Underwater self-protection cementing material intelligent construction device and method
Through intelligent underwater construction equipment, floating balls and protective agents are used to form a slow flow structure, combined with flexible and rigid pouring pipe design, the construction efficiency and quality problems in underwater stone throwing protection technology are solved, and the marine structure is realized Stable and long-term protection.
Patent Information
- Application Number
- CN202411218068.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-30
AI Technical Summary
The existing underwater stone throwing protection technology has insufficient construction efficiency and quality, the dropping and filling point is uncontrollable, the anti-shrinking ability is weak, and it is easily dispersed under the action of water flow, resulting in short protection time.
An intelligent construction device for underwater self-protecting cementing materials is designed, including a telescopic pipe main body, a cast pipe main body, a protective agent preparation device and a cementing material preparation device. The construction parameters are adjusted in real time through the detection device, and the floating ball and protective agent are used to form a slow-down. The flow structure realizes the precise casting and stable fall of cemented materials, and combines the design of flexible and rigid casting pipes to ensure construction safety and quality.
It realizes precise protection of marine structures, enhances construction efficiency and protection effect, and the cemented material does not easily diffuse or deviate underwater, provides stable and long-term protection, and ensures construction safety under the action of tides or wave currents.
Smart Images

Figure CN118911150A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of underwater construction, and in particular to an intelligent construction device and method for underwater self-protecting adhesive material. Background Art
[0002] When marine structures (such as pile foundations and barrel foundations) are installed on the seabed, the surrounding flow field distribution will change, causing scouring of the seabed surface soil around the structure, forming local scouring pits. Scouring pits are one of the important factors affecting the long-term stability and operational safety of marine structures.
[0003] Riprap protection is a common anti-scour measure, which refers to pouring stone and other construction materials into scour pits to protect marine structures.
[0004] In the related technology, stones are thrown directly from the sea surface or through the chute on the construction ship. Throwing stones through the chute can make the filling point more accurate to a certain extent, but the chute is not easy to move during the filling process because of the stones in the pipe. It can only be moved to the next point after the stone is thrown at one point. In order to achieve uniform laying of stones, a large number of points need to be laid out, and the position of the chute must be adjusted continuously, which seriously affects the construction efficiency. At the same time, the filling quality is significantly affected by the water flow, and the filling point is still uncontrollable; in addition, the anti-scouring ability of the riprap accumulation body is weak, and the stones are easily dispersed under the action of the water flow, and the protection time is short. Summary of the invention
[0005] In view of the above problems, an intelligent construction device and method for underwater self-protecting cementing materials are proposed to overcome the above problems or at least partially solve the above problems, including:
[0006] An intelligent construction device for underwater self-protecting cementing materials, the intelligent construction device for underwater self-protecting cementing materials comprising:
[0007] The telescopic tube body comprises a first telescopic tube and a second telescopic tube, one end of the first telescopic tube is fixedly mounted on a rotating base through a supporting device, and the other end is sleeved with the second telescopic tube, and the rotating base is fixedly mounted on a construction vessel;
[0008] The casting pipe body is nested inside the telescopic pipe body, and includes a first casting pipe, a second casting pipe and a third casting pipe. One end of the first casting pipe is connected to a material collecting hopper and a ball collecting hopper respectively, and the other end is connected to one end of the third casting pipe through the second casting pipe. The other end of the third casting pipe is a material outlet. The material collecting hopper is used to collect, store and re-mix the cementing material, and the ball collecting hopper is used to store and release the floating ball.
[0009] A protective agent preparation device, which is installed and fixed on the construction ship and connected to the first casting pipe through a first delivery pipe. The protective agent preparation device is also connected to a second delivery pipe, and the second delivery pipe is fixed to the outer wall of the second telescopic pipe;
[0010] The cementing material preparation device is installed and fixed on the construction ship and connected with the collecting hopper through a third conveying pipe.
[0011] Optionally, the second telescopic tube is provided with a first detection device, and the first detection device is used to detect underwater elevation information.
[0012] Optionally, the second telescopic tube is further provided with a second detection device, and the second detection device is used to detect underwater water flow information.
[0013] Optionally, the underwater self-protecting cementitious material intelligent construction device further includes:
[0014] The first driving device is arranged on the rotating base and connected to the sliding device; one end of the sliding device is fixedly installed on the first telescopic tube, and the other end is fixedly installed on the second telescopic tube. The sliding device is used to adjust the length of the telescopic tube body.
[0015] Optionally, a connecting passage between the first casting pipe and the ball collecting bucket is provided with a revolving door device, and the revolving door device is used to control the floating ball to enter the first casting pipe from the ball collecting bucket.
