Fabricated structure with pipeline hole and implementation method

By opening holes on the main body of the stacked beam of the prefabricated garage and combining the assembly method of prefabricated columns and plates, the problem of exposed equipment pipelines is solved, and the hiding of pipelines and building aesthetics is improved. At the same time, the construction process is simplified and the improvement of the construction is improved. Safety and efficiency.

CN118911278APending Publication Date: 2024-11-08SHENZHEN TONGCHEN ARCHITECTURAL DESIGN CONSULTING CO LTD

Patent Information

Application Number
CN202411297706.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The equipment pipelines in the existing prefabricated garage are exposed, which affects the visual experience and is difficult to hide, resulting in poor overall aesthetics.

Method used

Design a prefabricated structure with pipeline openings, and create a hidden pipeline by opening a set sized hole on the main body of the overlapping beam for use in the equipment pipeline, and combine the assembly method of prefabricated columns, overlapping beams and prefabricated plates. design.

Benefits of technology

It realizes the concealment of equipment pipelines, improves the aesthetics of the building structure, and simplifies the construction process and improves construction efficiency and safety through the use of high-strength concrete and prefabricated parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911278A_ABST
    Figure CN118911278A_ABST
Patent Text Reader

Abstract

According to the fabricated structure with the pipeline hole and the implementation method, superposed beam prefabricated parts are in lap joint with brackets of prefabricated stand columns or prefabricated columns, and one or more prefabricated plates are arranged between the adjacent superposed beam prefabricated parts side by side; the two ends of the prefabricated plates are in lap joint with the adjacent composite beam prefabricated parts or the connecting supports of the composite beam prefabricated parts correspondingly, composite beam cast-in-place parts are formed on the composite beam prefabricated parts through the cast-in-place technology, and the composite beam prefabricated parts and the composite beam cast-in-place parts jointly form a composite beam body. A hole for penetrating through an equipment pipeline is formed in the superposed beam main body, and a load-bearing floor or roof is formed above the prefabricated slab through a cast-in-place process. When the main beam adopts the superposed beam design, large hole opening treatment can be carried out at a unified position, arrangement conditions can be provided for equipment pipelines, and the influence of the pipelines on the clear height is reduced. Equipment pipelines can penetrate through the holes, the influence of the pipelines on the clear height of the bottom of the beam is reduced, and the safety of the beam can be guaranteed by arranging the consistency of the holing parts.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention discloses a building structure, in particular to an assembled structure with pipeline openings and a realization method, belonging to the technical field of building engineering. Background Art

[0002] A prefabricated garage is a prefabricated building structure that is usually assembled on site from prefabricated components. This type of garage is usually made of steel, concrete or other durable materials. The advantages of prefabricated garages include fast construction speed, relatively low cost, easy quality control, and high flexibility. Taking prefabricated garages as an example, other prefabricated building structures have similar problems as prefabricated garages. During the construction of prefabricated garages, design and manufacturing work is usually carried out first, and then the prefabricated components are transported to the site, and then assembled and installed by a professional construction team. Compared with traditional on-site construction, this construction method can greatly shorten the construction period and reduce the chaos and waste on the construction site. In addition, prefabricated garages can be disassembled and reassembled at a later stage, and have a certain degree of portability and reusability.

[0003] The assembled garage in the prior art is usually composed of columns, beams and composite panels. Among them, the conventional prefabricated composite panels are flat plates with low rigidity. On the one hand, they are inconvenient during transportation and are easily damaged during transportation. On the other hand, they are also prone to breakage during construction, which is particularly unsuitable for locations with relatively large spans such as basements. Conventional prefabricated composite beams are usually rectangular in design and cannot provide temporary supports for secondary beams and floor slabs, causing many inconveniences in the construction of assembled garages. Conventional frame main beams are cast-in-place, with low strength of steel bars and concrete. If holes are opened on the beams, the overall rigidity of the beams will be weakened, resulting in large requirements for the cross-section of the beams in the calculation and uncontrollable measures for opening holes to strengthen the beams. If the holes are not considered on the beams, the equipment pipelines must go through the bottom of the beams. The exposed equipment pipelines usually pass through the bottom of the beams, which will affect the visual experience of the entire garage, thereby greatly reducing the first impression. How to achieve a garage with a hidden pipeline structure has become an urgent problem to be solved in this field. Summary of the invention

[0004] In response to the above-mentioned shortcomings of exposed equipment pipelines and poor visual experience in prefabricated building structures in the prior art, the present invention provides a prefabricated structure with pipeline openings and an implementation method, which has openings of a set size on the composite beam body for running equipment pipelines, etc., and can achieve a relatively hidden design of the pipelines, making the entire building structure more beautiful as a whole.

