Method for judging 10kV single-phase earth fault based on fault line capacitance current finding mode

By using non-fault lines to retrieve the capacitance current of the fault line in a 10kV distribution network, and performing zero-sequence power direction calculation, the accuracy and persistence of single-phase grounding fault judgment is solved, and the accurate line selection of the fault line is achieved and section positioning improves the safety and stability of the power grid.

CN118914920APending Publication Date: 2024-11-08SUZHOU YINJU ELECTRIC POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410970828.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In a 10kV distribution network, within 2 to 10ms after a single-phase grounding fault occurs, it is difficult for the prior art to accurately determine the fault line, which easily leads to misjudgment and misoperation, and it is impossible to continuously determine whether the fault nature is transient or permanent.

Method used

By retrieving the capacitance current of the faulty line on the non-faulted line, using wide-area synchronization information to calculate the zero-sequence power direction, confirming the faulty line and fault segment, and realizing line selection or section positioning and relay protection of the faulty line.

Benefits of technology

It realizes accurate judgment and continuous monitoring of single-phase grounding faults of 10kV system, overcomes the limitation of the fault judgment time of only 2~10ms after the arc suppression coil device is started, improves the judgment accuracy and stability, and can distinguish between instantaneousness and permanentness. sexual failure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118914920A_ABST
    Figure CN118914920A_ABST
Patent Text Reader

Abstract

The invention discloses a 10kV single-phase earth fault distinguishing method based on a fault line capacitance current finding mode. The 10kV single-phase earth fault distinguishing method comprises the following steps that a fault point is excluded from being located at the upstream of a first measuring point of each line or on a 10kV bus of a transformer substation; finding out a fault line and a non-fault line; finding out a fault section and a non-fault section of the fault line; finding out the fault phase of the fault line; 2-10 ms after a single-phase earth fault occurs, zero-sequence current of a first measuring point on each non-fault line is further collected, the zero-sequence current is added and subjected to phase reversal, PMU zero-sequence current of a fault section of the fault line is obtained, and zero-sequence power direction calculation is conducted on the PMU zero-sequence current and PMU zero-sequence voltage in real time; when the zero-sequence voltage exists, further confirming that the line section has a single-phase earth fault; and when the fault time exceeds a specified time limit, a permanent single-phase earth fault is reported to occur in the line section. According to the method, the problem that whether a fault line is a transient single-phase grounding fault or a permanent single-phase grounding fault cannot be accurately judged in an arc suppression coil grounding mode is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a 10kV single-phase grounding fault identification method, and in particular to a 10kV single-phase grounding fault identification method based on retrieving the fault line capacitance current. The present invention belongs to the protection and control technical field of power distribution network. Background Art

[0002] In the arc suppression coil grounding system, an over-compensation scheme is generally adopted. When a single-phase grounding fault occurs on a 10kV distribution line, the arc suppression coil is started about 2 to 10ms after the fault occurs. The inductive current of the arc suppression coil compensates for and exceeds the capacitive current of the fault point, so that the fault information of the fault line is submerged by the inductive current, making it very difficult to further identify the single-phase grounding fault. In the 10kV distribution network system, which is a grounding system through an arc suppression coil, for a single-phase grounding fault on a 10kV distribution line, a wide-area synchronous (PMU) current measuring device is used to collect the A, B, and C phase currents on the line, and send them to the dispatching master station or substation end to calculate the zero-sequence current 3I0 of each line. At the same time, a wide-area synchronous voltage measuring device is installed on the secondary of the voltage transformer (PT) on the substation bus or line to collect the zero-sequence voltage 3U0, which is sent to the dispatching master station or substation end, and then the zero-sequence power direction is calculated. However, the zero-sequence power direction calculation and single-phase grounding fault judgment can only be performed within a short time of about 2 to 10ms. The existing technology has no way to further judge the single-phase grounding fault after 2 to 10ms. As long as the zero-sequence power direction is started, the action state is maintained when the zero-sequence voltage exists; this approach is prone to misjudgment and false operation. The present invention proposes that, 2 to 10 ms after the fault, the capacitance current of the fault line is retrieved from the non-fault line, and the zero-sequence power direction of the fault line is further calculated to improve the scheme for determining the fault line. That is, a relay protection technical scheme for single-phase grounding fault is proposed, which is a 10kV system that is grounded through an arc suppression coil. Based on wide-area synchronization information, the capacitance current of the 10kV fault line is retrieved from the capacitance current of the non-fault line, the fault line and the fault section are confirmed, and the fault line selection or section positioning is realized. Summary of the invention

[0003] In order to solve the above technical problems, the purpose of the present invention is to use a relay protection method for single-phase grounding fault based on wide-area synchronization information to retrieve the 10kV fault line capacitance current from the non-fault line capacitance current, confirm the fault line and the fault section, and realize the line selection or section positioning of the fault line; to realize this method, in the arc suppression coil grounding system, within the first 2 to 10ms of a single-phase grounding fault on a distribution line, a single-phase grounding judgment system master station located at the dispatching master station or the substation end collects the PMU zero-sequence current of each measuring point on each 10kV line and the PMU zero-sequence voltage of the PT secondary on the substation bus or line, and The zero-sequence power direction is calculated and the calculation results are sorted to preliminarily determine the faulty line section. 2 to 10 ms after the single-phase grounding fault, an innovative method is adopted to further collect the zero-sequence current of the first measuring point on each non-fault line, add and invert these zero-sequence currents, and obtain the PMU zero-sequence current (capacitive current) of the faulty section of the faulty line, and calculate the zero-sequence power direction with the PMU zero-sequence voltage in real time. During the period when the zero-sequence voltage persists, the above method is further used to confirm that a single-phase grounding fault has occurred in the line section. When the fault time exceeds the specified time limit, it is accurately determined that a permanent single-phase grounding fault has occurred in the line section.

[0004] To achieve the above object, the present invention adopts the following technical solution:

[0005] A method for determining a 10 kV single-phase grounding fault based on retrieving the capacitance current of a faulty line comprises the following steps:

[0006] Step 1) Collect zero-sequence voltage PMU data. When the zero-sequence voltage value is greater than the zero-sequence voltage start setting value, enter the single-phase grounding fault judgment program; collect the PMU data of zero-sequence current and zero-sequence voltage at each measuring point of each line, and calculate the zero-sequence power direction within the first 2 to 10 ms of the fault to exclude the fault point that is not upstream (power supply side) of the first measuring point of each line or on the 10 kV busbar of the substation;

[0007] Step 2) Find out the faulty lines and non-faulty lines;

[0008] Step 3) Find out the fault section and non-fault section of the fault line;

[0009] Step 4) Find out the fault phase of the faulty line;

[0010] Step 5) 2 to 10 ms after the fault, continue to collect the three-phase currents of A, B, and C at the first measuring point of each non-fault line or directly collect the zero-sequence current from the zero-sequence CT, continue to calculate the zero-sequence current, retrieve the capacitance current of the faulty line from the non-faulty line to continue to determine whether the faulty section of the line is still the faulty section of the line; add and invert the zero-sequence currents at the first measuring point of each non-faulty line to obtain the PMU zero-sequence current (capacitance current) of the faulty section of the faulty line, and calculate the zero-sequence power direction with the PMU zero-sequence voltage.

