Substation limited space automatic fire extinguishing monitoring method and system based on 5G technology

By adopting an automatic fire extinguishing monitoring system based on 5G technology in substations, using the Internet of Things and encrypted data transmission, combining physical models and machine learning models for risk assessment, the problem of fire detection delay in traditional systems is solved, achieving more efficient and accurate The fire response improves the safety and reliability of the substation.

CN118890370AInactive Publication Date: 2024-11-01ZONGYANG COUNTY POWER SUPPLY CO OF STATE GRID ANHUI ELECTRIC POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411127133.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional substation monitoring systems have problems of delayed data transmission and insufficient coverage in fire detection and early warning, which leads to lagging response and difficulty in time to detect and deal with potential fire hazards, increasing the risk of equipment damage and power interruption.

Method used

Using an automatic fire extinguishing monitoring system based on 5G technology, the environment and device status data are collected in real time through the Internet of Things and sensors, and data transmission is carried out using AES encryption and 5G network, and risk assessment is combined with physical models and machine learning models to generate accurate response instructions and Notify relevant personnel.

Benefits of technology

It improves the efficiency and accuracy of fire monitoring response in the substation, reduces false alarms and missed alarms, reduces the risk of equipment failure, and improves overall safety and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118890370A_ABST
    Figure CN118890370A_ABST
Patent Text Reader

Abstract

The invention discloses a transformer substation limited space automatic fire extinguishing monitoring method and system based on the 5G technology, and relates to the technical field of power grid monitoring. When the system is operated, a data acquisition module carries out accurate data collection through the Internet of Things and a sensor to ensure comprehensive coverage of environmental data and equipment operation states; the data transmission module utilizes AES encryption and 5G network technologies to ensure safe transmission and quick response of data, the problems of data delay and insufficient coverage in a traditional system are solved, the central processing module improves the reliability and accuracy of the data through advanced preprocessing technology and CRC verification, and the data transmission efficiency is improved. The central detection module and the state evaluation module adopt a multi-level risk evaluation method, the physical state of the equipment and the operation state of the system are accurately judged, the fire-fighting equipment and the environment adjustment equipment are rapidly triggered, and related personnel are synchronously notified to inspect, so that the efficiency and the accuracy of dealing with emergencies are greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power grid monitoring technology, and specifically to a method and system for automatic fire extinguishing monitoring in a limited space of a substation based on 5G technology. Background Art

[0002] In the broad field of smart grid and power system automation, substations, as the core nodes of power transmission, play a vital role. Substations are not only responsible for the transformation and distribution of electric energy, but also need to ensure the stable operation and safety of the power system. However, the internal environment of substations is complex and there are many types of equipment. Especially substations operating in limited spaces face special security and management challenges.

[0003] In the current operation and management of substations, traditional fire protection and environmental monitoring methods have many shortcomings. They mainly rely on manual inspections and a single sensor alarm mechanism, which is not only inefficient, but also has delayed responses and cannot detect and deal with potential fire hazards in a timely manner. Traditional monitoring systems usually have problems such as data transmission delays and insufficient coverage, and cannot achieve all-round, real-time monitoring and control. When emergencies such as fires occur, due to the lag in information transmission and the delay in manual response, it is often difficult to take effective countermeasures in time, resulting in the spread of fire, equipment damage, and even large-scale power outages. These abnormal situations not only affect the stable operation of the power system, but may also pose a threat to the surrounding environment and personnel safety. In addition, the limitations of traditional systems in detection and early warning make it difficult to detect and solve potential problems in a timely manner, resulting in long-term operation of equipment in hidden dangers, increasing maintenance costs and accident risks. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention provides a method and system for automatic fire extinguishing monitoring in limited spaces of substations based on 5G technology, which solves the problems mentioned in the background technology.

[0005] To achieve the above purpose, the present invention is implemented through the following technical solutions: Automatic fire extinguishing monitoring system for limited space of substation based on 5G technology. The defects and shortcomings of the existing system not only increase the difficulty of substation management, but also may cause serious safety hazards. When an emergency such as a fire occurs, due to the lag in information transmission and the delay in manual response, it is often difficult to take effective countermeasures in time, resulting in the spread of fire, equipment damage, and even large-scale power outages. These abnormal conditions not only affect the stable operation of the power system, but may also pose a threat to the surrounding environment and personnel safety. In addition, the limitations of traditional systems in detection and early warning make it difficult to discover and solve potential problems in a timely manner, resulting in long-term operation of equipment in hidden dangers, increasing maintenance costs and accident risks. Therefore, it is urgent to introduce an intelligent monitoring and automatic fire extinguishing system based on 5G technology to improve the safety management level and response efficiency in the limited space of the substation. .

[0006] Preferably, the data acquisition module includes an information collection unit and an assembly unit;

[0007] The information collection unit collects real-time data, including environmental data and energy storage equipment operating status data, by connecting to the Internet of Things and sensors operating in the substation operating space;

[0008] Among them, environmental data includes temperature, humidity and air quality; equipment operation status data includes voltage, current and pressure;

[0009] The sensors include temperature sensors, humidity sensors, air quality sensors, voltage sensors, current sensors and pressure sensors, which collect environmental data and energy storage device operating status data to the assembly unit through the Internet of Things gateway;

[0010] The assembly unit performs timestamp marking, collection location marking and collection device unique identification marking on the collected data to form an operation space data group;

[0011] The operation space data group includes a timestamp, a collection location mark, a sensor unique mark, environmental data and equipment operation status data.