[0005] The technical solution adopted by the present invention to solve its technical problems is: an assembled structure with pipeline openings, the structure includes prefabricated columns, prefabricated parts of composite beams, cast-in-place parts of composite beams and prefabricated panels, the prefabricated parts of composite beams are overlapped on the corbels of prefabricated columns or prefabricated columns, more than one prefabricated panels are arranged side by side between adjacent prefabricated parts of composite beams, and the two ends of the prefabricated panels are respectively overlapped on the connecting supports of adjacent prefabricated parts of composite beams or prefabricated parts of composite beams, the cast-in-place part of the composite beam is formed on the prefabricated part of the composite beam by a cast-in-place process, the prefabricated part of the composite beam and the cast-in-place part of the composite beam together constitute the main body of the composite beam, the main body of the composite beam is provided with openings for passing equipment pipelines, and a load-bearing floor or roof is formed above the prefabricated panels by a cast-in-place process.

[0006] A method for realizing an assembled structure with a pipeline opening, the method comprising the following steps: Step S1, pouring the structural floor of the entire garage, and making a "cup mouth" foundation at the corresponding position where the prefabricated columns are installed; Step S2, hoisting the prefabricated columns and inserting them into the "cup mouth" foundation to complete the installation of the prefabricated columns; Step S3, placing the prefabricated part of the composite beam on the prefabricated column, and welding the bottom reinforcement of the prefabricated part of the composite beam to the vertical reinforcement of the prefabricated column; Step S4, placing the prefabricated plate on the upper part of the prefabricated part of the composite beam; Step S5, hanging the Y-axis secondary beam formwork and tying the steel bars; Step S6, tying the slab surface reinforcement and pouring concrete.

[0007] The technical solution adopted by the present invention to solve the technical problem further includes: The structural dimensions of the opening are that the length is less than or equal to 1 / 6 of the span of the composite beam body, and the height is less than or equal to 2 / 5 of the height of the composite beam body. The thickness of the concrete layer of the composite beam body on the upper and lower sides of the opening is at least 2 / 5 of the height of the composite beam body, respectively. The opening corresponds to the precast panel.

[0008] The prefabricated part of the composite beam comprises a main body of the prefabricated part of the composite beam, top exposed steel bars, a steel cage, four corner steel bars, side exposed steel bars, middle reinforcing steel bars, top reinforcing steel bars and bottom reinforcing steel bars. The steel cage and the four corner steel bars are tied together to form a supporting main body of the prefabricated part of the composite beam. The top exposed steel bars are arranged in the main body of the prefabricated part of the composite beam, and part of them extend to the outside of the top of the main body of the prefabricated part of the composite beam. The top surface of the main body of the prefabricated part of the composite beam forms a cantilever on both sides corresponding to the top exposed steel bars. The side exposed steel bars, the middle reinforcing steel bars, the top reinforcing steel bars and the bottom reinforcing steel bars are all arranged parallel to the length direction of the main body of the prefabricated part of the composite beam. The side exposed steel bars and the bottom reinforcing steel bars are arranged at the bottom of the inner side of the steel cage, the middle reinforcing steel bars are arranged in the middle position of the inner side of the steel cage, and the top reinforcing steel bars are arranged at the top of the inner side of the steel cage.

[0009] The main body of the composite beam prefabricated part has a width of more than 200 mm and a height of more than 250 mm, and an opening having no more than 1 / 2 of the height of the composite beam prefabricated part is opened on the main body of the composite beam prefabricated part.

[0010] The steel cage is surrounded by a rectangular structure, with four steel bars at the four corners, which are respectively arranged at the four corners of the steel cage, more than two exposed steel bars at the top, more than two top reinforcing steel bars, more than two top reinforcing steel bars, more than one row of middle reinforcing steel bars, more than one steel bar in each row, four exposed steel bars on the side, one to four bottom reinforcing steel bars, the exposed side steel bars are respectively arranged corresponding to the positions of the top reinforcing steel bars, the bottom reinforcing steel bars are arranged between adjacent exposed side steel bars, and one or two bottom reinforcing steel bars are arranged between the exposed side steel bars.

[0011] A keyway is provided in the middle of the end surface of the main body of the prefabricated composite beam part, the width of the keyway is not less than 1 / 2 of the prefabricated composite beam part, and the height is not less than 1 / 2 of the prefabricated composite beam part.

[0012] The prefabricated panel adopts a groove plate, which includes a transverse plate and a rib plate. The rib plate is fixedly connected to both sides of the transverse plate. The transverse plate is embedded with a middle connecting steel bar, and part of the middle connecting steel bar is exposed at the top of the transverse plate. The prefabricated panel is embedded with side connecting steel bars, and part of the side connecting steel bars is exposed at the top of the transverse plate. The side connecting steel bars are arranged corresponding to the position of the rib plate.

[0013] The cross section of the rib plate is in the shape of a right-angled trapezoid, and a support foot is fixedly arranged on the outer side of the bottom of the rib plate.

[0014] The intermediate connecting steel bar is in a "V" shape, with both ends arranged in the transverse plate, and the sharp corners of the triangle are exposed at the top of the transverse plate. A first longitudinal steel bar is arranged in the transverse plate, and the first longitudinal steel bar is arranged corresponding to the end position of the intermediate connecting steel bar. A second longitudinal steel bar is arranged in the transverse plate, and the second longitudinal steel bar is arranged corresponding to the middle position of the adjacent intermediate connecting steel bars. A third longitudinal steel bar is arranged in the transverse plate, and the third longitudinal steel bar is arranged corresponding to the end positions on both sides of the transverse plate, and two third longitudinal steel bars are arranged on each side. A fourth longitudinal steel bar is arranged in the rib plate, and the fourth longitudinal steel bar is arranged at the bottom of the support leg. There are more than two fourth longitudinal steel bars in the single-side support leg.

