Efficient bridge concrete pouring formwork system and construction method thereof

The bridge concrete pouring formwork system facilitates easy installation, disassembly, and height adjustment of support plates, enhancing structural stability and integrity during concrete pouring.

CN119083320AInactive Publication Date: 2024-12-06SHANDONG JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411306155.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Common guard plates in bridge concrete pouring formworks are troublesome to install or disassemble and inconvenient to adjust, affecting their effectiveness.

Method used

A bridge concrete pouring formwork system with symmetrically arranged templates, hydraulic push rods, and adjustable support fixing plates controlled by a motorized system, allowing for easy installation, disassembly, and height adjustment.

Benefits of technology

Ensures structural stability during concrete pouring by adjusting support distances, preventing deformation and ensuring the integrity of the formwork system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083320A_ABST
    Figure CN119083320A_ABST
Patent Text Reader

Abstract

The invention discloses an efficient bridge concrete pouring formwork system and a construction method thereof.The efficient bridge concrete pouring formwork system comprises first pouring formworks, second pouring formworks are symmetrically arranged on the outer sides of the first pouring formworks, and the two first pouring formworks and the two second pouring formworks are symmetrically arranged; one side of the first pouring formwork and one side of the second pouring formwork are both connected with mounting clamping bases in a clamped mode, a first supporting and fixing plate and a second supporting and fixing plate are symmetrically arranged on the outer side of the first pouring formwork, and one side of the first supporting and fixing plate and one side of the second supporting and fixing plate are both fixedly connected with hydraulic push rods. During construction, the first pouring formwork and the second pouring formwork are clamped and fixed through the mounting clamping base, then the lower limiting frame is fixed to the lower end of the outer side of the first pouring formwork, the upper limiting frame is fixed to the upper end of the outer side of the first pouring formwork, and then the top-layer pouring splash-proof base is mounted on the tops of the first pouring formwork and the second pouring formwork.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a high-efficiency bridge concrete pouring formwork system and a construction method thereof. Background Art

[0002] The bridge concrete pouring formwork system refers to a temporary structural system used for pouring concrete in bridge projects. It can ensure that the concrete can form the shape, size and strength required by the design after pouring. An efficient formwork system can not only improve the construction speed, but also ensure the construction quality and safety.

[0003] During the construction process of concrete, guard plates are often used for external support and protection. However, common guard plates are troublesome to install or remove, and it is not convenient to adjust the height of the guard plates, which can easily affect the effect of use. Summary of the invention

[0004] The purpose of the present invention is to overcome the problem that the common guard plates in the prior art are troublesome to install or disassemble and it is inconvenient to adjust the height of the guard plates, which easily affects the effect of use. An efficient bridge concrete casting formwork system and a construction method thereof are provided. The efficient bridge concrete casting formwork system and the construction method thereof have the effect of facilitating the installation, disassembly and adjustment of the external support guard plates.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an efficient bridge concrete casting template system, comprising a first casting template, a second casting template is symmetrically arranged on the outer side of the first casting template, two of the first casting template and the second casting template are symmetrically arranged, one side of each of the first casting template and the second casting template is engaged and connected with a mounting seat, a first supporting fixing plate and a second supporting fixing plate are symmetrically arranged on the outer side of the first casting template, one side of each of the first supporting fixing plate and the second supporting fixing plate is fixedly connected with a hydraulic push rod, one end of the hydraulic push rod is fixedly connected with a control device, one side of the control device is fixedly connected with a displacement seat, a threaded rod is rotatably connected inside the displacement seat, an upper bearing is rotatably connected to the top of the threaded rod, a first built-in groove is arranged on one side of the top of the first built-in groove, a built-in block is rotatably connected inside the first built-in groove, a fixed shaft is fixedly connected to the top of the built-in block, a limited top seat is fixedly connected to the top of the fixed shaft, a lower bearing is rotatably connected to the bottom of the threaded rod, and a driving motor is fixedly connected to the bottom of the lower bearing.

[0006] Preferably, a first reinforcement seat is fixedly connected to the outer side of one end of the hydraulic push rod, and a second reinforcement seat is fixedly connected to the outer side of the other end of the hydraulic push rod, one side of the first reinforcement seat is fixedly connected to the outer side of the first support fixing plate, and one side of the second reinforcement seat is fixedly connected to the outer side of the control device.