[0012] Preferably, the data transmission module includes an encryption unit and a transmission unit;

[0013] The encryption unit encrypts the operation space data group and adds a check code, including encrypting the data packet using an AES symmetric encryption algorithm;

[0014] The additional check code includes generating a check code using a cyclic redundancy check (CRC) algorithm, and performing an additional check code on the encrypted operation space data group;

[0015] The transmission unit performs format conversion and packaging on the running space data group, and transmits the packaged data by using the 5G network. The packaged data is transmitted from the sending end to the receiving end through the 5G network, and after the receiving end receives the packaged data, it performs unpacking and verification of the check code. When the verification passes, a confirmation signal is sent; when it fails, resending is required;

[0016] The conversion includes conversion into a binary format, including data length, data content and check code content.

[0017] Preferably, the central processing module includes a verification unit and a pre-processing unit;

[0018] The verification unit performs CRC verification on the received packaged data, and then uses the symmetric key to decrypt the packaged data that passes the CRC verification to obtain the operation space data group;

[0019] The preprocessing unit preprocesses the decrypted operation space data group, including data cleaning preprocessing and data standardization preprocessing, and the standardized data values ​​are used to form an operation space feature data set X, including environmental data and energy storage device operation status data, specifically X={Z1, Z2, ..., Z i}, where Z i Specifically represents the serial number of the data value in the environmental data and the energy storage device operating status data;

[0020] Among them, data cleaning preprocessing includes noise filtering and missing value filling; data standardization preprocessing includes dimensionless standardization preprocessing.

[0021] Preferably, the central detection module includes a detection evaluation unit and a detection matching unit;

[0022] The detection and evaluation unit performs a preliminary risk assessment on the operation space feature data set X to obtain a detection evaluation index S prelim , to reflect the status of substation operating equipment in a limited space;

[0023] The detection matching unit uses a preset running state detection evaluation threshold Y and a detection evaluation index S prelim Perform matching and obtain the running equipment status detection and evaluation results;

[0024] The running equipment status detection and evaluation results are obtained by the following matching method:

[0025] When the detection evaluation index S prelim <operating status detection evaluation threshold Y, the operating equipment status detection result is qualified;

[0026] When the detection evaluation index S prelim≥ Operation status detection evaluation threshold Y, the result of the operation equipment status detection is unqualified;

[0027] When the detection evaluation index S prelim When the value is ≥ twice the operating status detection assessment threshold Y, the operating equipment status detection result is a warning.

[0028] Preferably, the detection evaluation index S prelim Obtained through the following calculation formula:

[0029] ;

[0030] In the formula, S prelim represents the detection evaluation index, which specifically reflects the fluctuation of the substation operating equipment status in a limited space. N represents the total number of features, which is specifically the length of the operating space feature data set X. W i Represents the weight coefficient of the i-th data value in the running space feature dataset X, represents the i-th data value at time t, Represents a processing function, which is a calculation function that performs nonlinear transformation processing on data values, and is used to proportionally amplify or reduce the impact of the i-th data.

[0031] Preferably, the state assessment module includes a trigger unit, a physical model assessment unit and a machine learning model assessment unit;

[0032] The trigger unit triggers the secondary evaluation strategy of the operating status according to the evaluation result of the operating equipment status detection, and establishes a time series evaluation physical model and a time series machine learning model for the fixed-period operating space feature data set X;

[0033] The fixed-period operation space feature data set X is specifically X={X(t), X(t-1,), ..., X(tk)}, where k represents the total number of operation space feature data sets X collected within the fixed period, specifically represented by the length of the time series within the fixed period, and the total number of time interval points;

[0034] Among them, the mechanism for triggering according to the running equipment status detection and evaluation results is as follows:

[0035] When the running equipment status detection result is unqualified, the running status secondary evaluation strategy mechanism is triggered;

[0036] When the running equipment status detection result is a warning, the running status secondary evaluation strategy mechanism is triggered, and the running status secondary evaluation strategy mechanism frequency is adjusted to 150%;

[0037] The physical model evaluation unit is trained by establishing a time series evaluation physical model to obtain a physical model evaluation index Sphys , and matches it with the preset secondary physical evaluation threshold WL to obtain the secondary evaluation response strategy of the physical model;

[0038] When the physical model evaluation index S phys <Secondary physical assessment threshold WL, obtain the response plan for the secondary assessment of the physical model without executing it, and mark the physical status of the equipment in the substation operation space as normal;

[0039] When the physical model evaluation index S phys ≥ the secondary physical assessment threshold WL, obtain the secondary assessment response plan for the execution physical model, and mark the abnormal physical status of the equipment in the substation operation space;

[0040] The machine learning model evaluation unit is trained by the established time series machine learning model to obtain the machine model evaluation index S ml , and matches it with the preset secondary machine model evaluation threshold JQ to obtain the secondary evaluation response strategy plan of the machine learning model;

[0041] When the machine model evaluation index S ml <Secondary machine model evaluation threshold JQ, obtain the response plan of not executing the secondary evaluation of the machine learning model, and mark the equipment operation system of the substation operation space as normal;

[0042] When the machine model evaluation index S ml ≥Secondary machine model evaluation threshold JQ, obtain the secondary evaluation response plan for executing the machine learning model, and mark the abnormalities of the equipment operation system in the substation operation space.

