Pipeline support for building construction

By introducing a combination of locking mechanism and adhesive into pipeline supports used in building construction, the problem of easy pipe rotation is solved, achieving stable clamping and fixation of the pipes and improving construction quality.

CN118912274AInactive Publication Date: 2024-11-08TIANYEJIANZHUSHE GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410990073.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In existing building construction, pipeline supports can cause pipelines to rotate easily after they are fixed in place, leading to instability.

Method used

A pipeline support for building construction is adopted, which includes a vertical beam, a first horizontal beam and a locking mechanism. The pipe is bonded and fixed by the clamping rod and the support rod in the locking mechanism, and the pipe is stably clamped by the drive of the screw and the connecting rod.

Benefits of technology

This effectively prevents the pipeline from rotating after it is fixed, improving the stability and reliability of the pipeline and ensuring the safe operation of the pipeline system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912274A_ABST
    Figure CN118912274A_ABST
Patent Text Reader

Abstract

The pipeline support for building construction comprises a vertical beam, a first cross beam is fixedly connected to the vertical beam, a locking mechanism used for locking a pipeline is arranged on the first cross beam, the locking mechanism comprises a base, a first clamping rod is arranged on the base, and the end, away from the base, of the first clamping rod is rotationally connected with a second clamping rod; a first sliding groove is formed in the second clamping rod, a moving seat is arranged in the first sliding groove, a containing cavity for containing adhesive is formed in the second clamping rod, a push rod is slidably connected into the second clamping rod, and one end of the push rod extends into the containing cavity and is fixedly connected with a piston. The first clamping rod is driven to rotate, the push rod is driven to push the piston to move in the containing cavity, the piston moves to extrude bonding glue in the containing cavity to the outer wall of the pipeline, the outer wall of the pipeline is bonded with the second clamping rod, and therefore when the clamping mechanism clamps the pipeline, pipeline bonding is achieved, and pipeline rotation is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline installation, and in particular to a pipeline support for building construction. Background Art

[0002] Pipeline is a general term for various pipes, wires, cables, etc. Pipeline support is a structural component for overhead laying of pipelines and lines. Pipeline support is an important device for supporting and fixing pipelines. It is widely used in construction, industry and civil engineering to ensure the stability and safe operation of the pipeline system.

[0003] The pipeline support used in construction is generally a metal frame, on which the pipeline is mounted, and the pipeline is fixed and limited by U-shaped clamps, etc. The pipeline fixed in this way is easy to rotate. For example, the Chinese patent announcement number CN220600689U in the prior art discloses a pipeline support for construction. Although it can be raised or lowered for easy adjustment, its disclosed structure is not convenient for fixing pipelines and cables. After the pipeline is fixed by this structure, the pipeline is easy to rotate. Therefore, it is necessary to develop a new pipeline support to solve the problem of pipeline rotation after installation. Summary of the invention

[0004] The purpose of the present invention is to solve the above technical problems and provide a pipeline support for building construction.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A pipeline support for building construction, comprising a vertical beam for fixing on a building, a first horizontal beam arranged perpendicular to the vertical beam being fixedly connected to the vertical beam, a locking mechanism for locking the pipeline being arranged on the first horizontal beam, the locking mechanism comprising a base, a first clamping rod, a second clamping rod, and a support rod, the base being provided with a U-shaped groove for placing the pipeline, first clamping rods rotatably connected to the base being symmetrically arranged on both sides of the U-shaped groove on the base, an end of the first clamping rod away from the base being rotatably connected to the second clamping rod, a first sliding groove being provided on the second clamping rod, and the first clamping rod being provided with a second sliding groove. The first slide groove is provided with a moving seat which is slidably matched with the first slide groove, one end of the support rod is hinged on the first clamping rod, and the other end of the support rod is hinged on the moving seat, and the second clamping rod is provided with a accommodating cavity for accommodating adhesive glue on the side of the moving seat away from the first clamping rod, and the second clamping rod is slidably connected with a push rod, one end of the push rod extends into the accommodating cavity and is fixedly connected with a piston, and the piston is slidably matched with the inner wall of the accommodating cavity. When the second clamping rod abuts against the pipeline to clamp the pipeline, the support rod drives the piston to move to squeeze the adhesive glue in the accommodating cavity onto the pipeline to bond the pipeline.

