Synchronous grouting construction method for controlling floating of super-large-diameter shield tunnel

By injecting double slurry into the upper half of the super-large diameter shield tunnel pipe sheet and injecting inert slurry into the lower half, the pipe sheet floats down and reduces engineering costs, achieving rapid hardening and improvement of floating resistance .

CN118911710APending Publication Date: 2024-11-08JIANGSU SOBUTE NEW MATERIALS CO LTD +1

Patent Information

Application Number
CN202310508191.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-08
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The super-large diameter shield tunnel pipe sheet has serious floating problems during the construction process. Traditional single-liquid grouting materials and processes are difficult to meet the anti-float requirements and are costly.

Method used

The combined grouting method of double liquid slurry and inert slurry is adopted, in which the upper half of the tube sheet is injected into double liquid slurry and the lower half is injected into inert slurry. The double liquid slurry is prepared from cement slurry and water glass according to a volume ratio of 10:1 to 12:1. , the inert slurry consists of fly ash, bentonite, quicklime, fine aggregate and admixture. The double slurry consists of cement, bentonite and admixture, and is injected evenly at intervals through the grouting pipeline of the shield machine.

Benefits of technology

The rapid hardening of the pipe sheet and improved anti-floating performance are achieved, the engineering cost is reduced, and the problem of uncontrollable floating of single slurry is solved, while avoiding the problem of excessive cost of double slurry.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911710A_ABST
    Figure CN118911710A_ABST
Patent Text Reader

Abstract

The invention discloses a synchronous grouting construction method for controlling floating of a super-large-diameter shield tunnel, which belongs to the technical field of shield construction, and comprises the following steps: respectively mixing inert slurry and cement slurry for double-liquid slurry, and preparing the double-liquid slurry from the cement slurry and water glass according to a volume ratio of 10: 1-12: 1; pumping the mixed inert slurry and the double-liquid slurry into a slurry storage tank in a shield tunneling machine; the multiple grouting pipelines are evenly arranged in the circumferential direction of the shield tunneling machine at intervals, and when the shield tunneling machine starts tunneling, double-liquid slurry is injected into the upper half portion of a segment through the grouting pipelines located on the half of the upper portion of the shield tunneling machine. And meanwhile, the other half of grouting pipelines located on the lower portion of the shield tunneling machine are used for synchronously injecting inert grout into the lower half portion of the segment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shield construction, and in particular relates to a synchronous grouting construction method for controlling the floating of an ultra-large diameter shield tunnel. Background Art

[0002] Among the tunnel construction methods, the shield method has the characteristics of small impact on the environment, strong adaptability to geology, safe and fast construction, etc., and has gradually become the preferred construction method for subways, cross-river tunnels, etc. With the advancement of shield technology, the number of ultra-large diameter shield tunnels is growing rapidly. As an indispensable part of earth pressure balance shield construction, the quality of synchronous grouting plays an important role in the forming and stability of tunnel segments. At present, there is a common problem of segment floating in synchronous grouting construction, which may even cause major safety accidents such as segment cracking and sediment leakage in severe cases.

[0003] The buoyancy of the shield tunnel segments increases with the diameter of the segments in a quadratic function, and the increase in buoyancy is much greater than the anti-buoyancy of the segment structure's deadweight. As the diameter of the shield tunnel increases, the problem of the buoyancy of the segments becomes more prominent. Traditional single-liquid grouting materials (inert slurry and hard slurry) and grouting processes can meet the stability requirements of 6m-class shield tunnel segments, but cannot meet the anti-buoyancy requirements of super-large shield tunnel segments with a diameter of ≥14m, and the material and construction costs remain high.

[0004] Patent CN 101672186 B ​​discloses a method and device for synchronous grouting of shield tunnel segments. While injecting mortar behind the segments, a quick-setting mixture is injected at intervals behind the segments. The quick-setting mixture is injected once every 200 mm of excavation. The quick-setting mixture and the mortar are not fully stirred, so it is difficult to ensure that the injected quick-setting mixture can fully contact and react with the mortar slurry, and it is difficult to produce a rapid setting effect as a whole, and a large amount of quick-setting mixture is wasted.

