Multifunctional ship for construction of inland river immersed tube tunnel and construction method thereof
By designing a multi-functional ship for the construction of inland river immersed tube tunnels, the problem of multiple ship configurations and high costs in the construction of inland river immersed tube tunnels has been solved, streamlined operations have been achieved, construction efficiency has been significantly improved and costs have been reduced.
Patent Information
- Application Number
- CN202411375268.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2044-09-30
AI Technical Summary
During the construction of inland waterway immersed pipe tunnels, there are many ship configurations, high construction costs, and complex water construction processes, which affect the construction cycle and efficiency.
Design a multi -functional ship for the inland sink tunnel construction, integrates stone throwing, lithotripping, gravel leveling, sinking pipe floating transportation, and the installation of sinking tube installation. Formation of flowing water.
A significant reduction of the ship allocation required by the inland pipe tunnel, reducing construction costs, improving the efficiency of water construction, and reducing the social impact of sealing.
Smart Images

Figure CN118895784B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of immersed tube tunnel construction, and in particular relates to a multifunctional ship for inland river immersed tube tunnel construction and a construction method thereof. Background Art
[0002] As a mode of transportation that quickly integrates into the urban expressway system and strengthens connections with the central urban area and the outside world, inland river immersed tube tunnels are an important factor affecting the development of regional economy and comprehensive transportation systems, and play an important supporting and guiding role in supporting regional urban construction and development.
[0003] The total length of an inland river immersed tube tunnel is generally short, but its construction process involves many social factors such as hydrological influence, navigation planning, water resource protection, urban planning, and traffic organization. Moreover, although the total length of an inland river immersed tube tunnel is short, its construction procedures have not been reduced. Its construction procedures include rough excavation of foundation trench, foundation treatment, fine excavation of foundation trench, block stone dumping, block stone tamping, crushed stone leveling, bed dredging, floating of immersed tube, installation of immersed tube, locking backfill, general backfill and face-changing backfill, etc. There are many water construction procedures, many ships and equipment required for construction, long operation time, and high risk of water operation. However, since the construction area of an inland river immersed tube tunnel is generally located near an inland waterway with shallow water depth, narrow river channel, high flow rate, and more silt erosion and siltation, there are problems such as no working surface on site, the need for comprehensive closure of navigation, the inability to form a streamlined operation, and the inability of large ships to enter the inland waterway, which seriously affects the construction period and construction cost of the inland river immersed tube tunnel.
[0004] For the construction of inland river immersed tube tunnels, patent CN116716933A discloses a barge for gravel base bed leveling and immersed tube sinking and installation, which integrates the functions of gravel base bed leveling and immersed tube sinking and installation, and its hull adopts an assembled structure, which can meet the requirements of construction in the fourth-level inland waterway area; however, its hull needs to be completely newly built, the cost is relatively high, and it only reduces the use of leveling ships in the special ships required for the original construction. To complete the overall construction of the inland river immersed tube tunnel, it is still necessary to invest more special ships, and the construction cost is still relatively high.
[0005] Therefore, how to further reduce the ship configuration required for inland immersed tube tunnels to significantly reduce construction costs and improve water construction efficiency is a technical problem that urgently needs to be solved. Summary of the invention
[0006] In view of the above technical problems, the present invention provides a multifunctional vessel for inland river immersed tube tunnel construction and a construction method thereof. The multifunctional vessel for inland river immersed tube tunnel construction integrates the functions of block stone filling, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation, and can realize the streamlining of water construction procedures, significantly improve the efficiency of water construction, and at the same time, significantly reduce ship configuration and reduce construction costs.
[0007] The present invention provides a multifunctional ship for inland river immersed tube tunnel construction, comprising:
[0008] The hull includes a first working barge, a second working barge and at least two connecting beams, the first working barge and the second working barge are arranged in parallel and in opposite directions, and the two connecting beams are detachably connected between the opposite bow ends and stern ends of the first working barge and the second working barge;
[0009] A block rock throwing and filling operation unit and a block rock tamping operation unit, wherein the block rock throwing and filling operation unit comprises block rock throwing and filling equipment, and the block rock tamping operation unit comprises block rock tamping equipment, and both the block rock throwing and filling equipment and the block rock tamping equipment are carried on the side of the first operation barge; when the hull turns to a direction in which the length direction of the first operation barge is perpendicular to the extension direction of the submerged tube foundation to be constructed and the first operation barge is closer to the initial operation end of the submerged tube foundation to be constructed than the second operation barge, the block rock throwing and filling equipment moves relative to the first operation barge along the length direction of the first operation barge to perform block rock throwing and filling operations, and the block rock tamping equipment moves relative to the first operation barge along the length direction of the first operation barge to perform block rock tamping operations;
[0010] The stone crushing and leveling operation unit comprises a stone crushing and leveling device, which is carried on the side of the second working barge; when the hull turns to a direction in which the length direction of the second working barge is perpendicular to the extension direction of the submerged tube foundation to be constructed and the second working barge is closer to the initial operation end of the submerged tube foundation to be constructed than the first working barge, the stone crushing and leveling device moves relative to the second working barge along the length direction of the second working barge to perform the stone crushing and leveling operation;
[0011] The immersed tube laying and installation operation unit includes four sets of laying equipment, which are respectively arranged at the two ends of two connecting beams; when the hull turns to a direction in which the length direction of the first working barge and the second working barge is parallel to the extension direction of the immersed tube foundation to be constructed, the four sets of laying equipment are respectively connected to the opposite sides of the axial ends of the immersed tube and the immersed tube is located between the first working barge and the second working barge, so as to transport the immersed tube and sink it onto the constructed immersed tube foundation.
[0012] In some embodiments, the rock dumping equipment and the rock tamping equipment are both located on the side of the first working barge away from the second working barge, and the stone crushing and leveling equipment is located on the side of the second working barge away from the first working barge; or, the rock dumping equipment is located on the side of the first working barge away from the second working barge, the rock tamping equipment is located on the side of the first working barge close to the second working barge, and the stone crushing and leveling equipment is located on the side of the second working barge away from the first working barge.