[0016] Optionally, the underwater self-protecting cementitious material intelligent construction device further includes:
[0017] The second driving device is arranged on the rotating base and connected to the first telescopic tube. The second driving device is used to adjust the angle of the telescopic tube body.
[0018] Optionally, the protective agent preparation device is provided with a first pumping device, and the first pumping device is used to transport the protective agent into the first casting pipe through the first delivery pipeline, and / or to transport the protective agent to an underwater target location through the second delivery pipeline.
[0019] Optionally, the cementitious material preparation device is provided with a second pumping device, and the second pumping device is used to convey the cementitious material into the collecting hopper through the third conveying pipeline.
[0020] Optionally, the underwater self-protecting adhesive material intelligent construction device also includes a control device, which is installed and fixed on the construction vessel and is electrically connected to the rotating base, the telescopic tube body, the protective agent preparation device, and the adhesive material preparation device, respectively.
[0021] Optionally, the first telescopic tube, the second telescopic tube, the first casting tube and the third casting tube are rigid tubes, and the second casting tube is a flexible hose.
[0022] Optionally, the first casting tube is connected to the second casting tube via a first flange, and the second casting tube is connected to the third casting tube via a second flange.
[0023] Optionally, the protective agent preparation device is used to prepare a protective agent, and the protective agent includes a polymer underwater protective agent.
[0024] Optionally, the bonding material includes one or more of the following: underwater self-protecting slurry, underwater self-protecting mortar, underwater self-protecting concrete, underwater self-protecting high-fluidity cementitious soil.
[0025] An intelligent construction method for underwater self-protecting cementing material, applied to the intelligent construction device for underwater self-protecting cementing material as described above, the method comprising:
[0026] Controlling the construction vessel to sail to the construction location and anchoring it;
[0027] Determine the target pouring point underwater, and use the first detection device to detect the underwater elevation information;
[0028] adjusting the length and / or angle of the telescopic tube body according to the elevation information so that the distance between the construction material outlet and the target pouring point reaches a preset distance;
[0029] Conveying the first floating ball from the ball collecting bucket to the first casting pipe;
[0030] Starting the protective agent preparation device to prepare the protective agent, and conveying the first protective agent to the first casting pipe through the first conveying pipe;
[0031] Convey the second floating ball from the ball collecting bucket to the first pouring pipe, so that the first floating ball and the second floating ball form a slow flow structure;
[0032] The second protective agent is transported to the water body in the preset area where the target pouring point is located through the second transport pipe to form a protection area;
[0033] Starting the cementing material preparation device to prepare the cementing material, and conveying the cementing material to the collecting hopper through the third conveying pipe, so that the cementing material falls into the target pouring point along the pouring pipe body under the action of the slow flow structure;
[0034] During the construction process, the second detection device is used to detect underwater water flow information, and the delivery pressure and / or delivery flow rate of the cementitious material is adjusted according to the water flow information.
[0035] A construction vessel, comprising the underwater self-protecting adhesive material intelligent construction device as described above.
[0036] The embodiments of the present invention have the following advantages:
[0037] 1. Through an embodiment of the present invention, the telescopic pipe body can be freely adjusted to make the construction material outlet close to the target pouring point underwater, and the pouring pipe body can perform construction operations of the cementing material, the protective agent, and the floating ball on the pouring point through the cementing material preparation device, the protector preparation device, and the ball collecting bucket, thereby realizing accurate pouring of the pouring point (such as the scouring pit). Moreover, in the underwater working environment, the cementing material is not easy to diffuse or deflect under the action of the floating ball and the protective agent, and can fall into the scouring pit to be poured more accurately, thereby playing a stable and long-term protective role for the marine structure.
[0038] 2. Through an embodiment of the present invention, the rigid first pouring pipe and the third pouring pipe ensure that no bending or deformation occurs during the pouring process, thereby ensuring that the cementing material can press the float ball downward under the action of gravity. At the same time, in order to ensure the pouring quality, the lower end of the third pouring pipe is at a relatively low height from the pouring point. Under the action of tides or waves, the construction ship will shake, and the third pouring pipe is very likely to touch the bottom. The flexible second pouring pipe is axially retracted to prevent the rigid pouring pipe from breaking or affecting the construction safety under the action of the bottoming force.
[0039] 3. Through an embodiment of the present invention, during the process of pouring the cementing material, the float is located in the pouring pipe, and the cementing material can be poured into the pipe through the buoyancy of the float, reducing the self-falling speed of the cementing material flowing into the lower port of the pouring pipe to avoid the dispersion and segregation of the cementing material in the pouring pipe due to water washing, thereby ensuring the pouring quality of the cementing material. In addition, the float is placed in the first pouring pipe by a revolving door device to improve the construction efficiency. At the same time, the number of floats can be increased or decreased according to the amount of cementing material poured. When the amount of cementing material poured increases, the number of floats is increased.
