Coal mine underground analogue simulation method and device

By acquiring and simulating coal mine underground data for three-dimensional simulation and trajectory generation, the problem of safety threats for coal mine underground operators is solved, and the accurate simulation and safety assessment of the coal mine underground environment is achieved, which significantly improves the operational safety and efficiency.

CN118917055AInactive Publication Date: 2024-11-08CCTEG CHINA COAL RES INST

Patent Information

Application Number
CN202410931543.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Due to the complex terrain, operational hazards and mining unknowns, underground coal mines have caused personal safety threats. The existing technology requires a lot of manpower, material resources and time to conduct field tests and surveys, and it is difficult to effectively evaluate and optimize underground positioning simulation technology.

Method used

By obtaining environmental data and survey data of target tunnels underground in coal mines, performing three-dimensional simulations, receiving and generating walking trajectories, and performing mobile simulations based on environmental and trajectory data, it realizes accurate simulation and safety assessment of the underground environment of coal mines.

Benefits of technology

It significantly improves the safety of coal mine operations and reduces risks in actual operations. Through simulation simulation technology, downhole positioning simulation can be evaluated and optimized without field operations, improving work efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917055A_ABST
    Figure CN118917055A_ABST
Patent Text Reader

Abstract

The invention provides a coal mine underground analogue simulation method and device, and relates to the technical field of environmental simulation, and the method comprises the steps: obtaining target data of a coal mine underground target roadway, the target data comprising environmental data and survey data; performing three-dimensional simulation on the target roadway based on the target data to obtain a target roadway model; receiving a walking track of the target person, and generating a simulation track of the walking track in the target roadway model; and under the condition that the walking track is updated, carrying out movement simulation in the target roadway model based on the environment data and the simulation track. The underground positioning simulation technology can be effectively evaluated and optimized, the safety of coal mine operation can be remarkably improved, and risks in actual operation are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of environmental simulation, and in particular to a method and device for underground coal mine simulation. Background Art

[0002] With the development of comprehensive intelligence and digitalization of coal mine mining, underground operation technology is also constantly updated and iterated. However, the updating of technology requires R&D personnel to stay on site, walk on the spot and conduct tests again and again to obtain a large amount of positioning test data as support.

[0003] However, due to the complexity of the terrain, operational hazards and mining uncertainties of coal mine comprehensive mining operations, some dangers may arise during coal mine comprehensive mining operations, posing a threat to the personal safety of underground coal mine workers. Summary of the invention

[0004] The present application aims to solve one of the technical problems in the related art at least to some extent.

[0005] To this end, the first purpose of the present application is to propose a coal mine underground simulation method to achieve accurate simulation and mobile simulation of the coal mine underground environment.

[0006] The second purpose of this application is to provide a simulation device for underground coal mines.

[0007] The third objective of the present application is to provide an electronic device.

[0008] A fourth objective of the present application is to provide a computer-readable storage medium.

[0009] A fifth object of the present application is to provide a computer program product.

[0010] To achieve the above-mentioned purpose, the first embodiment of the present application proposes a coal mine underground simulation method, comprising:

[0011] Acquire target data of a target tunnel in a coal mine, wherein the target data includes environmental data and survey data;

[0012] Performing a three-dimensional simulation on the target lane based on the target data to obtain a target lane model;

[0013] receiving a walking trajectory of a target person, and generating a simulated trajectory of the walking trajectory in the target lane model;

[0014] When the walking trajectory is updated, a movement simulation is performed within the target lane model based on the environment data and the simulation trajectory.

[0015] To achieve the above-mentioned purpose, the second embodiment of the present application proposes a coal mine underground simulation device, comprising:

[0016] An acquisition module, used to acquire target data of a target tunnel in a coal mine, wherein the target data includes environmental data and survey data;

[0017] A three-dimensional simulation module, used for performing three-dimensional simulation on the target lane based on the target data to obtain a target lane model;

[0018] A trajectory simulation module, used for receiving the walking trajectory of the target person and generating a simulation trajectory of the walking trajectory in the target lane model;

[0019] A movement simulation module is used to perform movement simulation in the target lane model based on the environmental data and the simulation trajectory when the walking trajectory is updated.

