Anti-collapse monitoring method for shield tunneling in composite stratum

By combining micro motion detection and real-time monitoring of road collapse sensing devices, the problem of ground collapse warning during composite formation shield tunnel excavation is solved, real-time monitoring and early warning of changes in stratigraphic density during shield tunnel excavation is realized, and the improvement of the Efficiency and accuracy in anti-collapse.

CN118911691APending Publication Date: 2024-11-08GUANGZHOU METRO DESIGN & RES INST CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411175447.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The prior art is difficult to achieve comprehensive real-time monitoring of shallow and deep soil during the excavation of composite strata shield tunnels, and cannot effectively prevent ground collapse accidents.

Method used

Comprehensive monitoring is carried out using micro-move detection and road collapse sensing devices. By burying micro-move detection and road collapse sensing devices above the axis of the shield tunnel, data is collected and analyzed in real time, changes in formation density are monitored, and construction measures are taken in a timely manner. Prevent collapse.

Benefits of technology

Three-dimensional monitoring of disturbances in the composite formation shield tunnel excavation is realized, real-time and efficient monitoring is ensured, and the early warning accuracy of ground collapse prevention during shield tunnel excavation is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911691A_ABST
    Figure CN118911691A_ABST
Patent Text Reader

Abstract

The invention discloses an anti-collapse monitoring method for shield tunneling of a composite stratum, which is used for comprehensively monitoring the disturbance condition of the composite stratum caused by shield tunneling in real time according to data acquired by micro-motion detection and a road collapse sensing device. The method has the advantages that the advantages of large micro-motion detection depth and high shallow soil body sensitivity of the road collapse sensing device are comprehensively utilized, the change condition of the compactness of the stratum is comprehensively reflected, the change condition of the shield tunneling composite stratum is sensed in real time, and the real-time performance of monitoring is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of ground subsidence monitoring, and in particular to a composite stratum shield tunnel excavation anti-subsidence monitoring method. Background Art

[0002] In the construction of urban rail transit, the shield method has become the main method of urban subway construction due to its safety and high efficiency. In the southern region, the geological environment of the strata that the shield tunnel passes through is becoming more and more complex, gradually changing from a single homogeneous stratum to a composite stratum composed of two or more strata. When the shield machine passes through boulders and composite strata with boulder groups, it is easy for the soil in front of the shield cutter head or above the shield body to become soft due to over-excavation of the shield or excessive disturbance of the boulders, and seep downward to form underground cavities. If measures are not taken in time, the underground cavities will develop too large, which may easily cause ground collapse, resulting in mechanical losses and casualties around the surface.

[0003] In terms of monitoring of road and surface collapse caused by shield tunneling, some studies focus on shallow surface monitoring. CNCN204902826U discloses a ground collapse monitoring device for subway shield construction based on the Internet of Things, which uses a total station to automatically monitor surface settlement data. Although the collection efficiency is improved, the speed of surface settlement is far behind the speed of underground cavity formation. CN113984875A discloses a wireless monitoring device for road and soil collapse, and its assembly method and assembly method, and proposes an embedded soil settlement monitoring device, which can wirelessly monitor the soil under the road, and can further improve the accuracy of collapse warning, but the monitoring position is mainly concentrated in the shallow surface soil, and it is impossible to monitor the shield tunneling stratum.

[0004] The monitoring of deep strata mainly uses geophysical exploration methods, such as CN117908138A discloses a method for monitoring the surface collapse of shield tunnels using transient electromagnetic method, using the resistivity change of the bad geological body above the shield tunnel, through periodic detection, and comparing and analyzing the risk position of surface collapse. CN116876310A discloses a method for preventing and controlling urban road collapse, using ground penetrating radar, high-density electrical method, transient electromagnetic method, micro-motion exploration method and other methods to perform periodic detection and prevent road collapse. However, the shield construction excavation speed is relatively fast, and the detection interval is difficult to ensure the real-time detection results using periodic detection. In addition, the shield excavation directly affects the soil around the excavated stratum, and the changes in the shallow soil on the surface are relatively lagging. Using geophysical exploration methods, the exploration results in a short period cannot effectively reflect the changes in the shallow soil.

