Foundation pit basement outer wall construction joint anti-seepage structure and construction method thereof
By using a combination method of water-expanded water stop belt, grouting pipe and waterproof coil reinforcement layer at the construction joints of the basement wall of the foundation pit, the problems of easy damage and difficulty in pre-embedding of traditional water-stop steel plates are solved, and stronger Anti-leakage effect and construction flexibility.
Patent Information
- Application Number
- CN202411090446.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-09
AI Technical Summary
In the construction joints of the basement wall of the foundation pit, traditional water-stop steel plates are prone to damage and difficulty in pre-embedding, resulting in poor leakage resistance and limited by the position of the supporting structure and construction time.
The combination method of water-expanded water stop belt, grouting pipe, waterproof coil reinforcement layer and junction is adopted. By adding a water-proof coil reinforcement layer at the construction joint, and pre-built water-expanded water stop strips and The grouting pipe is grouted by grouting pipes to seal the construction joints to form a multi-layer waterproof structure.
It effectively prevents groundwater leakage, avoids damage to water-stop steel plates, enhances the anti-leakage capability of construction joints, is not limited by the position of the support structure and construction conditions, and improves the practicality of construction.
Smart Images

Figure CN118911206A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to an anti-leakage structure for a construction joint of an outer wall of a foundation pit basement and a construction method thereof. Background Art
[0002] The exterior wall of the basement must first be constructed from the first layer of side walls to the bottom of the supporting structure, and a construction joint must be set at the bottom of the supporting structure. The second layer of side walls will be constructed after the support is removed. However, due to inadequate roughening and inadequate concrete vibration, the anti-leakage capacity of the concrete at the construction joint is weak. The traditional method is to add a water-stop steel plate at the construction joint. However, during the removal of the supporting structure, the concrete and materials of the supporting structure will fall and damage the water-stop steel plate. When pre-embedding the water-stop steel plate, 1 / 2 must be pre-embedded into the first layer of the side wall. Because the design position of the foundation pit support is close to the top elevation of the bottom plate, the side wall must protrude from the bottom plate surface, which is easy to conflict with the support position, resulting in the situation that 1 / 2 cannot be pre-embedded into the first layer of the side wall. In addition, when the project is slow to build, most of the water-stop steel plates are hand-embroidered and damaged due to the long construction time. During the removal of the supporting structure, the concrete and materials of the supporting structure will fall and damage the water-stop steel plate. The traditional method of using water-stop steel plates to prevent leakage in foundation pit construction joints is not applicable to basement exterior walls. Summary of the invention
[0003] In order to overcome the defects of the prior art, a foundation pit basement exterior wall construction joint anti-leakage structure and a construction method thereof are provided to solve the problem that the conventional method of setting a water-stop steel plate in the construction joint of the basement exterior wall for anti-leakage, the water-stop steel plate is prone to rust and damage during the construction process, thus affecting the anti-leakage performance.
[0004] In order to achieve the above-mentioned purpose, a foundation pit basement outer wall construction joint anti-leakage structure is provided, comprising:
[0005] A lower outer wall, wherein the inner edge of the top surface of the lower outer wall is formed with an anti-ridge;
[0006] A first grouting pipe is buried in the middle of the top surface of the lower outer wall, the first grouting pipe is connected to a grouting conduit, and the grouting conduit extends to the outside of the inner side of the lower outer wall;
[0007] Two water-swellable waterstops are buried in the top surface of the lower outer wall, and the two water-swellable waterstops are respectively arranged on opposite sides of the first grouting pipe;
[0008] An upper outer wall is cast on the top surface of the lower outer wall and the anti-slope;
[0009] A waterproofing membrane reinforcement layer is laid at the construction joint between the lower outer wall and the upper outer wall;
[0010] The waterproof roll material layer is laid on the outer sides of the lower outer wall, the waterproof roll material reinforcement layer and the upper outer wall.
[0011] Furthermore, the first grouting pipe is arranged along the length direction of the lower outer wall.
[0012] Furthermore, there are multiple grouting pipes, and the multiple grouting pipes are arranged at intervals along the length direction of the first grouting pipe.
[0013] Furthermore, it also includes a cover seam plate, which is padded between the waterproof membrane reinforcement layer and the construction joint, and the opposite sides of the cover seam plate extend to form attached wall panels, one attached wall panel is buried in the lower exterior wall, and the other attached wall panel is buried in the upper exterior wall, and a blocked space is formed between the cover seam plate and the lower exterior wall and the upper exterior wall, and a second grouting pipe is buried in the lower exterior wall, one end of the second grouting pipe extends into the blocked space, and the other end of the second grouting pipe extends to the outside of the inner side of the lower exterior wall.
[0014] Furthermore, an anchoring flange is formed on a side of the wall attachment panel away from the cover seam panel.