[0020] To achieve the above-mentioned purpose, the third aspect of the present application provides an electronic device, including: a processor, and a memory communicatively connected to the processor;

[0021] The memory stores computer-executable instructions;

[0022] The processor executes the computer execution instructions stored in the memory to implement a coal mine underground simulation method proposed in the first aspect embodiment of the present application.

[0023] To achieve the above-mentioned purpose, the fourth aspect embodiment of the present application proposes a computer-readable storage medium, in which computer execution instructions are stored. When the computer execution instructions are executed by the processor, they are used to implement a coal mine underground simulation method proposed in the first aspect embodiment of the present application.

[0024] To achieve the above-mentioned purpose, the fifth aspect embodiment of the present application proposes a computer program product, including a computer program, which, when executed by a processor, implements a coal mine underground simulation method proposed in the first aspect embodiment of the present application.

[0025] The coal mine underground simulation method and device provided by the present application obtains the target data of the target tunnel in the coal mine, the target data includes environmental data and survey data; performs three-dimensional simulation on the target tunnel based on the target data to obtain the target tunnel model; receives the walking trajectory of the target personnel, and generates a simulated trajectory of the walking trajectory in the target tunnel model; and performs movement simulation in the target tunnel model based on the environmental data and the simulated trajectory when the walking trajectory is updated. It can effectively evaluate and optimize the underground positioning simulation technology, significantly improve the safety of coal mine operations, and reduce the risks in actual operations.

[0026] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0028] Figure 1 A schematic diagram of a flow chart of a coal mine underground simulation method provided in an embodiment of the present application;

[0029] Figure 2 A schematic diagram of a flow chart of another underground coal mine simulation method provided in an embodiment of the present application;

[0030] Figure 3 An operation flow chart of a coal mine underground simulation platform provided in an embodiment of the present application;

[0031] Figure 4 A display screen image provided by an embodiment of the present application;

[0032] Figure 5 An example diagram of simulation test data provided by an embodiment of the present application;

[0033] Figure 6 Another example diagram of simulation test data provided by an embodiment of the present application;

[0034] Figure 7 Another example diagram of simulation test data provided in the embodiment of the present application:

[0035] Figure 8 A schematic diagram of the structure of a coal mine underground simulation device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0036] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.

[0037] The following describes the coal mine underground simulation method and device of the embodiment of the present application with reference to the accompanying drawings.

[0038] Figure 1 A schematic flow chart of a method for underground coal mine simulation provided in an embodiment of the present application.

[0039] Simulation virtual environment technology is currently widely used in China. Compared with the widely used fields, due to the terrain complexity, operation danger and mining uncertainty of coal mine comprehensive mining operations, professional manual operation is more reliable than simulation virtual technology investment. With the development of comprehensive intelligent and safe coal mines, the demand for underground operation positioning technology is constantly developing towards intelligence.

[0040] Faced with the continuous updating and iteration of coal mine positioning technology, positioning systems and supporting equipment are constantly innovating and improving technology and precise positioning algorithms. Every positioning product manufacturing company, from product research and development to obtaining manufacturing qualifications and then to market launch, is inseparable from the R&D personnel's repeated on-site visits, field walks, and tests, and obtains a large amount of positioning test data for support. The testing process consumes a lot of manpower, material resources, time and expenses. Moreover, in the process of coal mine comprehensive mining operations, some dangers may arise, posing a threat to the personal safety of underground coal mine workers.

[0041] To solve this problem, the present invention provides a method for simulating underground coal mines, so as to realize accurate simulation and mobile simulation of underground coal mine environments. Figure 1 As shown, the underground coal mine simulation method includes the following steps:

[0042] Step 101, obtaining target data of a target tunnel in a coal mine, wherein the target data includes environmental data and survey data.

[0043] Optionally, obtain and collect actual environmental data such as the terrain, equipment, tunnels, etc. underground in the coal mine, as well as overall data such as coal mine drawings, equipment configuration, tunnel layout, etc.

[0044] For any target lane, the corresponding environmental data includes at least one of the following: lane width, curvature, slope, and equipment position in the lane. The corresponding survey data includes at least one of the following: coal mine drawings, equipment configuration, and lane layout.

[0045] In the embodiment of the present application, the environmental data is actual environmental data acquired in real time, and the survey data is overall data of the coal mine where the target tunnel is located, which is acquired historically.