[0043] Preferably, the physical model evaluation index S phys Obtained through the following calculation formula:

[0044] ;

[0045] Where K represents the length of the fixed period time series, specifically the total number of time interval points, and W h represents the time weight coefficient, specifically the running space feature dataset X of the hth fixed period time series position, represents the running space feature dataset X of the th time interval point position, and They represent model training constants respectively, and their specific values ​​are set by the customer;

[0046] The machine model evaluation index S ml Obtained through the following calculation formula:

[0047] ;

[0048] In the formula, F ML () represents a machine learning model function, which specifically represents the evaluation of the spatial feature dataset X based on the input time series, including the feature input step, the LSTM unit calculation step and the machine learning model evaluation index calculation step;

[0049] Among them, the feature input step specifically inputs the time series running space feature dataset X as the input data matrix into the time series machine learning model; the LSTM unit calculation step includes processing the input time series running space feature dataset X and calculating the hidden state and memory unit state of each time step; the machine learning model evaluation index calculation step includes obtaining the calculation of the output layer through a series of gating mechanisms, including the forget gate, the input gate and the output gate, and converting the hidden state into the machine model evaluation index S ml , used to reflect the system operation status.

[0050] Preferably, the response module includes an instruction generation unit and an instruction execution unit;

[0051] The instruction generation unit generates response instructions according to the physical model secondary evaluation response strategy scheme and the machine learning model secondary evaluation response strategy scheme, including fire sprinkler system start and stop, gas fire extinguishing system start and stop, fire alarm system start and stop, ventilation system start and stop and adjustment, air conditioning system start and stop and adjustment, power switching equipment start and stop, and circuit breaker control system start and stop;

[0052] The instruction execution unit sends the response instruction to the relevant equipment in the substation operation space for execution, including fire-fighting equipment and environmental conditioning equipment, and simultaneously prompts relevant personnel to go for inspection, including sending the execution response instruction content to the relevant personnel's pending task list to prompt them to go for inspection.

[0053] The 5G-based substation limited space automatic fire extinguishing monitoring method includes the following steps:

[0054] Step 1: The data acquisition module collects real-time data by connecting to the Internet of Things and sensors running in the substation operation space, including environmental data and energy storage equipment operation status data, and simultaneously marks the collected data with a timestamp, a collection location mark, and a unique identification mark of the collection device to form an operation space data group;

[0055] Step 2: The data transmission module encrypts the operation space data group and adds a check code, including encrypting the data packet using the AES symmetric encryption algorithm, formatting and packaging the operation space data group, and transmitting the packaged data using the 5G network;

[0056] Step 3: The central processing module performs CRC check on the received packaged data, then uses the symmetric key to decrypt the packaged data, and preprocesses the decrypted operation space data group, including data cleaning preprocessing and data standardization preprocessing, to form the operation space feature data set X;

[0057] Step 4: The central detection module performs a preliminary risk assessment on the operational space feature dataset X and obtains the detection evaluation index S prelim , to reflect the substation operating equipment status in a limited space, synchronize the preset operating status detection and evaluation threshold Y for matching, and obtain the operating equipment status detection and evaluation results;

[0058] Step 5: The status evaluation module triggers the secondary evaluation strategy of the operating status according to the evaluation results of the operating equipment status detection, and establishes a time series evaluation physical model for the fixed-cycle operating space feature data set X. After training, the physical model evaluation index S is obtained. phys , establish a time series machine learning model, and obtain the machine model evaluation index S after training ml , synchronously match the preset secondary physical evaluation threshold WL and the secondary machine model evaluation threshold JQ to obtain the secondary evaluation response strategy of the physical model and the secondary evaluation response strategy of the machine learning model;

[0059] Step 6: The response module generates response instructions based on the secondary evaluation response strategy plan of the physical model and the secondary evaluation response strategy plan of the machine learning model, and sends the response instructions to the relevant equipment in the substation operation space for execution, including fire-fighting equipment and environmental conditioning equipment, and simultaneously prompts relevant personnel to go for inspection.

[0060] The present invention provides a substation limited space automatic fire extinguishing monitoring method and system based on 5G technology, which has the following beneficial effects:

[0061] (1) When the system is running, the data acquisition module collects data accurately through the Internet of Things and sensors to ensure comprehensive coverage of environmental data and equipment operating status. The data transmission module uses AES encryption and 5G network technology to ensure secure data transmission and rapid response, overcoming the problems of data delay and insufficient coverage in traditional systems. The central processing module improves the reliability and accuracy of data through advanced preprocessing technology and CRC verification. The central detection module and the status assessment module adopt a multi-level risk assessment method, including preliminary assessment and time series model assessment. Through the combination of physical models and machine learning models, the physical state of the equipment and the system operating status are accurately judged, reducing the false alarms or missed alarms caused by the lack of comprehensive analysis capabilities in traditional systems. The response module quickly triggers fire-fighting equipment and environmental conditioning equipment by generating precise control instructions, and simultaneously notifies relevant personnel to conduct inspections, greatly improving the efficiency and accuracy of responding to emergencies.

[0062] (2) The verification unit ensures the integrity and security of the data through CRC verification and AES decryption. The preprocessing unit further performs noise filtering, missing value filling and dimensionless normalization on the data to generate a high-quality operating space feature data set X. The central detection module accurately identifies abnormal fluctuations in the equipment status through preliminary risk assessment and threshold matching of the feature data set, and distinguishes between qualified, abnormal and warning states in a multi-level evaluation method, thereby improving the accuracy of data processing and the sensitivity of risk assessment. It can also provide early warning of potential equipment failures, thereby effectively reducing equipment operation risks and improving the overall safety and reliability of the substation.

