Enterprise risk prediction method and system based on big data

By building a supplier risk assessment model and risk prediction model, combining weather and logistics information, the problem of data integration difficulties in enterprises in the risk prediction process is solved, and accurate prediction and reduction of supply chain risks is achieved.

CN118886715AInactive Publication Date: 2024-11-01WEIHAI ZHONGDA INFORMATION TECH CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410942050.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the process of risk prediction, it is difficult for enterprises to integrate data due to the complexity of supply chains, making it difficult for them to accurately predict risks.

Method used

By obtaining supplier information and enterprise needs, a supplier risk assessment model is built, combining weather monitoring and logistics risk indicators, a risk prediction model is built, supply chain risks is predicted, and threshold alarms are set in the risk detection system.

Benefits of technology

It reduces the risks of the enterprise supply chain, improves the accuracy of risk prediction, and facilitates enterprises to take countermeasures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886715A_ABST
    Figure CN118886715A_ABST
Patent Text Reader

Abstract

The invention discloses an enterprise risk prediction method and system based on big data, and relates to the technical field of data analysis, and the method comprises the steps: obtaining the related supplier information of an enterprise supply chain and the demands of an enterprise for purchasing goods, limiting the conditions of suppliers, and constructing a supplier risk assessment model, according to the method, the supplier combination most suitable for the enterprise supply chain is selected, the risk of the enterprise supply chain is reduced, the acquired supplier risk assessment index, logistics risk index and cargo storage condition index are analyzed and fused, and the risk of the enterprise supply chain is predicted by establishing a prediction risk model. The method has the advantages that condition limitation is carried out on the suppliers, the supplier risk assessment model is established, the enterprise suppliers are selected, risks existing in an enterprise supply chain are reduced, logistics and enterprise storage conditions are analyzed, and the predicted risk value is more accurate through the risk prediction model.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data analysis technology, and in particular to an enterprise risk prediction method and system based on big data. Background Art

[0002] Data analysis refers to the collection, processing, conversion and mining of data to discover patterns, trends and correlations in the data and provide decision-making basis and guidance for enterprises and organizations. Data analysis can help enterprises discover customer needs, optimize product design, improve sales efficiency, reduce costs, and improve operational efficiency.

[0003] With the rapid development of big data, data analysis is involved in providing support and guidance in decision-making in all walks of life. In the process of predicting corporate risks, data analysis technology has also become important. However, in the prediction of corporate risks, due to the increasing complexity of the supply chain, companies may face data from multiple different sources, which may be difficult to integrate, leading to difficulties in the risk prediction process. Therefore, how to predict the risks of enterprises based on the influence of big data is a technical problem that needs to be solved in this field. Based on this, this solution proposes a method and system for predicting corporate risks based on big data. Summary of the invention

[0004] In order to solve the above technical problems, a method and system for enterprise risk prediction based on big data are provided. This technical solution selects the supplier combination that best suits the enterprise supply chain by restricting the conditions of suppliers and building a supplier risk assessment model, thereby reducing the risk of the enterprise supply chain. At the same time, the analysis and integration of supplier risk assessment indicators, logistics risk indicators and cargo storage status indicators can be used to predict the enterprise supply chain risk through a predictive risk model.

[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:

[0006] Obtain supplier information related to the enterprise's supply chain and the enterprise's demand for purchased goods;

[0007] Based on the enterprise demand set and supplier information, select the supplier group that best meets the enterprise requirements and obtain supplier risk assessment indicators;

[0008] Connect the enterprise supply chain system with the weather monitoring platform to obtain future weather conditions in real time;

[0009] Based on the types of logistics transportation provided by the selected suppliers, evaluate the impact of future weather conditions on different types of logistics;

[0010] Analyze logistics risk indicators based on future weather conditions and the impact of future weather conditions on different types of logistics;

[0011] Based on the enterprise warehouse data, calculate the warehouse cargo storage turnover rate and determine the cargo storage status indicators;

[0012] Based on supplier risk assessment indicators, logistics risk indicators and cargo storage status indicators, a risk prediction model is constructed to predict the probability of supply chain risks.

[0013] Establish a supply chain risk detection system. When the predicted risk probability is greater than the threshold, the system will issue an alarm to facilitate the company to take countermeasures.

