Telescopic chute type ship loader

By adopting a telescopic chute design in the loader, the sliding sleeve, side plate and gear bar are used to achieve synchronous and separate telescopic of the groove pipe, combined with the adjustment of the cylinder and motor, the loader is solved by complex structure and large weight. , the problem of high maintenance costs has achieved more efficient material transportation and lower usage costs.

CN118907891AActive Publication Date: 2024-11-08WUHAN HAIBO HARBOR & SHIPPING ENG TECH

Patent Information

Application Number
CN202411405642.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-11-08
Estimated Expiration
2044-10-10

AI Technical Summary

Technical Problem

The existing ship loaders have complex structures, large space area, heavy equipment weight and high maintenance costs.

Method used

The design of telescopic chute loader includes support beams, telescopic chutes, push mechanisms, cylindrical systems and dust removal systems. The synchronous and separate telescopic of the inner and outer groove pipes can be achieved through the cooperation of the sliding sleeve, side plate and stop rod. The cylinder and motor adjust the height and pitch angle of the bobbin, optimizing material discharge position and speed.

Benefits of technology

It improves the loading coverage and operating efficiency, reduces the volume and weight of the equipment, reduces maintenance costs, and improves the stability and universality of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118907891A_ABST
    Figure CN118907891A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of ship loaders, and particularly discloses a telescopic chute type ship loader which comprises a supporting beam, a supporting frame is arranged on the supporting beam, a telescopic chute is formed in the supporting frame and used for conveying materials for ship loading, a tail chute used for feeding and a telescopic chute tube used for discharging are arranged on the telescopic chute, and the telescopic chute tube is arranged in the supporting frame. A limiting guide rod is further fixedly installed in the supporting frame, and a stop rod fixed to the supporting frame is arranged on one side of the limiting guide rod. The telescopic chute comprises an outer chute pipe and an inner chute pipe, the outer chute pipe and the inner chute pipe are obliquely arranged, and the outer chute pipe is slidably assembled in the supporting frame in the length direction of the supporting frame; according to the telescopic chute type ship loader, through cooperative use of the sliding sleeves, the side plates and the stop rods, the inner chute pipe and the outer chute pipe stretch out and draw back synchronously in the supporting frame, the outer chute pipe stretches out and draws back independently, the discharging position can be well adjusted in the material discharging process, and the ship loading coverage and the operation efficiency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of ship loaders, and in particular to a telescopic inclined chute type ship loader. Background Art

[0002] Ship loaders are large bulk material machines used for loading at bulk material terminals. Large port bulk material loading equipment plays an important role in the high-speed, stable and rolling development of energy, power, metallurgy, ports and other industries, especially some large bulk material distribution centers.

[0003] The patent document with the authorization announcement number CN218707439U discloses an inland river rotary telescopic ship loader, which includes a support frame, a dock belt conveyor, a rotary mechanism, a first belt conveyor and a second belt conveyor. The discharge end of the dock belt conveyor is arranged on the support frame, and a head funnel is provided at the discharge end. The rotary mechanism is arranged on the support frame and is located below the head funnel. The first belt conveyor is installed on the rotary mechanism. The first belt conveyor realizes horizontal rotation under the action of the rotary mechanism. A first discharge cylinder is provided at one end of the first belt conveyor away from the rotary mechanism; the second belt conveyor is telescopically arranged on the first belt conveyor, and the second belt conveyor is located below the first discharge cylinder. The discharge end of the second belt conveyor is provided with a A second discharging cylinder is provided, and a rotating mechanism is provided on the supporting frame, which can drive the first belt conveyor to realize the rotating function, so that the material transported by the first belt conveyor has a wider coverage area, and a retractable second belt conveyor is provided on the first belt conveyor. The combination of the first belt conveyor and the second belt conveyor can adjust the material conveying length of the belt conveyor to adapt to the material transportation of ships under different circumstances, and under the telescopic action of the rotating mechanism and the second belt conveyor, the second discharging cylinder on the loader can fully cover the cabin of the loading operation area, and can evenly transport the material to the cabin, avoiding the ship moving operation during the loading operation, and also avoiding the problem of ship capsizing due to untimely ship moving.

