Control system health state evaluation method, system, equipment and medium
By building the control system health status evaluation index and evaluation model, the problem of low reliability of the control system health status evaluation results is solved, and accurate feedback and evaluation of the health status of complex systems is achieved.
Patent Information
- Application Number
- CN202410943222.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-08
AI Technical Summary
The prior art cannot effectively feedback the changes in the health status of the control system, and the reliability of the health status evaluation results is mainly due to the failure to comprehensively consider the coupling relationship between the non-equal interval information of multiple indicators and the data source.
By constructing health status evaluation indicators of control system, considering non-equal interval information, calculating fusion cycles and calculation cycles, determining the confidence distribution form and relative weights, and constructing a health status evaluation model to evaluate the health status of the control system.
It realizes accurate feedback on the health status of the control system and the reliability of evaluation results, can effectively integrate the health status of different subsystems, and provide more reliable health status evaluation results.
Smart Images

Figure CN118915685A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of control system health status assessment, and in particular to a control system health status assessment method, system, equipment and medium. Background Art
[0002] The control system is a multi-level complex system composed of multiple stand-alone subsystems, subsystems, components, and elements. It is used to realize the flight control and ground test control of complex weapon systems. The health status of the control system directly affects the combat effectiveness of the complex weapon system and plays a vital role in the fields of space shuttles and launch vehicles. Due to the complexity of the control system, the health status assessment is aimed at comprehensively considering the feasibility of the control system, that is, the feasibility of the assessment process, and making full use of the various information reflected by the control system to make an objective, fair, and reasonable comprehensive assessment to improve the adaptability of the system assessment results. Its significance lies in obtaining the comprehensive results of the health assessment of the control system, providing strong support for its health status prediction and health management, and improving the reliability of the control system operation to prevent catastrophic failures.
[0003] For the actual control system, the control system is a complex system with multiple index inputs, with many internal components and health status indicators, and the object to be evaluated is also very large. It is difficult to be convincing to evaluate the quality status of the missile control system based on only a few factors from various types of indicators, single machines, and even the entire control system. Moreover, the control system health assessment problem is a typical, open, complex system with a clear hierarchical structure, complex component relationships, and coupling. For the control system, the setting of the health assessment index system should be able to accurately reflect the subordinate relationship between the various levels, and each indicator has a clear connotation. According to the hierarchical recursive relationship, a hierarchical and rationally structured whole is formed, so as to effectively feedback the changes in the health status of the entire control system. Therefore, how to establish an effective health status assessment system based on the structure and mechanism of the control system is one of the current problems.
[0004] Since the control system health indicators involve multiple types of information, the amount of data information is large, there are a large number of inconsistent sampling intervals, and the technical fields involved are wide. However, the existing commonly used evaluation technologies do not consider the non-equal interval relationship between multiple indicators and data sources when evaluating the health status of complex systems. When processing the above indicators, they tend to use indicator equidistant data to evaluate the health of the system, in which the indicators of different samples are processed and kept at equal intervals. However, due to the requirements of test accuracy, the measurement intervals between different subsystems and even between different indicators are inconsistent. If these differences are ignored, the true health status of each subsystem cannot be accurately evaluated, which is not conducive to the health maintenance and maintenance of complex systems. This may lead to incorrect health status evaluation results, increase maintenance costs, and be unfavorable to the maintenance and management of complex systems. Therefore, how to comprehensively consider the non-equal interval information of multiple indicators of each key subsystem of the control system, unify the evaluation framework, integrate the health status of different subsystems, and obtain more reliable control system health status evaluation results is the second outstanding problem currently faced. Summary of the invention
[0005] The purpose of the present invention is to provide a control system health status assessment method, system, device and medium to solve the problem of inability to effectively feedback changes in the health status of the entire control system and low reliability of control system health status assessment results.
