Load switching control method and device for power line
By obtaining power line operation data and gradually adjusting the load according to the voltage change, the problem of excessive voltage fluctuation in load transfer is solved, ensuring the safe operation of power equipment.
Patent Information
- Application Number
- CN202411031536.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-05
AI Technical Summary
The prior art fails to effectively control the change in line voltage amplitude during load transfer, resulting in excessive voltage change, affecting the normal operation and safety of power-using equipment.
By obtaining the operating data of the power line, determine the target active load and minimum reactive power compensation amount of the transfer line, and gradually cut or connect the load according to the voltage change amount and the preset threshold value to control the voltage change amount and ensure that the voltage change is within the safe range Inside.
It effectively reduces the voltage fluctuation during line transfer, avoids equipment failures and safety hazards caused by excessive voltage, and improves the operational safety of electrical equipment.
Smart Images

Figure CN118899841A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power distribution network, and in particular to a load transfer control method and device for a power line. Background Art
[0002] Load transfer refers to transferring the load from a heavily loaded, under maintenance or faulty power line to other lines. With the development and upgrading of automatic switches and distribution network automation systems, load transfer has gradually become an important means of regulating line loads and improving reliability.
[0003] At present, the main factor considered in load transfer is the line load rate. Some methods also consider whether the voltage amplitude of the line after load transfer is qualified, but there is no restriction condition that considers the change of voltage amplitude. During the load transfer process, a large amount of load is quickly transferred from one line to another, causing a short-term and large change in the line load, thereby causing a large change in the voltage amplitude of the line.
[0004] However, excessive changes in voltage amplitude will cause electrical equipment on the line to fail to work properly and may even cause safety accidents. Therefore, it is necessary to pay attention to the voltage changes caused by load transfer to avoid serious consequences caused by excessive voltage changes. Summary of the invention
[0005] The present invention provides a load transfer control method and device for a power line to solve the problem in the prior art that load transfer causes excessive fluctuations in line voltage amplitude, resulting in failure of electrical equipment on the line to work normally.
[0006] According to one aspect of the present invention, there is provided a load transfer control method for a power line, comprising:
[0007] Acquiring operation data of the power line; wherein the power line includes a load line to be cut out, a load line to be connected, and a transfer line;
[0008] Determine, according to the operation data, the first target active load and the minimum reactive compensation amount corresponding to the transfer line after the line load check and the node voltage amplitude check; wherein the line load check includes checking the sum of the initial value of the active load on the transfer line and the active load of the load line to be connected, and the node voltage amplitude check includes checking the amplitude of the first node voltage of the first node of the transfer line, and the first node is the transfer connection point between the transfer line and the load line to be cut out;
[0009] Determine a first voltage change amount of the load line to be cut out and a second voltage change amount of the load line to be connected according to the first target active load, the minimum reactive compensation amount and the operation data;
[0010] Under the condition that the first voltage variation is greater than a first preset voltage variation threshold, and / or the second voltage variation is greater than a second preset voltage variation threshold, gradually cutting off part of the load of the transfer line;
[0011] The load of the load line to be cut out is gradually connected to the load line to be connected through the transfer line.
[0012] Optionally, before determining, according to the operation data, a first target active load and a minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check, the method further includes:
[0013] Determining a load reduction ratio threshold of the load line to be cut out according to the operating data and the first preset voltage change threshold;
[0014] Determining a load shedding step length according to the load reduction ratio threshold and the initial value of the active load of the transfer line in the operation data;
[0015] Under the condition that the first voltage variation is greater than a first preset voltage variation threshold, and / or the second voltage variation is greater than a second preset voltage variation threshold, gradually cutting off part of the load of the transfer line, including:
[0016] If the first voltage change is less than a first preset voltage change threshold and the second voltage change is greater than a second preset voltage change threshold, part of the load of the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval, until the active load of the transfer line at the current moment is equal to a second target active load, wherein the second target active load is calculated based on the operating data, the second preset voltage change threshold and the minimum reactive power compensation amount;
[0017] If the first voltage change is greater than a first preset voltage change threshold and the second voltage change is less than a second preset voltage change threshold, part of the load of the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval, until the active load of the transfer line at the current moment is equal to a third target active load, wherein the third target active load is calculated based on the operating data, the first preset voltage change threshold and the minimum reactive power compensation amount;
[0018] If the first voltage change is greater than a first preset voltage change threshold and the second voltage change is greater than a second preset voltage change threshold, part of the load of the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval until the active load of the transfer line at the current moment is equal to a fourth target active load, wherein the fourth target active load is the minimum value of the second target active load and the third target active load.
[0019] Optionally, the load transfer control method further includes:
[0020] If the first voltage variation is smaller than a first preset voltage variation threshold and the second voltage variation is smaller than a second preset voltage variation threshold, the load is not cut off.
[0021] Optionally, the operation data includes the active load of the load line to be connected, the initial value of the active load of the transfer line, the maximum active load threshold of the load line to be connected, and the second node voltage of the second node of the load line to be connected;
[0022] The determining, according to the operation data, the first target active load and the minimum reactive uncompensated amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check, comprises:
[0023] Performing line load verification according to the active load of the load line to be connected, the initial value of the active load of the transfer line, and the maximum active load threshold of the load line to be connected, and determining a fifth target active load of the transfer line that passes the line load verification;
[0024] determining the first node voltage according to the second node voltage, the fifth target active load and the operation data;
[0025] A node voltage amplitude check is performed according to the first node voltage and a preset node minimum voltage threshold, and a first target active load and a minimum reactive compensation amount of the transfer line that passes the node voltage amplitude check are determined.
[0026] Optionally, performing line load verification according to the active load of the load line to be connected, the initial value of the active load of the transfer line, and the maximum active load threshold of the load line to be connected, and determining the fifth target active load of the transfer line that passes the line load verification includes:
[0027] Calculating the sum of the active load of the load line to be connected and the initial value of the active load of the transfer line;
[0028] If the sum is greater than the maximum active load threshold of the load line to be connected, part of the load of the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval, until the active load of the transfer line at the current moment is equal to the sixth target active load, and the fifth target active load is equal to the sixth target active load; wherein the sixth target active load is the difference between the maximum active load threshold of the load line to be connected and the active load of the load line to be connected;
[0029] If the sum is less than or equal to the maximum active load threshold of the load line to be connected, the fifth target active load is set equal to the initial value of the active load of the transfer line.
[0030] Optionally, performing node voltage amplitude verification according to the first node voltage and a preset node minimum voltage threshold to determine a first target active load and a minimum reactive compensation amount of the transfer line that passes the node voltage amplitude verification includes:
[0031] If the first node voltage is less than the preset node minimum voltage threshold, part of the load of the transfer line is removed at a speed at which the load removal amount is less than or equal to the load removal step at every first preset time interval, until the active load of the transfer line at the current moment is equal to the seventh target active load, and the first target active load is made equal to the seventh target active load; the minimum reactive compensation amount is equal to the total reactive compensation capacity of the transfer line in the operation data; wherein the seventh target active load is calculated based on the operation data and the preset node minimum voltage threshold;
[0032] If the first node voltage is greater than or equal to the preset node minimum voltage threshold, set the first target active load equal to the fifth target active load; take the maximum value of 0 and the first target reactive compensation amount required when the first node voltage is greater than or equal to the preset node minimum voltage threshold, and determine the maximum value as the minimum reactive compensation amount, wherein the first target reactive compensation amount is calculated based on the operating data, the preset node minimum voltage threshold and the first target active load.
