Concrete laminated slab test piece pouring equipment and pouring process thereof

By using steel mesh and welded connection angle steel shear joints in the laminated plate specimen, the problem of unreliable connection of the laminated plate structure under shear force is solved, and the shear resistance and bidirectional bending performance are improved, which meets the High intensity demand.

CN118906208APending Publication Date: 2024-11-08CEEC ANHUI ELECTRICAL POWER CONSTR NO 1 CO
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411271785.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing laminated plate structure is prone to shear failure under shear force, resulting in the connection being not firm enough to meet the needs of high-strength shear resistance and bidirectional bending performance.

Method used

Design a concrete stacked plate specimen casting equipment, including steel mesh in the mold and welded connection angle steel shear joints. The prefabricated base plate and cast-in-place concrete slab are pre-embedded and fixed by angle steel shear joints, and reinforcement ribs are added to enhance the whole sex.

Benefits of technology

The shear resistance and bidirectional bending performance of the laminated plate specimens are improved, the integrity of the structure is enhanced, and the requirements of high-strength shear resistance and bidirectional bending performance are met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118906208A_ABST
    Figure CN118906208A_ABST
Patent Text Reader

Abstract

The invention discloses concrete laminated slab test piece pouring equipment which comprises a first mold, a reinforcing mesh is arranged in the first mold in a positioned mode, angle steel shear connectors are connected to grid points of the reinforcing mesh in a welded mode, reinforcing rib parts of an integrated structure are arranged on the angle steel shear connectors, and a prefabricated bottom plate is formed in the first mold in a pouring mode. The bottoms of the reinforcing meshes and the bottoms of the angle steel shear connectors are pre-buried and fixed through the prefabricated bottom plates; and when the strength of the prefabricated bottom plate reaches 80% of the preset strength, a second mold is arranged on the side face of the outline of the prefabricated bottom plate, a cast-in-place concrete plate is formed in the second mold in a pouring mode, the cast-in-place concrete plate and the prefabricated bottom plate form a laminated plate, and the top of the angle steel shear connector is pre-buried and fixed through the cast-in-place concrete plate. The laminated slab test piece structure formed by the prefabricated bottom plate and the cast-in-place concrete slab is improved, the integrity of the prefabricated bottom plate and the cast-in-place concrete slab can be improved, and the shear capacity and the bidirectional bending performance of the laminated slab test piece are further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of prefabricated building construction, and in particular to a concrete composite slab specimen casting device and a casting process thereof. Background Art

[0002] As a semi-assembled building, the composite floor has the advantages of convenient construction and good integrity compared to cast-in-place and assembled floors, and has been widely used in recent years. However, the composite floor currently has disadvantages such as heavy weight, high cost, and insufficient bearing capacity. For most composite slabs, they can be combined with each other to play their respective roles, and shear connectors play an extremely important role. Factors such as the design, quantity, and location of shear connectors will directly affect the bearing capacity, stability, and safety of the structure.

[0003] In order to develop and improve the shear resistance and two-way bending performance of composite slabs, composite slab specimens are generally used for performance testing to meet the performance requirements of the composite slabs. In the prior art, a steel mesh is usually embedded in the precast base plate of the composite slab specimen. During the composite construction with the cast-in-place concrete slab, one is to perform a roughening treatment on the joint surface of the precast base plate, and the other is to set grooves or convex ribs on the joint surface of the precast base plate. Both methods are to improve the shear connection strength with the cast-in-place concrete slab. However, during testing and use, the precast base plate layer in the composite slab is prone to shear failure when subjected to a large shear force, resulting in the existing composite slab structure having problems such as insufficient connection and poor performance, and being unable to meet the high-strength shear resistance and two-way bending performance requirements of the composite slab. Summary of the invention

[0004] The object of the present invention is to provide a concrete composite slab specimen casting device and a casting process thereof, so as to solve the problems in the above-mentioned background technology.