[0040] 4. Through the embodiments of the present invention, in actual application, underwater gravel throwing and filling operations can be carried out only through the telescopic pipe body and the pouring pipe body, that is, the cementing material pouring construction is changed to gravel throwing and filling construction, realizing the integrated construction of underwater self-protecting cementing material pouring and gravel precise throwing. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to more clearly illustrate the technical solution of the present invention, the accompanying drawings required for use in the description of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.
[0042] Figure 1 It is a side view of an intelligent construction device for underwater self-protecting cementing materials provided by one embodiment of the present invention;
[0043] Figure 2 It is a front view of another intelligent construction device for underwater self-protecting adhesive material provided by one embodiment of the present invention;
[0044] Figure 3 It is a schematic diagram of the flow direction of bonding materials when an intelligent construction device for underwater self-protecting bonding materials is working, provided by one embodiment of the present invention.
[0045] Figure 4 It is a flow chart of the steps of an intelligent construction method for underwater self-protecting adhesive materials provided by one embodiment of the present invention. DETAILED DESCRIPTION
[0046] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0047] Reference Figure 1 and Figure 2 , Figure 1 A side view of an underwater self-protecting adhesive material intelligent construction device provided by an embodiment of the present invention is shown. Figure 2 The figure shows a front view of an intelligent construction device for underwater self-protecting adhesive material provided by an embodiment of the present invention, and the intelligent construction device for underwater self-protecting adhesive material comprises:
[0048] The telescopic tube body includes a first telescopic tube 25 and a second telescopic tube 26. One end of the first telescopic tube 25 is fixed to the rotating base 21 through a supporting device, and the other end is sleeved with the second telescopic tube 26. The rotating base 21 is fixed to the construction vessel 1.
[0049] In a specific implementation, the first telescopic tube 25 and the second telescopic tube 26 are sleeved, and the first telescopic tube 25 and the second telescopic tube 26 can slide relative to each other to adjust the length of the telescopic tube body. The rotating base 21 can drive the telescopic tube body to rotate.
[0050] In some embodiments of the present invention, Figure 1 As shown, the underwater self-protecting cementing material intelligent construction device also includes:
[0051] The first driving device 24 is disposed on the rotating base 21 and connected to the sliding device 27; one end of the sliding device 27 is fixedly mounted on the first telescopic tube 25, and the other end is fixedly mounted on the second telescopic tube 26. The sliding device 27 is used to adjust the length of the telescopic tube body.
[0052] In a specific implementation, the first driving device 24 provides driving force for the sliding device 27. Under the action of the driving force, the sliding device 27 adjusts the total length of the telescopic tube body by controlling the relative sliding of the second telescopic tube 26 and the first telescopic tube 25. In practical applications, the sliding device 27 can be a pulley block or other possible devices.
[0053] In some embodiments of the present invention, Figure 1 As shown, the underwater self-protecting cementitious material intelligent construction device also includes:
[0054] The second driving device 23 is disposed on the rotating base and connected to the first telescopic tube 25. The second driving device 23 is used to adjust the angle of the telescopic tube body.
[0055] In a specific implementation, the second driving device can provide a driving force for the swing of the telescopic tube body to adjust the angle of the telescopic tube body.
[0056] The casting pipe body is nested inside the telescopic pipe body, and includes a first casting pipe 31, a second casting pipe 32 and a third casting pipe 33. One end of the first casting pipe 31 is connected to a collecting hopper 38 and a ball collecting hopper 43 respectively, and the other end is connected to one end of the third casting pipe 33 through the second casting pipe 32. The other end of the third casting pipe 33 is a material outlet. The collecting hopper 38 is used to collect, store and re-mix the cementing material, and the ball collecting hopper 43 is used to store and release the floating ball.
[0057] In a specific implementation, one end of the first pouring pipe connected to the collecting hopper and the collecting ball hopper is the inlet for materials such as cementing materials and floating balls. The cementing material is a special cement-based cementing material that can be solidified in an underwater environment. This type of material can maintain good bonding properties in a dynamic water environment and can be adapted to the pouring of underwater pits such as scouring pits and the cementing of riprap particles inside scouring pits. The cementing material is preferably a cement-based cementing material. The floating ball can be a spherical material with a density less than that of water, which has a certain buoyancy in water and is not easy to sink to the bottom of the water. The buoyancy of the floating ball can make the cementing material form a tube casting, reduce the self-falling speed of the cementing material flowing from the material outlet to the casting point, avoid the dispersion and segregation of the cementing material in the pouring pipe due to water washing, and ensure the casting quality of the cementing material. In practical applications, the diameter of the floating ball should be slightly lower than the diameter of the first pouring pipe 31. The material outlet is the underwater outlet of construction materials such as cementing materials, floating balls, and protective agents.