[0033] Optionally, determining the first voltage change of the load line to be cut out and the second voltage change of the load line to be connected according to the first target active load, the minimum reactive compensation amount and the operation data includes:
[0034] determining an unconstrained optimal reactive power compensation amount of the transfer line according to the first target active power load and the operation data;
[0035] Determine the constrained optimal reactive compensation amount of the transfer line according to the unconstrained optimal reactive compensation amount of the transfer line, the total reactive compensation capacity of the transfer line in the operation data, and the minimum reactive compensation amount;
[0036] Determine a first voltage change of the load line to be cut out according to the following first formula;
[0037] Where ΔU1 is the first voltage change, P” FTL is the first target active load, Q opt,C is the constrained optimal reactive power compensation, R 0F is the resistance of the load line to be cut out from the head end to the first node, P FTL is the initial value of the active load of the transfer line, Q FTL is the initial value of reactive load of the transfer line, X 0F is the reactance of the load line to be cut out from the head end to the first node, r is the preset reduction coefficient, U N is the line rated voltage;
[0038] Determine a second voltage change of the load line to be connected according to the following second formula;
[0039] Where ΔU2 is the second voltage change, P” FTL is the first target active load, Q opt,C is the constrained optimal reactive power compensation, R 0T is the resistance of the load line to be cut out from the head end to the second node, P FTL is the initial value of the active load of the transfer line, Q FTL is the initial value of reactive load of the transfer line, X 0T is the reactance of the load line to be cut out from the head end to the second node, r is the preset reduction coefficient, U N is the line rated voltage;
[0040] Preferably, after determining the constrained optimal reactive compensation amount of the transfer line according to the unconstrained optimal reactive compensation amount of the transfer line, the total reactive compensation capacity of the transfer line in the operation data, and the minimum reactive compensation amount, the method further includes:
[0041] determining a reactive compensation adjustment ratio threshold of the load line to be cut out according to the operating data and the first preset voltage change threshold;
[0042] Determine a reactive compensation adjustment step length according to the reactive compensation adjustment ratio threshold and the total reactive compensation capacity of the transfer line in the operation data;
[0043] Adjusting the partial reactive compensation of the switching line at a speed at which the reactive compensation adjustment amount is less than or equal to the reactive compensation adjustment step at every first preset time interval, until the reactive compensation amount of the switching line at the current moment is equal to the constrained optimal reactive compensation amount;
[0044] Optionally, before determining the first active load and the minimum reactive uncompensated amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check according to the operation data, the method further includes:
[0045] Determining a load increase ratio threshold of the load line to be connected according to the operating data and the second preset voltage change threshold;
[0046] Determining a load access step length according to the load increase ratio threshold and the initial value of the active load of the transfer line in the operation data;
[0047] The step of gradually connecting the load of the load line to be cut out to the load line to be connected via the transfer line comprises:
[0048] Disconnecting the switch at the connection point between the load line to be cut off and the transfer line;
[0049] After a second preset time interval, closing a switch at a connection point between the load line to be connected and the transfer line;
[0050] After a third preset time interval, the partial load of the transfer line is increased at a rate where the load access amount is less than or equal to the load access step at every first preset time interval, until the active load of the transfer line at the current moment is equal to the first target active load.
[0051] Optionally, before determining, according to the operation data, the first active load and the minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check, the method further includes:
[0052] Determine whether the voltage at the transfer connection point between the load line to be connected and the transfer line is greater than a preset node minimum voltage threshold;
[0053] When the voltage at the transfer connection point between the load line to be connected and the transfer line is greater than the preset node minimum voltage threshold, the step of determining the first target active load and minimum reactive compensation amount corresponding to the transfer line after passing the line load check and the node voltage amplitude check according to the operating data is performed.
[0054] According to another aspect of the present invention, there is provided a load transfer control device for a power line, comprising:
[0055] An acquisition module, the acquisition module is used to acquire the operation data of the power line; wherein the power line includes a load line to be cut out, a load line to be connected and a transfer line;
[0056] A first determination module, the first determination module is used to determine the first target active load and the minimum reactive uncompensated amount corresponding to the transfer line after the line load check and the node voltage amplitude check according to the operation data; wherein the line load check includes checking the sum of the initial value of the active load on the transfer line and the active load of the load line to be connected, and the node voltage amplitude check includes checking the amplitude of the first node voltage of the first node of the transfer line, and the first node is the transfer connection point between the transfer line and the load line to be cut out;
[0057] a second determination module, the second determination module being used to determine a first voltage change amount of the load line to be cut out and a second voltage change amount of the load line to be connected according to the first target active load, the minimum reactive compensation amount and the operation data;
[0058] A removal module, the removal module is used to gradually remove part of the load of the transfer line under the condition that the first voltage change amount is greater than a first preset voltage change threshold, and / or the second voltage change amount is greater than a second preset voltage change threshold;
[0059] A switching module is used to gradually connect the load of the load line to be cut out to the load line to be connected through the switching line.
[0060] An embodiment of the present invention provides a load transfer control method and device for a power line, wherein the method includes: acquiring operating data of the power line; determining a first target active load and a minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check according to the operating data; determining a first voltage change amount of the load line to be cut off and a second voltage change amount of the load line to be connected according to the first target active load, the minimum reactive compensation amount and the operating data; gradually cutting off part of the load of the transfer line under the condition that the first voltage change amount is greater than a first preset voltage change threshold, and / or the second voltage change amount is greater than a second preset voltage change threshold; and gradually connecting the load of the load line to be cut off to the load line to be connected through the transfer line. The technical solution provided by the embodiment of the present invention compares the first voltage change with the first preset voltage change threshold, compares the second voltage change with the second preset voltage change threshold, and gradually cuts off part of the load of the transfer line under the condition that the first voltage change is greater than the first preset voltage change threshold, and / or the second voltage change is greater than the second preset voltage change threshold, so that after the load of the transfer line is cut off, the voltage change of the load line to be cut off and the load line to be connected can be reduced, thereby reducing the change of the voltage amplitude on the line during the line transfer process, avoiding the problem that the electrical equipment cannot work normally due to excessive voltage change, and effectively improving the safety of the operation of the electrical equipment. In addition, the technical solution provided by the embodiment of the present invention gradually cuts off part of the load of the transfer line, so that the voltage amplitude of the load line to be cut off after the transfer changes more slowly, and by gradually connecting the load of the load line to be cut off through the transfer line to the load line to be connected, the voltage amplitude of the load line to be connected after the transfer changes more slowly, further improving the safety of the operation of the electrical equipment.