[0013] In some of the embodiments, the bow and stern of the first working barge are respectively provided with a first longitudinal tilt and load-adjusting water tank and a second longitudinal tilt and load-adjusting water tank, and the bow and stern of the second working barge are respectively provided with a third longitudinal tilt and load-adjusting water tank and a fourth longitudinal tilt and load-adjusting water tank; a first load-adjusting pipeline is connected between the first longitudinal tilt and load-adjusting water tank and the second longitudinal tilt and load-adjusting water tank, so that ballast water is allocated between the first longitudinal tilt and load-adjusting water tank and the second longitudinal tilt and load-adjusting water tank when the stone crushing and leveling equipment is moving, so as to maintain the balance of the first working barge and the second working barge; a second load-adjusting pipeline is connected between the third longitudinal tilt and load-adjusting water tank and the fourth longitudinal tilt and load-adjusting water tank, so that ballast water is allocated between the third longitudinal tilt and load-adjusting water tank and the fourth longitudinal tilt and load-adjusting water tank when the block stone throwing and filling equipment or the block stone tamping and leveling equipment is moving, so as to maintain the balance of the first working barge and the second working barge; and a transverse tilt and load-adjusting water tank is also provided on the ship sides of the first working barge and the second working barge that are away from each other.
[0014] In some of the embodiments, both ends of the connecting beam are hinged between the first working barge and the second working barge through hinged supports respectively arranged on the first working barge and the second working barge.
[0015] In some of the embodiments, a limit assembly for limiting the position of the connecting beam is provided on the first working barge and the second working barge, and the limit assembly includes three limit stops surrounding the end of the connecting beam from three sides, wherein two limit stops located on two opposite sides are first limit stops, and the remaining limit stops are second limit stops, and the two first limit stops are respectively abutted against the two sides of the connecting beam to limit the torsion of the connecting beam, and the second limit stop is abutted against the end face of the connecting beam in the length direction to limit the movement of the connecting beam.
[0016] In some of the embodiments, the stone throwing equipment includes a first track arranged on the first working barge along the length direction of the first working barge, a first sliding trolley slidably connected to the first track, and a stone throwing tube installed on the first sliding trolley and located on the outside of the first working barge; the stone tamping equipment includes a second track arranged on the first working barge along the length direction of the first working barge, a support frame slidably connected to the second track, and a vibrating hammer hoisted on the support frame by a lifting assembly and located on the outside of the first working barge, and the lifting assembly drives the vibrating hammer to rise and fall relative to the support frame.
[0017] In some of the embodiments, the gravel leveling equipment includes a third track arranged on the second working barge along the length direction of the second working barge, a second sliding trolley slidably connected to the third track, and a leveling pipe installed on the first sliding trolley and located on the outside of the second working barge. The leveling pipe is raised and lowered relative to the first sliding trolley, and the first sliding trolley is equipped with a rotating mechanism for driving the leveling pipe to rotate in a vertical plane relative to the second working barge.
[0018] In some of the embodiments, the sinking equipment includes a tube lowering winch and a pulley group installed on the connecting beam, and a wire rope connected between the tube lowering winch and the pulley group; the pulley group includes an upper pulley group installed on the connecting beam and a lower pulley group connected to the upper pulley group through the wire rope, and the end of the wire rope is connected to the tube lowering winch to drive the lower pulley group to rise and fall relative to the upper pulley group by retracting and releasing the wire rope through the tube lowering winch; the sinking equipment also includes a hydraulic pin for connecting the ear plate of the lower pulley group to the ear plate of the tube lifting point.
[0019] In addition, the present invention also provides an inland river immersed tube tunnel construction method, which uses the multifunctional ship for inland river immersed tube tunnel construction described in any of the above technical solutions to carry out inland river immersed tube tunnel construction, comprising the following steps:
[0020] Hull assembly steps: dispatch the first working barge and the second working barge to the construction area and moor them in front of the dry dock door, hoist the connecting beam between the first working barge and the second working barge and connect them to form the hull, and load the block stone throwing and filling operation unit, block stone tamping operation unit, crushed stone leveling operation unit and immersed tube sinking and installation operation unit on the hull respectively;
[0021] Hull debugging steps: adjust the hull to a state where the first working barge and the second working barge are respectively located on both sides of the dry dock door and are parallel to the extension direction of the immersed tube foundation to be constructed, and debug the block stone filling operation unit, block stone tamping operation unit, crushed stone leveling operation unit and immersed tube sinking and installation operation unit respectively;
[0022] The rock throwing and filling operation steps are as follows: the hull is rotated 90 degrees by a cable-twisting method, so that the length direction of the first working barge is perpendicular to the extension direction of the submerged tube foundation to be constructed and the first working barge is closer to the initial working end of the submerged tube foundation to be constructed than the second working barge, and the hull is gradually moved from the initial working end of the submerged tube foundation to be constructed to the final working end along the extension direction of the submerged tube foundation to be constructed. During the movement of the hull, the rock throwing and filling equipment moves relative to the first working barge along the length direction of the first working barge to perform the rock throwing and filling operation;
[0023] The stone tamping operation steps are as follows: the hull is returned to the initial operation end, and the hull is gradually moved from the initial operation end to the final operation end along the extension direction of the submerged tube foundation to be constructed. During the movement of the hull, the stone tamping equipment moves relative to the first operation barge along the length direction of the first operation barge to perform the stone tamping operation;
[0024] The stone crushing and leveling operation steps are as follows: the hull is rotated 180 degrees by a cable-twisting method, and the hull is gradually moved from the initial operation end of the submerged tube foundation to be constructed to the final operation end along the extension direction of the submerged tube foundation to be constructed. During the movement of the hull, the stone crushing and leveling equipment moves relative to the second working barge along the length direction of the second working barge to perform the stone crushing and leveling operation;
[0025] The steps of transporting and sinking the immersed tube are as follows: the hull is rotated 90° by mooring the ship and is moored in front of the dry dock door; the immersed tube to be installed is connected between the first working barge and the second working barge by using four sets of sinking equipment; the immersed tube and the hull are moved to the installation position of the immersed tube by mooring the ship and the sinking equipment is used to sink the immersed tube.