[0011] The method is as follows: 2 to 10 ms after the fault occurs,

[0012] ⑴ Continue to collect the three-phase currents of A, B, and C at the first measuring point of each non-fault line to calculate the zero-sequence current, or continue to collect the zero-sequence current at the first measuring point of each non-fault line. The method for retrieving the capacitance current of the fault line is: add and invert the zero-sequence currents at the first measuring point of each non-fault line to obtain the zero-sequence current of the fault line section PMU of the fault line, that is, the capacitance current;

[0013] Recover the capacitance current of the fault section of the faulty line The calculation formula is:

[0014]

[0015] In the formula, It is the sum of the zero-sequence currents at the first measuring point of all non-fault lines of the substation busbar;

[0016] (2) Continue to collect the PMU zero-sequence voltage and the PMU zero-sequence current of the faulty section of the faulty line, continue to calculate the zero-sequence power direction, and continue to confirm that the faulty section of the line is still the faulty section of the faulty line;

[0017] ⑶ Collect the zero-sequence voltage of PMU and calculate the starting value when the zero-sequence voltage is continuously greater than the zero-sequence voltage;

[0018] (4) The grounding point for eliminating single-phase grounding fault is not on the upstream line section of the first measuring point of the 10kV line or the 10kV busbar of the substation;

[0019] The zero-sequence current of the first measuring point on each line is collected, and the zero-sequence power direction is calculated with the zero-sequence voltage of the PMU. The result of the zero-sequence power direction calculation is: the non-fault lines are all in the reverse direction, while the fault line is in the positive direction. The grounding point of the single-phase grounding fault is screened out and is not in the upstream line section of the first measuring point of the 10kV line or on the 10kV busbar of the substation; among them, for the fault line, the zero-sequence current (capacitive current) of the fault line retrieved from the first measuring point is used to calculate the zero-sequence power direction;

[0020] Since the capacitive current is retrieved, the zero-sequence power direction of the fault line can be calculated continuously until the fault disappears, and the fault duration can be obtained;

[0021] Step 6: Determine the nature of the fault line fault:

[0022] When the result of the single-phase grounding fault screened in step 5 is: the duration of the single-phase grounding fault is less than time t, the fault line is judged to be an instantaneous single-phase grounding fault; time t is set to be greater than the disturbance fault time of the distribution line, and is taken as 0.1 to 10 minutes; when the duration of the single-phase grounding fault is greater than time t, the fault line is judged to be a permanent single-phase grounding fault;

[0023] Step 7, the single-phase ground fault judgment program and system return:

[0024] When the measured zero-sequence voltage is less than the return set value of the zero-sequence voltage, it is screened and judged that the single-phase grounding fault disappears, and the single-phase grounding fault judgment program and system return.

[0025] In the above-mentioned method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, the method for eliminating the fault point not being upstream of the first measurement point of each line or on the 10kV busbar of the substation in step 1) is as follows:

[0026] (1) If the zero-sequence power direction of at least one line at the first measuring point of the line is in the positive direction, the grounding point for excluding single-phase grounding fault is not in the upstream line section of the first measuring point of all 10kV lines or the 10kV busbar of the substation;

[0027] (2) If the calculation results of the zero-sequence power direction of the first measuring point of the line are all in the opposite direction, the grounding point of the single-phase grounding fault is screened out to be in the upstream line section of the first measuring point of all 10kV lines or the 10kV busbar of the substation;

[0028] Through the positive and negative screening in the above steps ⑴ and ⑵, it is ruled out that the single-phase grounding fault is not in the upstream line section of the first measuring point of each 10kV line or the 10kV busbar of the substation, but in the downstream line section of the first measuring point of a certain 10kV line.

[0029] In the above method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, in step 2), the calculation results of the zero-sequence power direction are sorted to determine the faulty line and the non-faulty line as follows:

[0030] ⑴ Screen out the faulty lines

[0031] If the direction of the zero-sequence power of the first measuring point on a certain line is calculated to be positive, the line section downstream of the measuring point of the line is selected as the fault line section;

[0032] ⑵Filter out non-faulty lines

[0033] If the direction of the zero-sequence power calculated for the first measuring point on a certain line is in the reverse direction, the line section downstream of the measuring point of the line is selected as the non-fault line section;

[0034] Through the above screening steps, faulty lines and non-faulty line sections are screened out.

[0035] In the above method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, step 3), the method for screening the faulty section of the faulty line and the non-faulty section of the faulty line is as follows:

[0036] ⑴ Calculate the zero-sequence power direction of each measuring point on the fault line, set condition ① if the zero-sequence power direction of one or more consecutive measuring points (may be 1 point, or 1 series of points: from the first measuring point of the line to the measuring point before the fault point) is in the positive direction, condition ② the zero-sequence current is greater than the zero-sequence current setting value; if the above two conditions are met, select the downstream line section of the measuring point as the positive direction of the fault;

[0037] (2) Calculate the zero-sequence power direction of each measuring point on the fault line. If it is in the reverse direction, select the downstream line section of the measuring point as the reverse direction of the fault;

[0038] ⑶ Sort the measurement points selected as the positive direction and the reverse direction of the fault. The sorting method is: the zero-sequence power direction on the line is judged to be the positive direction (from the first measurement point of the line to the measurement point before the fault point) and the reverse direction (all measurement points after the fault point) are sorted respectively. The downstream section of the last measurement point in the positive direction to the upstream section of the first measurement point in the reverse direction is the fault point of the line fault. The downstream section of the first measurement point in the reverse direction is the non-fault section of the line. The line section between the last measurement point in the positive direction of the fault and the first measurement point in the reverse direction of the fault is determined to be the fault section of the fault line.

[0039] (4) If the last measurement point in the positive direction of the fault is already the last measurement point of the line, the line section downstream of the measurement point is judged to be the faulty line section.