[0005] Patent CN 110566215 B discloses a quick-dissolving and quick-setting synchronous grouting method for a shield tunnel. The method injects a quick-setting agent encapsulated by a water-soluble encapsulating material into the synchronous grouting liquid and injects it into the space between the soil and the pipe segment. After a period of time, the water-soluble encapsulating material dissolves and releases the quick-setting agent. The quick-setting agent reacts with the synchronous grouting slurry to quickly form a reinforced coagulation block locally, which quickly provides support between the soil and the pipe segment and inhibits the floating of the tunnel pipe segment structure. This method is also difficult to ensure that the quick-setting agent and the slurry fully react, and only forms coagulation blocks locally. It is difficult to fundamentally solve the problem of pipe segment floating, and the cost is relatively high. Summary of the invention

[0006] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a synchronous grouting construction method for controlling the floating of an ultra-large diameter shield tunnel. Double liquid slurry is injected into the upper half of the segment and inert slurry is injected into the lower half. This can not only inhibit the floating of the segment but also greatly reduce the project cost.

[0007] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0008] The present invention provides a synchronous grouting construction method for controlling the floating of an ultra-large diameter shield tunnel, comprising the following method steps:

[0009] Separately mixing an inert slurry and a cement slurry for a double-liquid slurry, and preparing the double-liquid slurry by mixing the cement slurry and water glass in a volume ratio of 10:1 to 12:1;

[0010] Pumping the mixed inert slurry and the double-liquid slurry to the slurry storage tank in the shield machine;

[0011] A plurality of the grouting pipelines are evenly spaced along the circumference of the shield machine. When the shield machine starts to excavate, half of the grouting pipelines located at the upper part of the shield machine are used to inject double liquid slurry into the upper half of the segment, and the other half of the grouting pipelines located at the lower part of the shield machine are used to synchronously inject inert slurry into the lower half of the segment.

[0012] Furthermore, the composition ratio of the inert slurry is as follows:

[0013]

[0014]

[0015] Furthermore, the fly ash has a fineness of 45 μm and a square-hole sieve residue of less than 30%;

[0016] The bentonite is one of sodium-based bentonite and calcium-based bentonite, and the water absorption rate is ≥300%;

[0017] The fineness of the quicklime (0.2 mm sieve residue) is ≤ 2%, wherein the sum of the contents of calcium oxide and magnesium oxide is ≥ 85%;

[0018] The fine aggregate is a mixture of one or more of 0-2 mm river sand and machine-made sand in any proportion;

[0019] The admixture is one of a naphthalene-based water reducer and an aliphatic water reducer.

[0020] Furthermore, the composition ratio of the cement slurry is as follows:

[0021]

[0022] Furthermore, the cement is silicate cement with a strength grade of 42.5 or above;

[0023] The bentonite is one of sodium-based bentonite and calcium-based bentonite, and the water absorption rate is ≥300%;

[0024] The additive is one of hydroxypropyl methyl cellulose ether and hydroxyethyl methyl cellulose ether, and the viscosity is between 100000mP·s and 200000mP·s.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] Aiming at the floating problem of shield tunnel segments with super-large diameter (≥14m), the present invention adopts a synchronous grouting method for controlling the floating of large-diameter shield tunnels, injects double-liquid slurry into the upper half of the segment, which has the characteristics of short setting time and high early strength. After the grouting is completed, a hardened structure can be quickly formed with good anti-floating performance; and inert slurry is injected into the lower half, which not only solves the problem that the floating of the segment cannot be controlled when only single-liquid slurry is used during grouting, but also solves the problem of excessively high cost when only double-liquid slurry is used. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 The present invention provides a flowchart of a synchronous grouting method for controlling the floating of a large-diameter shield tunnel according to an embodiment of the present invention.

[0028] Figure 2 The present invention is a simplified schematic diagram of the layout of grouting pipelines in a synchronous grouting method for controlling the floating of a large-diameter shield tunnel provided in accordance with an embodiment of the present invention. DETAILED DESCRIPTION

[0029] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0030] Example 1

[0031] ① Mix cement slurry of inert slurry and double liquid slurry;

[0032] Among them, the component ratio of the inert slurry is:

[0033]

[0034] Meanwhile, the fineness of the fly ash is 45 μm, and the square hole sieve residue is 12%; the bentonite is sodium-based bentonite, and its water absorption rate is 376%; the fineness of the quicklime (0.2 mm sieve residue) is 0.8%, of which the sum of calcium oxide and magnesium oxide content is 92%; the fine aggregate is 0-2 mm river sand; and the admixture is a naphthalene-based water reducer.

