Tunnel waterproof material laying device
By combining hydraulic telescopic rods and hot-melt welding devices, the problem of loosening caused by unevenness during tunnel waterproofing membrane laying is solved, ensuring flat welding of the waterproofing membrane, preventing leakage, and improving the tunnel waterproofing effect.
Patent Information
- Application Number
- CN202411007370.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-08
AI Technical Summary
During the existing tunnel waterproofing membrane laying process, unevenness between the waterproofing membrane and the tunnel inner wall causes the area around the hot melt gasket to loosen, creating a potential leakage hazard.
The waterproof material laying device, driven by a hydraulic telescopic rod, ensures that the waterproof membrane is flattened and excess parts are pulled up during the laying process through the hydraulic telescopic rod and the hot melt welding device to avoid loosening. Step columns and support rods are used to flatten the area around the hot melt pad before welding, and then the pressure plate is welded separately.
This method enables the waterproof membrane to be welded smoothly inside the tunnel, avoiding the risk of leakage caused by loosening and improving the waterproofing effect of the tunnel.
Smart Images

Figure CN118911727A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel construction, and in particular to a tunnel waterproof material laying device. Background Art
[0002] Tunnel construction refers to the process of excavating a tunnel and installing auxiliary equipment. During the tunnel construction process, a waterproof sheet needs to be laid on the top of the tunnel to prevent water from seeping into the tunnel from the top. The existing tunnel waterproof sheet is laid by setting up a bracket and then manually installing and aligning it. While laying the waterproof sheet, the waterproof sheet is welded to the hot-melt gasket at intervals through hot melt. The waterproof sheet should be of moderate tightness. The inner wall of the tunnel is uneven, and the hot-melt gasket is fixed to the inner wall of the tunnel with a nail gun, forming a high protrusion from the tunnel wall. Therefore, it is easy to form looseness around the hot-melt gasket, resulting in the formation of artificial water storage points due to excessive looseness, thereby creating a leakage hazard. Summary of the Invention
[0003] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a tunnel waterproof material laying device.
[0004] In order to achieve the above object, the present invention adopts the following technical solutions:
[0005] A tunnel waterproofing material laying device includes a frame, guide rails fixedly connected to both ends of the upper side of the frame, the guide rails slidably connected to a slider, a control box fixedly connected to the frame, hydraulic telescopic rods rotatably connected to both sides of the control box, the guide rails slidably connected to a slider, the slider is fixedly connected to the hydraulic telescopic rod, a waterproof sheet roll is provided at the telescopic end of the hydraulic telescopic rod, the telescopic end of the hydraulic telescopic rod is fixedly connected to a support rod, and a hot melt welding device is provided at the end of the support rod;
[0006] The hot melt welding device includes a horizontal plate, a plurality of avoidance holes are arranged at intervals on the horizontal plate, a welder is coaxially arranged in each avoidance hole, one end of the welder is fixedly connected to the welding pressure plate, the horizontal plate is fixedly connected to the bracket, the bracket is fixedly connected to the push rod, the push rod is fixedly connected to the welder, the welder is slidably connected to a step column, the step column is hingedly connected to a plurality of support rods on the side facing the waterproof sheet roll and is provided with a rotary torsion spring, and the end of the support rod is fixedly connected to the push block;
[0007] The welder is provided with a boss, and a first spring is fixedly connected between the boss and the step column, and the diameter of the step column is larger than the diameter of the avoidance hole.
[0008] Preferably, the transverse plate is fixedly connected to the guide bar, the support rod is provided with a guide slot, the guide bar is adapted to the guide slot, the side of the support rod is fixedly connected to the hydraulic rod, and the telescopic end of the hydraulic rod is fixedly connected to the guide bar.
[0009] Preferably, the side of the step column away from the waterproof sheet roll is fixedly connected to a push rod, and the end of the push rod is rotatably connected to a pressure wheel.
[0010] Preferably, the telescopic end of the hydraulic telescopic rod is fixedly connected to the cross bar, the cross bar is provided with a first through slot, the sliding block is slidably connected in the first through slot, the sliding block is rotatably connected to the hinge block, the hinge block is slidably connected to the swing rod, the swing rod is provided with a second through slot, the hinge block is located in the second through slot, both ends of the swing rod are respectively fixedly connected to the limit rods, and the two limit rods are rotatably connected to the waterproof sheet roll;
[0011] The sliding block is controlled to slide along the first through slot by a linear sliding mechanism.
[0012] Preferably, one of the limit rods is fixedly connected to the control motor, and the control motor is fixedly connected to the waterproof sheet roll.