[0026] In some of the embodiments, in the rock throwing operation step, when the rock throwing equipment moves, ballast water is allocated between the third longitudinal inclination adjusting water tank and the fourth longitudinal inclination adjusting water tank through the second adjusting pipeline to maintain the balance of the first working barge and the second working barge; in the rock tamping operation step, when the rock tamping equipment moves, ballast water is allocated between the third longitudinal inclination adjusting water tank and the fourth longitudinal inclination adjusting water tank through the second adjusting pipeline to maintain the balance of the first working barge and the second working barge; in the stone crushing and leveling operation step, when the stone crushing and leveling equipment moves, ballast water is allocated between the first longitudinal inclination adjusting water tank and the second longitudinal inclination adjusting water tank through the first adjusting pipeline to maintain the balance of the first working barge and the second working barge.
[0027] Compared with the prior art, the advantages and beneficial effects of the present invention are:
[0028] 1. The multifunctional ship for inland river immersed tube tunnel construction provided by the present invention carries a rock dumping operation unit and a rock tamping operation unit through a first operation barge, carries a crushed stone leveling operation unit through a second operation barge, and carries an immersed tube sinking and installation operation unit through a connecting crossbeam. During construction, the switching of each operation unit is achieved by turning the hull, so that the rock dumping, rock tamping, crushed stone leveling, immersed tube floating and immersed tube installation processes can be completed in sequence by using one ship, which can form a streamlined operation, greatly reduce the ship configuration required for the inland river immersed tube tunnel, significantly reduce the construction cost, and improve the efficiency of water construction;
[0029] 2. The multifunctional ship for inland river immersed tube tunnel construction provided by the present invention integrates the functions of block stone dumping, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation. The working surface required for its construction is small, and there is no need to close the channel for navigation in the entire section, thus reducing the social impact of the closure;
[0030] 3. In the multifunctional ship for inland river immersed tube tunnel construction provided by the present invention, the block stone dumping operation unit and the block stone tamping operation unit are carried together on the first operation barge, while the crushed stone leveling operation unit is carried alone on the second operation barge. On the one hand, it is more conducive to maintaining the balance between the first operation barge and the second operation barge, and on the other hand, it can reduce the number of turns of the ship during the construction process, which is conducive to improving the construction efficiency;
[0031] 4. The multifunctional ship for inland river immersed tube tunnel construction provided by the present invention has a hull composed of a first working barge, a second working barge and a connecting crossbeam. The first working barge and the second working barge can enter the construction site through a narrow inland waterway and be assembled with the connecting crossbeam at the construction site, which can meet the requirements of inland river immersed tube tunnel construction;
[0032] 5. The inland river immersed tube tunnel construction method provided by the present invention utilizes a multifunctional ship integrated with the functions of block stone filling, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation for construction, and the switching of various operating units is realized by the steering of the hull, thereby completing the block stone filling, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation processes in sequence, forming a streamlined operation, significantly improving the efficiency of water construction and reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0034] Figure 1 A three-dimensional diagram of a multifunctional ship for inland river immersed tube tunnel construction provided by an embodiment of the present invention;
[0035] Figure 2 A top view of a multifunctional vessel for inland river immersed tube tunnel construction provided by an embodiment of the present invention;
[0036] Figure 3 A three-dimensional diagram of a multifunctional ship for inland river immersed tube tunnel construction connected to an immersed tube provided by an embodiment of the present invention;
[0037] Figure 4 A front view of a multifunctional vessel for inland river immersed tube tunnel construction connected to an immersed tube provided by an embodiment of the present invention;
[0038] Figure 5 for Figure 4 A partial enlarged view of point B in the middle;
[0039] Figure 6 for Figure 2 A partial enlarged view of the middle A;
[0040] Figure 7 A schematic diagram of the arrangement of the load-carrying water tank of the first working barge in a multifunctional ship for inland river immersed tube tunnel construction provided by an embodiment of the present invention;
[0041] Figure 8 A schematic diagram of the arrangement of the load-carrying water tank of the second working barge in the multifunctional ship for inland river immersed tube tunnel construction provided by an embodiment of the present invention;
[0042] Fig. 9A schematic diagram of a multifunctional ship for inland river immersed tube tunnel construction in a hull debugging state in an inland river immersed tube tunnel construction method provided by an embodiment of the present invention;
[0043] Fig.10 A schematic diagram of a multifunctional vessel for inland river immersed tube tunnel construction performing a rock dumping operation in the inland river immersed tube tunnel construction method provided by an embodiment of the present invention;
[0044] Fig.11 A schematic diagram of a multifunctional vessel for inland river immersed tube tunnel construction performing a stone tamping operation in the inland river immersed tube tunnel construction method provided by an embodiment of the present invention;
[0045] Fig.12 A schematic diagram of a process in which a multifunctional vessel for inland river immersed tube tunnel construction performs a 180° turn after a stone tamping operation in an inland river immersed tube tunnel construction method provided by an embodiment of the present invention;
[0046] Fig.13 A schematic diagram of a multifunctional vessel for inland river immersed tube tunnel construction performing stone crushing and leveling operations in the inland river immersed tube tunnel construction method provided by an embodiment of the present invention;
[0047] Fig.14 A schematic diagram of an inland river immersed tube tunnel construction method provided in an embodiment of the present invention in which a multifunctional vessel for inland river immersed tube tunnel construction performs immersed tube transportation operations.
