A raw coal sample buffer rack control method

By optimizing the control method of the raw coal sample buffer rack, the problems of safety and process automation in the automated storage and retrieval of raw coal samples in thermal power plants were solved, and the safety of raw coal samples and the risk of sample mixing were reduced in the storage and retrieval process.

CN118907722BActive Publication Date: 2026-11-24北京沄汇智能科技有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411110257.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2026-11-24
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

In existing technologies, the automated storage and retrieval of raw coal samples in thermal power plants cannot effectively guarantee the safety and automation of the process during the storage and retrieval, and there is a risk of sample mixing.

Method used

A method for controlling raw coal sample buffer racks is provided, comprising four steps: full barrel loading, full barrel unloading, empty barrel loading, and empty barrel unloading. By optimizing loading and unloading strategies and judgment conditions, the effective control of raw coal sample buffer racks is ensured.

Benefits of technology

It achieves safety and process automation in the storage and retrieval of raw coal samples, reduces the risk of sample mixing, and improves the control accuracy of the temporary storage of raw coal samples.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118907722B_ABST
    Figure CN118907722B_ABST
Patent Text Reader

Abstract

This invention relates to the field of raw coal sample buffering technology and discloses a raw coal sample buffering rack control method, including four steps: full barrel loading, full barrel unloading, empty barrel loading, and empty barrel unloading; the full barrel loading is illustrated using buffer rack #1 as an example. This invention achieves effective control of the raw coal sample buffering by setting up these four steps. Taking buffer rack #1 as an example, the full barrel loading strategy uses empty slots in the near-end column for barrels less than three, and empty slots in the far-end column for barrels three. For empty barrel loading, also using buffer rack #1 as an example, empty barrels are generally loaded in groups of three, using a strategy of loading from the middle, comparing the distances of the two ends from the middle position, and loading the closest end first. Similarly, for empty barrel unloading, also using buffer rack #1 as an example, the strategy of unloading from both ends is adopted, comparing the distances of the two ends from the middle position, and unloading the farthest end first. This ensures effective control of the raw coal sample buffering, guaranteeing the safety of the raw coal sample during storage and retrieval, and automating the process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of raw coal sample buffering technology, specifically a method for controlling a raw coal sample buffer rack. Background Technology

[0002] Raw coal refers to coal mined from above ground or underground, after which it has been screened and processed to remove gangue, pyrite, and other impurities. Unwashed and unprocessed raw coal produced from coal mines is also called raw coal. It includes natural coke and low-quality coal, but excludes low-calorific-value coal. Based on its degree of carbonization, it can be classified into peat, lignite, bituminous coal, and anthracite. Raw coal is mainly used for power generation, but a portion is also used as industrial and domestic raw materials.

[0003] Currently, raw coal samples from thermal power plants are generally collected mechanically or manually in accordance with national standards at coal yards and on transport vehicles. Samples are collected and stored in stainless steel tamper-evident containers, and then temporarily stored in the raw coal sample room via sample transfer carts.

[0004] Due to the current automated storage and retrieval of raw coal samples in thermal power plants, the back-to-back, non-face-to-face control of sampling and sample preparation personnel, and the single-in, single-out control of raw coal samples, it is easy to fail to effectively guarantee the safety and automation of the raw coal sample storage process when the raw coal sample barrels are automatically placed on and off the shelves. The system cannot effectively judge the status of the raw coal sample barrels, thus failing to achieve the goal of good control over the placement and removal of samples. The risk of sample mixing in the temporary storage of raw coal samples needs to be improved.

[0005] Therefore, we need to provide a method for controlling the raw coal sample buffer rack. Summary of the Invention

[0006] The purpose of this invention is to provide a method for controlling a raw coal sample buffer rack, so as to solve the problems mentioned in the background art.