[0040] Another method can be used to screen the fault section of the fault line and the non-fault section of the fault line: sort the zero-sequence current of the fault line at this moment, calculate and screen the phase of the zero-sequence current of the upstream measuring point and the downstream measuring point: when the phase of the zero-sequence current of the upstream measuring point and the zero-sequence current of the downstream measuring point appears in reverse phase, screen and select the coverage section of the upstream measuring point and the downstream measuring point as the fault section;

[0041] Note: When a single-phase grounding occurs in the line: the phase of the zero-sequence current will be opposite at the fault point. The fault location can be determined through this fault phenomenon.

[0042] The above-mentioned method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, step 4), the method for selecting the faulty phase of the faulty line is as follows:

[0043] (1) Calculate the A, B, and C three-phase current increments of each measuring point before the fault section of the fault line while screening in step 3) for:

[0044]

[0045] (2) In the formula, They are the A, B, and C phase currents collected after the fault section of the fault line fails. are the A, B, and C phase currents collected before the fault in the fault section of the faulty line, and Φ represents phase A, phase B, and phase C respectively;

[0046] ⑵ Sort the three-phase current increments of each measuring point before calculating the fault section of the faulty line, and determine that the phase with the largest current increment among the three-phase currents is the fault phase.

[0047] The above-mentioned method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, step 4), screens out the fault phase of the faulty line by another method: using the A, B, C three-phase voltage data of the PT secondary on the bus or line to screen the fault phases, when two of the three-phase voltages A, B, C are greater than the normal operating voltage and one of the phase voltages is less than m times the normal operating voltage or less, the phase with the reduced voltage is determined to be the fault phase of the faulty line, and m is 70% to 80%.

[0048] The above is another method to determine the fault phase: because the most obvious fault feature of single-phase grounding is the decrease in voltage of one phase of the PT, which can be used to determine the phase difference of single-phase grounding.

[0049] The above method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line includes step 1):

[0050] Preferably, the method for collecting zero-sequence current PMU data is: collecting PMU data of three-phase currents A, B, and C collected at each measuring point on each 10kV line, calculating the zero-sequence current at each measuring point of each line, or directly collecting PMU data of zero-sequence current at each measuring point using a zero-sequence current transformer; wherein the zero-sequence current calculated from the three-phase currents A, B, and C is for:

[0051]

[0052] (3) In the formula, is 3 times the zero-sequence current, is the A phase current, is the B phase current, is the C phase current;

[0053] Step 1) requires collecting the zero-sequence current of each measuring point of each line, which is also equal to the sum of the capacitance currents of the three-phase A, B, and C lines to the ground at each measuring point of each line in the event of a single-phase grounding fault, that is, the zero-sequence current is a comprehensive capacitance current.

[0054] Preferably, the method for collecting zero-sequence voltage PMU data is: collecting the three-phase voltage of the PT secondary on the substation bus or line, calculating the zero-sequence voltage in real time, and calculating the zero-sequence voltage from the A, B, and C three-phase voltages. for:

[0055]

[0056] In formula (4), is 3 times the zero-sequence voltage, is the A phase voltage, is the B phase voltage, is the C phase voltage;

[0057] Alternatively, use a zero-sequence voltage transformer PT to directly collect the zero-sequence voltage PMU data of the PT secondary on the substation bus or line.

[0058] The above method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line includes step 5):

[0059] The starting setting of zero-sequence voltage is: greater than the maximum unbalanced voltage value when the master station system collects zero-sequence voltage during normal operation:

[0060] 3U 0zd =K k *3U bph (5)

[0061] In formula (5), 3U 0zd is the zero-sequence voltage starting value; K k is the reliability factor; 3U bph It is the maximum unbalanced voltage value when the master station system collects zero-sequence voltage during normal operation, 3U 0zd Take 5~15V; reliability coefficient K k Take ≥1.5~2.0; the return setting of the zero-sequence voltage is k times the zero-sequence voltage starting setting, and k is 0.5~0.8.

[0062] In the above-mentioned method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, the zero-sequence current setting value in step 3) is greater than the maximum unbalanced current when the master station system collects the zero-sequence current under normal operation of the line.

[0063] 3I 0zd =K k 3I 0bph (6)

[0064] In formula (6), 3I 0zd is the zero-sequence current setting value; K k is the reliability coefficient; 3I 0bph It is the maximum unbalanced current when the master station system collects zero-sequence current during normal operation of the line, 3I 0zd Take 2~7A, reliability coefficient K k Take ≥1.5~2.0.

[0065] The above method for identifying a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line includes step 1:

[0066] If the zero-sequence power direction of the line is positive, it is a faulty line. The method for judging the zero-sequence power direction is: the angle range for judging the positive direction is -180°~0° or 180°~360°. The half angle position of the action area is called the maximum sensitivity angle. The sensitivity angle Φ lm The angle is 90°, and there is a clear action boundary, plus or minus 10° respectively, and the action equation is:

[0067]

[0068] If the zero-sequence power direction of the line is judged to be in the reverse direction, it is a non-fault line. The angle range for judging the reverse direction is 0°~180°, and its sensitive angle Φ lm The angle is -90°, and there is a clear action boundary, plus or minus 10° respectively. The action equation is:

[0069]

[0070] The voltage in the zero-sequence power direction is calculated as follows: Calculate the current in the zero-sequence power direction as

[0071] Compared with the prior art, the present invention has at least the following advantages:

[0072] 1. The present invention makes full use of the advantages of wide-area synchronous data. 2 to 10 ms before the fault, the PMU data of the entire 10kV power grid is collected, the zero-sequence power direction of the 10kV lines of the entire network is calculated, and the data is sorted. The fault line can be screened and identified, and the fault identification is very accurate, which is conducive to the safe and stable operation of the power grid.

[0073] 2. The present invention further collects the PMU data of the first collection point of the non-fault line at the time of the fault 2 to 10 ms after the fault occurs, and calculates the zero-sequence current (capacitor current) of the above-mentioned line, and then adds and inverts these zero-sequence currents, thereby indirectly finding out the zero-sequence current (capacitor current) of the fault section of the faulty line, and then calculates the zero-sequence power direction with the PMU zero-sequence voltage, and further confirms the faulty part of the faulty line, thereby overcoming the defect that the time for correctly judging the zero-sequence power direction of the faulty line is only 2 to 10 ms after the arc suppression coil device is started, giving full play to the advantages of big data, further screening and confirming the faulty line, and being simple and easy to implement.

