Carbon-sequestration electric power concrete pole preparation device and process
By adding fly ash, desulfurization gypsum and flue gas carbon dioxide to the preparation of power cement poles, and using positioning sealing mechanism and reinforcement structure, the problems of poor carbon fixation effect and mold gaps of power cement poles are solved, achieving high strength and durability and high-quality cement pole preparation.
Patent Information
- Application Number
- CN202411289277.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-08
AI Technical Summary
The existing power cement poles have poor carbon fixation effect, and rely on the reinforcement bar to improve strength and durability, and the mold fixing method causes gaps to affect casting quality.
A carbon-fixed electric cement pole preparation device is designed, including a raw material filling mechanism and a cement pole mold. By adding fly ash, desulfurization gypsum and flue gas carbon dioxide, combined with a positioning sealing mechanism, the sealing and reinforcement structure are achieved to prevent gaps and Heat expansion and contraction.
It significantly improves the carbon sequestration effect and durability of cement poles, avoids mold gaps, saves raw materials and improves casting quality.
Smart Images

Figure CN118906221A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cement pole preparation, and in particular to a device and process for preparing a carbon-fixing electric power cement pole. Background Art
[0002] With the rapid development of the electric power industry, a large amount of waste slag, waste materials and waste gas, such as fly ash, desulfurization gypsum, flue gas carbon dioxide, etc., have been generated. These wastes have caused serious pollution to the environment and also wasted a lot of resources. In order to solve these problems, researchers have begun to explore the use of these wastes for the preparation of new building materials, thereby achieving resource recycling and environmental protection. The carbon-fixing power cement pole preparation device and process is a new type of environmentally friendly building material production technology. It utilizes waste slag, waste materials and waste gas in the electric power industry to prepare carbon-fixing power cement poles with high strength, durability and environmental protection performance.
[0003] The existing power cement poles are usually made of cement, sand, gravel, water and steel bars as main raw materials, which are mixed and poured into a mold and then demolded. The power cement poles made of such raw materials have poor carbon fixation effect, and only steel bars can be used to improve the strength of the cement poles, which have poor durability. In addition, when the mold is poured, the mold is usually fixed with screws in the upper and lower halves, resulting in a gap between the molds that affects the casting quality.
[0004] Therefore, it is particularly necessary to design a carbon-fixing power cement pole preparation device and process to solve the above-mentioned technical problems. Summary of the invention
[0005] The purpose of the present invention is to provide a device and process for preparing carbon-fixing electric cement poles, so as to solve the problem mentioned in the above background technology that the existing electric cement poles have poor carbon fixation effect, can only use steel bars to improve the strength of the cement poles, have poor durability, and when the mold is poured, the mold is usually fixed with screws in an upper and lower halves, resulting in a gap between the molds that affects the casting quality.
[0006] In order to solve the above technical problems, the present invention provides a carbon sequestration power cement pole preparation device, comprising: a raw material filling mechanism, the raw material filling mechanism comprising a conveying assembly for conveying raw materials, the conveying assembly being provided with a raw material box and a preparation box side by side;
[0007] A cement rod mold, the cement rod mold comprising a horizontal bottom plate fixedly connected to a raw material filling mechanism, a pouring bottom mold fixedly arranged on the upper end of the horizontal bottom plate, a casting core assembly engaged in the pouring bottom mold, a limited material pipe fixedly arranged on one side of the pouring bottom mold, and a cover mold inserted into the upper end of the pouring bottom mold;
[0008] A positioning sealing mechanism, the positioning sealing mechanism is slidably arranged at the outer end of the limiting material pipe, the positioning sealing mechanism comprises a ring frame and a reinforcement component fixed to one side of the ring frame, the reinforcement component is provided with four groups, and the positioning sealing mechanism can slide along the limiting material pipe and the outer ends of the pouring bottom mold and the cover mold;
[0009] The preparation process of carbon-fixing power cement poles includes raw material preparation, mixture preparation, molding, maintenance, demolding and testing, as well as packaging and transportation. Fly ash, desulfurization gypsum and flue gas carbon dioxide are added to the original raw materials to play a carbon-fixing role.