[0006] To achieve the above object, the present invention provides the following solutions:
[0007] A control system health status assessment method, comprising:
[0008] Constructing a control system health status evaluation index according to system analog quantity information, timing information and inertial group calibration information, and using the control system health status evaluation index as a first index;
[0009] Considering the non-uniform interval information of the first indicator, dividing the first indicator according to the sampling intervals corresponding to different first indicators, and calculating the fusion period and calculation period of the first indicator;
[0010] Determine a second indicator according to the first indicator; the second indicator includes a confidence distribution form after the observation amount corresponding to the time series information is transformed, a confidence distribution form after the first indicator is transformed after the standardization processing, and a confidence distribution form after the first indicator is transformed after the filling;
[0011] Calculating the relative weight and reliability of the second indicator;
[0012] Constructing a health status assessment model according to the fusion cycle, the calculation cycle, the second indicator, the relative weight and the reliability;
[0013] The health status of the control system to be tested is evaluated according to the health status evaluation model.
[0014] Optionally, determining the second indicator according to the first indicator specifically includes:
[0015] Determine the observation values corresponding to different first indicators, and convert the observation values corresponding to different first indicators into confidence distribution forms; the confidence distribution forms include the confidence distribution forms of the observation values corresponding to the system analog information after the conversion, the confidence distribution forms of the observation values corresponding to the time series information after the conversion, and the confidence distribution forms of the observation values corresponding to the inertial group calibration information after the conversion;
[0016] Based on the confidence distribution form of the observation quantity corresponding to the system analog quantity information after transformation and the confidence distribution form of the observation quantity corresponding to the inertial group calibration information after transformation, the first index after division is standardized, and the standardized first index is transformed into a confidence distribution form;
[0017] Filling in missing values of the first index after division, determining the filled first index, and converting the filled first index into a confidence distribution form;
[0018] The confidence distribution form of the observed quantity corresponding to the time series information after transformation, the confidence distribution form of the first indicator after the standardization processing after transformation, and the confidence distribution form of the first indicator after the filling after transformation are used as the second indicator.
[0019] Optionally, determining the observed values corresponding to different first indicators and converting the observed values corresponding to different first indicators into a confidence distribution form specifically includes:
[0020] Determine the timing width and result deviation of the control system according to the timing information; the timing width is the difference between the end time and the start time of the timing signal; the result deviation is the difference between the end time and the reference time required to be completed by the control system;
[0021] Compare the time series width and the result deviation with corresponding standard criteria respectively to determine key information of the observation quantity corresponding to the time series information;
[0022] The confidence distribution form after the key information is transformed by using the input information conversion based on triangular fuzzy numbers, and the confidence distribution form after the observation quantity corresponding to the time series information is transformed is determined;
[0023] The observations corresponding to the system analog quantity information and the observations corresponding to the inertial group calibration information are converted into the confidence distribution form of the observations corresponding to the system analog quantity information and the confidence distribution form of the observations corresponding to the inertial group calibration information using the utility-based input information conversion.
[0024] Optionally, the missing values of the first index after the division are filled to determine the filled first index, specifically including:
[0025] Using the formula Fill in the missing values of the first index after division to determine the filled first index; wherein, is the filling value of the first index, X i (k) is the observed value of the first indicator, X i (k-1) is the observed value of the first indicator at the previous moment, X i (k-2) is X i (k-1) is the observation value of the previous moment, Γ i (k-1) is the proportional coefficient used to update the first indicator, k is the time calculation scale, i is the indicator number, k i are mutually prime natural numbers.
[0026] Optionally, the fusion period T f =T f = lcm{T1,T2,...,T L}; where {T1,T2,...,T L} is the sampling period of the first indicator, T L represents the Lth sampling period, where L is the number of different sampling periods corresponding to the first indicator; lcm represents the least common multiple calculation;
[0027] The calculation period T c =T c =gcd{T1,T2,...,T L}; where gcd represents the greatest common divisor calculation.