[0074] 3. The present invention uses the method of retrieving the capacitive current of the faulty section of the faulty line, and further calculates the zero-sequence power direction of the section to confirm whether the faulty line is a transient single-phase grounding fault or a permanent single-phase grounding fault. The fault is judged more accurately, and the problem of the arc suppression coil grounding method that cannot accurately judge whether the faulty line is a transient single-phase grounding fault or a permanent single-phase grounding fault is overcome.

[0075] 4. The present invention uses the method of retrieving the capacitive current of the faulty section of the faulty line to continuously calculate the zero-sequence power direction of the faulty section, thereby solving the problem that the single-phase grounding fault of the arc suppression coil grounding system can only be judged for 2 to 10ms and cannot be judged continuously.

[0076] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0077] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0078] Figure 1 This is a flow chart of single-phase grounding fault determination of a 10kV power distribution line according to the present invention;

[0079] Figure 2A single-line diagram of a 10kV power distribution line according to an embodiment of the present invention;

[0080] Figure 3 It is the action characteristic diagram of the zero-sequence power direction of the fault line of the present invention;

[0081] Figure 4 It is the action characteristic diagram of the zero-sequence power direction of the non-fault line of the present invention. DETAILED DESCRIPTION

[0082] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0083] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0084] The technical solution of the present invention is:

[0085] The overall idea of ​​the technical solution of the present invention is: in the arc suppression coil grounding system, based on the wide area synchronization information, within the first 2 to 10 ms of a single-phase grounding fault occurring in a distribution line, the single-phase grounding identification system master station located at the dispatching master station end or the substation end collects the PMU zero-sequence current of each measuring point on each 10kV line and the PMU zero-sequence voltage of the PT secondary on the substation bus or line, calculates the zero-sequence power direction in real time, and sorts the calculation results to preliminarily determine the faulty line section; 2 to 10 ms after the single-phase grounding fault, an innovative method is adopted to further collect the zero-sequence current of the first measuring point on each non-fault line, add and invert these zero-sequence currents, obtain the PMU zero-sequence current (capacitive current) of the faulty section of the faulty line, and calculate the zero-sequence power direction in real time with the PMU zero-sequence voltage; during the zero-sequence voltage duration period, the above method is further used to confirm that a single-phase grounding fault has occurred in the line section; when the fault time exceeds the specified time limit, it is accurately determined that a permanent single-phase grounding fault has occurred in the line section.

[0086] like Figure 2As shown, the test equipment is first installed: (1) At the dispatching master station or substation end, a single-phase grounding discrimination system master station (hereinafter referred to as the master station system) is set up to collect fault information, calculate the zero-sequence power direction, retrieve the capacitance current calculation of the fault line, and judge the non-fault line, fault line fault section, and fault line non-fault section where a single-phase grounding fault has occurred; (2) On the 10kV line, three-phase or zero-sequence current PMU type current measuring devices are installed at every other line, and the A, B, C phase PMU current or zero-sequence current of each measuring point (referred to as current measuring point) on the line is collected, and sent to the master station system for PMU zero-sequence current 3I0 calculation; (3) A PMU type voltage measuring device is installed on the PT secondary of the substation bus or line, and the PMU zero-sequence voltage 3U0 is collected and sent to the master station system. Preferably, the PMU type current measuring device is an overhead PMU type current measuring device (SGS) and a cable type current measuring device (RCMU), or other PMU type current measuring devices. The voltage level of the power distribution line used by the present invention is 6kV-35kV, and the grounding method used in the 6kV-35kV system is a grounding system through an arc suppression coil.

[0087] Based on the above hardware arrangement, the method of identifying 10kV single-phase grounding fault by retrieving the capacitance current of the fault line is as follows: Figure 1 As shown, the following steps are included:

[0088] Step 1) Collect zero-sequence voltage PMU data. When the zero-sequence voltage value is greater than the zero-sequence voltage start setting value, enter the single-phase grounding fault judgment program; collect the PMU data of zero-sequence current and zero-sequence voltage at each measuring point of each line, and calculate the zero-sequence power direction within the first 2 to 10 ms of the fault to exclude the fault point that is not upstream (power supply side) of the first measuring point of each line or on the 10 kV busbar of the substation;

[0089] Step 2) Find out the faulty lines and non-faulty lines;

[0090] Step 3) Find out the fault section and non-fault section of the fault line;

[0091] Step 4) Find out the fault phase of the faulty line;

[0092] Step 5) 2 to 10 ms after the fault, continue to collect the three-phase currents of A, B, and C at the first measuring point of each non-fault line or directly collect the zero-sequence current from the zero-sequence CT, continue to calculate the zero-sequence current, retrieve the capacitance current of the faulty line from the non-faulty line to continue to determine whether the faulty section of the line is still the faulty section of the line; add and invert the zero-sequence currents at the first measuring point of each non-faulty line to obtain the PMU zero-sequence current (capacitance current) of the faulty section of the faulty line, and calculate the zero-sequence power direction with the PMU zero-sequence voltage.

[0093] The method is as follows: 2 to 10 ms after the fault occurs,

[0094] ⑴ Continue to collect the three-phase currents of A, B, and C at the first measuring point of each non-fault line to calculate the zero-sequence current, or continue to collect the zero-sequence current at the first measuring point of each non-fault line. The method for retrieving the capacitance current of the fault line is: add and invert the zero-sequence currents at the first measuring point of each non-fault line to obtain the zero-sequence current of the fault line section PMU of the fault line, that is, the capacitance current;

[0095] Recover the capacitance current of the fault section of the faulty line The calculation formula is:

[0096]

[0097] (9) In the formula, It is the sum of the zero-sequence currents at the first measuring point of all non-fault lines of the substation busbar;

[0098] (2) Continue to collect the PMU zero-sequence voltage and the PMU zero-sequence current of the faulty section of the faulty line, continue to calculate the zero-sequence power direction, and continue to confirm that the faulty section of the line is still the faulty section of the faulty line;

[0099] ⑶ Collect the zero-sequence voltage of PMU and calculate the starting value when the zero-sequence voltage is continuously greater than the zero-sequence voltage;

[0100] (4) The grounding point for eliminating single-phase grounding fault is not on the upstream line section of the first measuring point of the 10kV line or the 10kV busbar of the substation;

[0101] The zero-sequence current of the first measuring point on each line is collected, and the zero-sequence power direction is calculated with the zero-sequence voltage of the PMU. The result of the zero-sequence power direction calculation is: the non-fault lines are all in the reverse direction, while the fault line is in the positive direction. The grounding point of the single-phase grounding fault is screened out and is not in the upstream line section of the first measuring point of the 10kV line or on the 10kV busbar of the substation; among them, for the fault line, the zero-sequence current (capacitive current) of the fault line retrieved from the first measuring point is used to calculate the zero-sequence power direction;