[0007] Preferably, the outer side of the fixed shaft is slidably connected to a limiting ring, and the outer side of the limiting ring is fixedly connected to a limiting plate.

[0008] Preferably, two of the first supporting fixing plates and the second supporting fixing plates are provided, a plurality of the mounting bases are provided, one end of the threaded rod passes through the interior of the lower bearing, and the threaded rod is rotationally connected to the driving motor.

[0009] Preferably, a first support plate is fixedly connected to the outer side of the upper bearing, a second support plate is fixedly connected to one side of the first support plate, an upper limit frame is fixedly connected to one side of the second support plate, the upper limit frame is fixedly connected to the upper end of the outer side of the first casting template, and a third reinforcement seat is fixedly connected to the outer side of one end of the second support plate close to the upper limit frame.

[0010] Preferably, a bottom support seat is fixedly connected to the outer side of the lower bearing, and a support base is fixedly connected to the outer side of the bottom support seat.

[0011] Preferably, a weighted base is fixedly connected to the bottom of the support base.

[0012] Preferably, the threaded rod is made of corrosion-resistant material.

[0013] Preferably, a top layer of pouring splash guard is fixedly connected to the top of the first pouring formwork, and a lower limit frame is fixedly connected to the lower end of the outer side of the first pouring formwork.

[0014] A construction method for an efficient bridge concrete pouring formwork system comprises the following steps:

[0015] Step 1: When in use, first fix the first casting template and the second casting template by installing the card seat, then fix the lower limit frame to the lower end of the outer side of the first casting template, and then fix the upper limit frame to the upper end of the outer side of the first casting template, and then install the top casting splash seat on the top of the first casting template and the second casting template, and fix the first support plate and the second support plate on the outer side of the upper bearing by setting the first support plate and the second support plate, so as to achieve the effect of supporting and fixing the upper bearing at the top of the threaded rod, place the limit ring on the top of the upper bearing, hold the limit top seat to pass the fixed shaft and the built-in block through the inside of the limit ring and clamp them into the inside of the upper bearing, and then rotate the limit top seat so that the built-in block fixed at the bottom of the fixed shaft is screwed into the other side of the first built-in groove at the lower end of the second built-in groove, so as to achieve the fixing effect of the limit ring and the limit plate, when the limit ring and the limit plate need to be disassembled, the built-in block is rotated by holding the limit top seat so that the built-in block is rotated to the lower end of the second built-in groove, and then the built-in block is taken out through the inside of the second built-in groove.

[0016] Step 2: When the support structure is installed, start the drive motor so that the threaded rod rotates inside the upper bearing and the lower bearing under the drive of the drive motor, and is rotatably connected to the displacement seat fixed on one side of the control device through the threaded rod, so as to achieve the up and down displacement effect of the hydraulic push rod, the first support fixing plate and the second support fixing plate, and it is more convenient to adjust the height of the first support fixing plate and the second support fixing plate as required. When the first support fixing plate and the second support fixing plate are adjusted to the appropriate position, the drive motor can be stopped, and the hydraulic push rod is controlled by the control device to adjust the distance between the hydraulic push rod and the first casting template, so as to protect and fix the outer side of the first casting template as required to ensure the structural stability during the casting process.

[0017] Compared with the prior art, the present invention provides an efficient bridge concrete pouring formwork system and a construction method thereof, which has the following beneficial effects:

[0018] 1. The present invention sets a first support fixing plate, which is located at the lower end of the outside of the first casting template, and the second support fixing plate is located at the upper end of the outside of the first casting template. The first support fixing plate and the second support fixing plate control the hydraulic push rod through a control device, and the hydraulic push rod adjusts the distance between the first casting template so that the outside of the first casting template can be protected and fixed as needed, thereby ensuring the structural stability during the casting process. Because when pouring bridge concrete, the stability of the template system is the key to ensuring the casting quality, the outer support structure can effectively withstand the lateral pressure of the concrete during the casting process, prevent the first casting template from being deformed or shifted due to excessive force, so as to ensure the overall stability of the template system.