[0028] Optionally, the relative weight of the second indicator is:
[0029] in, is the relative weight corresponding to the second indicator at the kth moment, is the initial calculation weight, L is the number of different sampling periods corresponding to the first indicator, T i is the sampling period corresponding to the i-th indicator in the first indicator, T l (l=1,...,L) is the lth sampling period;
[0030] The reliability of the second indicator r i (k) is:
[0031] in, represents static reliability, represents dynamic reliability, τ i It is a parameter that characterizes the impact of disturbance on reliability.
[0032] Optionally, the health status assessment model is:
[0033] O(H(k))={(H j ,β j (k))}; where O(H(k)) is the health status assessment result corresponding to the kth moment; H j is the reference value corresponding to the jth health level; β j (k) is the confidence level corresponding to the jth health level.
[0034] A control system health status assessment system, comprising:
[0035] A first indicator determination module is used to construct a control system health status evaluation indicator according to system analog quantity information, timing information and inertial group calibration information, and use the control system health status evaluation indicator as a first indicator;
[0036] A fusion period and calculation period calculation module, used to consider the non-uniform interval information of the first indicator, divide the first indicator according to the sampling intervals corresponding to different first indicators, and calculate the fusion period and calculation period of the first indicator;
[0037] A second indicator determination module, used to determine a second indicator according to the first indicator; the second indicator includes a confidence distribution form after the observation amount corresponding to the time series information is transformed, a confidence distribution form after the first indicator is transformed after the standardization processing, and a confidence distribution form after the first indicator is transformed after the filling;
[0038] A relative weight and reliability calculation module, used to calculate the relative weight and reliability of the second indicator;
[0039] A health status assessment model construction module, used to construct a health status assessment model according to the fusion cycle, the calculation cycle, the second indicator, the relative weight and the reliability;
[0040] The health status assessment module is used to assess the health status of the control system to be tested according to the health status assessment model.
[0041] An electronic device comprises a memory and a processor, wherein the memory is used to store a computer program, and the processor runs the computer program so that the electronic device executes the control system health status assessment method.
[0042] A computer-readable storage medium stores a computer program, which implements the control system health status assessment method when executed by a processor.
[0043] According to the specific embodiment provided by the present invention, the present invention discloses the following technical effects: the embodiment of the present invention constructs a control system health status assessment index according to system analog quantity information, time series information and inertial group calibration information, effectively feedbacks the change of the health status of the entire control system; and takes the control system health status assessment index as the first index, considers the non-equal interval information of the first index, divides the first index according to the sampling intervals corresponding to different first indicators, calculates the fusion period and calculation period of the first index, and determines the second index according to the first index, the second index includes the confidence distribution form after the observation quantity corresponding to the time series information is transformed, the confidence distribution form after the first index is transformed after the normalization processing, and the confidence distribution form after the first index is transformed after the filling; and calculates the relative weight and reliability of the second index, and constructs a health status assessment model according to the above parameters to assess the health status of the control system to be tested. By dividing the first index according to the sampling intervals corresponding to different first indicators, and calculating the second index including the confidence distribution form after the first indicator is transformed after the filling, it is possible to comprehensively consider the non-equal interval information of multiple indicators in the control system health status assessment index, unify the assessment framework, integrate the health status of different subsystems, and obtain reliable control system health status assessment results. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0045] Figure 1 A flow chart of the control system health status assessment method provided by the present invention;
[0046] Figure 2 This is a diagram of the control system health status assessment indicator system architecture provided by the present invention;
[0047] Figure 3 This is an example diagram of the real value and filled value of some indicators of the control system;
[0048] Figure 4 It is the flow chart of the fusion strategy based on the ER method;
[0049] Figure 5 A schematic diagram of the control system health status confidence distribution considering non-uniformly spaced information;
[0050] Figure 6 Schematic diagram of the expected utility corresponding to the health state of the control system. DETAILED DESCRIPTION
[0051] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] The purpose of the present invention is to provide a control system health status assessment method, system, device and medium, which can effectively feedback changes in the health status of the entire control system and improve the reliability of the control system health status assessment results.
