Middle rock pillar reinforcing device for sudden change section from large section to small section of shallow-buried tunnel
By using prefabricated support cage structures, including cast-injected piles and side stabilizing nail transmission components in tunnel construction, the problem of poor stability of rock columns in shallow buried tunnels is solved, the construction period and quality is ensured, and the construction difficulty and cost are reduced.
Patent Information
- Application Number
- CN202411007878.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-25
AI Technical Summary
In tunnel construction, the stability of rock columns in shallow buried tunnels is difficult to ensure, especially in small clear distance sections, which leads to high construction difficulties and safety hazards. It is difficult for the existing technology to effectively reinforce small-diameter pile foundations and increase construction difficulty.
Prefabricated support cage structure, including cast-in piles, crown beams and lock-in anchor pipes, through cast-in piles and side stabilization nail transmission components, ensure that the support cage main body is in the center of the pile pit, improve the support capacity and connection stability of cast-in piles, and is suitable for different Construction of depth and diameter.
It effectively improves the stability and connection firmness of rock columns in small clearance, reduces construction difficulty and cost, ensures construction period and quality, and has good versatility and applicability.
Smart Images

Figure CN118911701A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction and engineering construction, and in particular to a rock column reinforcement device in a sudden change section from a large section to a small section in a shallow buried tunnel. Background Art
[0002] At present, there are many subway and tunnel construction projects in my country. Some difficult problems are often encountered during construction. The stability of the rock pillar in the shallow buried section of the small clearance tunnel is one of them. In some cases, the width of the rock pillar in the two cross-cavities is extremely small, which makes it difficult to ensure the stability of the middle rock pillar. For example, in the piston air shaft ~ Huansha Road Station section of the Songhua Road Station ~ Huansha Road Station section of the Guiyang Rail Transit Line 3 Phase I Project, the tunnel has a connecting line between Line 2 and Line 3 at ZDK32+104.215 on the left line to connect to the Huansha Road Station of Line 2. Here, two equal-section small-clearance cross-cavities (area 39㎡) are divided by a large section (N section, area 143㎡). The small-clearance section of the two equal-section cross-cavities is as long as 55m. The narrowest width of the rock pillar in the two cross-cavities is only 1m, and the space available for construction is small. It is difficult to ensure that the middle rock pillar has sufficient supporting strength. The superposition of spatial effects brought about by the construction process is very likely to endanger the safety of ground structures and personnel in the cave, and the construction is difficult. Summary of the invention
[0003] The disclosed embodiment relates to a rock pillar reinforcement device in a shallow tunnel with a large-section to small-section mutation section, which can well increase the stability and connection firmness of rock pillars in a small clear distance, thereby effectively ensuring the construction period and construction quality, having better structural stability, good versatility, and low production cost. The use of a prefabricated support cage structure avoids the problem of greater difficulty in small-diameter pile foundation construction and reduces the construction difficulty.
[0004] In a first aspect, the present disclosure provides a rock pillar reinforcement device in a shallow tunnel with a large-section to small-section mutation section, specifically comprising:
[0005] Cast-in-place piles: cast-in-place piles are set along the middle rock pillars in the shallow buried section of the small clearance tunnel, and cast-in-place piles are set along the length of the tunnel on the outside of the two small-section tunnels;
[0006] The crown beam is fixed on the top of the cast-in-place pile, and the crown beam and the cast-in-place pile are connected as one;
[0007] The locking foot anchor pipe passes through the small-section tunnel wall and is anchored to the cast-in-place pile;
[0008] Cast-in-place piles are reinforced concrete cast-in-place structures. Cast-in-place piles include:
[0009] A support cage body, wherein the support cage body is a cylindrical cage-shaped structure, the center of the support cage body is an inner support rod, the outer side of the support cage body is an outer support rod arranged in a circumferential array, and the support cage body is provided with multiple pieces, and the multiple support cage bodies are installed up and down;
[0010] A rotating shaft, the rotating shaft being rotatably connected to the top of the supporting cage body;
[0011] Bottom stabilizing nails, which are arranged in a circular array at the bottom of the support cage body;
[0012] Side stabilizing nails, there are multiple groups of side stabilizing nails, and each group of side stabilizing nails is arranged in a circular array and has multiple pieces;
[0013] The side nail transmission assembly is arranged inside the supporting cage body.