[0019] 2. The present invention arranges a threaded rod, which rotates inside the upper bearing and the lower bearing under the drive of the driving motor, and is rotatably connected to a displacement seat fixed on one side of the control device through the threaded rod, so as to achieve the up and down displacement effect of the hydraulic push rod, the first support fixing plate and the second support fixing plate, and is more convenient to adjust the height of the first support fixing plate and the second support fixing plate as required, so as to more safely and reliably support and protect the first casting template externally.

[0020] 3. The present invention provides an upper bearing, wherein the upper end of the upper bearing is provided with a first built-in groove, and the upper end of one side of the first built-in groove is provided with a second built-in groove, the built-in clamping block is rotatably connected inside the first built-in groove, and the second built-in groove is set in a semicircular shape. When installing the limit plate, the limit ring is placed on the top of the upper bearing, and the fixed shaft and the built-in clamping block are passed through the inside of the limit ring and clamped into the inside of the upper bearing by holding the limit top seat, and then the limit top seat is rotated so that the built-in clamping block fixed at the bottom of the fixed shaft is screwed into the other side of the first built-in groove at the lower end of the second built-in groove, so as to achieve the fixing effect of the limit ring and the limit plate. When the limit ring and the limit plate need to be disassembled, the built-in clamping block is rotated by holding the limit top seat so that the built-in clamping block is rotated to the lower end of the second built-in groove, and then the built-in clamping block is taken out through the inside of the second built-in groove. The operation is simple and convenient.

[0021] 4. The present invention sets a first support plate, which is displaced to the outside of the upper bearing and is fixedly connected to the upper limit frame on the outside of the first casting template through the second support plate. When in use, the upper limit frame is fixed to the upper end of the outside of the first casting template, and the first support plate and the second support plate are fixed to the outside of the upper bearing, so as to achieve the effect of supporting and fixing the upper bearing at the top of the threaded rod.

[0022] 5. The present invention provides a top-layer pouring splash guard. During the concrete pouring process, due to the fluidity and splashing of concrete, if there is no top-layer pouring splash guard, the concrete may splash out of the first pouring formwork, affecting the closure and structural integrity of the first pouring formwork. It can also reduce the waste of concrete and improve the utilization rate of concrete.

[0023] The parts not involved in the device are the same as the existing technology or can be implemented by using the existing technology. The structure of the invention is scientific and reasonable, and it is safe and convenient to use, which provides great help to people. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the axial structure of the efficient bridge concrete pouring formwork system and the construction method thereof proposed by the present invention;

[0025] Figure 2 yes Figure 1A schematic diagram of the enlarged structure at point A;

[0026] Figure 3 yes Figure 1 A schematic diagram of the enlarged structure at B;

[0027] Figure 4 It is a front structural schematic diagram of a high-efficiency bridge concrete pouring formwork system and a construction method thereof proposed by the present invention;

[0028] Figure 5 It is a right-side structural schematic diagram of the efficient bridge concrete pouring formwork system and the construction method thereof proposed by the present invention;

[0029] Figure 6 yes Figure 5 A schematic diagram of the enlarged structure at C;

[0030] Figure 7 It is a left vertical section structural schematic diagram of the efficient bridge concrete pouring formwork system and the construction method thereof proposed by the present invention;

[0031] Figure 8 yes Figure 7 A schematic diagram of the structure at D of FIG.

[0032] Fig. 9 It is a right-view vertical section structural schematic diagram of the efficient bridge concrete pouring formwork system and the construction method thereof proposed by the present invention;

[0033] Fig.10 yes Fig. 9 Enlarged structural diagram at E.

[0034] Description of Reference Numerals

[0035] The first casting template 1, the first supporting fixed plate 2, the first reinforcement seat 3, the hydraulic push rod 4, the second reinforcement seat 5, the control device 6, the displacement seat 7, the threaded rod 8, the upper bearing 9, the first built-in groove 10, the second built-in groove 11, the built-in block 12, the fixed shaft 13, the limit top seat 14, the limit ring 15, the limit plate 16, the first support plate 17, the second support plate 18, the upper limit frame 19, the third reinforcement seat 20, the lower bearing 21, the drive motor 22, the bottom support seat 23, the support base 24, the weighted base 25, the second supporting fixed plate 26, the top casting splashproof seat 27, the lower limit frame 28, the second casting template 29, and the installation seat 30. DETAILED DESCRIPTION

[0036] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.