[0102] Since the capacitive current is retrieved, the zero-sequence power direction of the fault line can be calculated continuously until the fault disappears, and the fault duration can be obtained;

[0103] Step 6: Determine the nature of the fault line fault:

[0104] When the result of the single-phase grounding fault screened in step 5 is: the duration of the single-phase grounding fault is less than time t, the fault line is judged to be an instantaneous single-phase grounding fault; time t is set to be greater than the disturbance fault time of the distribution line, and is taken as 0.1 to 10 minutes; when the duration of the single-phase grounding fault is greater than time t, the fault line is judged to be a permanent single-phase grounding fault;

[0105] Step 7, the single-phase ground fault judgment program and system return:

[0106] When the measured zero-sequence voltage is less than the return set value of the zero-sequence voltage, it is screened and judged that the single-phase grounding fault disappears, and the single-phase grounding fault judgment program and system return.

[0107] Preferably, in the method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, the method for eliminating the fault point not being upstream of the first measurement point of each line or on the 10kV busbar of the substation in step 1) is:

[0108] (1) If the zero-sequence power direction of at least one line at the first measuring point of the line is in the positive direction, the grounding point for excluding single-phase grounding fault is not in the upstream line section of the first measuring point of all 10kV lines or the 10kV busbar of the substation;

[0109] (2) If the calculation results of the zero-sequence power direction of the first measuring point of the line are all in the opposite direction, the grounding point of the single-phase grounding fault is screened out to be in the upstream line section of the first measuring point of all 10kV lines or the 10kV busbar of the substation;

[0110] Through the positive and negative screening in the above steps ⑴ and ⑵, it is ruled out that the single-phase grounding fault is not in the upstream line section of the first measuring point of each 10kV line or the 10kV busbar of the substation, but in the downstream line section of the first measuring point of a certain 10kV line.

[0111] Preferably, the method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, in step 2), the zero-sequence power direction calculation results are sorted, and the method for determining the faulty line and the non-faulty line is as follows:

[0112] ⑴ Screen out the faulty lines

[0113] If the direction of the zero-sequence power of the first measuring point on a certain line is calculated to be positive, the line section downstream of the measuring point of the line is selected as the fault line section;

[0114] ⑵Filter out non-faulty lines

[0115] If the direction of the zero-sequence power calculated for the first measurement point on a certain line is in the reverse direction, the line section downstream of the measurement point of the line is selected as the non-fault line section;

[0116] Through the above screening steps, faulty lines and non-faulty line sections are screened out.

[0117] Preferably, based on the method of retrieving the capacitance current of the fault line to identify the 10kV single-phase grounding fault, step 3), the method of screening the fault section of the fault line and the non-fault section of the fault line is as follows:

[0118] ⑴ Calculate the zero-sequence power direction of each measuring point on the fault line, set condition ① if the zero-sequence power direction of one or more consecutive measuring points (may be 1 point, or 1 series of points: from the first measuring point of the line to the measuring point before the fault point) is in the positive direction, condition ② the zero-sequence current is greater than the zero-sequence current setting value; if the above two conditions are met, select the downstream line section of the measuring point as the positive direction of the fault;

[0119] (2) Calculate the zero-sequence power direction of each measuring point on the fault line. If it is in the reverse direction, select the downstream line section of the measuring point as the reverse direction of the fault;

[0120] ⑶ Sort the measurement points selected as the positive direction and the reverse direction of the fault. The sorting method is: the zero-sequence power direction on the line is judged to be the positive direction (from the first measurement point of the line to the measurement point before the fault point) and the reverse direction (all measurement points after the fault point) are sorted respectively. The downstream section of the last measurement point in the positive direction to the upstream section of the first measurement point in the reverse direction is the fault point of the line fault. The downstream section of the first measurement point in the reverse direction is the non-fault section of the line. The line section between the last measurement point in the positive direction of the fault and the first measurement point in the reverse direction of the fault is determined to be the fault section of the fault line.

[0121] (4) If the last measurement point in the positive direction of the fault is already the last measurement point of the line, the line section downstream of the measurement point is judged to be the faulty line section.

[0122] Another method can be used to screen the fault section of the fault line and the non-fault section of the fault line: sort the zero-sequence current of the fault line at this moment, calculate and screen the phase of the zero-sequence current of the upstream measuring point and the downstream measuring point: when the phase of the zero-sequence current of the upstream measuring point and the zero-sequence current of the downstream measuring point appears in reverse phase, screen and select the coverage section of the upstream measuring point and the downstream measuring point as the fault section;

[0123] Note: When a single-phase grounding occurs in the line: the phase of the zero-sequence current will be opposite at the fault point. The fault location can be determined through this fault phenomenon.

[0124] Preferably, based on the method of identifying a 10kV single-phase grounding fault by retrieving the capacitance current of the faulty line, step 4), the method of identifying the faulty phase of the faulty line is as follows:

[0125] (1) While screening in step 3), calculate the A, B, and C three-phase current increments of each measuring point before the fault section of the fault line for:

[0126]

[0127] In formula (10), They are the A, B, and C phase currents collected after the fault section of the fault line fails. are the A, B, and C phase currents collected before the fault in the fault section of the faulty line, and Φ represents phase A, phase B, and phase C respectively;

[0128] ⑵ Sort the three-phase current increments of each measuring point before calculating the fault section of the faulty line, and determine that the phase with the largest current increment among the three-phase currents is the fault phase.

[0129] Preferably, a method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, step 4), another method is used to screen out the fault phase of the faulty line: the A, B, and C three-phase voltage data of the PT secondary on the bus or line are used to screen the fault phases. When the voltages of two of the three-phase voltages A, B, and C are greater than the normal operating voltage and the voltage of one phase is less than m times or less than the normal operating voltage, the phase with the reduced voltage is determined to be the fault phase of the faulty line, and m is 70% to 80%.

[0130] The above is another method to determine the fault phase: because the most obvious fault feature of single-phase grounding is the decrease in voltage of one phase of the PT, which can be used to determine the phase difference of single-phase grounding.