[0007] Furthermore, an extrusion hole is provided at one end of the second clamping rod away from the first clamping rod, and the extrusion hole extends into the accommodating cavity. A push rod is fixedly connected to the piston, and a blocking block is fixedly connected to the end of the push rod. The blocking block is located in the extrusion hole to block the extrusion hole, and when the piston moves, the blocking block is driven to move out of the extrusion hole to open the extrusion hole.

[0008] Furthermore, a first compression spring is arranged on a side of the movable seat away from the first clamping rod, one end of the first compression spring is fixed on the second clamping rod, and the other end of the first compression spring is fixed on the movable seat.

[0009] Furthermore, a driving rod is fixedly connected to the first clamping rod, and the driving rod is fixed on the side of the U-shaped groove of the first clamping rod away from the base. The base is provided with an avoidance groove for avoiding the driving rod and the first clamping rod, and a first slider is slidably connected in the avoidance groove. A connecting rod is hingedly connected to the first slider, and an end of the connecting rod away from the first slider is hinged to an end of the driving rod away from the first clamping rod. A threaded hole is provided on the base, and a screw is threadedly fitted in the threaded hole, and an end of the screw is rotatably connected to the first slider. The rotation of the screw drives the first slider to move and then drives the connecting rod to drive the driving rod to rotate.

[0010] Furthermore, second slide grooves are arranged on both sides of the avoidance groove, and protruding columns are arranged on both sides of the first sliding block, and the protruding columns extend into the second slide grooves and slidably cooperate with the second slide grooves.

[0011] Furthermore, a storage groove is provided on the base at the bottom of the U-shaped groove, and the storage groove is located directly below the second clamping rod, and the width of the storage groove is greater than the width of the second clamping rod.

[0012] Furthermore, the vertical beam is fixedly connected to a second cross beam, and a plurality of wire trough locking devices are installed on the second cross beam. The wire trough locking devices are provided to lock the wire troughs for placing the electric wires, thereby keeping the position of the wire troughs stable.

[0013] Furthermore, the wire trough locking device includes a first horizontal frame and a first vertical frame, the first horizontal frame is fixed on the second horizontal beam, the first vertical frame is fixed at one end of the first horizontal frame and is arranged perpendicular to the first horizontal frame; the first horizontal frame is slidably connected to a second sliding block that slides laterally along the first horizontal frame, the second sliding block is fixedly connected to the second vertical frame, the second vertical frame is sleeved with a sliding sleeve that slides up and down along the second vertical frame, and the sliding sleeve is fixedly connected to the second horizontal frame, the first vertical frame is provided with an elongated groove arranged up and down, the end of the second horizontal frame is away from the sliding sleeve passes through the elongated groove, the first vertical frame is sleeved with a clamping sleeve, the clamping sleeve is threaded with a locking bolt, and the end of the locking bolt passes through the clamping sleeve and abuts against the side wall of the first vertical frame and squeezes the side wall of the first vertical frame so that the side wall clamps the second horizontal frame inside.

[0014] Furthermore, a dovetail groove is provided on the first cross frame, and the dovetail groove is arranged along the length direction of the first cross frame. A dovetail groove slider matching the shape of the dovetail groove is provided at the bottom of the second slider, and the dovetail groove slider is located in the dovetail groove and slidably cooperates with the dovetail groove.

[0015] Furthermore, a transverse sleeve is fixedly connected to one side of the clamping sleeve, and the transverse sleeve is arranged on the second transverse frame.