[0005] The purpose of the present invention can be achieved through the following technical solutions:

[0006] A concrete composite slab specimen casting device comprises a mold 1, a steel mesh is positioned in the mold 1, angle steel shear connectors are welded to the grid points of the steel mesh, the angle steel shear connectors are provided with reinforcing ribs of an integrated structure, a prefabricated bottom plate is cast in the mold 1, and the bottom of the steel mesh and the angle steel shear connector are embedded and fixed by the prefabricated bottom plate;

[0007] When the strength of the prefabricated bottom plate reaches 80% of the preset strength, a second mold is provided on the contour side of the prefabricated bottom plate, a cast-in-place concrete slab is cast in the second mold, the cast-in-place concrete slab and the prefabricated bottom plate form a composite slab, and the cast-in-place concrete slab pre-buries and fixes the top of the angle steel shear connector;

[0008] Among them, the lengths of the prefabricated base plate and the cast-in-place concrete slab are respectively preset L values, the widths are respectively preset W values, and the heights are respectively preset H values. The bottom of the angle steel shear connector is embedded in the prefabricated base plate to a depth of 1 / 2H value, and the top is embedded in the cast-in-place concrete slab to a depth of 1 / 2H value.

[0009] As a further solution of the present invention: the reinforcing rib is at least two parallel steel bars, and the parallel steel bars are welded and fixed to the flange plate wall on each side of the angle steel shear connector, the parallel steel bars located at the bottom of the angle steel shear connector are embedded in the prefabricated base plate, and the parallel steel bars located at the top of the angle steel shear connector are embedded in the cast-in-place concrete slab.

[0010] As a further solution of the present invention: the flange plate on each side of the angle steel shear connector is 50 mm long and 3 mm thick; the parallel steel bars are Φ8 mm steel bars with a length of 50 mm.

[0011] As a further solution of the present invention: the reinforcing ribs are V-shaped oblique steel bars, the oblique steel bars are welded and fixed to the flange plate walls on each side of the angle steel shear connector, the bottom of the oblique steel bars are embedded in the prefabricated base plate, and the top is embedded in the cast-in-place concrete slab.

[0012] As a further solution of the present invention: the length of the flange plate on each side of the angle steel shear connector is 50mm and the thickness is 3mm; the oblique steel bars are Φ8mm steel bars, and the two ends of the oblique steel bars are aligned with the two ends of the height side of the angle steel shear connector and welded and fixed, and the V-shaped intersection end is aligned with the middle position of the height side of the angle steel shear connector and welded and fixed.

[0013] As a further solution of the present invention: the preset L value is 1200 mm, the preset W value is 400 mm, and the preset H value is 60 mm.

[0014] As a further solution of the present invention: at least two strain gauges 1 are arranged in the middle of the steel mesh; at least two strain gauges 2 are arranged in the middle of the top surface of the cast-in-place concrete slab; strain gauges 3 are respectively arranged in the middle of the side walls of the prefabricated bottom plate and the cast-in-place concrete slab.

[0015] A concrete composite slab specimen casting process comprises the following steps:

[0016] Step S1, rolling the steel mesh, arranging the transverse steel bars and the longitudinal steel bars uniformly in a rectangular shape in a crisscross manner, positioning the spacing between the transverse steel bars and the longitudinal steel bars by using binding wires according to standard sizes, and finally tying them at grid points to form a steel mesh, and at least two strain gauges are arranged in the middle of the steel mesh;

[0017] Step S2, manufacturing the angle steel shear connector, in the factory, workers use a cutting machine to cut the angle steel and the steel bar into shape, and then use an electric welder to weld the steel bar to the angle steel wing plate to form an angle steel shear connector with a reinforcing rib;

[0018] Step S3, prefabricated bottom plate production, welding and fixing the angle steel shear connector with reinforcing ribs on the grid points of the steel mesh, and placing it in mold 1, and pouring concrete in the mold 1 to harden and shape the prefabricated bottom plate production;

[0019] Step S4, making a cast-in-place concrete slab. The prefabricated bottom slab is cured for 7 days. After its strength reaches 80% of the preset strength, the mold 1 is removed, and a mold 2 is set along the contour side of the mold 1. Concrete is poured in the mold 2 and hardened to complete the cast-in-place concrete slab.

[0020] Step S5, strain gauge installation. The cast-in-place concrete slab and the precast base slab form a composite slab specimen. At least two strain gauges 2 are arranged in the middle of the top surface of the cast-in-place concrete slab, and strain gauges 3 are arranged in the middle of the side walls of the precast base slab and the cast-in-place concrete slab, respectively.

[0021] As a further solution of the present invention: the method for forming an angle steel shear connector with reinforced ribs in step S2 includes: welding and fixing two parallel steel bars on the flange plate wall on each side of the angle steel shear connector, the parallel steel bars located at the bottom of the angle steel shear connector are pre-embedded in the prefabricated base plate, and the parallel steel bars located at the top of the angle steel shear connector are pre-embedded in the cast-in-place concrete slab.