[0063] (3) Through the obtained physical model secondary evaluation response strategy and machine learning model secondary evaluation response strategy, the corresponding response mechanism can be accurately triggered when abnormal equipment operation or warning is detected. The physical model evaluation and machine learning model evaluation are independent and complementary to each other, providing multi-dimensional risk assessment from the physical state of the equipment and the system operation state, making the system more comprehensive and accurate when judging abnormal equipment state. In addition, the response module can quickly control key fire protection, ventilation and air conditioning equipment by generating precise instructions, and simultaneously notify relevant personnel to conduct inspections, effectively reducing potential risks caused by equipment failure or environmental changes, and improving the ability to respond to emergencies. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] Figure 1 This is a schematic diagram of the flow chart of the substation limited space automatic fire extinguishing monitoring system based on 5G technology of the present invention;

[0065] Figure 2 This is a schematic diagram of the steps of the substation limited space automatic fire extinguishing monitoring method based on 5G technology of the present invention. DETAILED DESCRIPTION

[0066] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0067] Example 1

[0068] The present invention provides a substation limited space automatic fire extinguishing monitoring system based on 5G technology, please refer to Figure 1 , including a data acquisition module, a data transmission module, a central processing module, a central detection module, a state assessment module and a response module;

[0069] The data acquisition module collects real-time data by connecting to the Internet of Things and sensors running in the substation operation space, including environmental data and energy storage equipment operation status data, and simultaneously timestamps the collected data, marks the collection location, and uniquely identifies the collection device to form an operation space data group;

[0070] The data transmission module encrypts the operation space data group and adds a check code, including encrypting the data packet using an AES symmetric encryption algorithm, formatting and packaging the operation space data group, and transmitting the packaged data by using a 5G network;

[0071] The central processing module performs CRC check on the received packaged data, decrypts the packaged data using a symmetric key, and preprocesses the decrypted operation space data group, including data cleaning preprocessing and data standardization preprocessing, to form an operation space feature data set X;

[0072] The central detection module performs a preliminary risk assessment on the operation space feature data set X to obtain the detection evaluation index S prelim , to reflect the substation operating equipment status in a limited space, synchronize the preset operating status detection and evaluation threshold Y for matching, and obtain the operating equipment status detection and evaluation results;

[0073] The state evaluation module triggers the secondary evaluation strategy of the operating state according to the evaluation results of the operating equipment state detection, establishes a time series evaluation physical model for the fixed-cycle operating space feature data set X, and obtains the physical model evaluation index S after training. phys , establish a time series machine learning model, and obtain the machine model evaluation index S after training ml, synchronously match the preset secondary physical evaluation threshold WL and the secondary machine model evaluation threshold JQ to obtain the secondary evaluation response strategy of the physical model and the secondary evaluation response strategy of the machine learning model;

[0074] The response module generates response instructions based on the physical model secondary evaluation response strategy plan and the machine learning model secondary evaluation response strategy plan, and sends the response instructions to relevant equipment in the substation operation space for execution, including fire-fighting equipment and environmental conditioning equipment, and simultaneously prompts relevant personnel to go for inspection.

[0075] In this embodiment, the data acquisition module collects data accurately through the Internet of Things and sensors to ensure comprehensive coverage of environmental data and equipment operating status. The data transmission module uses AES encryption and 5G network technology to ensure secure data transmission and rapid response, overcoming the problems of data delay and insufficient coverage in traditional systems. The central processing module improves the reliability and accuracy of the data through advanced preprocessing technology and CRC verification. The central detection module and the status assessment module adopt a multi-level risk assessment method, including preliminary assessment and time series model assessment. Through the combination of physical models and machine learning models, the physical state of the equipment and the system operating status are accurately judged, reducing the false alarms or missed alarms caused by the lack of comprehensive analysis capabilities in traditional systems. The response module quickly triggers fire-fighting equipment and environmental adjustment equipment by generating precise control instructions, and simultaneously notifies relevant personnel to conduct inspections, greatly improving the efficiency and accuracy of responding to emergencies.

[0076] Example 2

[0077] This embodiment is explained in Example 1, please refer to Figure 1 ,Specifically: the data acquisition module includes an information collection unit and an assembly unit;

[0078] The information collection unit collects real-time data, including environmental data and energy storage equipment operating status data, by connecting to the Internet of Things and sensors operating in the substation operating space;

[0079] Among them, environmental data includes temperature, humidity and air quality; equipment operation status data includes voltage, current and pressure;

[0080] The sensors include temperature sensors, humidity sensors, air quality sensors, voltage sensors, current sensors and pressure sensors, which collect environmental data and energy storage device operating status data to the assembly unit through the Internet of Things gateway;

[0081] The assembly unit performs timestamp marking, collection location marking and collection device unique identification marking on the collected data to form an operation space data group;

[0082] The operation space data group includes a timestamp, a collection location mark, a sensor unique mark, environmental data and equipment operation status data.

[0083] The data transmission module includes an encryption unit and a transmission unit;

[0084] The encryption unit encrypts the operation space data group and adds a check code, including encrypting the data packet using an AES symmetric encryption algorithm;

[0085] The additional check code includes generating a check code using a cyclic redundancy check (CRC) algorithm, and performing an additional check code on the encrypted operation space data group;

[0086] The transmission unit performs format conversion and packaging on the running space data group, and transmits the packaged data by using the 5G network. The packaged data is transmitted from the sending end to the receiving end through the 5G network, and after the receiving end receives the packaged data, it performs unpacking and verification of the check code. When the verification passes, a confirmation signal is sent; when it fails, resending is required;

[0087] The conversion includes conversion into a binary format, including data length, data content and check code content.