[0013] Preferably, the telescopic end of the hydraulic telescopic rod is fixedly connected to the blocking rod, and the blocking rod and the limiting rod are directly fixedly connected to the limiting spring.
[0014] Preferably, the bottom of the swing rod is fixedly connected to the oblique rod, the lower end of the oblique rod is provided with an inclined surface, and the boss is rotatably connected to the roller.
[0015] The advantages of the present invention are: a tunnel waterproof material laying device provided by the present invention is guided by a hydraulic telescopic rod along a guide rail to lay a circular waterproof board in the tunnel. During the laying process, for the position of the hot-melt gasket that needs to be welded, the push rod pushes the welding pressure plate of the welder to contact the waterproof board with the hot-melt gasket before welding. The step column carries the support rod and the push block to flatten the hot-melt gasket during welding. Then the step column is blocked by the cross plate and stops moving. At this time, the waterproof board is pulled flat on the hot-melt gasket, and then continues to push. The welder uses the welding pressure plate alone to weld the hot-melt gasket and the waterproof board, so that when the waterproof board is welded to the hot-melt gasket, the excess margin (loose waterproof board) is pulled in the direction where there is no welding, thereby ensuring that the waterproof board is unfolded flat and avoiding defects caused by looseness.
[0016] The present invention changes the position of the sliding block and the hinge block so that the left end or the right end of the waterproof sheet roll can be lifted at the required position, thereby obtaining a pulling effect. The lifted hinge point adapts to the differentiated requirements of the tensioning position, thereby better overcoming the looseness of the waterproof sheet welding. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a basic structural diagram of the present invention;
[0018] Figure 2 yes Figure 1 A local enlarged view of point E in FIG;
[0019] Figure 3 It is a schematic structural diagram of the hot melt welding device of the present invention;
[0020] Figure 4It is a three-dimensional distribution diagram of the hot melt welding device of the present invention;
[0021] Figure 5 This is a schematic diagram of the split structure of the crossbar and the swing arm of the present invention;
[0022] Figure 6 It is a schematic diagram of the nodes of the waterproof board welding of the present invention. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0024] like Figure 1-6 As shown, the present invention provides a tunnel waterproof material laying device, including a frame 1, wherein the upper ends of the frame 1 are fixedly connected to guide rails 11, the guide rails 11 are slidably connected to sliders 12, the frame 1 is fixedly connected to a control box 13, both sides of the control box 13 are rotatably connected to hydraulic telescopic rods 14, the hydraulic telescopic rods 14 are driven to rotate by an existing driving mechanism, the guide rails 11 are slidably connected to a slide 15, the slide 15 is fixedly connected to the hydraulic telescopic rod 14, the telescopic end of the hydraulic telescopic rod 14 is provided with a waterproof sheet roll 16, the telescopic end of the hydraulic telescopic rod 14 is fixedly connected to a support rod 17, and the end of the support rod 17 is provided with a hot melt welding device 2;
[0025] The hot melt welding device 2 includes a transverse plate 21, and a plurality of avoidance holes 22 are arranged at intervals on the transverse plate 21. A welder 23 is coaxially arranged in each avoidance hole 22, which adopts an electric heating method. One end of the welder 23 is fixedly connected to the welding pressure plate 24, and the transverse plate 21 is fixedly connected to the bracket 25. The bracket 25 is fixedly connected to the push rod 26. The push rod 26 is electric. The push rod 26 is fixedly connected to the welder 23. The welder 23 is slidably connected to the step column 27. The step column 27 is hinged to one side of the waterproof sheet roll 16 and is provided with a rotary torsion spring. The end of the support rod 28 is fixedly connected to the push block 29. The push block 29 presses the waterproof sheet that has not been welded. Due to the hinged effect, as the stage As the step column 27 approaches, the pressed waterproof sheet slides in the direction away from the hot-melt gasket. The welding pressure plate 24 is provided with a heating groove 241 adapted to the hot-melt gasket. The waterproof sheet is partially sleeved on the hot-melt gasket 10, thereby reducing the influence of the high convexity of the hot-melt gasket 10 and facilitating the cooperation with the support rod 28 and the push block 29 so that the hot-melt gasket 10 is flattened during welding. The side of the step column 27 away from the waterproof sheet roll 16 is fixedly connected to the push rod 3. The end of the push rod 3 is rotatably connected to the pressure wheel 31 to press the waterproof sheet in the direction that has been laid around the hot-melt gasket 10. This direction cannot be pushed or pulled along the diameter direction of the hot-melt gasket 10 because it has already been laid and tensioning will be counterproductive.