[0061] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0063] Figure 1 A flow chart of a load transfer control method for a power line provided by an embodiment of the present invention;
[0064] Figure 2 A connection diagram of a power line provided by an embodiment of the present invention;
[0065] Figure 3 A flow chart of another load transfer control method for a power line provided by an embodiment of the present invention;
[0066] Figure 4 A flow chart of another load transfer control method for a power line provided by an embodiment of the present invention;
[0067] Figure 5 A flow chart of another load transfer control method for a power line provided by an embodiment of the present invention;
[0068] Figure 6 is a flow chart of another load transfer control method for a power line provided by an embodiment of the present invention;
[0069] Figure 7 A voltage variation curve diagram at a second node of a line to be connected during a load transfer process provided by an embodiment of the present invention;
[0070] Figure 8 A schematic structural diagram of a load transfer control device for a power line provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0071] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0072] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0073] Figure 1 A flow chart of a load transfer control method for a power line provided by an embodiment of the present invention, Figure 2A connection diagram of a power line provided by an embodiment of the present invention is applicable to the situation where a line in a distribution network is overloaded, needs to be repaired, or has a fault, and part of the load of one line is connected to another line for power supply. The method can be executed by a load transfer control device of a power line. Figure 1 and Figure 2 , the load transfer control method comprises:
[0074] S110: Acquire operation data of the power line.
[0075] Among them, the power line includes a load line FL to be cut out, a load line TL to be connected, and a transfer line FTL. It should be noted that in some optional embodiments, the load line FL to be cut out, the load line TL to be connected, and the transfer line FTL are independent lines. In other optional embodiments, the transfer line FTL is a section of the load line FL to be cut out. Correspondingly, the operation data of the circuit line includes the operation data corresponding to the load line FL to be cut out, the load line TL to be connected, and the transfer line FTL. The operation data corresponding to any one of the load line FL to be cut out, the load line TL to be connected, and the transfer line FTL include but are not limited to the rated voltage, voltage, active load, reactive load, resistance, reactance and other data corresponding to the circuit.
[0076] S120. Determine, according to the operation data, a first target active load and a minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check.
[0077] Among them, the line load check includes checking the sum of the initial value of the active load on the transfer line FTL and the active load of the load line TL to be connected, and the node voltage amplitude check includes checking the amplitude of the first node voltage of the first node F of the transfer line FTL, and the first node F is the transfer connection point between the transfer line FTL and the load line FL to be cut out. Specifically, the first check method for line load check and the second check method for node voltage amplitude check can be pre-set, and the line load check and node voltage amplitude check are performed according to the first check method and the second check method. Optionally, the first check method includes checking the size relationship between the sum of the initial value of the active load on the transfer line FTL and the active load of the load line TL to be connected and the first preset value, wherein the first preset value is positively correlated with the maximum active load threshold of the load line to be connected. Exemplarily, the first preset value is equal to 90%-100% of the maximum active load threshold of the load line to be connected. Optionally, the second check method includes checking the size relationship between the first node voltage of the transfer line and the second preset value, wherein the second preset value is positively correlated with the preset node minimum voltage threshold. Exemplarily, the second preset value is equal to 85%-100% of the preset node minimum voltage threshold.
[0078] Optionally, the line load check is performed before the node voltage amplitude check. The purpose of the line load check is to ensure that the line capacity on the load line TL to be connected can be used normally by the load on the transfer line FTL after it is connected to the load line TL to be connected. The purpose of the node voltage amplitude check is to ensure that after the load on the transfer line FTL is connected to the load line TL to be connected, the voltage of the transfer line FTL will not be too low.
[0079] S130. Determine a first voltage change of a load line to be cut out and a second voltage change of a load line to be connected according to the first target active load, the minimum reactive compensation amount and the operation data.
[0080] Specifically, a first determination rule for the first voltage change and a second determination rule for the second voltage change can be pre-set, and the first voltage change of the load line to be cut out and the second voltage change of the load line to be connected are determined respectively according to the first determination rule and the second determination rule. Optionally, the first determination rule includes determining the unconstrained optimal reactive compensation amount of the transfer line according to the first target active load and part of the operating data; determining the constrained optimal reactive compensation amount of the transfer line according to the unconstrained optimal reactive compensation amount of the transfer line, the total reactive compensation capacity of the transfer line in the operating data, and the minimum reactive compensation amount, and gradually adjusting the reactive compensation amount of the transfer line; determining the first voltage change amount according to the constrained optimal reactive compensation amount, the first target active load, and part of the operating data; the second determination rule includes determining the second voltage change amount according to the constrained optimal reactive compensation amount, the first target active load, and part of the operating data.
[0081] Among them, the purpose of determining the first voltage change of the load line to be cut off and the second voltage change of the load line to be connected is to compare the first voltage change with the first preset voltage change threshold, and compare the second voltage change with the second preset voltage change threshold, to ensure that the voltage change is within the preset voltage change threshold, to avoid excessive voltage change on the line after the transfer line connects the load to the load line to be connected.
[0082] S140: When the first voltage variation is greater than a first preset voltage variation threshold, and / or the second voltage variation is greater than a second preset voltage variation threshold, gradually cut off part of the load of the transfer line.
[0083] Among them, the first preset voltage change threshold is the maximum voltage change threshold at the transfer connection point between the transfer line FTL and the load line to be cut out FL, that is, the maximum voltage change threshold at the first node F, which is usually set according to 3% of the line rated voltage. The line rated voltage refers to the rated voltage of the load line to be cut out FL, the load line to be connected TL and the transfer line FTL, and the rated voltage of each line is the same; the second preset voltage change threshold is the maximum voltage change threshold at the transfer connection point between the load line to be connected TL and the transfer line FTL, that is, the maximum voltage change threshold at the second node T, which is usually set according to 3% of the line rated voltage. Gradual removal refers to gradual removal at a certain removal amount at each time interval. The time interval can be the same time interval or different time intervals, and the removal amount can be the same removal amount or different removal amounts. By gradually removing part of the load of the transfer line, the voltage amplitude of the load line to be cut out after the transfer changes more smoothly, further improving the safety of the operation of the electrical equipment.
[0084] Specifically, when the first voltage change is greater than the first preset voltage change threshold, and / or the second voltage change is greater than the second preset voltage change threshold, it means that the voltage amplitude of the load line to be cut off and the load line to be connected after the transfer changes greatly. Therefore, it is necessary to gradually cut off part of the load of the transfer line to reduce the change in voltage amplitude on the line caused by the transfer line connecting the load to the load line to be connected.
[0085] S150, gradually connect the load of the load line to be cut off to the load line to be connected via the transfer line.
[0086] Among them, gradual access means that the load of the load line to be cut out is gradually connected to the load line to be connected through the transfer line at a certain access amount at each time interval. The time interval can be the same time interval or different time intervals, and the access amount can be the same access amount or different access amounts. By gradually connecting the load of the load line to be cut out to the load line to be connected through the transfer line, the voltage amplitude of the load line to be connected after the transfer changes more slowly, further improving the safety of the operation of the power equipment.
