Sintered ore production method and control device

The most important intermediate indicator of sintered ore productivity is determined through the productivity inference model, optimize the manufacturing conditions of sintered ore, and solve the problem of inefficient sintered ore productivity monitoring in the prior art, and improve the stability and efficiency of productivity.

CN118900920APending Publication Date: 2024-11-05JFE STEEL CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380028673.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-03-28
Filing Date
2023-03-08
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The prior art fails to effectively improve the productivity of the sintered ore when monitoring the operation of the sintered machine, and the temperature distribution in a specific area may not have the greatest impact on productivity, resulting in inefficient productivity monitoring.

Method used

The productivity inference model is used to determine the index that has the greatest impact on sintered ore productivity through multiple intermediate indicators, and the manufacturing conditions of sintered ore are monitored and adjusted based on this.

Benefits of technology

Efficient monitoring and optimization of sintered ore productivity is achieved, and the stability and efficiency of productivity are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118900920A_ABST
    Figure CN118900920A_ABST
Patent Text Reader

Abstract

In this method for producing sintered ore, granulated particles granulated from a sintering raw material containing an iron-containing raw material and a carbon-containing raw material are charged into an endless moving tray (32) of a sintering machine (30) to form a charge layer, and the charge layer is sintered to produce sintered ore. The method for producing sintered ore comprises: a step for generating a productivity estimation model using a plurality of intermediate indexes related to the production of sintered ore as inputs and an index related to the productivity of sintered ore as an output; and a step for specifying, from among the plurality of intermediate indexes, an intermediate index having the highest degree of influence on the index related to productivity using the productivity estimation model.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for producing sintered ore and a control device.

[0002] In the blast furnace ironmaking method, sintered ore and the like are used as an iron source. The sintered ore is produced by sintering granulated particles using a sintering machine. The granulated particles are produced by granulating a sintering raw material containing an iron-containing raw material and a carbon-containing raw material.

[0003] When sintered ore is produced using a sintering machine, production is performed while monitoring the operation in order to stably produce the sintered ore.

[0004] For example, Patent Document 1 discloses a technology for measuring the temperature distribution of a specific region in a sintering raw material layer formed when the sintering raw material is charged into a sintering machine in an on-line manner and monitoring the operation of the sintering machine based on the measured temperature distribution. Background Art

[0005] Patent Document 1: Japanese Patent Application Publication No. 2013-83400

[0006] Even if the operation of the sintering machine is monitored based on a specific index in order to maintain and improve the productivity of the sintered ore, the index may not necessarily have the greatest influence on the productivity of the sintered ore.

[0007] For example, Patent Document 1 discloses a technique for monitoring the operation of sintering ore based on the temperature distribution of a specific area. However, the temperature distribution of a specific area does not necessarily have the greatest impact on the productivity of sintering ore.

[0008] Thus, there is a problem that even if the operation of the sintering machine is monitored based on a specific index, it is not necessarily possible to efficiently monitor the productivity of the sintered ore. Summary of the invention

[0009] An object of the present invention is to provide a method for producing sintered ore and a control device capable of efficiently monitoring the productivity of the sintered ore.

[0010] A method for producing sintered ore according to one embodiment of the present invention comprises loading granulated particles obtained by granulating a sintering raw material containing an iron-containing raw material and a carbon-containing raw material into a ring-shaped movable tray of a sintering machine to form a charging layer, and sintering the charging layer to produce sintered ore.

[0011] The method for producing sintered ore comprises the following steps: generating a productivity estimation model, the productivity estimation model taking a plurality of intermediate indicators related to the production of the sintered ore as input and producing an indicator related to the productivity of the sintered ore as output; and

[0012] The step of determining, from among the plurality of intermediate indicators, an intermediate indicator having the highest degree of influence on the indicator related to the productivity using the productivity estimation model.

[0013] A control device according to one embodiment of the present invention is used in a sintering facility, which is a facility for manufacturing sintered ore by loading granulated particles obtained by granulating a sintering raw material containing an iron-containing raw material and a carbon-containing raw material into a ring-shaped movable tray of a sintering machine to form a charging layer, and sintering the charging layer.

[0014] The control device includes a control unit that generates a productivity estimation model that takes a plurality of intermediate indicators related to the production of the sintered ore as input and outputs an indicator related to the productivity of the sintered ore.

[0015] Furthermore, the control unit uses the productivity estimation model to identify, from among the plurality of intermediate indicators, an intermediate indicator having the highest degree of influence on the indicator related to the productivity.

[0016] According to the method for producing sintered ore and the control device of the present invention, the intermediate index having the greatest influence on the productivity of the sintered ore can be identified, and thus the productivity of the sintered ore can be efficiently monitored by using the identified intermediate index. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a diagram schematically showing a configuration example of a sintering facility according to one embodiment of the present invention.

[0018] Figure 2 It is a diagram schematically showing a configuration example of a control device according to an embodiment of the present invention.