[0014] Preferably, based on the enterprise demand set and supplier information, a supplier group that best meets the enterprise requirements is selected, and supplier risk assessment indicators are obtained, including:

[0015] The obtained enterprise requirements are recorded as a set D, where D = {d1...d b ...d n};

[0016] The set of suppliers that can meet the needs of the enterprise is recorded as set V, where V = {v1...v i ...v m};

[0017] Establish restrictions on selecting suppliers based on the company's needs and supplier information;

[0018] Generate several supplier combinations based on the supplier's restrictions;

[0019] Based on the needs of the enterprise, extract the evaluation factors that can affect the enterprise's supply chain risk from suppliers;

[0020] Extract and generate several evaluation factors that can affect the enterprise supply chain risk from supplier combinations;

[0021] Based on each supplier's historical data, score the assessment factors that can affect the company's supply chain risk;

[0022] Assign weights to the assessment factors that can affect the company's supply chain risk based on the importance the company places on each demand;

[0023] Input the evaluation factors that can affect the enterprise supply chain risk in each supplier combination generated under the restriction conditions into the supplier risk assessment model to obtain the risk assessment value of each group of suppliers;

[0024] Select the supplier group with the lowest risk assessment value as the supplier, and use the risk assessment value of this group of suppliers as the supplier risk assessment indicator;

[0025] The expression of the restriction condition for selecting a supplier is:

[0026]

[0027] Where V i is the demand for goods provided by the i-th supplier, m is the total number of suppliers that can meet the specific needs of the enterprise, and D 需 is the total amount of demand for this type of enterprise, V imax Provide the maximum quantity of this demand to the i-th supplier;

[0028] The expression of the supplier risk assessment model is:

[0029]

[0030] Where K is the supplier risk assessment value, a is the total number of assessment factors, O b is the score of the bth evaluation factor, W b is the weight of the bth evaluation factor.

[0031] Preferably, according to the future weather conditions and the impact of the future weather conditions on different types of logistics, the logistics risk indicators are analyzed specifically including:

[0032] Based on the types of logistics transportation provided by suppliers, it can be divided into railway, aviation, maritime logistics and mixed logistics, denoted as set N;

[0033] Based on the impact of future weather on different logistics, determine the risk factors of different logistics under specific weather conditions;

[0034] Scoring future weather based on historical data on the impact of different weather conditions on various logistics;

[0035] Based on the risk factor and weather score of logistics, the scores of different logistics in various weather conditions are calculated through the logistics status calculation formula and recorded as logistics risk indicators;

[0036] The logistics status calculation formula is:

[0037]

[0038] Where U is the logistics score, N j is the score of the j-th specific weather, R j is the risk factor of the jth type of logistics under specific weather conditions, and P is the score of other influencing factors.

[0039] Preferably, based on the enterprise warehouse data, the warehouse cargo storage turnover rate is calculated, and the cargo storage status index is determined to specifically include:

[0040] Set a fixed time period and obtain the purchase and shipment quantities at each time point in the period;

[0041] Calculate the warehouse's cargo storage turnover rate and record it as the cargo storage status indicator;

[0042] The calculation formula of the cargo storage turnover rate is:

[0043]

[0044] Where H is the cargo storage turnover rate, L 入 is the purchase quantity at the hth time point, L 出 is the purchase quantity at the hth time point, N 存 is the inventory at the hth time point, and S is the total number of time points.

[0045] Preferably, a risk prediction model is constructed based on supplier risk assessment indicators, logistics risk indicators and cargo storage status indicators to predict the probability of supply chain risks, specifically including:

[0046] The supplier risk assessment index, logistics risk index and cargo storage status index are standardized to obtain the supplier risk assessment standardized index, logistics risk standardized index and cargo storage status standardized index;

[0047] Establish a risk prediction model to predict the risk probability of the enterprise supply chain;

[0048] Based on the risk value calculated by the risk prediction model, predict the risks that enterprises face in the supply chain;

[0049] Wherein, the risk prediction model expression is:

[0050] Y=β0+β1K+β2U+β3H

[0051] Where Y is the predicted supply chain risk value, K is the supplier risk assessment index, U is the logistics risk index, H is the cargo storage status index, and β0, β1, β2, and β3 are all model coefficients.

[0052] Furthermore, a big data-based enterprise risk prediction system is proposed, which is used to implement the above-mentioned big data-based enterprise risk prediction method, including:

[0053] An information collection module, which is used to obtain supplier information related to the enterprise supply chain and the enterprise's demand for purchased goods;

[0054] Supplier risk assessment module: the information collection module is used to select the supplier group that best meets the enterprise's requirements based on the enterprise's demand set and supplier information, and conduct risk assessment on the supplier group;

[0055] A logistics risk assessment module, which is used to analyze logistics risk indicators based on future weather conditions and the impact of weather on logistics;

[0056] A storage status module, which is used to calculate the warehouse cargo storage turnover rate and determine the cargo storage status index;

[0057] A supply chain risk prediction module, which is used to build a risk prediction model to predict the probability of supply chain risks;

[0058] The risk detection system is used to generate an alarm when the predicted risk probability is greater than a threshold value, so that the enterprise can take corresponding measures.