[0037] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0038] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0039] See also Figure 1-10 , the present invention provides a technical solution:

[0040] Embodiment 1:

[0041] A high-efficiency bridge concrete casting template system comprises a first casting template 1, a second casting template 29 is symmetrically arranged on the outer side of the first casting template 1, two of the first casting template 1 and the second casting template 29 are symmetrically arranged, one side of the first casting template 1 and the second casting template 29 are both snap-connected with a mounting card seat 30, a first supporting fixing plate 2 and a second supporting fixing plate 26 are symmetrically arranged on the outer side of the first casting template 1, one side of the first supporting fixing plate 2 and the second supporting fixing plate 26 are both fixedly connected with a hydraulic push rod 4, one end of the hydraulic push rod 4 is fixedly connected with a control device 6, one side of the control device 6 is fixedly connected with a displacement seat 7, the displacement seat 7 is internally rotatably connected with a threaded rod 8, the top of the threaded rod 8 is rotatably connected with an upper bearing 9, the upper end of the upper bearing 9 is provided with a first built-in groove 10, one side of the top of the first built-in groove 10 is provided with a second built-in groove 11, the first built-in groove 10 is internally rotatably connected with a built-in card block 12, the built-in card block 1 2 is fixedly connected with a fixed shaft 13 at the top, and the top of the fixed shaft 13 is fixedly connected with a limited top seat 14. The bottom of the threaded rod 8 is rotatably connected with a lower bearing 21, and the bottom of the lower bearing 21 is fixedly connected with a driving motor 22. The first support fixing plate 2 is located at the lower end of the outside of the second casting template 29, and the second support fixing plate 26 is located at the upper end of the outside of the second casting template 29. The first support fixing plate 2 and the second support fixing plate 26 control the hydraulic push rod 4 through the control device 6, and the hydraulic push rod 4 is used to adjust the distance between the first casting template 1 and the second casting template 29, so as to protect and fix the outside of the first casting template 1 and the second casting template 29 as needed, which can ensure the structural stability during the casting process. Because when pouring bridge concrete, the stability of the template system is the key to ensuring the casting quality, the outer support structure can effectively withstand the lateral pressure of concrete during the casting process, prevent the first casting template from being deformed or displaced due to excessive force, so as to ensure the overall stability of the template system.

[0042] Specific implementation process: first, the first casting template 1 and the second casting template 29 are fixed by installing the clamping seat 30, and then the lower limit frame 28 is fixed to the lower end of the outer side of the first casting template 1, and then the upper limit frame 19 is fixed to the upper end of the outer side of the first casting template 1, and then the top casting splash seat 27 is installed on the top of the first casting template 1 and the second casting template 29, and the first support plate 17 and the second support plate 18 are fixed to the outer side of the upper bearing 9, so as to achieve the upper bearing 9 at the top of the threaded rod 8. To achieve the effect of supporting and fixing, place the limiting ring 15 on the top of the upper bearing 9, hold the limiting top seat 14, pass the fixed shaft 13 and the built-in clamping block 12 through the inside of the limiting ring 15 and clamp them into the inside of the upper bearing 9, and then rotate the limiting top seat 14 to make the built-in clamping block 12 fixed at the bottom of the fixed shaft 13 screw into the other side of the first built-in groove 10 at the lower end of the second built-in groove 11, so as to achieve the fixing effect of the limiting ring 15 and the limiting plate 16. When the limiting ring 15 and the limiting plate 16 need to be disassembled, the inner The built-in card block 12 is rotated by holding the limiting top seat 14, so that the built-in card block 12 is rotated to the lower end of the second built-in groove 11, and then the built-in card block 12 is taken out through the inside of the second built-in groove 11. When the support structure is installed, the drive motor 22 is started, so that the threaded rod 8 is driven by the drive motor 22 to rotate inside the upper bearing 9 and the lower bearing 21, and the threaded rod 8 is rotatably connected to the displacement seat 7 fixed on one side of the control device 6, so as to achieve the up and down displacement effect of the hydraulic push rod 4, the first support fixing plate 2 and the second support fixing plate 26, and it is more convenient to adjust the height of the first support fixing plate 2 and the second support fixing plate 26 as required. When the first support fixing plate 2 and the second support fixing plate 26 are adjusted to the appropriate position, the work of the drive motor 22 can be stopped, and the hydraulic push rod 4 is controlled by the control device 6, and the hydraulic push rod 4 is used to adjust the distance between it and the first casting template 1, so that the outer side of the first casting template 1 can be protected and fixed as required to ensure the structural stability during the casting process.