[0014] In at least some embodiments, a plurality of groups of threaded holes are provided in a circular array at the bottom of the support cage body, light holes are provided in a circular array at the top of the support cage body, the threaded holes of a bottom support cage body are bolted with bottom stabilizing nails, the lower support cage body is inserted into the light holes through connecting bolts and connected to the threaded holes of the upper support cage body, and the top support cage body is connected to the crown beam through the light holes.
[0015] In at least some embodiments, the side staple drive assembly includes:
[0016] A driving thread, the driving thread is coaxially fixedly connected to the rear of the rotating shaft;
[0017] The swing driving slider is slidably connected to the top of the uppermost supporting cage body, and the swing driving slider is threadedly connected with the driving thread to form a lead screw nut transmission pair.
[0018] In at least some embodiments, the side nail drive assembly further includes:
[0019] A swing connecting rod, the swing connecting rod is hingedly connected to the end of the swing driving slider;
[0020] The intermediate rotating shaft is rotatably connected to the inner support rod, the other end of the swing connecting rod is hinged to the intermediate rotating shaft, and the swing driving slider, the swing connecting rod, the intermediate rotating shaft and the supporting cage body together constitute a crank slider transmission structure.
[0021] In at least some embodiments, the side nail drive assembly further includes:
[0022] A swing arm, the swing arm is rotatably connected to the outer side of the inner support rod;
[0023] A swing connection piece is arranged on the top of the swing arm and is plug-connected with the middle rotating shaft.
[0024] In at least some embodiments, the side nail drive assembly further includes:
[0025] A swing kit is evenly arranged and rotated to connect the outer side of the outer support rod;
[0026] The side stabilizing nail is hingedly connected to the outside of the swing arm, the side stabilizing nail is slidably connected to the swing kit, and the swing arm, the swing kit, the side stabilizing nail and the support cage body together constitute a crank slider transmission mechanism.
[0027] In at least some embodiments, an upper connecting part is provided on the top of the intermediate rotating shaft, and the upper connecting part is a groove structure. A lower connecting part is provided on the bottom of the intermediate rotating shaft, and the lower connecting part is a protruding structure. The upper and lower intermediate rotating shafts are plug-connected by the upper connecting part and the lower connecting part.
[0028] In at least some embodiments, the diameter of the cast-in-place piles is Φ0.6-0.8m, the distance between the cast-in-place piles is 2-4m, and the bottom elevation of the cast-in-place piles is 3-4.5m lower than the invert arch of the tunnel.
[0029] In at least some embodiments, when the width of the middle rock column is 1-2m, the cast-in-place piles in the middle rock column are distributed along the center of the middle rock column; when the width of the middle rock column is greater than 2m and less than 4m, the cast-in-place piles in the middle rock column are arranged in sequence and staggered along the length direction of the middle rock column close to both sides of the middle rock column, and the distance between the cast-in-place piles and the two sides of the middle rock column is 0.2-1m.
[0030] In at least some embodiments, the locking foot anchor pipe at the location of the cast-in-place pile is anchored in the cast-in-place pile, and three locking foot anchor pipes are anchored in one side of each cast-in-place pile in the middle rock column, and the locking foot anchor pipes on both sides of the three locking foot anchor pipes are anchored in the cast-in-place pile obliquely in staggered directions.
[0031] The present invention provides a rock column reinforcement device in a sudden change section from a large section to a small section in a shallow buried tunnel, which has the following beneficial effects:
[0032] The present invention can effectively reinforce the rock pillars in the shallow buried section of the small clearance tunnel before the construction of the shallow buried section of the small clearance tunnel. During the construction of the shallow buried section of the clearance tunnel, no additional reinforcement can be performed to ensure the stability of the rock pillars in the small clearance, thereby effectively ensuring the construction period and construction quality, and the structural stability can also be better.