[0019] Figure 3 This is a flowchart showing a sequence example of a method for producing a sintered ore according to an embodiment of the present invention.

[0020] Figure 4A This is a graph showing the correlation between the exhaust gas oxygen concentration and the sintered ore yield in Examples.

[0021] Figure 4B This is a graph showing the correlation between the exhaust gas temperature and the yield of sintered ore in Examples.

[0022] Figure 5 This is a graph showing the correlation between the exhaust gas oxygen concentration and the sintered ore yield in Examples.

[0023] Figure 6 This is a graph showing the correlation between the carbon gas flow rate and the exhaust gas oxygen concentration in the ignition furnace of the sintering machine in the example.

[0024] Figure 7 It is a graph showing the time changes of the carbon gas flow rate, exhaust gas oxygen concentration, and return ore generation rate of the ignition furnace in the example. DETAILED DESCRIPTION

[0025] Hereinafter, embodiments of the present invention will be described with reference to the drawings.

[0026] Figure 1 1 is a diagram schematically showing a configuration example of a sintering facility 1 according to an embodiment of the present invention. The sintering facility 1 is a facility capable of producing sintered ore from a sintering raw material containing an iron-containing raw material and a carbon-containing raw material.

[0027] The sintering facility 1 includes a control device 10 , a granulator 20 , a sintering machine 30 , a pulverizer 40 , a cooler 50 , and a screening device 60 .

[0028] The control device 10 can communicate with the granulator 20, the sintering machine 30, the pulverizer 40, the cooler 50, and the screening device 60. The control device 10 controls the granulator 20, the sintering machine 30, the pulverizer 40, the cooler 50, and the screening device 60.

[0029] The structure and function of the control device 10 will be described in detail later.

[0030] The granulator 20 granulates granulated particles from the sintering raw material containing the iron-containing raw material and the carbon-containing raw material. When the granulator 20 granulates the granulated particles, granulation water is added to the sintering raw material. The sintering raw material may also contain a calcium oxide (CaO)-containing raw material as a secondary raw material. The granulated particles granulated by the granulator 20 are transported to the sintering machine 30. The iron-containing raw material may be, for example, iron ore. The carbon-containing raw material may be, for example, powdered coke. The CaO-containing raw material may be, for example, limestone.

[0031] The granulator 20 may be any granulator that can produce granulated particles, and may be, for example, a drum mixer.

[0032] The sintering machine 30 may be any sintering machine that sintered granulated pellets, and may be, for example, a Dwight Lloyd type sintering machine. The sintering machine 30 includes a sintering raw material supply device 31 , a tray 32 , an ignition furnace 33 , and a wind box 34 .

[0033] The sintering raw material supply device 31 loads the granulated particles supplied from the granulator 20 into the tray 32 .

[0034] The tray 32 is a circular movable tray. When the tray 32 is loaded with granulated particles from the sintering raw material supply device 31 , a loading layer of the sintering raw material is formed on the tray 32 .

[0035] The ignition furnace 33 ignites the carbon-containing raw material contained in the surface layer of the charge layer formed on the tray 32 .

[0036] The wind box 34 sucks air from the charge layer formed on the tray 32 from below. When the air of the charge layer is sucked downward by the wind box 34, the combustion and melt in the charge layer move downward in the charge layer. In this way, the combustion and melt move in the charge layer, thereby sintering the charge layer. By sintering the charge layer, a sintered cake is obtained.

[0037] The pulverizer 40 pulverizes the sintered cake supplied from the sintering machine 30 . The pulverizer 40 supplies the pulverized product of the sintered cake to the cooler 50 .

[0038] The cooler 50 cools the pulverized product of the sintered cake supplied from the pulverizer 40 . The pulverized product of the sintered cake cooled by the cooler 50 is supplied to the screening device 60 .

[0039] The screening device 60 screens the pulverized product of the sintered cake cooled by the cooler 50 according to the particle size of the pulverized product. For example, the screening device 60 screens the pulverized product of the sintered cake into sintered ore with a particle size of 5 mm or more and return ore with a particle size of less than 5 mm.

[0040] Thus, the ore is finally screened by the screening device 60 to produce sintered ore. In addition, the return ore screened by the screening device 60 can be reused as a sintering raw material.

[0041] Next, the configuration and function of the control device 10 will be described. First, the outline of the function of the control device 10 will be described.

[0042] The control device 10 acquires the production conditions of the sintered ore. In addition, the control device 10 acquires sensor information from various sensors provided in the sintering machine 30 .

[0043] The control device 10 calculates a plurality of intermediate indicators related to the production of sintered ore based on the acquired production conditions and sensor information. The plurality of intermediate indicators may include estimated values ​​of the intermediate indicators estimated based on the production conditions and sensor information.

[0044] The control device 10 specifies the intermediate index having the highest influence on the index related to the productivity of the sintered ore from among the plurality of intermediate indexes.