[0043] A construction method for an efficient bridge concrete pouring formwork system comprises the following steps;

[0044] Step 1: When in use, first, the first casting template 1 and the second casting template 29 are fixed by installing the card seat 30, and then the lower limit frame 28 is fixed to the lower end of the outer side of the first casting template 1, and then the upper limit frame 19 is fixed to the upper end of the outer side of the first casting template 1, and then the top casting splash seat 27 is installed on the top of the first casting template 1 and the second casting template 29, and the first support plate 17 and the second support plate 18 are fixed to the outer side of the upper bearing 9, so as to achieve the effect of supporting and fixing the upper bearing 9 at the top of the threaded rod 8, and the limit ring 15 is placed on the top of the upper bearing 9, and the limit top seat 14 is held by hand. The fixed shaft 13 and the built-in clamping block 12 are passed through the interior of the limiting ring 15 and clamped into the interior of the upper bearing 9, and then the limiting top seat 14 is rotated so that the built-in clamping block 12 fixed at the bottom of the fixed shaft 13 is screwed into the other side of the first built-in groove 10 at the lower end of the second built-in groove 11, so as to achieve the fixing effect of the limiting ring 15 and the limiting plate 16. When the limiting ring 15 and the limiting plate 16 need to be disassembled, the built-in clamping block 12 is rotated by holding the limiting top seat 14 so that the built-in clamping block 12 is rotated to the lower end of the second built-in groove 11, and then the built-in clamping block 12 can be taken out through the interior of the second built-in groove 11.

[0045] Step 2: When the support structure is installed, start the drive motor 22, so that the threaded rod 8 rotates inside the upper bearing 9 and the lower bearing 21 under the drive of the drive motor 22, and is rotatably connected to the displacement seat 7 fixed on one side of the control device 6 through the threaded rod 8, so as to achieve the up and down displacement effect of the hydraulic push rod 4, the first support fixing plate 2 and the second support fixing plate 26, and it is more convenient to adjust the height of the first support fixing plate 2 and the second support fixing plate 26 as required. When the first support fixing plate 2 and the second support fixing plate 26 are adjusted to the appropriate position, the drive motor 22 can be stopped, and the hydraulic push rod 4 is controlled by the control device 6, and the hydraulic push rod 4 is used to adjust the distance between it and the first casting template 1, so as to protect and fix the outer side of the first casting template 1 as required to ensure the structural stability during the casting process.

[0046] Embodiment 2: A first reinforcement seat 3 is fixedly connected to the outer side of one end of the hydraulic push rod 4, and a second reinforcement seat 5 is fixedly connected to the outer side of the other end of the hydraulic push rod 4. One side of the first reinforcement seat 3 is fixedly connected to one side of the outside of the first support fixing plate 2, and one side of the second reinforcement seat 5 is fixedly connected to one side of the outside of the control device 6. A top layer of pouring splash-proof seat 27 is fixedly connected to the top of the first casting formwork 1. During the concrete pouring process, due to the fluidity and splashing of concrete, if there is no top layer of pouring splash-proof seat 27, concrete may splash out of the first casting formwork, affecting the closure and structural integrity of the first casting formwork, and can also reduce concrete waste and improve concrete utilization.

[0047] Embodiment 3: The outer side of the fixed shaft 13 is slidably connected to the limiting ring 15 , and the outer side of the limiting ring 15 is fixedly connected to the limiting plate 16 .

[0048] Embodiment 4: There are two first supporting and fixing plates 2 and two second supporting and fixing plates 26, and there are several mounting bases 30. One end of the threaded rod 8 passes through the interior of the lower bearing 21, and the threaded rod 8 is rotationally connected to the driving motor 22. The threaded rod 8 is made of corrosion-resistant material.

