Foundation pile self-balancing static load test displacement observation device and analysis method thereof
By designing a self-balancing static load test displacement observation device of foundation pile in self-balancing static load test, using hydraulic cylinders and laser rangefinders to detect displacement changes and draw load-displacement curves, the ultimate compressive bearing of foundation piles in the existing technology is solved The problem of insufficient force data error and analysis has achieved more accurate and economical experimental results.
Patent Information
- Application Number
- CN202411050327.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-01
AI Technical Summary
The existing self-balancing static load test methods have problems such as large errors, unreasonable assumptions, unavailability of the whole pile load-displacement curve, and environmental impact, resulting in inaccurate data on the ultimate compressive bearing capacity of the foundation pile.
A self-balancing static load test displacement observation device of foundation piles is designed, including a load box, a pressurized mechanism, a displacement detector and a data collector. The displacement changes of the upper and lower connecting plates are detected through hydraulic cylinders and laser rangefinders, and the displacement changes of the upper and lower connecting plates are plotted. Load-displacement curve, cancel ground displacement observation reference piles and foundation pile beams, improve adaptability and reduce construction period and costs.
It effectively avoids the data error of the ultimate compressive bearing capacity of the foundation pile, solves the shortcomings of the analysis method, provides a more reasonable load-displacement curve, improves the accuracy and applicability of the test, and reduces construction period and costs.
Smart Images

Figure CN118895791A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of self-balancing static load test, and in particular relates to a displacement observation device for a self-balancing static load test of a pile foundation and an analysis method thereof. Background Art
[0002] The existing self-balancing static load test load box displacement observation method is usually a method of pre-embedded displacement tubes or displacement wires, and then by measuring the upward displacement of the upper pile and the downward displacement of the lower pile, the load-displacement curves of the upper pile and the lower pile are obtained to obtain the ultimate compressive bearing capacity of the pile. Since the self-balancing pile test method can greatly reduce the reaction force or does not require a reaction force platform, it has great advantages in static load tests of pile foundations in areas with high bearing capacity or limited site conditions.
[0003] The existing self-balancing static load test load box displacement observation method is usually a method of pre-embedded displacement tubes or displacement wires, and then by measuring the upward displacement of the upper pile and the downward displacement of the lower pile, the load-displacement curves of the upper pile and the lower pile are obtained to obtain the ultimate compressive bearing capacity of the pile. Since the self-balancing pile test method can greatly reduce the reaction force or does not require a reaction force platform, it has great advantages in static load tests of pile foundations in areas with high bearing capacity or limited site conditions.
[0004] However, there are some shortcomings in the current data analysis and processing of self-balanced static load tests. The theoretical basis of the equal displacement method and the equal load method is insufficient; the simplified method and the precise method are based on assumptions that are inconsistent with the actual conditions, and some of the assumptions are unreasonable; when the lower displacement is less than the upper displacement, the equivalent displacement method cannot obtain a complete load-displacement curve and cannot determine the ultimate bearing capacity; the precise method requires a large amount of test and monitoring data to be laid out in the pile body for calculation, and the data acquisition cost and calculation requirements are high; the numerical analysis method or analytical algorithm is also based on a large number of assumptions, test data and geotechnical parameters, and the accurate results need to be inverted by conventional static load test piles under the same test conditions, which is very costly and difficult to implement; and the conventional method (the method of adding the bearing capacity of the upper and lower piles) completely separates the upper and lower piles, analyzes the bearing capacity independently and then adds them, and cannot obtain the load-displacement curve of the whole pile, and cannot consider the upper and lower piles as a whole. Sometimes it is obviously unreasonable and the results are too small.
[0005] In addition to the unreasonableness of some basic assumptions, the properties of the rock and soil around the pile are often unbalanced (mainly due to different soil types), and the properties of the same type of rock and soil are often quite different (soil discreteness). The distribution of pile side resistance is related to factors such as the composition of the soil layer around the pile, the size of the load, and the length of the pile. Even if there is only one layer of soil around the pile, it will not be evenly distributed. These assumptions are often different from the actual situation, and the results of the analysis are generally limited and cannot be widely applied.
[0006] In addition, the displacement of the upper and lower sections of the self-balancing test pile, that is, the displacement of the upper and lower connecting plates of the load box, is easily affected by general wind force, temperature, slight vibration, or even when the reference pile and foundation pile beam are slightly touched, thereby further affecting the data obtained from the test and causing large errors in the data.
[0007] Therefore, there is an urgent need to establish a theoretically more complete method for determining the load-displacement curve of the entire pile from self-balancing test pile data. Summary of the invention
[0008] In order to solve the above-mentioned problems existing in the prior art, the present invention provides a displacement observation device and an analysis method for a self-balancing static load test of a pile foundation, which solves the problem that the ultimate compressive bearing capacity data of the pile foundation obtained by the existing self-balancing test has a large probability of error. At the same time, improvements are made to many shortcomings of the existing self-balancing test pile data analysis, and the reference piles and pile beams for ground displacement observation are eliminated. On the one hand, the adaptability of the self-balancing static load test to the site and environment is improved, and on the other hand, the construction period and cost may be greatly reduced.