[0059] Optional, supplier risk assessment modules include:

[0060] A set construction unit, the set construction unit is used to form a set by combining the acquired enterprise requirements and suppliers that can meet the enterprise requirements;

[0061] A restriction condition unit, wherein the restriction condition unit is used to establish restriction conditions for selecting suppliers based on the enterprise's needs and supplier information;

[0062] A supplier unit to be selected, wherein the supplier unit to be selected is used to generate a plurality of supplier combinations based on the supplier restriction conditions;

[0063] An evaluation factor extraction unit, the evaluation factor extraction unit is used to extract evaluation factors that can affect the enterprise supply chain risk from generating a plurality of supplier combinations;

[0064] An assessment factor scoring unit, wherein the assessment factor scoring unit is used to score assessment factors that can affect the enterprise supply chain risk;

[0065] An assessment factor weighting unit, wherein the assessment factor weighting unit is used to assign weights to assessment factors that can affect the enterprise supply chain risk;

[0066] A model unit, wherein the model unit is used to construct a supplier risk assessment model;

[0067] A calculation unit, wherein the calculation unit is used to input the evaluation factors that can affect the enterprise supply chain risk into the supplier risk evaluation model to obtain each group of supplier risk evaluation values;

[0068] The indicator unit is used to select the supplier group assessment value with the lowest risk assessment value as the supplier risk assessment indicator.

[0069] Optional logistics risk assessment modules include:

[0070] A weather monitoring unit, wherein the weather monitoring unit is used to obtain future weather conditions in real time;

[0071] A set construction unit, the set construction unit is used to construct the logistics transportation types provided by the supplier into a set;

[0072] A risk coefficient unit, wherein the risk coefficient unit is used to determine the risk coefficients of different logistics under specific weather conditions according to the degree of impact of future weather on different logistics;

[0073] A scoring unit, the scoring unit is used to score future weather based on historical data of the impact of different weather conditions on various logistics;

[0074] The calculation unit is used to calculate the scores of different logistics in various weather conditions through a logistics status calculation formula, and record them as logistics risk indicators.

[0075] Optionally, the storage status module includes:

[0076] Incoming and outgoing goods unit, which is used to obtain the incoming and outgoing goods volume at each time node of a fixed time period;

[0077] A calculation unit is used to calculate the cargo storage turnover rate of the warehouse as a cargo storage status indicator.

[0078] Optional supply chain risk prediction modules include:

[0079] An indicator processing unit, which is used to standardize the indicators obtained by the supplier risk assessment module, the logistics risk assessment module, and the storage status module;

[0080] A model unit, wherein the model unit is used to establish a risk prediction model to predict the risk probability of the enterprise supply chain;

[0081] A risk prediction unit is used to predict the risks existing in the supply chain of an enterprise according to a risk prediction model.

[0082] Compared with the prior art, the present invention has the following beneficial effects:

[0083] The present invention proposes an enterprise risk prediction scheme based on big data. By imposing conditional restrictions on suppliers and establishing a supplier risk assessment model, the most suitable supplier for the enterprise is selected, thereby reducing the risk in the enterprise supply chain. At the same time, the logistics and enterprise storage conditions are analyzed, and the predicted risk value is made more accurate through the risk prediction model. BRIEF DESCRIPTION OF THE DRAWINGS

[0084] Figure 1 A flow chart of the enterprise risk prediction method of big data proposed by the present invention;

[0085] Figure 2 A flow chart of the method for obtaining the supplier group risk index in the present invention;

[0086] Figure 3 It is a flow chart of the method for analyzing logistics risk indicators in the present invention;

[0087] Figure 4 A flow chart of the method for obtaining cargo storage status indicators in the present invention;

[0088] Figure 5 A flow chart of a method for constructing a risk prediction model and predicting supply chain risks in the present invention;

[0089] Figure 6 This is a structural block diagram of the enterprise risk prediction system for big data proposed by the present invention. DETAILED DESCRIPTION

[0090] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.