[0010] Preferably, the raw material filling mechanism further comprises a base, a support plate fixedly arranged at the upper end of the base, and the conveying assembly is inserted into the support plate.
[0011] Preferably, the conveying assembly includes a rotating motor connected to one side of the support plate, the output end of the rotating motor is provided with a driving wheel and a screw rod, the screw rod is provided with a separating wheel aligned with the position of the preparation box, and the upper end of the driving wheel is meshed with two sets of driven wheels.
[0012] Preferably, a loading rod is connected to one side of the driven wheel, and a rotating plate is arranged on the loading rod to align with the raw material box and the preparation box.
[0013] Preferably, the horizontal bottom plate includes a support frame for supporting the pouring bottom mold and a lateral frame for supporting the casting core assembly, a lateral cover is threadedly fixed to the upper end of the lateral frame, the pouring bottom mold and the cover mold are inserted and fixed up and down, and a slot is opened at the upper end of the lateral frame.
[0014] Preferably, the limiting material pipe comprises an inner frame threadedly connected to the pouring bottom mold, and a limiting plate arranged on one side of the inner frame, and the outer diameter of the inner frame is equal to the outer diameter of the pouring bottom mold and the cover mold after being combined.
[0015] Preferably, the casting core assembly comprises a snap-fit bottom mold inserted into the slot, a built-in core is fixedly provided on one side of the snap-fit bottom mold, and six groups of reinforcing steel bars are inserted into the snap-fit bottom mold.
[0016] Preferably, the reinforcement assembly includes a fixed plate and a guide rail fixed on one side of the ring frame, one side of the fixed plate is connected to a cylinder component, an output end of the cylinder component is provided with a push clamp, the push clamp is slidably engaged on one side of the guide rail, and a rotating wheel is provided through one side of the push clamp.
[0017] Preferably, a motor is connected to one side of the rotating wheel, and the motor drives the rotating wheel to rotate.
[0018] The present invention also provides a preparation process of a carbon-fixing electric cement pole, comprising:
[0019] S1. Raw material preparation
[0020] Cement, sand, gravel and water are common raw materials for making power cement poles. This carbon-fixing power cement pole innovatively adds fly ash, desulfurization gypsum and flue gas carbon dioxide from coal-fired power plants.
[0021] S2. Mixture preparation
[0022] The prepared raw materials are mixed at the mixing station to make a mixture of a certain proportion.
[0023] S3, Forming
[0024] The raw materials are conveyed into the cement pole mold by the raw material filling mechanism. The conveying of the raw material filling mechanism fills the mold with the mixed materials. The sealing arrangement of the cement pole mold and the positioning sealing mechanism enables the raw materials to be formed in the cement pole mold.
[0025] S4, demoulding
[0026] Move the positioning sealing mechanism to the limiting material pipe, and remove the side cover and cover mold for demoulding.
[0027] S5. Packaging and transportation
[0028] The qualified power cement poles will be packaged and then transported to the construction site for installation and use.
[0029] The beneficial effects of the present invention are:
[0030] 1. The present invention arranges the raw material filling mechanism and the cement pole mold in combination. The casting core assembly is placed between the pouring bottom mold and the cover mold to fill the pouring core and the steel bars. The steel bars can reinforce the cement pole. The pouring core makes the inside of the cement pole hollow to prevent the cement from thermal expansion and contraction, while saving raw materials and preventing loss.
[0031] 2. The present invention realizes the extrusion of the pouring bottom mold and the cover mold by moving the positioning sealing mechanism on the outer diameter of the cement pole mold, effectively preventing the generation of pouring gaps, and when the positioning sealing mechanism moves to the outside of the limiting material pipe, the cover mold can be opened normally for mold removal, which solves the problem that the existing power cement pole mold is usually fixed with upper and lower halves by screws, resulting in a gap between the molds that affects the casting quality.