[0015] Furthermore, the outer sides of the lower outer wall and the upper outer wall are coated with a waterproof coating.
[0016] The present invention provides a construction method for a foundation pit basement outer wall construction joint anti-leakage structure, comprising the following steps:
[0017] A waterproofing membrane reinforcement layer is laid at the construction joint between the lower outer wall and the upper outer wall;
[0018] A waterproof roll material layer is arranged outside the casting position of the lower outer wall, and a waterproof roll material reinforcement layer is arranged inside the waterproof roll material layer, so that the position of the waterproof roll material reinforcement layer corresponds to the construction joint between the lower outer wall and the upper outer wall;
[0019] Casting the lower outer wall, and forming an anti-ridge at the inner edge of the top surface of the lower outer wall;
[0020] roughening the top surface of the lower outer wall;
[0021] Installing a first grouting pipe and two water-swellable waterstops respectively, so that the first grouting pipe is buried in the middle of the top surface of the lower outer wall, and the two water-swellable waterstops are respectively arranged on opposite sides of the first grouting pipe;
[0022] Casting on the top surface of the lower outer wall and the anti-slope to form an upper outer wall;
[0023] After the upper outer wall is solidified, the construction joint between the lower outer wall and the upper outer wall is grouted through the grouting conduit on the grouting pipe to seal the construction joint.
[0024] The beneficial effects of the present invention are that the anti-leakage structure of the construction joint of the outer wall of the foundation pit basement of the present invention adopts an anti-leakage combination method of a water-swelling waterstop strip, a grouting pipe, a waterproof membrane reinforcement layer and a tongue and groove, a waterproof membrane reinforcement layer is added to the water-facing surface of the construction joint, and a tongue and groove of a certain height is poured on the water-repellent surface when pouring the first layer of outer wall (i.e., the lower outer wall) concrete, after the support structure is removed, the construction joint is roughened and three grooves are chiseled out at the same time, and the water-swelling waterstop strip and the grouting pipe are pre-buried, when the second layer of outer wall (i.e., the upper outer wall) concrete is poured, the waterstop strip expands when it encounters water and closes the construction joint, after the new concrete is poured, the construction joint is closed again by grouting through the grouting pipe, and at the same time, the construction joint cross section is not in the same horizontal plane through the tongue and groove, thereby enhancing the anti-leakage capability.
[0025] The anti-leakage structure of the construction joint of the outer wall of the foundation pit basement of the present invention can effectively prevent groundwater leakage. There is no need to pre-embed water-stop steel plates when constructing the lower outer wall, thereby avoiding damage to the water-stop steel plates during the construction process. The measures are not limited by the support structure position, pouring time, and construction conditions, and are highly practical. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0027] Figure 1 It is a schematic structural diagram of the anti-leakage structure of the construction joint of the outer wall of the foundation pit basement according to an embodiment of the present invention.
[0028] Figure 2 Schematic diagram of the structure of the cover seam plate according to an embodiment of the present invention. DETAILED DESCRIPTION
[0029] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant invention, rather than to limit the invention. It is also necessary to explain that, for ease of description, only the parts related to the invention are shown in the accompanying drawings.
[0030] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0031] Reference Figure 1 and Figure 2As shown, the present invention provides a leakage-proof structure for the construction joint of the exterior wall of a foundation pit basement, comprising: a lower exterior wall 1, a first grouting pipe 2, a water-swellable waterstop 3, an upper exterior wall 4, a waterproof membrane reinforcement layer 5, and a waterproof membrane layer 6.
[0032] The lower outer wall 1 is cast on the bottom of the basement structure. The inner edge of the top surface of the lower outer wall 1 is formed with an anti-ridge 11. A tongue-and-groove is formed between the anti-ridge and the top surface of the lower outer wall.
[0033] The first grouting pipe 2 is buried in the middle of the top surface of the lower outer wall 1. The first grouting pipe 2 is connected with a grouting conduit. The grouting conduit extends to the outside of the inner side of the lower outer wall 1.
[0034] Specifically, the first grouting pipe 2 is arranged along the length direction of the lower outer wall 1 .
[0035] In this embodiment, there are multiple grouting conduits, which are arranged at intervals along the length direction of the first grouting conduit 2. The intervals between the grouting conduits are 5 to 6 m.
[0036] The number of the water-swelling waterstop strips 3 is two. The two water-swelling waterstop strips 3 are buried in the top surface of the lower outer wall 1. The two water-swelling waterstop strips 3 are respectively arranged on opposite sides of the first grouting pipe 2.
[0037] The upper outer wall 4 is cast on the top surface of the lower outer wall 1 and the anti-ridge 11.
[0038] The waterproofing membrane reinforcement layer 5 is laid at the construction joint between the lower outer wall 1 and the upper outer wall 4 .