[0091] Reference Figure 1 As shown in the figure, the enterprise risk prediction method based on big data includes:

[0092] Obtain supplier information related to the enterprise's supply chain and the enterprise's demand for purchased goods;

[0093] Based on the enterprise demand set and supplier information, select the supplier group that best meets the enterprise requirements and obtain supplier risk assessment indicators;

[0094] Connect the enterprise supply chain system with the weather monitoring platform to obtain future weather conditions in real time;

[0095] Based on the types of logistics transportation provided by the selected suppliers, evaluate the impact of future weather conditions on different types of logistics;

[0096] Analyze logistics risk indicators based on future weather conditions and the impact of future weather conditions on different types of logistics;

[0097] Based on the enterprise warehouse data, calculate the warehouse cargo storage turnover rate and determine the cargo storage status indicators;

[0098] Based on supplier risk assessment indicators, logistics risk indicators and cargo storage status indicators, a risk prediction model is constructed to predict the probability of supply chain risks.

[0099] Establish a supply chain risk detection system. When the predicted risk probability is greater than the threshold, the system will issue an alarm to facilitate the company to take countermeasures.

[0100] This solution obtains the company's supplier information and needs, selects suppliers through risk assessment, and obtains the supplier's risk assessment indicators; connects to the weather monitoring platform to obtain real-time weather information, evaluates the impact of weather on different types of logistics, analyzes logistics risk indicators and warehousing risk indicators, and establishes a risk prediction model to predict the risks in the company's supply chain.

[0101] Reference Figure 2 As shown, in some embodiments, based on the enterprise demand set and supplier information, a supplier group that best meets the enterprise requirements is selected, and the supplier risk assessment index is obtained, specifically including:

[0102] The obtained enterprise requirements are recorded as a set D, where D = {d1...d b ...d n};

[0103] The set of suppliers that can meet the needs of the enterprise is recorded as set V, where V = {v1...v i ...v m};

[0104] Establish restrictions on selecting suppliers based on the company's needs and supplier information;

[0105] Generate several supplier combinations based on the supplier's restrictions;

[0106] Based on the needs of the enterprise, extract the evaluation factors that can affect the enterprise's supply chain risk from suppliers;

[0107] Extract and generate several evaluation factors that can affect the enterprise supply chain risk from supplier combinations;

[0108] Based on each supplier's historical data, score the assessment factors that can affect the company's supply chain risk;

[0109] Assign weights to the assessment factors that can affect the company's supply chain risk based on the importance the company places on each demand;

[0110] Input the evaluation factors that can affect the enterprise supply chain risk in each supplier combination generated under the restriction conditions into the supplier risk assessment model to obtain the risk assessment value of each group of suppliers;

[0111] Select the supplier group with the lowest risk assessment value as the supplier, and use the risk assessment value of this group of suppliers as the supplier risk assessment indicator;

[0112] The expression of the restriction condition for selecting a supplier is:

[0113]

[0114] Where V i is the demand for goods provided by the i-th supplier, m is the total number of suppliers that can meet the specific needs of the enterprise, and D 需 is the total amount of demand for this type of enterprise, V imax Provide the maximum quantity of this demand to the i-th supplier;

[0115] The expression of the supplier risk assessment model is:

[0116]

[0117] Where K is the supplier risk assessment value, a is the total number of assessment factors, O b is the score of the bth evaluation factor, W b is the weight of the bth evaluation factor.

[0118] The enterprise demand in this solution can be the enterprise's demand for commodity types, commodity quality, commodity quantity, etc. And set supplier restrictions according to the enterprise's demand, so as to select suppliers that can meet the enterprise's demand.

[0119] Reference Figure 3 As shown, according to the future weather conditions and the impact of future weather conditions on different types of logistics, the logistics risk indicators analyzed specifically include:

[0120] Based on the types of logistics transportation provided by suppliers, it can be divided into railway, aviation, maritime logistics and mixed logistics, denoted as set N;

[0121] Based on the impact of future weather on different logistics, determine the risk factors of different logistics under specific weather conditions;

[0122] Scoring future weather based on historical data on the impact of different weather conditions on various logistics;

[0123] Based on the risk factor and weather score of logistics, the scores of different logistics in various weather conditions are calculated through the logistics status calculation formula and recorded as logistics risk indicators;

[0124] The logistics status calculation formula is:

[0125]

[0126] Where U is the logistics score, N j is the score of the j-th specific weather, R j is the risk factor of the jth type of logistics under specific weather conditions, and P is the score of other influencing factors.