[0058] In some embodiments of the present invention, the bonding material includes one or more of the following: underwater self-protecting slurry, underwater self-protecting mortar, underwater self-protecting concrete, and underwater self-protecting high-fluidity cementitious soil.
[0059] Underwater self-protecting mortar can flow and fill the gaps between gravel particles without external vibration, while maintaining a uniform texture without segregation or stratification. Underwater self-protecting mortar has high fluidity and self-compacting properties, and can flow and fill the gaps between gravel particles without external vibration. Underwater self-protecting concrete can also flow and fill the gaps between gravel particles without external vibration, while maintaining a uniform texture without segregation or stratification. Underwater self-protecting high-flow cementitious cement combines the advantages of high fluidity, self-compacting and underwater non-dispersion of underwater self-protecting mortar with low cement material consumption.
[0060] In some embodiments of the present invention, Figure 1 As shown, one end of the first pouring pipe 31 connected to the material collecting hopper 38 and the ball collecting hopper 43 respectively can be limited by a first limiting ring 34, and one end of the third pouring pipe 33 serving as a material outlet can be limited by a second limiting ring 35.
[0061] In some embodiments of the present invention, the first telescopic tube, the second telescopic tube, the first casting tube and the third casting tube are rigid tubes, and the second casting tube is a flexible hose.
[0062] In practical applications, the rigid tube is preferably a steel tube, and the flexible hose is preferably a corrugated hose. The corrugated hose can elastically expand and contract under a certain load while keeping the tube diameter unchanged. Among them, the rigid first pouring tube and the third pouring tube can ensure that no bending or deformation occurs during the pouring process, thereby ensuring that the cementing material can press the float ball downward under the action of gravity. At the same time, in order to ensure the pouring quality, the material outlet is close to the pouring point. Under the action of tides or wave currents, the construction ship will shake, and the third pouring tube is very likely to touch the bottom. The flexible second pouring tube is axially expanded and contracted to prevent the rigid pouring tube from breaking or affecting construction safety under the action of the bottoming force.
[0063] In some embodiments of the present invention, Figure 2 As shown, the connection channel between the first pouring pipe 31 and the ball collecting bucket 43 is provided with a revolving door device 42 , and the revolving door device 42 is used to control the floating ball to enter the first pouring pipe 31 from the ball collecting bucket 43 .
[0064] In a specific implementation, the revolving door device is provided with a revolving door structure. In a natural state, the revolving door structure blocks the floating ball from entering the first pouring pipe. When the revolving door structure is controlled to rotate, the floating ball enters the first pouring pipe along the connecting channel between the first pouring pipe and the ball collecting bucket. Each rotation of the revolving door structure can control a floating ball to enter the first pouring pipe, thereby realizing precise control of the floating ball transportation.
[0065] In practical applications, the revolving door device can improve construction efficiency and at the same time increase or decrease the number of floats according to the amount of cementing material poured. When the amount of cementing material poured increases, the number of floats is increased, and when the amount of cementing material poured decreases, the number of floats is reduced.
[0066] In practical applications, the connection channel between the first pouring pipe and the ball collecting bucket can be arranged to be inclined to ensure that the floating ball in the ball collecting bucket can enter the connection channel under the action of its own weight.
[0067] In some embodiments of the present invention, the first casting pipe is connected to the second casting pipe via a first flange, and the second casting pipe is connected to the third casting pipe via a second flange.
[0068] In a specific implementation, the first flange and the second flange can move freely in the first telescopic tube, having the dual functions of limiting and connecting. The first casting tube, the first casting tube, and the third casting tube are equal-diameter tubes with colinear axes.
[0069] A protective agent preparation device 52 is installed and fixed on the construction vessel 1 and connected to the first casting pipe 31 through a first delivery pipe 36. The protective agent preparation device 52 is also connected to a second delivery pipe 37, and the second delivery pipe 37 is fixed to the outer wall of the second telescopic pipe 26;
[0070] The protective agent preparation device is used to prepare underwater protective agent, the first delivery pipe is used to deliver the protective agent to the first casting pipe, and the second delivery pipe is used to deliver the protective agent to the water body near the casting point.
[0071] In some embodiments of the present invention, the protective agent preparation device is used to prepare a protective agent, and the protective agent includes a polymer underwater protective agent.