[0039] The waterproofing roll material layer 6 is laid on the outer sides of the lower outer wall 1 , the waterproofing roll material reinforcement layer 5 and the upper outer wall 4 .
[0040] As a preferred embodiment, the anti-seepage structure of the construction joint of the outer wall of the foundation pit basement also includes a cover seam plate 7. The cover seam plate 7 is padded between the waterproof membrane reinforcement layer 5 and the construction joint. Attached wall panels 71 are extended on opposite sides of the cover seam plate 7. One attached wall panel 71 is buried in the lower outer wall 1. Another attached wall panel 71 is buried in the upper outer wall 4. A blocked space is formed between the cover seam plate 7 and the lower outer wall 1 and the upper outer wall 4. A second grouting pipe 8 is buried in the lower outer wall 1. One end of the second grouting pipe 8 extends into the blocked space. The other end of the second grouting pipe 8 extends to the outside of the inner side of the lower outer wall 1.
[0041] After the upper outer wall is solidified, cement slurry is poured into the sealing space through the second grouting pipe. The cement slurry is solidified in the cover seam plate to form a sealing layer, which is used to seal the construction joint. The cover seam plate and the sealing layer improve the anti-leakage performance of the construction joint.
[0042] An anchoring flange 72 is formed on a side of the wall attachment plate 71 away from the cover seam plate 7 .
[0043] In this embodiment, the wall attachment panel and the cover seam panel are vertically arranged, and the anchor flange and the cover seam panel are arranged in the same direction.
[0044] In some embodiments, the outer sides of the lower outer wall 1 and the upper outer wall 4 are coated with a waterproof coating. Specifically, the waterproof coating is a polyurethane coating.
[0045] The present invention provides a construction method for a foundation pit basement outer wall construction joint anti-leakage structure, comprising the following steps:
[0046] S1, a waterproof membrane reinforcement layer 5, is laid at the construction joint between the lower outer wall 1 and the upper outer wall 4.
[0047] S2. A waterproof roll material layer 6 is arranged outside the casting position of the lower outer wall 1, and a waterproof roll material reinforcement layer 5 is arranged inside the waterproof roll material layer 6, so that the position of the waterproof roll material reinforcement layer 5 corresponds to the construction joint between the lower outer wall 1 and the upper outer wall 4.
[0048] In this embodiment, before pouring the lower outer wall, a cover seam plate and a second grouting pipe are first arranged on the inner side of the waterproof membrane reinforcement layer. After pouring the lower outer wall, the wall plate and the anchor flange on the lower side of the cover seam plate are buried in the lower outer wall, and the other end of the second grouting pipe extends to the outside of the inner side of the lower outer wall.
[0049] S3, pouring the lower outer wall 1, and forming an anti-ridge 11 on the inner edge of the top surface of the lower outer wall 1.
[0050] S4, roughening the top surface of the lower outer wall 1.
[0051] S5. Install the first grouting pipe 2 and two water-swellable waterstop strips 3 respectively, so that the first grouting pipe 2 is buried in the middle of the top surface of the lower outer wall 1, and the two water-swellable waterstop strips 3 are respectively arranged on the opposite sides of the first grouting pipe 2.
[0052] S6. Casting is performed on the top surface of the lower outer wall 1 and the anti-ridge 11 to form the upper outer wall 4.
[0053] When pouring the upper outer wall, the attached wall board and the anchor flange on the upper side of the cover seam plate are buried in the upper outer wall, and a blocking space is formed between the cover seam plate 7 and the lower outer wall 1 and the upper outer wall 4.
[0054] S7, after the upper outer wall 4 is solidified, the construction joint between the lower outer wall 1 and the upper outer wall 4 is grouted through the grouting conduit on the grouting pipe to seal the construction joint.
[0055] After the upper outer wall solidifies, cement slurry is poured into the sealing space through the second grouting pipe to solidify and form a sealing layer.
[0056] The anti-seepage structure of the construction joint of the outer wall of the foundation pit basement of the present invention adopts an anti-seepage combination method of a water-swelling waterstop strip, a grouting pipe, a waterproof roll material reinforcement layer and a tongue and groove. A waterproof roll material reinforcement layer is added to the water-facing surface of the construction joint, and a tongue and groove of a certain height is poured on the water-repelling surface when pouring the first layer of outer wall (i.e., the lower outer wall) concrete. After the support structure is removed, the construction joint is roughened and three grooves are chiseled out at the same time, and the water-swelling waterstop strip and the grouting pipe are pre-buried. When the second layer of outer wall (i.e., the upper outer wall) concrete is poured, the waterstop strip expands when it encounters water and closes the construction joint. After the new concrete is poured, the construction joint is closed again by grouting through the grouting pipe. At the same time, the construction joint cross section is not in the same horizontal plane through the tongue and groove, thereby enhancing the anti-seepage capability.