[0048] In the figure:
[0049] 1. Hull; 2. Stone dumping equipment; 3. Stone tamping equipment; 4. Stone leveling equipment; 5. Sinking equipment; 6. Immersed tube; 7. Articulated support; 8. Limiting assembly; 9. Dock door; 10. Immersed tube foundation to be constructed;
[0050] 11. First working barge; 111. First trim adjustment water tank; 112. Second trim adjustment water tank; 113. First working barge transverse adjustment water tank; 12. Second working barge; 121. Third trim adjustment water tank; 122. Fourth trim adjustment water tank; 123. Second working barge transverse adjustment water tank; 13. Connecting beam;
[0051] 21. First track; 22. First sliding trolley; 23. Riprap pipe;
[0052] 31. Support frame; 32. Lifting assembly; 33. Vibrating hammer;
[0053] 41. The third track; 42. The leveling pipe; 43. The second sliding trolley; 44. The rotating mechanism;
[0054] 51. Pipe lowering winch; 52. Wire rope; 53. Pulley block; 531. Upper pulley block; 532. Lower pulley block; 54. Hydraulic latch;
[0055] 81. A first limit stop; 82. A second limit stop. DETAILED DESCRIPTION
[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0057] In the description of the present invention, it is necessary to understand that the terms "center", "up", "down", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0058] The terms "first", "second", and "third" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the technical features indicated. Thus, a feature defined as "first", "second", and "third" may explicitly or implicitly include one or more of the features.
[0059] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0060] As attached Figure 1-Figure 4As shown, in an illustrative embodiment of the multifunctional ship for inland river immersed tube tunnel construction of the present invention, the multifunctional ship for inland river immersed tube tunnel construction includes a hull 1, a block stone dumping operation unit, a block stone tamping operation unit, a crushed stone leveling operation unit and an immersed tube sinking and installation operation unit; the hull 1 includes a first operation barge 11, a second operation barge 12 and at least two connecting beams 13, the first operation barge 11 and the second operation barge 12 are arranged in parallel and in opposite directions, and the two connecting beams 13 are respectively detachably connected to the opposite bow and stern ends of the first operation barge 11 and the second operation barge 12. The rock throwing operation unit includes a rock throwing device 2, and the rock tamping operation unit includes a rock tamping device 3. Both the rock throwing device 2 and the rock tamping device 3 are carried on the side of the first working barge 11. When the hull 1 turns to a direction in which the length direction of the first working barge 11 is perpendicular to the extension direction of the immersed tube foundation 10 to be constructed and the first working barge 11 is closer to the initial working end of the immersed tube foundation 10 to be constructed than the second working barge 12, the rock throwing device 2 moves relative to the first working barge 11 along the length direction of the first working barge 11 to perform rock throwing. The stone tamping device 3 moves relative to the first working barge 11 along the length direction of the first working barge 11 to perform the stone tamping operation; the stone crushing and leveling operation unit includes a stone crushing and leveling device 4, which is carried on the side of the second working barge 12; when the hull 1 turns to a direction in which the length direction of the second working barge 12 is perpendicular to the extension direction of the submerged tube foundation 10 to be constructed and the second working barge 12 is closer to the initial working end of the submerged tube foundation 10 to be constructed than the first working barge 11, the stone crushing and leveling device 4 moves relative to the first working barge 11 along the length direction of the second working barge 12 to perform the stone tamping operation. The second working barge 12 moves to carry out stone crushing and leveling operations; the immersed tube sinking and installation operation unit includes four sets of sinking equipment 5, which are respectively arranged at the two ends of the two connecting beams 13; when the hull 1 turns to a direction in which the length direction of the first working barge 11 and the second working barge 12 is parallel to the extension direction of the immersed tube foundation 10 to be constructed, the four sets of sinking equipment 5 are respectively connected to the opposite sides of the axial ends of the immersed tube 6 and the immersed tube 6 is located between the first working barge 11 and the second working barge 12, so as to transport the immersed tube 6 and sink the immersed tube 6 onto the constructed immersed tube foundation 10.
[0061] In the above multifunctional ship for inland river immersed tube tunnel construction, it should be noted that the first working barge 11 and the second working barge 12 are of the same type, and the parameters such as the length, width, and depth of the two are consistent, so as to keep the hull 1 balanced during construction. Moreover, the first working barge 11 and the second working barge 12 can be modified from existing engineering square barges, and the existing engineering square barges are equipped with a block stone dumping operation unit and a block stone tamping operation unit as the first working barge 11, and the existing engineering square barges are equipped with a crushed stone leveling operation unit as the second working barge 12, thereby reducing the cost of the ship.
[0062] The above-mentioned multifunctional ship for inland river immersed tube tunnel construction carries the block stone filling operation unit and the block stone tamping operation unit through the first operation barge 11, carries the crushed stone leveling operation unit through the second operation barge 12, and carries the immersed tube sinking and installation operation unit through the connecting crossbeam 13. During construction, the switching of each operation unit is realized by turning the hull 1, so that the block stone filling, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation processes can be completed in sequence by one ship, which can form a streamlined operation, greatly reduce the ship configuration required for inland river immersed tube tunnels, significantly reduce construction costs, and improve water construction efficiency. Moreover, the above-mentioned multifunctional ship for inland river immersed tube tunnel construction integrates the functions of block stone filling, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation. The working surface required for its construction is small, and there is no need to close the waterway for navigation operations on the entire section, which reduces the social impact of the closure. Furthermore, in the above-mentioned multifunctional ship for inland river immersed tube tunnel construction, the block stone dumping operation unit and the block stone tamping operation unit are carried together on the first operation barge 11, and the crushed stone leveling operation unit is carried alone on the second operation barge 12. On the one hand, it is more conducive to maintaining the balance of the first operation barge 11 and the second operation barge 12, and on the other hand, it can reduce the number of turns of the hull 1 during the construction process, which is conducive to improving construction efficiency. In addition, the above-mentioned multifunctional ship for inland river immersed tube tunnel construction, its hull 1 is composed of the first operation barge 11, the second operation barge 12 and the connecting crossbeam 13. The first operation barge 11 and the second operation barge 12 can enter the construction site through the narrow inland waterway, and be assembled with the connecting crossbeam 13 at the construction site, which can meet the requirements of inland river immersed tube tunnel construction.