[0022] As a further solution of the present invention: the method for forming an angle steel shear connector with reinforced ribs in step S2 includes: welding and fixing V-shaped oblique steel bars to the flange plate walls on each side of the angle steel shear connector, the bottom of the oblique steel bars being pre-embedded in the prefabricated base plate, and the top being pre-embedded in the cast-in-place concrete slab.

[0023] Beneficial effects of the present invention: During the construction process of the composite slab specimen of the present application, the prefabricated base plate is prefabricated in the factory, and a number of angle steel shear connectors are embedded during the prefabrication of the prefabricated base plate. By setting reinforcing ribs on the angle steel shear connectors to improve the composite slab specimen structure formed by the prefabricated base plate and the cast-in-place concrete slab, the integrity of the prefabricated base plate and the cast-in-place concrete slab can be increased, and the shear resistance and bidirectional bending performance of the composite slab specimen are further improved. The composite slab specimen can better reflect the more prominent performance requirements of the composite slab. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The present invention will be further described below in conjunction with the accompanying drawings.

[0025] Figure 1 It is a schematic diagram of the mold structure of the prefabricated bottom plate of the concrete composite slab specimen casting equipment of the present invention;

[0026] Figure 2 It is a schematic diagram of an angle steel shear connector with parallel steel bars pre-embedded on a prefabricated bottom plate of a concrete composite slab specimen casting device of the present invention;

[0027] Figure 3 yes Figure 2 Schematic diagram of the cast-in-place concrete slab structure using the precast bottom plate as the bottom formwork;

[0028] Figure 4 It is a schematic diagram of an angle steel shear connector with oblique steel bars pre-embedded on a prefabricated bottom plate of a concrete composite slab specimen casting device of the present invention;

[0029] Figure 5 yes Figure 4 Schematic diagram of the cast-in-place concrete slab structure using the precast bottom plate as the bottom formwork;

[0030] Figure 6 It is a schematic diagram of the structure of a composite slab specimen formed by a prefabricated bottom plate and a cast-in-place concrete slab of a concrete composite slab specimen casting equipment of the present invention;

[0031] Figure 7 yes Figure 6 Schematic cross-sectional view of ;

[0032] Figure 8 is a schematic diagram of crack distribution of the composite plate specimen labeled CP-3 in the test of Example 1;

[0033] Fig. 9 is a schematic diagram of crack distribution of the composite plate specimen labeled CP-4 in the test of Example 2;

[0034] Fig.10 This is a schematic diagram of crack distribution of the composite plate specimen labeled CP-1 in the comparative example 1;

[0035] Fig.11 This is a schematic diagram of crack distribution of the composite plate specimen labeled CP-2 in the test of Comparative Example 2;

[0036] Fig.12 It is a comparison curve of mid-span deflection of the composite plate specimens labeled CP-1, CP-2, CP-3 and CP-4 in the load test of the present invention;

[0037] Fig.13 It is a comparison curve of the steel bar strain in the mid-span of the composite plate specimens labeled CP-1, CP-2, CP-3 and CP-4 of the present invention under load test;

[0038] Fig.14 It is a comparative curve diagram of the concrete strain on the top surface of the mid-span slab in the load test of the composite slab specimens labeled CP-1, CP-2, CP-3 and CP-4 of the present invention.

[0039] In the figure: 10, mold one; 20, steel mesh; 30, angle steel shear connector; 300, parallel steel bars; 301, diagonal steel bars; 40, prefabricated base plate; 50, mold two; 60, cast-in-place concrete slab; 70, strain gauge one; 80, strain gauge two; 90, strain gauge three. DETAILED DESCRIPTION

[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] In the description of the present invention, it should be understood that the terms indicating orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention; in the description of the present invention, the meaning of "multiple" and "several" is at least two, for example two, three, etc., unless otherwise clearly and specifically defined.

[0042] See also Figures 1 to 7 As shown, the present invention is a concrete composite slab specimen casting equipment, including a mold 10, a steel mesh 20 is positioned and arranged in the mold 10, angle steel shear connectors 30 are welded and connected to the grid points of the steel mesh 20, and the angle steel shear connectors 30 are provided with reinforcing ribs of an integral structure. A prefabricated bottom plate 40 is cast in the mold 10, and the prefabricated bottom plate 40 embeds and fixes the bottom of the steel mesh 20 and the angle steel shear connector 30.