[0016] The invention provides a pipeline support for construction, which has the following beneficial effects: by driving the first clamping rod to rotate, the first clamping rod drives the second clamping rod to rotate, so that the second clamping rod abuts against the side wall of the pipeline, and continues to drive the first clamping rod to rotate. The second clamping rod rotates relative to the first clamping rod under the action of the pipeline clamping force, so that the support rod drives the moving seat to move along the first sliding groove, and the movement of the moving seat drives the push rod to push the piston to move in the accommodating chamber, and the movement of the piston squeezes the adhesive in the accommodating chamber onto the outer wall of the pipeline, so that the outer wall of the pipeline is bonded to the second clamping rod, so that the pipeline is bonded to prevent the pipeline from rotating while the clamping mechanism clamps the pipeline; the first slider is driven to move by the movement of the screw rod, and the movement of the first slider drives the connecting rod to move, so that the first clamping rod is rotated under the joint action of the connecting rod and the driving rod, and then drives the second clamping rod to clamp the pipeline, and the second clamping rod encounters resistance when clamping the pipeline and rotates relative to the first clamping rod, thereby squeezing out the adhesive. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings:

[0018] Figure 1 A schematic diagram of the structure of a pipeline support for building construction provided by the present invention;

[0019] Figure 2 A schematic diagram of the structure of a locking mechanism in a pipeline support for building construction provided by the present invention;

[0020] Figure 3 A partial side cross-sectional schematic diagram of a first sliding block in a pipeline support for building construction provided by the present invention;

[0021] Figure 4 for Figure 2 Schematic diagram of the local structure in;

[0022] Figure 5 for Figure 4 A schematic diagram of the structure of the part when the piston in the receiving chamber squeezes out the adhesive in the receiving chamber;

[0023] Figure 6 A schematic structural diagram of a wire trough locking device in a pipeline support for construction provided by the present invention;

[0024] Figure 7 A schematic diagram of the lateral local structure of the second sliding block in a pipeline support for building construction provided by the present invention;

[0025] Figure 8 The present invention is a schematic diagram of a side cross-sectional structure of a clamping sleeve in a pipeline support for building construction provided by the present invention.

[0026] Explanation of the reference numerals in the figure: 1, vertical beam; 2, first horizontal beam; 3, locking mechanism; 31, base; 3101, U-shaped groove; 32, first clamping rod; 33, second clamping rod; 331, first slide groove; 332, accommodating cavity; 333, extrusion hole; 34, support rod; 35, moving seat; 36, push rod; 37, piston; 38, push rod; 39, blocking block; 310, first compression spring; 311, driving rod; 312, The first slider; 313, connecting rod; 314, screw; 315, second slide groove; 316, boss; 317, storage groove; 4, second crossbeam; 5, wire groove locking device; 51, first cross frame; 52, first vertical frame; 521, long groove; 53, second slider; 531, dovetail groove slider; 54, second vertical frame; 55, sliding sleeve; 56, second cross frame; 57, clamping sleeve; 571, transverse sleeve; 58, locking bolt. DETAILED DESCRIPTION

[0027] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] It should be noted that all directional indications in the embodiments of the present invention (such as up-down-left-right-front-back...) are only used to explain the relative position relationship - movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly. The connection can be a direct connection or an indirect connection.