[0063] like Figure 1 and Figure 2 As shown, in this embodiment, the rock throwing equipment 2 and the rock tamping equipment 3 are both located on the ship side of the first working barge 11 away from the second working barge 12, and the crushed stone leveling equipment 4 is located on the ship side of the second working barge 12 away from the first working barge 11. Such arrangement of the rock throwing equipment 2, the rock tamping equipment 3 and the crushed stone leveling equipment 4 is more conducive to maintaining the balance of the hull 1. It can be understood that the rock throwing equipment 2 and the rock tamping equipment 3 can also be respectively carried on both sides of the first working barge 11 in this field, specifically: the rock throwing equipment 2 is located on the ship side of the first working barge 11 away from the second working barge 12, the rock tamping equipment 3 is located on the ship side of the first working barge 11 close to the second working barge 12, and the crushed stone leveling equipment 4 is located on the ship side of the second working barge 12 away from the first working barge 11. Such arrangement of the rock throwing equipment 2 and the rock tamping equipment 3 is more conducive to maintaining the balance of the first working barge 11.
[0064] like Figure 4 and Figure 5As shown, both ends of the connecting beam 13 are respectively hinged between the first working barge 11 and the second working barge 12 through the hinged supports 7 provided on the first working barge 11 and the second working barge 12. The connecting beam 13 is connected to the first working barge 11 and the second working barge 12 in a hinged manner, and can adapt to the different ups and downs of the first working barge 11 and the second working barge 12, so as to facilitate the assembly of the hull 1 on the water.
[0065] like Figure 2 and Figure 6 As shown, the first working barge 11 and the second working barge 12 are both provided with a limit assembly 8 for limiting the position of the connecting beam 13. The limit assembly 8 includes three limit stops surrounding the end of the connecting beam 13 from three sides, wherein the two limit stops located on the two opposite sides are the first limit stops 81, and the remaining limit stops are the second limit stops 82. The two first limit stops 81 are respectively against the two sides of the connecting beam 13 to limit the torsion of the connecting beam 13, and the second limit stops 82 are against the end face of the connecting beam 13 in the length direction to limit the movement of the connecting beam 13. The limit assembly 8 can effectively limit the torsion and movement of the connecting beam 13, thereby ensuring the overall stability of the multifunctional ship.
[0066] like Figure 7 and Figure 8As shown, in this embodiment, the bow end and the stern end of the first working barge 11 are respectively provided with a first trimming and loading water tank 111 and a second trimming and loading water tank 112, and the bow end and the stern end of the second working barge 12 are respectively provided with a third trimming and loading water tank 121 and a fourth trimming and loading water tank 122; a first loading adjustment pipeline is connected between the first trimming and loading water tank 111 and the second trimming and loading water tank 112, so that when the stone crushing and leveling equipment 4 moves, ballast water is allocated between the first trimming and loading water tank 111 and the second trimming and loading water tank 112 to maintain the first working barge 1 1 and the second working barge 12; a second load adjustment pipeline is connected between the third longitudinal tilt adjustment water tank 121 and the fourth longitudinal tilt adjustment water tank 122, so that ballast water can be allocated between the third longitudinal tilt adjustment water tank 121 and the fourth longitudinal tilt adjustment water tank 122 when the block stone throwing equipment 2 or the block stone tamping equipment 3 is moving, so as to maintain the balance of the first working barge 11 and the second working barge 12; the first working barge transverse tilt adjustment water tank 113 and the second working barge transverse tilt adjustment water tank 123 are also provided on the ship sides of the first working barge 11 and the second working barge 12 that are away from each other. In this embodiment, by respectively setting trim water tanks (including a first trim water tank 111, a second trim water tank 112, a third trim water tank 121 and a fourth trim water tank 122) at the bow and stern of a working barge (including a first working barge 11 and a second working barge 12), when the construction equipment (including a block stone dumping equipment 2, a block stone tamping equipment 3 and a crushed stone leveling equipment 4) of a working barge moves along the working barge to perform construction work, the trim of the hull 1 can be quickly reduced by allocating ballast water between the two trim water tanks arranged at the bow and stern of another working barge. At the same time, the heel of the hull 1 can be reduced by adjusting the first working barge transverse trim water tank 113 and the second working barge transverse trim water tank 123. It should be noted that when allocating ballast water between the trim water tanks, the ballast water adjustment direction is opposite to the moving direction of the construction equipment.
[0067] For the rock dumping operation unit, the specific instructions are as follows: Figure 1 and Figure 2As shown, the rock throwing equipment 2 includes a first track 21 arranged on the first working barge 11 along the length direction of the first working barge 11, a first sliding trolley 22 slidably connected to the first track 21, and a riprap tube 23 installed on the first sliding trolley 22 and located outside the first working barge 11. When performing the rock throwing operation, the rock is guided to the seabed by the riprap tube 23, and the riprap tube 23 is moved by the sliding of the first sliding trolley 22 along the first track 21, so as to complete the riprap at different positions. In addition, the rock throwing operation unit also includes a rock feeding system for feeding the riprap tube 23, a riprap tube positioning system for obtaining the position of the riprap tube 23, a riprap tube lifting system for sinking and lifting the riprap tube 23, a riprap tube locking system for fixing the position of the riprap tube 23, a hydrological monitoring real-time forecasting system for monitoring hydrological information, and a riprap amount monitoring system for monitoring the amount of rock thrown by the riprap tube 23. It should be noted that each auxiliary system of the above-mentioned rock throwing operation unit can adopt the existing system.