[0009] The purpose of the present invention can be achieved through the following technical solutions: a self-balancing static load test displacement observation device for pile foundation, comprising a load box, a pressurizing mechanism, a displacement detector and a data acquisition instrument, the load box comprising an upper connecting plate, a lower connecting plate and a hydraulic cylinder, the two ends of the hydraulic cylinder are respectively fixedly connected to the upper connecting plate and the lower connecting plate, the upper connecting plate and the lower connecting plate are respectively fixedly connected to the upper pile and the lower pile, the displacement detector is installed in the load box and detects the distance between the upper connecting plate and the lower connecting plate, the pressurizing mechanism is located on the ground and connected to the hydraulic cylinder, the pressurizing mechanism increases the pressure in the hydraulic cylinder so that the hydraulic cylinder pushes the upper pile and the lower pile to move, the data acquisition instrument is electrically connected to the displacement detector and the pressurizing mechanism, and the data acquisition instrument draws a load-displacement curve by one-to-one correspondence between the detection result of the displacement detector and the loading force of the pressurizing mechanism.
[0010] As a preferred technical solution of the present invention, the displacement detector includes a laser rangefinder, a guide tube, a sliding tube and a detection plate, the guide tube is installed on the top surface of the lower connecting plate, the sliding tube is installed on the bottom surface of the upper connecting plate, the sliding tube is located in the guide tube and slides in contact with the guide tube, the guide tube and the sliding tube are parallel to the central axis of the upper connecting plate and the lower connecting plate, the detection plate is embedded in the top surface of the sliding tube, and the laser rangefinder is installed on the inner bottom surface of the guide tube and measures the position change of the detection plate.
[0011] As a preferred technical solution of the present invention, the pressurizing mechanism includes an oil pump and a high-pressure oil pipe. The oil pump is connected to the hydraulic cylinder through the high-pressure oil pipe. The length of one end of the high-pressure oil pipe connected to the hydraulic cylinder is retractable.
[0012] As a preferred technical solution of the present invention, at least two hydraulic cylinders are provided, and the plurality of hydraulic cylinders are distributed in a circular array along the center of the upper connecting plate.
[0013] As a preferred technical solution of the present invention, the upper connecting plate and the lower connecting plate are both annular plates, and a plurality of through grooves and a plurality of reinforcing ribs are formed on the upper connecting plate and the lower connecting plate.
[0014] As a preferred technical solution of the present invention, the top surface of the upper connecting plate is further provided with two through holes, and two grouting pipes are respectively arranged in the two through holes.
[0015] Based on the above-mentioned pile foundation self-balancing static load test displacement observation device, a pile foundation self-balancing static load test displacement analysis method is also proposed, including the following steps:
[0016] S1: Fix and weld the upper connecting plate and the steel cage of the upper pile, and weld the reinforcing steel bars between the upper connecting plate and the upper steel cage; fix and weld the lower connecting plate and the steel cage of the lower pile, and weld the reinforcing steel bars between the lower connecting plate and the lower steel cage;
[0017] S2: Connect the pressurizing mechanism to the hydraulic cylinder;
[0018] S3: lower the entire steel cage to the designated location;
[0019] S4: lower the guide tube, pass through the center hole between the upper connecting plate and the lower connecting plate, and lower to the lower part of the steel cage, and pour concrete to form a pile;
[0020] S5: By applying pressure through the pressure mechanism, oil can be injected into the hydraulic cylinder to stretch it, so that the upper connecting plate moves upward, driving the upper pile to move upward, and the lower connecting plate moves downward, driving the lower pile section to move downward;
[0021] S6: The displacement detector detects the displacement of the upper connecting plate and the lower connecting plate during the movement and transmits the detection result to the data acquisition instrument;
[0022] S7: The data acquisition instrument draws a load-displacement curve by corresponding the detection result of the displacement detector and the loading force of the pressurizing mechanism one by one;
[0023] S8: Inject cement slurry or grouting material from the grouting pipe between the upper connecting plate and the lower connecting plate to tighten the connection.
[0024] As a preferred technical solution of the present invention, in step S5, the pressurizing mechanism performs pressurization step by step, and the loading value of each step is 1 / 10 of the maximum loading value.
[0025] As a preferred technical solution of the present invention, in step S8, the pressure relief is carried out in stages, and the pressure relief value of each stage is twice the graded load during loading, and the pressure is unloaded in equal amounts stage by stage.
[0026] As a preferred technical solution of the present invention, in step S6, the detection value of the displacement detector measures the displacement change at 5 minutes, 15 minutes, 30 minutes, 45 minutes and 60 minutes after each level of load is applied, and then detects the displacement change every 30 minutes.
[0027] The beneficial effects of the present invention are as follows: by drawing a load-displacement curve corresponding to the displacement change between the upper and lower connecting plates in the load box and the loading value of the pressure mechanism, the ultimate loading compressive bearing capacity data of the foundation pile is obtained, which avoids the displacement value of the upper and lower piles changing due to the influence of the environment during the loading process, thereby causing the displacement value of a certain pile to reach the limit value while the displacement value of the other pile does not reach the limit value, so that the ultimate loading compressive bearing capacity data of the foundation pile obtained at this time is inconsistent with the actual situation, and solves the problem that the error probability of the ultimate compressive bearing capacity data of the foundation pile obtained by the existing self-balancing test is large. In addition, it also solves the problems of insufficient theoretical basis of the existing analysis method, unreasonable assumptions, incomplete curves, and failure to conduct unified analysis of the upper and lower piles. . BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0029] Figure 1 It is a structural schematic diagram of the displacement observation device of the present invention;
[0030] Figure 2 It is a schematic diagram of the load box structure of the present invention;
[0031] Figure 3 It is a schematic diagram of the structure of the displacement detector of the present invention;
[0032] Figure 4 is a flow chart of the observation method of the present invention;
[0033] Figure 5 It is a typical self-balancing static load test curve and total displacement method principle diagram;
[0034] Figure 6 It is a typical self-balanced static load test curve and the equivalent load-total displacement method curve principle diagram;
[0035] Main component symbols
[0036] In the figure: 1. load box; 11. upper connecting plate; 12. lower connecting plate; 13. hydraulic cylinder; 2. pressurizing mechanism; 21. oil pump; 22. high-pressure oil pipe; 3. displacement detector; 31. laser rangefinder; 32. guide tube; 33. sliding tube; 34. detection plate; 4. data acquisition instrument. DETAILED DESCRIPTION
[0037] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments.