[0032] 3. The present invention makes the cement pole have better carbon fixation effect by adding fly ash, desulfurized gypsum and flue gas carbon dioxide into the raw materials. The strength of the cement pole is improved by matching with steel bars, and the durability is good. This solves the problem that the existing power cement pole has poor carbon fixation effect and can only use steel bars to improve the strength of the cement pole, which has poor durability. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0034] Figure 1 It is a schematic diagram of the overall structure of a carbon fixation power cement pole preparation device of the present invention;
[0035] Figure 2 This is a structural schematic diagram of a raw material filling mechanism of a carbon-fixing power cement pole preparation device of the present invention;
[0036] Figure 3 It is a schematic diagram of the dissected structure of a raw material filling mechanism of a carbon fixation power cement pole preparation device of the present invention;
[0037] Figure 4 Schematic diagram of the split structure of a cement pole mold for a carbon-fixing power cement pole manufacturing device of the present invention Figure 1 ;
[0038] Figure 5 Schematic diagram of the split structure of a cement pole mold for a carbon-fixing power cement pole manufacturing device of the present invention Figure 2 ;
[0039] Figure 6 It is a structural schematic diagram of a positioning and sealing mechanism of a carbon fixation power cement pole preparation device of the present invention;
[0040] Figure 7 The present invention is a flow chart of a process for preparing carbon-fixing electric cement poles.
[0041] In the figure:
[0042] 1. Raw material filling mechanism; 11. Support plate; 12. Base; 13. Conveying assembly; 131. Rotating motor; 132. Driving wheel; 133. Driven wheel; 1331. Loading rod; 1332. Turning plate; 134. Screw rod; 135. Separating wheel; 14. Raw material box; 15. Preparation box; 2. Cement rod mold; 21. Horizontal bottom plate; 211. Support frame; 212. Side frame; 2121. Card slot; 22. Lateral cover; 23, pouring bottom mold; 24, cover mold; 25, limiting material pipe; 251, internal frame; 252, limiting plate; 26, casting core assembly; 261, locking bottom mold; 262, internal core; 263, reinforcing steel bars; 3, positioning sealing mechanism; 31, ring frame; 32, reinforcement assembly; 321, fixing plate; 322, guide rail; 323, cylinder parts; 324, push clamp; 325, rotating wheel; 326, motor parts. DETAILED DESCRIPTION
[0043] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.
[0044] like Figure 1-Figure 7As shown, a carbon sequestration power cement pole preparation device and process of the present invention comprises a raw material filling mechanism 1, the raw material filling mechanism 1 comprises a conveying assembly 13 for conveying raw materials, and a raw material box 14 and a preparation box 15 are arranged side by side on the conveying assembly 13;
[0045] The cement rod mold 2 includes a horizontal bottom plate 21 fixedly connected to the raw material filling mechanism 1, a pouring bottom mold 23 is fixedly arranged on the upper end of the horizontal bottom plate 21, a casting core assembly 26 is clamped in the pouring bottom mold 23, a limiting material pipe 25 is fixedly arranged on one side of the pouring bottom mold 23, and a cover mold 24 is inserted into the upper end of the pouring bottom mold 23;
[0046] The positioning sealing mechanism 3 is slidably arranged at the outer end of the limiting material tube 25. The positioning sealing mechanism 3 includes a ring frame 31 and a reinforcement component 32 fixed to one side of the ring frame 31. The reinforcement component 32 is provided with four groups. The positioning sealing mechanism 3 can slide along the limiting material tube 25 and the outer ends of the pouring bottom mold 23 and the cover mold 24.
[0047] The preparation process of carbon-fixing power cement poles includes raw material preparation, mixture preparation, molding, maintenance, demolding and testing, as well as packaging and transportation. Fly ash, desulfurization gypsum and flue gas carbon dioxide are added to the original raw materials to play a carbon-fixing role.
[0048] The raw material filling mechanism 1 also includes a base 12, a support plate 11 fixedly arranged at the upper end of the base 12, a conveying assembly 13 inserted into the support plate 11, and the conveying assembly 13 includes a rotating motor 131 connected to one side of the support plate 11, and the output end of the rotating motor 131 is provided with a driving wheel 132 and a screw rod 134, and the screw rod 134 is aligned with the position of the preparation box 15 and a separating wheel 135 is arranged, and two groups of driven wheels 133 are meshed at the upper end of the driving wheel 132, and a loading rod 1331 is connected to one side of the driven wheel 133, and a rotating plate 1332 is arranged on the loading rod 1331 to align with the raw material box 14 and the preparation box 15.