[0004] However, the following problems still exist in this solution: although the material conveying length can be adjusted by combining the first belt conveyor and the second belt conveyor, the belt conveyor structure is often relatively complicated. When the two sets of belt conveyors are used in combination, the space occupied is relatively large, resulting in a relatively large overall weight of the equipment. The loading process is often suspended transportation, which requires a more complex installation structure to maintain the stability of the belt conveyor during suspended transportation, and the maintenance and use costs of the equipment are relatively high. Summary of the invention

[0005] The present invention provides a telescopic chute type ship loader, aiming to solve the problems in the related art of large occupied space area, large overall weight of the equipment and high maintenance and use costs.

[0006] The telescopic chute ship loader of the present invention comprises a support beam, a support frame is arranged on the support beam, a telescopic chute is arranged inside the support frame for conveying materials for loading, a tail chute for feeding and a telescopic chute for discharging are arranged on the telescopic chute, a limit guide rod is fixedly installed in the support frame, and a stop rod fixed on the support frame is arranged on one side of the limit guide rod; The telescopic chute includes an outer trough pipe and an inner trough pipe, both of which are inclined, and the outer trough pipe is slidably assembled inside the support frame along the length direction of the support frame, the telescopic chute is arranged at one end of the outer trough pipe away from the support frame, a pushing mechanism is arranged on the outer side of the outer trough pipe to push the outer trough pipe to slide inside the support frame, the inner trough pipe is slidably assembled inside the outer trough pipe, and the top end of the inner trough pipe extends to the outside of the outer trough pipe; A sliding sleeve is fixedly installed on the outer wall of the outer groove tube, and the sliding sleeve is slidably assembled on the limiting guide rod. A side plate matched with the stop rod is fixedly installed on the outer wall of the inner groove tube, and the side plate is slidably assembled on the limiting guide rod.

[0007] Preferably, the telescopic chute includes a vertical cylinder, a chute pipe and a cylinder. The vertical cylinder is inserted into the end of the outer trough pipe away from the support frame, the chute pipe is slidably assembled on the outside of the vertical cylinder, the cylinder is fixedly installed on the vertical cylinder, and the telescopic end of the cylinder is fixedly connected to the chute pipe. The effect is that the cylinder can adjust the lifting and lowering of the chute pipe outside the vertical cylinder to adjust the discharge height, so as to better adapt to the changes in material height during loading.

[0008] Preferably, a pipe head is fixedly installed at the bottom end of the chute pipe, an inverted conical bucket is fixedly installed inside the pipe head, a closed bucket is rotatably installed above the conical bucket, and material holes are provided on the conical bucket and the closed bucket, and a second motor is provided at the bottom of the conical bucket, and the output end of the second motor is fixed to the closed bucket, which has the effect that the closed bucket can be driven by the second motor to rotate so that the closed bucket and the material holes on the conical bucket are misaligned to adjust the discharge speed of the pipe head and suspend the discharge.

[0009] Preferably, the pushing mechanism includes a lead screw, a threaded sleeve and a first motor. The lead screw is rotatably assembled in a support frame, the threaded sleeve is threadedly connected to the outside of the lead screw, and the threaded sleeve is fixed to the outer groove tube. The first motor is fixedly assembled on the support frame, and the output end of the first motor is connected to the lead screw through a transmission belt. The effect is that the lead screw can be driven to rotate by the first motor to push the threaded sleeve to move the outer groove tube, thereby realizing the extension and retraction of the telescopic inclined slot in the support frame.

[0010] Preferably, a front support seat and a rear support seat are provided at the bottom of the support beam, a door frame is provided at the top of the support beam, and a pull rod is provided between the door frame and the support beam. A hinge seat is also provided at the top of the support beam, and the bottom side of the top end of the support frame is hinged in the hinge seat.

[0011] Preferably, the support beam is also provided with a pitch system and a dust removal system for adjusting the pitch angle of the telescopic chute and removing dust from materials swung inside the tail chute.

[0012] Preferably, the pitch system includes a connecting arm, a connecting buckle and a winch, the top end of the connecting arm is rotatably mounted on the portal frame, the top end of the connecting buckle is rotatably connected to the bottom end of the connecting arm, the bottom end of the connecting buckle is rotatably mounted on the support frame, the winch is installed on the support beam, and the end of the steel rope in the winch passes around the portal frame and is fixed to the support frame. The effect is that the support frame is suspended from the portal frame by the connecting arm and the connecting buckle, and the winch can drive the support frame to rotate on the hinged seat when the steel rope is retracted and released to adjust the pitch angle of the outer groove pipe.

[0013] Preferably, the dust removal system includes a dust box and a dust pipe. The dust box is fixedly mounted on the support beam and is located directly above the tail chute. The top of the dust pipe is connected to the air inlet of the dust box. The effect is that the dust raised by the materials in the tail chute can be absorbed by the dust box.