[0045] An index related to the productivity of sintered ore may be, for example, the yield of sintered ore. The yield of sintered ore may be, for example, a value calculated by the following formula (1).

[0046] (Mass of sintered ore with a particle size of 5 mm or more × 100) / (Mass of sintered ore with a particle size of 5 mm or more + Mass of returned ore with a particle size of less than 5 mm) (1)

[0047] In this embodiment, the case where the index related to the productivity of the sintered ore is the yield rate of the sintered ore is taken as an example and described, but the index related to the productivity of the sintered ore is not limited to the yield rate of the sintered ore. The index related to the productivity of the sintered ore may also be the speed of the tray 32, the strength of the sintered ore, etc.

[0048] The control device 10 determines the target value of the intermediate indicator having the highest degree of influence on the indicator related to the productivity in such a manner that the indicator related to the productivity of the sintered ore exceeds the target value. Hereinafter, the target value of the indicator related to the productivity of the sintered ore is also referred to as the "first target value". In addition, the target value of the intermediate indicator having the highest degree of influence on the indicator related to the productivity is also referred to as the "second target value". That is, the control device 10 determines the second target value of the intermediate indicator having the highest degree of influence on the indicator related to the productivity in such a manner that the indicator related to the productivity of the sintered ore exceeds the first target value.

[0049] The control device 10 may also determine a set value of a manufacturing condition of the sintered ore, which is used to make the intermediate index having the highest influence on the index related to productivity the second target value. The manufacturing condition of the sintered ore may be, for example, the speed of the tray 32, the moisture content of the sintering raw material during granulation, the content ratio of the CaO-containing raw material in the sintering raw material, and the content ratio of the carbon-containing raw material in the sintering raw material.

[0050] Next, the configuration of the control device 10 will be described.

[0051] Figure 2 1 is a diagram schematically showing a configuration example of a control device 10 according to an embodiment of the present invention. The control device 10 may be a general-purpose computer such as a workstation or a personal computer, or may be a dedicated computer configured to function as the control device 10 of the sintering facility 1 .

[0052] The control device 10 includes a control unit 11 , an input unit 12 , an output unit 13 , a storage unit 14 , and a communication unit 15 .

[0053] The control unit 11 includes at least one processor, at least one dedicated circuit, or a combination thereof. The processor is a general-purpose processor such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit), or a dedicated processor dedicated to a specific process. The dedicated circuit is, for example, an FPGA (Field-Programmable Gate Array) or an ASIC (Application Specific Integrated Circuit).

[0054] The control unit 11 reads the program, data, etc. stored in the storage unit 14 and executes various functions. The control unit 11 controls the granulator 20 , the sintering machine 30 , the pulverizer 40 , the cooler 50 , and the screening device 60 .

[0055] The control unit 11 executes the program read from the storage unit 14 , thereby enabling the control unit 11 to function as a sensor information acquisition unit 111 , an intermediate index acquisition unit 112 , an intermediate index determination unit 113 , a target value acquisition unit 114 , and a guidance information acquisition unit 115 .

[0056] The processing executed by the sensor information acquisition unit 111 , the intermediate index acquisition unit 112 , the intermediate index determination unit 113 , the target value acquisition unit 114 , and the guidance information acquisition unit 115 will be described later.

[0057] The input unit 12 includes one or more input interfaces for detecting user input and acquiring input information based on user operation. The input unit 12 includes, for example, physical keys, electrostatic capacitance keys, a touch screen integrated with the display of the output unit 13, or a microphone for receiving voice input.

[0058] The output unit 13 includes one or more output interfaces for outputting information and notifying the user. The output unit 13 includes, for example, a display that outputs information in the form of images, a speaker that outputs information in the form of sound, etc. The display included in the output unit 13 may be, for example, an LCD (Liquid Crystal Display), a CRT (Cathode Ray Tube) display, etc.

[0059] The storage unit 14 is, for example, a flash memory, a hard disk, an optical memory, etc. A part of the storage unit 14 may be outside the control device 10. In this case, a part of the storage unit 14 may be a hard disk, a memory card, etc. connected to the control device 10 via an arbitrary interface.

[0060] The storage unit 14 stores programs for the control unit 11 to execute various functions, data used by the programs, and the like.

[0061] The communication unit 15 includes at least one of a communication module corresponding to wired communication and a communication module corresponding to wireless communication. The control device 10 can communicate with other terminal devices and the like via the communication unit 15 .

[0062] Next, the processing executed by the sensor information acquisition unit 111 , the intermediate index acquisition unit 112 , the intermediate index determination unit 113 , the target value acquisition unit 114 , and the guidance information acquisition unit 115 will be described.

[0063] The sensor information acquisition unit 111 acquires information on the manufacturing conditions of the sintered ore from the sintering machine 30. The sensor information acquisition unit 111 may also acquire information on the manufacturing conditions through an input operation of an operator to the input unit 12. In addition, the sensor information acquisition unit 111 may also acquire information on the manufacturing conditions input by an operator to other terminal devices by receiving information via the communication unit 15.