[0068] For the block stone tamping operation unit, the specific instructions are as follows: Figure 1 and Figure 2 As shown, the block rock tamping device 3 includes a second track arranged on the first working barge 11 along the length direction of the first working barge 11 (it should be noted that in this embodiment, the block rock tamping device 3 and the block rock dumping device 2 share the same track, that is, the second track and the first track 21 are the same track), a support frame 31 slidably connected to the second track, and a vibrating hammer 33 hoisted on the support frame 31 by a lifting assembly 32 and located outside the first working barge 11. The lifting assembly 32 drives the vibrating hammer 33 to rise and fall relative to the support frame 31. When performing the block rock tamping operation, the vibrating hammer 33 is lowered to contact the seabed block rock bed by the lifting assembly 32, the block rock bed is tamped by the vibrating hammer 33, and the vibrating hammer 33 is moved by the sliding of the support frame 31 along the second track, thereby completing the block rock tamping at different positions. In addition, the block stone tamping operation unit also includes a vibrating hammer positioning system for obtaining the position of the vibrating hammer 33, a vibrating hammer lifting control system for controlling the lifting and lowering of the vibrating hammer 33, a vibrating hammer movement control system for controlling the movement of the vibrating hammer 33, a vibrating hammer power control system for controlling the vibration force of the vibrating hammer 33, a vibrating amount control system for controlling the vibration amount, and a block stone tamping quality monitoring system for monitoring the block stone tamping quality. It should be noted that the various auxiliary systems of the above-mentioned block stone tamping operation unit can adopt existing systems.
[0069] For the stone crushing and leveling unit, the specific instructions are as follows: Figure 1 and Figure 2As shown, the crushed stone leveling equipment 4 includes a third track 41 provided on the second working barge 12 along the length direction of the second working barge 12, a second sliding trolley 43 slidably connected to the third track 41, and a leveling pipe 42 installed on the first sliding trolley 22 and located outside the second working barge 12. The leveling pipe 42 is raised and lowered relative to the first sliding trolley 22, and the first sliding trolley 22 is equipped with a rotating mechanism 44 for driving the leveling pipe 42 to rotate relative to the second working barge 12 in a vertical plane. When performing the crushed stone leveling operation, the leveling pipe 42 is rotated to a vertical state by the rotating mechanism 44, and the leveling pipe 42 is lowered to contact with the crushed stone bed after being tamped, and the crushed stone bed is leveled by the leveling pipe 42, and the second sliding trolley 43 slides and moves the leveling pipe 42 along the third track 41 to level different positions, thereby forming a ridge-shaped crushed stone ridge. In addition, the stone crushing and leveling operation unit also includes a leveling pipe positioning system, a leveling pipe moving locking system, a leveling pipe lifting and locking system, a leveling pipe verticality control system, a stone crushing cushion slope adjustment system, a leveling pipe rotation locking system, a leveling pipe stone crushing feeding system, a leveling head water level compensation system, a leveling pipe stone crushing position monitoring and early warning system, a leveling pipe stone crushing quantity monitoring system, a leveling pipe positioning compensation system, a leveling pipe moving automatic loading system, a leveling head anti-collision early warning system, and a leveling pipe anti-dumping early warning system, etc. It should be noted that the various auxiliary systems of the above-mentioned stone crushing and leveling operation unit can adopt existing systems.
[0070] The specific instructions for the immersed tube installation unit are as follows: Figure 3 and Figure 4 As shown, the sinking equipment 5 includes a tube sinking winch 51 and a pulley group 53 installed on the connecting beam 13, and a wire rope 52 connected between the tube sinking winch 51 and the pulley group 53; the pulley group 53 includes an upper pulley group 531 installed on the connecting beam 13 and a lower pulley group 532 connected to the upper pulley group 531 through the wire rope 52, and the end of the wire rope 52 is connected to the tube sinking winch 51, so as to drive the lower pulley group 532 to rise and fall relative to the upper pulley group 531 by retracting and releasing the wire rope 52 through the tube sinking winch 51; the sinking equipment 5 also includes a hydraulic pin 54 for connecting the ear plate of the lower pulley group 532 to the ear plate of the lifting point of the immersed tube 6. When connecting the immersed tube 6, the lug of the lower slide block 532 is connected to the lug of the lifting point of the immersed tube 6 through the hydraulic latch 54; when sinking the immersed tube 6, the steel wire rope 52 is released through the immersed tube sinking winch 51, and the immersed tube 6 can be sunk onto the gravel bed.
[0071] like Figure 9-Figure 14 As shown, based on the above-mentioned multifunctional ship for inland river immersed tube tunnel construction, the present invention also provides an inland river immersed tube tunnel construction method, which uses the above-mentioned multifunctional ship for inland river immersed tube tunnel construction to carry out inland river immersed tube tunnel construction, including the following steps:
[0072] S1 hull assembly step: dispatch the first working barge 11 and the second working barge 12 to the construction area and moor them in front of the dry dock door 9, hoist the connecting beam 13 between the first working barge 11 and the second working barge 12 and connect them to form the hull 1, and load the block stone filling operation unit, the block stone tamping operation unit, the crushed stone leveling operation unit and the immersed tube sinking and installation operation unit on the hull 1 respectively;
[0073] S2 hull debugging step: adjust the hull 1 to a state where the first working barge 11 and the second working barge 12 are respectively located on both sides of the dry dock door 9 and are parallel to the extension direction of the immersed tube foundation 10 to be constructed, and debug the block stone filling operation unit, the block stone tamping operation unit, the crushed stone leveling operation unit and the immersed tube sinking and installation operation unit respectively;
[0074] S3: rock throwing and filling operation step: the hull 1 is rotated 90° by a cable-twisting method, so that the length direction of the first working barge 11 is perpendicular to the extension direction of the submerged tube foundation 10 to be constructed and the first working barge 11 is closer to the initial working end of the submerged tube foundation 10 to be constructed than the second working barge 12, and the hull 1 is gradually moved from the initial working end of the submerged tube foundation 10 to the final working end along the extension direction of the submerged tube foundation 10 to be constructed. During the movement of the hull 1, the rock throwing and filling equipment 2 moves relative to the first working barge 11 along the length direction of the first working barge 11 to perform the rock throwing and filling operation;
[0075] S4: stone tamping operation step: the hull 1 is returned to the initial operation end, and the hull 1 is gradually moved from the initial operation end to the final operation end along the extension direction of the submerged tube foundation 10 to be constructed. During the movement of the hull 1, the stone tamping device 3 moves relative to the first operation barge 11 along the length direction of the first operation barge 11 to perform the stone tamping operation;
[0076] S5: stone crushing and leveling operation step: the hull 1 is rotated 180 degrees by a cable-twisting method, and the hull 1 is gradually moved from the initial operation end of the submerged tube foundation 10 to the final operation end along the extension direction of the submerged tube foundation 10 to be constructed. During the movement of the hull 1, the stone crushing and leveling equipment 4 moves relative to the second working barge 12 along the length direction of the second working barge 12 to perform stone crushing and leveling operation;
[0077] S6 immersed tube transportation and sinking steps: rotate the hull 1 90° by mooring, and make the hull 1 park in front of the dry dock door 9, use four sets of sinking equipment 5 to connect the immersed tube 6 to be installed between the first working barge 11 and the second working barge 12, and move the immersed tube 6 and the hull 1 to the installation position of the immersed tube 6 by mooring, and sink the immersed tube 6 by the sinking equipment 5.