[0087] The technical solution provided by the embodiment of the present invention compares the first voltage change with the first preset voltage change threshold, compares the second voltage change with the second preset voltage change threshold, and gradually cuts off part of the load of the transfer line under the condition that the first voltage change is greater than the first preset voltage change threshold, and / or the second voltage change is greater than the second preset voltage change threshold, so that after the load of the transfer line is cut off, the voltage change of the load line to be cut off and the load line to be connected can be reduced, thereby reducing the change of the voltage amplitude on the line during the line transfer process, avoiding the problem that the electrical equipment cannot work normally due to excessive voltage change, and effectively improving the safety of the operation of the electrical equipment. In addition, the technical solution provided by the embodiment of the present invention gradually cuts off part of the load of the transfer line, so that the voltage amplitude of the load line to be cut off after the transfer changes more slowly, and by gradually connecting the load of the load line to be cut off through the transfer line to the load line to be connected, the voltage amplitude of the load line to be connected after the transfer changes more slowly, further improving the safety of the operation of the electrical equipment.
[0088] Figure 3 This is a flow chart of another load transfer control method for a power line provided by an embodiment of the present invention. The embodiment of the present invention further refines S140 based on the above embodiment.
[0089] See also Figure 3 , the load transfer control method comprises:
[0090] S310: Obtain operation data of the power line.
[0091] Specifically, the power management department collects the following data by querying the distribution network automation system for the load line FL to be cut out, the load line TL to be connected, and the transfer line FTL during load transfer: line rated voltage U N , the active load P of the load line TL to be connected TL , the maximum load threshold P of the load line TL to be connected max,TL , the initial value P of the active load of the transfer line FTL FTL , the initial value of reactive load Q of the transfer line FTL FTL , the total reactive power compensation capacity Q of the transfer line FTL C , the resistance R of the switching line FTL from the first node F to the second node T FT , the reactance X of the switching line FTL from the first node F to the second node T FT , the resistance R of the load line FL to be cut out from the head end to the first node F 0F and reactance X 0F , the voltage U of the second node T of the load line TL to be connected T, the resistance R of the load line TL to be connected from the head end to the second node T 0T and reactance X 0T .
[0092] S311. Determine a load reduction ratio threshold of the load line to be cut out according to the operating data and the first preset voltage change threshold.
[0093] Specifically, according to the operation data and the first preset voltage change threshold, the load reduction ratio threshold of the load line to be cut out is determined based on the following formula:
[0094] In the formula, r max,dF is the load reduction ratio threshold of the load line to be cut out, r is the preset reduction coefficient, U N is the line rated voltage, ΔU min,F is the first preset voltage change threshold, P FTL is the initial value of active load of the transfer line, R 0F is the resistance of the load line FL to be cut out from the head end to the first node F, Q FTL is the initial value of reactive load of the transfer line FTL, X 0F It is the reactance of the load line FL to be cut out from the head end to the first node F; wherein the preset reduction coefficient is generally 0.8-0.9 and can be preset.
[0095] S312: Determine a load shedding step length according to a load reduction ratio threshold and an initial value of active load of the transfer line in the operation data.
[0096] Specifically, the load shedding step length is determined according to the product of the load reduction ratio threshold and the initial value of the active load of the transfer line in the operation data, as shown in the following formula: max,dF P FTL .
[0097] S313. Determine, according to the operation data, a first target active load and a minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check.
[0098] This step is the same as the step S120 in the above embodiment and will not be described again here.
[0099] S314. Determine a first voltage change of a load line to be cut out and a second voltage change of a load line to be connected according to the first target active load, the minimum reactive compensation amount and the operation data.
[0100] This step is the same as the step S130 in the above embodiment and will not be described again here.
[0101] S315. If the first voltage change is less than the first preset voltage change threshold and the second voltage change is greater than the second preset voltage change threshold, part of the load on the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval until the active load of the transfer line at the current moment is equal to the second target active load.
[0102] The first preset time interval Δt is generally set to a minute level and can be preset. The second target active load is calculated based on the operating data, the second preset voltage change threshold and the minimum reactive power load, as shown in the following formula:
[0103] In the formula, ΔU max,T is the second preset voltage change threshold, Q opt,C is the constrained optimal reactive power compensation, R 0T is the resistance of the load line TL from the head end to the second node, P FTL is the initial value of active load of the transfer line, Q FTL is the initial value of reactive load of the transfer line, X 0T is the reactance of the load line TL to be connected from the head end to the second node, r is the preset reduction coefficient, U N is the rated voltage of the line.
[0104] Specifically, judge Is it established, and Is it established? If Established, and If it is not true, then the load removal amount is not greater than r max,dF P FTL , the load of the transfer line FTL is sequentially cut off at every first time interval Δt until the active load of the transfer line FTL at the current moment is equal to the second target active load, thereby completing the voltage transformation amplitude verification and processing.
[0105] S316. If the first voltage change is greater than the first preset voltage change threshold and the second voltage change is less than the second preset voltage change threshold, part of the load on the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval until the active load of the transfer line at the current moment is equal to the third target active load.
[0106] The third target active load is calculated according to the operating data, the first preset voltage change threshold and the minimum reactive power uncompensated amount, and is specifically obtained by the following formula:
[0107] In the formula, ΔU max,F is the first preset voltage change threshold, Q opt,Cis the constrained optimal reactive power compensation, R 0F is the resistance of the load line FL to be cut out from the head end to the first node F, P FTL is the initial value of active load of the transfer line FTL, Q FTL is the initial value of reactive load of the transfer line FTL, X 0F is the reactance of the load line FL to be cut out from the head end to the first node F, r is the preset reduction coefficient, U N is the rated voltage of the line.
[0108] Specifically, judge Is it established, and Is it established? If Not true, and Established, according to the load removal amount is not greater than r max,dF P FTL , at every first time interval Δt, the load of the transfer line FTL is sequentially cut off until the active load of the transfer line FTL at the current moment is equal to the third target active load, thereby completing the voltage transformation amplitude verification and processing.
[0109] S317. If the first voltage change is greater than the first preset voltage change threshold and the second voltage change is greater than the second preset voltage change threshold, part of the load on the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval until the active load of the transfer line at the current moment is equal to the fourth target active load.
[0110] The fourth target active load is the minimum value of the second target active load and the third target active load.
[0111] Specifically, judge Is it established, and Is it established? If Not true, and If it is not true, then the load removal amount is not greater than r max,dF P FTL , every first time interval Δt, the load of the transfer line FTL is removed in sequence until the active load of the transfer line FTL at the current moment is equal to Until then, the voltage transformation amplitude verification and processing is completed.
[0112] S318: If the first voltage change is smaller than the first preset voltage change threshold and the second voltage change is smaller than the second preset voltage change threshold, the load is not cut off.
[0113] Specifically, judge Is it established, and Is it established? If Established, and If the condition is established, the load will not be removed.
[0114] S319, gradually connect the load of the load line to be cut off to the load line to be connected through the transfer line.
[0115] This step is the same as the method step of the above embodiment S150 and will not be repeated here.
[0116] Optionally, determining, according to the operation data, a first target active load and a minimum reactive uncompensated amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check, comprises:
[0117] 1) Perform line load verification according to the active load of the load line to be connected, the initial value of the active load of the transfer line, and the maximum active load threshold of the load line to be connected, and determine the fifth target active load of the transfer line that passes the line load verification.