[0043] When the strength of the precast base plate 40 reaches 80% of the preset strength, a mold 2 50 is provided on the contour side of the precast base plate 40, and a cast-in-place concrete slab 60 is cast in the mold 2 50. The cast-in-place concrete slab 60 and the precast base plate 40 form a composite slab, and the cast-in-place concrete slab 60 embeds and fixes the top of the angle steel shear connector 30.

[0044] Among them, the lengths of the prefabricated base plate 40 and the cast-in-place concrete slab 60 are respectively preset L values, the preset L value is 1200mm, the widths are respectively preset W values, the preset W value is 400mm, the heights are respectively preset H values, the preset H value is 60mm, the bottom of the angle steel shear connector 30 is embedded in the prefabricated base plate 40 to a depth of 1 / 2H value, and the top is embedded in the cast-in-place concrete slab 60 to a depth of 1 / 2H value.

[0045] During the construction process of the composite slab test specimen of the present application, the precast base plate 40 is precast in the factory, and a number of angle steel shear connectors 30 are embedded in the precast process of the precast base plate 40. By setting reinforcing ribs on the angle steel shear connectors 30 to improve the composite slab test specimen structure formed by the precast base plate 40 and the cast-in-place concrete slab 60, the integrity of the precast base plate 40 and the cast-in-place concrete slab 60 can be increased, and the shear resistance and bidirectional bending performance of the composite slab test specimen are further improved. The composite slab test specimen can better reflect the more prominent performance requirements of the composite slab.

[0046] like Figure 2 and Figure 3 As shown, the reinforcing ribs are at least two parallel steel bars 300, which are welded and fixed to the flange plate wall on each side of the angle steel shear connector 30, the parallel steel bars 300 located at the bottom of the angle steel shear connector 30 are embedded in the prefabricated bottom plate 40, and the parallel steel bars 300 located at the top of the angle steel shear connector 30 are embedded in the cast-in-place concrete slab 60; the flange plate on each side of the angle steel shear connector 30 is 50 mm long and 3 mm thick; the parallel steel bars 300 are Φ8 mm steel bars with a length of 50 mm.

[0047] like Figure 4 and Figure 5 As shown, the reinforcing rib is a V-shaped oblique steel bar 301, which is welded and fixed on the flange plate wall on each side of the angle steel shear connector 30, and the bottom of the oblique steel bar 301 is embedded in the prefabricated bottom plate 40, and the top is embedded in the cast-in-place concrete slab 60; the length of the flange plate on each side of the angle steel shear connector 30 is 50mm and the thickness is 3mm; the oblique steel bar 301 is a Φ8mm steel bar, and the two ends of the oblique steel bar 301 are aligned with the two ends of the height side of the angle steel shear connector 30 and welded and fixed, and the V-shaped intersection end is aligned with the middle position of the height side of the angle steel shear connector 30 and welded and fixed.

[0048] like Figure 1 and Figure 6 As shown, at least two strain gauges 70 are arranged in the middle of the steel mesh 20; at least two strain gauges 80 are arranged in the middle of the top surface of the cast-in-place concrete slab 60; strain gauges 3 90 are respectively arranged in the middle of the side walls of the prefabricated bottom plate 40 and the cast-in-place concrete slab 60, so as to facilitate obtaining the test data of the composite plate specimen of the present application through the arranged strain gauges 70, 80 and 90.

[0049] The present invention also provides a concrete composite slab specimen casting process, comprising the following steps:

[0050] Step S1, rolling the steel mesh 20, arranging the transverse steel bars and the longitudinal steel bars evenly in a rectangular shape in a crisscross manner, and positioning the spacing between the transverse steel bars and the longitudinal steel bars using binding wires according to standard dimensions, and finally tying them at grid points to form the steel mesh 20, and at least two strain gauges 70 are arranged in the middle of the steel mesh 20.

[0051] Step S2, manufacturing the angle steel shear connector 30, in the factory, workers use a cutting machine to cut the angle steel and the steel bar into shape, and then use an electric welder to weld the steel bar to the angle steel wing plate to form the angle steel shear connector 30 with reinforcing ribs.

[0052] In this step, the angle steel shear connector 30 with reinforcing ribs can be formed in the following two ways.