[0088] Example 3

[0089] This embodiment is explained in Example 2. Please refer to Figure 1 ,Specifically: the central processing module includes a verification unit and a pre-processing unit;

[0090] The verification unit performs CRC verification on the received packaged data, and then uses the symmetric key to decrypt the packaged data that passes the CRC verification to obtain the operation space data group;

[0091] The preprocessing unit preprocesses the decrypted operation space data group, including data cleaning preprocessing and data standardization preprocessing, and the standardized data values ​​are used to form an operation space feature data set X, including environmental data and energy storage device operation status data, specifically X={Z1, Z2, ..., Z i}, where Z i Specifically represents the serial number of the data value in the environmental data and the energy storage device operating status data;

[0092] Among them, data cleaning preprocessing includes noise filtering and missing value filling; data standardization preprocessing includes dimensionless standardization preprocessing.

[0093] The central detection module includes a detection evaluation unit and a detection matching unit;

[0094] The detection and evaluation unit performs a preliminary risk assessment on the operation space feature data set X to obtain a detection evaluation index S prelim , to reflect the status of substation operating equipment in a limited space;

[0095] The detection matching unit uses a preset running state detection evaluation threshold Y and a detection evaluation index S prelim Perform matching and obtain the running equipment status detection and evaluation results;

[0096] The running equipment status detection and evaluation results are obtained by the following matching method:

[0097] When the detection evaluation index S prelim <operating status detection evaluation threshold Y, the operating equipment status detection result is qualified;

[0098] When the detection evaluation index S prelim ≥ Operation status detection evaluation threshold Y, the result of the operation equipment status detection is unqualified;

[0099] When the detection evaluation index S prelim When the value is ≥ twice the operating status detection assessment threshold Y, the operating equipment status detection result is a warning.

[0100] The detection evaluation index S prelim Obtained through the following calculation formula:

[0101] ;

[0102] In the formula, S prelim represents the detection evaluation index, which specifically reflects the fluctuation of the substation operating equipment status in a limited space. N represents the total number of features, which is specifically the length of the operating space feature data set X. W i Represents the weight coefficient of the i-th data value in the running space feature dataset X, represents the i-th data value at time t, Represents a processing function, which is a calculation function that performs nonlinear transformation processing on data values, and is used to proportionally amplify or reduce the impact of the i-th data.

[0103] In this embodiment, the verification unit ensures the integrity and security of the data through CRC verification and AES decryption. The preprocessing unit further performs noise filtering, missing value filling and dimensionless standardization on the data to generate a high-quality operation space feature data set X. The central detection module accurately identifies abnormal fluctuations in the equipment status through preliminary risk assessment and threshold matching of the feature data set, and distinguishes between qualified, abnormal and warning states in a multi-level evaluation manner, thereby improving the accuracy of data processing and the sensitivity of risk assessment. It can also provide early warning of potential equipment failures, thereby effectively reducing equipment operation risks and improving the overall safety and reliability of the substation.

[0104] Example 4

[0105] This embodiment is explained in Example 3, please refer to Figure 1 ,Specifically: the state evaluation module includes a trigger unit, a physical model evaluation unit and a machine learning model evaluation unit;

[0106] The trigger unit triggers the secondary evaluation strategy of the operating status according to the evaluation result of the operating equipment status detection, and establishes a time series evaluation physical model and a time series machine learning model for the fixed-period operating space feature data set X;

[0107] The fixed-period operation space feature data set X is specifically X={X(t), X(t-1,), ..., X(tk)}, where k represents the total number of operation space feature data sets X collected within the fixed period, specifically represented by the length of the time series within the fixed period, and the total number of time interval points;

[0108] Among them, the mechanism for triggering according to the running equipment status detection and evaluation results is as follows:

[0109] When the running equipment status detection result is unqualified, the running status secondary evaluation strategy mechanism is triggered;

[0110] When the running equipment status detection result is a warning, the running status secondary evaluation strategy mechanism is triggered, and the running status secondary evaluation strategy mechanism frequency is adjusted to 150%;

[0111] The physical model evaluation unit is trained by establishing a time series evaluation physical model to obtain a physical model evaluation index S phys , and matches it with the preset secondary physical evaluation threshold WL to obtain the secondary evaluation response strategy of the physical model;

[0112] When the physical model evaluation index S phys <Secondary physical assessment threshold WL, obtain the response plan for the secondary assessment of the physical model without executing it, and mark the physical status of the equipment in the substation operation space as normal;

[0113] When the physical model evaluation index S phys ≥ the secondary physical assessment threshold WL, obtain the secondary assessment response plan for the execution physical model, and mark the abnormal physical status of the equipment in the substation operation space;

[0114] The machine learning model evaluation unit is trained by the established time series machine learning model to obtain the machine model evaluation index S ml , and matches it with the preset secondary machine model evaluation threshold JQ to obtain the secondary evaluation response strategy plan of the machine learning model;

[0115] When the machine model evaluation index S ml <Secondary machine model evaluation threshold JQ, obtain the response plan of not executing the secondary evaluation of the machine learning model, and mark the equipment operation system of the substation operation space as normal;

[0116] When the machine model evaluation index S ml ≥Secondary machine model evaluation threshold JQ, obtain the secondary evaluation response plan for executing the machine learning model, and mark the abnormalities of the equipment operation system in the substation operation space.

