Foundation pit tube well rear shut-in well structure

By inserting steel casing and filling filler in the foundation pit pipe well, setting up an annular steel bar frame and water stop ring, and sealing and connecting with waterproof coils, the problem of poor waterproofing effect of the sealing structure of the existing foundation pit pipe well is solved, and the waterproofing effect is achieved. More efficient waterproofing and construction stability.

CN118911207AInactive Publication Date: 2024-11-08CHINA 19TH METALLURGICAL CORP

Patent Information

Application Number
CN202411157699.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The waterproofing effect of the existing foundation pit pipe well rear seal structure is poor, the connection between the thick steel pipe and the pipe well is unstable, and the waterproof layer is prone to detachment, resulting in a decrease in the water stop effect.

Method used

Use a steel casing inserted in a sand-free well pipe, and fills it inside and outside, set up an annular steel bar frame and water stop ring, use waterproof coils to connect through hot melt, and add a steel casing to a concrete cushion and raft. The contact area of ​​the slab concrete layer forms an overall structure to ensure waterproofing performance.

Benefits of technology

The waterproof effect of the back sealing well of the foundation pit pipe well is improved, and the steel casing and concrete layer staggered due to foundation settlement deformation is avoided, the waterproof performance is enhanced, and the stability and safety of the construction process are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911207A_ABST
    Figure CN118911207A_ABST
Patent Text Reader

Abstract

The invention discloses a foundation pit tube well rear shut-in well structure in the technical field of foundation pit construction, which comprises a steel casing inserted in a sand-free well tube, an inner filler filled in the steel casing and an outer filler laid around the steel casing, and the outer filler comprises a concrete cushion layer, a waterproof layer, a fine stone concrete layer and a raft concrete layer from bottom to top in sequence. A first reinforcing steel bar frame and a second reinforcing steel bar frame are arranged on the outer wall of the steel casing and located in the raft concrete layer and the concrete cushion layer respectively, a plurality of straight reinforcing steel bars are arranged between the first reinforcing steel bar frame and the second reinforcing steel bar frame, and the lower ends of the straight reinforcing steel bars are inserted into rock mass on the periphery of a well mouth of the sand-free well pipe. The first reinforcing steel bar frame, the second reinforcing steel bar frame and the straight reinforcing steel bars on the outer wall of the steel casing are used as inner connecting frames, so that the concrete cushion layer, the waterproof layer, the fine stone concrete layer and the raft concrete layer can be connected more tightly to form a whole, the waterproof layer cannot be damaged due to dislocation of the steel casing and the concrete layer, and the service life of the raft concrete layer is prolonged. And the waterproof effect of the whole well sealing structure is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit construction, and in particular to a foundation pit pipe well post-well sealing structure. Background Art

[0002] The well sealing project is a very critical link in the foundation pit project. The purpose of well sealing is to protect the surrounding buildings and underground facilities, prevent groundwater influx and geological disasters, and ensure the construction safety of the foundation pit project. A reasonable well sealing construction plan can not only ensure the smooth progress of the foundation pit project construction process, but also shorten the period, reduce costs, and improve the quality of the project. However, during the construction of the well sealing structure of the foundation pit pipe well, the well is often sealed by simply pouring base concrete. During the solidification process of the concrete, a gap will appear between the concrete and the inner wall of the pipe well, resulting in the bottom of the foundation pit pipe well. The pressurized water may bubble up along the four sides of the cast-in-place piles. Therefore, the existing well sealing structure has a poor waterproof and water-stopping effect.

[0003] At present, there are also some technologies that increase the waterproof effect by setting steel pipes and water-stop rings. For example, the utility model patent with the publication number CN220789816U discloses setting a section of thick steel pipe above the well pipe, laying fillers inside and outside the thick steel pipe, and using thick water-stop steel plates and waterproof layers outside the thick steel pipe for waterproofing. The disadvantage of this solution is that the connection between the thick steel pipe and the pipe well is not stable enough, resulting in cracks between the thick steel pipe and the pipe well when the foundation settles and deforms, and the waterproof layer is easy to separate from the thick steel pipe, resulting in a decrease in the water-stop effect. Summary of the invention

[0004] In order to overcome the shortcomings of the existing foundation pit sealing structure, such as poor waterproof effect, the technical problem to be solved by the present invention is to provide a foundation pit pipe well rear sealing structure with good waterproof effect.