[0033] The present invention adopts a telescopic side stabilizing nail structure, which can ensure that the support cage body is located at the center of the pile pit, ensure that the bored pile construction has good mechanical properties, and at the same time ensure that the bored pile and the pit wall have a good compression effect, ensure the connection stability, and improve the supporting capacity of the bored pile. At the same time, it can meet the construction requirements of different depths and different diameters, and can solve the problem of inconsistent bored pile diameters caused by different widths of middle rock columns during construction. The present invention has good applicability, can be prefabricated in batches, and there is no need to prefabricate the bored piles one by one, thereby reducing production costs.
[0034] The present invention can well increase the stability and connection firmness of rock columns in small clear distances, thereby effectively ensuring the construction period and construction quality, having better structural stability, and at the same time having good versatility and low production cost. The prefabricated support cage structure is adopted, thus avoiding the problem of greater difficulty in small-diameter pile foundation construction and reducing the construction difficulty. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings of the embodiment are briefly introduced below.
[0036] The drawings described below are only related to some embodiments of the present invention, but are not intended to limit the present invention.
[0037] In the attached picture:
[0038] Figure 1 A schematic diagram showing the planar layout of the structure of the present application is shown;
[0039] Figure 2 A schematic cross-sectional view showing the structure of the present application;
[0040] Figure 3 A side schematic diagram showing the structure of the present application;
[0041] Figure 4 A schematic diagram showing the installation of the support cage body of the structure of the present application is shown;
[0042] Figure 5 A schematic diagram of the support cage body of the structure of the present application is shown;
[0043] Figure 6 A schematic diagram of the side stabilizing nails of the structure of the present application is shown;
[0044] Figure 7 A schematic diagram showing the bottom of the support cage body of the structure of the present application is shown;
[0045] Figure 8 A schematic diagram of the bottom stabilizing nail of the structure of the present application is shown;
[0046] Fig. 9A schematic diagram showing the installation of the bottom stabilizing nails of the structure of the present application is shown;
[0047] Fig.10 A schematic diagram showing the installation of side stabilizing nails of the structure of the present application is shown;
[0048] Fig.11 A schematic diagram showing the transmission of the intermediate shaft of the structure of the present application is shown;
[0049] Reference numerals list
[0050] 1. Right-line small-section tunnel; 2. Left-line small-section tunnel; 3. Middle rock column; 4. Large-section tunnel; 5. Cast-in-place pile; 501. Support cage body; 5011. Outer support rod; 5012. Inner support rod; 502. Rotating shaft; 5021. Driving thread; 503. Swinging drive slider; 504. Swinging connecting rod; 505. Intermediate rotating shaft; 5051. Lower connecting part; 5052. Upper connecting part; 506. Swing arm; 601. Swing connecting piece; 507. Side stabilizing nail; 508. Swinging kit; 509. Connecting bolt; 510. Bottom stabilizing nail; 6. Locking foot anchor pipe; 7. Crown beam. DETAILED DESCRIPTION
[0051] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] Example 1: Please refer to Figures 1 to 3 :
[0053] The present invention proposes a rock pillar reinforcement device in a sudden change section from a large section to a small section in a shallow buried tunnel, comprising:
[0054] Cast-in-place piles 5 are constructed along the middle rock pillar 3 in the shallow buried section of the small clearance tunnel. At the same time, cast-in-place piles 5 are constructed along the length direction of the tunnel on the outside of the two small-section tunnels;
[0055] A crown beam 7, which is fixed on the top of the cast-in-place pile 5, and the crown beam 7 and the cast-in-place pile 5 are connected as one;
[0056] A locking foot anchor pipe 6, which passes through the small-section tunnel wall and is anchored and connected to the cast-in-place pile 5;
[0057] In the present disclosure, Figure 1As shown, the pile diameter of the cast-in-place pile 5 is Φ0.6-0.8m, the pile spacing of the cast-in-place pile 5 is 2-4m, and the pile bottom elevation of the cast-in-place pile 5 is 3-4.5m lower than the tunnel main hole invert arch.
[0058] In the present disclosure, Figure 1 As shown, when the width of the middle rock column 3 is 1-2m, the cast-in-place piles 5 in the middle rock column 3 are distributed along the center of the middle rock column 3; when the width of the middle rock column 3 is greater than 2m and less than 4m, the cast-in-place piles 5 in the middle rock column 3 are arranged in sequence and staggered near both sides of the middle rock column 3 along the length direction of the middle rock column 3, and the distance between the cast-in-place piles 5 and the two sides of the middle rock column 3 is 0.2-1m.