[0053] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0054] Embodiment 1
[0055] like Figure 1 As shown, the present invention provides a control system health status assessment method, comprising:
[0056] Step 101: construct a control system health status assessment index according to system analog quantity information, timing information and inertial group calibration information, and use the control system health status assessment index as a first index.
[0057] Step 102: Considering the non-uniform interval information of the first indicator, dividing the first indicator according to the sampling intervals corresponding to different first indicators, and calculating the fusion period and calculation period of the first indicator.
[0058] Step 103: Determine a second indicator based on the first indicator; the second indicator includes the confidence distribution form of the observed quantity corresponding to the time series information after transformation, the confidence distribution form of the first indicator after standardization, and the confidence distribution form of the first indicator after filling.
[0059] Step 104: Calculate the relative weight and reliability of the second indicator.
[0060] Step 105: construct a health status assessment model according to the fusion cycle, the calculation cycle, the second indicator, the relative weight and the reliability.
[0061] Step 106: Evaluate the health status of the control system to be tested according to the health status evaluation model.
[0062] In practical applications, in order to select the indicators involved in the evaluation, the control system plays a key role in the operation of actual complex weapons. Since the control system is a nonlinear, time-varying, complex multivariable system with many internal components and many health status indicators, in the health status test of the control system, each single machine such as the control system combination, servo system, and inertial navigation system reflects the health status of the control system. In a complete test process, it is also necessary to comprehensively consider the timing of the control system general inspection, and on this basis, further carry out the evaluation of the health status of the entire control system. The control combination and servo are mainly presented in the form of analog quantities, mainly including the oil level of the servo system tank and the displacement of the actuator. The test data of the inertial navigation system mainly comes from the relevant test indicators of the inertial group calibration, and its navigation accuracy is mainly related to the zero drift coefficient and the first drift coefficient of the accelerometer and gyroscope. In actual testing, the inertial group analog quantity uses the light intensity voltage of the gyroscope and the temperature voltage of the accelerometer as the main characteristics of the health status of the inertial navigation system. The comprehensive test indicators of the control system are mainly the timing signals of the control system general inspection, which are replaced by timing indicators here, including timing width and result deviation. The timing width is the difference between the end time and the start time of the timing signal, and the result deviation is the difference between the end time and the reference time required by the system. According to the system requirements and expert knowledge, the theoretical values of the timing width and the result deviation are used as standard criteria. Therefore, in order to further obtain the health status of the control system, it is necessary to comprehensively consider the test information and test indicator data of different levels of the control system in the health characteristic system. Based on this, the following is established: Figure 2 The control system health status assessment indicator system is shown.
[0063] In practical applications, the step 103 specifically includes: determining the observation values corresponding to different first indicators, and converting the observation values corresponding to different first indicators into a confidence distribution form; the confidence distribution form includes the confidence distribution form of the observation value corresponding to the system analog quantity information after conversion, the confidence distribution form of the observation value corresponding to the time series information after conversion, and the confidence distribution form of the observation value corresponding to the inertial group calibration information after conversion; based on the confidence distribution form of the observation value corresponding to the system analog quantity information after conversion and the confidence distribution form of the observation value corresponding to the inertial group calibration information after conversion, the first indicator after division is standardized, and the first indicator after standardization is converted into a confidence distribution form; the missing values of the first indicator after division are filled, the filled first indicator is determined, and the filled first indicator is converted into a confidence distribution form; the confidence distribution form of the observation value corresponding to the time series information after conversion, the confidence distribution form of the first indicator after standardization, and the confidence distribution form of the first indicator after conversion are used as the second indicator.
[0064] In practical applications, the observation values corresponding to different first indicators are determined, and the observation values corresponding to different first indicators are converted into confidence distribution forms, specifically including: determining the timing width and result deviation of the control system according to the timing information; the timing width is the difference between the end time and the start time of the timing signal; the result deviation is the difference between the end time and the reference time required to be completed by the control system; comparing the timing width and the result deviation with the corresponding standard criteria respectively to determine the key information of the observation quantity corresponding to the timing information; using the input information conversion based on triangular fuzzy numbers to convert the key information into a confidence distribution form, and determine the confidence distribution form of the observation quantity corresponding to the timing information after conversion; using the input information conversion based on utility to convert the observation quantity corresponding to the system analog quantity information and the observation quantity corresponding to the inertial group calibration information into the confidence distribution form of the observation quantity corresponding to the system analog quantity information and the confidence distribution form of the observation quantity corresponding to the inertial group calibration information.