[0005] Therefore, it is necessary to simultaneously meet the requirements of three-dimensional monitoring of the deep strata of shield tunnels and the shallow soil on the surface, realize comprehensive real-time monitoring of the shallow and deep parts of shield tunnels in composite strata, reveal the changes in strata caused by shield tunneling, and prevent collapse accidents. This is where this application needs to focus on improvement. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide a composite stratum shield tunnel excavation anti-collapse monitoring method, which conducts shallow and deep comprehensive monitoring of the composite stratum excavation disturbance caused by shield tunnel excavation, and comprehensively reflects the changes in the density of the composite stratum.

[0007] In order to solve the above technical problems, the present invention provides a composite stratum shield tunnel excavation anti-collapse monitoring method, which performs comprehensive real-time monitoring of the composite stratum disturbance caused by shield tunneling based on data collected by micro-motion detection and road collapse sensing devices; the method comprises the following steps: Step S1: Determine the shield tunnel excavation anti-collapse monitoring section according to the shield machine position; The shield machine position refers to the projection position of the shield machine cutter head on the ground. The monitoring area at least includes the area where the shield cutter head has been excavated but the segments have not yet been assembled and the area where the cutter head is to be excavated; Preferably, the section length of the to-be-excavated section of the monitoring section is at least three ring segment lengths; Step S2: burying a road collapse sensor device in the concrete road layer above the axis of the shield tunnel in the monitoring section and laying out a micro-motion detection line; Preferably, the installation spacing of the road collapse sensor devices is determined according to the sensitivity of the sensors; Preferably, the micro-motion detection survey line is composed of micro-motion stations arranged in a straight line to form a linear array, which is laid out on the surface above the axis of the shield tunnel in the monitoring section, and the number of stations and the distance between stations included in the linear array are determined according to the depth of the monitored stratum; Step S3: During the tunneling process of the shield machine, the road collapse sensor device and the micro-motion station simultaneously collect data, and wirelessly transmit the data back to the background for query processing and analysis; The observation data analysis interval of the micro-motion detection line shall not exceed 1 hour; The monitoring data of the road collapse sensor device is transmitted back at a frequency of not less than once an hour; Step S4: Analyze the road collapse monitoring data and micro-motion detection data, compare the data change trends at different times, and obtain the change trend of the stratum density; The road collapse sensor device records the settlement data of the shallow soil on the surface, and the micro-motion observation data reflects the changes in the density of the deep soil layer near the buried depth of the composite stratum shield tunnel. By analyzing the road collapse monitoring data and micro-motion data hour by hour, the change trend of the stratum density can be compared. Step S5: Integrate the road collapse monitoring data and micro-motion data, combine with the shield machine excavation status, analyze the stratum changes caused by shield excavation, and when abnormal conditions occur, take construction measures in time to avoid the collapse of the ground above the shield tunnel; When over-excavation of the shield occurs, the density of the stratum decreases too quickly, which can easily cause underground voids. Construction measures such as grouting and stopping excavation should be taken in time to avoid collapse of the ground above the shield tunnel.

[0008] Compared with the prior art, the present invention has the advantages of wide monitoring range, real-time performance and high monitoring efficiency, which are specifically embodied in: 1) The present invention comprehensively utilizes the advantages of large micro-motion detection depth and high sensitivity of shallow soil of road collapse sensor device to realize three-dimensional monitoring of shield tunneling disturbance in composite strata and comprehensively reflect the changes in stratum density; 2) The present invention processes and analyzes the micro-motion detection data and the monitoring data of the road collapse sensor device at an interval of no more than 1 hour, and perceives the changes in the composite strata of shield tunneling in real time, thus ensuring the real-time nature of monitoring; 3) The present invention has the advantages of automatic data collection and wireless transmission, thereby improving the monitoring efficiency; after the micro-motion array and road collapse sensor device are deployed, the data can be transmitted back wirelessly, which is more efficient than manual monitoring. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings: Figure 1 is a flow chart of a specific embodiment of the present invention; Figure 2 is a plan view schematic diagram of utilizing road collapse monitoring and micro-motion detection in a specific embodiment of the present invention; Figure 3 is a schematic longitudinal section diagram of a comprehensive monitoring system in an embodiment of the present invention; Figure 4 is a schematic diagram of an array method for micro-motion detection in an embodiment of the present invention; Description of the numbers in the figure: 1—tunnel with assembled segments; 2—tunnels where the shield cutterhead has been excavated but the segments have not yet been assembled; 3—tunnel to be excavated; 4—monitoring area; 5—Shield tunnel axis; 6—Road collapse sensor device; 7—micro-motion detection line; 8—composite formation; 9—Hollow hole; 10—Lonely rock; 11—Micromotion station. DETAILED DESCRIPTION