[0064] In addition, the sensor information acquisition unit 111 acquires, for example, temperature information of the exhaust gas, component information of the exhaust gas, and flow rate information of the exhaust gas as sensor information. The sensor information acquisition unit 111 may acquire sensor information from various sensors provided in the sintering machine 30. Alternatively, the sensor information acquisition unit 111 may acquire sensor information through input operation of the operator to the input unit 12. In addition, the sensor information acquisition unit 111 may also acquire sensor information input by the operator to other terminal devices by receiving via the communication unit 15.

[0065] For example, the sensor information acquisition unit 111 may acquire the temperature information of the exhaust gas from a temperature sensor provided in the wind box 34. Alternatively, the sensor information acquisition unit 111 may acquire the flow rate information of the exhaust gas from a gas flow meter provided at an end of the wind box 34.

[0066] The exhaust gas component information can be obtained by sampling the exhaust gas in the wind box 34 and performing chemical analysis such as gas chromatography on the sampled exhaust gas. The sensor information acquisition unit 111 can acquire the exhaust gas component information thus obtained through input operation of the input unit 12 by the operator.

[0067] The sensor information acquisition unit 111 outputs the acquired information on the production conditions of the sintered ore and the acquired sensor information to the intermediate index acquisition unit 112 .

[0068] The intermediate index acquisition unit 112 calculates a plurality of intermediate indexes based on the information on the production conditions of the sintered ore and the sensor information acquired from the sensor information acquisition unit 111. The intermediate index is an index related to the production of the sintered ore by the sintering machine 30.

[0069] In the present embodiment, the intermediate index acquisition unit 112 calculates the exhaust gas temperature, the exhaust gas CO2 (carbon dioxide) concentration, the exhaust gas CO (carbon monoxide) concentration, the exhaust gas oxygen concentration, the exhaust gas flow rate, the BTP (Burn Through Point) and the BRP (Burn Rising Point) as a plurality of intermediate indexes when producing sintered ore in the sintering machine 30. The BTP means the position of the maximum temperature of the exhaust gas in the longitudinal direction of the sintering machine 30. The BRP means the position of the exhaust gas in the longitudinal direction of the sintering machine 30 at which the exhaust gas reaches any temperature within the range of 100 to 300°C.

[0070] The intermediate index obtaining unit 112 can calculate the exhaust gas temperature, BTP, and BRP based on the exhaust gas temperature information obtained from the sensor information obtaining unit 111. In addition, the intermediate index obtaining unit 112 can calculate the exhaust gas CO2 concentration, exhaust gas CO concentration, and exhaust gas oxygen concentration based on the exhaust gas component information obtained from the sensor information obtaining unit 111. In addition, the intermediate index obtaining unit 112 can calculate the exhaust gas flow rate based on the exhaust gas flow rate information obtained from the sensor information obtaining unit 111.

[0071] The intermediate index obtaining unit 112 can, for example, use the physical model disclosed in Reference 1 shown below and the information on the manufacturing conditions of the sintered ore obtained from the sensor information obtaining unit 111 to calculate the estimated values of BTP and BRP.

[0072] (Reference 1: Yamaoka et al. ISIJ International, Vol. 45, No. 4, pp. 522)

[0073] In addition, the intermediate index obtaining unit 112 can, for example, use the heat conduction model disclosed in Reference 2 shown below and the information on the manufacturing conditions of the sintered ore obtained from the sensor information obtaining unit 111 to calculate the estimated values of BTP and BRP.

[0074] (Reference 2: Koichiro Ohno et al., Influence of Coke Combustion Rate Equation on Numerical Simulation of Temperature Distribution in Sintering Process Layer, Iron and Steel (Influence of Coke Combustion Rate Equation on Numerical Simulation of Temperature Distribution in Sintering Process Layer, Iron and Steel), Vol. 101, (2015), No. 1, P19 - P24)

[0075] The intermediate index determination unit 113 determines the intermediate index with the highest influence degree on the index related to the productivity of the sintered ore from among the multiple intermediate indexes obtained by the intermediate index obtaining unit 112.

[0076] If the intermediate index determination unit 113 obtains the actual value of the finished product rate of the sintered ore from the sintering machine 30, a data set with the multiple intermediate indexes at this time and the actual value of the finished product rate of the sintered ore as a group is stored in the storage unit 14.

[0077] When the storage unit 14 stores a specified number of data sets, the intermediate indicator determination unit 113 uses the stored data sets for machine learning to generate a productivity inference model as a machine learning model that has been learned. The intermediate indicator determination unit 113 uses a plurality of intermediate indicators as input and uses an indicator related to the productivity of sintered ore, i.e., the yield of sintered ore, as output to perform machine learning, thereby generating a productivity inference model. The specified number of data sets may be, for example, 50 data sets. The intermediate indicator determination unit 113 stores the generated productivity inference model in the storage unit 14. As a machine learning model, for example, SPSS manufactured by IBM can be used.