[0049] Through the above structure, the base 12 fixes the support plate 11, the support plate 11 supports the conveying assembly 13, the conveying assembly 13 is used for conveying carbon-fixed raw materials, the rotating motor 131 drives the screw rod 134 to rotate to realize raw material conveying, the separating wheel 135 is arranged at the lower end of the preparation box 15, and the raw materials conveyed from the raw material box 14 are further crushed, and other blanks required for the power cement pole are added from the preparation box 15 for synchronous conveying, the driving wheel 132 drives the two sets of driven wheels 133 to rotate synchronously, and the rotating plate 1332 helps the raw materials to quickly enter the conveying range of the screw rod 134 to prevent jamming.
[0050] The horizontal bottom plate 21 includes a support frame 211 for supporting the pouring bottom mold 23, and a lateral frame 212 for supporting the casting core assembly 26. The upper end of the lateral frame 212 is threadedly fixed with a lateral cover 22. The pouring bottom mold 23 and the cover mold 24 are inserted and fixed up and down. A slot 2121 is provided at the upper end of the lateral frame 212. The limiting material pipe 25 includes an inner frame 251 threadedly connected to the pouring bottom mold 23, and a limiting plate 252 is arranged on one side of the inner frame 251. The outer diameter of the inner frame 251 is equal to the outer diameter of the pouring bottom mold 23 and the cover mold 24 after being combined. The casting core assembly 26 includes a snap-fit bottom mold 261 inserted into the slot 2121, and an inner core 262 is fixedly arranged on one side of the snap-fit bottom mold 261. Six groups of reinforcing steel bars 263 are inserted into the snap-fit bottom mold 261.
[0051] Through the above structure, the support frame 211 and the lateral frame 212 are used for support, and the lateral frame 212 and the lateral cover 22 are threadedly connected to realize the closed fixation of the casting core assembly 26. The casting core assembly 26 is engaged in the slot 2121, and the positioning sealing mechanism 3 is sleeved on the inner frame 251. The setting of the limit plate 252 prevents the positioning sealing mechanism 3 from falling off. The engaging bottom mold 261 is the lower support of the cement rod, and the reinforcing steel bar 263 is inserted into the engaging bottom mold 261. After the cement rod is poured, the reinforcing steel bar 263 is fixed inside the cement rod to improve the strength of the cement rod. The setting of the inner core 262 makes the cement rod after pouring hollow, which saves raw materials while preventing the influence of thermal expansion and contraction of cement.
[0052] The reinforcement assembly 32 includes a fixed plate 321 and a guide rail 322 fixed on one side of the ring frame 31. A cylinder component 323 is connected to one side of the fixed plate 321. A push clamp 324 is provided at the output end of the cylinder component 323. The push clamp 324 is slidably engaged with one side of the guide rail 322. A rotating wheel 325 is penetrated by one side of the push clamp 324. A motor component 326 is connected to one side of the rotating wheel 325. The motor component 326 drives the rotating wheel 325 to rotate.
[0053] Through the above structure, the fixed plate 321 fixes the cylinder part 323, and the cylinder part 323 drives the push clamp 324 to move along the guide rail 322. The rotating wheel 325 rotatably connected to the push clamp 324 can provide sealing extrusion force for the pouring bottom mold 23 and the cover mold 24 under the drive of the cylinder part 323. The rotation of the rotating wheel 325 drives the positioning sealing mechanism 3 to move as a whole. During pouring, the positioning sealing mechanism 3 moves to the outside of the pouring bottom mold 23 and the cover mold 24. When taking materials, the positioning sealing mechanism 3 moves to the outside of the limiting material tube 25.
[0054] In order to further better explain the above embodiment, the present invention also provides an implementation scheme, a preparation process of a carbon-fixing power cement pole, and a method of use comprises the following steps:
[0055] S1. Raw material preparation
[0056] Cement, sand, gravel and water are common raw materials for making power cement poles. This carbon-fixing power cement pole innovatively adds fly ash, desulfurization gypsum and flue gas carbon dioxide from coal-fired power plants. Fly ash has certain activity and can be used as a mineral admixture. Desulfurization gypsum can be used as a retarder and mineral admixture. Flue gas carbon dioxide can play a carbon-fixing role during the raw material mixing process.