[0014] Preferably, the tail chute is arranged obliquely, and the bottom end of the tail chute is communicated with the support frame, and a hopper located at the port of the tail chute is arranged on the top of the inner groove tube.

[0015] Beneficial effects: When the present invention is in use, the inner groove pipe and the outer groove pipe can be synchronously extended and retracted in the support frame and the outer groove pipe can be independently extended and retracted through the coordinated use of the sliding sleeve, the side plate and the baffle rod, so that the discharge position can be better adjusted during material discharge, the loading coverage and operation efficiency can be improved, and while ensuring the increase in the conveying distance, the volume of the equipment can be effectively reduced, the weight of the equipment can be reduced, the stability of the equipment can be maintained more conveniently, and the use cost can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a perspective view of the present invention.

[0017] Figure 2 It is a front view of the present invention.

[0018] Figure 3 It is a three-dimensional view of the telescopic chute of the present invention.

[0019] Figure 4 It is a three-dimensional diagram of the support frame of the present invention.

[0020] Figure 5 It is a cross-sectional view of a telescopic chute of the present invention.

[0021] Figure 6 The present invention Figure 1 Schematic diagram of the enlarged structure at point A in the middle.

[0022] Reference numerals: 10. Support beam; 11. Front support seat; 12. Rear support seat; 13. Door frame; 14. Pull rod; 15. Support frame; 151. Limit guide rod; 152. Stop rod; 16. Articulated seat; 20. Tail chute; 21. Feed box; 30. Telescopic chute; 31. Outer chute tube; 311. Sliding sleeve; 32. Inner chute tube; 321. Side plate; 322. Hopper; 40. Telescopic chute; 41. Vertical cylinder; 42, chute pipe; 421, pipe head; 422, conical bucket; 423, closed bucket; 424, material hole; 425, second motor; 43, cylinder; 50, pitch system; 51, connecting arm; 52, connecting buckle; 53, winch; 60, dust removal system; 61, dust suction box; 62, dust suction pipe; 70, pushing mechanism; 71, screw; 72, threaded sleeve; 73, first motor. DETAILED DESCRIPTION

[0023] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0024] like Figures 1 to 6 As shown, the telescopic chute ship loader of the present invention comprises a support beam 10, a tail chute 20 and a telescopic chute 30 are arranged above the support beam 10 for conveying materials, a telescopic chute 30 is provided with a telescopic chute 40 to guide the discharge position of the materials, a pitching system 50 and a dust removal system 60 are also arranged on the support beam 10, the pitching system 50 can adjust the pitching angle of the telescopic chute 30 to change the discharge position of the telescopic chute 40, and the dust removal system 60 removes the material dust raised inside the tail chute 20.

[0025] refer to Figure 1 and Figure 2 A front support seat 11 and a rear support seat 12 are provided at the bottom of the support beam 10 , a door frame 13 is provided at the top of the support beam 10 , and a pull rod 14 is provided between the door frame 13 and the support beam 10 .

[0026] refer to Figure 2 and Figure 3 A support frame 15 and an articulated seat 16 are provided on the top of the support beam 10, a telescopic inclined slot 30 is provided in the support frame 15, the support frame 15 is tilted, and the bottom side of the top of the support frame 15 is hinged in the articulated seat 16, a pitch system 50 is provided between the door frame 13 and the support frame 15, so that the support frame 15 can rotate above the support beam 10 to adjust the pitch of the telescopic inclined slot 30, a limiting guide rod 151 is fixedly installed in the support frame 15, and a stop rod 152 fixed to the support frame 15 is provided on one side of the limiting guide rod 151.

[0027] refer to Figure 2 and Figure 3 The tail chute 20 is inclined, and the bottom end of the tail chute 20 is connected to the support frame 15, so that the material can enter the telescopic chute 30 in the support frame 15 along the tail chute 20. A feeding box 21 is provided at the top of the tail chute 20 for receiving the material fed by the external feeding system.

[0028] refer to Figure 2 and Figure 3 The telescopic inclined groove 30 includes an outer groove tube 31 and an inner groove tube 32. The outer groove tube 31 and the inner groove tube 32 are both inclined, and the outer groove tube 31 is slidably assembled inside the support frame 15 along the length direction of the support frame 15, and the inner groove tube 32 is slidably assembled inside the outer groove tube 31, and the top end of the inner groove tube 32 extends to the outside of the outer groove tube 31.