[0007] To achieve the above objectives, the present invention provides the following technical solution: a method for controlling a raw coal sample buffer rack, comprising four steps: full barrel loading, full barrel unloading, empty barrel loading, and empty barrel unloading; the full barrel loading is taken as an example of buffer rack #1, and the full barrel loading strategy is as follows: for less than 3 barrels, the near-end column empty space is used for loading; for 3 barrels, the far-end column empty space is used for loading; the full barrel unloading is used for sample batching tasks. Taking buffer rack #1 as an example, the specific steps are as follows: Step 1: Check if there are any unloaded tasks on buffer rack #1 in the sample batching task team list. If not, continue to wait. If there are, retrieve a batch number to be batched and then determine if full barrel unloading is being performed. If so, wait for it to complete; otherwise, start... The process begins with the full barrel removal process; Step 2: Locate the full barrel information for the same batch number and coal sample type on buffer rack #1; Step 3: If the batching method is manual, remove the full barrel to the sampling port and execute the full barrel removal sampling port process; if the batching method is automatic, remove the full barrel to the batching port and execute the full barrel removal batching port process; Taking buffer rack #1 as an example, empty barrels are typically placed in groups of three, using a middle-placement strategy, comparing the distances from both ends to the middle position, and placing the closest end first; Taking buffer rack #1 as an example, empty barrels are removed from both ends, comparing the distances from both ends to the middle position, and removing the farthest end first.

[0008] Preferably, the specific steps for placing the full barrels on the shelf are as follows: Step 1: Determine if the #1 buffer rack is in full position. If all three conditions are met (full barrel in position, no barrels being placed on the shelf, no barrels being removed from the shelf), proceed to the next step; Step 2: Determine if the #1 buffer rack is ready; Step 3: Read the sampling code on the coal sample barrel and retrieve the sampling information from the database based on the sampling code; Step 4: Determine if this is the first full barrel. If yes, release it; otherwise, determine if this is the second full barrel. Determine if both the first and second full barrels come from the same supplier and have the same coal type. If they do, release it; otherwise, place the first full barrel on the shelf and proceed to step 6, turning the second full barrel into the first full barrel; Step 5: Determine if the third full barrel comes from the same supplier and has the same coal type as the second full barrel. If they do, proceed to placing all three full barrels on the shelf; otherwise, place the first two full barrels on the shelf and proceed to step 6, turning the third full barrel into one full barrel; Step 6: When placing the barrels on the shelf:

[0009] a) When a bucket is put on the shelf, first check if there are two full buckets at the near end of the buffer shelf. If so, place it in the third empty column and then transfer the three buckets to the far end. If there are not two full buckets, check if there is a full bucket at the near end. If so, place it in the second empty column. If not, place it in a separate empty column at the near end.

[0010] b) When putting two barrels on the shelf, first check if there is a full barrel at the near end of the buffer shelf. If so, place it in the empty slots of the second and third columns, and then transfer the three barrels to the far end. If not, place the two barrels in an empty slot in the near end column.

[0011] c) When placing the three barrels on the shelf, put them directly in the empty space at the farthest end of the column;

[0012] Step 7: Swap strategy. Find the column with three empty slots at the far end, and then swap the three full slots with its position.

[0013] The preferred steps for the full bucket removal sampling port process (manual batching) are as follows: determine whether the No. 1 buffer rack is ready; find the full bucket to be removed and start removing it to the sampling port.

[0014] The preferred steps for the full bucket removal and batching process (automatic batching) are as follows: Determine if the #1 buffer rack is ready; Locate the full bucket to be removed and remove it to the batching port; Begin removing the bucket.

[0015] Preferably, the specific steps for placing empty buckets on the shelves are as follows: Step 1: Determine whether the empty bucket line of buffer rack #1 is full. If all three conditions are met (empty bucket line is full, no empty buckets are being placed on the shelves, and no full buckets are being removed from the shelves), proceed to the next step; Step 2: First, determine whether the number of empty columns of buffer rack #1 is less than 8. If it is less, do not execute the empty bucket placement instruction; Step 3: Determine whether buffer rack #1 is ready; Step 4: Send an empty bucket placement command to the PLC master control, find the empty column position closest to the middle position, write the placement position to the PLC, and start placement; Step 5: Placement completed.

[0016] Preferably, the specific steps for removing empty buckets from the shelves are as follows: Step 1: Determine whether the empty bucket line of cache rack #1 is full. If all three conditions are met (empty bucket line not, no empty buckets are being put on the shelf, no full buckets are being removed from the shelf), proceed to the next step; Step 2: Determine whether cache rack #1 is ready; Step 3: If ready, find the empty bucket furthest from the center position and start removing it from the shelf.