[0057] S2. Mixture preparation
[0058] The prepared raw materials are mixed at the mixing station to make a mixture of a certain proportion. In order to ensure the uniformity of the mixture, multiple mixing and batching are required.
[0059] S3, Forming
[0060] The raw materials are conveyed into the cement rod mold 2 by the raw material filling mechanism 1 . The conveying of the raw material filling mechanism 1 fills the mold with the mixed materials. The sealing arrangement of the cement rod mold 2 and the positioning sealing mechanism 3 enables the raw materials to be formed in the cement rod mold 2 .
[0061] S4, demoulding
[0062] The positioning sealing mechanism 3 is moved to the position of the limiting material pipe 25, and the lateral cover 22 and the cover mold 24 are disassembled for demoulding.
[0063] S5. Packaging and transportation
[0064] The qualified power cement poles will be packaged and then transported to the construction site for installation and use.
[0065] Working principle: The conveying component 13 is used to convey the mixed raw materials for preparing the carbon-fixed power cement pole in the raw material box 14 to the cement pole mold 2. The preparation box 15 can add a part of the material to the conveying component 13 to prevent excessive bubbles during the raw material pouring, which affects the pouring quality. The horizontal bottom plate 21 supports and fixes the pouring bottom mold 23. The pouring bottom mold 23 and the cover mold 24 are mutually engaged. The casting core component 26 is placed between the pouring bottom mold 23 and the cover mold 24 to fill the pouring core and steel bars. The steel bars can reinforce the cement pole. The pouring core makes the inside of the cement pole hollow to prevent the cement from thermal expansion and contraction, while saving raw materials and preventing loss. The limiting material pipe 25 is connected to the merged pouring bottom mold 23. The outer diameters of the mold 23 and the cover mold 24 are of equal width, and the inner wall of the ring frame 31 is of equal width to the outer diameter of the limiting material pipe 25, so that the reinforcement component 32 can drive the ring frame 31 to move along the limiting material pipe 25 and the outer diameter of the combined pouring bottom mold 23 and the cover mold 24, thereby achieving extrusion of the pouring bottom mold 23 and the cover mold 24, and effectively preventing the generation of pouring gaps. When the positioning sealing mechanism 3 moves to the outside of the limiting material pipe 25, the cover mold 24 can be opened normally for mold removal. The fly ash, desulfurized gypsum and flue gas carbon dioxide added to the raw materials for preparing the carbon-fixing power cement pole make the cement pole have a better carbon fixation effect, and the strength of the cement pole is improved with steel bars, and the durability is good.
[0066] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A carbon sequestration power cement pole preparation device, characterized in that: include: A raw material filling mechanism (1), the raw material filling mechanism (1) comprising a conveying assembly (13) for conveying raw materials, wherein a raw material box (14) and a preparation box (15) are arranged side by side on the conveying assembly (13); A cement rod mold (2), the cement rod mold (2) comprising a horizontal bottom plate (21) fixedly connected to a raw material filling mechanism (1), a pouring bottom mold (23) fixedly arranged at the upper end of the horizontal bottom plate (21), a casting core assembly (26) being engaged in the pouring bottom mold (23), a limiting material pipe (25) fixedly arranged on one side of the pouring bottom mold (23), and a cover mold (24) inserted into the upper end of the pouring bottom mold (23); A positioning sealing mechanism (3), the positioning sealing mechanism (3) is slidably arranged at the outer end of the limiting material pipe (25), the positioning sealing mechanism (3) comprises a ring frame (31) and a reinforcement component (32) fixed to one side of the ring frame (31), the reinforcement component (32) is provided with four groups, and the positioning sealing mechanism (3) can slide along the limiting material pipe (25), and the outer ends of the pouring bottom mold (23) and the cover mold (24); The preparation process of carbon-fixing power cement poles includes raw material preparation, mixture preparation, molding, maintenance, demolding and testing, as well as packaging and transportation. Fly ash, desulfurization gypsum and flue gas carbon dioxide are added to the original raw materials to play a carbon-fixing role.