[0015] The beneficial effect of the present invention is that when the main beam adopts the composite beam design, the opening can be processed at a uniform position, which can provide layout conditions for equipment pipelines and reduce the influence of pipelines on the net height. The equipment pipelines can pass through the openings, reducing the influence of pipelines on the net height of the bottom of the beam, and the consistency of the opening position can ensure the safety of the beam.

[0016] The present invention does not require formwork for beam and slab construction. The prefabricated part of the composite beam can be temporarily supported on the prefabricated column or the corbel of the prefabricated column, and the prefabricated trough plate can be temporarily supported on the lug of the prefabricated part of the composite beam. The on-site installation is relatively efficient. After the prefabricated part of the composite beam is hoisted to the top of the prefabricated column, the bottom reinforcement of the continuous beam is welded to each other, and the trough plate is hoisted to the lug of the prefabricated part of the composite beam, and then the next step of the construction of the cast-in-place reinforced concrete of the beam and slab can be carried out.

[0017] When installing the columns in the present invention, the cup-shaped foundation is combined with the installation conditions, and there is no need for steel bar alignment and grouting in the holes; at the same time, the reserved corbels on the top of the columns provide temporary fulcrums for the prefabricated parts of the composite beams, which can simplify the layout of the construction scaffolding. The present invention sets corbels in the direction of the composite beams, which is convenient for factory prefabrication and stacking; the use of high-strength concrete can reduce damage caused by collisions during transportation; combined with the foundation form, the on-site installation is relatively efficient. The main work at the installation site is only to hoist the prefabricated columns into the cup-shaped foundation, and the construction of the columns can be basically completed; the corbels on the top of the columns provide temporary support for the prefabricated parts of the composite beams, and there are no dense steel bar heads at the beam-column nodes as in the conventional prefabricated parts of bidirectional composite beams, so the construction is relatively simple.

[0018] The prefabricated parts of the present invention have a high degree of standardization, which is conducive to the use of high-strength materials, good waterproofing effect and short construction period. The present invention adopts a prefabricated structure to form prefabricated components in the factory, so that high-strength concrete can obtain relatively good curing conditions and is not easily damaged during transportation. Prefabricated trough plates can use high-strength steel bars such as T63 and steel strands to reduce steel consumption, save materials and reduce carbon. After using high-strength steel bars, the number of steel bars in the components is reduced, which is convenient for on-site installation.

[0019] The present invention will be further described below in conjunction with the accompanying drawings and specific implementation methods. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the cross-sectional structure of the superimposed position of the prefabricated panels in the present invention.

[0021] Figure 2 It is a schematic diagram of the cross-sectional structure of the main part of the composite beam in the present invention.

[0022] Figure 3 It is a schematic diagram of the cross-sectional structure of the overlapping position of the rib beams of the prefabricated plate in the present invention.

[0023] Figure 4 It is a schematic diagram of the cross-sectional structure of the connection portion in the present invention when viewed from above.

[0024] Figure 5 It is a schematic diagram of the cross-sectional structure of the connection portion in the present invention when viewed from above.

[0025] Figure 6 It is a schematic diagram of the connection structure at the height difference of the prefabricated panels of the present invention.

[0026] Figure 7 This is a schematic diagram of the large-scale structure of the connection between the long side of the precast panel and the cast-in-place section in the present invention.

[0027] Figure 8 It is a schematic diagram of the side structure of the prefabricated panel in the present invention.

[0028] Fig. 9 It is a schematic cross-sectional structure diagram of a first embodiment of a prefabricated panel in the present invention.

[0029] Fig.10 It is a schematic diagram of the cross-sectional structure of the second embodiment of the prefabricated panel in the present invention.

[0030] Fig.11 It is a schematic diagram of the side view structure of the prefabricated part of the composite beam in the present invention.

[0031] Fig.12 This is a schematic cross-sectional structure diagram of an embodiment 1 of the prefabricated part of the composite beam in the non-civil defense area of ​​the present invention.

[0032] Fig.13 This is a schematic diagram of the cross-sectional structure of the second embodiment of the prefabricated part of the composite beam in the non-civil defense area of ​​the present invention.

[0033] Fig.14 It is a schematic diagram of the cross-sectional structure of the third embodiment of the prefabricated part of the composite beam in the non-civil defense area of ​​the present invention.

[0034] Fig.15 It is a schematic diagram of the cross-sectional structure of the opening positions of the prefabricated part of the composite beam in the non-civil defense area in the present invention.

[0035] Fig.16 It is a schematic diagram of the cross-sectional structure of the prefabricated part of the composite beam in the non-civil defense area of ​​the present invention where the hole is not opened.

[0036] Fig.17 This is a schematic diagram of the front view structure of the prefabricated part of the composite beam in the non-civil defense area of ​​the present invention.

[0037] Fig.18 It is a schematic cross-sectional structure diagram of a first embodiment of the prefabricated part of the composite beam in the civil air defense area of ​​the present invention.