[0059] In the present disclosure, Figure 1-2 As shown, the locking foot anchor pipe 6 at the position of the cast-in-place pile 5 is anchored in the cast-in-place pile 5, and three locking foot anchor pipes 6 are anchored in one side of each cast-in-place pile 5 in the middle rock column 3, and the locking foot anchor pipes 6 on both sides of the three locking foot anchor pipes 6 are anchored in the cast-in-place pile 5 at an angle in a staggered direction.
[0060] Example 2: Please refer to Figures 1 to 3 :
[0061] The difference between this embodiment and embodiment 1 is that the pile diameter of the cast-in-place pile 5 is Φ0.7m.
[0062] Example 3: Please refer to Figures 1 to 3 :
[0063] The difference between this embodiment and embodiment 1 is that the pile diameter of the cast-in-place pile 5 is Φ0.8m.
[0064] Example 4: Please refer to Figures 1 to 3 :
[0065] The difference between this embodiment and embodiment 1 is that when the width of the middle rock column 3 is greater than 2m and less than 4m, the cast-in-place piles 5 are arranged in sequence and staggered along the length direction of the middle rock column 3 close to both sides of the middle rock column 3, and the distance between the cast-in-place piles 5 and the two sides of the middle rock column 3 is 0.2-1m, and the locking foot anchor pipe 6 corresponding to the position of the cast-in-place pile 5 is anchored in the cast-in-place pile 5.
[0066] Example 5: Please refer to Figures 4 to 5 :
[0067] The present invention proposes a rock pillar reinforcement device in a sudden change section from a large section to a small section in a shallow buried tunnel, comprising:
[0068] The cast-in-place pile 5 is a reinforced concrete cast-in-place structure, and the cast-in-place pile 5 includes:
[0069] The support cage body 501 is a cylindrical cage structure, the center of the support cage body 501 is an inner support rod 5012, the outer side of the support cage body 501 is an outer support rod 5011 arranged in a circumferential array, and the support cage body 501 is provided with multiple pieces, and the multiple support cage bodies 501 are installed up and down;
[0070] A rotating shaft 502, the rotating shaft 502 is rotatably connected to the top of the supporting cage body 501;
[0071] In the present disclosure, Figure 7 As shown, a plurality of groups of threaded holes are arranged in a circular array at the bottom of the support cage body 501, and light holes are arranged in a circular array at the top of the support cage body 501. The threaded hole of the bottom support cage body 501 is bolted with a bottom stabilizing nail 510. The lower support cage body 501 is inserted into the light hole through the connecting bolt 509 and connected to the threaded hole of the upper support cage body 501. The top support cage body 501 is connected to the crown beam 7 through the light hole, thus realizing the universality of the threaded hole, which can realize both the bottom fixed support and the connection between the support cage bodies 501, has good versatility and improves the convenience of use.
[0072] Example 6: Please refer to Figures 3 to 11 :
[0073] The present invention proposes a rock pillar reinforcement device in a sudden change section from a large section to a small section in a shallow buried tunnel, comprising:
[0074] Bottom stabilizing nails 510, which are arranged in a circular array at the bottom of the support cage body 501;
[0075] Side stabilizing nails 507, there are multiple groups of side stabilizing nails 507, and each group of side stabilizing nails 507 is arranged in a circular array and has multiple pieces;
[0076] The side nail transmission assembly is arranged inside the support cage body 501 .
[0077] In the present disclosure, Fig.11 As shown, the side nail driving assembly includes:
[0078] A driving thread 5021, the driving thread 5021 is coaxially fixedly connected to the rear of the rotating shaft 502;
[0079] The swing driving slider 503 is slidably connected to the top of the uppermost supporting cage body 501. The swing driving slider 503 is threadedly connected with the driving thread 5021 to form a screw nut transmission pair. In use, when the rotating shaft 502 is rotated, the rotating shaft 502 drives the swing driving slider 503 to slide through the screw nut transmission pair formed by the threaded connection between the swing driving slider 503 and the driving thread 5021.