2. A carbon sequestration power cement pole preparation device as claimed in claim 1, characterized in that: The raw material filling mechanism (1) further comprises a base (12), a support plate (11) fixedly arranged at the upper end of the base (12), and the conveying assembly (13) is inserted into the support plate (11).
3. A carbon sequestration power cement pole preparation device as claimed in claim 1, characterized in that: The conveying assembly (13) comprises a rotating motor (131) connected to one side of the support plate (11); a driving wheel (132) and a screw rod (134) are arranged at the output end of the rotating motor (131); a separating wheel (135) is arranged at a position aligned with the preparation box (15) of the screw rod (134); and two sets of driven wheels (133) are meshedly arranged at the upper end of the driving wheel (132).
4. A carbon sequestration power cement pole preparation device as claimed in claim 1, characterized in that: A loading rod (1331) is connected to one side of the driven wheel (133), and a rotating plate (1332) is arranged on the loading rod (1331) so as to align with the raw material box (14) and the preparation box (15).
5. A carbon sequestration power cement pole preparation device as claimed in claim 4, characterized in that: The horizontal bottom plate (21) comprises a support frame (211) for supporting a pouring bottom mold (23), and a lateral frame (212) for supporting a casting core assembly (26); a lateral cover (22) is threadedly fixed to the upper end of the lateral frame (212); the pouring bottom mold (23) and the cover mold (24) are inserted and fixed up and down; and a slot (2121) is provided at the upper end of the lateral frame (212).
6. The carbon sequestration power cement pole preparation device according to claim 1, characterized in that: The limiting material pipe (25) comprises an inner frame (251) threadedly connected to the pouring bottom mold (23), and a limiting plate (252) arranged on one side of the inner frame (251). The outer diameter of the inner frame (251) is equal to the outer diameter of the pouring bottom mold (23) and the cover mold (24) after being combined.
7. A carbon sequestration power cement pole preparation device as claimed in claim 1, characterized in that: The casting core assembly (26) comprises a snap-fit bottom mold (261) inserted into the slot (2121), a built-in core (262) is fixedly provided on one side of the snap-fit bottom mold (261), and six groups of reinforcing steel bars (263) are inserted into the snap-fit bottom mold (261).
8. A carbon sequestration power cement pole preparation device as claimed in claim 7, characterized in that: The reinforcement assembly (32) comprises a fixing plate (321) fixed on one side of the ring frame (31) and a guide rail (322); one side of the fixing plate (321) is connected to a cylinder member (323); an output end of the cylinder member (323) is provided with a push clamp (324); the push clamp (324) is slidably engaged with one side of the guide rail (322); and a rotating wheel (325) is provided through one side of the push clamp (324).
9. A carbon sequestration power cement pole preparation device as claimed in claim 8, characterized in that: One side of the rotating wheel (325) is connected to a motor component (326), and the motor component (326) drives the rotating wheel (325) to rotate.
10. The process for preparing carbon-fixing electric power cement pole according to any one of claims 9, characterized in that: The method of use comprises the following steps: S1. Raw material preparation Cement, sand, gravel and water are the common raw materials for making power cement poles. This carbon-fixing power cement pole innovatively adds fly ash, desulfurized gypsum and flue gas carbon dioxide from coal-fired power plants. S2. Mixture preparation The prepared raw materials are mixed at the mixing station to form a mixture of a certain proportion; S3, Forming The raw materials are conveyed into the cement rod mold (2) by the raw material filling mechanism (1), the conveying of the raw material filling mechanism (1) enables the mixed material to fill the mold, and the sealing arrangement of the cement rod mold (2) and the positioning sealing mechanism (3) enables the raw materials to be formed in the cement rod mold (2); S4, demoulding The positioning sealing mechanism (3) is moved to the position of the limiting material pipe (25), and the side cover (22) and the cover mold (24) are disassembled for demoulding; S5. Packaging and transportation The qualified power cement poles will be packaged and then transported to the construction site for installation and use.