[0046] Step 102: Perform three-dimensional simulation on the target tunnel based on the target data to obtain a target tunnel model.

[0047] Optionally, the target data covers various overall and local data of the target tunnel. Based on the target data, a three-dimensional virtual model of the target tunnel can be constructed as a simulation scene.

[0048] In the embodiment of the present application, three-dimensional simulation is performed on each tunnel, and a virtual three-dimensional model of the entire coal mine can be generated.

[0049] As an example, a three-dimensional simulation of the underground scene of a coal mine can be performed based on the acquired target data through a three-dimensional geographic information system (Geographic Information System or Geo-Information system, GIS).

[0050] Step 103, receiving the walking trajectory of the target person, and generating a simulated trajectory of the walking trajectory in the target lane model.

[0051] Optionally, the target personnel may be a tester who operates in a virtual underground environment (i.e., the target tunnel model) through virtualized helmet displays, sensing handles and other equipment, and a walking trajectory is generated by the walking path of the target personnel when operating in the target tunnel model.

[0052] Optionally, after receiving the walking trajectory, the walking trajectory is simulated in the target lane model to generate a corresponding behavior trajectory.

[0053] As an example, virtual positioning and navigation can be performed through ultra-wideband flight positioning technology and navigation map technology to generate a corresponding virtual trajectory.

[0054] Step 104 , when the walking trajectory is updated, a movement simulation is performed in the target lane model based on the environmental data and the simulation trajectory.

[0055] Optionally, when the target person moves, the walking trajectory is updated accordingly. On the basis of the simulated trajectory, the virtual position of the target person in the target tunnel model at any moment is determined according to the environmental data, and the virtual position at consecutive moments is displayed as an updated moving trajectory to realize the movement simulation of the target person in the target tunnel model.

[0056] In this embodiment, by obtaining the target data of the target tunnel in the coal mine, the target data includes environmental data and survey data; performing a three-dimensional simulation of the target tunnel based on the target data to obtain a target tunnel model; receiving the walking trajectory of the target personnel, and generating a simulated trajectory of the walking trajectory in the target tunnel model; and performing a mobile simulation in the target tunnel model based on the environmental data and the simulated trajectory when the walking trajectory is updated. It can effectively evaluate and optimize the underground positioning simulation technology, significantly improve the safety of coal mine operations, and reduce the risks in actual operations.

[0057] This embodiment provides another underground coal mine simulation method. Figure 2 A schematic flow chart of another coal mine underground simulation method provided in an embodiment of the present application.

[0058] like Figure 2 As shown, the underground coal mine simulation method may include the following steps:

[0059] Step 201, obtaining target data of a target tunnel in a coal mine, wherein the target data includes environmental data and survey data.

[0060] Optionally, obtain and collect actual environmental data such as the terrain, equipment, tunnels, etc. underground in the coal mine, as well as overall data such as coal mine drawings, equipment configuration, tunnel layout, etc.

[0061] For any target lane, the corresponding environmental data includes at least one of the following: lane width, curvature, slope, and equipment position in the lane. The corresponding survey data includes at least one of the following: coal mine drawings, equipment configuration, and lane layout.

[0062] In the embodiment of the present application, the environmental data is actual environmental data acquired in real time, and the survey data is overall data of the coal mine where the target tunnel is located, which is acquired historically.

[0063] Furthermore, based on the immersive roaming technology in the virtual simulation teaching system, the target data is imported into the virtual simulation system and the three-dimensional GIS navigation service platform.

[0064] Optionally, by organizing and formatting the target data, the system can construct a virtual three-dimensional tunnel model with full coverage of the coal mine where the target tunnel is located, including coal mining area, excavation area, electromechanical area, ventilation area, transportation area, etc.

[0065] Step 202: Perform three-dimensional simulation on the target tunnel based on the target data to obtain a target tunnel model.

[0066] Optionally, a three-dimensional geographic information system (GIS) is used to perform environmental simulation on the target tunnel according to the target data to generate a target tunnel model.

[0067] In the embodiment of the present application, according to the target data, 3D MAX software is used to capture and render, and combined with a three-dimensional GIS platform, a three-dimensional image of the underground scene world is presented.

