (12) is connected to a cooling water pool (20).

4. A cooling water side stream treatment system for a sintering dust removal ash production line for preparing potassium chloride as claimed in claim 2, characterized in that: The water outlet end of the drainage pipe (12) is located below the liquid surface in the cooling water pool (20).

5. A cooling water side stream treatment system for a sintering dust removal ash production line for preparing potassium chloride as described in any one of claims 2 to 4, characterized in that: A top plate (15) is arranged on the top of the side plate (10), and the top plate (15) and the side plate (10) form a barrel shape.

6. A cooling water side stream treatment system for a sintering dust removal ash production line for preparing potassium chloride as claimed in claim 5, characterized in that: The bottom end of the transmission channel is located at the bottom of the cooling tower (40).