[0038] Fig.19 This is a schematic diagram of the cross-sectional structure of the second embodiment of the prefabricated part of the composite beam in the civil air defense area of ​​the present invention.

[0039] Fig. 20 It is a schematic diagram of the cross-sectional structure of the opening positions of the prefabricated part of the composite beam in the civil air defense area of ​​the present invention.

[0040] Fig.21 It is a schematic diagram of the cross-sectional structure of the prefabricated part of the composite beam in the civil air defense area of ​​the present invention where no hole is opened.

[0041] Fig. 22This is a front view structural schematic diagram of the prefabricated part of the composite beam in the civil air defense area of ​​the present invention (connection support position).

[0042] In the figure, 1-precast column, 11-corbel, 2-precast part of composite beam, 21-main body of precast part of composite beam, 22-exposed steel bar on top, 23-ear, 24-keyway, 25-exposed steel bar on side, 26-steel cage, 27-corner steel bar, 28-middle reinforcing steel bar, 29-top reinforcing steel bar, 210-bottom reinforcing steel bar, 3-precast slab, 31-cross slab, 32-rib plate, 33-support foot, 34-connection position, 35-middle connecting steel bar, 36-side connecting steel bar, 37-first longitudinal steel bar, 38-second longitudinal steel bar, 39-third longitudinal steel bar, 310-fourth longitudinal steel bar, 4-cast-in-place part of composite beam, 5-roof, 6-joint, 7-opening. DETAILED DESCRIPTION

[0043] This embodiment is a preferred implementation mode of the present invention. Other embodiments whose principles and basic structures are the same or similar to those of this embodiment are within the protection scope of the present invention.

[0044] Please refer to the attached Figure 1 To Attachment Fig. 22 The present invention mainly protects an assembled structure with a pipeline opening in the opening, which mainly includes a prefabricated column 1, a prefabricated part 2 of a composite beam, a cast-in-place part 4 of a composite beam and a prefabricated plate 3. The prefabricated part 2 of the composite beam is overlapped on the corbel 11 of the prefabricated column 1. In specific implementation, the prefabricated column 1 may not be provided with a corbel, and the prefabricated part 2 of the composite beam may be directly overlapped on the prefabricated column 1. In this embodiment, the corbel 11 should be understood in a broad sense. In addition to the common building column corbel structure, other protruding structures with supporting and bearing functions should also be understood as the corbel in the present invention. The above precast panels 3 are arranged side by side between adjacent precast parts 2 of composite beams, and the two ends of the precast panels 3 are respectively overlapped on the adjacent precast parts 2 of composite beams, and the cast-in-place part 4 of the composite beam is formed on the precast parts 2 of the composite beams by a cast-in-place process. The precast parts 2 of the composite beams and the cast-in-place part 4 of the composite beams together constitute the main body of the composite beam, and the main body of the composite beams is provided with openings 7 for passing equipment pipelines. A roof 5 is formed above the precast panels 3 by a cast-in-place process. In this embodiment, the roof is taken as an example for explanation. In specific implementation, a load-bearing floor or other roof structure can also be formed above the precast panels 3.

[0045] In this embodiment, the structural dimensions of the opening 7 are that the length is less than or equal to 1 / 6 of the span of the composite beam body, the height is less than or equal to 2 / 5 of the height of the composite beam body, the thickness of the concrete layer of the composite beam body on the upper and lower sides of the opening 7 is at least 2 / 5 of the height of the composite beam body, and the opening 7 is opened corresponding to the precast plate 3. Taking a 10.3-meter-long composite beam as an example, the maximum structural dimensions of the opening 7 are 1600 mm in length and 400 mm in height, which can fully meet the requirements for the passage of general water, electricity, and equipment pipelines. The main crossbeams on the upper and lower sides of the opening 7 have at least 350 mm thick concrete layers to ensure the strength of the composite beam body at the opening 7.

[0046] In this embodiment, the prefabricated plate 3 adopts a groove-type prefabricated plate, which can also be called a groove plate. The opening 7 is preferably opened corresponding to the groove plate so that the opening 7 is opposite to the groove on the groove plate. In specific implementation, the prefabricated plate 3 can also adopt other forms of prefabricated plates, such as: flat plate, etc.