[0010] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0011] like Figure 1 As shown, the present invention provides a composite stratum shield tunnel excavation anti-collapse monitoring method, which uses micro-motion detection and road collapse sensor devices to conduct comprehensive real-time monitoring of composite stratum disturbance caused by shield machine excavation; specifically, it includes the following steps: Step S1: Determine the shield tunnel excavation anti-collapse monitoring section 4 according to the shield machine position; When the shield machine is excavating, it usually advances forward in a complete ring. According to the number of rings of segments assembled by the shield machine, the number of rings corresponding to the position of the shield machine cutterhead is determined, thereby determining the projection position of the shield machine cutterhead on the ground. Figure 2 As shown in the figure, the shield tunnel construction includes tunnel 1 where the segments have been assembled, tunnel 2 where the shield cutter has been excavated but the segments have not been assembled, and tunnel 3 to be excavated. In the area of ​​tunnel 1 where the segments have been assembled, the synchronous grouting process has filled the surrounding soil with slurry, and the stratum stability is relatively good. In tunnel 2 where the shield cutter has been excavated but the segments have not been assembled, the soil in the tunnel has just been cut, and the soil around the tunnel is in direct contact with the shield.

[0012] When the shield machine cutterhead starts to dig, the soil within the range of the first ring of segments of the tunnel to be excavated is cut. Figure 3 As shown, there may be obstacles such as boulders 10 in the tunnel excavation area. The disturbance range of the cutterhead cutting the soil will be further expanded, and the location where underground cavities may occur will be further expanded. To ensure the effectiveness of the monitoring area, the monitoring interval 4 at least includes the tunnel 2 that has been excavated by the shield cutterhead but has not yet assembled the segments and the tunnel 3 to be excavated. The interval length of the tunnel 3 to be excavated in the monitoring interval is at least three rings of segments.

[0013] Step S2: burying a road collapse sensor device 6 in the concrete road layer above the axis 5 of the shield tunnel in the monitoring section, and laying a micro-motion detection line 7 on the surface above the axis 5 of the shield tunnel in the monitoring section; The road subsidence sensor device 6 monitors the settlement of shallow soil, and the installation spacing is determined according to the sensitivity of the road subsidence sensor device 6; like Figure 4 As shown in , the micro-motion detection line 7 is composed of a linear array of micro-motion stations 11 arranged along a straight line. The number and spacing of the micro-motion stations 11 required for the linear array are determined according to the tunnel depth to be detected, and the length of the micro-motion detection line 7 is determined by the length of the monitoring interval 4.

[0014] Step S3: During the tunneling process of the shield machine, the road collapse sensor device 6 and the micro-motion station 11 simultaneously collect data and wirelessly transmit the data back to the background for query processing and analysis; The data recorded by the micro-motion station 11 is wirelessly transmitted back to the background for analysis; the shield machine takes about 4 hours to advance one ring. In order to ensure the real-time data results, the analysis interval of the observation data of the micro-motion detection line 7 does not exceed 1 hour, and the monitoring data of the road collapse sensor device 6 is not less than once an hour. The time interval between analysis and transmission is too long, and it is impossible to provide timely feedback to the construction personnel.

[0015] The micro-motion detection line 7 realizes the detection of deep strata at the buried depth of the tunnel, and the road collapse sensor device 6 is highly sensitive to the settlement of shallow soil. The combination of the two realizes the three-dimensional monitoring of the disturbance of shield tunneling in composite strata.