[0038] When the self-balancing method is used to detect the ultimate bearing capacity of the foundation pile, the displacement of the upper and lower piles is usually detected, and then the ultimate bearing capacity of the foundation pile is calculated based on the loading value of the point after the upper and lower piles reach the limit point, or the maximum loading value is taken when the load box reaches the loading limit and the upper and lower piles have not reached the limit point. In theory, the upper and lower piles should reach the limit point at the same time, and the data obtained at this time is the ultimate bearing capacity of the foundation pile. However, the properties of the rock and soil around the foundation pile are often unbalanced (mainly due to different soil types), and the properties of the rock and soil of the same type are often quite different (discreteness of soil). The distribution of pile side resistance is related to factors such as the composition of the soil layer around the pile, the size of the load, and the length of the pile. Even if there is only one layer of soil around the pile, it will not be evenly distributed, so it is impossible to accurately judge the placement position of the load box, resulting in a large deviation in the ultimate bearing capacity of the foundation obtained during the actual test.
[0039] See also Figure 5-Figure 6 , points A and B are the limit load points of the lower pile and the upper pile respectively, the corresponding loads are Q1 and Q2, and the corresponding displacement is s1 (s A )、s2(s B ). At load Q1, the lower pile reaches the limit, the upper pile does not reach the limit, and the whole pile does not reach the limit; at load Q2, the upper pile reaches the limit, the lower pile exceeds the limit, and the whole pile exceeds the limit; obviously, there is a load between Q1 and Q2, corresponding to the limit of the whole pile. When the lower end plate of the load box moves downward by s1, the lower pile reaches the limit, and when the upper end plate of the load box moves upward by s2, the upper pile reaches the limit. Therefore, when the total displacement of the upper and lower end plates (that is, the relative displacement of the upper and lower end plates) s=s1+s2, the bearing capacity of the upper and lower piles reaches the limit, that is, load Q i The corresponding total displacement of the upper and lower end plates (CD length in the figure) is s1+s2. Combining the continuity of the curve and the monotonicity of the displacement with the load, it can be seen that Q i The point exists and is unique. The situation is similar when the upper pile reaches the limit before the lower pile, or when they reach the limit at the same time.
[0040] The above description does not make specific requirements for the displacement of points A and B. Points A and B can be selected arbitrarily, that is, for any points A and B on the Qs curve of the lower pile and the upper pile, the corresponding loads are Q1 and Q2, and the corresponding displacements are s1 and s2. At the load min (Q1, Q2), the total displacement of the upper and lower piles is less than or equal to s1+s2; at the load max (Q1, Q2), the total displacement of the upper and lower piles is greater than or equal to s1+s2. Obviously, there is a load Q between Q1 and Q2. i (or Q i =Q1=Q2), the corresponding total displacement of the upper and lower piles is equal to s1+s2. Therefore, the load corresponding to the total displacement of the upper and lower piles (i.e. the relative displacement of the upper and lower piles) s=s1+s2 is the equivalent load of Q1 and Q2.
[0041] From the above analysis, it can be seen that corresponding to the load value, the relationship between the equivalent load and the corresponding total displacement is as follows:
[0042] Q=(Q i -w) / λ+Q i (1)
[0043] s1=s A =s C -Δs (2)
[0044] s2=s B =s D +Δs (3)
[0045] s=s1+s2=(s1+Δs)+(s2-Δs)=s C +s D (4)
[0046] Where λ is the pullout coefficient of the soil on the side of the upper pile, and is the weight of the upper pile. For any load and its corresponding displacement of the upper and lower piles, formulas (1) to (4) are valid.
[0047] After one of the upper and lower (side) piles in the load box reaches the ultimate load Q1 first, the other pile has not yet reached the limit. As the load and displacement increase, the entire pile reaches the ultimate load Q iWhen the load and displacement continue to increase, the displacement of the side that reaches the limit first increases by Δs; as the load and displacement continue to increase, the pile on the other side also reaches the limit Q2. At this time, the displacement of this side is also increased by Δs compared with the displacement when the whole pile reaches the limit load. It can also be understood from the perspective of displacement balance or displacement compensation. When the whole pile reaches the limit load, the loading value of the load box is between the limit loads of the upper and lower piles. At this time, the displacements of the upper and lower piles are different from the displacements at their respective limit loads by Δs, but one side is larger and the other side is smaller. The curve determined by formulas (1) and (4) is the equivalent load-total displacement curve. Taking the average value of the displacement in formula (4), it is the equivalent load-average displacement curve, which is equivalent to the load-displacement curve of the traditional static load test. When the ultimate bearing capacity is determined according to the equivalent load-total displacement curve, the displacement limit is the sum of the displacement limit of the upper pile and the displacement limit of the lower pile; when the ultimate bearing capacity is determined according to the equivalent load-average displacement curve, the displacement limit is half of the former.
[0048] See also Figure 6 , where curve 1 is the load-upper displacement curve; curve 2 is the load-lower displacement curve; curve 3 is the load-total displacement curve (the corresponding displacements of curves 1 and 2 are added together); curve 4 is the equivalent load-total displacement curve (the displacement is the same as 3, added after load conversion).