[0065] In the health status assessment system, time series information, analog quantity information, and inertial group calibration information need to be integrated under the same framework of evidence reasoning. In view of this, a conversion model of health status information is constructed based on various indicators.
[0066] (1) Conversion of timing information:
[0067] Due to the particularity of time series indicators, the input of time series indicators is converted into confidence distribution by using input information conversion based on triangular fuzzy numbers:
[0068]
[0069] Among them, x i represents the observed value of the ith indicator. The corresponding health assessment level is H = {H1, H2, ..., H N}, N represents the number of corresponding evaluation levels, is the reference boundary value corresponding to the health level under this conversion method, Respectively represent the lower limit of the reference value, the median of the reference value, and the upper limit of the reference value. j,i Indicates that the i-th indicator corresponds to the j-th health level H j The initial confidence level.
[0070] (2) Conversion of other information:
[0071] Once the input indicators are determined, the input of each indicator is converted into a confidence distribution using the utility-based input information transformation:
[0072]
[0073] Among them, the corresponding health assessment level is H = {H1, H2, ..., H N}, H j ′ represents the lower limit of the numerical value of the corresponding evaluation level of the inertial group calibration index, H j ' +1 represents the numerical upper limit of the evaluation level of the inertial group calibration index, β j+1,i Indicates that the i-th indicator corresponds to the j+1th health level H j+1 The initial confidence level.
[0074] In practical applications, the missing values of the first index after division are filled to determine the first index after filling, specifically including: using the formula Fill in the missing values of the first index after division to determine the filled first index; wherein, is the filling value of the first index, X i (k) is the observed value of the first indicator, X i (k-1) is the observed value of the first indicator at the previous moment, X i (k-2) is X i (k-1) is the observation value of the previous moment, Γ i (k-1) is the proportional coefficient used to update the first indicator, k is the time calculation scale, i is the indicator number, k i are mutually prime natural numbers.
[0075] In practical applications, the fusion period T f =T f = lcm{T1,T2,...,T L}; where {T1,T2,...,T L} is the sampling period of the first indicator, T L represents the Lth sampling period, where L is the number of different sampling periods corresponding to the first indicator; lcm represents the least common multiple calculation;
[0076] The calculation period T c =T c =gcd{T1,T2,...,T L}; where gcd represents the greatest common divisor calculation.
[0077] In practical applications, the impact of non-uniformly spaced data on indicator weights is comprehensively considered, and the indicator weights are calculated in combination with the sampling period.
[0078] The relative weight of the second indicator is: in, is the relative weight corresponding to the second indicator at the kth moment, is the initial calculation weight, L is the number of different sampling periods corresponding to the first indicator, T i is the sampling period corresponding to the i-th indicator in the first indicator, T l (l=1,...,L) is the lth sampling period.
[0079] In practical applications, in order to reduce the impact of inherent interference and / or noise on indicators during measurement, another important attribute of the evidence reasoning rules should be considered comprehensively when fusing indicator data: reliability.
[0080] The reliability of the second indicator r i (k) is: in, represents static reliability, represents dynamic reliability, τ i It is a parameter that characterizes the impact of disturbance on reliability.
[0081] In practical applications, the health status assessment model is: O(H(k))={(H j ,β j (k))}; where O(H(k)) is the health status assessment result corresponding to the kth moment; H j is the reference value corresponding to the jth health level; β j (k) is the confidence level corresponding to the jth health level.