[0057] The anti-leakage structure for the construction joint of the outer wall of the foundation pit basement of the present invention is not limited by the position of the supporting structure, the pouring time and the construction conditions, and has strong practicality.
[0058] The anti-seepage structure of the construction joint of the outer wall of the foundation pit basement of the present invention is convenient to construct by adding a waterproof coiled material reinforcement layer, a water stop strip, a grouting pipe, and a tongue and groove, and can be fine-tuned according to the position during the construction process.
[0059] The anti-leakage structure of the construction joint of the outer wall of the foundation pit basement of the present invention can effectively prevent groundwater leakage. There is no need to pre-embed water-stop steel plates when constructing the lower outer wall, thereby avoiding damage to the water-stop steel plates during the construction process. The measures are not limited by the support structure position, pouring time, and construction conditions, and are highly practical.
[0060] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the present application.
Claims
1. A leakage-proof structure for the construction joint of the outer wall of a foundation pit basement. It is characterized in that include: A lower outer wall, wherein the inner edge of the top surface of the lower outer wall is formed with an anti-ridge; A first grouting pipe is buried in the middle of the top surface of the lower outer wall, the first grouting pipe is connected to a grouting conduit, and the grouting conduit extends to the outside of the inner side of the lower outer wall; Two water-swellable waterstops are buried in the top surface of the lower outer wall, and the two water-swellable waterstops are respectively arranged on opposite sides of the first grouting pipe; An upper outer wall is cast on the top surface of the lower outer wall and the anti-slope; A waterproofing membrane reinforcement layer is laid at the construction joint between the lower outer wall and the upper outer wall; The waterproof roll material layer is laid on the outer sides of the lower outer wall, the waterproof roll material reinforcement layer and the upper outer wall.
2. The anti-leakage structure for the construction joint of the outer wall of the foundation pit basement according to claim 1, It is characterized in that The first grouting pipe is arranged along the length direction of the lower outer wall.
3. The anti-leakage structure for the construction joint of the outer wall of the foundation pit basement according to claim 2, It is characterized in that There are multiple grouting pipes, and the multiple grouting pipes are arranged at intervals along the length direction of the first grouting pipe.
4. The anti-leakage structure for the construction joint of the outer wall of the foundation pit basement according to claim 1, It is characterized in that It also includes a cover seam plate, which is padded between the waterproof membrane reinforcement layer and the construction joint. The cover seam plate is extended on opposite sides to form attached wall panels, one attached wall panel is buried in the lower exterior wall, and the other attached wall panel is buried in the upper exterior wall. A blocked space is formed between the cover seam plate and the lower exterior wall and the upper exterior wall. A second grouting pipe is buried in the lower exterior wall, one end of the second grouting pipe extends into the blocked space, and the other end of the second grouting pipe extends to the outside of the inner side of the lower exterior wall.
5. The anti-leakage structure for the construction joint of the outer wall of the foundation pit basement according to claim 4, It is characterized in that An anchoring flange is formed on one side of the wall attachment plate away from the cover seam plate.
6. The anti-leakage structure for the construction joint of the outer wall of the foundation pit basement according to claim 1, It is characterized in that The outer sides of the lower outer wall and the upper outer wall are coated with a waterproof coating.
7. A construction method for the anti-leakage structure of the construction joint of the outer wall of the foundation pit basement according to any one of claims 1 to 6, It is characterized in that The following steps are involved: A waterproofing membrane reinforcement layer is laid at the construction joint between the lower outer wall and the upper outer wall; A waterproof roll material layer is arranged outside the casting position of the lower outer wall, and a waterproof roll material reinforcement layer is arranged inside the waterproof roll material layer, so that the position of the waterproof roll material reinforcement layer corresponds to the construction joint between the lower outer wall and the upper outer wall; Casting the lower outer wall, and forming an anti-ridge at the inner edge of the top surface of the lower outer wall; roughening the top surface of the lower outer wall; Installing a first grouting pipe and two water-swellable waterstops respectively, so that the first grouting pipe is buried in the middle of the top surface of the lower outer wall, and the two water-swellable waterstops are respectively arranged on opposite sides of the first grouting pipe; Casting on the top surface of the lower outer wall and the anti-slope to form an upper outer wall; After the upper outer wall is solidified, the construction joint between the lower outer wall and the upper outer wall is grouted through the grouting conduit on the grouting pipe to seal the construction joint.
Citation Information
Patent Citations
Anti-seepage treatment method for basement bottom plate construction joint
CN113186985A
Construction joint waterproof structure without water-stop belt at structure interface and construction method of construction joint waterproof structure
CN114941348A
Method for treating underground engineering leakage water without chiseling
CN117966779A
Basement outer wall construction joint waterproof structure and construction method
CN118441817A
Prefabricated outer wall waterproof connection structure
CN213572429U