[0131] Preferably, a method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line comprises step 1):

[0132] The method for collecting zero-sequence current PMU data is: collect the PMU data of the three-phase currents A, B, and C collected at each measuring point on each 10kV line, calculate the zero-sequence current at each measuring point on each line, or use a zero-sequence current transformer to directly collect the PMU data of the zero-sequence current at each measuring point; the zero-sequence current calculated from the three-phase currents A, B, and C for:

[0133]

[0134] (11) In the formula, is 3 times the zero-sequence current, is the A phase current, is the B phase current, is the C phase current;

[0135] Step 1) requires collecting the zero-sequence current of each measuring point of each line, which is also equal to the sum of the capacitance currents of the three-phase A, B, and C lines to the ground at each measuring point of each line in the event of a single-phase grounding fault, that is, the zero-sequence current is a comprehensive capacitance current.

[0136] The method for collecting zero-sequence voltage PMU data is: collect the three-phase voltage of the PT secondary on the substation bus or line, calculate the zero-sequence voltage in real time, and calculate the zero-sequence voltage from the A, B, and C three-phase voltages. for:

[0137]

[0138] In formula (12), is 3 times the zero-sequence voltage, is the A phase voltage, is the B phase voltage, is the C phase voltage;

[0139] Alternatively, use a zero-sequence voltage transformer PT to directly collect the zero-sequence voltage PMU data of the PT secondary on the substation bus or line.

[0140] Preferably, a method for determining a 10kV single-phase grounding fault based on retrieving the fault line capacitance current includes step 5):

[0141] The starting setting of zero-sequence voltage is: greater than the maximum unbalanced voltage value when the master station system collects zero-sequence voltage during normal operation:

[0142] 3U 0zd =K k *3U bph (13)

[0143] In formula (13), 3U 0zd is the zero-sequence voltage starting value; K k is the reliability factor; 3U bph It is the maximum unbalanced voltage value when the master station system collects zero-sequence voltage during normal operation, 3U 0zd Take 5~15V; reliability coefficient K k Take ≥1.5~2.0; the return setting of the zero-sequence voltage is k times the zero-sequence voltage starting setting, and k is 0.5~0.8.

[0144] Preferably, in the method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line, the zero-sequence current setting value in step 3) is greater than the maximum unbalanced current when the master station system collects the zero-sequence current under normal operation of the line.

[0145] 3I 0zd=K k 3I 0bph (14)

[0146] In formula (14), 3I 0zd is the zero-sequence current setting value; K k is the reliability coefficient; 3I 0bph It is the maximum unbalanced current when the master station system collects zero-sequence current during normal operation of the line, 3I 0zd Take 2~7A, reliability coefficient K k Take ≥1.5~2.0.

[0147] Preferably, a method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line comprises step 1:

[0148] If the zero-sequence power direction of the line is positive, it is a faulty line. The method for judging the zero-sequence power direction is: the angle range for judging the positive direction is -180°~0° or 180°~360°. The half angle position of the action area is called the maximum sensitivity angle. The sensitivity angle Φ lm The angle is 90°, and there is a clear action boundary, plus or minus 10° respectively, and the action equation is:

[0149]

[0150] If the zero-sequence power direction of the line is judged to be in the reverse direction, it is a non-fault line. The angle range for judging the reverse direction is 0°~180°, and its sensitive angle Φ lm The angle is -90°, and there is a clear action boundary, plus or minus 10° respectively. The action equation is:

[0151]

[0152] The voltage in the zero-sequence power direction is calculated as follows: Calculate the current in the zero-sequence power direction as

[0153] The following takes a 10kV line as an example:

[0154] Embodiment 1

[0155] Combination Figure 2, A, B, C phase or zero-sequence current PMU type current measuring devices are installed at each measuring point 1~n on each 10kV line and each line branch line respectively, and the A, B, C phase current or zero-sequence current on the line is collected and sent to the main station system for zero-sequence current 3I0 calculation; at the same time, PMU type voltage measuring devices are installed on the substation bus or PT secondary on the line to collect zero-sequence voltage 3U0 and send it to the main station system; then the zero-sequence power direction is calculated in the main station system, and the fault section of the single-phase grounding fault of the distribution line is judged and found by calculating the zero-sequence power direction of each measuring point on each outgoing line.

[0156] The specific embodiments are as follows:

[0157] The voltage and current in the zero-sequence power direction are When the zero-sequence power direction of the line is positive, its sensitivity angle Φ lm is 90°, and its motion equation is:

[0158]

[0159] Further, we make the action boundary clear by adding or subtracting 10°, and we get:

[0160]

[0161] Therefore, the angle range for judging the zero-sequence direction of the zero-sequence current protection power as the positive direction is -170° to -10° or 190° to 350°.

[0162] When the line is a non-fault line and the zero-sequence power direction is in the opposite direction, its sensitivity angle Φ lm is -90°, and its motion equation is:

[0163]

[0164] Further, we make the action boundary clear by adding or subtracting 10°, and we get:

[0165]

[0166] Therefore, the angle range for judging the zero-sequence direction of the zero-sequence current protection power is 10° to 170°.

[0167] In the arc suppression coil grounding system, the arc suppression coil starts to work 2 to 10ms after the initial fault, and the inductive current of the arc suppression coil drowns out the fault information of the fault section of the fault line, making the zero-sequence power direction of the fault section of the fault line, which was originally judged to be the positive direction of the fault, now judged to be the reverse direction. However, the fault information of the non-fault line and the fault information of the non-fault section of the fault line are not drowned, and can be used to continue the zero-sequence current (capacitive current) calculation of the fault section of the fault line, which retrieves the zero-sequence current (capacitive current) of the fault section of the fault line. for:

[0168]

[0169] (21) In the formula, It is the sum of the PMU zero-sequence currents of the first measuring point of all non-fault lines of the substation bus.

[0170] When zero-sequence voltage still exists in the system, the zero-sequence power direction of the fault line can be further calculated with the collected PMU zero-sequence voltage, and the duration of the single-phase grounding fault in the fault section of the fault line can be further determined, and it can be determined whether the fault line is a transient single-phase grounding fault or a permanent single-phase grounding fault.