[0072] In this embodiment, the protective agent is a high molecular underwater protective agent, which is soluble in water and forms a stable spatial flexible network in water, thereby inhibiting the segregation of the cementing material during the flow process and maintaining good flow properties of the cementing material.
[0073] In some embodiments of the present invention, Figure 2As shown, the protective agent preparation device 52 is provided with a first pumping device 62, and the first pumping device 62 is used to transport the protective agent to the first casting pipe 31 through the first delivery pipeline 36, and / or to transport the protective agent to an underwater target location through the second delivery pipeline 37. The target location can be a water body near an underwater casting point.
[0074] In a specific implementation, the speed and flow rate of delivering the protective agent to the first pouring pipe and / or the underwater target location can be controlled by adjusting the pumping pressure and pumping flow rate of the first pumping device.
[0075] The cement material preparation device 51 is installed and fixed on the construction vessel 1 and connected to the collecting hopper 38 through a third conveying pipe 64 .
[0076] In a specific implementation, the cementing material preparation device is used to prepare underwater cementing material. After the preparation is completed, the cementing material is transported to the collecting hopper through the third conveying pipe, and the cementing material enters the first casting pipe from the collecting hopper.
[0077] In some embodiments of the present invention, Figure 2 As shown, the cement material preparation device is provided with a second pumping device 61 , and the second pumping device 61 is used to transport the cement material into the collecting hopper 38 through the third conveying pipeline 64 .
[0078] In a specific implementation, the speed and flow rate of conveying the cementitious material into the collecting hopper can be controlled by adjusting the pumping pressure and pumping flow rate of the second pumping device.
[0079] In some embodiments of the present invention, Figure 1 As shown, the second telescopic tube 26 is provided with a first detection device 28, and the first detection device 28 is used to detect underwater elevation information.
[0080] In the specific implementation, Figure 1 As shown, the first detection device 28 can be arranged on the outer wall of the second telescopic tube 26 and can be arranged at a position close to the material outlet in the third casting tube 33. When the telescopic tube body is operating underwater, the first detection device 28 can determine the elevation information of the target casting point, that is, it can measure the distance between the material outlet and the target casting point, and provide data support for the adjustment of the underwater direction, angle, etc. of the telescopic tube body, so as to improve the accuracy of the material outlet reaching the target position.
[0081] In some embodiments of the present invention, the second telescopic tube is further provided with a second detection device, and the second detection device is used to detect underwater water flow information.
[0082] In the specific implementation, Figure 1As shown, the second detection device 29 can be arranged on the outer wall of the second telescopic tube 26, and can be arranged at a position close to the material outlet in the third casting tube 33. When the telescopic tube body is operating underwater, the second detection device 29 can detect water flow information such as the flow rate and direction of the water flow. According to the water flow information, the possible diffusion and casting conditions of materials such as cementing materials and protective agents under water can be judged, thereby providing data support for the casting control of these materials. For example, according to the water flow information, the diffusion law of the protective agent in the water flow is determined, and the flow rate and pressure of the protective agent delivered to the underwater by the first pumping device 62 through the second delivery pipeline 37 are adjusted in real time to ensure that the water body protective agent near the material outlet can form a stable spatial flexible network.
[0083] In some embodiments of the present invention, Figure 1 As shown, the underwater self-protecting adhesive material intelligent construction device also includes a control device 7, which is installed and fixed on the construction vessel 1, and is electrically connected to the rotating base 21, the telescopic tube body, the protective agent preparation device 52, and the adhesive material preparation device 51 respectively.
[0084] In a specific implementation, the control device can be electrically connected to the rotating base, the telescopic tube body, the protective agent preparation device, and the bonding material preparation device through cables, so as to uniformly control these devices or structures, such as controlling the rotating base to drive the telescopic body to rotate to adjust the direction, adjust the length and angle of the telescopic tube body, control the protective agent preparation device to prepare or transport the protective agent, control the bonding material preparation device to prepare or transport the bonding material, etc.
[0085] In some embodiments of the present invention, the control device can also be electrically connected to the first detector and the second detector. The control device receives the underwater elevation information collected by the first detector and the underwater water flow information collected by the second detector, and then performs precise and intelligent control of the telescopic body, protective agent preparation device, bonding material and other equipment and structures based on this information.
[0086] Reference Figure 4 Some embodiments of the present invention also provide an intelligent construction method for underwater self-protecting cementitious materials, which specifically includes the following steps:
[0087] Step 401, controlling the construction vessel to sail to the construction location and anchoring;
[0088] In specific implementation, after the construction vessel is fixed by anchoring, construction work can be carried out.