[0005] The technical solution adopted by the present invention to solve its technical problem is:

[0006] The post-well sealing structure of the foundation pit pipe well includes a steel casing inserted in the sandless well pipe, an inner filler filled in the steel casing and an outer filler laid around the steel casing, wherein the outer fillers are, from bottom to top, a concrete cushion layer, a waterproof layer, a fine stone concrete layer and a raft concrete layer, and an annular first steel bar frame and a second steel bar frame are provided on the outer wall of the steel casing, which are respectively located in the raft concrete layer and the concrete cushion layer, and a plurality of straight steel bars are arranged in a circular array between the first steel bar frame and the second steel bar frame with the axis of the steel casing as the rotation axis, the straight steel bars are parallel to the axis of the steel casing, and the lower ends thereof are inserted into the rock mass around the wellhead of the sandless well pipe.

[0007] Furthermore, the waterproof layer is a waterproof coiled material, which is sealed and connected to the outer wall of the steel casing and around the straight steel bars by hot-melt.

[0008] Furthermore, the steel casing is located in the raft concrete layer, and a first water stop ring and a second water stop ring are arranged at intervals in the portion located above the first reinforcement frame.

[0009] Furthermore, the upper end of the steel casing exceeds the raft concrete layer, and is provided with a top cover at the upper end. The periphery of the top cover is flush with the top of the raft concrete layer, and an anti-collision ring is provided above the top cover, and the anti-collision ring and the top cover are connected by multiple buffer support rods.

[0010] Furthermore, a threaded hole is provided at the end of the upper end of the steel casing, and a through hole is provided on the top cover at a position opposite to the threaded hole. The mounting bolt passes through the through hole and is connected to the threaded hole to fix the top cover to the top of the steel casing.

[0011] Furthermore, the inner filler in the steel casing is a crushed stone layer and a concrete filling layer from bottom to top, and a sealing steel plate is provided on the top of the concrete filling layer, and the sealing steel plate is flush with the top of the outer filler.

[0012] The beneficial effects of the present invention are as follows: by inserting the steel casing in the sandless well pipe, the reliability of the connection between the steel casing and the sandless well pipe can be increased, and the situation in which the steel casing is loosened from the sandless well pipe when subjected to external impact can be avoided, thereby ensuring the waterproof performance; the first steel frame, the second steel frame and the straight steel bars connected therebetween on the outer wall of the steel casing can increase the contact area between the steel casing and the concrete cushion layer and the raft concrete layer, and play the role of an internal connecting frame, which can make the connection between the concrete cushion layer, the waterproof layer, the fine stone concrete layer and the raft concrete layer tighter to form a whole; even if the foundation settles and deforms, the entire well sealing structure will rise and fall synchronously, and the waterproof layer will not be damaged due to the misalignment of the steel casing and the concrete layer, thereby improving the waterproof effect of the entire well sealing structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a front cross-sectional structural schematic diagram of the present invention;

[0014] Figure 2 For the present invention Figure 1 A schematic diagram of the enlarged structure of part A;

[0015] Figure 3 It is a schematic diagram of the local structure of the top cover of the present invention;

[0016] Marked in the figure are, 1-sandless well pipe, 2-concrete cushion layer, 3-waterproof layer, 4-fine stone concrete layer, 5-raft concrete layer, 6-first water stop ring, 7-second water stop ring, 8-top cover, 9-anti-collision ring, 10-sealing steel plate, 11-steel casing, 12-concrete filling layer, 13-gravel layer, 14-buffer support rod, 15-mounting bolt, 16-threaded hole, 17-through hole, 18-straight steel bar, 19-first steel bar frame, 20-second steel bar frame. DETAILED DESCRIPTION

[0017] The present invention is further described below in conjunction with the accompanying drawings.

[0018] It should be noted that if there are directional indication terms in the present invention, such as up, down, left, right, front, and back directions and orientation terms, they are for the purpose of facilitating the description of the relative position relationship between components, and are not specific to the absolute position of the related components or the position relationship between components. They are only used to explain the relative position relationship and movement of the components in a certain posture. If the specific posture changes, the directional indication will also change accordingly. If there are terms related to quantity in the present invention, such as "multiple", "multiple", "several", etc., they specifically refer to two or more.