[0035] Among them, the component proportion of the cement slurry of the double liquid slurry is:

[0036]

[0037] Meanwhile, the cement is silicate cement with a strength grade of 42.5; the bentonite is calcium-based bentonite with a water absorption rate of 376%; and the admixture is hydroxypropyl methylcellulose ether with a viscosity of 120,000 mP·s.

[0038] ② Transport and pump the mixed inert slurry and double-liquid slurry to the slurry storage tank inside the shield machine respectively.

[0039] ③ When the shield machine starts to excavate, Figure 2 The 1#, 2#, 3#, and 4# grouting pipes at the top are respectively injected with cement slurry and water glass of double-liquid slurry, wherein the volume ratio between cement slurry and water glass of double-liquid slurry is 10:1. Figure 2 Inert slurry is injected into the 5#, 6#, 7# and 8# grouting pipelines located at the bottom.

[0040] ④After grouting is completed, clean the grouting pipeline in time.

[0041] Example 2

[0042] ① Mix cement slurry of inert slurry and double liquid slurry;

[0043] Among them, the component ratio of the inert slurry is:

[0044]

[0045]

[0046] Meanwhile, the fineness of the fly ash is 45 μm, and the square hole sieve residue is 20%; the bentonite is sodium-based bentonite, and its water absorption rate is 425%; the fineness of the quicklime (0.2 mm sieve residue) is 0.8%, and the calcium oxide + magnesium oxide content is 92%; the fine aggregate is 0-2 mm river sand; and the admixture is an aliphatic water reducer.

[0047] Among them, the cement slurry mix ratio of double liquid slurry is:

[0048]

[0049] Meanwhile, the cement is silicate cement with a strength grade of 42.5; the bentonite is calcium-based bentonite with a water absorption rate of 425%; and the admixture is hydroxyethyl methyl cellulose ether with a viscosity of 120000 mP·s.

[0050] ② Transport and pump the mixed slurry to the slurry storage tank inside the shield machine.

[0051] ③ When the shield machine starts to excavate, the cement slurry and water glass of the double-liquid slurry are respectively injected through the 1#, 2#, 3# and 4# grouting pipelines located at the upper part, where the volume ratio of the cement slurry to water glass of the double-liquid slurry is 10:1, and the inert slurry is injected through the 5#, 6#, 7# and 8# grouting pipelines located at the lower part.

[0052] ④After grouting is completed, clean the grouting pipeline in time.

[0053] Example 3

[0054] ① Mixing of cement slurry of inert slurry and double liquid slurry;

[0055] The inert slurry mix ratio is:

[0056]

[0057]

[0058] Meanwhile, the fly ash has a fineness of 45 μm square sieve residue of 15%; the bentonite is sodium-based bentonite, and its water absorption rate is 425%; the quicklime has a fineness (0.2 mm sieve residue) of 0.8%, and a calcium oxide + magnesium oxide content of 92%; the fine aggregate is 0-2 mm machine-made sand; the admixture is a naphthalene-based water reducer;

[0059] Among them, the cement slurry mix ratio of double liquid slurry is:

[0060]

[0061] Meanwhile, the cement is silicate cement with a strength grade of 42.5; the bentonite is sodium-based bentonite with a water absorption rate of 425%; and the admixture is hydroxypropyl methylcellulose ether with a viscosity of 150000 mP·s.

[0062] ② Transport and pump the mixed slurry to the slurry storage tank inside the shield machine.

[0063] ③ When the shield machine starts to excavate, the cement slurry and water glass of the double-liquid slurry are respectively injected through the 1#, 2#, 3# and 4# grouting pipelines located at the upper part, where the volume ratio of the cement slurry to water glass of the double-liquid slurry is 12:1, and the inert slurry is injected through the 5#, 6#, 7# and 8# grouting pipelines located at the lower part.