[0068] The simulation virtual technology is combined with the three-dimensional GIS navigation system service platform to create a virtual underground environment, realizing the overall scene simulation of the coal mine where the target tunnel is located. For any target tunnel, there is a corresponding virtual target tunnel model.

[0069] Step 203, receiving the walking trajectory of the target person, determining the simulated distance corresponding to the walking trajectory by simulating the transmission process of the ultra-wideband signal; and virtually positioning the walking trajectory according to the simulated distance to generate a simulated trajectory.

[0070] Optionally, the target personnel may be a tester who operates in a virtual underground environment (i.e., the target tunnel model) through virtualized helmet displays, sensing handles and other equipment, and a walking trajectory is generated by the walking path of the target personnel when operating in the target tunnel model.

[0071] Among them, Ultra Wide Band (UWB) technology is a wireless carrier communication technology. The pulse wave signal is dense and continuous and propagates at a speed close to the speed of light. The time difference from sending the original pulse to receiving the response signal can be accurately estimated through this time difference, which can achieve high-precision ranging and positioning.

[0072] Optionally, UWB pulse signals are generated by implanting simulation software to simulate the attenuation and delayed transmission process and filtering and amplification signal processing of ultra-wideband signals.

[0073] In the embodiment of the present application, a program is written by simulating a walking trajectory module, and the corresponding developed hardware device is used to simulate the emission, transmission and reception process of the UWB signal.

[0074] Optionally, determine the transmitting time and receiving time of the simulated ultra-wideband signal; determine the propagation time of the ultra-wideband signal based on the transmitting time and the receiving time; determine the simulated distance based on the propagation speed and propagation time of the ultra-wideband signal.

[0075] In the embodiment of the present application, the propagation speed of the ultra-wideband signal is the propagation speed of the signal in the air. After the propagation speed and the propagation time are determined, the product of the propagation speed and the propagation time is calculated as the simulated distance.

[0076] By simulating UWB signals, relevant parameters such as signal strength, noise level, transmission delay, etc. can be flexibly adjusted to simulate different environments and scenarios.

[0077] After obtaining the target tunnel model, virtual positioning and navigation are carried out by combining UWB ultra-wideband flight positioning technology and navigation map technology, so as to carry out virtual positioning and navigation of the coal mine without entering the actual working environment of the alternative coal mine.

[0078] In the embodiment of the present application, UWB real-time positioning technology is implanted based on the TOF two-way ranging method and the inertial navigation recursion principle.

[0079] Step 204 , when the walking trajectory is updated, a movement simulation is performed in the target lane model based on the environmental data and the simulation trajectory.

[0080] Optionally, when the target person moves, the walking trajectory is updated accordingly. On the basis of the simulated trajectory, based on the target lane model combined with real-time positioning technology, an efficient rendering engine is used through 3D MAX software to support fast rendering of large-scale scenes, and to capture and render factors such as scene lighting, materials, and shadows.

[0081] Furthermore, based on the environmental data, the scene and object movement in the target tunnel are captured and rendered.

[0082] In the embodiment of the present application, inertial motion capture rendering such as lanes, equipment movement, and personnel actions can be added according to actual needs, and real-time interaction and synchronization can be performed in the three-dimensional image world.

[0083] Furthermore, based on the simulated trajectory and target data, path planning is performed for the target person.

[0084] In the embodiment of the present application, factors such as the width, curvature, slope of the alley, as well as requirements such as the speed and direction of personnel walking, are taken into account to generate a safe and efficient walking path. The system uses the Dijkstra algorithm in path planning to plan the shortest and most efficient arrival path.

[0085] As an example, the method of the embodiment of the present application can be installed on a simulation platform in a coal mine, such as Figure 3 As shown, the target personnel operate the equipment on the underground coal mine simulation platform, and the target data (including environmental data and survey data) obtained by the platform is captured and rendered by 3D MAX software to generate a three-dimensional model, and the target data and 3DMAX three-dimensional model are imported into the three-dimensional GIS platform, so that the target data, three-dimensional modeling and three-dimensional GIS platform are combined to generate a three-dimensional scene of the coal mine. The generated three-dimensional scene is returned to the underground coal mine simulation platform as a scene for the target personnel to perform virtual operations. Further, based on the TOF two-way ranging method and the inertial navigation recursion principle, UWB real-time positioning technology is implanted, and then the virtual positioning ranging method (navigation map technology) is integrated to perform a test of the target personnel moving in the three-dimensional scene. When the walking trajectory of the target personnel is updated, the movement of the target personnel in the three-dimensional scene is simulated.