[0053] One method is to form an angle steel shear connector 30 with reinforced ribs, including: welding and fixing two parallel steel bars 300 on the flange plate wall on each side of the angle steel shear connector 30, the parallel steel bars 300 located at the bottom of the angle steel shear connector 30 are pre-embedded in the prefabricated base plate 40, and the parallel steel bars 300 located at the top of the angle steel shear connector 30 are pre-embedded in the cast-in-place concrete slab 60.

[0054] Another method for forming an angle steel shear connector 30 with reinforced ribs includes: welding and fixing a V-shaped oblique steel bar 301 to the flange plate wall on each side of the angle steel shear connector 30, with the bottom of the oblique steel bar 301 embedded in the prefabricated base plate 40 and the top embedded in the cast-in-place concrete plate 60.

[0055] Step S3, manufacturing the prefabricated base plate 40, welding and fixing the angle steel shear connector 30 with reinforcing ribs on the grid points of the steel mesh 20, and placing it in a mold 10, and pouring concrete in the mold 10 to harden and shape the prefabricated base plate 40.

[0056] Step S4, manufacturing of cast-in-place concrete slab 60. The prefabricated base plate 40 manufactured above is cured for 7 days. After its strength reaches 80% of the preset strength, mold 10 is removed, and mold 2 50 is set along the contour side of mold 10. Concrete is poured in mold 2 50 and hardened to complete the manufacture of cast-in-place concrete slab 60.

[0057] Step S5, strain gauge installation. The cast-in-place concrete slab 60 and the precast base plate 40 form a composite slab specimen. At least two strain gauges 80 are arranged in the middle of the top surface of the cast-in-place concrete slab 60, and strain gauges 90 are arranged in the middle of the side walls of the precast base plate 40 and the cast-in-place concrete slab 60, respectively.

[0058] The following is a specific example to illustrate that the composite plate specimens produced in this application have good shear resistance and bidirectional bending performance.

[0059] Example 1

[0060] This embodiment 1 is a concrete composite slab specimen casting equipment, including a mold 10, in which a steel mesh 20 is positioned and arranged, and angle steel shear connectors 30 are welded and connected to the grid points of the steel mesh 20, and the angle steel shear connectors 30 are provided with reinforcing ribs of an integral structure. A prefabricated bottom plate 40 is cast in the mold 10, and the prefabricated bottom plate 40 embeds and fixes the bottom of the steel mesh 20 and the angle steel shear connector 30.

[0061] The reinforcing ribs are at least two parallel steel bars 300, which are welded and fixed to the flange plate wall on each side of the angle steel shear connector 30. The parallel steel bars 300 located at the bottom of the angle steel shear connector 30 are embedded in the prefabricated base plate 40, and the parallel steel bars 300 located at the top of the angle steel shear connector 30 are embedded in the cast-in-place concrete slab 60; the flange plate on each side of the angle steel shear connector 30 is 50 mm long and 3 mm thick; the parallel steel bars 300 are Φ8 mm steel bars with a length of 50 mm.

[0062] When the strength of the precast base plate 40 reaches 80% of the preset strength, a mold 2 50 is provided on the contour side of the precast base plate 40, and a cast-in-place concrete slab 60 is cast in the mold 2 50. The cast-in-place concrete slab 60 and the precast base plate 40 form a composite slab, and the cast-in-place concrete slab 60 embeds and fixes the top of the angle steel shear connector 30.

[0063] Among them, the lengths of the prefabricated base plate 40 and the cast-in-place concrete slab 60 are respectively preset L values, the preset L value is 1200mm, the widths are respectively preset W values, the preset W value is 400mm, the heights are respectively preset H values, the preset H value is 60mm, the bottom of the angle steel shear connector 30 is embedded in the prefabricated base plate 40 to a depth of 1 / 2H value, and the top is embedded in the cast-in-place concrete slab 60 to a depth of 1 / 2H value.

[0064] At least two strain gauges 70 are arranged in the middle of the steel mesh 20; at least two strain gauges 80 are arranged in the middle of the top surface of the cast-in-place concrete slab 60; strain gauges 3 90 are respectively arranged in the middle of the side walls of the prefabricated bottom plate 40 and the cast-in-place concrete slab 60, so as to facilitate obtaining the test data of the composite plate specimen of the present application through the arranged strain gauges 70, 80 and 90.

[0065] The composite plate specimen finally produced in this embodiment is recorded with the label CP-3.