[0089] Step 402, determining the target pouring point underwater, and using the first detection device to detect the underwater elevation information;
[0090] Step 403, adjusting the length and / or angle of the telescopic tube body according to the elevation information so that the distance between the construction material outlet and the target pouring point reaches a preset distance;
[0091] In a specific implementation, the target pouring point can be an underwater point to be poured, such as a scouring pit, etc. After determining the target pouring point, the entire body consisting of the telescopic pipe body and the pouring pipe body is extended underwater, and the first detection device is used to detect the underwater elevation information. According to the elevation information, the direction, angle, and length of the telescopic pipe body are adjusted by rotating the base, the first driving device, the sliding device, etc., so that the distance between the construction material outlet and the target pouring point reaches a preset distance. In practical applications, the preset distance can be 0-3m.
[0092] Step 404, transporting the first floating ball from the ball collecting bucket to the first casting pipe;
[0093] In a specific implementation, a plurality of floating balls can be placed in the ball collecting bucket in advance, and then the floating balls are controlled to fall into the first pouring pipe by a revolving door device arranged between the ball collecting bucket and the first pouring pipe channel. The first floating ball has a certain buoyancy and will float in the first pouring pipe at this time.
[0094] Step 405, starting the protective agent preparation device to prepare the protective agent, and conveying the first protective agent to the first casting pipe through the first conveying pipe;
[0095] In a specific implementation, the protective agent is prepared by a protective agent preparation device, and the first protective agent is transported to the first casting pipe. At this time, the first protective agent is located above the first float.
[0096] Step 406, transporting the second floating ball from the ball collecting bucket to the first casting pipe, so that the first floating ball and the second floating ball form a slow flow structure;
[0097] In a specific implementation, the second float is transported into the first casting pipe, and the second float floats above the first protective agent. Figure 2 As shown, the first float ball and the second float ball form a slow flow structure in the first casting pipe.
[0098] Step 407, delivering the second protective agent to the water body in the preset area where the target pouring point is located through the second delivery pipe to form a protection area;
[0099] In a specific implementation, the second protective agent is transported to the water body in a preset area where the target pouring point is located through a second delivery pipe. The preset area can be an area with a certain range centered on the target pouring point, so that the second protective agent forms a stable spatial flexible network in the water body in this area, i.e., a protection area.
[0100] Step 408, start the cementitious material preparation device to prepare the cementitious material, and convey the cementitious material to the collecting hopper through the third conveying pipe, so that the cementitious material falls into the target pouring point along the pouring pipe body under the action of the slow flow structure.
[0101] In a specific implementation, after the cementing material is prepared, the cementing material can be transported to the collecting hopper by the second pumping device, and the cementing material falls into the first pouring pipe, such as Figure 3 As shown, the cementing material moves under the action of gravity, pressing the second float, the first protective agent, and the first float. At the same time, due to the buffering effect of the slow flow structure formed by the first float and the second float, the cementing material can reach the material outlet along the first pouring pipe, the second pouring pipe, and the third pouring pipe at a relatively stable speed. At this time, the cementing material falls into the spatial flexible network formed by the second protective agent and is not easy to fall apart. Finally, the cementing material falls into the target pouring point, that is, the pouring construction operation of the target pouring point is completed.
[0102] Step 409: During the construction process, the second detection device is used to detect underwater water flow information, and the delivery pressure and / or delivery flow rate of the cementitious material is adjusted according to the water flow information.
[0103] In a specific implementation, the water flow information may be information such as the water flow direction and the water flow velocity. Through these water flow information, the expansion law of the protective agent in the water flow can be determined, and then the delivery pressure and / or delivery flow rate of the second protective agent can be adjusted accordingly to ensure that a stable spatial flexible network is formed in the water body in the preset area where the target casting point is located.
[0104] In actual application, by dropping anchor and moving the construction vessel in a small range and repeating the above construction process, multi-point pouring can be carried out in the construction area.
[0105] In practical applications, the amount of cementitious material pumped each time is about 50%-80% of the volume of the first pouring pipe, the second pouring pipe, and the third pouring pipe to ensure continuous pouring of the cementitious material into pipes. At the same time, the buoyancy of the cementitious material should exceed the buoyancy of the float.
[0106] In practical applications, the pouring construction of the bonding material can also be transformed into a gravel throwing process. The underwater self-protecting bonding material intelligent construction device provided by the present invention can realize the integrated construction of underwater self-protecting bonding material pouring and gravel precise throwing.
[0107] Some embodiments of the present invention further provide a construction vessel, wherein the construction vessel comprises the underwater self-protecting adhesive material intelligent construction device as described above.