[0019] like Figure 1 , Figure 2 As shown, a foundation pit pipe well post-sealing structure provided by the present invention includes a steel casing 11 inserted in a sandless well pipe 1, as well as an inner filler filled in the steel casing 11 and an outer filler laid around the steel casing 11, wherein the outer fillers are, from bottom to top, a concrete cushion layer 2, a waterproof layer 3, a fine stone concrete layer 4 and a raft concrete layer 5, and an annular first steel bar frame 19 and a second steel bar frame 20 are provided on the outer wall of the steel casing 11, which are respectively located in the raft concrete layer 5 and the concrete cushion layer 2, and a plurality of straight steel bars 18 are arranged in a circular array between the first steel bar frame 19 and the second steel bar frame 20 with the axis of the steel casing 11 as the rotation axis, and the straight steel bars 18 are parallel to the axis of the steel casing 11, and the lower ends thereof are inserted into the rock mass around the wellhead of the sandless well pipe 1.

[0020] The construction process of the present invention is: first, a steel casing 11 with an outer diameter the same as the inner diameter of the sandless well pipe 1 is inserted into the sandless well pipe 1, and the lower end of the straight steel bar 18 is inserted into the rock mass around the wellhead of the sandless well pipe 1 to realize the positioning and installation of the steel casing 11, and then the construction of the inner and outer fillers is carried out. When laying the outer filler, a layer of concrete cushion 2 is first laid, ensuring that the concrete cushion 2 is higher than the second steel frame 20, and then a waterproof layer 3 is laid on the concrete cushion 2, and then a protective layer of fine stone concrete layer 4 is laid, and the fine stone concrete layer 4 does not exceed the first steel frame 19. The fine stone concrete layer 4 and the concrete cushion 2 are mainly used to protect the middle waterproof layer 3, so the concrete is relatively fine, and finally the raft concrete layer 5 is laid. The first steel frame 19, the second steel frame 20 and the straight steel bars 18 connected therebetween on the outer wall of the steel casing 11 can increase the contact area between the steel casing 11 and the concrete cushion layer 2 and the raft concrete layer 5, and play the role of an internal connecting frame, which can make the connection between the concrete cushion layer 2, the waterproof layer 3, the fine stone concrete layer 4 and the raft concrete layer 5 tighter to form a whole. Even if the foundation settles and deforms, the entire well-sealing structure will rise and fall synchronously, and the waterproof layer 3 will not be damaged due to the misalignment of the steel casing 11 and the concrete layer, thereby improving the waterproof effect of the entire well-sealing structure.

[0021] For the inner filler in the steel casing 11, a structure of a crushed stone layer 13 and a concrete filling layer 12 can be adopted from bottom to top, and a sealing steel plate 10 is provided on the top of the concrete filling layer 12, and the sealing steel plate 10 is flush with the top of the outer filler. The crushed stone layer 13 can be used as a hydrophobic layer, and can also treat weak foundations, diffuse stress, accelerate the consolidation and settlement of the lower soil layer, and thus improve the bearing capacity of the shallow foundation below the bottom surface of the foundation. The sealing steel plate 10 plays a sealing role to prevent groundwater from seeping out from the inside of the steel casing 11.

[0022] For the waterproof layer 3, the present invention preferably uses a waterproof roll, which can be sealed and connected to the outer wall of the steel casing 11 and around the straight steel bars 18 by hot melting. The waterproof roll has certain flexibility and elasticity, can adapt to foundation settlement, and is connected to the outer wall of the steel casing 11 by hot melting, has good sealing performance, and can prevent groundwater from seeping out along the outer wall of the steel casing 11.

[0023] Furthermore, the first water stop ring 6 and the second water stop ring 7 are arranged at intervals in the steel casing 11 located in the raft concrete layer 5 and above the first steel frame 19. By arranging two water stop rings, even if some groundwater passes through the waterproof layer 3 and seeps upward along the steel casing 11, it can be blocked by the first water stop ring 6 and the second water stop ring 7, thereby increasing the seepage path and improving the waterproof effect.