[0080] In the present disclosure, Fig.11 As shown, the side nail driving assembly also includes:
[0081] A swing link 504, the swing link 504 is hingedly connected to the end of the swing driving slider 503;
[0082] The intermediate rotating shaft 505 is rotatably connected to the inside of the inner support rod 5012, and the other end of the swing connecting rod 504 is hinged to the intermediate rotating shaft 505. The swing driving slider 503, the swing connecting rod 504, the intermediate rotating shaft 505 and the support cage body 501 together constitute a crank slider transmission structure. In use, when the swing driving slider 503 slides, the swing driving slider 503 drives the intermediate rotating shaft 505 to swing through the crank slider transmission structure composed of the swing driving slider 503, the swing connecting rod 504, the intermediate rotating shaft 505 and the support cage body 501.
[0083] In the present disclosure, Figure 6 As shown, the side nail driving assembly also includes:
[0084] A swing arm 506, the swing arm 506 is rotatably connected to the outer side of the inner support rod 5012;
[0085] The swing connector 601 is arranged at the top of the swing arm 506 , and the swing connector 601 is plug-connected with the intermediate shaft 505 . When the intermediate shaft 505 swings during use, the intermediate shaft 505 drives the swing arm 506 to swing through the swing connector 601 .
[0086] In the present disclosure, Figure 7 As shown, the side nail driving assembly also includes:
[0087] The swing kit 508 is evenly arranged and rotatably connected to the outer side of the outer support rod 5011;
[0088] The side stabilizing nail 507 is hinged on the outside of the swing arm 506, and the side stabilizing nail 507 is slidably connected to the swing kit 508. The swing arm 506, the swing kit 508, the side stabilizing nail 507 and the support cage body 501 together constitute a crank slider transmission mechanism. In use, when the swing arm 506 swings, the swing arm 506 drives the side stabilizing nail 507 to slide through the crank slider transmission mechanism jointly constituted by the swing arm 506, the swing kit 508, the side stabilizing nail 507 and the support cage body 501, thereby extending and retracting the side stabilizing nail 507 to meet the casting needs of cast-in-place piles 5 of different sizes. At the same time, the side stabilizing nail 507 can also be tightly inserted into the middle rock column 3 to improve the connection stability of the cast-in-place pile 5 and the middle rock column 3.
[0089] In the present disclosure, Figure 9-10 As shown, an upper connecting portion 5052 is provided on the top of the intermediate rotating shaft 505, and the upper connecting portion 5052 is a groove structure. A lower connecting portion 5051 is provided on the bottom of the intermediate rotating shaft 505, and the lower connecting portion 5051 is a convex structure. The upper and lower intermediate rotating shafts 505 are plug-connected through the upper connecting portion 5052 and the lower connecting portion 5051. In use, when the upper intermediate rotating shaft 505 rotates, the upper intermediate rotating shaft 505 drives the lower intermediate rotating shaft 505 to rotate synchronously through the upper connecting portion 5052 and the lower connecting portion 5051.
[0090] The working principle of this embodiment:
[0091] A tunnel is a right-line small-section tunnel 1 and a left-line small-section tunnel 2 that intersect at a large-section tunnel 4. At the intersection, the large-section tunnel 4 (section N, area 143 m2) is divided into two equal-section small-clearance cross-cavities (right-line small-section tunnel 1 and left-line small-section tunnel 2) (area 39 m2). The small-clearance section of the right-line small-section tunnel 1 and the left-line small-section tunnel 2 is as long as 55 m. The narrowest width of the rock pillar 3 in the two cross-cavities is only 1 m. During construction, cast-in-place piles 5 are added along the middle rock pillar 3 in the shallow buried section of the small-clearance tunnel. The pile diameter is Φ0.6 m, the pile spacing is 2-4 m, and the pile bottom elevation is 3-4.5 m lower than the tunnel main hole invert arch. A cap beam 7 is set on the top of the cast-in-place pile 5 to connect the cast-in-place piles 5 into a Overall, during the initial support arch construction, the locking foot anchor pipe 6 near one side of the middle rock column 3 is anchored into the cast-in-place pile 5. Specifically: when the width of the middle rock column 3 is 1-2m, the cast-in-place pile 5 is distributed along the center of the middle rock column 3; when the width of the middle rock column 3 is greater than 2m and less than 4m, the cast-in-place piles 5 are staggered in sequence along the length direction of the middle rock column 3 near both sides of the middle rock column 3, and the distance between the cast-in-place piles 5 and the two sides of the middle rock column 3 is 0.2-1m. The locking foot anchor pipe 6 corresponding to the position of the cast-in-place pile 5 is anchored into the cast-in-place pile 5, and three locking foot anchor pipes 6 are anchored on one side of each cast-in-place pile 5, and the locking foot anchor pipes 6 on both sides of the three locking foot anchor pipes 6 are tilted and anchored into the cast-in-place pile 5 along the staggered direction.