[0108] The embodiments of the present invention have the following advantages:
[0109] 1. Through an embodiment of the present invention, the telescopic pipe body can be freely adjusted to make the construction material outlet close to the target pouring point underwater, and the pouring pipe body can perform construction operations of the cementing material, the protective agent, and the floating ball on the pouring point through the cementing material preparation device, the protector preparation device, and the ball collecting bucket, thereby realizing accurate pouring of the pouring point (such as the scouring pit). Moreover, in the underwater working environment, the cementing material is not easy to diffuse or deflect under the action of the floating ball and the protective agent, and can fall into the scouring pit to be poured more accurately, thereby playing a stable and long-term protective role for the marine structure.
[0110] 2. Through an embodiment of the present invention, the rigid first pouring pipe and the third pouring pipe ensure that no bending or deformation occurs during the pouring process, thereby ensuring that the cementing material can press the float ball downward under the action of gravity. At the same time, in order to ensure the pouring quality, the lower end of the third pouring pipe is at a relatively low height from the pouring point. Under the action of tides or waves, the construction ship will shake, and the third pouring pipe is very likely to touch the bottom. The flexible second pouring pipe is axially retracted to prevent the rigid pouring pipe from breaking or affecting the construction safety under the action of the bottoming force.
[0111] 3. Through an embodiment of the present invention, during the process of pouring the cementing material, the float is located in the pouring pipe, and the cementing material can be poured into the pipe through the buoyancy of the float, reducing the self-falling speed of the cementing material flowing into the lower port of the pouring pipe to avoid the dispersion and segregation of the cementing material in the pouring pipe due to water washing, thereby ensuring the pouring quality of the cementing material. In addition, the float is placed in the first pouring pipe by a revolving door device to improve the construction efficiency. At the same time, the number of floats can be increased or decreased according to the amount of cementing material poured. When the amount of cementing material poured increases, the number of floats is increased.
[0112] 4. Through the embodiments of the present invention, in actual application, underwater gravel throwing and filling operations can be carried out only through the telescopic pipe body and the pouring pipe body, that is, the cementing material pouring construction is changed to gravel throwing and filling construction, realizing the integrated construction of underwater self-protecting cementing material pouring and gravel precise throwing.
[0113] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with the relevant laws, regulations and standards of the relevant countries and regions, and provide corresponding operation entrances for users to choose to authorize or refuse.
[0114] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0115] Those skilled in the art will appreciate that the embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the embodiments of the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the embodiments of the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0116] The embodiments of the present invention are described with reference to the flowcharts and / or block diagrams of the methods, terminal devices (systems), and computer program products according to the embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing terminal device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing terminal device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0117] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing terminal device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce a manufactured product including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0118] These computer program instructions can also be loaded onto a computer or other programmable data processing terminal device so that a series of operating steps are executed on the computer or other programmable terminal device to produce a computer-implemented process, thereby providing instructions for executing on the computer or other programmable terminal device to implement the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0119] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the embodiments of the present invention.
[0120] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the above elements.
[0121] The above is a detailed introduction to the intelligent construction device and method of underwater self-protecting adhesive materials. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for general technical personnel in this field, according to the idea of the present invention, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.
Claims
1. An intelligent construction device for underwater self-protecting cementing materials, characterized in that: The underwater self-protecting cementing material intelligent construction device comprises: The telescopic tube body comprises a first telescopic tube and a second telescopic tube, one end of the first telescopic tube is fixedly mounted on a rotating base through a supporting device, and the other end is sleeved with the second telescopic tube, and the rotating base is fixedly mounted on a construction vessel; The casting pipe body is nested inside the telescopic pipe body, and includes a first casting pipe, a second casting pipe and a third casting pipe. One end of the first casting pipe is connected to a material collecting hopper and a ball collecting hopper respectively, and the other end is connected to one end of the third casting pipe through the second casting pipe. The other end of the third casting pipe is a material outlet. The material collecting hopper is used to collect, store and re-mix the cementing material, and the ball collecting hopper is used to store and release the floating ball. A protective agent preparation device, which is installed and fixed on the construction ship and connected to the first casting pipe through a first delivery pipe. The protective agent preparation device is also connected to a second delivery pipe, and the second delivery pipe is fixed to the outer wall of the second telescopic pipe; The cementing material preparation device is installed and fixed on the construction ship and connected with the collecting hopper through a third conveying pipe.
2. The intelligent construction device for underwater self-protecting cementing materials according to claim 1 is characterized in that: The second telescopic tube is provided with a first detection device, and the first detection device is used to detect underwater elevation information.
3. The intelligent construction device for underwater self-protecting cementing materials according to claim 2 is characterized in that: The second telescopic tube is also provided with a second detection device, and the second detection device is used to detect underwater water flow information.