[0017] This invention provides a method for controlling a raw coal sample buffer rack. It has the following beneficial effects:

[0018] (1) This invention sets up four steps: full barrel loading, full barrel unloading, empty barrel loading, and empty barrel unloading. Taking the No. 1 buffer rack as an example, the full barrel loading strategy is to load less than 3 barrels into the near-end empty column and load 3 barrels into the far-end empty column. Taking the No. 1 buffer rack as an example, the empty barrel loading strategy is generally to load 3 empty barrels together, and to load from the middle, comparing the distances of the two ends from the middle position, and loading the end with the closest distance first. Taking the No. 1 buffer rack as an example, the empty barrel unloading strategy is to unload from both ends, comparing the distances of the two ends from the middle position, and unloading the end with the farthest distance first. This achieves effective control of the raw coal sample buffering area, ensuring the safety of the raw coal sample in the storage and retrieval process and the automation of the process.

[0019] (2) This invention sets up a full-bucket removal process. When checking the sample batching task team list, if there are any unremoved tasks on buffer rack #1, the process continues to wait. If there are, a batch number to be batched is retrieved, and it is then determined whether full-bucket removal is currently being performed. If so, the process waits for completion; otherwise, the full-bucket removal process begins. Then, the system searches for full-bucket information on buffer rack #1 that matches the supplier and coal sample type for that batch number. If the batching method is manual, the full-bucket is removed to the sampling port, and full-bucket removal sampling is performed. The process involves two steps: If the batching method is automatic, then when a full barrel is removed from the rack, it is moved to the batching port, and the full barrel removal and batching port process is executed. The full barrel removal and sampling port process (for manual batching) involves checking if the #1 buffer rack is ready; locating the full barrel to be removed, and starting the removal to the sampling port. The full barrel removal and batching port process (for automatic batching) involves checking if the #1 buffer rack is ready; locating the full barrel to be removed, and removing it to the batching port; and starting the removal process. This achieves two forms of full barrel removal, reducing the risk of sample mixing during the temporary storage of raw coal samples. Attached Figure Description

[0020] Figure 1 This is a flowchart illustrating the overall process of product listing and delisting in this invention.

[0021] Figure 2 This is a flowchart of the process for placing a full bucket on a shelf according to the present invention;

[0022] Figure 3 This is a flowchart illustrating the process of removing empty buckets from shelves according to the present invention.

[0023] Figure 4 This is a flowchart of the process for placing empty buckets on shelves according to the present invention. Detailed Implementation

[0024] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0025] Example 1

[0026] A preferred embodiment of the raw coal sample buffer rack control method provided by the present invention is as follows: Figure 1-4 The following describes a method for controlling a raw coal sample buffer rack, comprising four steps: full-bucket loading, full-bucket unloading, empty-bucket loading, and empty-bucket unloading. Taking buffer rack #1 as an example, the full-bucket loading strategy uses empty slots in the near-end column for loads less than 3 buckets, and empty slots in the far-end column for loads of 3 buckets. Full-bucket unloading is used for sample batching tasks. Taking buffer rack #1 as an example, the specific steps are as follows: Step 1: Check the sample batching task queue list for any unloaded tasks on buffer rack #1. If not, continue waiting. If so, retrieve a batch number to be batched and then determine if full-bucket unloading is currently in progress. If so, wait for it to complete; otherwise, begin the full-bucket unloading process. Step 1: Find the supplier and coal sample type of the same full barrel on the No. 1 buffer rack; Step 2: If the batching method is manual, then remove the full barrel to the sampling port and execute the full barrel removal sampling port process; if the batching method is automatic, then remove the full barrel to the batching port and execute the full barrel removal batching port process; Taking the No. 1 buffer rack as an example, empty barrels are generally placed in groups of 3, using a middle-placement strategy, comparing the distances from both ends to the middle position, and placing the end closest to the middle position first; Taking the No. 1 buffer rack as an example, empty barrels are removed from the rack from both ends, comparing the distances from both ends to the middle position, and removing the end furthest from the middle position first.

[0027] Example 2

[0028] Please see Figures 1-4 Based on Example 1, the following further steps are obtained: Taking the No. 1 buffer rack as an example, the full-bucket shelving strategy is as follows: for less than 3 buckets, the near-end column empty space is used for shelving; for 3 buckets, the far-end column empty space is used for shelving. The specific steps are as follows: Step 1: Determine whether the No. 1 buffer rack is in full position. If all three conditions are met (full bucket in position, no buckets being shelved, no buckets being unshelved), proceed to the next step; Step 2: Determine whether the No. 1 buffer rack is ready; Step 3: Read the sampling code on the coal sample bucket and obtain the sampling information from the database according to the sampling code; Step 4: Determine whether it is the first full bucket. If yes, release it; otherwise, determine whether it is the second full bucket. Determine whether it comes from the same supplier and has the same coal type as the first full bucket. If yes, release it; otherwise, shelving the first full bucket and proceeding to step 6, turning the second full bucket into the first full bucket; Step 5: Determine whether the third full bucket comes from the same supplier and has the same coal type as the second full bucket. If yes, proceed to shelving the three full buckets; otherwise, shelving the first two full buckets and proceeding to step 6, turning the third full bucket into one full bucket;