[0049] In order to better obtain the ultimate bearing capacity of the foundation pile, the following case analysis of the actual construction process is carried out:
[0050] The diameter of the bored pile in a certain project is 1000mm, the length of the pile above the load box is 42m, the deadweight is 808kN, the pull-out coefficient of the upper pile is λ, and the test load and related displacement are shown in Table 2.1-1.
[0051] Table 2.1-1 Test loading and related displacement
[0052] Load value (kn) 1400 2100 2800 3500 4200 4900 5600 6300 7000 Lower displacement (mm) 0.38 0.86 2.59 4.32 8.63 15.97 26.98 45.86 73.52 Upper displacement(mm) 0.39 0.86 1.41 2.73 7.19 15.47 25.9 38.85 58.81 Total displacement(mm) 0.77 1.72 4 7.05 15.82 31.44 52.88 84.71 132.33
[0053] The values of ultimate bearing capacity in various specifications are generally 40mm and 0.05d according to displacement. In the following Tables 2.1-2 and 2.1-3, Q′us and Qux are taken according to these two situations respectively. The total displacement law is taken as 80mm and 0.10d accordingly. In order to obtain more data comparison, the pull-out coefficient is expanded to the entire possible range (0.6~1.0).
[0054] Table 2.1-2 Results of the upper and lower pile ultimate load addition method and total displacement method (s = 40mm, 80mm)
[0055] λ 0.6 0.7 0.8 0.9 1 Q′us+Qux(kN) 15303.3 13986.1 12998.1 12229.8 11615.1 Qz(kN) 15177.5 13894.5 12931.9 12183.8 11585.1 Ratio ζ 0.99 0.99 0.99 1 1
[0056] Note: Qus is the pull-out resistance of the upper pile, Q′us is the compressive bearing capacity after conversion from Qus, Qz is the bearing capacity determined by the total displacement method, the same below.
[0057] Table 2.1-3 Results of the upper and lower pile ultimate load addition method and total displacement method (s = 50mm, 100mm)
[0058] λ 0.6 0.7 0.8 0.9 1 Q′us+Qux(kN) 16209.8 14809.1 13758.6 12941.5 12287.8 Qz(kN) 16053.1 14691.9 13670.7 12877 12241.8 Ratio ζ 0.99 0.99 0.99 1 1
[0059] It can be seen from Tables 2.1-1 to 2.1-3 that when the total displacement reaches the sum of the controlled displacements of the upper and lower piles (one side of the pile reaches the ultimate controlled displacement while the other side does not, the total displacement reaches the sum of the controlled displacements on both sides, or the controlled displacement is reached on both sides of the pile), the bearing capacity obtained by the total displacement method is very consistent with the sum of the ultimate loads of the upper and lower piles.
[0060] The foundation of an offshore wind turbine uses steel pipe piles with a pile diameter of 1.70m, a wall thickness of 25mm to 30mm, a pile length of 72m above the load box, a deadweight of 880kN, and a load box 2m from the pile bottom. The upper pile pullout coefficient is λ, and the test load and related displacement are shown in Table 2.2-1.
[0061] Table 2.2-1 Test loading and displacement
[0062] Load value (kn) 2800 4200 5600 7000 8400 9800 11200 12600 Lower displacement (mm) 0.68 1.64 5.03 10.07 17.63 27.7 43.31 63.45 Upper displacement(mm) 0.27 0.75 2.05 3.42 7.91 13.85 26.65 44.89 Total displacement(mm) 0.95 2.39 7.08 13.49 25.54 41.55 69.96 108.34
[0063] Table 2.2-2 Results of the upper and lower pile ultimate load addition method and total displacement method (s = 40mm, 80mm)
[0064] λ 0.6 0.7 0.8 0.9 1 Q′us+Qux(kN) 29810.9 27109.8 25084 23508.3 22247.8 QZ(kN) 29376.6 26832.3 24924 23439.8 22252.5 Ratio ζ 0.99 0.99 0.99 1 1
[0065] Table 2.2-3 Results of the upper and lower pile ultimate load addition method and total displacement method (s = 85mm, 170mm)
[0066] λ 0.6 0.7 0.8 0.9 1 Q′us+Qux(kN) 32133.3 29342.9 27250 25622.2 24320 QZ(kN) 32133.3 29342.9 27250 25622.2 24320 Ratio ζ 1 1 1 1 1
[0067] It can be seen from Tables 2.2-1 to 2.2-3 that when the total displacement does not reach the sum of the controlled displacements of the upper and lower piles (one side of the pile reaches the ultimate controlled displacement while the other side does not, the total displacement does not reach the sum of the controlled displacements on both sides, or the controlled displacement is not reached on both sides of the pile), the bearing capacity obtained by the total displacement method is very consistent with the sum of the ultimate loads of the upper and lower piles.
[0068] Therefore, the ultimate bearing capacity of the pile obtained by detecting the sum of the controlled displacements of the upper and lower piles is consistent with the data obtained by separately detecting the displacements of the upper and lower piles. Therefore, the total displacement of the upper and lower piles can be used to complete the data calculation. Moreover, when the total displacement is used for calculation, the deviation of the ultimate bearing capacity of the pile can be reduced, such as the following case:
[0069] The pile foundation of a certain project has a pile diameter of 1.4m, a pile length of 8.0m above the load box, and a deadweight of 307.7kN. The upper pile pullout coefficient is λ and is taken as 0.9. The test load and related displacement are shown in Table 3.1-1.