[0029] refer to Figure 2 , Figure 3 and Figure 6 The outer wall of the outer groove tube 31 is fixedly installed with a sliding sleeve 311, and the sliding sleeve 311 is slidably assembled on the limiting guide rod 151. The outer wall of the inner groove tube 32 is fixedly installed with a side plate 321 adapted to the stop rod 152, and the side plate 321 is slidably assembled on the limiting guide rod 151. When the outer groove tube 31 slides into the interior of the support frame 15, the sliding sleeve 311 can push the side plate 321 to slide along the limiting guide rod 151, so that the inner groove tube 32 follows the outer groove tube 31 and moves in parallel. The outer groove tube 31 is gradually moved and retracted into the support frame 15. When the outer groove tube 31 slides out of the support frame 15, the sliding sleeve 311 retreats relative to the side plate 321. Since the inner groove tube 32 is arranged obliquely, the inner groove tube 32 will gradually extend out of the support frame 15 under the action of its own gravity, and make the side plate 321 slide along the limiting guide rod 151. When the side plate 321 is blocked by the blocking rod 152 during the sliding and cannot continue to slide, the inner groove tube 32 is restricted from extending out of the support frame 15.

[0030] refer to Figure 2 and Figure 3 A hopper 322 located at the end of the tail chute 20 is provided at the top of the inner trough pipe 32, so that the material can enter the hopper 322 from the tail chute 20 for loading and transporting the material.

[0031] refer to Figure 2-Figure 4A pushing mechanism 70 is arranged outside the outer groove tube 31, which is used to push the outer groove tube 31 to slide in the support frame 15. The pushing mechanism 70 includes a lead screw 71, a threaded sleeve 72 and a first motor 73. The lead screw 71 is rotatably assembled in the support frame 15, the threaded sleeve 72 is threadedly connected to the outside of the lead screw 71, and the threaded sleeve 72 is fixed to the outer groove tube 31. The first motor 73 is fixedly assembled on the support frame 15, and the output end of the first motor 73 is connected to the lead screw 71 through a transmission belt, and then the lead screw 71 can be driven to rotate, so as to push the threaded sleeve 72 to drive the outer groove tube 31 to move in the support frame 15, so that the telescopic chute 30 extends from the support frame 15.

[0032] refer to Figure 2 and Figure 5 The telescopic chute 40 includes a vertical cylinder 41, a chute pipe 42 and a cylinder 43. The vertical cylinder 41 is inserted into the end of the outer groove pipe 31 away from the support frame 15. The chute pipe 42 is slidably assembled on the outside of the vertical cylinder 41. The cylinder 43 is fixedly installed on the vertical cylinder 41. The telescopic end of the cylinder 43 is fixedly connected to the chute pipe 42. After the material enters the vertical cylinder 41 from the outer groove pipe 31, the chute pipe 42 guides the material to the falling position for loading. The chute pipe 42 is driven to rise and fall outside the vertical cylinder 41 by the telescopic movement of the cylinder 43. The height of the chute pipe 42 can be adjusted to better adjust the discharge height.

[0033] refer to Figure 5 A pipe head 421 is fixedly installed at the bottom end of the chute pipe 42, and an inverted conical bucket 422 is fixedly installed inside the pipe head 421. A closed bucket 423 is rotatably installed above the conical bucket 422, and material holes 424 are opened on the conical bucket 422 and the closed bucket 423. When the conical bucket 422 and the material holes 424 on the closed bucket 423 are aligned and connected, the material can be discharged from the pipe head 421, and the material discharge rate increases with the increase of the alignment area of ​​the material holes 424. When the conical bucket 422 and the material holes 424 on the closed bucket 423 are completely misaligned, the discharge of the material can be suspended. A second motor 425 is arranged at the bottom of the conical bucket 422, and the output end of the second motor 425 is fixed to the closed bucket 423, so that the second motor 425 can drive the closed bucket 423 to rotate on the conical bucket 422, so that the conical bucket 422 and the material holes 424 on the closed bucket 423 are aligned or misaligned.

[0034] refer to Figure 2The pitch system 50 includes a connecting arm 51, a connecting buckle 52 and a winch 53. The top end of the connecting arm 51 is rotatably mounted on the gantry 13, the top end of the connecting buckle 52 is rotatably connected to the bottom end of the connecting arm 51, and the bottom end of the connecting buckle 52 is rotatably mounted on the support frame 15. The winch 53 is installed on the support beam 10. The end of the steel rope in the winch 53 passes around the gantry 13 and is fixed to the support frame 15. The winch 53 retracts and releases the steel rope to make the connecting arm 51 rotate on the gantry 13, and the outer groove pipe 31 is driven to rise and fall by the connecting buckle 52. The support frame 15 rotates on the hinge seat 16 to adjust the pitch angle of the outer groove pipe 31.