[0029] Step Six: When listing the product:

[0030] a) When a bucket is put on the shelf, first check if there are two full buckets at the near end of the buffer shelf. If so, place it in the third empty column and then transfer the three buckets to the far end. If there are not two full buckets, check if there is a full bucket at the near end. If so, place it in the second empty column. If not, place it in a separate empty column at the near end.

[0031] b) When putting two barrels on the shelf, first check if there is a full barrel at the near end of the buffer shelf. If so, place it in the empty slots of the second and third columns, and then transfer the three barrels to the far end. If not, place the two barrels in an empty slot in the near end column.

[0032] c) When placing the three barrels on the shelf, put them directly in the empty space at the farthest end of the column;

[0033] Step 7: Swap strategy. Find the column with three empty slots at the far end, and then swap the three full slots with its position.

[0034] Example 3

[0035] Please see Figures 1-4 Furthermore, based on Example 1, the following steps were obtained: Full bucket removal is used for sample batching tasks. Taking the No. 1 cache rack as an example, the specific steps are as follows: Step 1: Check if there are any unremoved tasks on the No. 1 cache rack in the sample batching task team list. If not, continue to wait. If a batch number to be sampled and batched is retrieved, determine if full barrel removal is currently in progress. If so, wait for it to complete; otherwise, begin the full barrel removal process. Step 2: Locate the full barrel information for the same batch number and coal sample type on buffer rack #1. Step 3: If the batching method is manual, remove the full barrel to the sampling port and execute the full barrel removal sampling port process. If the batching method is automatic, remove the full barrel to the batching port and execute the full barrel removal batching port process. The specific steps for the full barrel removal sampling port process (manual batching) are: determine if buffer rack #1 is ready; locate the full barrel to be removed and begin removing it to the sampling port. The specific steps for the full barrel removal batching port process (automatic batching) are: determine if buffer rack #1 is ready; locate the full barrel to be removed and remove it to the batching port; begin removal.

[0036] Example 4

[0037] Please see Figures 1-4Furthermore, based on Example 1, the following is obtained: Taking cache rack #1 as an example, empty bucket placement typically involves placing three empty buckets together, using a middle-placement strategy. The distances from both ends to the middle position are compared, and the end closest to the middle position is placed first. The specific steps are as follows: Step 1: Determine if the empty bucket line of cache rack #1 is full. If all three conditions are met (empty bucket line is full, no empty buckets are being placed, and no full buckets are being removed), proceed to the next step; Step 2: First, determine if the number of empty columns in cache rack #1 is less than 8. If less, the empty bucket placement instruction is not executed; Step 3: Determine if cache rack #1 is ready; Step 4: Send an empty bucket placement command to the PLC master control, find the empty column closest to the middle position, write the placement position to the PLC, and begin placement; Step 5: Placement complete.

[0038] Example 5

[0039] Please see Figures 1-4 Furthermore, based on Example 1, the following steps are obtained: Taking cache rack #1 as an example, the strategy of removing empty buckets from both ends is adopted. The distances from both ends to the middle position are compared, and the end with the greatest distance is removed first. The specific steps are as follows: Step 1: Determine whether the empty bucket line of cache rack #1 is full. If three conditions are met (empty bucket line not, no empty buckets are being added, and no full buckets are being removed), proceed to the next step; Step 2: Determine whether cache rack #1 is ready; Step 3: If ready, find the empty bucket with the greatest distance from the middle position and start removing it.