[0118] 2) Determine the first node voltage according to the second node voltage, the fifth target active load and the operation data.
[0119] 3) Performing a node voltage amplitude check according to the first node voltage and a preset node minimum voltage threshold, and determining a first target active load and a minimum reactive compensation amount of the transfer line that passes the node voltage amplitude check.
[0120] Optionally, performing line load verification according to the active load of the load line to be connected, the initial value of the active load of the transfer line, and the maximum active load threshold of the load line to be connected, and determining the fifth target active load of the transfer line that passes the line load verification includes:
[0121] Calculate the sum of the active load of the load line to be connected and the initial value of the active load of the transfer line;
[0122] If the sum is greater than the maximum active load threshold of the load line to be connected, part of the load of the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval, until the active load of the transfer line at the current moment is equal to the sixth target active load, and the fifth target active load is equal to the sixth target active load; wherein the sixth target active load is the difference between the maximum active load threshold of the load line to be connected and the active load of the load line to be connected;
[0123] If the sum is less than or equal to the maximum active load threshold of the load line to be connected, the fifth target active load is set equal to the initial value of the active load of the transfer line.
[0124] The specific formula is as follows: TL +P FTL , where P TL is the active load of the load line to be connected, PFTL is the initial value of the active load of the transfer line.
[0125] Specifically, judging P TL +P FTL ≤P max,T Is it true? If so, let P' FTL =P FTL If not, the load removal amount is not greater than r max,dF P FTL , every first preset time interval Δt, the load of the transfer line FTL is cut off in sequence until the active load of the transfer line FTL at the current moment is equal to P max,TL -P TL So far, let P' FTL =P max,TL -P TL ; Among them, P' FTL is the fifth target active load, P max,TL It is the maximum active load threshold of the load line to be connected.
[0126] When the first node voltage is determined according to the second node voltage, the fifth target active load and the operating data, specifically, the first node voltage is determined according to the second node voltage, the fifth target active load and the operating data based on the following formula:
[0127] Where U T is the second node voltage of the load line TL to be connected, P' FTL is the fifth target active load, the initial value of reactive load Q of the transfer line FTL FTL , the total reactive power compensation capacity Q of the transfer line FTL C , the resistance R of the switching line FTL from the first node F to the second node T FT , the reactance X of the switching line FTL from the first node F to the second node T FT .
[0128] Optionally, performing a node voltage amplitude check according to the first node voltage and a preset node minimum voltage threshold, and determining a first target active load and a minimum reactive compensation amount of a transfer line that passes the node voltage amplitude check includes:
[0129] If the voltage of the first node is less than the preset node minimum voltage threshold, part of the load of the transfer line is removed at a speed of load removal amount less than or equal to the load removal step length at every first preset time interval, until the active load of the transfer line at the current moment is equal to the seventh target active load, and the first target active load is equal to the seventh target active load; the minimum reactive compensation amount is equal to the total reactive compensation capacity of the transfer line in the operation data; wherein the seventh target active load is calculated based on the operation data and the preset node minimum voltage threshold. The preset node minimum voltage threshold is generally preset based on 93% of the rated voltage of the line.
[0130] If the first node voltage is greater than or equal to the preset node minimum voltage threshold, set the first target active load equal to the fifth target active load; take the maximum value of 0 and the first target reactive compensation amount required when the first node voltage is greater than or equal to the preset node minimum voltage threshold, and determine the maximum value as the minimum reactive compensation amount, wherein the first target reactive compensation amount is calculated based on the operating data, the preset node minimum voltage threshold and the fifth target active load.
[0131] Specifically, the seventh target active load is calculated using the following formula:
[0132] Where U min is the preset node minimum voltage threshold.
[0133] The first target reactive power compensation amount is calculated using the following formula:
[0134] Where U min is the preset node minimum voltage threshold, P' FTL It is the fifth target active load.
[0135] Specifically, judge Is it true? If so, let P" FTL =P' FTL , If not, the load removal amount is not greater than r max,dF P FTL , every first preset time interval Δt, the load of the transfer line FTL is cut off in sequence until the active load of the transfer line FTL at the current moment is equal to So far, Q min,C =Q C , where P” FTL is the first target active load, Q min,C is the minimum reactive power compensation amount.
[0136] Figure 4This is a flow chart of another load transfer control method for a power line provided by an embodiment of the present invention. The embodiment of the present invention further refines S130 based on the above embodiments. Figure 4 , the load transfer control method comprises:
[0137] S410: Acquire operation data of the power line.
[0138] This step is the same as the step in the above embodiment S110 and will not be described again here.
[0139] S420. Determine, according to the operation data, a first target active load and a minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check.
[0140] This step is the same as the step S120 in the above embodiment and will not be described again here.
[0141] S430: Determine an unconstrained optimal reactive power compensation amount of the transfer line according to the first target active power load and the operation data.
[0142] Specifically, according to the first target active load and the operating data, the following formula is used to determine the unconstrained optimal reactive compensation amount of the transfer line:
[0143] In the formula, P FTL It is the first target active load.
[0144] S440 , determining a constrained optimal reactive compensation amount of the transfer line according to the unconstrained optimal reactive compensation amount of the transfer line, the reactive compensation amount of the transfer line in the operation data, and the minimum reactive compensation amount.
[0145] Specifically, firstly, the minimum value of the total reactive compensation capacity of the transfer line in the operation data and the unconstrained optimal reactive compensation amount of the transfer line is taken, and then the maximum value between the minimum value and the minimum reactive compensation amount is taken, and the maximum value is determined as the constrained optimal reactive compensation amount of the transfer line, as shown in the following formula:
[0146] In the formula, Q opt,C is the constrained optimal reactive power compensation.
[0147] When the reactive load of the transfer line FTL needs to be compensated and adjusted, the adjustment amount shall not exceed r max,C Q C , at every first preset time interval Δt, adjust the reactive power compensation of the transfer line FTL in sequence until the compensation amount is equal to Q opt,C So far, in the formula, r max,CThe proportional threshold is adjusted for reactive power compensation; the purpose of determining the constrained optimal reactive power compensation amount is to make the load transfer process smoother on the basis of ensuring the transferred load amount.
[0148] S450: Determine a first voltage change of the load line to be switched out according to a first formula.
[0149] Specifically, according to the following first formula, a first voltage change amount of the load line to be cut out is determined;
[0150] Where ΔU1 is the first voltage change, P” FTL is the first target active load, Q opt,C is the constrained optimal reactive power compensation, R 0F is the resistance of the load line to be cut out from the head end to the first node, P FTL is the initial value of active load of the transfer line, Q FTL is the initial value of reactive load of the transfer line, X 0F is the reactance of the load line to be cut out from the head end to the first node, r is the preset reduction factor, U N is the rated voltage of the line.
[0151] S460. Determine a second voltage change of the load line to be connected according to the second formula.