[0047] In this embodiment, the composite beam prefabricated part 2 mainly includes a composite beam prefabricated part body 21, top exposed steel bars 22, a steel cage 26, four corner steel bars 27, side exposed steel bars 25, middle reinforcing steel bars 28, top reinforcing steel bars 29 and bottom reinforcing steel bars 210. The steel cage 26 and the four corner steel bars 27 are tied together to form a supporting body of the composite beam prefabricated part 2. Concrete is poured in the supporting body to form the composite beam prefabricated part body 21. The top exposed steel bars 22 are arranged in the composite beam prefabricated part body 21, and part of them extend to the outside of the top of the composite beam prefabricated part body 21. The top surface of the composite beam prefabricated part body 21 corresponds to the top The exposed steel bars 22 form a cantilever 23 on both sides, which is used to place the prefabricated prefabricated panels. In this embodiment, In the embodiment, the ear 23 should be interpreted in a broad sense. In addition to the conventional ear structure shown in this embodiment, it can also be other side protruding structures. As long as it can be used to place and support the structure of the precast plate, it should be understood as the ear structure in the present invention. The side exposed steel bars 25, the middle reinforcing steel bars 28, the top reinforcing steel bars 29 and the bottom reinforcing steel bars 210 are all arranged parallel to the length direction of the main body 21 of the precast part of the composite beam. The side exposed steel bars 25 and the bottom reinforcing steel bars 210 are arranged at the bottom of the inner side of the steel cage 26, the middle reinforcing steel bars 28 are arranged in the middle position of the inner side of the steel cage 26, and the top reinforcing steel bars 29 are arranged at the top of the inner side of the steel cage 26. The precast part 2 of the composite beam adopts an inverted T-shaped structure design, and the ear 23 of the flange can be used to place the precast plate 3.

[0048] In this embodiment, the width of the main body 21 of the prefabricated part of the composite beam is more than 200mm, preferably 650mm~850mm, and the height is more than 250mm, preferably 300~550mm, which can be determined according to needs. When it is used in non-civil defense areas, its width can be 800mm, and when it is used in civil defense areas, its width can be 850mm, and the height is preferably 450mm. If an opening 7 is opened at the corresponding position, the height of the corresponding position is preferably 350mm, that is, the opening 7 has no more than 1 / 2 of the height of the prefabricated part of the composite beam opened on the main body 21 of the prefabricated part of the composite beam. In this embodiment, a height of 100mm is opened on the main body 21 of the prefabricated part of the composite beam.

[0049] In this embodiment, the steel cage 26 is surrounded by a rectangular structure, and four corner steel bars 27 are provided, which are respectively provided at the four corners of the steel cage 26. The four corner steel bars 27 are preferably φ12 steel bars, that is, the diameter of the four corner steel bars 27 is preferably 12 mm.

[0050] In the present embodiment, more than two exposed top steel bars 22 are provided, and four are provided in the present embodiment. More than two top reinforcing steel bars 29 are also provided, and four are provided in the present embodiment. More than two top reinforcing steel bars 29 are provided. In the present embodiment, the top reinforcing steel bars 29 are preferably provided corresponding to the top exposed top steel bars 22. The top reinforcing steel bars 29 are preferably φ16 steel bars, that is, the diameter of the top reinforcing steel bars 29 is preferably 16 mm.

[0051] In this embodiment, more than one row of intermediate reinforcing steel bars 28 may be provided according to actual needs, and each row may have more than one steel bar. In this embodiment, fifteen to twenty-seven steel bars are provided, and three rows are preferably provided, and each row may have five to nine steel bars according to actual needs. The intermediate reinforcing steel bars 28 are preferably φ12.7 steel bars, that is, the diameter of the intermediate reinforcing steel bars 28 is preferably 12.7 mm.

[0052] In this embodiment, four side exposed steel bars 25 are provided, and one to four bottom reinforcing steel bars 210 are provided. The side exposed steel bars 25 are provided at positions corresponding to the top reinforcing steel bars 29, and the bottom reinforcing steel bars 210 are provided between adjacent side exposed steel bars 25. One or two bottom reinforcing steel bars 210 may be provided between the side exposed steel bars 25, or none may be provided. In this embodiment, the side exposed steel bars 25 and the bottom reinforcing steel bars 210 are preferably steel bars of φ25, that is, the diameters of the side exposed steel bars 25 and the bottom reinforcing steel bars 210 are preferably 25 mm.

[0053] In this embodiment, a key groove 24 is opened in the middle position of the end surface of the main body 21 of the prefabricated part of the composite beam. The width of the key groove 24 is not less than 1 / 2 of the prefabricated part of the composite beam, and the height is not less than 1 / 2 of the prefabricated part of the composite beam. In this embodiment, the key groove 24 is preferably 450mm wide and 140mm high.

[0054] In this embodiment, the prefabricated panel 3 preferably adopts a groove plate, which includes a transverse plate 31 and a rib plate 32. The rib plate 32 is fixedly connected to both sides of the transverse plate 31. The transverse plate 31 is embedded with a middle connecting steel bar 35, and part of the middle connecting steel bar 35 is exposed at the top of the transverse plate 31. The prefabricated panel is embedded with side connecting steel bars 36, and part of the side connecting steel bars 36 is exposed at the top of the transverse plate 31. The side connecting steel bars 36 are arranged at the position corresponding to the rib plate 32.

[0055] In this embodiment, the cross-section of the rib 32 is in the shape of a right-angled trapezoid. The connection between the rib 32 and the cross plate 31 is defined as a connection position 34. The connection position 34 is in an arc shape, which can enhance the strength of this part on the one hand and reduce the stress accumulation of this part on the other hand.

[0056] In this embodiment, a support foot 33 is fixedly provided on the outer side of the bottom of the rib plate 32, which can increase the contact area between the rib plate 32 and the connecting surface, thereby increasing its stability.