[0030] like Figure 1-Figure 8 As shown, a pipeline support for building construction comprises a vertical beam 1 for fixing on a building, a first horizontal beam 2 arranged perpendicularly to the vertical beam 1 is fixedly connected to the vertical beam 1, a locking mechanism 3 for locking the pipeline is arranged on the first horizontal beam 2, the locking mechanism 3 comprises a base 31, a first clamping rod 32, a second clamping rod 33, and a support rod 34, a U-shaped groove 3101 for placing the pipeline is arranged on the base 31, first clamping rods 32 rotatably connected to the base 31 are symmetrically arranged on both sides of the U-shaped groove 3101 on the base 31, an end of the first clamping rod 32 away from the base 31 is rotatably connected to the second clamping rod 33, a first sliding groove 331 is arranged on the second clamping rod 33, and the first sliding groove 331 is provided on the second clamping rod 33. The groove 331 is provided with a movable seat 35 that slidably cooperates with the first sliding groove 331, one end of the support rod 34 is hinged on the first clamping rod 32, and the other end of the support rod 34 is hinged on the movable seat 35. The second clamping rod 33 is provided with a accommodating cavity 332 for accommodating adhesive glue on the side of the movable seat 35 away from the first clamping rod 32, and the second clamping rod 33 is slidably connected with a push rod 36, one end of the push rod 36 extends into the accommodating cavity 332 and is fixedly connected with a piston 37, and the piston 37 is slidably cooperated with the inner wall of the accommodating cavity 332. When the second clamping rod 33 abuts against the pipeline to clamp the pipeline, the support rod 34 drives the piston 37 to move to squeeze the adhesive glue in the accommodating cavity 332 onto the pipeline to bond the pipeline.

[0031] By adopting the above technical solution, when in use, by driving the first clamping rod 32 to rotate, the first clamping rod 32 drives the second clamping rod 33 to rotate, so that the second clamping rod 33 abuts against the side wall of the pipe, and continues to drive the first clamping rod 32 to rotate. The second clamping rod 33 rotates relative to the first clamping rod 32 under the action of the pipe clamping force, so that the support rod 34 drives the moving seat 35 to move along the first slide groove 331, and the movement of the moving seat 35 drives the push rod 36 to push the piston 37 to move in the accommodating chamber 332. The movement of the piston 37 squeezes the adhesive in the accommodating chamber 332 onto the outer wall of the pipe, so that the outer wall of the pipe is bonded to the second clamping rod 33, so that when the clamping mechanism clamps the pipe, the pipe is bonded to prevent the pipe from rotating.

[0032] Specifically, an extrusion hole 333 is provided at one end of the second clamping rod 33 away from the first clamping rod 32, and the extrusion hole 333 extends into the accommodating chamber 332. A push rod 38 is fixedly connected to the piston 37, and a blocking block 39 is fixedly connected to the end of the push rod 38. The blocking block 39 is located in the extrusion hole 333 to block the extrusion hole 333. When the piston 37 moves, the blocking block 39 is driven to move out of the extrusion hole 333 to open the extrusion hole 333. By providing the blocking block 39 connected to the piston 37, the extrusion hole 333 is blocked by the blocking block 39 when not clamped, thereby preventing the adhesive in the accommodating chamber 332 from flowing out. When clamped, the piston 37 moves to drive the blocking block 39 to move out of the extrusion hole 333 to open the extrusion hole 333, so as to facilitate the extrusion of the adhesive for bonding.

[0033] Specifically, a first compression spring 310 is provided on the side of the movable seat 35 away from the first clamping rod 32, one end of the first compression spring 310 is fixed to the second clamping rod 33, and the other end of the first compression spring 310 is fixed to the movable seat 35. By providing the first compression spring 310 to generate elastic force on the movable seat 35, when the second clamping rod 33 does not clamp the pipe, the movable seat 35 remains away from the accommodating cavity 332, thereby preventing the piston 37 from being driven to squeeze out the adhesive in the accommodating cavity 332 when the pipe is not clamped.