[0082] All the values of the first indicator input are described as reliability distribution, and the first indicator is divided according to the corresponding sampling interval. The specific process is as follows Figure 4 As shown, the fusion strategies based on the ER method are used for fusion:
[0083]
[0084] Among them, n is the number of indicators, N is the number of health levels, is the mixing weight, β j,i Indicates that the i-th indicator corresponds to the j-th health level H j The initial confidence level under It is the sum of the initial confidences corresponding to N health levels. An intermediate variable to simplify the calculation. and r i (k) are the indicator weight and reliability corresponding to the i-th indicator, is the mixed weight of the ith indicator. It can be obtained by calculating the relative weight and reliability of the second indicator. The health status distribution of the control system calculated by the above three formulas is:
[0085] O(H(k))={(H j ,βj (k))}.
[0086] Among them, O(H(k)) is the evaluation result corresponding to the kth moment; H j is the reference value corresponding to the jth health level; β j (k) is the confidence level corresponding to the health level.
[0087] By integrating the standardized data and the corresponding weights and reliability, the system analog information, timing information and inertial group calibration information are integrated to obtain the comprehensive health status assessment result of the control system state. In practical applications, the utility value of the output result is often used to represent the change of its health status, and the corresponding utility value is:
[0088]
[0089] Based on the above method, the present invention provides the following embodiments:
[0090] Step 1: According to Figure 2 The health status evaluation index system shown in the figure is selected as follows: control system total inspection sequence I t ; Analog quantities include: Servo system oil tank oil level F l , actuator displacement A d , IMU gyro light intensity voltage L g and the accelerometer temperature voltage T a ; The calibration information of the inertial group includes: the zero-order drift coefficient D0 and the scale factor K of the inertial group gyroscope g , and the zero-order drift coefficient K0 and scale factor K of the accelerometer a Etc.; Based on the actual situation, 91 sets of relevant test data were collected. Due to the requirements of test accuracy, the test data of some indicators were incomplete and the test intervals were inconsistent.
[0091] Step 2: Fill missing data of indicators. Due to inconsistent test intervals, it is necessary to predict and fill missing values of some indicators. After processing, the filled indicator values are obtained. According to the actual sampling interval (analog sampling interval T1 = 1, inertial group gyroscope sampling interval T2 = 2, inertial group accelerometer sampling interval T3 = 3), the fusion period and calculation period are calculated as follows: T f =6 and T c =1. Figure 3 This is an example diagram of the true value and filled value of some indicators of the control system.
[0092] Step 3: Indicator quantification and confidence conversion: The confidence conversion of the control system related test indicator information is performed. The health level and reference value settings of some evaluation indicators of the control system are shown in Table 1:
[0093] Table 1 Evaluation index reference level and reference value setting table
[0094]
[0095]
[0096] Step 4: Determine the indicator weights: This is a key step in health status assessment. Determine the weights based on the importance of the indicators. Comprehensively consider the impact of non-equal interval data on indicator weights, and calculate the relative weights between indicators based on the established weight calculation method.
[0097] Step 5: Determine the reliability of the indicator: In order to reduce the impact of inherent interference and / or noise when measuring the indicator, the reliability of the evidence needs to be considered when fusing the indicator data.
[0098] Step 6: Establish a control system health status assessment model based on evidence reasoning: Comprehensively consider the calculation cycle and fusion cycle, the filled index value, the relative weight and reliability, establish a health status assessment model, and obtain the assessment results. Determine the quality status assessment level based on expert experience, perform confidence conversion based on the filled data obtained in step 2, and obtain the health status of the control system at the corresponding moment. Based on the established federated evidence reasoning health status assessment model, calculate the actual health status, predicted health status, and missing health status of the corresponding subsystem of the control system according to the calculation cycle and fusion cycle to obtain the comprehensive health status. Figure 5 A schematic diagram of the control system health status confidence distribution considering non-uniformly spaced information; Figure 6 is a schematic diagram of the expected utility of the corresponding control system health state, such as Figure 5-Figure 6 shown.