[0171] Combined with the above judgment method,

[0172] When a B-phase grounding fault occurs in the downstream line section of the 4th measuring point of the 1st line, and the collected or calculated zero-sequence voltage exceeds the zero-sequence voltage setting value, the master station system enters the single-phase grounding fault judgment procedure, and immediately collects the zero-sequence current of each line and each measuring point, and calculates the zero-sequence power direction. Within 2 to 10 ms after the initial fault: the zero-sequence power direction of the 1st line 1 to 4 measuring points is judged to be in the positive direction, and the zero-sequence power direction of the measuring points on the 5th to nth lines is judged to be in the reverse direction; the increments of the A, B, and C three-phase currents of the 1st line 1 to 4 measuring points are calculated, among which the B phase current is the largest, or the three-phase voltage is used to judge that the A and C phase voltages increase, and the B phase voltage decreases and is less than m times the normal operating voltage, then the fault is between the 4th and 5th measuring points of the 1st line, and the fault phase is the B phase;

[0173] 2 to 10 ms after the fault, continue to collect the zero-sequence current of the first measurement point of the non-fault line of the 2nd to nth lines, add and invert the zero-sequence current of the first measurement point of the non-fault line, and then get the zero-sequence current (capacitive current) of the fault section of the faulty line. Continue to calculate the zero-sequence power direction of the fault section of the faulty line with the zero-sequence voltage, and further judge it as the positive direction. If the fault duration is less than t time, report that a transient B-phase grounding fault has occurred between the 4th and 5th measurement points of the 1st line; if the fault duration is greater than t time, report that a permanent B-phase grounding fault has occurred between the 4th and 5th measurement points of the 1st line;

[0174] When the zero-sequence voltage disappears, the master station system single-phase grounding fault judgment program exits.

[0175] In addition to the above embodiments, the present invention may also have other implementation modes, and any technical solution formed by equivalent replacement or equivalent transformation falls within the protection scope required by the present invention.

Claims

1. A method for identifying 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line. It is characterized in that The following steps are involved: Step 1) Collect zero-sequence voltage PMU data, and when the zero-sequence voltage value is greater than the zero-sequence voltage starting setting value, enter the single-phase grounding fault judgment program; The collected PMU data of zero-sequence current and zero-sequence voltage at each measuring point of each line are used to calculate the zero-sequence power direction within the first 2 to 10 ms of the fault to exclude the possibility that the fault point is not upstream of the first measuring point of each line or on the 10 kV busbar of the substation; Step 2) Find out the faulty lines and non-faulty lines; Step 3) Find out the fault section and non-fault section of the fault line; Step 4) Find out the fault phase of the faulty line; Step 5) 2 to 10 ms after the fault, continue to collect the three-phase currents of the first measurement point A, B, and C of each non-fault line or directly collect the zero-sequence current from the zero-sequence CT, continue to calculate the zero-sequence current, and retrieve the fault line capacitance current from the non-fault line to continue to determine whether the fault section of the line is still the fault section of the line; The zero-sequence current of the first measuring point of each non-fault line is added and inverted to obtain the PMU zero-sequence current of the fault section of the fault line, and the zero-sequence power direction is calculated with the PMU zero-sequence voltage. The method is as follows: 2 to 10 ms after the fault occurs, ⑴ Continue to collect the three-phase currents of A, B, and C at the first measuring point of each non-fault line to calculate the zero-sequence current, or continue to collect the zero-sequence current at the first measuring point of each non-fault line. The method for retrieving the capacitance current of the fault line is: add and invert the zero-sequence currents at the first measuring point of each non-fault line to obtain the zero-sequence current of the fault line section PMU of the fault line, that is, the capacitance current; Recover the capacitance current of the fault section of the faulty line The calculation formula is: (1) In the formula, It is the sum of the zero-sequence currents at the first measuring point of all non-fault lines of the substation busbar; (2) Continue to collect the PMU zero-sequence voltage and the PMU zero-sequence current of the faulty section of the faulty line, continue to calculate the zero-sequence power direction, and continue to confirm that the faulty section of the line is still the faulty section of the faulty line; ⑶ Collect the zero-sequence voltage of PMU and calculate the starting value when the zero-sequence voltage is continuously greater than the zero-sequence voltage; (4) The grounding point for eliminating single-phase grounding fault is not on the upstream line section of the first measuring point of the 10kV line or the 10kV busbar of the substation; The zero-sequence current of the first measuring point on each line is collected, and the zero-sequence power direction is calculated with the zero-sequence voltage of the PMU. The result of the zero-sequence power direction calculation is: the non-fault lines are all in the reverse direction, while the fault line is in the positive direction. The grounding point of the single-phase grounding fault is screened out and is not in the upstream line section of the first measuring point of the 10kV line or on the 10kV busbar of the substation; among them, for the fault line, the zero-sequence current of the fault line retrieved from the first measuring point is used to calculate the zero-sequence power direction; Since the capacitive current is retrieved, the zero-sequence power direction of the fault line can be calculated continuously until the fault disappears, and the fault duration can be obtained; Step 6: Determine the nature of the fault line fault: When the result of the single-phase grounding fault screened in step 5 is: the duration of the single-phase grounding fault is less than time t, the fault line is judged to be an instantaneous single-phase grounding fault; time t is set to be greater than the disturbance fault time of the distribution line, and is taken as 0.1 to 10 minutes; when the duration of the single-phase grounding fault is greater than time t, the fault line is judged to be a permanent single-phase grounding fault; Step 7, the single-phase ground fault judgment program and system return: When the measured zero-sequence voltage is less than the return set value of the zero-sequence voltage, it is screened and judged that the single-phase grounding fault disappears, and the single-phase grounding fault judgment program and system return.

2. The method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line according to claim 1, It is characterized in that Step 1) The method for eliminating the fault point that is not upstream of the first measurement point of each line or on the 10kV busbar of the substation is: (1) If the zero-sequence power direction of at least one line at the first measuring point of the line is in the positive direction, the grounding point for excluding single-phase grounding fault is not in the upstream line section of the first measuring point of all 10kV lines or the 10kV busbar of the substation; (2) If the calculation results of the zero-sequence power direction of the first measuring point of the line are all in the opposite direction, the grounding point of the single-phase grounding fault is screened out to be in the upstream line section of the first measuring point of all 10kV lines or the 10kV busbar of the substation; Through the positive and negative screening in the above steps ⑴ and ⑵, it is ruled out that the single-phase grounding fault is not in the upstream line section of the first measuring point of each 10kV line or the 10kV busbar of the substation, but in the downstream line section of the first measuring point of a certain 10kV line.

3. The method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line according to claim 1, It is characterized in that In step 2), the method of sorting the zero-sequence power direction calculation results and determining the faulty line and the non-faulty line is as follows: ⑴ Screen out the faulty lines If the direction of the zero-sequence power of the first measuring point on a certain line is calculated to be positive, the line section downstream of the measuring point of the line is selected as the fault line section; ⑵Filter out non-faulty lines If the direction of the zero-sequence power calculated for the first measurement point on a certain line is in the reverse direction, the line section downstream of the measurement point of the line is selected as the non-fault line section; Through the above screening steps, faulty lines and non-faulty line sections are screened out.