[0049] Embodiment 5: The outer side of the upper bearing 9 is fixedly connected with a first support plate 17, one side of the first support plate 17 is fixedly connected with a second support plate 18, one side of the second support plate 18 is fixedly connected with an upper limit frame 19, the lower end of the outer side of the first casting template 1 is fixedly connected with a lower limit frame 28, the upper limit frame 19 is fixedly connected to the upper end of the outer side of the first casting template 1, the outer side of the second support plate 18 close to the upper limit frame 19 is fixedly connected with a third reinforcement seat 20, the outer side of the lower bearing 21 is fixedly connected with a bottom support seat 23, the outer side of the bottom support seat 23 is fixedly connected with a support base 24, the bottom of the support base 24 is fixedly connected with a weighted base 25, the upper end of the interior of the upper bearing 9 is provided with a first built-in groove 10, the upper end of one side of the first built-in groove 10 is provided with a second built-in groove 11, and the built-in block 12 is inside the first built-in groove 10 The second built-in groove 11 is set to be semicircular. When installing the limit plate 16, the limit ring 15 is placed on the top of the upper bearing 9, and the fixed shaft 13 and the built-in clamping block 12 are passed through the inside of the limit ring 15 and clamped into the inside of the upper bearing 9 by holding the limit top seat 14, and then the limit top seat 14 is rotated so that the built-in clamping block 12 fixed at the bottom of the fixed shaft 13 is screwed into the other side of the first built-in groove 10 at the lower end of the second built-in groove 11, so as to achieve the fixing effect of the limit ring 15 and the limit plate 16. When the limit ring 15 and the limit plate 16 need to be disassembled, the built-in clamping block 12 is rotated by holding the limit top seat 14 so that the built-in clamping block 12 is rotated to the lower end of the second built-in groove 11, and then the built-in clamping block 12 is taken out through the inside of the second built-in groove 11. The operation is simple and convenient.

[0050] The preferred embodiments of the present invention are described in detail above, but the present invention is not limited thereto. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications, including the combination of various technical features in any other suitable manner, and these simple modifications and combinations should also be regarded as the contents disclosed by the present invention and belong to the protection scope of the present invention.

Claims

1. An efficient bridge concrete pouring formwork system, comprising a first pouring formwork (1), characterized in that: A second casting template (29) is symmetrically arranged on the outer side of the first casting template (1), and two of the first casting template (1) and the second casting template (29) are symmetrically arranged. One side of the first casting template (1) and the second casting template (29) are both snap-connected with a mounting seat (30). A first supporting fixing plate (2) and a second supporting fixing plate (26) are symmetrically arranged on the outer side of the first casting template (1), and one side of the first supporting fixing plate (2) and the second supporting fixing plate (26) are both fixedly connected with a hydraulic push rod (4), one end of the hydraulic push rod (4) is fixedly connected with a control device (6), and one side of the control device (6) is fixedly connected with a displacement seat (7). ), the displacement seat (7) is internally rotatably connected to a threaded rod (8), the top of the threaded rod (8) is rotatably connected to an upper bearing (9), the upper end of the upper bearing (9) is provided with a first built-in groove (10), one side of the top of the first built-in groove (10) is provided with a second built-in groove (11), the first built-in groove (10) is internally rotatably connected to a built-in clamping block (12), the top of the built-in clamping block (12) is fixedly connected to a fixed shaft (13), the top of the fixed shaft (13) is fixedly connected to a limited top seat (14), the bottom of the threaded rod (8) is rotatably connected to a lower bearing (21), the bottom of the lower bearing (21) is fixedly connected to a driving motor (22).

2. The efficient bridge concrete pouring formwork system according to claim 1 is characterized in that: The outer side of one end of the hydraulic push rod (4) is fixedly connected to a first reinforcement seat (3), and the outer side of the other end of the hydraulic push rod (4) is fixedly connected to a second reinforcement seat (5). One side of the first reinforcement seat (3) is fixedly connected to the outer side of the first support fixing plate (2), and one side of the second reinforcement seat (5) is fixedly connected to the outer side of the control device (6).

3. The efficient bridge concrete pouring formwork system according to claim 1 is characterized in that: The outer side of the fixed shaft (13) is slidably connected to a limiting circular ring (15), and the outer side of the limiting circular ring (15) is fixedly connected to a limiting plate (16).