[0024] In addition, since other constructions are to be carried out above the foundation pit, there is a possibility that the steel casing 11 will be impacted, causing the steel casing 11 to shake, and causing cracks between it and the inner and outer fillers. Therefore, in order to protect the steel casing 11, the upper end of the steel casing 11 is made to exceed the raft concrete layer 5, and a top cover 8 is provided at the upper end. The periphery of the top cover 8 is flush with the top of the raft concrete layer 5, and an anti-collision ring 9 is provided above the top cover 8. The anti-collision ring 9 and the top cover 8 are connected by a plurality of buffer rods 14. The diameter of the top cover 8 needs to be larger than the outer diameter of the steel casing 11 so as to protect the surrounding of the top of the steel casing 11. The buffer rods 14 and the anti-collision ring 9 are provided on the top of the top cover 8, which can buffer the impact from the top, avoid a large impact directly on the steel casing 11, and thus reduce the shaking of the steel casing 11 caused by the impact.

[0025] The specific installation method of the top cover 8 is as follows Figure 3 As shown, a threaded hole 16 is provided at the end of the upper end of the steel casing 11, and a through hole 17 is provided on the top cover 8 at a position opposite to the threaded hole 16. The mounting bolt 15 passes through the through hole 17 and is connected to the threaded hole 16, thereby fixing the top cover 8 on the top of the steel casing 11. The bolt connection is used, and the top cover can be easily replaced later.

Claims

1. A foundation pit pipe well post-sealing structure, comprising a steel casing (11) inserted in a sandless well pipe (1), an inner filler filled in the steel casing (11) and an outer filler laid around the steel casing (11), characterized in that: The external filler is composed of a concrete cushion layer (2), a waterproof layer (3), a fine stone concrete layer (4) and a raft concrete layer (5) from bottom to top. A first annular steel frame (19) and a second annular steel frame (20) are provided on the outer wall of the steel casing (11). The first annular steel frame (19) and the second annular steel frame (20) are located in the raft concrete layer (5) and the concrete cushion layer (2) respectively. A plurality of straight steel bars (18) are provided in an annular array between the first annular steel frame (19) and the second annular steel frame (20) with the axis of the steel casing (11) as the rotation axis. The straight steel bars (18) are parallel to the axis of the steel casing (11), and their lower ends are inserted into the rock mass around the wellhead of the sandless well pipe (1).

2. The post-sealing well structure for the foundation pit pipe well according to claim 1, characterized in that: The waterproof layer (3) is a waterproof coiled material, which is sealed and connected to the outer wall of the steel casing (11) and around the straight steel bars (18) by hot-melt method.

3. The post-sealing well structure for foundation pit pipe well according to claim 1, characterized in that: The steel casing (11) is located in the raft concrete layer (5), and a first water stop ring (6) and a second water stop ring (7) are arranged at intervals at a position above the first steel reinforcement frame (19).

4. The post-sealing well structure for a foundation pit pipe well according to claim 1, characterized in that: The upper end of the steel casing (11) exceeds the raft concrete layer (5), and a top cover (8) is provided at the upper end. The periphery of the top cover (8) is flush with the top of the raft concrete layer (5), and an anti-collision ring (9) is provided above the top cover (8). The anti-collision ring (9) and the top cover (8) are connected by a plurality of buffer support rods (14).

5. The post-sealing structure of the foundation pit pipe well according to claim 4, characterized in that: A threaded hole (16) is provided at the upper end of the steel casing (11), and a through hole (17) is provided on the top cover (8) at a position opposite to the threaded hole (16). The mounting bolt (15) passes through the through hole (17) and is connected to the threaded hole (16), thereby fixing the top cover (8) on the top of the steel casing (11).

6. The post-sealing well structure for foundation pit pipe well according to claim 1, characterized in that: The inner filler in the steel casing (11) is a crushed stone layer (13) and a concrete filling layer (12) from bottom to top, and a sealing steel plate (10) is provided on the top of the concrete filling layer (12), and the sealing steel plate (10) is flush with the top of the outer filler.

Citation Information

Patent Citations

  • Base pit dewatering and water saving device and construction method thereof

    CN101768976A

  • Well closing casing pipe used for dewatering well, dewatering well and well closing method for dewatering well

    CN104947700A

  • Underground works deep well precipitation well head shutoff structure

    CN204530733U

  • Water well structure falls

    CN208517959U

  • Anti-seismic low-carbon building structure

    CN209703684U

Cited By

  • Semi-detachable dewatering well sealing device and construction method

    CN120797719A