[0152] Specifically, according to the following second formula, a second voltage change amount of the load line to be connected is determined;
[0153] Where ΔU2 is the second voltage change, P” FTL is the first target active load, Q opt,C is the constrained optimal reactive power compensation, R 0T is the resistance of the load line to be cut out from the head end to the second node, P FTL is the initial value of active load of the transfer line, Q FTL is the initial value of reactive load of the transfer line, X 0T is the reactance of the load line to be cut out from the head end to the second node, r is the preset reduction factor, U N is the rated voltage of the line.
[0154] Preferably, after determining the constrained optimal reactive compensation amount of the transfer line according to the unconstrained optimal reactive compensation amount of the transfer line, the total reactive compensation capacity of the transfer line in the operating data, and the minimum reactive compensation amount, it also includes: determining the reactive compensation adjustment ratio threshold of the load line to be cut out according to the operating data and the first preset voltage change threshold; determining the reactive compensation adjustment step according to the reactive compensation adjustment ratio threshold and the total reactive compensation capacity of the transfer line in the operating data; adjusting part of the reactive compensation of the transfer line at a speed at which the reactive compensation adjustment amount is less than or equal to the reactive compensation adjustment step at every first preset time interval, until the reactive compensation amount of the transfer line at the current moment is equal to the constrained optimal reactive compensation amount.
[0155] S470: When the first voltage variation is greater than a first preset voltage variation threshold, and / or the second voltage variation is greater than a second preset voltage variation threshold, gradually cut off part of the load of the transfer line.
[0156] This step is the same as the method step S140 in the above embodiment and will not be repeated here.
[0157] S480, gradually connect the load of the load line to be cut out to the load line to be connected through the transfer line.
[0158] This step is the same as the method step of the above embodiment S150 and will not be repeated here.
[0159] Figure 5 This is a flow chart of another load transfer control method for a power line provided in an embodiment of the present invention. The embodiment of the present invention further refines S150 based on the above embodiment.
[0160] See also Figure 5 , the load transfer control method comprises:
[0161] S510: Acquire operation data of the power line.
[0162] This step is the same as the step in the above embodiment S110 and will not be described again here.
[0163] S520: Determine a load increase ratio threshold of the load line to be connected according to the operating data and the second preset voltage change threshold.
[0164] Specifically, according to the operating data, the load increase ratio threshold of the load line to be connected is determined by using the following formula:
[0165] In the formula, r max,uT is the load increase ratio threshold of the load line to be connected, ΔU min,T is a second preset voltage change threshold.
[0166] S530: Determine a load access step length according to a load increase ratio threshold and an initial value of active load of the transfer line in the operation data.
[0167] Specifically, the load access step length is determined according to the product of the load increase ratio threshold and the initial value of the active load of the transfer line in the operation data, as shown in the following formula: max,uT P FTL .
[0168] S540. Determine, according to the operation data, a first target active load and a minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check.
[0169] This step is the same as the step S120 in the above embodiment and will not be described again here.
[0170] S550. Determine a first voltage change of a load line to be cut out and a second voltage change of a load line to be connected according to the first target active load, the minimum reactive compensation amount and the operation data.
[0171] This step is the same as the step S130 in the above embodiment and will not be described again here.
[0172] S560: When the first voltage variation is greater than a first preset voltage variation threshold, and / or the second voltage variation is greater than a second preset voltage variation threshold, gradually cut off part of the load of the transfer line.
[0173] This step is the same as the method step S140 in the above embodiment and will not be repeated here.
[0174] S570: Disconnect the switch at the connection point between the load line to be cut off and the transfer line.
[0175] S580: After a second preset time interval, close the switch at the connection point between the load line to be connected and the transfer line.
[0176] S590. After a third preset time interval, increase the partial load of the transfer line at a rate where the load access amount is less than or equal to the load access step size every first preset time interval until the active load of the transfer line at the current moment is equal to the first target active load.
[0177] Specifically, see Figure 2, the load of the load line FL to be cut out is gradually connected to the load line TL to be connected through the transfer line FTL. The switch at the connection point between the load line FL to be cut out and the transfer line FTL needs to be disconnected, that is, the switch at the first node F is disconnected. After a second preset time interval, the switch at the connection point between the load line TL to be connected and the transfer line FTL is closed, that is, the switch at the second node T is closed. After a third preset time interval, the load connection amount is less than or equal to r at every first preset time interval. max,uT P FTL Increase the partial load of the transfer line at a speed until the active load of the transfer line at the current moment is equal to P" FTL The first preset time interval, the second preset time interval and the third preset time interval may be the same or different, and the present invention does not limit this.
[0178] Optionally, before determining the first active load and the minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check according to the operation data, the method further includes:
[0179] Determine whether the voltage at the transfer connection point between the load line to be connected and the transfer line is greater than a preset node minimum voltage threshold;
[0180] When the voltage at the transfer connection point between the load line to be connected and the transfer line is greater than the preset node minimum voltage threshold, the step of determining the first target active load and the minimum reactive compensation amount corresponding to the transfer line after passing the line load check and the node voltage amplitude check according to the operating data is executed.
[0181] Specifically, judging U T >U min Is it established? If so, execute the step of determining the first target active load and minimum reactive compensation amount corresponding to the transfer line after passing the line load check and the node voltage amplitude check according to the operating data; if not, load transfer is not allowed and the control process ends.
[0182] The load transfer control method for the power line provided by the present application is specifically introduced below with a specific embodiment.
[0183] Figure 6 is a flow chart of another load transfer control method for a power line provided by an embodiment of the present invention, see Figure 6 ,The load transfer control method includes:
[0184] S610: Collect operation data of the power line and set a control threshold.
[0185] S620, determining whether the second node voltage is greater than a preset node minimum voltage threshold, if so, executing S630; if not, ending.
[0186] S630, obtaining a load increase ratio threshold, a load decrease ratio threshold, and a reactive compensation adjustment ratio threshold.
[0187] S640: Line load verification and processing.
[0188] S650: Verify and process node voltage amplitude.
[0189] S660. Adjust reactive power compensation to a constrained optimal reactive power compensation amount.
[0190] S670: Check and process the voltage variation.
[0191] S680, load batch transfer and supplement.
[0192] For example, in a specific embodiment, Figure 2 The circuit shown is explained.
[0193] 1) Obtain the following data:
[0194] U N =10kV, R 0F =1.92Ω, X 0F =3.20Ω
[0195] U T =10.25kV, R 0T =2.88Ω, X 0T =4.80Ω
[0196] P TL =2.0MW, P max,TL =3.5MW, P FTL =1.0MW, Q FTL =0.3Mvar, Q C =0.2Mvar
[0197] R FT =0.64Ω, X FT =1.08Ω
[0198] Set the following parameters:
[0199] U min =9.30kV, ΔU max,F =0.3kV, ΔU max,T =0.3kV, Δt=1min, r=0.85
[0200] 2) Determine U T >U minEstablished, go to step 3).
[0201] 3) Load reduction ratio threshold r max,dF =0.89, reactive compensation adjustment ratio threshold r max,C =3.98, load rise ratio threshold r max,uT =0.59.
[0202] 4) Determine P TL +P FTL ≤P max,TL Established, P' FTL =1MW.
[0203] 5) Judgment Established, P FTL =1MW, Q min,C =0.