[0127] This solution analyzes the types of railway, aviation, sea and mixed logistics provided by suppliers, combines the impact of future weather on various logistics and historical data scores, and calculates the risk index of each logistics under different weather conditions. This solution can help companies identify the risks that different logistics options may face in supply chain management, and formulate corresponding response strategies and measures accordingly.

[0128] Reference Figure 4 As shown, the calculation of warehouse cargo storage turnover rate based on enterprise warehouse data and determination of cargo storage status indicators specifically include:

[0129] Set a fixed time period and obtain the purchase and shipment quantities at each time point in the period;

[0130] Calculate the warehouse's cargo storage turnover rate and record it as the cargo storage status indicator;

[0131] The calculation formula of the cargo storage turnover rate is:

[0132]

[0133] Where H is the cargo storage turnover rate, L 入 is the purchase quantity at the hth time point, L 出 is the purchase quantity at the hth time point, N 存 is the inventory at the hth time point, and S is the total number of time points.

[0134] The greater the cargo storage turnover rate calculated in the above process, the more effectively the company utilizes the warehouse inventory within the set fixed time period, reduces the company's inventory costs, optimizes inventory management, and reduces the risk of unsalable or expired inventory.

[0135] Reference Figure 5 As shown, the risk prediction model is constructed based on the supplier risk assessment index, logistics risk index and cargo storage status index to predict the probability of supply chain risks, which specifically includes:

[0136] The supplier risk assessment index, logistics risk index and cargo storage status index are standardized to obtain the supplier risk assessment standardized index, logistics risk standardized index and cargo storage status standardized index;

[0137] Establish a risk prediction model to predict the risk probability of the enterprise supply chain;

[0138] Based on the risk value calculated by the risk prediction model, predict the risks that enterprises face in the supply chain;

[0139] Wherein, the risk prediction model expression is:

[0140] Y=β0+β1K+β2U+β3H

[0141] Where Y is the predicted supply chain risk value, K is the supplier risk assessment index, U is the logistics risk index, H is the cargo storage status index, and β0, β1, β2, and β3 are all model coefficients.

[0142] The model used in this solution is a multivariate linear model, which can simultaneously consider the impact of multiple factors on supply chain risks, help companies make more objective and scientific decisions, and reduce the impact of subjective factors. Compared with other complex models, this model has lower costs during implementation and can provide higher prediction accuracy after a lot of training.

[0143] For further information, see Figure 6 As shown, the present solution is based on the same inventive concept of the enterprise risk prediction method based on big data, and also proposes an enterprise risk prediction system based on big data, including:

[0144] An information collection module, which is used to obtain supplier information related to the enterprise supply chain and the enterprise's demand for purchased goods;

[0145] Supplier risk assessment module: the information collection module is used to select the supplier group that best meets the enterprise's requirements based on the enterprise's demand set and supplier information, and conduct risk assessment on the supplier group;

[0146] A logistics risk assessment module, which is used to analyze logistics risk indicators based on future weather conditions and the impact of weather on logistics;

[0147] A storage status module, which is used to calculate the warehouse cargo storage turnover rate and determine the cargo storage status index;

[0148] A supply chain risk prediction module, which is used to build a risk prediction model to predict the probability of supply chain risks;

[0149] The risk detection system is used to generate an alarm when the predicted risk probability is greater than a threshold value, so that the enterprise can take corresponding measures.

[0150] Optionally, the supplier risk assessment module includes:

[0151] A set construction unit, the set construction unit is used to form a set by combining the acquired enterprise requirements and suppliers that can meet the enterprise requirements;

[0152] A restriction condition unit, wherein the restriction condition unit is used to establish restriction conditions for selecting suppliers based on the enterprise's needs and supplier information;

[0153] A supplier unit to be selected, wherein the supplier unit to be selected is used to generate a plurality of supplier combinations based on the supplier restriction conditions;

[0154] An evaluation factor extraction unit, the evaluation factor extraction unit is used to extract evaluation factors that can affect the enterprise supply chain risk from generating a plurality of supplier combinations;

[0155] An assessment factor scoring unit, wherein the assessment factor scoring unit is used to score assessment factors that can affect the enterprise supply chain risk;

[0156] An assessment factor weighting unit, wherein the assessment factor weighting unit is used to assign weights to assessment factors that can affect the enterprise supply chain risk;

[0157] A model unit, wherein the model unit is used to construct a supplier risk assessment model;

[0158] A calculation unit, wherein the calculation unit is used to input the evaluation factors that can affect the enterprise supply chain risk into the supplier risk evaluation model to obtain each group of supplier risk evaluation values;

[0159] The indicator unit is used to select the supplier group assessment value with the lowest risk assessment value as the supplier risk assessment indicator.