[0086] Through the method of the embodiment of the present application, the target personnel can use the virtualized helmet display, sensor handle and other operating devices to freely walk and observe in the virtual underground environment according to the planned path, and at the same time have the obstacle avoidance function, can autonomously avoid obstacles or dangerous areas, and feel the real underground environment. The target personnel can experience the coal mine environment and underground operations without leaving home.

[0087] When the target person performs a mobile simulation, the screen displayed on the monitor is as follows: Figure 4 shown.

[0088] In the embodiment of the present application, the movement simulation of multiple target persons can be performed simultaneously, such as Figure 5 As shown, the real-time information of multiple target personnel is exported through the coal mine underground simulation platform, where the real-time information may include personnel screen, mine area details, personnel details, department statistics, regional statistics, equipment status, equipment distribution and other information, all of which are obtained through three-dimensional scenes.

[0089] Taking personnel details as an example, a real-time information table is generated based on the real-time positioning and work information of multiple target personnel. The header of the real-time information table includes department, employee number, name, card number, position, type of work, employee type, responsibility, area, current location, range, movement, entry time and status.

[0090] For example, the target employee named Virtual 1, the department he is in is the Second Comprehensive Excavation Team, the employee number is 0717, the card number is 30105, the position is employee, the type of work is maintenance electrician, the employee type is employee, the responsibility is employee, the area he is in is the 3216 Yunshun coal exit lane, the current position (including the card reader number that reads the current position) is 6.08 meters after the turning of the 3216 Yunshun coal exit lane, the card reader number is 108, the range is within the area, the entry time is 2024.7.1 14:32:10, and the online status of Virtual 1 is online. The above information constitutes a piece of personnel details information of Virtual 1. The personnel details information of multiple target employees constitutes a real-time information table of personnel details.

[0091] As another example, the header of the real-time information table can also be increased or decreased as required, such as Figure 6 As shown, the header of the real-time information table includes department, card number, name, employee number, position, employee type, type of work, responsibility, current area, current location, range, progress, status, accumulation, entry time and shift. Figure 7 As shown, the header of the real-time information table includes unit, work number, employee name, card number, position, employee type, type of work, whether or not the employee is a leader, and shift system.

[0092] By collecting statistics on the real-time information of each target person, you can also obtain overall statistical information, such as Figure 5 Above the table header are underground personnel statistics, equipment statistics, area statistics and vehicle statistics. Underground personnel statistics include personnel statistics information such as 243 people underground and 0 people asking for help; equipment statistics include 8 DC units; area statistics include area statistics information such as 0 people in area timeout and 0 people in restricted area; vehicle statistics include vehicle statistics information such as 19 vehicles and 0 vehicles alarming.

[0093] Furthermore, the target personnel can also be queried for trajectory, attendance, report statistics, operation history, personnel information, etc. by switching the information platform. In this embodiment, the target data of the target tunnel in the coal mine is obtained, and the target data includes environmental data and survey data; the target tunnel is simulated in three dimensions based on the target data to obtain the target tunnel model; the walking trajectory of the target personnel is received, and the simulation distance corresponding to the walking trajectory is determined by simulating the transmission process of the ultra-wideband signal; the walking trajectory is virtually positioned according to the simulation distance to generate a simulation trajectory; when the walking trajectory is updated, the mobile simulation is performed in the target tunnel model based on the environmental data and the simulation trajectory. It can effectively evaluate and optimize the underground positioning simulation technology, which can significantly improve the safety of coal mine operations and reduce the risks in actual operations.

[0094] In order to implement the above-mentioned embodiment, the present application also proposes a coal mine underground simulation device.

[0095] Figure 8 A schematic diagram of the structure of a coal mine underground simulation device provided in an embodiment of the present application.

[0096] like Figure 8 As shown, the coal mine underground simulation device 400 includes: an acquisition module 401, a three-dimensional simulation module 402, a trajectory simulation module 403 and a movement simulation module 404.