[0034] Specifically, a driving rod 311 is fixedly connected to the first clamping rod 32, and the driving rod 311 is fixed on the side of the U-shaped groove 3101 on the first clamping rod 32 away from the base 31. The base 31 is provided with an avoidance groove for avoiding the driving rod 311 and the first clamping rod 32, and the first slider 312 is slidably connected in the avoidance groove. The first slider 312 is hingedly connected with a connecting rod 313, and the end of the connecting rod 313 away from the first slider 312 is hinged to the end of the driving rod 311 away from the first clamping rod 32. A threaded hole is provided on the base 31, and a screw 314 is threadedly fitted in the threaded hole, and the end of the screw 314 is rotatably connected to the first slider 312, and the screw 314 rotates to drive the first slider 312 to move and then drives the connecting rod 313 to drive the driving rod 311 to rotate. The first slider 312 is driven to move by the screw rod 314, and the first slider 312 drives the connecting rod 313 to move, so that the first clamping rod 32 rotates under the joint action of the connecting rod 313 and the driving rod 311, and then drives the second clamping rod 33 to clamp the pipe. When the second clamping rod 33 clamps the pipe, it encounters resistance and rotates relative to the first clamping rod 32, so that the adhesive is squeezed out; when there is no need to clamp the pipe, the first slider 312 moves to the side away from the U-shaped groove 3101, driving the second clamping rod 33 to rotate in the direction away from the U-shaped groove 3101, so that the top of the U-shaped groove 3101 is open, which facilitates the placement of the pipe in the U-shaped groove 3101 for installation. Specifically, a nut for facilitating the rotation of the screw 314 is provided at the end of the screw 314 away from the first slider 312.

[0035] Specifically, the two sides of the avoidance groove are provided with second slide grooves 315, and the two sides of the first slider 312 are provided with protrusions 316, and the protrusions 316 extend into the second slide grooves 315 and slide in cooperation with the second slide grooves 315. Through the cooperation between the second slide grooves 315 and the protrusions 316, the first slider 312 is restricted so that the first slider 312 keeps moving in a straight line during movement, making the driving more stable.

[0036] Specifically, a storage groove 317 is provided on the base 31 at the bottom of the U-shaped groove 3101, and the storage groove 317 is located directly below the second clamping rod 33, and the width of the storage groove 317 is greater than the width of the second clamping rod 33. By providing the storage groove 317, the adhesive falling from the pipeline is collected to prevent the adhesive from dripping.

[0037] Specifically, the vertical beam 1 is fixedly connected with a second cross beam 4, and a plurality of wire trough locking devices 5 are installed on the second cross beam 4. The wire trough locking devices 5 are provided to lock the wire troughs for placing the wires, thereby keeping the position of the wire troughs stable. The wire slot locking device 5 includes a first cross frame 51 and a first vertical frame 52, the first cross frame 51 is fixed on the second cross beam 4, the first vertical frame 52 is fixed at one end of the first cross frame 51 and is arranged perpendicular to the first cross frame 51; the first cross frame 51 is slidably connected with a second slider 53 that slides laterally along the first cross frame 51, the second slider 53 is fixedly connected with a second vertical frame 54, the second vertical frame 54 is sleeved with a sliding sleeve 55 that slides up and down along the second vertical frame 54, and the sliding sleeve 55 is fixedly connected with a second cross frame 56, the first vertical frame 52 is provided with an elongated groove 521 arranged up and down, and the end of the second cross frame 56 away from the sliding sleeve 55 passes through the elongated groove 521, the first vertical frame 52 is sleeved with a clamping sleeve 57, and the clamping sleeve 57 is threadedly matched with a locking bolt 58, and the end of the locking bolt 58 passes through the clamping sleeve 57 and abuts against the side wall of the first vertical frame 52 and squeezes the side wall of the first vertical frame 52 so that the side wall clamps the internal second cross frame 56. A rectangular space for placing a cable trough is enclosed by the first horizontal frame 51, the first vertical frame 52, the second horizontal frame 56 and the second vertical frame 54. The rectangular cross-section cable trough is limited by the first horizontal frame 51, the first vertical frame 52, the second horizontal frame 56 and the second vertical frame 54 to prevent the cable trough from moving. The position between the second horizontal frame 56 and the first vertical frame 52 is kept fixed by tightening the locking bolt 58, so that the rectangular frame enclosed by the first horizontal frame 51, the first vertical frame 52, the second horizontal frame 56 and the second vertical frame 54 remains stable. Therefore, by limiting a point where the locking bolt 58 is located, the vertically movable second horizontal frame 56 and the laterally movable second vertical frame 54 are limited, thereby reducing the number of bolts used and increasing the installation speed.