[0066] Example 2

[0067] The difference between this embodiment 2 and embodiment 1 is that the reinforcing ribs are arranged differently. The reinforcing ribs are V-shaped oblique steel bars 301, which are welded and fixed on the flange plate walls on each side of the angle steel shear connector 30. The bottom of the oblique steel bars 301 is embedded in the prefabricated bottom plate 40, and the top is embedded in the cast-in-place concrete slab 60. The length of the flange plate on each side of the angle steel shear connector 30 is 50 mm and the thickness is 3 mm. The oblique steel bars 301 are Φ8 mm steel bars, and the two ends of the oblique steel bars 301 are aligned with the two ends of the height side of the angle steel shear connector 30 and welded and fixed, and the V-shaped intersection end is aligned with the middle position of the height side of the angle steel shear connector 30 and welded and fixed.

[0068] The composite plate specimen finally produced in this embodiment is recorded with the label CP-4.

[0069] Comparative Example 1

[0070] The difference between this comparative example 1 and the embodiment 1 is that the embedded angle steel shear connector 30 with reinforcing ribs is removed from the precast base plate 40 and the cast-in-place concrete plate 60, and during the forming and hardening process of the precast base plate 40, the top surface of the precast base plate 40 is roughened with steel rake teeth, the depth of the roughening notch is about 4 mm, and the roughening area is not less than 80% of the top surface, so as to meet the rough surface construction requirements of the composite slab in the "Concrete Structure Design Code".

[0071] The composite plate specimen finally produced in this comparative example is recorded with the label CP-1.

[0072] Comparative Example 2

[0073] The difference between this comparative example 1 and example 1 is that the embedded angle steel shear connector 30 with reinforcing ribs is removed from the precast base plate 40 and the cast-in-place concrete slab 60, and during the molding process of the precast base plate 40, a plurality of grooves are opened on the top surface of the precast base plate 40 to allow the pouring material of the cast-in-place concrete slab to enter the grooves to form a shear resistance structure.

[0074] The composite plate specimen finally produced in this comparative example is recorded with the label CP-2.

[0075] Embodiment 1 and embodiment 2 and comparative examples 1 and comparative examples 2 were tested by using composite plate specimens made by a 500T microcomputer-controlled electro-hydraulic servo pressure testing machine of model MAS-500 for testing.

[0076] First, if Figures 8 to 11 As shown, the composite plate specimens with the labels CP-1, CP-2, CP-3 and CP-4 were subjected to crack distribution tests respectively. The development of cracks in the composite plate specimens during the four-equal-division loading process was mainly concentrated on the bottom and side surfaces of the pure bending section in the mid-span. Through the analysis of the crack distribution diagram, it can be seen that the degree of cracks in Example 1 and Example 2 is obviously lighter.

[0077] Secondly, the composite plate specimens with the numbers CP-1, CP-2, CP-3 and CP-4 were subjected to bearing capacity tests respectively, and the cracking load (Fcr), yield load (Fy) and ultimate load (Fu) values ​​of the composite plate specimens were measured as shown in Table 1.

[0078] Table 1 Test results of bearing capacity of composite plate specimens

[0079] Test items Fcr / KN Fy / KN Fu / KN Example 1 15.20 56.30 70.90 Example 2 15.55 57.75 70.90 Comparative Example 1 13.70 42.10 55.00 Comparative Example 2 14.75 49.05 56.80

[0080] It can be seen from Table 1 that the ultimate load and yield load of the composite plate specimen with the label CP-4 in Example 2 are the largest, followed by the composite plate specimen with the label CP-3 in Example 1, and the composite plate specimen with the label CP-1 in Comparative Example 1 is the smallest; among them, the cracking load, yield load and ultimate load of the composite plate specimen with the label CP-3 in Example 1 are respectively increased by 3.05%, 14.78% and 24.8% compared with the composite plate specimen with the label CP-1 in Comparative Example 1, and the cracking load, yield load and ultimate load of the composite plate specimen with the label CP-4 in Example 2 are respectively increased by 5.03%, 17.73% and 27.81% compared with the composite plate specimen with the label CP-1 in Comparative Example 1; the bearing capacity of the composite plate specimen of the present application as shown by the cracking load, yield load and ultimate load is significantly improved.