[0040] Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for controlling a raw coal sample buffer rack, characterized in that, It includes four steps: putting full buckets on the shelf, taking full buckets off the shelf, putting empty buckets on the shelf, and taking empty buckets off the shelf. Taking cache rack #1 as an example, the full-bucket shelving strategy is as follows: for racks with fewer than 3 buckets, empty slots in the near column are used for shelving; for racks with 3 buckets, empty slots in the far column are used for shelving. The process of removing full bins from shelves is used for sample batching and sorting tasks. Taking buffer rack #1 as an example, the specific steps are as follows: Step 1: Check the batch re-aggregation task team list for any unremoved tasks on cache rack #1. If not, continue waiting. If so, retrieve a batch number to be re-aggregated and then check if full-bucket removal is currently in progress. If so, wait for it to complete. Execution complete; otherwise, proceed with the process of removing items from shelves when full. Step 2: Locate the full barrel information for the same batch number and coal sample type on buffer rack #1; Step 3: If the batching method is manual batching, then remove the full container from the shelf to the sampling port and execute the full container removal sampling port process; if the batching method is automatic batching, then remove the full container from the shelf to the batching port and execute the full container removal batching port process. Taking cache rack #1 as an example, the empty buckets are usually placed in groups of three, using a strategy of placing them from the middle. The distances from the two ends to the middle position are compared, and the end with the closest distance is placed first. Taking cache rack #1 as an example, the empty bucket removal strategy adopts a strategy of removing the buckets from both ends. The distances from both ends to the middle position are compared, and the bucket with the greatest distance is removed first.

2. The method for controlling a raw coal sample buffer rack according to claim 1, characterized in that: The specific steps for placing the full bucket on the shelf are as follows: Step 1: Determine if cache rack #1 is full. If the following three conditions are met simultaneously: full, no items are being added, and no items are being removed, proceed to the next step. Step 2: Determine if cache rack #1 is ready; Step 3: Read the sampling code on the coal sample container and retrieve the sampling information from the database based on the sampling code; Step 4: Determine if it is the first full bucket. If yes, release it. Otherwise, determine if it is the second full bucket. Determine if it comes from the same supplier and has the same coal type as the first full bucket. If yes, release it. Otherwise, put the first full bucket on the shelf and proceed to Step 6 to turn the second full bucket into the first full bucket. Step 5: Determine whether the third full bucket and the second full bucket are from the same supplier and have the same coal type. If they are the same, put the three full buckets on the shelf. Otherwise, put the first two full buckets on the shelf and execute step 6 to turn the third full bucket into one full bucket. Step Six: When listing the product: a) When a bucket is put on the shelf, first check if there are two full buckets at the near end of the buffer shelf. If so, place it in the third empty column and then transfer the three buckets to the far end. If there are not two full buckets, check if there is a full bucket at the near end. If so, place it in the second empty column. If not, place it in a separate empty column at the near end. b) When putting two barrels on the shelf, first check if there is a full barrel at the near end of the buffer shelf. If so, place it in the empty slots of the second and third columns, and then transfer the three barrels to the far end. If not, place the two barrels in an empty slot in the near end column. c) When placing the three barrels on the shelf, put them directly in the empty space at the farthest end of the column; Step 7: Swap strategy. Find the column with three empty slots at the far end, and then swap the three full slots with its position.

3. The method for controlling a raw coal sample buffer rack according to claim 1, characterized in that: The process of removing full barrels from the sampling port adopts the following steps for manual approval: determine whether the No. 1 buffer rack is ready; find the position of the full barrel to be removed and start removing it to the sampling port.

4. The method for controlling a raw coal sample buffer rack according to claim 1, characterized in that: The automatic batching process for removing full bins from shelves and returning them to the batching port involves the following steps: determining whether buffer rack #1 is ready; locating the full bin to be removed and removing it to the batching port; and starting the removal process.

5. The method for controlling a raw coal sample buffer rack according to claim 1, characterized in that: The specific steps for placing the empty buckets on the shelf are as follows: Step 1: Determine if the empty bucket line of cache rack #1 is full. If the following three conditions are met simultaneously: the empty bucket line is full, there are no empty buckets being added, and there are no full buckets being removed, proceed to the next step. Step 2: First, determine if the number of empty columns in cache #1 is less than 8. If it is less, do not execute the empty bucket placement instruction. Step 3: Determine if cache rack #1 is ready; Step 4: Send an empty bucket placement command to the PLC master control, find the empty column closest to the middle position, write the placement position to the PLC, and start placement; Step 5: Product listing complete.

6. The method for controlling a raw coal sample buffer rack according to claim 1, characterized in that: The specific steps for removing the empty buckets from the shelves are as follows: Step 1: Determine if the empty bucket line of cache rack #1 is full. If the following three conditions are met simultaneously: no empty bucket line, no empty buckets are being added, and no full buckets are being removed, proceed to the next step. Step 2: Determine if cache rack #1 is ready; Step 3: Once everything is ready, find the empty bucket furthest from the center and start removing it from the shelf.