[0099] The present invention can comprehensively consider non-uniformly spaced information such as system timing information, analog quantity information, inertial group calibration information, etc., to realize dynamic health assessment of complex systems, further truly reflect the actual working status and health status degradation trend of the control system, and enrich the optional basis for health status assessment of complex systems.
[0100] The present invention also provides a new weight discount criterion, which comprehensively considers the influence of the non-equally spaced sampling period of the indicators and combines it with the initial weight. The combination of the two jointly reflects the relative importance between the indicators containing non-equally spaced information, which is more reliable.
[0101] Embodiment 2
[0102] In order to execute the method corresponding to the above-mentioned embodiment 1 to achieve the corresponding functions and technical effects, a control system health status assessment system is provided below.
[0103] A control system health status assessment system, comprising:
[0104] The first indicator determination module is used to construct a control system health status evaluation indicator according to system analog quantity information, timing information and inertial group calibration information, and use the control system health status evaluation indicator as the first indicator.
[0105] The fusion period and calculation period calculation module is used to consider the non-uniform interval information of the first indicator, divide the first indicator according to the sampling intervals corresponding to different first indicators, and calculate the fusion period and calculation period of the first indicator.
[0106] A second indicator determination module is used to determine a second indicator based on the first indicator; the second indicator includes the confidence distribution form of the observed quantity corresponding to the time series information after transformation, the confidence distribution form of the first indicator after standardization, and the confidence distribution form of the first indicator after filling.
[0107] The relative weight and reliability calculation module is used to calculate the relative weight and reliability of the second indicator.
[0108] A health status assessment model construction module is used to construct a health status assessment model according to the fusion cycle, the calculation cycle, the second indicator, the relative weight and the reliability.
[0109] The health status assessment module is used to assess the health status of the control system to be tested according to the health status assessment model.
[0110] Embodiment 3
[0111] An electronic device includes a memory and a processor, wherein the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the control system health status assessment method described above.
[0112] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the control system health status assessment method described above.
[0113] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0114] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A control system health status assessment method, characterized in that: include: Constructing a control system health status evaluation index according to system analog quantity information, timing information and inertial group calibration information, and using the control system health status evaluation index as a first index; Considering the non-uniform interval information of the first indicator, dividing the first indicator according to the sampling intervals corresponding to different first indicators, and calculating the fusion period and calculation period of the first indicator; Determine a second indicator according to the first indicator; the second indicator includes a confidence distribution form after the observation amount corresponding to the time series information is transformed, a confidence distribution form after the first indicator is transformed after the standardization processing, and a confidence distribution form after the first indicator is transformed after the filling; Calculating the relative weight and reliability of the second indicator; Constructing a health status assessment model according to the fusion cycle, the calculation cycle, the second indicator, the relative weight and the reliability; The health status of the control system to be tested is evaluated according to the health status evaluation model.
2. The control system health status assessment method according to claim 1, characterized in that: Determining the second indicator according to the first indicator specifically includes: Determine the observation values corresponding to different first indicators, and convert the observation values corresponding to different first indicators into confidence distribution forms; the confidence distribution forms include the confidence distribution forms of the observation values corresponding to the system analog information after the conversion, the confidence distribution forms of the observation values corresponding to the time series information after the conversion, and the confidence distribution forms of the observation values corresponding to the inertial group calibration information after the conversion; Based on the confidence distribution form of the observation quantity corresponding to the system analog quantity information after transformation and the confidence distribution form of the observation quantity corresponding to the inertial group calibration information after transformation, the first index after division is standardized, and the standardized first index is transformed into a confidence distribution form; Filling in missing values of the first index after division, determining the filled first index, and converting the filled first index into a confidence distribution form; The confidence distribution form of the observed quantity corresponding to the time series information after transformation, the confidence distribution form of the first indicator after the standardization processing after transformation, and the confidence distribution form of the first indicator after the filling after transformation are used as the second indicator.