[0160] Optionally, the logistics risk assessment module includes:

[0161] A weather monitoring unit, wherein the weather monitoring unit is used to obtain future weather conditions in real time;

[0162] A set construction unit, the set construction unit is used to construct the logistics transportation types provided by the supplier into a set;

[0163] A risk coefficient unit, wherein the risk coefficient unit is used to determine the risk coefficients of different logistics under specific weather conditions according to the degree of impact of future weather on different logistics;

[0164] A scoring unit, the scoring unit is used to score future weather based on historical data of the impact of different weather conditions on various logistics;

[0165] The calculation unit is used to calculate the scores of different logistics in various weather conditions through a logistics status calculation formula, and record them as logistics risk indicators.

[0166] Optionally, the storage status module includes:

[0167] Incoming and outgoing goods unit, which is used to obtain the incoming and outgoing goods volume at each time node of a fixed time period;

[0168] A calculation unit is used to calculate the cargo storage turnover rate of the warehouse as a cargo storage status indicator.

[0169] Optionally, the supply chain risk prediction module includes:

[0170] An indicator processing unit, which is used to standardize the indicators obtained by the supplier risk assessment module, the logistics risk assessment module, and the storage status module;

[0171] A model unit, wherein the model unit is used to establish a risk prediction model to predict the risk probability of the enterprise supply chain;

[0172] A risk prediction unit is used to predict the risks existing in the supply chain of an enterprise according to a risk prediction model.

[0173] The working process of the above enterprise risk prediction system based on big data is as follows:

[0174] Step 1: The information collection module obtains supplier information related to the enterprise supply chain and the enterprise's demand for purchased goods;

[0175] Step 2: The set construction unit forms a set of the acquired enterprise requirements and suppliers that can meet the enterprise requirements;

[0176] Step 3: The constraint unit establishes constraint conditions for selecting suppliers based on the enterprise's needs and supplier information;

[0177] Step 4: The supplier selection unit generates several supplier combinations based on the supplier restriction conditions;

[0178] Step 5: The evaluation factor extraction unit extracts and generates evaluation factors of several supplier combinations that can affect the enterprise supply chain risk;

[0179] Step 6: The assessment factor scoring unit scores the assessment factors that can affect the enterprise's supply chain risk;

[0180] Step 7: The assessment factor weighting unit assigns weights to the assessment factors that can affect the enterprise supply chain risk;

[0181] Step 8: The model unit builds a supplier risk assessment model;

[0182] Step 9: The calculation unit inputs the evaluation factors that can affect the enterprise supply chain risk into the supplier risk assessment model to obtain the risk assessment value of each group of suppliers;

[0183] Step 10: The indicator unit selects the supplier group assessment value with the lowest risk assessment value as the supplier risk assessment indicator.

[0184] Step 11: The weather monitoring unit obtains future weather conditions in real time;

[0185] Step 12: The set construction unit constructs the logistics transportation types provided by the supplier into a set;

[0186] Step 13: The risk coefficient unit determines the risk coefficients of different logistics under specific weather conditions according to the impact of future weather on different logistics;

[0187] Step 14: The scoring unit scores future weather based on the historical impact data of different weather conditions on various logistics;

[0188] Step 15: The calculation unit calculates the scores of different logistics under various weather conditions through the logistics status calculation formula, and records them as logistics risk indicators;

[0189] Step 16: The inbound and outbound cargo units obtain the inbound and outbound cargo quantities at each time point in a fixed time period;

[0190] Step 17: The calculation unit calculates the cargo storage turnover rate of the warehouse and records it as the cargo storage status index;

[0191] Step 18: The indicator processing unit standardizes the indicators obtained by the supplier risk assessment module, the logistics risk assessment module, and the storage status module;

[0192] Step 19: The model unit is used to establish a risk prediction model to predict the risk probability of the enterprise supply chain;

[0193] Step 20: The risk prediction unit predicts the risks of the enterprise in the supply chain based on the risk prediction model;

[0194] Step 21: When the predicted risk probability is greater than the threshold, the risk detection system will issue an alarm to facilitate the enterprise to take countermeasures.

[0195] In summary, the advantages of the present invention are: conditional restrictions on suppliers are established to establish a supplier risk assessment model to select enterprise suppliers, thereby reducing the risks in the enterprise supply chain, analyzing the logistics and enterprise storage conditions, and making the predicted risk value more accurate through the risk prediction model.