[0026] The welder 23 is provided with a boss 231 , and a first spring 232 is fixedly connected between the boss 231 and the step column 27 . The diameter of the step column 27 is larger than the diameter of the avoidance hole 22 .
[0027] The present invention lays an annular waterproof sheet in a tunnel by guiding the guide rail 11 with a hydraulic telescopic rod 14. During the laying process, the push rod 26 pushes the welding pressure plate 24 of the welder 23 to bring the waterproof sheet into contact with the hot-melt gasket 10 before welding, and the step column 27 with the support rod 28 and the push block 29 flattens the area around the hot-melt gasket 10 during welding. Then the step column 27 is stopped by the cross plate 21. At this time, the waterproof sheet is pulled flat on the hot-melt gasket 10, and then continues to be pushed. The welder 23 uses the welding pressure plate 24 alone to weld the hot-melt gasket 10 and the waterproof sheet, so that when the waterproof sheet is welded to the hot-melt gasket 10, the excess margin (loose waterproof sheet) is pulled in the direction where there is no welding, thereby ensuring that the waterproof sheet is unfolded flat and avoiding defects caused by looseness.
[0028] As an embodiment of the present invention, the horizontal plate 21 is fixedly connected to the guide bar 211, the support rod 17 is provided with a guide groove 212, the guide bar 211 is adapted to the guide groove 212, the side of the support rod 17 is fixedly connected to the hydraulic rod 213, and the telescopic end of the hydraulic rod 213 is fixedly connected to the guide bar 211.
[0029] The hydraulic rod 213 pushes the hot melt welding device 2 to offset as a whole to adapt to the misaligned setting of the hot melt gasket 10.
[0030] As an embodiment of the present invention, one of the limit rods 44 is fixedly connected to the control motor 45, the control motor 45 is fixedly connected to the waterproof sheet roll 16, and a torque sensor is arranged between the main shaft of the control motor 45 and the installation shaft of the waterproof sheet roll 16. The torque sensor is a prior art and needs to be adaptively matched according to the width of the waterproof sheet and the requirement of laying tension force. It is used to monitor the tensioning force after the waterproof sheet is laid. On the one hand, it avoids the waterproof sheet from being laid too loose, and on the other hand, it cooperates with the hot melt welding device 2 to synchronously tighten it within the set torque requirement during welding.
[0031] That is, the control motor 45 is released to lay the waterproof sheet. When it is paused at the welding position, the control motor 45 sets a pre-set tensioning force A. The welding flattens the waterproof sheet and stretches it toward the control motor 45, so that the pre-set tensioning force A is reduced. Then the corresponding controller recognizes that the torque of the torque sensor is reduced, and at this time drives the control motor 45 to perform adaptive winding, thereby ensuring that each welding position can avoid slack.
[0032] As an embodiment of the present invention, the telescopic end of the hydraulic telescopic rod 14 is fixedly connected to the cross bar 4, the cross bar 4 is provided with a first through slot 41, the sliding block 42 is slidably connected in the first through slot 41, the sliding block 42 is rotatably connected to the hinge block 421, the hinge block 421 is slidably connected to the swing rod 43, the swing rod 43 is provided with a second through slot 431, the hinge block 421 is located in the second through slot 431, and the two ends of the swing rod 43 are respectively fixedly connected to the limit rods 44, and the two limit rods 44 are rotatably connected to the waterproof sheet roll 16;
[0033] The sliding block 42 slides along the first through slot 41 through a linear sliding mechanism, which is a conventional linear drive mechanism such as a screw slider mechanism.
[0034] Furthermore, the telescopic end of the hydraulic telescopic rod 14 is fixedly connected to the barrier rod 46, and the barrier rod 46 and the limit rod 44 are directly fixedly connected to the limit spring 47. The barrier rod 46 plays a limiting role in the lifting of the waterproof board roll 16. The bottom of the swing rod 43 is fixedly connected to the inclined rod 48, and the lower end of the inclined rod 48 is provided with an inclined surface, and the boss 231 is rotatably connected to the roller 49.