[0117] The physical model evaluation index S phys Obtained through the following calculation formula:

[0118] ;

[0119] Where K represents the length of the fixed period time series, specifically the total number of time interval points, and W h represents the time weight coefficient, specifically the running space feature dataset X of the hth fixed period time series position, represents the running space feature dataset X of the th time interval point position, and They represent model training constants respectively, and their specific values ​​are set by the customer;

[0120] The machine model evaluation index S ml Obtained through the following calculation formula:

[0121] ;

[0122] In the formula, F ML () represents a machine learning model function, which specifically represents the evaluation of the spatial feature dataset X based on the input time series, including the feature input step, the LSTM unit calculation step and the machine learning model evaluation index calculation step;

[0123] Among them, the feature input step specifically inputs the time series running space feature dataset X as the input data matrix into the time series machine learning model; the LSTM unit calculation step includes processing the input time series running space feature dataset X and calculating the hidden state and memory unit state of each time step; the machine learning model evaluation index calculation step includes obtaining the calculation of the output layer through a series of gating mechanisms, including the forget gate, the input gate and the output gate, and converting the hidden state into the machine model evaluation index S ml , used to reflect the system operation status.

[0124] The response module includes an instruction generation unit and an instruction execution unit;

[0125] The instruction generation unit generates response instructions according to the physical model secondary evaluation response strategy scheme and the machine learning model secondary evaluation response strategy scheme, including fire sprinkler system start and stop, gas fire extinguishing system start and stop, fire alarm system start and stop, ventilation system start and stop and adjustment, air conditioning system start and stop and adjustment, power switching equipment start and stop, and circuit breaker control system start and stop;

[0126] The instruction execution unit sends the response instruction to the relevant equipment in the substation operation space for execution, including fire-fighting equipment and environmental conditioning equipment, and simultaneously prompts relevant personnel to go for inspection, including sending the execution response instruction content to the relevant personnel's pending task list to prompt them to go for inspection.

[0127] In this embodiment, by obtaining the physical model secondary evaluation response strategy and the machine learning model secondary evaluation response strategy, the corresponding response mechanism can be accurately triggered when abnormal equipment operation or early warning is detected. The physical model evaluation and the machine learning model evaluation are independent and complementary to each other, providing multi-dimensional risk assessment from the physical state of the equipment and the system operation state, respectively, so that the system is more comprehensive and accurate when judging abnormal equipment state. In addition, the response module can quickly control key fire protection, ventilation and air conditioning equipment by generating precise instructions, and simultaneously notify relevant personnel to conduct inspections, effectively reducing potential risks caused by equipment failure or environmental changes, and improving the ability to respond to emergencies.

[0128] Example 5

[0129] For the automatic fire extinguishing monitoring method of substation limited space based on 5G technology, please refer to Figure 2 , specifically: including the following steps:

[0130] Step 1: The data acquisition module collects real-time data by connecting to the Internet of Things and sensors running in the substation operation space, including environmental data and energy storage equipment operation status data, and simultaneously marks the collected data with a timestamp, a collection location mark, and a unique identification mark of the collection device to form an operation space data group;

[0131] Step 2: The data transmission module encrypts the operation space data group and adds a check code, including encrypting the data packet using the AES symmetric encryption algorithm, formatting and packaging the operation space data group, and transmitting the packaged data using the 5G network;

[0132] Step 3: The central processing module performs CRC check on the received packaged data, then uses the symmetric key to decrypt the packaged data, and preprocesses the decrypted operation space data group, including data cleaning preprocessing and data standardization preprocessing, to form the operation space feature data set X;

[0133] Step 4: The central detection module performs a preliminary risk assessment on the operational space feature dataset X and obtains the detection evaluation index S prelim , to reflect the substation operating equipment status in a limited space, synchronize the preset operating status detection and evaluation threshold Y for matching, and obtain the operating equipment status detection and evaluation results;

[0134] Step 5: The status evaluation module triggers the secondary evaluation strategy of the operating status according to the evaluation results of the operating equipment status detection, and establishes a time series evaluation physical model for the fixed-cycle operating space feature data set X. After training, the physical model evaluation index S is obtained. phys , establish a time series machine learning model, and obtain the machine model evaluation index S after training ml , synchronously match the preset secondary physical evaluation threshold WL and the secondary machine model evaluation threshold JQ to obtain the secondary evaluation response strategy of the physical model and the secondary evaluation response strategy of the machine learning model;

[0135] Step 6: The response module generates response instructions based on the secondary evaluation response strategy plan of the physical model and the secondary evaluation response strategy plan of the machine learning model, and sends the response instructions to the relevant equipment in the substation operation space for execution, including fire-fighting equipment and environmental conditioning equipment, and simultaneously prompts relevant personnel to go for inspection.

[0136] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. The substation limited space automatic fire extinguishing monitoring system based on 5G technology is characterized by: It includes data acquisition module, data transmission module, central processing module, central detection module, status assessment module and response module; The data acquisition module collects real-time data by connecting to the Internet of Things and sensors running in the substation operation space, including environmental data and energy storage equipment operation status data, and simultaneously timestamps the collected data, marks the collection location, and uniquely identifies the collection device to form an operation space data group; The data transmission module encrypts the operation space data group and adds a check code, including encrypting the data packet using an AES symmetric encryption algorithm, formatting and packaging the operation space data group, and transmitting the packaged data by using a 5G network; The central processing module performs CRC check on the received packaged data, decrypts the packaged data using a symmetric key, and preprocesses the decrypted operation space data group, including data cleaning preprocessing and data standardization preprocessing, to form an operation space feature data set X; The central detection module performs a preliminary risk assessment on the operation space feature data set X to obtain the detection evaluation index S prelim , to reflect the substation operating equipment status in a limited space, synchronize the preset operating status detection and evaluation threshold Y for matching, and obtain the operating equipment status detection and evaluation results; The state evaluation module triggers the secondary evaluation strategy of the operating state according to the evaluation results of the operating equipment state detection, establishes a time series evaluation physical model for the fixed-cycle operating space feature data set X, and obtains the physical model evaluation index S after training. phys , establish a time series machine learning model, and obtain the machine model evaluation index S after training ml , synchronously match the preset secondary physical evaluation threshold WL and the secondary machine model evaluation threshold JQ to obtain the secondary evaluation response strategy of the physical model and the secondary evaluation response strategy of the machine learning model; The response module generates response instructions based on the physical model secondary evaluation response strategy plan and the machine learning model secondary evaluation response strategy plan, and sends the response instructions to relevant equipment in the substation operation space for execution, including fire-fighting equipment and environmental conditioning equipment, and simultaneously prompts relevant personnel to go for inspection.