[0196] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. The enterprise risk prediction method based on big data is characterized by: include: Obtain supplier information related to the enterprise's supply chain and the enterprise's demand for purchased goods; Based on the enterprise demand set and supplier information, select the supplier group that best meets the enterprise requirements and obtain supplier risk assessment indicators; Connect the enterprise supply chain system with the weather monitoring platform to obtain future weather conditions in real time; Based on the types of logistics transportation provided by the selected suppliers, evaluate the impact of future weather conditions on different types of logistics; Analyze logistics risk indicators based on future weather conditions and the impact of future weather conditions on different types of logistics; Based on the enterprise warehouse data, calculate the warehouse cargo storage turnover rate and determine the cargo storage status indicators; Based on supplier risk assessment indicators, logistics risk indicators and cargo storage status indicators, a risk prediction model is constructed to predict the probability of supply chain risks. Establish a supply chain risk detection system. When the predicted risk probability is greater than the threshold, the system will issue an alarm to facilitate the company to take countermeasures.

2. The enterprise risk prediction method based on big data according to claim 1 is characterized in that: The method of selecting the supplier group that best meets the enterprise's requirements based on the enterprise's demand set and supplier information and obtaining the supplier risk assessment indicators specifically includes: The obtained enterprise requirements are recorded as a set D, where D = {d1...d b ...d n }; The set of suppliers that can meet the needs of the enterprise is recorded as set V, where V = {v1...v i ...v m }; Establish restrictions on selecting suppliers based on the company's needs and supplier information; Generate several supplier combinations based on the supplier's restrictions; Based on the needs of the enterprise, extract the evaluation factors that can affect the enterprise's supply chain risk from suppliers; Extract and generate several evaluation factors that can affect the enterprise supply chain risk from supplier combinations; Based on each supplier's historical data, score the assessment factors that can affect the company's supply chain risk; Assign weights to the assessment factors that can affect the company's supply chain risk based on the importance the company places on each demand; Input the evaluation factors that can affect the enterprise supply chain risk in each supplier combination generated under the restriction conditions into the supplier risk assessment model to obtain the risk assessment value of each group of suppliers; Select the supplier group with the lowest risk assessment value as the supplier, and use the risk assessment value of this group of suppliers as the supplier risk assessment indicator; The expression of the restriction condition for selecting a supplier is: In the formula, v i is the demand for goods provided by the i-th supplier, m is the total number of suppliers that can meet the specific needs of the enterprise, and d b is the total amount of demand for this type of enterprise, v imax Provide the maximum quantity of this demand to the i-th supplier; The expression of the supplier risk assessment model is: Where K is the supplier risk assessment value, a is the total number of assessment factors, O z is the score of the zth evaluation factor, W z is the weight of the zth evaluation factor.

3. The enterprise risk prediction method based on big data according to claim 1 is characterized in that: The analysis of logistics risk indicators based on future weather conditions and the impact of future weather conditions on different types of logistics specifically includes: Based on the types of logistics transportation provided by suppliers, it can be divided into railway, aviation, maritime logistics and mixed logistics, denoted as set N; Based on the impact of future weather on different logistics, determine the risk factors of different logistics under specific weather conditions; Scoring future weather based on historical data on the impact of different weather conditions on various logistics; Based on the risk factor and weather score of logistics, the scores of different logistics in various weather conditions are calculated through the logistics status calculation formula and recorded as logistics risk indicators; The logistics status calculation formula is: In the formula, U is the logistics score, C j is the score of the j-th specific weather, R j is the risk factor of the jth type of logistics under specific weather conditions, and P is the score of other influencing factors.

4. The enterprise risk prediction method based on big data according to claim 1 is characterized in that: The calculation of the warehouse cargo storage turnover rate based on the enterprise warehouse data and the determination of the cargo storage status index specifically include: Set a fixed time period and obtain the purchase and shipment quantities at each time point in the period; Calculate the warehouse's cargo storage turnover rate and record it as the cargo storage status indicator; The calculation formula of the cargo storage turnover rate is: Where H is the cargo storage turnover rate, L 入 is the purchase quantity at the hth time point, L 出 is the purchase quantity at the hth time point, E 存 is the inventory at the hth time point, and S is the total number of time points.