[0078] The intermediate index determination unit 113 uses the productivity estimation model generated in this way to determine the intermediate index having the highest influence on the index related to the productivity of the sintered ore from among the plurality of intermediate indexes.

[0079] For example, the intermediate indicator determination unit 113 makes a chart showing the relationship between each intermediate indicator and the yield rate of the sintered ore, and calculates the correlation between the intermediate indicator and the yield rate of the sintered ore from the chart. The intermediate indicator determination unit 113 determines the intermediate indicator with the largest correlation coefficient as the intermediate indicator with the highest influence on the yield rate of the sintered ore. A large correlation coefficient means that the correlation between the change of the intermediate indicator and the change of the yield rate of the sintered ore is high, so it can be said that the influence of the intermediate indicator on the yield rate of the sintered ore is high. On the other hand, a small correlation coefficient means that the correlation between the change of the intermediate indicator and the change of the yield rate of the sintered ore is low, that is, it means that the intermediate indicator changes unrelated to the yield rate of the sintered ore, so it can be said that the influence of the intermediate indicator on the yield rate of the sintered ore is low.

[0080] In addition, for example, when the units of multiple intermediate indicators are the same, the intermediate indicator determination unit 113 may also create a graph showing the relationship between each intermediate indicator and the yield rate of the sintered ore, and calculate the slope of the regression line from the graph. The intermediate indicator determination unit 113 may also determine the intermediate indicator with the largest slope of the regression line as the intermediate indicator with the highest influence on the yield rate of the sintered ore.

[0081] The intermediate index determination unit 113 outputs the determined intermediate index to the output unit 13 .

[0082] The output unit 13 outputs the intermediate index acquired from the intermediate index specifying unit 113. For example, when the output unit 13 includes a display, the output unit 13 displays the intermediate index acquired from the intermediate index specifying unit 113 on the display.

[0083] The operator who visually checks the intermediate index having the highest influence on the yield of the sintered ore displayed on the display can monitor the production of the sintered ore by the sintering machine 30 based on the intermediate index.

[0084] For example, when the yield of the sintered ore is higher than the target value, the operator maintains the manufacturing conditions of the sintered ore of the sintering machine 30 in such a way that the intermediate index with the highest degree of influence on the yield of the sintered ore does not change. Thus, the state in which the yield of the sintered ore is higher than the target value can be maintained. On the other hand, when the yield of the sintered ore is lower than the target value, the operator changes the intermediate index with the highest degree of influence on the yield of the sintered ore. At this time, the operator adjusts the manufacturing conditions of the sintered ore of the sintering machine 30, so that the intermediate index with the highest degree of influence on the yield of the sintered ore can be changed.

[0085] The control device 10 may determine a target value (second target value) of an intermediate indicator having the highest influence on the yield of the sintered ore so that the yield of the sintered ore exceeds the target value (first target value).

[0086] In this case, the intermediate index determination unit 113 outputs the intermediate index determined as the intermediate index having the highest influence on the yield of the sintered ore to the target value acquisition unit 114 .

[0087] When the intermediate indicator determined as the intermediate indicator with the highest influence on the yield rate of sintered ore is obtained from the intermediate indicator determination unit 113, the target value acquisition unit 114 reads the productivity estimation model stored in the storage unit 14 from the storage unit 14 and obtains the first target value. The first target value may be predetermined and stored in the storage unit 14, or may be obtained through an input operation of the operator to the input unit 12.

[0088] The target value acquisition unit 114 estimates the yield of the sintered ore while changing the value of the intermediate index input to the productivity estimation model, and determines whether the estimated yield of the sintered ore exceeds the first target value. The target value acquisition unit 114 can change the value of the intermediate index every 1 unit within a predetermined range and input it to the productivity estimation model, and determine the value of the intermediate index when the estimated yield of the sintered ore exceeds the first target value as the second target value of the intermediate index.

[0089] The target value acquisition unit 114 outputs the determined second target value of the intermediate indicator to the guidance information acquisition unit 115. In addition, even if the value of the intermediate indicator is changed within a predetermined range, when the yield of the sintered ore does not exceed the first target value, the target value acquisition unit 114 may output information indicating that the second target value cannot be obtained to the guidance information acquisition unit 115.

[0090] When the second target value of the intermediate index is acquired from the target value acquisition unit 114, the guidance information acquisition unit 115 determines the setting value of the production condition of the sintered ore so that the intermediate index reaches the second target value. The guidance information acquisition unit 115 determines at least one setting value as the setting value of the production condition of the sintered ore.