2. According to claim 1, the substation limited space automatic fire extinguishing monitoring system based on 5G technology is characterized by: The data acquisition module includes an information collection unit and an assembly unit; The information collection unit collects real-time data, including environmental data and energy storage equipment operating status data, by connecting to the Internet of Things and sensors operating in the substation operating space; Among them, environmental data includes temperature, humidity and air quality; equipment operation status data includes voltage, current and pressure; The sensors include temperature sensors, humidity sensors, air quality sensors, voltage sensors, current sensors and pressure sensors, which collect environmental data and energy storage device operating status data to the assembly unit through the Internet of Things gateway; The assembly unit performs timestamp marking, collection location marking and collection device unique identification marking on the collected data to form an operation space data group; The operation space data group includes a timestamp, a collection location mark, a sensor unique mark, environmental data and equipment operation status data.

3. According to claim 1, the substation limited space automatic fire extinguishing monitoring system based on 5G technology is characterized by: The data transmission module includes an encryption unit and a transmission unit; The encryption unit encrypts the operation space data group and adds a check code, including encrypting the data packet using an AES symmetric encryption algorithm; The additional check code includes generating a check code using a cyclic redundancy check (CRC) algorithm, and performing an additional check code on the encrypted operation space data group; The transmission unit performs format conversion and packaging on the running space data group, and transmits the packaged data by using the 5G network. The packaged data is transmitted from the sending end to the receiving end through the 5G network, and after the receiving end receives the packaged data, it performs unpacking and verification of the check code. When the verification passes, a confirmation signal is sent; when it fails, resending is required; The conversion includes conversion into a binary format, including data length, data content and check code content.

4. According to claim 2, the substation limited space automatic fire extinguishing monitoring system based on 5G technology is characterized by: The central processing module includes a verification unit and a pre-processing unit; The verification unit performs CRC verification on the received packaged data, and then uses the symmetric key to decrypt the packaged data that passes the CRC verification to obtain the operation space data group; The preprocessing unit preprocesses the decrypted operation space data group, including data cleaning preprocessing and data standardization preprocessing, and the standardized data values ​​are used to form an operation space feature data set X, including environmental data and energy storage device operation status data, specifically X={Z1, Z2, ..., Z i }, where Z i Specifically represents the serial number of the data value in the environmental data and the energy storage device operating status data; Among them, data cleaning preprocessing includes noise filtering and missing value filling; data standardization preprocessing includes dimensionless standardization preprocessing.

5. According to claim 1, the substation limited space automatic fire extinguishing monitoring system based on 5G technology is characterized by: The central detection module includes a detection evaluation unit and a detection matching unit; The detection and evaluation unit performs a preliminary risk assessment on the operation space feature data set X to obtain a detection evaluation index S prelim , to reflect the status of substation operating equipment in a limited space; The detection matching unit uses a preset running state detection evaluation threshold Y and a detection evaluation index S prelim Perform matching and obtain the running equipment status detection and evaluation results; The running equipment status detection and evaluation results are obtained by the following matching method: When the detection evaluation index S prelim <operating status detection evaluation threshold Y, the operating equipment status detection result is qualified; When the detection evaluation index S prelim ≥ Operation status detection evaluation threshold Y, the result of the operation equipment status detection is unqualified; When the detection evaluation index S prelim When the value is ≥ twice the operating status detection assessment threshold Y, the operating equipment status detection result is a warning.

6. The substation limited space automatic fire extinguishing monitoring system based on 5G technology according to claim 5 is characterized by: The detection evaluation index S prelim Obtained through the following calculation formula: ; In the formula, S prelim represents the detection evaluation index, which specifically reflects the fluctuation of the substation operating equipment status in a limited space. N represents the total number of features, which is specifically the length of the operating space feature data set X. W i Represents the weight coefficient of the i-th data value in the running space feature dataset X, represents the i-th data value at time t, Represents a processing function, which is a calculation function that performs nonlinear transformation processing on data values, and is used to proportionally amplify or reduce the impact of the i-th data.