[0057] In this embodiment, the middle connecting steel bar 35 is in a "V" shape, with both ends arranged in the horizontal plate 31, and the triangular sharp corners are exposed at the top of the horizontal plate 31. The first longitudinal steel bar 37 is arranged in the horizontal plate 31, and the first longitudinal steel bar 37 is arranged at the position corresponding to the end of the middle connecting steel bar 35. In this embodiment, the spacing of the middle connecting steel bars 35 in the horizontal direction is 35-45CM, preferably 40CM.

[0058] In this embodiment, a second longitudinal steel bar 38 is provided in the transverse plate 31. The second longitudinal steel bar 38 is provided at the middle position corresponding to the adjacent middle connecting steel bars 35. The horizontal spacing of the second longitudinal steel bars 38 is 35-45CM, preferably 40CM.

[0059] In this embodiment, a third longitudinal steel bar 39 is provided in the transverse plate 31, and the third longitudinal steel bar 39 is provided at the end positions on both sides of the transverse plate 31, and two third longitudinal steel bars 39 are provided on each side. A fourth longitudinal steel bar 310 is provided in the rib plate 32, and the fourth longitudinal steel bar 310 is provided at the bottom of the support leg 33. There are more than two fourth longitudinal steel bars 310 provided in the single-side support leg 33, preferably two or four. In this embodiment, the side connecting steel bar 36 is in the shape of a right-angled trapezoid, the fourth longitudinal steel bar 310 is provided at the inner side of the bottom of the side connecting steel bar 36, and the third longitudinal steel bar 39 is provided at the inner side of the top of the side connecting steel bar 36.

[0060] The present invention also protects a method for realizing a prefabricated structure with a pipeline opening, that is, a construction method of the prefabricated structure, which comprises the following steps: Step S1, pouring the structural base plate of the entire structure, and making a "cup mouth" foundation at the corresponding position of the prefabricated column 1 for subsequent installation of the prefabricated column 1; Step S2, hoisting the prefabricated column 1 and inserting it into the "cup mouth" foundation to complete the installation of the prefabricated column 1. A steel bar alignment hole needs to be reserved at the bottom of a conventional prefabricated column, and the grouting is not dense after the prefabricated column is in place. When installing the prefabricated column 1 in the present invention, combined with the situation of the cup mouth foundation, there is no need for steel bar alignment and grouting in the hole, and the prefabricated column 1 can be directly inserted into the cup mouth; at the same time, a corbel 11 is reserved at the top of the prefabricated column 1 in this embodiment, which provides a temporary fulcrum for the prefabricated main beam and simplifies the arrangement of the construction scaffolding. The prefabricated column 1 is only provided with a corbel 11 in the direction of the composite beam, which is convenient for factory prefabrication and stacking. In specific implementation, the corbel may not be provided, and the prefabricated part of the composite beam may be directly overlapped on the prefabricated column 1; the use of high-strength concrete can reduce damage caused by collisions during transportation; combined with the foundation form, the on-site installation is relatively efficient. In this embodiment, the main work on site is only to hoist the prefabricated columns into the cup mouth, and the construction of the columns can be basically completed; the column top bracket provides temporary support for the prefabricated part of the composite beam, and there is no dense steel bar head at the beam-column node as in the conventional prefabricated part of the bidirectional composite beam, so the construction is relatively simple; Step S3, placing the X-axis main beam prefabricated part, that is, the composite beam prefabricated part 2, on the prefabricated column 1, and welding the bottom reinforcement of the composite beam prefabricated part 2 to the vertical reinforcement of the prefabricated column 1; Step S4, the prefabricated plate 3 is placed on the upper part of the prefabricated part 2 of the composite beam. The prefabricated plate 3 is a prefabricated component in the factory. The high-strength concrete is used for relatively good curing conditions and is not easy to be damaged during transportation. The prefabricated part 2 of the composite beam and the prefabricated plate 3 can both use high-strength steel bars such as T63 and steel strands to reduce the amount of steel used, save materials and reduce carbon. After using high-strength steel bars, the number of steel bars in the component is reduced, which is convenient for on-site installation; Step S5, Y-direction secondary beam formwork hanging and steel bar tying. In the present invention, only one direction uses the composite beam prefabricated part 2, and there is no cross-reinforcement phenomenon of the composite beam prefabricated part, which is convenient for construction; the other direction uses the cast-in-place part, and the steel bars are made and installed on site, which is flexible and simple; Step S6, tying the slab surface reinforcement and pouring concrete to form the joints 6 between adjacent precast slabs 3 and the roof 5.

[0061] The building structure of the present invention can be applied to garages, warehouses or other buildings where equipment pipelines need to pass through.

[0062] When the main beam of the present invention adopts a composite beam design, openings can be made at a uniform position, which can provide layout conditions for equipment pipelines and reduce the impact of pipelines on the net height. Equipment pipelines can pass through the openings to reduce the impact of pipelines on the net height of the bottom of the beam, and the consistency of the opening positions can ensure the safety of the beam.