[0091] For example, when the intermediate indicators are BTP, BRP, exhaust gas component concentration and exhaust gas temperature, the guidance information acquisition unit 115 can calculate the values ​​of the above intermediate indicators by inputting the raw material stacking density, exhaust gas flow rate, tray 32 speed, moisture content of the sintered raw material during granulation, the content ratio of CaO-containing raw material in the sintered raw material, and the content ratio of carbon-containing raw material in the sintered raw material into the physical model disclosed in the above reference 1.

[0092] Therefore, the guidance information acquisition unit 115 changes the speed of the tray 32, the moisture content of the sintering raw materials during granulation, the content ratio of the CaO-containing raw materials in the sintering raw materials, and the content ratio of the carbon-containing raw materials in the sintering raw materials among the items input into the physical model, while calculating the values ​​of intermediate indicators such as BTP, BRP, component concentration of exhaust gas, and exhaust gas temperature, and determines the speed of the tray 32, the moisture content of the sintering raw materials during granulation, the content ratio of the CaO-containing raw materials in the sintering raw materials, and the content ratio of the carbon-containing raw materials in the sintering raw materials when the calculated values ​​of the intermediate indicators become above the second target value.

[0093] The guidance information acquisition unit 115 can obtain a setting value for at least one of the manufacturing conditions of the sintered ore based on the determined speed of the tray 32, the moisture content of the sintering raw material during granulation, the content ratio of the CaO-containing raw material in the sintering raw material, and the content ratio of the carbon-containing raw material in the sintering raw material.

[0094] In addition, the influence of the manufacturing conditions of the sintered ore on each intermediate indicator may not be shown by a physical model. For example, an experiment may be conducted in advance to confirm how each intermediate indicator changes when the manufacturing conditions are actually changed, and the data of the experimental results may be stored in advance in the storage unit 14. The control unit 11 may also generate an intermediate indicator inference model for the machine learning model to learn the machine learning, and the machine learning model takes the manufacturing conditions of the sintered ore as input and takes the intermediate indicator with the highest influence on the yield of the sintered ore among the multiple intermediate indicators as output. In this case, the guidance information acquisition unit 115 uses the intermediate indicator inference model to determine the set value of the manufacturing condition, and the set value of the manufacturing condition is used to make the intermediate indicator with the highest influence on the indicator related to productivity become the second target value.

[0095] When the guidance information acquisition unit 115 determines the setting value of at least one of the production conditions of the sintered ore, the guidance information acquisition unit 115 outputs the determined setting value to the output unit 13 .

[0096] Output unit 13 outputs the set values ​​of the manufacturing conditions acquired from guidance information acquisition unit 115. For example, when output unit 13 includes a display, output unit 13 displays the set values ​​of the manufacturing conditions acquired from guidance information acquisition unit 115 on the display.

[0097] The operator who visually checks the set values ​​of the production conditions displayed on the display adjusts the production conditions of the sintered ore to the set values ​​and operates the sintering machine 30, thereby producing sintered ore so that the yield of the sintered ore satisfies the first target value.

[0098] Alternatively, the guidance information acquisition unit 115 may automatically set the determined setting value as the setting value of the production condition of the sintered ore. Thus, the sintering machine 30 can automatically produce sintered ore so that the yield of the sintered ore satisfies the first target value.

[0099] When the guidance information acquisition unit 115 acquires information indicating that the second target value cannot be obtained from the target value acquisition unit 114 , the setting value of the sintered ore production condition may be determined, and error information may be output to the output unit 13 to be displayed.

[0100] Reference Figure 3 The flowchart shown in FIG. 1 illustrates a method for producing sintered ore executed by the sintering facility 1 according to the present embodiment.

[0101] In step S101 , the control unit 11 of the control device 10 generates a productivity estimation model that takes a plurality of intermediate indices related to the production of sintered ore as input and outputs an index related to the productivity of the sintered ore.

[0102] In step S102, the control unit 11 uses the productivity estimation model to determine the intermediate indicator with the highest impact on the indicator related to productivity from the plurality of intermediate indicators. The control unit 11 may also output the determined intermediate indicator with the highest impact on the indicator related to productivity to the output unit 13 and display it on the output unit 13.

[0103] (Example)

[0104] Reference Figure 4A to Figure 7 , an example of a method for producing sintered ore using the sintering equipment 1 according to the present embodiment will be described.

[0105] Figure 4A This is a graph showing the correlation between the exhaust gas oxygen concentration and the sintered ore yield. Figure 4B This is a graph showing the correlation between the exhaust gas temperature and the yield of sintered ore.

[0106] If reference Figure 4A and Figure 4B , the correlation coefficient between the exhaust gas oxygen concentration and the sintered ore yield is greater than the correlation coefficient between the exhaust gas temperature and the sintered ore yield. It can be seen that as an intermediate indicator, the exhaust gas oxygen concentration has a higher influence on the sintered ore yield than the exhaust gas temperature.

[0107] In addition, the correlation coefficients of the exhaust gas temperature, exhaust gas CO2 concentration, exhaust gas CO concentration, exhaust gas oxygen concentration, exhaust gas flow rate, BTP and BRP, which are intermediate indicators, with the yield of sintered ore were confirmed, and the exhaust gas oxygen concentration is the intermediate indicator with the greatest impact on the yield of sintered ore.