[0035] refer to Figure 1 and Figure 2 The dust removal system 60 includes a dust box 61 and a dust pipe 62. The dust box 61 is fixedly mounted on the support beam 10 and is located directly above the tail chute 20. The top end of the dust pipe 62 is connected to the air inlet of the dust box 61, and the bottom end of the dust pipe 62 is connected to the inside of the tail chute 20, so that the dust box 61 can absorb the dust raised by vibration in the tail chute 20 through the dust pipe 62 to avoid environmental pollution.

[0036] Working principle: the material is put into the tail chute 20 from the feeding box 21 and slides down, enters the inner chute pipe 32 from the hopper 322, and then enters the outer chute pipe 31 along the inner chute pipe 32 and finally discharged and loaded by the telescopic chute 40. The dust box 61 absorbs the dust raised by the vibration in the tail chute 20 through the dust suction pipe 62; The first motor 73 drives the lead screw 71 to rotate, pushing the threaded sleeve 72 to gradually slide and extend with the outer grooved tube 31 in the support frame 15, and driving the sliding sleeve 311 to slide along the limiting guide rod 151 during the extension, and retreating relative to the side plate 321. As the sliding sleeve 311 retreats, the side plate 321 slides along the limiting guide rod 151, so that the inner grooved tube 32 follows the outer grooved tube 31 and extends from the support frame 15, thereby performing the first stage of extension of the telescopic chute 30. As the inner groove tube 32 extends to a certain length, the blocking rod 152 blocks the side plate 321 sliding along the limiting guide rod 151, thereby limiting the inner groove tube 32 from further extending, thereby completing the first stage of extension of the telescopic chute 30, and the threaded sleeve 72 continues to move, so that the outer groove tube 31 continues to extend, and the telescopic chute 30 is extended in the second stage, so that the telescopic chute 40 extends to a farther position for material discharge; During material discharge, the steel rope is retracted and released by the winch 53 , the connecting arm 51 rotates on the door frame 13 , and the outer groove pipe 31 is driven to rise and fall by the connecting buckle 52 , so that the support frame 15 rotates on the hinge seat 16 to adjust the pitch angle of the outer groove pipe 31 .

[0037] In the present invention, by the coordinated use of the sliding sleeve 311, the side plate 321 and the blocking rod 152, the inner groove pipe 32 and the outer groove pipe 31 can be synchronously extended and retracted in the support frame 15, and the outer groove pipe 31 can be independently extended and retracted, so that the discharge position can be better adjusted during material discharge, the loading coverage and operation efficiency can be improved, and while ensuring the increase in the conveying distance, the volume of the equipment can be effectively reduced, the weight of the equipment can be reduced, and the stability of the equipment can be more conveniently maintained, thereby reducing the cost of use; by rotating the support frame 15 on the support beam 10, the pitch angle of the telescopic chute 30 can be adjusted, and the sliding and lifting of the chute pipe 42 outside the vertical cylinder 41 can be coordinated to adjust the discharge height, thereby better adapting to different water levels and changes in the height of the materials loaded on the ship, and improving the universality of the equipment; by the mutual cooperation of the conical bucket 422 and the closed bucket 423, the discharge speed can be adjusted by adjusting the connection area of ​​the material hole 424, so as to better control the loading rate.

[0038] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A telescopic chute ship loader, comprising a support beam (10), wherein a support frame (15) is arranged on the support beam (10), characterized in that: A telescopic chute (30) is provided inside the support frame (15) for conveying materials for loading onto a ship. A tail chute (20) for feeding materials and a telescopic chute (40) for discharging materials are provided on the telescopic chute (30). A limit guide rod (151) is also fixedly installed inside the support frame (15). A stop rod (152) fixed to the support frame (15) is provided on one side of the limit guide rod (151); The telescopic chute (30) comprises an outer chute tube (31) and an inner chute tube (32), the outer chute tube (31) and the inner chute tube (32) are both arranged obliquely, and the outer chute tube (31) is slidably assembled inside the support frame (15) along the length direction of the support frame (15), the telescopic chute (40) is arranged at one end of the outer chute tube (31) away from the support frame (15), a pushing mechanism (70) is arranged on the outer side of the outer chute tube (31) to push the outer chute tube (31) to slide inside the support frame (15), the inner chute tube (32) is slidably assembled inside the outer chute tube (31), and the top end of the inner chute tube (32) extends to the outside of the outer chute tube (31); A sliding sleeve (311) is fixedly mounted on the outer wall of the outer groove tube (31), and the sliding sleeve (311) is slidably mounted on the limiting guide rod (151). A side plate (321) adapted to the blocking rod (152) is fixedly mounted on the outer wall of the inner groove tube (32), and the side plate (321) is slidably mounted on the limiting guide rod (151).