4. The method for determining a 10 kV single-phase grounding fault based on retrieving the capacitance current of the faulty line according to claim 1, It is characterized in that The method for screening the fault section of the fault line and the non-fault section of the fault line in step 3) is as follows: ⑴ Calculate the zero-sequence power direction of each measuring point on the fault line, set condition ① if the zero-sequence power direction of one or more consecutive measuring points is in the positive direction, condition ② the zero-sequence current is greater than the zero-sequence current setting value; if the above two conditions are met, select the downstream line section of the measuring point as the fault positive direction; (2) Calculate the zero-sequence power direction of each measuring point on the fault line. If it is in the reverse direction, select the downstream line section of the measuring point as the reverse direction of the fault; ⑶ Sort the measurement points selected as the positive direction and the reverse direction of the fault. The sorting method is: the zero-sequence power directions on the line are sorted as the positive direction and the reverse direction respectively. The downstream section of the last measurement point in the positive direction to the upstream section of the first measurement point in the reverse direction is the fault point of the line fault. The downstream section of the first measurement point in the reverse direction is the non-fault section of the line. The line section between the last measurement point in the positive direction of the fault and the first measurement point in the reverse direction of the fault is determined to be the fault section of the fault line. (4) If the last measurement point in the positive direction of the fault is already the last measurement point of the line, the line section downstream of the measurement point is judged to be the fault line section; Another method for screening the fault section of the fault line and the non-fault section of the fault line: sort the zero-sequence current of the fault line at this moment, calculate and screen the phase of the zero-sequence current of the upstream measuring point and the downstream measuring point: when the phase of the zero-sequence current of the upstream measuring point and the zero-sequence current of the downstream measuring point appears in reverse phase, the coverage section of the upstream measuring point and the downstream measuring point is screened and selected as the fault section.

5. The method for determining a 10kV single-phase grounding fault based on retrieving the capacitance current of the faulty line according to claim 1, It is characterized in that Step 4), the method of screening out the fault phase of the faulty line is as follows: (1) Calculate the A, B, and C three-phase current increments of each measuring point before the fault section of the fault line while screening in step 3) for: (2) In the formula, They are the A, B, and C phase currents collected after the fault section of the fault line fails. are the A, B, and C phase currents collected before the fault in the fault section of the faulty line, and Φ represents phase A, phase B, and phase C respectively; ⑵ Sort the three-phase current increments of each measuring point before calculating the fault section of the faulty line, and determine that the phase with the largest current increment among the three-phase currents is the fault phase.

6. The method for determining a 10 kV single-phase grounding fault based on retrieving the capacitance current of the faulty line according to claim 1, It is characterized in that Step 4), another method is used to screen the fault phase of the faulty line: the A, B, C three-phase voltage data of the PT secondary on the bus or line are used to screen the fault phases. When two of the three-phase voltages A, B, C are greater than the normal operating voltage and one of the phase voltages is less than m times the normal operating voltage or less, the phase with reduced voltage is determined to be the fault phase of the faulty line, and m is 70% to 80%.

7. The method for determining a 10 kV single-phase grounding fault based on retrieving the capacitance current of the faulty line according to claim 1, It is characterized in that The method for collecting zero-sequence current PMU data in step 1 is: collecting PMU data of three-phase currents A, B, and C collected at each measuring point on each 10kV line, calculating the zero-sequence current at each measuring point of each line, or directly collecting PMU data of zero-sequence current at each measuring point using a zero-sequence current transformer; the zero-sequence current calculated from the three-phase currents A, B, and C for: (3) In the formula, is 3 times the zero-sequence current, is the A phase current, is the B phase current, is the C phase current; The method for collecting zero-sequence voltage PMU data is: collect the three-phase voltage of the PT secondary on the substation bus or line, calculate the zero-sequence voltage in real time, and calculate the zero-sequence voltage from the A, B, and C three-phase voltages. for: In formula (4), is 3 times the zero-sequence voltage, is the A phase voltage, is the B phase voltage, is the C phase voltage; Alternatively, use a zero-sequence voltage transformer PT to directly collect the zero-sequence voltage PMU data of the PT secondary on the substation bus or line.

8. The method for determining a 10 kV single-phase grounding fault based on retrieving the capacitance current of the faulty line according to claim 1, It is characterized in that Wherein step 5): The starting setting value of the zero-sequence voltage is greater than the maximum unbalanced voltage value when the master station system collects the zero-sequence voltage during normal operation: 3U 0zd =K k *3U bph (5) In formula (5), 3U 0zd is the zero-sequence voltage starting value; K k is the reliability factor; 3U bph It is the maximum unbalanced voltage value when the master station system collects zero-sequence voltage during normal operation, 3U 0zd Take 5~15V; reliability coefficient K k Take ≥1.5~2.0; the return setting of the zero-sequence voltage is k times the zero-sequence voltage starting setting, and k is 0.5~0.

8.

9. The method for determining a 10 kV single-phase grounding fault based on retrieving the capacitance current of the faulty line according to claim 1, It is characterized in that The zero-sequence current setting value in step 3) is greater than the maximum unbalanced current when the master station system collects zero-sequence current under normal line operation. <h2 style=";text-align:left;direction:ltr">3I<h2 style=";text-align:left;direction:ltr"> 0zd <h2 style=";text-align:left;direction:ltr"> =K<h2 style=";text-align:left;direction:ltr"> k <h2 style=";text-align:left;direction:ltr"> 3I<h2 style=";text-align:left;direction:ltr"> 0bph <h2 style=";text-align:left;direction:ltr"> (6) In formula (6), 3I 0zd is the zero-sequence current setting value; K k is the reliability coefficient; 3I 0bph It is the maximum unbalanced current when the master station system collects zero-sequence current during normal operation of the line, and the reliability coefficient K k Take ≥1.5~2.0, 3I 0zd Take 2~7A.

10. The method for determining a 10 kV single-phase grounding fault based on retrieving the capacitance current of the faulty line according to claim 1, It is characterized in that Step 1: If the zero-sequence power direction of the line is positive, it is a faulty line. The method for judging the zero-sequence power direction is: the angle range for judging the positive direction is -180°~0° or 180°~360°. The half angle position of the action area is called the maximum sensitivity angle. The sensitivity angle Φ lm The angle is 90°, and there is a clear action boundary, plus or minus 10° respectively, and the action equation is: If the zero-sequence power direction of the line is judged to be in the reverse direction, it is a non-fault line. The angle range for judging the reverse direction is 0°~180°, and its sensitive angle Φ lm The angle is -90°, and there is a clear action boundary, plus or minus 10° respectively. The action equation is: The voltage in the zero-sequence power direction calculated in equations (7)-(8) is Calculate the current in the zero-sequence power direction as