[0108] Figure 5 3 is a graph showing how the correlation between the exhaust gas oxygen concentration and the sintered ore yield depends on the thickness of the charge layer formed on the tray 32 . Figure 5 The graph shows the cases where the thickness of the charge layer is 650.0 mm, 647.5 mm, 645.0 mm, 642.5 mm, and 640.0 mm. The thickness of the charge layer is one of the production conditions of sintered ore.

[0109] The slope of the regression line between the exhaust gas oxygen concentration and the sintered ore yield was calculated for each charge layer thickness, and the results are as follows.

[0110]

[0111] Thus, it can be seen that if the thickness of the charge layer, which is a manufacturing condition of sintered ore, changes, the influence of the exhaust gas oxygen concentration, which is an intermediate index, on the yield of sintered ore changes. In addition, from this result, it can be seen that if the manufacturing conditions of sintered ore change, the intermediate index with the highest influence on the yield of sintered ore may change.

[0112] Figure 6 It is a graph showing the correlation between the carbon gas flow rate (C gas flow rate) of the ignition furnace 33 of the sintering machine 30 and the exhaust gas oxygen concentration.

[0113] from Figure 6 It can be seen that by changing the carbon gas flow rate of the ignition furnace 33, which is a manufacturing condition of sintered ore, the exhaust gas oxygen concentration, which is an intermediate indicator, can be changed. That is, by only finding the second target value of the exhaust gas oxygen concentration that can make the sintered ore yield become the first target value, the setting value of the carbon gas flow rate of the ignition furnace 33 that can make the exhaust gas oxygen concentration become the second target value can be determined.

[0114] Figure 7 It is a graph showing the time changes of the carbon gas flow rate (C gas flow rate), the exhaust gas oxygen concentration and the return ore generation rate of the ignition furnace 33. The return ore generation rate means that the lower the return ore generation rate, the higher the yield of the sintered ore.

[0115] exist Figure 7 In the example shown, the carbon gas flow rate of the ignition furnace 33, which is one of the production conditions of the sintered ore, is adjusted to 1300 [Nm 3 / hr], the exhaust gas oxygen concentration as an intermediate indicator can be made the second target value. At this time, the return ore generation rate is 20.0% by mass, and the sintered ore yield can be increased to 80% by mass. The sintered ore yield at this time can achieve the first target value.

[0116] As described above, in the method for manufacturing sintered ore and the control device 10 according to the present embodiment, the control device 10 performs the following steps: a step of generating a productivity estimation model, the productivity estimation model taking a plurality of intermediate indicators related to the manufacture of sintered ore as input and taking an indicator related to the productivity of sintered ore as output; and a step of determining the intermediate indicator with the highest degree of influence on the indicator related to the productivity from the plurality of intermediate indicators using the productivity estimation model. Thus, the control device 10 can determine the intermediate indicator with the highest degree of influence on the indicator related to the productivity of sintered ore from the plurality of intermediate indicators related to the manufacture of sintered ore. As a result, the operator can monitor the manufacture of sintered ore using the intermediate indicator with the greatest influence on the productivity of sintered ore, and thus can efficiently monitor the manufacture of sintered ore from the viewpoint of maintaining and improving the productivity of sintered ore. Therefore, the method for manufacturing sintered ore and the control device 10 according to the present embodiment can efficiently monitor the productivity of sintered ore.

[0117] In addition, in the manufacturing method of sintered ore and the control device 10 of the present embodiment, the control device 10 can determine the second target value of the intermediate index having the highest influence on the index related to productivity in such a manner that the index related to productivity of the sintered ore exceeds the first target value, and determine the set value of the manufacturing condition for making the intermediate index the second target value. Thus, the operator can adjust the set value of the manufacturing condition of the sintered ore in such a manner that the intermediate index having the highest influence on the index related to productivity becomes the second target value. Therefore, the sintered ore can be manufactured in such a manner that the target productivity of the sintered ore can be achieved.

[0118] The workload of managing all of the multiple intermediate indicators related to the manufacture of sintered ore is large. Therefore, the manufacture of sintered ore is usually managed based on specific intermediate indicators. In the past, there were many cases where the manufacture of sintered ore was managed based on specific intermediate indicators without understanding the influence on the productivity of sintered ore. Therefore, sometimes the manufacture of sintered ore was managed based on the intermediate indicators with less influence on the productivity of sintered ore, and the manufacturing conditions were adjusted. In this method, it is difficult to manufacture sintered ore in a way that can achieve the target productivity of sintered ore. In contrast, in the manufacturing method of sintered ore involved in the present embodiment, the intermediate indicator with the highest influence on the indicators related to the productivity of sintered ore is determined, so that the manufacture of sintered ore can be efficiently managed based on the intermediate indicator. In addition, the manufacturing conditions of sintered ore are adjusted in a way that the intermediate indicator with the highest influence on the indicators related to the productivity of sintered ore becomes the target value, so that the sintered ore can be manufactured in a way that achieves the target yield of sintered ore.