[0092] During the construction of the cast-in-place pile 5, according to the actual required depth of the cast-in-place pile 5, the support cage body 501 is connected end to end and connected by connecting bolts 509, and then the support cage body 501 is placed in the pile pit, and the rotating shaft 502 is rotated by a tool, and the rotating shaft 502 drives the swing driving slider 503 to slide through the screw nut transmission pair composed of the threaded connection of the swing driving slider 503 and the driving thread 5021, and the swing driving slider 503 drives the intermediate rotating shaft 505 to swing through the crank slider transmission structure composed of the swing driving slider 503, the swing connecting rod 504, the intermediate rotating shaft 505 and the support cage body 501, and the intermediate rotating shaft 505 drives the swing arm 505 through the swing connecting member 601. 6 swings, the swing arm 506 drives the side stabilizing nail 507 to slide through the crank slider transmission mechanism composed of the swing arm 506, the swing kit 508, the side stabilizing nail 507 and the support cage body 501, and the side stabilizing nail 507 is extended. After the side stabilizing nail 507 touches the pit wall, the support cage body 501 is adjusted to make the support cage body 501 in the center position, and then the support cage body 501 is rammed downward and pressed in the pile pit, and the rotating shaft 502 is tightened to make the side stabilizing nail 507 in close contact with the pit wall to ensure the connection stability of the cast-in-place pile 5 and the middle rock column 3, and connected with the crown beam 7 steel bar through the light hole on the top of the support cage body 501, and then mortar is poured to form the cast-in-place pile 5.
[0093] In this article, there are a few points to note:
[0094] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.
[0095] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.
[0096] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. Rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel, It is characterized in that include: Cast-in-place piles (5), the cast-in-place piles (5) are arranged along the middle rock pillars (3) in the shallow buried section of the small clear distance tunnel, and cast-in-place piles (5) are arranged along the length direction of the tunnel on the outside of two small cross-section tunnels; A crown beam (7), wherein the crown beam (7) is fixed on the top of the cast-in-place pile (5), and the crown beam (7) and the cast-in-place pile (5) are connected as a whole; A locking foot anchor pipe (6), wherein the locking foot anchor pipe (6) passes through the small-section tunnel wall and is anchored and connected to the cast-in-place pile (5); The cast-in-place pile (5) is a reinforced concrete cast-in-place structure, and the cast-in-place pile (5) comprises: A support cage body (501), wherein the support cage body (501) is a cylindrical cage-shaped structure, the center of the support cage body (501) is an inner support rod (5012), the outer side of the support cage body (501) is an outer support rod (5011) arranged in a circumferential array, and the support cage body (501) is provided with multiple pieces, and the multiple support cage bodies (501) are installed up and down; A rotating shaft (502), the rotating shaft (502) being rotatably connected to the top of the supporting cage body (501); Bottom stabilizing nails (510), the bottom stabilizing nails (510) are arranged in a circular array at the bottom of the support cage body (501); Side stabilizing pins (507), wherein the side stabilizing pins (507) are provided in a plurality of groups, and each group of side stabilizing pins (507) is provided with a plurality of pieces arranged in a circular array; A side nail transmission assembly is arranged inside the support cage body (501).
2. The rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel according to claim 1, It is characterized in that The pile diameter of the cast-in-place pile (5) is Φ0.6-0.8m, the pile spacing of the cast-in-place pile (5) is 2-4m, and the pile bottom elevation of the cast-in-place pile (5) is 3-4.5m lower than the tunnel main hole invert arch.