[0204] 6) Constrained optimal reactive power compensation Q opt,C =0.2Mvar, r max,C Q C =0.80Mvar, so the reactive power compensation can be adjusted to 0.2Mvar at one time.
[0205] 7) Judgment Establish, judge Not true, r max,dF P FTL =0.89MW, so the active load of the transfer line FTL can be reduced to
[0206] 8) Disconnect the switch at the connection point between the load line FL to be disconnected and the transfer line FTL, that is, disconnect the switch at the first node F, after a second preset time interval, close the switch at the connection point between the load line TL to be connected and the transfer line FTL, that is, close the switch at the second node T, after a third preset time interval, according to the load connection amount less than or equal to r every first preset time interval max,uT P FTL = The partial load of the transfer line is increased at a rate of 0.59 MW, so the active load of the transfer line FTL can be increased to 1 MW at one time.
[0207] The voltage change at the second node T of the load line TL to be connected during the load transfer process is as follows: Figure 7 As shown, Figure 7 The voltage variation curve diagram at the second node of the load line to be connected during the load transfer process provided by the embodiment of the present invention is composed of Figure 7 It can be seen that the voltage changes caused by the two operations are within the preset voltage change threshold range, which are 0.29kV and 0.09kV respectively, thus avoiding the problem caused by excessive voltage changes.
[0208] In summary, the technical solution provided by the embodiment of the present invention has the following beneficial effects:
[0209] 1) The technical solution provided by the embodiment of the present invention compares the first voltage change with the first preset voltage change threshold, and compares the second voltage change with the second preset voltage change threshold, and gradually cuts off part of the load of the transfer line under the condition that the first voltage change is greater than the first preset voltage change threshold, and / or the second voltage change is greater than the second preset voltage change threshold, so that after the load of the transfer line is cut off, the voltage change of the load line to be cut out and the load line to be connected can be reduced, thereby reducing the change of the voltage amplitude on the line during the line transfer process, avoiding the problem of electrical equipment not being able to work normally due to excessive voltage changes, and effectively improving the safety of the operation of electrical equipment.
[0210] 2) The technical solution provided by the embodiment of the present invention comprehensively considers the load size and reactive power compensation capacity of the transfer line section, coordinates the control of load and reactive power compensation, and makes the load transfer process smoother while ensuring the transferred load amount.
[0211] 3) The technical solution provided by the embodiment of the present invention is simple and easy to implement, and is suitable for application in practical engineering.
[0212] Figure 8 A schematic diagram of a load transfer control device for a power line according to an embodiment of the present invention is shown in FIG. Figure 8 The load transfer control device includes an acquisition module 810, a first determination module 820, a second determination module 830, a removal module 840 and a transfer module 850.
[0213] The acquisition module 810 is used to acquire the operation data of the power line; wherein the power line includes the load line to be cut out, the load line to be connected and the transfer line.
[0214] The first determination module 820 is used to determine the first target active load and the minimum reactive uncompensated amount corresponding to the transfer line after the line load check and the node voltage amplitude check are passed according to the operating data; wherein, the line load check includes checking the sum of the initial value of the active load on the transfer line and the active load of the load line to be connected, and the node voltage amplitude check includes checking the amplitude of the first node voltage of the first node of the transfer line, and the first node is the transfer connection point between the transfer line and the load line to be cut out.
[0215] The second determination module 830 is used to determine a first voltage change amount of a load line to be cut out and a second voltage change amount of a load line to be connected according to the first target active load, the minimum reactive compensation amount and the operation data.
[0216] The removal module 840 is used to gradually remove part of the load of the transfer line under the condition that the first voltage change is greater than the first preset voltage change threshold and / or the second voltage change is greater than the second preset voltage change threshold.
[0217] The switching module 850 is used to gradually connect the load of the load line to be switched out to the load line to be connected through the switching line.
[0218] The load transfer control device for a power line provided in an embodiment of the present invention can execute the load transfer control method for a power line provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0219] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0220] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A load transfer control method for a power line, characterized in that: include: Acquiring operation data of the power line; wherein the power line includes a load line to be cut out, a load line to be connected, and a transfer line; Determine, according to the operation data, the first target active load and the minimum reactive compensation amount corresponding to the transfer line after the line load check and the node voltage amplitude check; wherein the line load check includes checking the sum of the initial value of the active load on the transfer line and the active load of the load line to be connected, and the node voltage amplitude check includes checking the amplitude of the first node voltage of the first node of the transfer line, and the first node is the transfer connection point between the transfer line and the load line to be cut out; Determine a first voltage change amount of the load line to be cut out and a second voltage change amount of the load line to be connected according to the first target active load, the minimum reactive compensation amount and the operation data; Under the condition that the first voltage variation is greater than a first preset voltage variation threshold, and / or the second voltage variation is greater than a second preset voltage variation threshold, gradually cutting off part of the load of the transfer line; The load of the load line to be cut out is gradually connected to the load line to be connected through the transfer line.
2. The load transfer control method according to claim 1, characterized in that: Before determining the first target active load and the minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check according to the operation data, the method further includes: Determining a load reduction ratio threshold of the load line to be cut out according to the operating data and the first preset voltage change threshold; Determining a load shedding step length according to the load reduction ratio threshold and the initial value of the active load of the transfer line in the operation data; Under the condition that the first voltage variation is greater than a first preset voltage variation threshold, and / or the second voltage variation is greater than a second preset voltage variation threshold, gradually cutting off part of the load of the transfer line, including: If the first voltage change is less than a first preset voltage change threshold and the second voltage change is greater than a second preset voltage change threshold, part of the load of the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval, until the active load of the transfer line at the current moment is equal to a second target active load, wherein the second target active load is calculated based on the operating data, the second preset voltage change threshold and the minimum reactive power compensation amount; If the first voltage change is greater than a first preset voltage change threshold and the second voltage change is less than a second preset voltage change threshold, part of the load of the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval, until the active load of the transfer line at the current moment is equal to a third target active load, wherein the third target active load is calculated based on the operating data, the first preset voltage change threshold and the minimum reactive power compensation amount; If the first voltage change is greater than a first preset voltage change threshold and the second voltage change is greater than a second preset voltage change threshold, part of the load of the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval until the active load of the transfer line at the current moment is equal to a fourth target active load, wherein the fourth target active load is the minimum value of the second target active load and the third target active load.
3. The load transfer control method according to claim 1, characterized in that: Also includes: If the first voltage variation is smaller than a first preset voltage variation threshold and the second voltage variation is smaller than a second preset voltage variation threshold, the load is not cut off.
4. The load transfer control method according to claim 2, characterized in that: The operation data includes the active load of the load line to be connected, the initial value of the active load of the transfer line, the maximum active load threshold of the load line to be connected, and the second node voltage of the second node of the load line to be connected, where the second node is the transfer connection point between the line to be connected and the transfer line; The determining, according to the operation data, the first target active load and the minimum reactive uncompensated amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check, comprises: Performing line load verification according to the active load of the load line to be connected, the initial value of the active load of the transfer line, and the maximum active load threshold of the load line to be connected, and determining a fifth target active load of the transfer line that passes the line load verification; determining the first node voltage according to the second node voltage, the fifth target active load and the operation data; A node voltage amplitude check is performed according to the first node voltage and a preset node minimum voltage threshold, and a first target active load and a minimum reactive compensation amount of the transfer line that passes the node voltage amplitude check are determined.