5. The enterprise risk prediction method based on big data according to claims 1-4 is characterized in that: The risk prediction model is constructed based on the supplier risk assessment index, logistics risk index and cargo storage status index to predict the probability of supply chain risk, which specifically includes: The supplier risk assessment index, logistics risk index and cargo storage status index are standardized to obtain the supplier risk assessment standardized index, logistics risk standardized index and cargo storage status standardized index; Establish a risk prediction model to predict the risk probability of the enterprise supply chain; Based on the risk value calculated by the risk prediction model, predict the risks that enterprises face in their supply chain; Wherein, the risk prediction model expression is: Y=β0+β1K+β2U+β3H Where Y is the predicted supply chain risk value, K is the supplier risk assessment index, U is the logistics risk index, H is the cargo storage status index, and β0, β1, β2, and β3 are all model coefficients.

6. Enterprise risk prediction system based on big data, characterized by: A method for implementing a big data-based enterprise risk prediction system as claimed in any one of claims 1 to 5, comprising: An information collection module, which is used to obtain supplier information related to the enterprise supply chain and the enterprise's demand for purchased goods; Supplier risk assessment module: the information collection module is used to select the supplier group that best meets the enterprise's requirements based on the enterprise's demand set and supplier information, and conduct risk assessment on the supplier group; A logistics risk assessment module, which is used to analyze logistics risk indicators based on future weather conditions and the impact of weather on logistics; A storage status module, which is used to calculate the warehouse cargo storage turnover rate and determine the cargo storage status index; A supply chain risk prediction module, which is used to build a risk prediction model to predict the probability of supply chain risks; The risk detection system is used to generate an alarm when the predicted risk probability is greater than a threshold value, so that the enterprise can take corresponding measures.

7. The enterprise risk prediction system based on big data according to claim 6 is characterized in that: The supplier risk assessment module includes: A set construction unit, the set construction unit is used to form a set by combining the acquired enterprise requirements and suppliers that can meet the enterprise requirements; A restriction condition unit, wherein the restriction condition unit is used to establish restriction conditions for selecting suppliers based on the enterprise's needs and supplier information; A supplier unit to be selected, wherein the supplier unit to be selected is used to generate a plurality of supplier combinations based on the supplier restriction conditions; An evaluation factor extraction unit, the evaluation factor extraction unit is used to extract evaluation factors that can affect the enterprise supply chain risk from generating a plurality of supplier combinations; An assessment factor scoring unit, wherein the assessment factor scoring unit is used to score assessment factors that can affect the enterprise supply chain risk; An assessment factor weighting unit, wherein the assessment factor weighting unit is used to assign weights to assessment factors that can affect the enterprise supply chain risk; A model unit, wherein the model unit is used to construct a supplier risk assessment model; A calculation unit, wherein the calculation unit is used to input the evaluation factors that can affect the enterprise supply chain risk into the supplier risk evaluation model to obtain each group of supplier risk evaluation values; The indicator unit is used to select the supplier group assessment value with the lowest risk assessment value as the supplier risk assessment indicator.

8. The enterprise risk prediction system based on big data according to claim 6 is characterized in that: The logistics risk assessment module includes: A weather monitoring unit, wherein the weather monitoring unit is used to obtain future weather conditions in real time; A set construction unit, the set construction unit is used to construct the logistics transportation types provided by the supplier into a set; A risk coefficient unit, wherein the risk coefficient unit is used to determine the risk coefficients of different logistics under specific weather conditions according to the degree of impact of future weather on different logistics; A scoring unit, the scoring unit is used to score future weather based on historical data of the impact of different weather conditions on various logistics; The calculation unit is used to calculate the scores of different logistics in various weather conditions through a logistics status calculation formula, and record them as logistics risk indicators.

9. The enterprise risk prediction system based on big data according to claim 6 is characterized in that: The storage status module includes: Incoming and outgoing goods unit, which is used to obtain the incoming and outgoing goods volume at each time node of a fixed time period; A calculation unit is used to calculate the cargo storage turnover rate of the warehouse as a cargo storage status indicator.

10. The enterprise risk prediction system based on big data according to claim 6, characterized in that: The supply chain risk prediction module includes: An indicator processing unit, which is used to standardize the indicators obtained by the supplier risk assessment module, the logistics risk assessment module, and the storage status module; A model unit, wherein the model unit is used to establish a risk prediction model to predict the risk probability of the enterprise supply chain; A risk prediction unit is used to predict the risks existing in the supply chain of an enterprise according to a risk prediction model.

Citation Information

Cited By

  • Medicine supplier holographic monitoring method and system based on risk assessment

    CN119417240A

  • Holographic monitoring method and system for pharmaceutical suppliers based on risk assessment

    CN119417240B

  • Supply chain risk early warning system based on big data analysis

    CN120430627A