[0070] Table 3.1-1 Test loading and displacement
[0071] Load value (kN) 560 840 1120 1400 1680 1960 2240 2520 2800 Lower displacement (mm) 0.09 0.22 0.42 0.78 1.36 4.37 20.03 42.05 64.71 Upper displacement(mm) 0.19 0.45 1.09 2.15 3.42 4.87 6.59 8.66 11.27 Total displacement(mm) 0.28 0.67 1.51 2.93 4.78 9.24 26.62 50.71 75.98
[0072] When the lower displacement drops sharply, the upper displacement is relatively small, and the friction resistance on the pile side is far from being fully exerted, which is inconsistent with the conventional static load test. This is caused by the characteristics of the self-balancing method itself. It is unreasonable to simply take the value according to the existing specifications. From the conventional pile force and static load test, when the load is applied to the pile top, the friction resistance on the pile side of the upper pile is exerted first, and then the resistance on the pile side and pile end of the lower pile gradually exerts. When the bearing capacity of the lower pile is insufficient and the displacement becomes larger, the resistance on the pile side of the upper pile will follow, which will help the lower pile and slow down the displacement growth of the lower pile. This mutual assistance and shared responsibility is basically consistent with the principle of mutual compensation of the displacement of the upper and lower piles in the total displacement method, which is more reasonable than considering the upper and lower piles separately. The steep drop in this case can be considered as a "pseudo-steep drop".
[0073] Therefore, under the action of 2240kN, the displacement increment is 5.2 times the displacement increment under the previous load, which is determined to be a steep drop in displacement. Qux = 1960kN, Qus = 2800kN, Q′us = 2769.2kN. The ultimate load obtained by adding the ultimate loads of the upper and lower piles is 4729.2kN, which is obviously not the true ultimate load of the pile. According to the total displacement method, the displacement increment generated under the load of 2240kN is 3.9 times the displacement increment under the previous load, which can not be determined to be a steep drop. The ultimate load after conversion is 5569.2kN, which is 18% higher than the former. The total displacement is 75.98mm, which is slightly less than the limit displacement of 80mm. If the loading continues, the ultimate load may have a slight room for improvement; if the total displacement is controlled according to 140mm (2×0.05d), the bearing capacity may have a large room for improvement.
[0074] In a certain cast-in-place pile foundation, the pile diameter is 0.8m, the pile length above the load box is 6.5m, and the deadweight is 81.5kN. The upper pile pullout coefficient is λ and is taken as 0.9. The test load and related displacement are shown in Table 3.2-1.
[0075] Table 3.2-1 Test loading and displacement
[0076] Load value (kN) 440 660 880 1100 1320 1540 1760 1980 2200 2420 Lower displacement (mm) 0.02 0.05 0.13 0.22 0.36 0.52 0.74 0.99 1.32 1.85 Upper displacement(mm) 0.39 0.77 1.68 3.69 7.91 15.62 26.15 41.33 59.65 85.78 Total displacement(mm) 0.41 0.82 1.81 3.91 8.27 16.14 26.89 42.32 60.97 87.63
[0077] From the above table, we can see that the displacement of the pile on one side is very large, while that on the other side is very small. The bearing capacity of the lower pile is 2420.0 kN, and the compressive bearing capacity of the upper pile is 2088.0 kN. The ultimate bearing capacity of the upper and lower piles combined is 4508.0 kN. The ultimate bearing capacity obtained by the total displacement method (s=80 mm) is 4885.4 kN, which is a reasonable increase of 8% over the former.
[0078] Therefore, through the study of the typical displacement curve of the self-balancing static load test and combining the test principle of the self-balancing method, the converted load-displacement curve, namely the load-total displacement method curve and the load-average displacement curve, is inferred.
[0079] The results obtained by the total displacement method are very consistent with the results obtained by the upper and lower pile limit load addition method. In special cases such as "pseudo-steep drop" or great difference in displacement between the upper and lower piles, the total displacement method can reasonably correct or compensate the results of the upper and lower pile limit load addition method.
[0080] The total displacement method is based on the measured data of self-balancing test piles. It does not make any model or parameter assumptions, nor does it require the use of numerical methods such as data fitting for analysis and processing. It is simple and applicable, and the results are more reasonable and accurate.
[0081] The self-displacement method is a type of total displacement method. Its characteristic is that it does not require the help of an external displacement observation reference system. They are not easily affected by external environmental factors such as wind, temperature changes, and vibrations. When the existing displacement observation reference system observes the foundation piles at sea, due to the strong winds and waves on the sea, the support columns of the displacement observation reference system will continue to shake under the action of external forces, resulting in the failure of the reference surface of the action system to maintain balance, resulting in large errors in the displacement data of the foundation piles observed, thereby affecting the judgment of the bearing capacity of the foundation piles. Calculating the bearing capacity of the foundation piles by measuring the relative displacement change inside the foundation piles can greatly reduce the impact of external factors.
[0082] Therefore, please refer to Figure 1-Figure 4The present embodiment provides a displacement observation device for a self-balancing static load test of a pile foundation, comprising a load box 1, a pressurizing mechanism 2, a displacement detector 3 and a data acquisition instrument 4. The load box 1 comprises an upper connecting plate 11, a lower connecting plate 12 and a hydraulic cylinder 13. The two ends of the hydraulic cylinder 13 are fixedly connected to the upper connecting plate 11 and the lower connecting plate 12 respectively. The upper connecting plate 11 and the lower connecting plate 12 are fixedly connected to the upper pile and the lower pile respectively. The displacement detector 3 is installed in the load box 1 and detects the distance between the upper connecting plate 11 and the lower connecting plate 12. The pressurizing mechanism 2 is located on the ground and is connected to the hydraulic cylinder 13. The pressurizing mechanism 2 increases the pressure in the hydraulic cylinder 13 so that the hydraulic cylinder 13 pushes the upper pile and the lower pile to move. The data acquisition instrument 4 is electrically connected to the displacement detector 3 and the pressurizing mechanism 2. The data acquisition instrument 4 draws a load-displacement curve by corresponding the detection result of the displacement detector 3 to the loading force of the pressurizing mechanism 2 one by one.