[0064] ④After grouting is completed, clean the grouting pipeline in time.

[0065] Example 4

[0066] ① Mix cement slurry of inert slurry and double liquid slurry;

[0067] The inert slurry mix ratio is:

[0068]

[0069] Meanwhile, the fineness of the fly ash is 45 μm square hole sieve residue is 20%; the bentonite is calcium-based bentonite, and its water absorption rate is 376%; the fineness of the quicklime (0.2 mm sieve residue) is 0.8%, and the calcium oxide + magnesium oxide content is 92%; the fine aggregate is 0-2 mm machine-made sand; and the admixture is an aliphatic water reducer.

[0070] Among them, the cement slurry mix ratio of double liquid slurry is:

[0071]

[0072] Meanwhile, the cement is silicate cement with a strength grade of 42.5; the bentonite is calcium-based bentonite with a water absorption rate of 376%; and the admixture is hydroxyethyl methyl cellulose ether with a viscosity of 180000 mP·s.

[0073] ② Transport and pump the mixed slurry to the slurry storage tank inside the shield machine.

[0074] ③ When the shield machine starts to excavate, the cement slurry and water glass of the double-liquid slurry are respectively injected through the 1#, 2#, 3# and 4# grouting pipelines located at the upper part. The volume ratio of the cement slurry and water glass of the double-liquid slurry is 12:1. The inert slurry is injected through the 5#, 6#, 7# and 8# grouting pipelines located at the lower part.

[0075] ④After grouting is completed, clean the grouting pipeline in time.

[0076] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A synchronous grouting construction method for controlling the floating of an ultra-large diameter shield tunnel. It is characterized in that The method comprises the following steps: Separately mixing an inert slurry and a cement slurry for a double-liquid slurry, and preparing the double-liquid slurry by mixing the cement slurry and water glass in a volume ratio of 10:1 to 12:1; The mixed inert slurry and the double-liquid slurry are pumped to the slurry storage tank in the shield machine respectively; A plurality of the grouting pipelines are evenly spaced along the circumference of the shield machine. When the shield machine starts to excavate, half of the grouting pipelines located at the upper part of the shield machine are used to inject double liquid slurry into the upper half of the segment, and the other half of the grouting pipelines located at the lower part of the shield machine are used to synchronously inject inert slurry into the lower half of the segment.

2. The synchronous grouting construction method for controlling the floating of a super-large diameter shield tunnel according to claim 1, It is characterized in that The composition ratio of the inert slurry is as follows:

3. The synchronous grouting construction method for controlling the floating of a super-large diameter shield tunnel according to claim 2, It is characterized in that The fly ash has a fineness of 45 μm and a square-hole sieve residue of less than 30%; The bentonite is one of sodium-based bentonite and calcium-based bentonite, and the water absorption rate is ≥300%; The fineness of the quicklime (0.2 mm sieve residue) is ≤ 2%, wherein the sum of the contents of calcium oxide and magnesium oxide is ≥ 85%; The fine aggregate is a mixture of one or more of 0-2 mm river sand and machine-made sand in any proportion; The admixture is one of a naphthalene-based water reducer and an aliphatic water reducer.

4. The synchronous grouting construction method for controlling the floating of a super-large diameter shield tunnel according to claim 3, It is characterized in that The composition ratio of the cement slurry is as follows:

5. The synchronous grouting construction method for controlling the floating of a super-large diameter shield tunnel according to claim 4, It is characterized in that The cement is silicate cement with a strength grade of 42.5 or above; The bentonite is one of sodium-based bentonite and calcium-based bentonite, and the water absorption rate is ≥300%; The additive is one of hydroxypropyl methyl cellulose ether and hydroxyethyl methyl cellulose ether, and the viscosity is between 100000mP·s and 200000mP·s.

Citation Information

Patent Citations

  • Method and device for synchronously grouting shield tunnel pipe sheet

    CN101672186B

  • A method for rapid dissolution and quick setting synchronous grouting in shield tunnels

    CN110566215B

Cited By

  • Grouting slurry and synchronous grouting method suitable for shield construction in large-gradient section of water-rich sandy gravel stratum

    CN121609553A