[0038] Specifically, a dovetail groove is provided on the first cross frame 51, and the dovetail groove is arranged along the length direction of the first cross frame 51. A dovetail groove slider 531 matching the shape of the dovetail groove is provided at the bottom of the second slider 53, and the dovetail groove slider 531 is located in the dovetail groove and slidably cooperates with the dovetail groove. The first cross frame 51 slidably cooperates with the second slider 53 through the dovetail groove, so that the second slider 53 moves stably along the first cross frame 51.

[0039] Specifically, a transverse sleeve 571 is fixedly connected to one side of the clamping sleeve 57, and the transverse sleeve 571 is sleeved on the second transverse frame 56. By arranging the transverse sleeve 571 on the clamping sleeve 57, the upper and lower positions between the second transverse frame 56 and the clamping sleeve 57 are kept stable, so that the locking bolt 58 on the clamping sleeve 57 is always located on the side of the second transverse frame 56, and the second transverse frame 56 can be clamped by tightening the locking bolt 58, thereby avoiding the need to adjust the positions of the clamping sleeve 57 and the second transverse frame 56 up and down, ensuring the tightening reliability, and facilitating installation.

[0040] The parts not involved in this technical solution can be implemented by using existing technologies.

[0041] The above shows and describes the basic principles, main features and characteristics of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements fall within the scope of the present invention to be protected. The scope of the present invention to be protected includes the attached claims and their equivalents.

Claims

1. A pipeline support for construction, characterized in that: The invention comprises a vertical beam (1) for fixing on a building, wherein a first horizontal beam (2) arranged perpendicular to the vertical beam (1) is fixedly connected to the vertical beam (1), and a locking mechanism (3) for locking a pipe is arranged on the first horizontal beam (2), and the locking mechanism (3) comprises a base (31), a first clamping rod (32), a second clamping rod (33), and a support rod (34), and the base (31) is provided with a U-shaped groove (3101) for placing the pipe, and first clamping rods (32) rotatably connected to the base (31) are symmetrically arranged on both sides of the U-shaped groove (3101) on the base (31), and the end of the first clamping rod (32) away from the base (31) is rotatably connected to the second clamping rod (33), and the second clamping rod (33) is provided with a first slide groove (331), and the first slide groove (331) is provided with a first clamping rod (331). A movable seat (35) is provided which is slidably matched with the first slide groove (331); one end of the support rod (34) is hinged on the first clamping rod (32); the other end of the support rod (34) is hinged on the movable seat (35); a receiving cavity (332) for receiving adhesive is provided in the second clamping rod (33) on the side of the movable seat (35) away from the first clamping rod (32); a push rod (36) is slidably connected in the second clamping rod (33); one end of the push rod (36) extends into the receiving cavity (332) and is fixedly connected to a piston (37); the piston (37) is slidably matched with the inner wall of the receiving cavity (332); when the second clamping rod (33) abuts against the pipeline to clamp the pipeline, the support rod (34) drives the piston (37) to move to squeeze the adhesive in the receiving cavity (332) onto the pipeline to bond the pipeline.

2. A pipeline support for construction according to claim 1, characterized in that: An extrusion hole (333) is provided at one end of the second clamping rod (33) away from the first clamping rod (32), and the extrusion hole (333) extends into the accommodating chamber (332). A push rod (38) is fixedly connected to the piston (37), and a blocking block (39) is fixedly connected to the end of the push rod (38). The blocking block (39) is located in the extrusion hole (333) to block the extrusion hole (333). When the piston (37) moves, the blocking block (39) is driven to move out of the extrusion hole (333) and thus open the extrusion hole (333).