[0083] By setting a displacement detector 3 in the load box 1 to detect the displacement of the upper connecting plate 11 and the lower connecting plate 12, the displacement of the upper pile and the lower pile during the self-balancing static load test is obtained to calculate the ultimate bearing capacity of the foundation pile. At the same time, since the displacement detector 3 is located in the load box 1, the displacement of the upper and lower piles will not be affected by the environment when detecting the displacement, which will not cause detection errors.
[0084] In order to prevent the displacement detector 3 from being affected by external interference and affecting the detection effect during the detection process, in this embodiment, the displacement detector 3 includes a laser rangefinder 31, a guide tube 32, a sliding tube 33 and a detection plate 34. The guide tube 32 is installed on the top surface of the lower connecting plate 12, the sliding tube 33 is installed on the bottom surface of the upper connecting plate 11, the sliding tube 33 is located in the guide tube 32 and slides in contact with the guide tube 32, the guide tube 32 and the sliding tube 33 are parallel to the central axis of the upper connecting plate 11 and the lower connecting plate 12, the detection plate 34 is embedded in the top surface of the sliding tube 33, the laser rangefinder 31 is installed on the inner bottom surface of the guide tube 32 and measures the position change of the detection plate 34, and when the hydraulic cylinder 13 pushes the upper connecting plate 11 to move, the sliding tube 33 is located in the guide tube 32 and slides in contact with the guide tube 32. When the plate 11 and the lower connecting plate 12 move, the sliding tube 33 will slide in the guide tube 32, and the laser rangefinder 31 is located in the guide tube 32 to detect the displacement of the sliding tube 33, so as to obtain the total displacement variable of the load box 1 during the pressurization process, and then calculate the ultimate bearing capacity of the pile according to the pressurization value of the pressurizing mechanism 2. At the same time, during the pouring of the pile, the entire load box 1 will be covered with concrete. Therefore, in order to protect the detection result of the displacement detector 3 from interference, the laser rangefinder 31 is protected by the setting of the guide tube 32 and the sliding tube 33, so as to avoid detection errors caused by being blocked by concrete during distance detection.
[0085] In order to smoothly complete the loading process of the pressurizing mechanism 2, in one embodiment, the pressurizing mechanism 2 includes an oil pump 21 and a high-pressure oil pipe 22. The oil pump 21 is connected to the hydraulic cylinder 13 through the high-pressure oil pipe 22. The length of one end of the high-pressure oil pipe 22 connected to the hydraulic cylinder 13 is retractable. Since the upper and lower piles will be separated during the loading process, in order to avoid the high-pressure oil pipe 22 being stretched when the position of the load box 1 changes compared to the ground during continuous pressurization, resulting in damage to the oil pipe and oil leakage, the loading force of the load box 1 is insufficient, which affects the calculation of the ultimate bearing capacity of the pile foundation.
[0086] In order to allow the load box 1 to better apply force to the upper and lower piles during loading, and to avoid the situation where the direction of the force is not in the same direction as the central axis of the pile, so that the loading force cannot be fully applied to the pile, resulting in a calculated error in the ultimate bearing capacity of the pile, in one embodiment, at least two hydraulic cylinders 13 are arranged, and the plurality of hydraulic cylinders 13 are distributed in a ring array along the center of the upper connecting plate 11, so that the hydraulic cylinders 13 are evenly distributed on the annular surface of the upper connecting plate 11. When the oil pump 21 is pressurized, the plurality of hydraulic cylinders 13 can be lifted synchronously, and then the upper and lower piles can be balanced in force when pushed by the upper connecting plate 11 and the lower connecting plate 12, thereby avoiding the situation where the displacement trajectory of the upper and lower piles is deviated due to the offset of the force points when they are displaced.
[0087] In order to reduce the additional impact of the load box 1 on the displacement of the upper and lower piles during the test, in one embodiment, the upper connecting plate 11 and the lower connecting plate 12 are both annular plates, and a plurality of through grooves and a plurality of reinforcing ribs are provided on the upper connecting plate 11 and the lower connecting plate 12. The weight of the load box 1 is reduced by providing through grooves on the upper connecting plate 11 and the lower connecting plate 12. At the same time, in order to avoid the strength problem of the upper connecting plate 11 and the lower connecting plate 12 when reducing the weight of the load box 1, a plurality of reinforcing ribs are provided to improve the structural strength of the upper connecting plate 11 and the lower connecting plate 12 to avoid the load box 1 from breaking during the loading process.
[0088] During the loading process of the load box 1, the foundation piles will be separated at the position of the load box 1. Therefore, in order to reduce the use cost, in one embodiment, two through holes are further opened on the top surface of the upper connecting plate 11, and two grouting pipes are respectively arranged in the two through holes. After the test is completed, cement slurry or grouting material that meets the design strength requirements and has good fluidity is injected into the load box 1 through the grouting pipes to play a role in filling and tightening the connection, so that the test piles can also be used as engineering piles after the test is completed, thereby reducing the use cost.