[0078] The above-mentioned inland river immersed tube tunnel construction method utilizes a multifunctional ship with integrated functions of block rock dumping, block rock tamping, crushed stone leveling, immersed tube floating and immersed tube installation for construction, and the switching of each operation unit is realized by turning the hull 1, thereby completing the block rock dumping, block rock tamping, crushed stone leveling, immersed tube floating and immersed tube installation processes in sequence, forming a streamlined operation, significantly improving the efficiency of water construction and reducing construction costs. In the above-mentioned inland river immersed tube tunnel construction method, it should be noted that those skilled in the art can reasonably arrange the cable system of the hull 1 according to common knowledge, and realize the rotation and twisting of the hull 1 by twisting the cable. The cable system arrangement during the rotation and twisting of the hull 1 is not described in detail here.
[0079] In some embodiments, in the block rock filling operation step, when the block rock filling equipment 2 moves, ballast water is allocated between the third longitudinal inclination adjusting water tank 121 and the fourth longitudinal inclination adjusting water tank 122 through the second adjusting pipeline to maintain the balance of the first working barge 11 and the second working barge 12; in the block rock leveling operation step, when the block rock leveling equipment 3 moves, ballast water is allocated between the third longitudinal inclination adjusting water tank 121 and the fourth longitudinal inclination adjusting water tank 122 through the second adjusting pipeline to maintain the balance of the first working barge 11 and the second working barge 12; in the crushed stone leveling operation step, when the crushed stone leveling equipment 4 moves, ballast water is allocated between the first longitudinal inclination adjusting water tank 111 and the second longitudinal inclination adjusting water tank 112 through the first adjusting pipeline to maintain the balance of the first working barge 11 and the second working barge 12.
[0080] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0081] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.
Claims
1. Multifunctional ship for inland river immersed tube tunnel construction, characterized by: include: A hull, the hull comprising a first working barge, a second working barge and at least two connecting beams, the first working barge and the second working barge are arranged in parallel and in opposite directions, the two connecting beams are respectively detachably connected between the bow end and the stern end of the first working barge and the second working barge; both ends of the connecting beam are respectively hinged between the first working barge and the second working barge through hinged supports arranged on the first working barge and the second working barge; A block rock throwing and filling operation unit and a block rock tamping operation unit, wherein the block rock throwing and filling operation unit comprises block rock throwing and filling equipment, and the block rock tamping operation unit comprises block rock tamping equipment, and both the block rock throwing and filling equipment and the block rock tamping equipment are carried on the side of the first working barge; when the hull turns to a direction in which the length direction of the first working barge is perpendicular to the extension direction of the submerged tube foundation to be constructed and the first working barge is closer to the initial working end of the submerged tube foundation to be constructed than the second working barge, the block rock throwing and filling equipment moves relative to the first working barge along the length direction of the first working barge to perform block rock throwing and filling operations, and the block rock tamping equipment moves relative to the first working barge along the length direction of the first working barge to perform block rock tamping operations; A stone crushing and leveling operation unit, comprising a stone crushing and leveling device, which is carried on the side of the second working barge; when the hull turns to a direction in which the length direction of the second working barge is perpendicular to the extension direction of the immersed tube foundation to be constructed and the second working barge is closer to the initial operation end of the immersed tube foundation to be constructed than the first working barge, the stone crushing and leveling device moves relative to the second working barge along the length direction of the second working barge to perform a stone crushing and leveling operation; The immersed tube laying and installation operation unit comprises four sets of laying equipment, which are respectively arranged at the two ends of the two connecting beams; when the hull turns to a direction in which the length direction of the first working barge and the second working barge is parallel to the extension direction of the immersed tube foundation to be constructed, the four sets of laying equipment are respectively connected to the opposite sides of the axial ends of the immersed tube and the immersed tube is located between the first working barge and the second working barge, so as to transport the immersed tube and sink the immersed tube onto the constructed immersed tube foundation; The bow and stern of the first working barge are respectively provided with a first trim water tank and a second trim water tank, and the bow and stern of the second working barge are respectively provided with a third trim water tank and a fourth trim water tank; a first load adjustment pipeline is connected between the first trim water tank and the second trim water tank, so that when the stone crushing and leveling equipment is moving, ballast water is allocated between the first trim water tank and the second trim water tank to maintain the balance of the first working barge and the second working barge; a second load adjustment pipeline is connected between the third trim water tank and the fourth trim water tank, so that when the block stone throwing and filling equipment or the block stone tamping equipment is moving, ballast water is allocated between the third trim water tank and the fourth trim water tank to maintain the balance of the first working barge and the second working barge; a transverse trim water tank is also provided on the ship sides of the first working barge and the second working barge that are away from each other.
2. The multifunctional ship for inland river immersed tube tunnel construction according to claim 1 is characterized in that: The rock-throwing equipment and the rock-tamping equipment are both located on the side of the first working barge away from the second working barge, and the crushed stone-leveling equipment is located on the side of the second working barge away from the first working barge; or, the rock-throwing equipment is located on the side of the first working barge away from the second working barge, the rock-tamping equipment is located on the side of the first working barge close to the second working barge, and the crushed stone-leveling equipment is located on the side of the second working barge away from the first working barge.