3. A pipeline support for construction according to claim 1, characterized in that: A first compression spring (310) is arranged on the side of the movable seat (35) away from the first clamping rod (32); one end of the first compression spring (310) is fixed on the second clamping rod (33), and the other end of the first compression spring (310) is fixed on the movable seat (35).

4. A pipeline support for construction according to claim 1, characterized in that: The first clamping rod (32) is fixedly connected to a driving rod (311), and the driving rod (311) is fixed to a side of the first clamping rod (32) away from the U-shaped groove (3101) on the base (31). The base (31) is provided with an avoidance groove for avoiding the driving rod (311) and the first clamping rod (32). A first sliding block (312) is slidably connected in the avoidance groove. The first sliding block (312) is hingedly connected to a connecting rod (313). One end of the connecting rod (313) away from the first slider (312) is hinged to one end of the driving rod (311) away from the first clamping rod (32); a threaded hole is provided on the base (31), a screw rod (314) is threadedly engaged in the threaded hole, an end of the screw rod (314) is rotatably connected to the first slider (312), and the screw rod (314) rotates to drive the first slider (312) to move, thereby driving the connecting rod (313) to drive the driving rod (311) to rotate.

5. A pipeline support for construction according to claim 4, characterized in that: Second slide grooves (315) are arranged on both sides of the avoidance groove, and protruding columns (316) are arranged on both sides of the first sliding block (312), and the protruding columns (316) extend into the second slide grooves (315) and slideably cooperate with the second slide grooves (315).

6. A pipeline support for construction according to any one of claims 1 to 5, characterized in that: A storage groove (317) is provided on the base (31) at the bottom of the U-shaped groove (3101), and the storage groove (317) is located directly below the second clamping rod (33), and the width of the storage groove (317) is greater than the width of the second clamping rod (33).

7. The pipeline support for construction according to claim 1, characterized in that: A second cross beam (4) is fixedly connected to the vertical beam (1), and a plurality of wire slot locking devices (5) are installed on the second cross beam (4).

8. A pipeline support for construction according to claim 7, characterized in that: The wire slot locking device (5) comprises a first horizontal frame (51) and a first vertical frame (52), wherein the first horizontal frame (51) is fixed on the second horizontal beam (4), and the first vertical frame (52) is fixed on one end of the first horizontal frame (51) and is arranged perpendicular to the first horizontal frame (51); the first horizontal frame (51) is slidably connected with a second slider (53) which slides laterally along the first horizontal frame (51), the second slider (53) is fixedly connected with a second vertical frame (54), the second vertical frame (54) is sleeved with a sliding sleeve (55) which slides up and down along the second vertical frame (54), and the sliding sleeve (55) is fixedly connected with the second vertical frame (54) The movable sleeve (55) is fixedly connected with a second horizontal frame (56); the first vertical frame (52) is provided with vertically arranged long grooves (521); one end of the second horizontal frame (56) away from the sliding sleeve (55) passes through the long groove (521); a clamping sleeve (57) is sleeved on the first vertical frame (52); a locking bolt (58) is threadedly engaged on the clamping sleeve (57); an end of the locking bolt (58) passes through the clamping sleeve (57) and abuts against a side wall of the first vertical frame (52) and squeezes the side wall of the first vertical frame (52) so that the side wall clamps the second horizontal frame (56) inside.

9. A pipeline support for construction according to claim 8, characterized in that: The first cross frame (51) is provided with a dovetail groove, and the dovetail groove is arranged along the length direction of the first cross frame (51); the bottom of the second slider (53) is provided with a dovetail groove slider (531) matching the shape of the dovetail groove, and the dovetail groove slider (531) is located in the dovetail groove and slidably cooperates with the dovetail groove.

10. A pipeline support for construction according to claim 8 or 9, characterized in that: A transverse sleeve (571) is fixedly connected to one side of the clamping sleeve (57), and the transverse sleeve (571) is sleeved on the second transverse frame (56).

Citation Information

Patent Citations

  • Pipeline support for building construction

    CN220600689U