[0063] The present invention does not require formwork for beam and slab construction. The prefabricated part of the composite beam can be temporarily supported on the prefabricated column or the corbel of the prefabricated column, and the prefabricated trough plate can be temporarily supported on the lug of the prefabricated part of the composite beam. The on-site installation is relatively efficient. After the prefabricated part of the composite beam is hoisted to the top of the prefabricated column, the bottom reinforcement of the continuous beam is welded to each other, and the trough plate is hoisted to the lug of the prefabricated part of the composite beam, and then the next step of the construction of the cast-in-place reinforced concrete of the beam and slab can be carried out.

[0064] When installing the columns in the present invention, the cup-shaped foundation is combined with the situation, and there is no need for steel bar alignment and grouting in the holes; at the same time, the reserved corbels on the top of the columns provide temporary fulcrums for the prefabricated parts of the composite beams, which can simplify the layout of the construction scaffolding. The present invention sets corbels in the direction of the composite beams, which is convenient for factory prefabrication and stacking; the use of high-strength concrete can reduce damage caused by collisions during transportation; combined with the foundation form, the on-site installation is relatively efficient. The main work at the installation site is only to hoist the prefabricated columns into the cup-shaped foundation, and the construction of the columns can be basically completed; the corbels on the top of the columns provide temporary support for the prefabricated parts of the composite beams, and there are no dense steel bar heads at the beam-column nodes as in the conventional prefabricated parts of bidirectional composite beams, so the construction is relatively simple. The prefabricated parts of the present invention have a high degree of standardization, which is conducive to the use of high-strength materials, good waterproofing effect and short construction period.

[0065] The prefabricated parts of the present invention have a high degree of standardization, which is conducive to the use of high-strength materials, good waterproofing effect and short construction period. The present invention adopts a prefabricated structure to form prefabricated components in the factory, so that high-strength concrete can obtain relatively good curing conditions and is not easily damaged during transportation. Prefabricated trough plates can use high-strength steel bars such as T63 and steel strands to reduce steel consumption, save materials and reduce carbon. After using high-strength steel bars, the number of steel bars in the components is reduced, which is convenient for on-site installation.

[0066] The invention adopts the manufacturing of prefabricated columns, beams and plates, which can be carried out synchronously with the foundation construction or even in advance, and the hoisting speed is fast, which can save 20 days of the traditional formwork and steel bar construction time, save the formwork construction time, save 30 days of demoulding and maintenance time, and the underground garage can be delivered and put into use in advance. The progress of the prefabricated components of the invention is not affected by environmental protection and weather. At the same time, the construction of the outdoor garden in advance can shorten the total construction period, cancel the decoration time such as plastering of the underground garage, save 30 to 60 days of construction time, and the installation of the underground garage pipeline can be synchronized with the upper soil covering garden (reducing the concrete temperature stress shrinkage time), saving 60 days of cross construction time, so that the underground garage can be delivered and put into use in advance.

Claims

1. An assembled structure with pipeline openings, characterized by: The structure comprises a prefabricated column (1), a prefabricated part of a composite beam (2), a cast-in-place part of a composite beam (4) and a prefabricated plate (3). The prefabricated part of the composite beam (2) is overlapped on the corbel (11) of the prefabricated column (1) or the prefabricated column. One or more prefabricated plates (3) are arranged side by side between adjacent prefabricated parts of the composite beam (2), and both ends of the prefabricated plates (3) are overlapped on adjacent prefabricated parts of the composite beam (2) or the connecting supports of the prefabricated parts of the composite beam. The cast-in-place part (4) of the composite beam is formed on the prefabricated part of the composite beam (2) by a cast-in-place process. The prefabricated part (2) of the composite beam and the cast-in-place part (4) of the composite beam together constitute a composite beam body. An opening (7) for passing equipment pipelines is opened on the composite beam body. A load-bearing floor or roof (5) is formed above the prefabricated plate (3) by a cast-in-place process.

2. The assembled structure with pipeline openings according to claim 1 is characterized in that: The structural dimensions of the opening (7) are that its length is less than or equal to 1 / 6 of the span of the composite beam body, and its height is less than or equal to 2 / 5 of the height of the composite beam body. The thickness of the concrete layer of the composite beam body on the upper and lower sides of the opening (7) is at least 2 / 5 of the height of the composite beam body. The opening (7) is opened corresponding to the precast panel (3).

3. The assembled structure with pipeline openings according to claim 1 is characterized in that: The composite beam prefabricated part (2) comprises a composite beam prefabricated part body (21), top exposed steel bars (22), a steel cage (26), four corner steel bars (27), side exposed steel bars (25), middle reinforcing steel bars (28), top reinforcing steel bars (29) and bottom reinforcing steel bars (210). The steel cage (26) and the four corner steel bars (27) are tied together to form a supporting body of the composite beam prefabricated part (2). The top exposed steel bars (22) are arranged in the composite beam prefabricated part body (21) and partially extend outward from the top of the composite beam prefabricated part body (21). The top surface of the prefabricated part body (21) forms a cantilever (23) on both sides corresponding to the top exposed steel bars (22); the side exposed steel bars (25), the middle reinforcing steel bars (28), the top reinforcing steel bars (29) and the bottom reinforcing steel bars (210) are all arranged parallel to the length direction of the prefabricated part body (21) of the composite beam; the side exposed steel bars (25) and the bottom reinforcing steel bars (210) are arranged at the bottom of the inner side of the steel cage (26); the middle reinforcing steel bars (28) are arranged at the middle position of the inner side of the steel cage (26); and the top reinforcing steel bars (29) are arranged at the top of the inner side of the steel cage (26).