[0016] Step S4: Analyze the road collapse monitoring data and micro-motion detection data, compare the data change trends at different times, and obtain the change trend of the stratum density; Shield excavation itself will cause the density of the excavated soil to change, which is reflected in the detection results of the micro-motion detection line 7. The apparent shear wave velocity of the soil layer near the tunnel cutterhead in the micro-motion inversion decreases. At the same time, considering the multi-solution of the inversion, the density change of the soil layer near the tunnel of the composite stratum 8 is judged by comparing the results of the micro-motion detection inversion hour by hour. When there is no cavity underground, the monitoring data of the road collapse sensor device 6 will remain basically unchanged.

[0017] Step S5: Integrate the road collapse monitoring data and micro-motion data, combine with the shield machine excavation status, analyze the stratum changes caused by shield excavation, and when abnormal conditions occur, take construction measures in time to avoid the collapse of the ground above the shield tunnel; The tunneling of the shield machine itself will cause the density of the composite stratum 8 to decrease. It is necessary to further combine the parameters such as the amount of slag excavated by the shield machine to determine whether there is over-excavation. When there is a cavity 9 in the shallow area of ​​the composite stratum 8 due to shield over-excavation, the soil density in the cavity 9 area decreases very quickly, which is reflected in the micro-motion detection data results. The apparent shear wave velocity inverted in this area also decreases very quickly. At the same time, the soil settlement data monitored by the road collapse sensor device 6 will gradually increase.

[0018] Combined with the monitoring data of the road collapse sensor device 6 and the inversion results of the micro-motion detection line 7, once the existence of the underground cavity 9 is confirmed, the construction unit is promptly notified to take measures such as grouting and shield tunneling to prevent the cavity from further expanding and prevent surface collapse accidents.

[0019] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A composite stratum shield tunnel excavation anti-collapse monitoring method, which performs comprehensive real-time monitoring of composite stratum disturbance caused by shield tunneling based on data collected by micro-motion detection and road collapse sensing devices; comprising the following steps: Step S1: Determine the shield tunnel excavation anti-collapse monitoring section according to the shield machine position; The shield machine position refers to the projection position of the shield machine cutter head on the ground. The monitoring area at least includes the area where the shield cutter head has been excavated but the segments have not yet been assembled and the area where the cutter head is to be excavated; Step S2: burying a road collapse sensor device in the concrete road layer above the axis of the shield tunnel in the monitoring section and laying out a micro-motion detection line; The linear array method is used for micro-motion detection; Step S3: During the tunneling process of the shield machine, the road collapse sensor device and the micro-motion station simultaneously collect data, and wirelessly transmit the data back to the background for query processing and analysis; Step S4: Analyze the road collapse monitoring data and micro-motion detection data, compare the data change trends at different times, and obtain the change trend of the stratum density; The road collapse sensor device records the settlement data of the shallow soil on the surface, and the micro-vibration observation data reflects the changes in the density of the deep soil layer near the buried depth of the shield tunnel in the composite stratum; Step S5: Integrate the road subsidence monitoring data and micro-motion data, combine with the shield machine excavation status, analyze the ground changes caused by shield excavation, and when abnormal conditions occur, take construction measures in time to avoid ground collapse above the shield tunnel.

2. The composite stratum shield tunnel excavation anti-collapse monitoring method according to claim 1 is characterized in that: In step S1, the length of the section to be excavated in the monitoring section is at least the length of three ring segments.

3. The composite stratum shield tunnel excavation anti-collapse monitoring method according to claim 1 is characterized in that: In step S2, the installation spacing of the road collapse sensor devices is determined according to the sensitivity of the sensors.

4. The composite stratum shield tunnel excavation anti-collapse monitoring method according to claim 1 is characterized in that: In step S2, the micro-motion detection survey line is composed of micro-motion stations arranged in a straight line to form a linear array, which is deployed on the surface above the axis of the shield tunnel in the monitoring section. The number of stations included in the linear array and the distance between stations are determined according to the depth of the monitored stratum.

5. The composite stratum shield tunnel excavation anti-collapse monitoring method according to claim 1 is characterized in that: In step S3, the observation data analysis interval of micro-motion detection does not exceed 1 hour.

6. The composite stratum shield tunnel excavation anti-collapse monitoring method according to claim 1 is characterized by: In step S3, the monitoring data of the road collapse sensor device is transmitted back at a frequency not less than once an hour.