3. The multifunctional ship for inland river immersed tube tunnel construction according to claim 1 is characterized in that: The first working barge and the second working barge are both provided with a limit assembly for limiting the position of the connecting beam, and the limit assembly includes three limit stops surrounding the end of the connecting beam from three sides, wherein the two limit stops located on two opposite side surfaces are first limit stops, and the remaining limit stops are second limit stops, and the two first limit stops are respectively abutted against the two sides of the connecting beam to limit the torsion of the connecting beam, and the second limit stop is abutted against the end face of the connecting beam in the length direction to limit the movement of the connecting beam.
4. The multifunctional ship for inland river immersed tube tunnel construction according to claim 1, characterized in that: The stone throwing equipment includes a first track arranged on the first working barge along the length direction of the first working barge, a first sliding trolley slidably connected to the first track, and a stone throwing tube installed on the first sliding trolley and located on the outside of the first working barge; the stone tamping equipment includes a second track arranged on the first working barge along the length direction of the first working barge, a support frame slidably connected to the second track, and a vibrating hammer hoisted on the support frame by a lifting assembly and located on the outside of the first working barge, and the lifting assembly drives the vibrating hammer to rise and fall relative to the support frame.
5. The multifunctional ship for inland river immersed tube tunnel construction according to claim 1, characterized in that: The gravel leveling equipment includes a third track arranged on the second working barge along the length direction of the second working barge, a second sliding trolley slidably connected to the third track, and a leveling pipe installed on the second sliding trolley and located on the outside of the second working barge. The leveling pipe is raised and lowered relative to the second sliding trolley, and the second sliding trolley is equipped with a rotating mechanism for driving the leveling pipe to rotate relative to the second working barge in a vertical plane.
6. The multifunctional ship for inland river immersed tube tunnel construction according to claim 1, characterized in that: The sinking equipment includes a tube lowering winch and a pulley group installed on the connecting crossbeam, and a steel wire rope connected between the tube lowering winch and the pulley group; the pulley group includes an upper pulley group installed on the connecting crossbeam and a lower pulley group connected to the upper pulley group through the steel wire rope, and the end of the steel wire rope is connected to the tube lowering winch so that the steel wire rope can be retracted and released by the tube lowering winch to drive the lower pulley group to rise and fall relative to the upper pulley group; the sinking equipment also includes a hydraulic pin for connecting the ear plate of the lower pulley group to the ear plate of the tube lifting point.
7. A method for constructing an inland river immersed tube tunnel, characterized in that: The inland river immersed tube tunnel construction is carried out using the multifunctional ship for inland river immersed tube tunnel construction as described in any one of claims 1 to 6, comprising the following steps: Hull assembly steps: dispatching the first working barge and the second working barge to the construction area and mooring them in front of the dry dock door, hoisting the connecting crossbeam between the first working barge and the second working barge and connecting them to form the hull, and loading the block stone dumping operation unit, the block stone tamping operation unit, the crushed stone leveling operation unit and the immersed tube sinking and installation operation unit on the hull respectively; Hull debugging step: adjusting the hull to a state where the first working barge and the second working barge are respectively located on both sides of the dry dock door and are parallel to the extension direction of the immersed tube foundation to be constructed, and respectively debugging the block stone filling operation unit, the block stone tamping operation unit, the crushed stone leveling operation unit and the immersed tube sinking and installation operation unit; The rock throwing and filling operation steps are as follows: the hull is rotated 90 degrees by a cable-twisting method, so that the length direction of the first working barge is perpendicular to the extension direction of the submerged tube foundation to be constructed and the first working barge is closer to the initial working end of the submerged tube foundation to be constructed than the second working barge, and the hull is gradually moved from the initial working end of the submerged tube foundation to be constructed to the final working end along the extension direction of the submerged tube foundation to be constructed. During the movement of the hull, the rock throwing and filling equipment moves relative to the first working barge along the length direction of the first working barge to perform the rock throwing and filling operation; Stone tamping operation step: returning the hull to the initial operation end, and gradually moving the hull from the initial operation end to the final operation end again along the extension direction of the immersed tube foundation to be constructed. During the movement of the hull, the stone tamping device moves relative to the first operation barge along the length direction of the first operation barge to perform the stone tamping operation; The stone crushing and leveling operation step is as follows: the hull is rotated 180 degrees by a cable-twisting method, and the hull is gradually moved from the initial operation end of the submerged tube foundation to be constructed to the final operation end along the extension direction of the submerged tube foundation to be constructed. During the movement of the hull, the stone crushing and leveling equipment moves relative to the second working barge along the length direction of the second working barge to perform the stone crushing and leveling operation; The steps of transporting and sinking the immersed tube are as follows: the hull is rotated 90° by mooring the hull, and the hull is moored in front of the dry dock door, the immersed tube to be installed is connected between the first working barge and the second working barge by using four sets of the sinking equipment, the immersed tube and the hull are moved to the installation position of the immersed tube by mooring the hull, and the immersed tube is sunk by the sinking equipment.
8. The inland river immersed tube tunnel construction method according to claim 7, characterized in that: In the block stone filling operation step, when the block stone filling equipment moves, ballast water is allocated between the third longitudinal tilt adjusting water tank and the fourth longitudinal tilt adjusting water tank through the second adjusting pipeline to maintain the balance of the first working barge and the second working barge; in the block stone leveling operation step, when the block stone leveling equipment moves, ballast water is allocated between the third longitudinal tilt adjusting water tank and the fourth longitudinal tilt adjusting water tank through the second adjusting pipeline to maintain the balance of the first working barge and the second working barge; in the crushed stone leveling operation step, when the crushed stone leveling equipment moves, ballast water is allocated between the first longitudinal tilt adjusting water tank and the second longitudinal tilt adjusting water tank through the first adjusting pipeline to maintain the balance of the first working barge and the second working barge.
Citation Information
Patent Citations
Foundation construction barge for immersed tube
CN102758439A
Riprapping, tamping and leveling method based on self-walking jack-up platform
CN108396747A
Leveling method and leveling system for full-floating leveling ship
CN116353811A
Gravel foundation bed leveling and immersed tube sinking installation integrated barge and immersed tube tunnel construction method
CN116716933A