[0081] Finally, the composite plate specimens with the numbers CP-1, CP-2, CP-3, and CP-4 were subjected to bending performance tests. First, based on the load-time relationship of each specimen and the collected mid-span deflection, the test data of two plates of the same plate type were averaged and plotted into the mid-span load-deflection curve of the composite plate, as shown in Figure 1. Fig.12 As shown, the bearing capacity of the composite plate specimen with CP-4 in Example 2 is greater than that of the composite plate specimen with CP-3 in Example 1. Compared with the angle steel shear connector with parallel steel bars in Example 1 and the angle steel shear connector with oblique steel bars in Example 2, the angle steel shear connector with welded oblique steel bars has a larger contact area with the concrete, and the scope of influence on the surrounding concrete is also increased accordingly; as the load increases, the lateral deformation of the concrete becomes larger and larger, and the lateral deformation profiles of the oblique steel bars and the concrete are not coplanar, which will limit the deformation of the concrete in this stress range and give full play to the compressive characteristics of the concrete; in the later stage of load application, that is, the steel bar yield stage, due to the similar structures of the two angle steels, the curves show similar trends.

[0082] Second: Based on the mid-span load-bottom tensile reinforcement strain curve measured in the experiment, such as Fig.13 As shown, as the load level increases, the difference in tensile strain becomes larger and larger, and Examples 1 and 2 perform better.

[0083] Third: Take the average value of the concrete measurement point data at the mid-span position of the slab top and use the drawing software to obtain the load-strain curve of the slab top concrete, such as Fig.14 As shown in the figure, during the entire test process, there was no crushing of the concrete on the top of the specimen, nor was there a significant decrease in the compressive strain of the concrete on the top of the slab.

[0084] From the above analysis, it can be seen that the degree of cracks in Example 1 and Example 2 is obviously lighter, the bearing capacity of the composite plate specimens shown by the cracking load, yield load and ultimate load is significantly improved, and the bending resistance is improved. Therefore, the composite plate specimens of the present application have the presence of the angle steel shear connector, which ensures the shear resistance of the composite surface of the plate during the loading stage, improves the stiffness and integrity of the plate, and inhibits the development of cracks; the composite plate specimens of the present application have high bearing capacity and bending resistance.

[0085] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A concrete composite slab specimen casting device, characterized in that: The invention comprises a mold (10), wherein a steel mesh (20) is positioned and arranged in the mold (10), and angle steel shear connectors (30) are respectively welded and connected to the grid points of the steel mesh (20), and the angle steel shear connectors (30) are provided with reinforcing ribs of an integral structure, and a prefabricated bottom plate (40) is cast and formed in the mold (10), and the prefabricated bottom plate (40) pre-buries and fixes the bottom of the steel mesh (20) and the angle steel shear connector (30); When the strength of the prefabricated bottom plate (40) reaches 80% of the preset strength, a second mold (50) is provided on the contour side of the prefabricated bottom plate (40), a cast-in-place concrete slab (60) is cast in the second mold (50), the cast-in-place concrete slab (60) and the prefabricated bottom plate (40) form a composite slab, and the cast-in-place concrete slab (60) pre-buries and fixes the top of the angle steel shear connector (30); The lengths of the prefabricated bottom plate (40) and the cast-in-place concrete plate (60) are respectively preset L values, the widths are respectively preset W values, and the heights are respectively preset H values. The bottom of the angle steel shear connector (30) is embedded in the prefabricated bottom plate (40) to a depth of 1 / 2H value, and the top is embedded in the cast-in-place concrete plate (60) to a depth of 1 / 2H value.

2. A concrete composite slab specimen casting device according to claim 1, characterized in that: The reinforcing ribs are at least two parallel steel bars (300), which are welded and fixed to the flange plate wall on each side of the angle steel shear connector (30), the parallel steel bars (300) located at the bottom of the angle steel shear connector (30) are pre-embedded in the prefabricated bottom plate (40), and the parallel steel bars (300) located at the top of the angle steel shear connector (30) are pre-embedded in the cast-in-place concrete slab (60).

3. A concrete composite slab specimen casting device according to claim 2, characterized in that: The flange plate on each side of the angle steel shear connector (30) is 50 mm long and 3 mm thick; the parallel steel bars (300) are Φ8 mm steel bars with a length of 50 mm.

4. A concrete composite slab specimen casting device according to claim 1, characterized in that: The reinforcing rib is a V-shaped oblique steel bar (301), the oblique steel bar (301) is welded and fixed to the flange plate wall on each side of the angle steel shear connector (30), the bottom of the oblique steel bar (301) is pre-embedded in the prefabricated bottom plate (40), and the top is pre-embedded in the cast-in-place concrete plate (60).