4. The intelligent construction device for underwater self-protecting cementing materials according to claim 3 is characterized in that: The underwater self-protecting cementing material intelligent construction device also includes: The first driving device is arranged on the rotating base and connected to the sliding device; one end of the sliding device is fixedly installed on the first telescopic tube, and the other end is fixedly installed on the second telescopic tube. The sliding device is used to adjust the length of the telescopic tube body.
5. The intelligent construction device for underwater self-protecting cementing materials according to claim 3 is characterized in that: The connecting passage between the first casting pipe and the ball collecting bucket is provided with a revolving door device, and the revolving door device is used to control the floating ball to enter the first casting pipe from the ball collecting bucket.
6. The intelligent construction device for underwater self-protecting cementing materials according to claim 3 is characterized in that: The underwater self-protecting cementing material intelligent construction device also includes: The second driving device is arranged on the rotating base and connected to the first telescopic tube. The second driving device is used to adjust the angle of the telescopic tube body.
7. The intelligent construction device for underwater self-protecting cementing materials according to claim 3 is characterized in that: The protective agent preparation device is provided with a first pumping device, and the first pumping device is used to transport the protective agent into the first casting pipe through the first delivery pipeline, and / or to transport the protective agent to a target position underwater through the second delivery pipeline.
8. The intelligent construction device for underwater self-protecting cementing materials according to claim 3 is characterized in that: The cementitious material preparation device is provided with a second pumping device, and the second pumping device is used to convey the cementitious material into the collecting hopper through the third conveying pipeline.
9. The intelligent construction device for underwater self-protecting cementing materials according to any one of claims 3 to 8, characterized in that: The underwater self-protecting adhesive material intelligent construction device also includes a control device, which is installed and fixed on the construction ship and is electrically connected to the rotating base, the telescopic tube body, the protective agent preparation device, and the adhesive material preparation device respectively.
10. The intelligent construction device for underwater self-protecting cementing materials according to any one of claims 3 to 8, characterized in that: The first telescopic tube, the second telescopic tube, the first casting tube and the third casting tube are rigid tubes, and the second casting tube is a flexible hose.
11. The intelligent construction device for underwater self-protecting cementing materials according to any one of claims 3 to 8, characterized in that: The first pouring pipe is connected to the second pouring pipe via a first flange, and the second pouring pipe is connected to the third pouring pipe via a second flange.
12. The intelligent construction device for underwater self-protecting cementing materials according to any one of claims 3 to 8, characterized in that: The protective agent preparation device is used for preparing a protective agent, and the protective agent includes a polymer underwater protective agent.
13. The intelligent construction device for underwater self-protecting cementing materials according to any one of claims 3 to 8, characterized in that: The bonding material includes one or more of the following: underwater self-protecting slurry, underwater self-protecting mortar, underwater self-protecting concrete, and underwater self-protecting high-fluidity cementitious soil.
14. An intelligent construction method for underwater self-protecting cementitious materials, characterized in that: Applied to the intelligent construction device for underwater self-protecting cementing materials according to any one of claims 3 to 13, the method comprises: Controlling the construction vessel to sail to the construction location and anchoring it; Determine the target pouring point underwater, and use the first detection device to detect the underwater elevation information; adjusting the length and / or angle of the telescopic tube body according to the elevation information so that the distance between the construction material outlet and the target pouring point reaches a preset distance; Conveying the first floating ball from the ball collecting bucket to the first casting pipe; Starting the protective agent preparation device to prepare the protective agent, and conveying the first protective agent to the first casting pipe through the first conveying pipe; Convey the second floating ball from the ball collecting bucket to the first pouring pipe, so that the first floating ball and the second floating ball form a slow flow structure; The second protective agent is transported to the water body in the preset area where the target pouring point is located through the second transport pipe to form a protection area; Starting the cementing material preparation device to prepare the cementing material, and conveying the cementing material to the collecting hopper through the third conveying pipe, so that the cementing material falls into the target pouring point along the pouring pipe body under the action of the slow flow structure; During the construction process, the second detection device is used to detect underwater water flow information, and the delivery pressure and / or delivery flow rate of the cementitious material is adjusted according to the water flow information.
15. A construction ship, characterized in that: The construction vessel includes the underwater self-protecting adhesive material intelligent construction device as described in any one of claims 1-13.
Citation Information
Patent Citations
Drop filling and pouring integrated construction device
CN115977098A
Underwater pouring device and pouring construction method of underwater cementing material
CN117684573A
Underwater concrete pouring and constructing device
CN203145021U
Underwater cementing material pouring device
CN221461209U
Spray reclaming apparatus for reinforcing soft groundof sea bottom
KR200193262Y1