2. The telescopic chute ship loader according to claim 1, characterized in that: The telescopic chute (40) comprises a vertical tube (41), a chute tube (42) and a cylinder (43); the vertical tube (41) is plugged into an end of the outer groove tube (31) away from the support frame (15); the chute tube (42) is slidably mounted on the outside of the vertical tube (41); the cylinder (43) is fixedly mounted on the vertical tube (41); and the telescopic end of the cylinder (43) is fixedly connected to the chute tube (42).

3. The telescopic chute ship loader according to claim 2, characterized in that: A pipe head (421) is fixedly mounted at the bottom end of the chute pipe (42), an inverted conical bucket (422) is fixedly mounted inside the pipe head (421), a closed bucket (423) is rotatably mounted above the conical bucket (422), and material holes (424) are provided on both the conical bucket (422) and the closed bucket (423), a second motor (425) is arranged at the bottom of the conical bucket (422), and an output end of the second motor (425) is fixed to the closed bucket (423).

4. The telescopic chute ship loader according to claim 1, characterized in that: The pushing mechanism (70) comprises a lead screw (71), a threaded sleeve (72) and a first motor (73); the lead screw (71) is rotatably mounted in a support frame (15); the threaded sleeve (72) is threadedly connected to the outside of the lead screw (71); the threaded sleeve (72) is fixed to the outer groove tube (31); the first motor (73) is fixedly mounted on the support frame (15); and an output end of the first motor (73) is connected to the lead screw (71) via a transmission belt.

5. The telescopic chute ship loader according to claim 1, characterized in that: The bottom of the support beam (10) is provided with a front support seat (11) and a rear support seat (12), the top of the support beam (10) is provided with a door frame (13), and a pull rod (14) is provided between the door frame (13) and the support beam (10), and the top of the support beam (10) is also provided with an articulated seat (16), and the bottom side of the top end of the support frame (15) is hinged in the articulated seat (16).

6. The telescopic chute ship loader according to claim 5, characterized in that: The support beam (10) is also provided with a pitch system (50) and a dust removal system (60) for adjusting the pitch angle of the telescopic chute (30) and removing dust from materials swung up inside the tail chute (20).

7. The telescopic chute ship loader according to claim 6, characterized in that: The pitch system (50) comprises a connecting arm (51), a connecting buckle (52) and a winch (53); the top end of the connecting arm (51) is rotatably mounted on the door frame (13); the top end of the connecting buckle (52) is rotatably connected to the bottom end of the connecting arm (51); the bottom end of the connecting buckle (52) is rotatably mounted on the support frame (15); the winch (53) is mounted on the support beam (10); and the end of the steel rope in the winch (53) passes around the door frame (13) and is fixed to the support frame (15).

8. The telescopic chute ship loader according to claim 6, characterized in that: The dust removal system (60) comprises a dust collection box (61) and a dust collection pipe (62); the dust collection box (61) is fixedly mounted on the support beam (10) and is located directly above the tail chute (20); the top end of the dust collection pipe (62) is in communication with an air inlet of the dust collection box (61).

9. The telescopic chute ship loader according to claim 1, characterized in that: The tail chute (20) is arranged obliquely, and the bottom end of the tail chute (20) is connected to the support frame (15), and the top of the inner groove tube (32) is provided with a hopper (322) located at the end of the tail chute (20).

Citation Information

Patent Citations

  • System and method for conveying solids through an outlet pipe

    CN103836280A

  • Bucket type elevating ship loader

    CN106044289A

  • Novel ship loading system for large-water-head bulk cargo wharf in mountainous area

    CN116354138A

  • Intelligent automatic transverse translation tire type ship loader and moving method

    CN117342295A

  • A jar discharging pipe is retrieved to dust

    CN207607858U

Cited By

  • Ship unloading equipment with double grab buckets and telescopic conveying structure

    CN121201828A