[0089] Based on the above-mentioned pile foundation self-balancing static load test displacement observation device, a pile foundation self-balancing static load test displacement analysis method is also proposed, including the following steps:
[0090] S1: The upper connecting plate 11 and the steel cage of the upper pile are fixedly welded, and reinforcing steel bars are welded between the upper connecting plate 11 and the upper steel cage; the lower connecting plate 12 and the steel cage of the lower upper pile are fixedly welded, and reinforcing steel bars are welded between the lower connecting plate 12 and the lower steel cage, so that when the load box 1 is loaded, the steel cage connected to the upper connecting plate 11 and the lower connecting plate 12 is not strong enough to push the entire upper pile or the lower pile to move, which will cause the test to fail;
[0091] S2: Connect the high-pressure oil pipe 22 in the pressurizing mechanism 2 with the hydraulic cylinder 13, so as to facilitate pressurizing the hydraulic cylinder 13 to push the upper and lower piles to move during subsequent tests;
[0092] S3: lower the entire steel cage to the designated location;
[0093] S4: lowering the guide tube, passing through the central hole between the upper connecting plate 11 and the lower connecting plate 12, and lowering to the lower part of the steel cage, and pouring concrete to form a pile;
[0094] S5: The pressurizing mechanism 2 is used to inject oil into the hydraulic cylinder 13 to extend it, so that the upper connecting plate 11 moves upward, driving the upper pile to move upward, and the lower connecting plate 12 moves downward, driving the lower pile section to move downward;
[0095] S6: The displacement detector 3 detects the displacement of the upper connecting plate 11 and the lower connecting plate 12 during the movement and transmits the detection result to the data acquisition device 4;
[0096] S7: The data acquisition instrument 4 draws a load-displacement curve by corresponding the detection result of the displacement detector 3 and the loading force of the pressurizing mechanism 2 one by one. When the data acquisition instrument 4 has collected the detection result of the displacement detector 3 and the pressurizing value of the pressurizing mechanism 2, the data acquisition instrument 4 corresponds the pressurizing value at each pressurization with the relative displacement between the upper connecting plate 11 and the lower connecting plate 12 detected by the displacement detector 3, and draws a load-displacement curve to better determine the loading value corresponding to the ultimate bearing capacity node of the foundation pile, and calculate the ultimate bearing capacity of the foundation pile;
[0097] S8: Inject cement slurry or grouting material from the grouting pipe between the upper connecting plate 11 and the lower connecting plate 12 to tighten the connection, so that the test pile can also be used as an engineering pile after the test is completed, reducing the use cost.
[0098] During the test, both the upper pile and the lower pile will be displaced. During the displacement, in order to prevent the loading force of the pressure mechanism 2 from being too large, thereby causing the displacement of the upper pile or the lower pile to be too large, resulting in a misjudgment when judging whether the limit point has been reached, therefore, in one embodiment, in step S5, the pressure mechanism 2 applies pressure step by step, and the loading value of each level is 1 / 10 of the maximum loading value, so that the pressure mechanism 2 applies pressure step by step, so that the upper pile or the lower pile can adapt to the pressure provided by the pressure mechanism 2 during the test, avoiding displacement that does not conform to the actual situation during the movement, thereby avoiding the test personnel mistakenly believing that the limit loading node of the pile has been reached due to large displacement changes, resulting in errors in the calculation of the bearing value of the ultimate bearing capacity of the pile.
[0099] After the test is completed, since the upper pile will gradually exceed the original casting position during the test and is also subjected to a large load, the pile body will undergo a certain deformation. Therefore, in order to reduce the stress and deformation of the test pile, thereby reducing the risk of its damage, in one embodiment, in step S8, the pressure relief is performed in stages, and the pressure relief value of each stage is twice the graded load during loading, and the unloading is performed in equal amounts step by step. By gradually reducing the load size, relieving the pressure step by step, and unloading in equal amounts, the stress and deformation of the test pile can be reduced, thereby reducing the risk of its damage.
[0100] During the test, the loading force of the pressure mechanism 2 will gradually increase, and the increasing loading force will also cause the resistance caused by the soil layer around the foundation pile to continue to increase. However, due to the delay of the friction of the soil layer's own weight, this will cause the displacement of the upper and lower piles to be delayed after the loading is completed. Therefore, in order to avoid errors in the detection results of the displacement detector 3, in one embodiment, in step S6, the detection value of the displacement detector 3 measures the displacement change at 5min, 15min, 30min, 45min and 60min after each level of load is applied, and then detects the displacement change every 30min. When loading, since the subsequent loading force will increase successively, and since the resistance provided by the soil layer where the foundation pile is located will be different, when the loading force becomes larger and larger and exceeds the resistance provided by the soil layer, a larger displacement will be generated at this time. At the same time, since the resistance provided by the soil layer will have a delay, the displacement detector 3 can extend a period of time after each loading when performing the detection, so as to ensure the accuracy of the detection.
[0101] Therefore, from the above test analysis, we can know that:
[0102] (1) This paper deduces the equivalent load total displacement curve and proposes a total displacement method based on the self-balancing method of pile testing; this method can overcome the influence of wind, temperature changes (including sunlight), wave impact, ground vibration, and human contact, and has good adaptability to the site and environment.
[0103] (2) This paper proposes a self-displacement method that does not require external reference piles and reference beams, which greatly simplifies the displacement observation of the self-balancing static load test and will greatly save project time and costs (for example, offshore pile tests do not require the construction of reference piles);
[0104] (3) This paper uses a large number of field cases for verification and analysis, confirming the credibility and superiority of this method. It can conduct a comprehensive analysis of the test results of the upper and lower piles, and avoid the obviously unreasonable results that appear in the analysis of the upper and lower piles when "pseudo-steep drop" occurs.