4. The assembled structure with pipeline openings according to claim 3 is characterized in that: The width of the composite beam prefabricated part body (21) is greater than 200 mm and the height is greater than 250 mm. The opening (7) is opened on the composite beam prefabricated part body (21) at a length not exceeding 1 / 2 of the composite beam prefabricated part height.

5. The assembled structure with pipeline openings according to claim 3 is characterized in that: The steel cage (26) is surrounded by a rectangular structure, four corner steel bars (27) are provided, which are respectively provided at the four corners of the steel cage (26), two or more top exposed steel bars (22) are provided, two or more top reinforcing steel bars (29) are provided, two or more top reinforcing steel bars (29) are provided, more than one row of middle reinforcing steel bars (28) are provided, each row has more than one, four side exposed steel bars (25) are provided, one to four bottom reinforcing steel bars (210) are provided, the side exposed steel bars (25) are respectively provided at the positions corresponding to the top reinforcing steel bars (29), the bottom reinforcing steel bars (210) are provided between adjacent side exposed steel bars (25), and one or two bottom reinforcing steel bars (210) are provided between the side exposed steel bars (25).

6. The assembled structure with pipeline openings according to claim 3 is characterized in that: A key slot (24) is provided in the middle of the end surface of the main body (21) of the composite beam prefabricated part. The key slot (24) has a width not less than 1 / 2 of the composite beam prefabricated part and a height not less than 1 / 2 of the composite beam prefabricated part.

7. The assembled structure with pipeline openings according to claim 1 is characterized in that: The prefabricated plate (3) adopts a groove plate, which includes a transverse plate (31) and a rib plate (32). The rib plate (32) is fixedly connected to both sides of the transverse plate (31). The transverse plate (31) is embedded with a middle connecting steel bar (35), and the middle connecting steel bar (35) is partially exposed at the top of the transverse plate (31). The prefabricated plate is embedded with a side connecting steel bar (36), and the side connecting steel bar (36) is partially exposed at the top of the transverse plate (31). The side connecting steel bar (36) is arranged at a position corresponding to the rib plate (32).

8. The assembled structure with pipeline openings according to claim 7 is characterized in that: The cross section of the rib plate (32) is in the shape of a right-angled trapezoid, and a support foot (33) is fixedly provided on the outer side of the bottom of the rib plate (32).

9. The assembled structure with pipeline openings according to claim 7 is characterized in that: The intermediate connecting steel bar (35) is in a "V" shape, with both ends arranged in the transverse plate (31), and the triangular sharp corner is exposed at the top of the transverse plate (31). A first longitudinal steel bar (37) is arranged in the transverse plate (31), and the first longitudinal steel bar (37) is arranged at a position corresponding to the end of the intermediate connecting steel bar (35). A second longitudinal steel bar (38) is arranged in the transverse plate (31), and the second longitudinal steel bar (38) is arranged at a position corresponding to the middle of adjacent intermediate connecting steel bars (35). A third longitudinal steel bar (39) is arranged in the transverse plate (31), and the third longitudinal steel bar (39) is arranged at positions corresponding to the ends of both sides of the transverse plate (31), and two third longitudinal steel bars (39) are arranged on each side. A fourth longitudinal steel bar (310) is arranged in the rib plate (32), and the fourth longitudinal steel bar (310) is arranged at the bottom of the support foot (33). Two or more fourth longitudinal steel bars (310) are arranged in the support foot (33) on one side.

10. A method for realizing an assembled structure with pipeline openings, characterized in that: The method comprises the following steps: Step S1, pouring the structural base plate of the entire structure, and making a "cup mouth" foundation at the corresponding position of the prefabricated column (1); Step S2, hoisting the prefabricated column (1) and inserting it into the "cup mouth" foundation to complete the installation of the prefabricated column (1); Step S3, placing the prefabricated part of the composite beam (2) on the prefabricated column (1), and welding the bottom reinforcement of the prefabricated part of the composite beam (2) to the vertical reinforcement of the prefabricated column (1); Step S4, the prefabricated plate (3) is placed on the upper part of the prefabricated part (2) of the composite beam; Step S5, hanging the Y-axis secondary beam formwork and tying the steel bars; Step S6, tying the slab surface reinforcement and pouring concrete.

Citation Information

Patent Citations

  • Prefabricated hollow superposed beam, and cast-in-situ construction method for beam and precast slab

    CN101487332A

  • Pipeline-separated fabricated invisible beam laminated floor slab installed from top to bottom

    CN109707091A

  • Fabricated concrete superposed beam and construction method thereof

    CN111809796A

  • Laminated beam structure based on precast beam and slab units and construction method of laminated beam structure

    CN116677138A

  • Prefabricated large-opening partially-coated steel reinforced concrete beam and construction method

    CN117966968A

Cited By

  • Steel-concrete structure beam column connecting joint combined component and combining method thereof

    CN120797823A