3. The control system health status assessment method according to claim 2, characterized in that: Determine the observed values corresponding to different first indicators, and convert the observed values corresponding to different first indicators into a confidence distribution form, specifically including: Determine the timing width and result deviation of the control system according to the timing information; the timing width is the difference between the end time and the start time of the timing signal; the result deviation is the difference between the end time and the reference time required to be completed by the control system; Compare the time series width and the result deviation with corresponding standard criteria respectively to determine key information of the observation quantity corresponding to the time series information; The confidence distribution form after the key information is transformed by using the input information conversion based on triangular fuzzy numbers, and the confidence distribution form after the observation quantity corresponding to the time series information is transformed is determined; The observations corresponding to the system analog quantity information and the observations corresponding to the inertial group calibration information are converted into the confidence distribution form of the observations corresponding to the system analog quantity information and the confidence distribution form of the observations corresponding to the inertial group calibration information using the utility-based input information conversion.
4. The control system health status assessment method according to claim 1, characterized in that: Filling the missing values of the first index after division to determine the filled first index specifically includes: Using the formula Fill in the missing values of the first index after division to determine the filled first index; wherein, is the filling value of the first index, X i (k) is the observed value of the first indicator, X i (k-1) is the observed value of the first indicator at the previous moment, X i (k-2) is X i (k-1) is the observation value of the previous moment, Γ i (k-1) is the proportional coefficient used to update the first indicator, k is the time calculation scale, i is the indicator number, k i are mutually prime natural numbers.
5. The control system health status assessment method according to claim 1, characterized in that: The fusion period T f =T f = lcm{T1,T2,...,T L }; Among them, {T1,T2,...,T L } is the sampling period of the first indicator, T L represents the Lth sampling period, where L is the number of different sampling periods corresponding to the first indicator; lcm represents the least common multiple calculation; The calculation period T c =T c =gcd{T1,T2,...,T L }; where gcd represents the greatest common divisor calculation.
6. The control system health status assessment method according to claim 1, characterized in that: The relative weight of the second indicator is: in, is the relative weight corresponding to the second indicator at the kth moment, is the initial calculation weight, L is the number of different sampling periods corresponding to the first indicator, T i is the sampling period corresponding to the i-th indicator in the first indicator, T l (l=1,...,L) is the lth sampling period; The reliability of the second indicator r i (k) is: in, represents static reliability, represents dynamic reliability, τ i It is a parameter that characterizes the impact of disturbance on reliability.
7. The control system health status assessment method according to claim 1, characterized in that: The health status assessment model is: O(H(k))={(H j ,β j (k))}; where O(H(k)) is the health status assessment result corresponding to the kth moment; H j is the reference value corresponding to the jth health level; β j (k) is the confidence level corresponding to the jth health level.
8. A control system health status assessment system, characterized in that: include: A first indicator determination module is used to construct a control system health status evaluation indicator according to system analog quantity information, timing information and inertial group calibration information, and use the control system health status evaluation indicator as a first indicator; A fusion period and calculation period calculation module, used to consider the non-uniform interval information of the first indicator, divide the first indicator according to the sampling intervals corresponding to different first indicators, and calculate the fusion period and calculation period of the first indicator; A second indicator determination module, used to determine a second indicator according to the first indicator; the second indicator includes a confidence distribution form after the observation amount corresponding to the time series information is transformed, a confidence distribution form after the first indicator is transformed after the standardization processing, and a confidence distribution form after the first indicator is transformed after the filling; A relative weight and reliability calculation module, used to calculate the relative weight and reliability of the second indicator; A health status assessment model construction module, used to construct a health status assessment model according to the fusion cycle, the calculation cycle, the second indicator, the relative weight and the reliability; The health status assessment module is used to assess the health status of the control system to be tested according to the health status assessment model.
9. An electronic device, characterized in that: It comprises a memory and a processor, wherein the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the control system health status assessment method as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: It stores a computer program, which, when executed by a processor, implements the control system health status assessment method as described in any one of claims 1 to 7.
Citation Information
Cited By
Complex system performance evaluation method and device considering missing data
CN120850736A
A method and device for performance evaluation of complex systems considering missing data
CN120850736B