4. The efficient bridge concrete pouring formwork system according to claim 1 is characterized in that: The first supporting and fixing plates (2) and the second supporting and fixing plates (26) are both provided with two, the mounting bases (30) are provided with a plurality, one end of the threaded rod (8) passes through the interior of the lower bearing (21), and the threaded rod (8) is rotationally connected to the driving motor (22).

5. The efficient bridge concrete pouring formwork system according to claim 1 is characterized in that: A first support plate (17) is fixedly connected to the outer side of the upper bearing (9); a second support plate (18) is fixedly connected to one side of the first support plate (17); an upper limit frame (19) is fixedly connected to one side of the second support plate (18); the upper limit frame (19) is fixedly connected to the upper end of the outer side of the first casting template (1); and a third reinforcement seat (20) is fixedly connected to the outer side of one end of the second support plate (18) close to the upper limit frame (19).

6. The efficient bridge concrete pouring formwork system according to claim 1 is characterized in that: The outer side of the lower bearing (21) is fixedly connected to a bottom support seat (23), and the outer side of the bottom support seat (23) is fixedly connected to a support base (24).

7. The efficient bridge concrete pouring formwork system according to claim 6 is characterized in that: The bottom of the support base (24) is fixedly connected with a weighted base (25).

8. The efficient bridge concrete pouring formwork system according to claim 1 is characterized in that: The threaded rod (8) is made of corrosion-resistant material.

9. The efficient bridge concrete pouring formwork system according to claim 1 is characterized in that: A top layer of pouring splash-proof seat (27) is fixedly connected to the top of the first pouring template (1), and a lower limit frame (28) is fixedly connected to the lower end of the outer side of the first pouring template (1).

10. The construction method of the efficient bridge concrete pouring formwork system according to any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: When in use, firstly, the first casting template (1) and the second casting template (29) are fixed by installing the card seat (30), then the lower limit frame (28) is fixed to the lower end of the outer side of the first casting template (1), and then the upper limit frame (19) is fixed to the upper end of the outer side of the first casting template (1), and then the top casting splash seat (27) is installed on the top of the first casting template (1) and the second casting template (29), and the first support plate (17) and the second support plate (18) are fixed on the outer side of the upper bearing (9), so as to achieve the effect of supporting and fixing the upper bearing (9) at the top of the threaded rod (8), and the limit ring (15) is placed on the top of the upper bearing (9), and the limit top seat (14) is held by hand. The fixed shaft (13) and the built-in clamping block (12) are inserted into the interior of the upper bearing (9) through the interior of the limiting circular ring (15), and then the limiting top seat (14) is rotated so that the built-in clamping block (12) fixed at the bottom of the fixed shaft (13) is screwed into the other side of the interior of the first built-in groove (10) at the lower end of the second built-in groove (11), thereby achieving the fixing effect of the limiting circular ring (15) and the limiting plate (16). When it is necessary to disassemble the limiting circular ring (15) and the limiting plate (16), the built-in clamping block (12) is rotated by holding the limiting top seat (14) so ​​that the built-in clamping block (12) is rotated to the lower end of the second built-in groove (11), and then the built-in clamping block (12) is taken out through the interior of the second built-in groove (11); Step 2: When the support structure is installed, the drive motor (22) is started, so that the threaded rod (8) rotates inside the upper bearing (9) and the lower bearing (21) under the drive of the drive motor (22), and the threaded rod (8) is rotatably connected to the displacement seat (7) fixed on one side of the control device (6), so as to achieve the effect of up and down displacement of the hydraulic push rod (4), the first support fixing plate (2) and the second support fixing plate (26), and it is more convenient to adjust the height of the first support fixing plate (2) and the second support fixing plate (26) as required. When the first support fixing plate (2) and the second support fixing plate (26) are adjusted to a suitable position, the operation of the drive motor (22) can be stopped, and the hydraulic push rod (4) is controlled by the control device (6), and the hydraulic push rod (4) is used to adjust the distance between the hydraulic push rod (4) and the first casting template (1), so as to protect and fix the outer side of the first casting template (1) as required, thereby ensuring the structural stability during the casting process.