7. According to claim 1, the substation limited space automatic fire extinguishing monitoring system based on 5G technology is characterized by: The state assessment module includes a trigger unit, a physical model assessment unit and a machine learning model assessment unit; The trigger unit triggers the secondary evaluation strategy of the operating status according to the evaluation result of the operating equipment status detection, and establishes a time series evaluation physical model and a time series machine learning model for the fixed-period operating space feature data set X; The fixed-period operation space feature data set X is specifically X={X(t), X(t-1,), ..., X(tk)}, where k represents the total number of operation space feature data sets X collected within the fixed period, specifically represented by the length of the time series within the fixed period, and the total number of time interval points; Among them, the mechanism for triggering according to the running equipment status detection and evaluation results is as follows: When the running equipment status detection result is unqualified, the running status secondary evaluation strategy mechanism is triggered; When the running equipment status detection result is a warning, the running status secondary evaluation strategy mechanism is triggered, and the running status secondary evaluation strategy mechanism frequency is adjusted to 150%; The physical model evaluation unit is trained by establishing a time series evaluation physical model to obtain a physical model evaluation index S phys , and matches it with the preset secondary physical evaluation threshold WL to obtain the secondary evaluation response strategy of the physical model; When the physical model evaluation index S phys <Secondary physical assessment threshold WL, obtain the response plan for the secondary assessment of the physical model without executing it, and mark the physical status of the equipment in the substation operation space as normal; When the physical model evaluation index S phys ≥ the secondary physical assessment threshold WL, obtain the secondary assessment response plan for the execution physical model, and mark the abnormal physical status of the equipment in the substation operation space; The machine learning model evaluation unit is trained by the established time series machine learning model to obtain the machine model evaluation index S ml , and matches it with the preset secondary machine model evaluation threshold JQ to obtain the secondary evaluation response strategy plan of the machine learning model; When the machine model evaluation index S ml <Secondary machine model evaluation threshold JQ, obtain the response plan of not executing the secondary evaluation of the machine learning model, and mark the equipment operation system of the substation operation space as normal; When the machine model evaluation index S ml ≥Secondary machine model evaluation threshold JQ, obtain the secondary evaluation response plan for executing the machine learning model, and mark the abnormalities of the equipment operation system in the substation operation space.

8. The substation limited space automatic fire extinguishing monitoring system based on 5G technology according to claim 7 is characterized by: The physical model evaluation index S phys Obtained through the following calculation formula: ; Where K represents the length of the fixed period time series, specifically the total number of time interval points, and W h represents the time weight coefficient, specifically the running space feature dataset X of the h-th fixed period time series position, represents the running space feature dataset X of the th time interval point position, and They represent model training constants respectively, and their specific values ​​are set by the customer; The machine model evaluation index S ml Obtained through the following calculation formula: ; In the formula, F ML () represents a machine learning model function, which specifically represents the evaluation of the spatial feature dataset X based on the input time series, including the feature input step, the LSTM unit calculation step and the machine learning model evaluation index calculation step; Among them, the feature input step specifically inputs the time series running space feature dataset X as the input data matrix into the time series machine learning model; the LSTM unit calculation step includes processing the input time series running space feature dataset X and calculating the hidden state and memory unit state of each time step; the machine learning model evaluation index calculation step includes obtaining the calculation of the output layer through a series of gating mechanisms, including the forget gate, the input gate and the output gate, and converting the hidden state into the machine model evaluation index S ml , used to reflect the system operation status.

9. The substation limited space automatic fire extinguishing monitoring system based on 5G technology according to claim 1 is characterized by: The response module includes an instruction generation unit and an instruction execution unit; The instruction generation unit generates response instructions according to the physical model secondary evaluation response strategy scheme and the machine learning model secondary evaluation response strategy scheme, including fire sprinkler system start and stop, gas fire extinguishing system start and stop, fire alarm system start and stop, ventilation system start and stop and adjustment, air conditioning system start and stop and adjustment, power switching equipment start and stop, and circuit breaker control system start and stop; The instruction execution unit sends the response instruction to the relevant equipment in the substation operation space for execution, including fire-fighting equipment and environmental conditioning equipment, and simultaneously prompts relevant personnel to go for inspection, including sending the execution response instruction content to the relevant personnel's pending task list to prompt them to go for inspection.

10. A substation limited space automatic fire extinguishing monitoring method based on 5G technology, comprising a substation limited space automatic fire extinguishing monitoring system based on 5G technology as described in any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: The data acquisition module collects real-time data by connecting to the Internet of Things and sensors running in the substation operation space, including environmental data and energy storage equipment operation status data, and simultaneously marks the collected data with a timestamp, a collection location mark, and a unique identification mark of the collection device to form an operation space data group; Step 2: The data transmission module encrypts the operation space data group and adds a check code, including encrypting the data packet using the AES symmetric encryption algorithm, formatting and packaging the operation space data group, and transmitting the packaged data using the 5G network; Step 3: The central processing module performs CRC check on the received packaged data, then uses the symmetric key to decrypt the packaged data, and preprocesses the decrypted operation space data group, including data cleaning preprocessing and data standardization preprocessing, to form the operation space feature data set X; Step 4: The central detection module performs a preliminary risk assessment on the operational space feature dataset X and obtains the detection evaluation index S prelim , to reflect the substation operating equipment status in a limited space, synchronize the preset operating status detection and evaluation threshold Y for matching, and obtain the operating equipment status detection and evaluation results; Step 5: The status evaluation module triggers the secondary evaluation strategy of the operating status according to the evaluation results of the operating equipment status detection, and establishes a time series evaluation physical model for the fixed-cycle operating space feature data set X. After training, the physical model evaluation index S is obtained. phys , establish a time series machine learning model, and obtain the machine model evaluation index S after training ml , synchronously match the preset secondary physical evaluation threshold WL and the secondary machine model evaluation threshold JQ to obtain the secondary evaluation response strategy of the physical model and the secondary evaluation response strategy of the machine learning model; Step 6: The response module generates response instructions based on the secondary evaluation response strategy plan of the physical model and the secondary evaluation response strategy plan of the machine learning model, and sends the response instructions to the relevant equipment in the substation operation space for execution, including fire-fighting equipment and environmental conditioning equipment, and simultaneously prompts relevant personnel to go for inspection.