[0035] In order to better achieve the laying quality of the waterproof board by cooperating with the winding effect of the control motor 45, the single control motor 45 cannot adapt to the tensioning difference of the hot-melt gaskets 10 at different positions. The hot-melt gaskets 10 are welded one by one. When welding the outermost hot-melt gasket 10, the hinge position point of the sliding block 42 and the hinge block 421 is adjusted to the middle of the cross bar 4 and the swing bar 43. When the welder 23 is pushed forward for pressure welding, the roller 49 contacts the inclined surface set at the lower end of the inclined rod 48, and the swing bar 43 is pushed upward by the inclined rod 48. The swing bar 43 is twisted relative to the cross bar 4 at the sliding block 42 and the hinge block 421, so that the waterproof board roll 16 is lifted, and then it is convenient to change the position of the sliding block 42 and the hinge block 421, so that the waterproof board roll 16 can be lifted at the left end or the right end at the required position, thereby obtaining a pulling effect. The lifted hinge point adapts to the differentiated requirements of the tensioning position, thereby better overcoming the looseness of the waterproof board welding.
[0036] While embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions, and variations may be made to these embodiments without departing from the principles and spirit of the invention, and that the scope of the invention is defined by the appended claims and their equivalents.
Claims
1. A tunnel waterproof material laying device, comprising a frame (1), wherein both ends of the upper side of the frame (1) are fixedly connected to guide rails (11), the guide rails (11) are slidably connected to sliders (12), the frame (1) is fixedly connected to a control box (13), both sides of the control box (13) are rotatably connected to hydraulic telescopic rods (14), the guide rails (11) are slidably connected to a slide seat (15), the slide seat (15) is fixedly connected to the hydraulic telescopic rod (14), and a waterproof sheet roll (16) is arranged at the telescopic end of the hydraulic telescopic rod (14), characterized in that: The telescopic end of the hydraulic telescopic rod (14) is fixedly connected to the support rod (17), and the end of the support rod (17) is provided with a hot melt welding device (2); The hot melt welding device (2) comprises a transverse plate (21), the transverse plate (21) is provided with a plurality of avoidance holes (22) at intervals, each avoidance hole (22) is coaxially provided with a welder (23), one end of the welder (23) is fixedly connected to a welding pressure plate (24), the transverse plate (21) is fixedly connected to a bracket (25), the bracket (25) is fixedly connected to a push rod (26), the push rod (26) is fixedly connected to the welder (23), a step column (27) is slidably connected to the welder (23), the step column (27) is hingedly connected to a plurality of support rods (28) on one side facing the waterproof sheet roll (16) and is provided with a rotary torsion spring, and the end of the support rod (28) is fixedly connected to a push block (29); The welder (23) is provided with a boss (231), a first spring (232) is fixedly connected between the boss (231) and the step column (27), and the diameter of the step column (27) is greater than the diameter of the avoidance hole (22).
2. A tunnel waterproof material laying device according to claim 1, characterized in that: The transverse plate (21) is fixedly connected to the guide bar (211), the support rod (17) is provided with a guide slot (212), the guide bar (211) is adapted to the guide slot (212), the side of the support rod (17) is fixedly connected to the hydraulic rod (213), and the telescopic end of the hydraulic rod (213) is fixedly connected to the guide bar (211).
3. A tunnel waterproof material laying device according to claim 1, characterized in that: The side of the step column (27) away from the waterproof sheet roll (16) is fixedly connected to the top rod (3), and the end of the top rod (3) is rotatably connected to the clamping wheel (31).
4. A tunnel waterproof material laying device according to claim 1, characterized in that: The telescopic end of the hydraulic telescopic rod (14) is fixedly connected to the cross bar (4), the cross bar (4) is provided with a first through groove (41), a sliding block (42) is slidably connected in the first through groove (41), the sliding block (42) is rotatably connected to the hinge block (421), the hinge block (421) is slidably connected to the swing rod (43), the swing rod (43) is provided with a second through groove (431), the hinge block (421) is located in the second through groove (431), and the two ends of the swing rod (43) are respectively fixedly connected to the limit rods (44), and the two limit rods (44) are rotatably connected to the waterproof board roll (16); The sliding block (42) is controlled to slide along the first through slot (41) by a linear sliding mechanism.
5. A tunnel waterproof material laying device according to claim 4, characterized in that: One of the limit rods (44) is fixedly connected to a control motor (45), and the control motor (45) is fixedly connected to the waterproof sheet roll (16).
6. A tunnel waterproof material laying device according to claim 4, characterized in that: The telescopic end of the hydraulic telescopic rod (14) is fixedly connected to a stop rod (46), and the stop rod (46) and the limit rod (44) are directly fixedly connected to a limit spring (47).
7. A tunnel waterproof material laying device according to claim 4, characterized in that: The bottom of the swing rod (43) is fixedly connected to the inclined rod (48), the lower end of the inclined rod (48) is provided with an inclined surface, and the boss (231) is rotatably connected to the roller (49).
Citation Information
Cited By
Paving and hanging trolley for rubber sealing layer of artificial chamber
CN122169850A