5. The load transfer control method according to claim 4, characterized in that: The performing of line load verification according to the active load of the load line to be connected, the initial value of the active load of the transfer line, and the maximum active load threshold of the load line to be connected, and determining the fifth target active load of the transfer line that passes the line load verification comprises: Calculating the sum of the active load of the load line to be connected and the initial value of the active load of the transfer line; If the sum is greater than the maximum active load threshold of the load line to be connected, part of the load of the transfer line is removed at a speed where the load removal amount is less than or equal to the load removal step at every first preset time interval, until the active load of the transfer line at the current moment is equal to the sixth target active load, and the fifth target active load is equal to the sixth target active load; wherein the sixth target active load is the difference between the maximum active load threshold of the load line to be connected and the active load of the load line to be connected; If the sum is less than or equal to the maximum active load threshold of the load line to be connected, the fifth target active load is set equal to the initial value of the active load of the transfer line.
6. The load transfer control method according to claim 4, characterized in that: The performing node voltage amplitude verification according to the first node voltage and a preset node minimum voltage threshold to determine a first target active load and a minimum reactive compensation amount of the transfer line that passes the node voltage amplitude verification comprises: If the first node voltage is less than the preset node minimum voltage threshold, part of the load of the transfer line is removed at a speed at which the load removal amount is less than or equal to the load removal step at every first preset time interval, until the active load of the transfer line at the current moment is equal to the seventh target active load, and the first target active load is made equal to the seventh target active load; the minimum reactive compensation amount is equal to the total reactive compensation capacity of the transfer line in the operation data; wherein the seventh target active load is calculated based on the operation data and the preset node minimum voltage threshold; If the first node voltage is greater than or equal to the preset node minimum voltage threshold, set the first target active load equal to the fifth target active load; take the maximum value of 0 and the first target reactive compensation amount required when the first node voltage is greater than or equal to the preset node minimum voltage threshold, and determine the maximum value as the minimum reactive compensation amount, wherein the first target reactive compensation amount is calculated based on the operating data, the preset node minimum voltage threshold and the first target active load.
7. The load transfer control method according to claim 1, characterized in that: The determining, according to the first target active load, the minimum reactive power compensation amount and the operation data, a first voltage change amount of the load line to be cut out and a second voltage change amount of the load line to be connected comprises: determining an unconstrained optimal reactive power compensation amount of the transfer line according to the first target active power load and the operation data; Determine the constrained optimal reactive compensation amount of the transfer line according to the unconstrained optimal reactive compensation amount of the transfer line, the total reactive compensation capacity of the transfer line in the operation data, and the minimum reactive compensation amount; Determine a first voltage change of the load line to be cut out according to the following first formula; Where ΔU1 is the first voltage change, P″ FTL is the first target active load, Q opt,C is the constrained optimal reactive power compensation, R 0F is the resistance of the load line to be cut out from the head end to the first node, P FTL is the initial value of the active load of the transfer line, Q FTL is the initial value of reactive load of the transfer line, X 0F is the reactance of the load line to be cut out from the head end to the first node, r is the preset reduction coefficient, U N is the line rated voltage; Determine a second voltage change of the load line to be connected according to the following second formula; Where ΔU2 is the second voltage change, P F ” TL is the first target active load, Q opt,C is the constrained optimal reactive power compensation, R 0T is the resistance of the load line to be cut out from the head end to the second node, P FTL is the initial value of the active load of the transfer line, Q FTL is the initial value of reactive load of the transfer line, X 0T is the reactance of the load line to be cut out from the head end to the second node, r is the preset reduction coefficient, U N is the line rated voltage; Preferably, after determining the constrained optimal reactive compensation amount of the transfer line according to the unconstrained optimal reactive compensation amount of the transfer line, the total reactive compensation capacity of the transfer line in the operation data, and the minimum reactive compensation amount, the method further includes: Determining a reactive compensation adjustment ratio threshold of the load line to be cut out according to the operating data and the first preset voltage change threshold; Determine a reactive compensation adjustment step length according to the reactive compensation adjustment ratio threshold and the total reactive compensation capacity of the transfer line in the operation data; The partial reactive compensation of the transfer line is adjusted at a speed at which the reactive compensation adjustment amount is less than or equal to the reactive compensation adjustment step at every first preset time interval until the reactive compensation amount of the transfer line at the current moment is equal to the constrained optimal reactive compensation amount.
8. The load transfer control method according to claim 1, characterized in that: Before determining the first active load and the minimum reactive uncompensated amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check according to the operation data, the method further includes: Determining a load increase ratio threshold of the load line to be connected according to the operating data and the second preset voltage change threshold; Determining a load access step length according to the load increase ratio threshold and the initial value of the active load of the transfer line in the operation data; The step of gradually connecting the load of the load line to be cut out to the load line to be connected via the transfer line comprises: Disconnecting the switch at the connection point between the load line to be cut off and the transfer line; After a second preset time interval, closing a switch at a connection point between the load line to be connected and the transfer line; After a third preset time interval, the partial load of the transfer line is increased at a rate where the load access amount is less than or equal to the load access step at every first preset time interval, until the active load of the transfer line at the current moment is equal to the first target active load.
9. The load transfer control method according to claim 1, characterized in that: Before determining the first active load and the minimum reactive compensation amount corresponding to the transfer line after the transfer line passes the line load check and the node voltage amplitude check according to the operation data, the method further includes: Determine whether the voltage at the transfer connection point between the load line to be connected and the transfer line is greater than a preset node minimum voltage threshold; When the voltage at the transfer connection point between the load line to be connected and the transfer line is greater than the preset node minimum voltage threshold, the step of determining the first target active load and minimum reactive compensation amount corresponding to the transfer line after passing the line load check and the node voltage amplitude check according to the operating data is performed.
10. A load transfer control device for a power line, characterized in that: include: An acquisition module, the acquisition module is used to acquire the operation data of the power line; wherein the power line includes a load line to be cut out, a load line to be connected and a transfer line; A first determination module, the first determination module is used to determine the first target active load and the minimum reactive uncompensated amount corresponding to the transfer line after the line load check and the node voltage amplitude check according to the operation data; wherein the line load check includes checking the sum of the initial value of the active load on the transfer line and the active load of the load line to be connected, and the node voltage amplitude check includes checking the amplitude of the first node voltage of the first node of the transfer line, and the first node is the transfer connection point between the transfer line and the load line to be cut out; a second determination module, the second determination module being used to determine a first voltage change amount of the load line to be cut out and a second voltage change amount of the load line to be connected according to the first target active load, the minimum reactive compensation amount and the operation data; A removal module, the removal module is used to gradually remove part of the load of the transfer line under the condition that the first voltage change amount is greater than a first preset voltage change threshold, and / or the second voltage change amount is greater than a second preset voltage change threshold; A switching module is used to gradually connect the load of the load line to be cut out to the load line to be connected through the switching line.