[0119] The present invention is not limited to the above-mentioned embodiments. For example, multiple blocks recorded in the block diagram may be combined, or one block may be divided. Instead of executing multiple steps recorded in the flowchart in a time series according to the description, the steps may be executed in parallel or in a different order according to the processing capability of the device executing each step or as required. In addition, changes may be made within the scope of the gist of the present invention.

[0120] For example, in the above-mentioned embodiment, the case where the intermediate index acquisition unit 112 calculates the exhaust gas temperature, the exhaust gas CO2 concentration, the exhaust gas CO concentration, the exhaust gas oxygen concentration, the exhaust gas flow rate, BTP and BRP as multiple intermediate indicators is explained as an example, but the intermediate index acquisition unit 112 only needs to calculate at least two of the exhaust gas temperature, the exhaust gas CO2 concentration, the exhaust gas CO concentration, the exhaust gas oxygen concentration, the exhaust gas flow rate, BTP and BRP.

[0121] Furthermore, in the above-mentioned embodiment, the case where the control unit 11 has the function of the guide information acquisition unit 115 is described as an example. However, the present invention is not limited thereto, and the control unit 11 may not have the function of the guide information acquisition unit 115. However, if the control unit 11 has the function of the guide information acquisition unit 115, the sintered ore can be manufactured in a manner that achieves the target sintered ore yield, and therefore, it is preferred that the control unit 11 has the function of the guide information acquisition unit 115.

[0122] Description of Reference Numerals

[0123] 1…sintering equipment; 10…control device; 11…control unit; 12…input unit; 13…output unit; 14…storage unit; 15…communication unit; 20…granulator; 30…sintering machine; 31…sintering raw material supply device; 32…tray; 33…ignition furnace; 34…bellows; 40…crusher; 50…cooler; 60…screening device; 111…sensor information acquisition unit; 112…intermediate index acquisition unit; 113…intermediate index determination unit; 114…target value acquisition unit; 115…guidance information acquisition unit.

Claims

1. A method for producing sintered ore, wherein granulated particles obtained by granulating a sintering raw material containing an iron-containing raw material and a carbon-containing raw material are loaded into a ring-shaped movable tray of a sintering machine to form a charging layer, and the charging layer is sintered to produce sintered ore, wherein: The method for producing sintered ore comprises the following steps: a step of generating a productivity estimation model, the productivity estimation model taking a plurality of intermediate indices related to the production of the sintered ore as input and producing an indice related to the productivity of the sintered ore as output; and The step of determining, from among the plurality of intermediate indicators, an intermediate indicator having the highest degree of influence on the indicator related to the productivity using the productivity estimation model.

2. The method for producing sintered ore according to claim 1, wherein: The plurality of intermediate indicators include at least two of exhaust gas temperature, exhaust gas CO2 concentration, exhaust gas CO concentration, exhaust gas oxygen concentration, exhaust gas flow rate, BTP and BRP, The CO2 refers to carbon dioxide, the CO refers to carbon monoxide, the BTP is the abbreviation of Burn Through Point, which refers to the sintering end point, and the BRP is the abbreviation of Burn Rising Point, which refers to the temperature rising point.

3. The method for producing sintered ore according to claim 1 or 2, wherein: A second target value of an intermediate index having the highest influence on the index related to the productivity is determined so that the index related to the productivity of the sintered ore exceeds the first target value.

4. The method for producing sintered ore according to claim 3, wherein: The following steps are also included: a step of generating an intermediate index inference model, wherein the intermediate index inference model takes the manufacturing conditions of the sintered ore as input and takes the plurality of intermediate indexes as output; and A step of determining a setting value of the manufacturing condition using the intermediate indicator estimation model, wherein the setting value of the manufacturing condition is used to make the intermediate indicator having the highest influence on the indicator related to the productivity become the second target value.

5. The method for producing a sintered ore according to any one of claims 1 to 4, wherein: An index related to the productivity of the sintered ore is the yield rate of the sintered ore or the speed of the tray.

6. A control device for a sintering device, wherein the sintering device is a device for manufacturing sintered ore by loading granulated particles obtained by granulating a sintering raw material containing an iron-containing raw material and a carbon-containing raw material into a ring-shaped movable tray of a sintering machine to form a charging layer, and sintering the charging layer, wherein: The control device comprises a control unit, The control unit generates a productivity estimation model that takes a plurality of intermediate indicators related to the production of the sintered ore as input and outputs an indicator related to the productivity of the sintered ore, Furthermore, the control unit specifies, from among the plurality of intermediate indicators, an intermediate indicator having the highest degree of influence on an indicator related to the productivity, using the productivity estimation model.