5. A concrete composite slab specimen casting device according to claim 4, characterized in that: The length of each side flange plate of the angle steel shear connector (30) is 50 mm and the thickness is 3 mm; the oblique steel bars (301) are Φ8 mm steel bars, and the two ends of the oblique steel bars (301) are aligned with the two ends of the height side of the angle steel shear connector (30) and are welded and fixed, and the V-shaped intersection end is aligned with the middle position of the height side of the angle steel shear connector (30) and is welded and fixed.

6. The concrete composite slab specimen casting equipment according to claim 1, characterized in that: The preset L value is 1200 mm, the preset W value is 400 mm, and the preset H value is 60 mm.

7. The concrete composite slab specimen casting equipment according to claim 1, characterized in that: At least two strain gauges 1 (70) are arranged at the middle of the steel mesh (20); at least two strain gauges 2 (80) are arranged at the middle of the top surface of the cast-in-place concrete slab (60); and strain gauges 3 (90) are arranged at the middle of the side walls of the prefabricated bottom plate (40) and the cast-in-place concrete slab (60).

8. A concrete composite slab specimen casting process, characterized in that: The following steps are involved: Step S1, rolling the steel mesh (20), arranging the transverse steel bars and the longitudinal steel bars uniformly in a rectangular shape in a vertical and horizontal interlaced manner, positioning the spacing between the transverse steel bars and the longitudinal steel bars by using binding wires according to standard dimensions, and finally tying them at grid points to form the steel mesh (20), and at least two strain gauges (70) are arranged in the middle of the steel mesh (20); Step S2, manufacturing the angle steel shear connector (30), in the factory, workers cut the angle steel and the steel bar into shape using a cutting machine, and then use an electric welder to weld the steel bar to the angle steel wing plate to form the angle steel shear connector (30) with a reinforcing rib; Step S3, manufacturing the prefabricated base plate (40), welding and fixing the angle steel shear connector (30) with reinforcing ribs on the grid points of the steel mesh (20), and placing it in the mold one (10), pouring concrete in the mold one (10), and hardening and forming to complete the manufacturing of the prefabricated base plate (40); Step S4, manufacturing a cast-in-place concrete slab (60), the prefabricated base plate (40) manufactured above is cured for 7 days, and after its strength reaches 80% of the preset strength, the mold 1 (10) is removed, and a mold 2 (50) is set along the contour side of the mold 1 (10), and concrete is poured in the mold 2 (50) to harden and shape the cast-in-place concrete slab (60); Step S5, strain gauge installation, the cast-in-place concrete slab (60) and the prefabricated bottom plate (40) form a composite slab specimen, at least two strain gauges 2 (80) are arranged in the middle of the top surface of the cast-in-place concrete slab (60), and strain gauges 3 (90) are arranged in the middle of the side walls of the prefabricated bottom plate (40) and the cast-in-place concrete slab (60), respectively.

9. A concrete composite slab specimen casting process according to claim 8, characterized in that: The method for forming the angle steel shear connector (30) with reinforcing ribs in step S2 comprises: welding and fixing two parallel steel bars (300) on the flange plate wall on each side of the angle steel shear connector (30), pre-embedded in the prefabricated base plate (40) at the bottom of the angle steel shear connector (30), and pre-embedded in the cast-in-place concrete plate (60) at the top of the angle steel shear connector (30).

10. A concrete composite slab specimen casting process according to claim 8, characterized in that: The method for forming the angle steel shear connector (30) with reinforcing ribs in step S2 comprises: welding and fixing V-shaped oblique steel bars (301) on the flange plate walls on each side of the angle steel shear connector (30), wherein the bottom of the oblique steel bars (301) are pre-embedded in the prefabricated bottom plate (40) and the top is pre-embedded in the cast-in-place concrete plate (60).

Citation Information

Patent Citations

  • Shearing resistance connection piece for steel and concrete combined structural member

    CN102888897A

  • Integrated profile steel-concrete composite floor slab based on I-shaped steel

    CN109723177A

  • Section steel connecting node of precast shear wall

    CN201933646U

  • Ultrathin bottom plate with superhigh strength for lamination board

    CN201972287U

  • Composite floor slab with shear pins

    CN220434014U