3. The rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel according to claim 1, It is characterized in that When the width of the middle rock column (3) is 1-2 m, the cast-in-place piles (5) in the middle rock column (3) are distributed along the center of the middle rock column (3); when the width of the middle rock column (3) is greater than 2 m and less than 4 m, the cast-in-place piles (5) in the middle rock column (3) are arranged in a staggered manner along the length direction of the middle rock column (3) close to both sides of the middle rock column (3), and the distance between the cast-in-place piles (5) and the two sides of the middle rock column (3) is 0.2-1 m.
4. The rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel according to claim 1, It is characterized in that The locking foot anchor pipe (6) at the location of the cast-in-place pile (5) is anchored in the cast-in-place pile (5), and three locking foot anchor pipes (6) are correspondingly anchored on one side of each cast-in-place pile (5) in the middle rock column (3), and the locking foot anchor pipes (6) on both sides of the three locking foot anchor pipes (6) are tilted and anchored in the cast-in-place pile (5) in a staggered direction.
5. The rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel according to claim 1, It is characterized in that The bottom of the support cage body (501) is provided with a plurality of groups of threaded holes in a circular array, and the top of the support cage body (501) is provided with light holes arranged in a circular array. The threaded holes of the bottom support cage body (501) are bolted with bottom stabilizing nails (510), the lower support cage body (501) is inserted into the light holes through connecting bolts (509) and connected to the threaded holes of the upper support cage body (501), and the top support cage body (501) is connected to the crown beam (7) through the light holes.
6. The rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel according to claim 1, It is characterized in that The side nail transmission assembly includes: A driving thread (5021), the driving thread (5021) is coaxially fixedly connected to the rear of the rotating shaft (502); The swing driving slider (503) is slidably connected to the top of the uppermost supporting cage body (501), and the swing driving slider (503) is threadedly connected with the driving thread (5021) to form a screw nut transmission pair.
7. The rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel according to claim 6, It is characterized in that The side nail transmission assembly also includes: A swing connecting rod (504), the swing connecting rod (504) is hingedly connected to the end of the swing driving slider (503); The intermediate rotating shaft (505) is rotatably connected to the inside of the inner support rod (5012), the other end of the swing connecting rod (504) is hinged to the intermediate rotating shaft (505), and the swing driving slider (503), the swing connecting rod (504), the intermediate rotating shaft (505) and the supporting cage body (501) together constitute a crank slider transmission structure.
8. The rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel according to claim 7, It is characterized in that The side nail transmission assembly also includes: A swing arm (506), the swing arm (506) is rotatably connected to the outer side of the inner support rod (5012); A swing connection piece (601) is arranged on the top of the swing arm (506), and the swing connection piece (601) is plug-connected with the middle rotating shaft (505).
9. The rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel according to claim 8, It is characterized in that The side nail transmission assembly also includes: A swing kit (508), the swing kit (508) is evenly arranged and rotatably connected to the outer side of the outer support rod (5011); The side stabilizing nail (507) is hingedly connected to the outside of the swing arm (506), the side stabilizing nail (507) is slidably connected to the swing kit (508), and the swing arm (506), the swing kit (508), the side stabilizing nail (507) and the support cage body (501) together constitute a crank slider transmission mechanism.
10. The rock pillar reinforcement device in the sudden change section from large section to small section of shallow buried tunnel according to claim 7, It is characterized in that The top of the intermediate rotating shaft (505) is provided with an upper connecting part (5052), which is a groove structure; the bottom of the intermediate rotating shaft (505) is provided with a lower connecting part (5051), which is a convex structure; the upper and lower intermediate rotating shafts (505) are plug-connected through the upper connecting part (5052) and the lower connecting part (5051).
Citation Information
Patent Citations
Tunnel excavation and supporting construction method
CN108756895A
Method for controlling ultra-deep air shaft reinforcing construction
CN110030015A
Novel structure system of shallow-buried large-span underground excavation subway station and construction method of novel structure system
CN115467690A
Soil-rock combined stratum suspended pile deep foundation pit supporting structure
CN116289988A
Comprehensive construction method for shallow buried section of tunnel using urban railway mine tunneling method
WO2022122052A1