[0105] (4) This method can avoid the shortcomings of many existing analysis methods and obtain a complete load-displacement curve. It does not require a large number of conditional assumptions, parameter assumptions, or conditional inversion. It has a simple principle, strong applicability, and is easy to use.
[0106] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.
Claims
1. A displacement observation device for self-balancing static load test of pile foundation, Features: It includes a load box, a pressurizing mechanism, a displacement detector and a data acquisition instrument. The load box includes an upper connecting plate, a lower connecting plate and a hydraulic cylinder. The two ends of the hydraulic cylinder are fixedly connected to the upper connecting plate and the lower connecting plate respectively. The upper connecting plate and the lower connecting plate are fixedly connected to the upper pile and the lower pile respectively. The displacement detector is installed in the load box and detects the distance between the upper connecting plate and the lower connecting plate. The pressurizing mechanism is located on the ground and connected to the hydraulic cylinder. The pressurizing mechanism increases the pressure in the hydraulic cylinder so that the hydraulic cylinder pushes the upper pile and the lower pile to move. The data acquisition instrument is electrically connected to the displacement detector and the pressurizing mechanism. The data acquisition instrument draws a load-displacement curve by one-to-one correspondence between the detection result of the displacement detector and the loading force of the pressurizing mechanism.
2. A displacement observation device for self-balancing static load test of pile foundation according to claim 1, Features: The displacement detector includes a laser rangefinder, a guide tube, a sliding tube and a detection plate. The guide tube is installed on the top surface of the lower connecting plate, the sliding tube is installed on the bottom surface of the upper connecting plate, the sliding tube is located in the guide tube and slides with the guide tube, the guide tube and the sliding tube are parallel to the central axis of the upper connecting plate and the lower connecting plate, the detection plate is embedded in the top surface of the sliding tube, and the laser rangefinder is installed on the bottom surface of the guide tube and measures the position change of the detection plate.
3. A displacement observation device for self-balancing static load test of pile foundation according to claim 1, Features: The pressurizing mechanism comprises an oil pump and a high-pressure oil pipe. The oil pump is connected to the hydraulic cylinder through the high-pressure oil pipe. The length of one end of the high-pressure oil pipe connected to the hydraulic cylinder is retractable.
4. A displacement observation device for self-balancing static load test of pile foundation according to claim 1, Features: At least two hydraulic cylinders are provided, and the plurality of hydraulic cylinders are distributed in a circular array along the center of the upper connecting plate.
5. A displacement observation device for self-balancing static load test of pile foundation according to claim 1, Features: The upper connecting plate and the lower connecting plate are both annular plates, and are provided with a plurality of through grooves and a plurality of reinforcing ribs.
6. A displacement observation device for self-balancing static load test of pile foundation according to claim 5, Features: The top surface of the upper connecting plate is also provided with two through holes, and two grouting pipes are respectively arranged in the two through holes.
7. A method for analyzing displacement of a pile foundation self-balancing static load test, used in a pile foundation self-balancing static load test displacement observation device as claimed in any one of claims 3 to 6, It is characterized in that The following steps are involved: S1: Fix and weld the upper connecting plate and the steel cage of the upper pile, and weld the reinforcing steel bars between the upper connecting plate and the upper steel cage; fix and weld the lower connecting plate and the steel cage of the lower pile, and weld the reinforcing steel bars between the lower connecting plate and the lower steel cage; S2: Connect the pressurizing mechanism to the hydraulic cylinder; S3: lower the entire steel cage to the designated location; S4: lower the guide tube, pass through the center hole between the upper connecting plate and the lower connecting plate, and lower to the lower part of the steel cage, and pour concrete to form a pile; S5: By applying pressure through the pressure mechanism, oil can be injected into the hydraulic cylinder to stretch it, so that the upper connecting plate moves upward, driving the upper pile to move upward, and the lower connecting plate moves downward, driving the lower pile section to move downward; S6: The displacement detector detects the displacement of the upper connecting plate and the lower connecting plate during the movement and transmits the detection result to the data acquisition instrument; S7: The data acquisition instrument draws a load-displacement curve by corresponding the detection result of the displacement detector and the loading force of the pressurizing mechanism one by one; S8: Inject cement slurry or grouting material from the grouting pipe between the upper connecting plate and the lower connecting plate to tighten the connection.
8. A displacement observation method for a self-balancing static load test of a pile foundation according to claim 7, Features: In step S5, the pressurizing mechanism performs pressurization step by step, and the loading value of each step is 1 / 10 of the maximum loading value.
9. A method for observing displacement of a pile foundation self-balancing static load test according to claim 7, Features: In step S8, the pressure relief is carried out in stages, and the pressure relief value of each stage is twice the graded load during loading, and the pressure is unloaded in equal amounts stage by stage.
10. A displacement observation method for a self-balancing static load test of a pile foundation according to claim 7, Features: In step S6, the displacement detector measures the displacement change at 5 minutes, 15 minutes, 30 minutes, 45 minutes and 60 minutes after each level of load is applied, and then measures the displacement change every 30 minutes.
Citation Information
Patent Citations
Loading box for self-balancing method detection and pile foundation bearing capacity detection device and method
CN111236327A
Construction method for foundation pile load detection based on self-balancing static load
CN111827375A
Pile foundation horizontal bearing capacity self-balancing detection device and method
CN114032972A
Intelligent load box
CN118345885A
Self-balancing test device
CN217231983U
Cited By
Self-displacement measuring device for self-balancing static load test and test method
CN121856042A
A self-displacement measuring device and test method for self-balancing static load tests