[0097] An acquisition module 401 is used to acquire target data of a target tunnel in a coal mine, wherein the target data includes environmental data and survey data;

[0098] A three-dimensional simulation module 402 is used to perform three-dimensional simulation on the target lane based on the target data to obtain a target lane model;

[0099] The trajectory simulation module 403 is used to receive the walking trajectory of the target person and generate a simulated trajectory of the walking trajectory in the target lane model;

[0100] The movement simulation module 404 is used to perform movement simulation in the target lane model based on the environmental data and the simulation trajectory when the walking trajectory is updated.

[0101] Furthermore, in a possible implementation of the embodiment of the present application, the trajectory simulation module 403 is specifically configured to:

[0102] By simulating the transmission process of the ultra-wideband signal, the simulated distance corresponding to the walking trajectory is determined;

[0103] The walking trajectory is virtually positioned according to the simulated distance to generate a simulated trajectory.

[0104] Determine the transmitting time and receiving time of the analog ultra-wideband signal;

[0105] Determine the propagation time of the ultra-wideband signal based on the transmission time and the reception time;

[0106] The simulated distance is determined based on the propagation speed and propagation time of the UWB signal.

[0107] Simulate the attenuation and delay of ultra-wideband signals and the transmission process as well as filtering and amplification signal processing.

[0108] Furthermore, in a possible implementation of the embodiment of the present application, the three-dimensional simulation module 402 is specifically used to:

[0109] Through the three-dimensional geographic information system, according to the target data, the environment of the target tunnel is simulated and the target tunnel model is generated.

[0110] Furthermore, in a possible implementation of the embodiment of the present application, the device is also used for:

[0111] Based on the environmental data, the scene and object movement in the target tunnel are captured and rendered.

[0112] Based on the simulated trajectory and target data, path planning is performed for the target person.

[0113] Organize and format target data in a compatible manner.

[0114] It should be noted that the aforementioned explanation of the embodiment of the underground coal mine simulation method is also applicable to the underground coal mine simulation device of this embodiment, and will not be repeated here.

[0115] In the embodiment of the present application, by obtaining the target data of the target tunnel in the coal mine, the target data includes environmental data and survey data; performing a three-dimensional simulation of the target tunnel based on the target data to obtain a target tunnel model; receiving the walking trajectory of the target personnel, and generating a simulated trajectory of the walking trajectory in the target tunnel model; and performing a mobile simulation in the target tunnel model based on the environmental data and the simulated trajectory when the walking trajectory is updated. It can effectively evaluate and optimize the underground positioning simulation technology, significantly improve the safety of coal mine operations, and reduce the risks in actual operations.

[0116] In order to implement the above-mentioned embodiments, the present application also proposes an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer execution instructions; the processor executes the computer execution instructions stored in the memory to implement the coal mine underground simulation method provided in the above-mentioned embodiments.

[0117] In order to implement the above embodiments, the present application also proposes a computer-readable storage medium, in which computer execution instructions are stored. When the computer execution instructions are executed by a processor, they are used to implement the coal mine underground simulation method provided by the above embodiments.

[0118] In order to implement the above embodiments, the present application also proposes a computer program product, including a computer program, which, when executed by a processor, implements the coal mine underground simulation method provided by the above embodiments.

[0119] The collection, storage, use, processing, transmission, provision and disclosure of user personal information involved in this application are in compliance with relevant laws and regulations and do not violate public order and good morals.

[0120] It should be noted that personal information from users should be collected for legitimate and reasonable purposes and should not be shared or sold outside of these legitimate uses. In addition, such collection / sharing should be carried out after receiving the user's informed consent, including but not limited to notifying the user to read the user agreement / user notice and sign the agreement / authorization including authorization of relevant user information before the user uses the function. In addition, any necessary steps should be taken to protect and safeguard access to such personal information data and ensure that others who have access to personal information data comply with its privacy policy and procedures.

[0121] This application is expected to provide an implementation scheme for users to selectively block the use or access of personal information data. That is, this application is expected to provide hardware and / or software to prevent or block access to such personal information data. Once the personal information data is no longer needed, risks can be minimized by limiting data collection and deleting data. In addition, when applicable, personal identifiers are removed from such personal information to protect the privacy of users.

[0122] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0123] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0124] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0125] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purposes of this specification, a "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic devices), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0126] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0127] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0128] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0129] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A coal mine underground simulation method, characterized in that: The following steps are involved: Acquire target data of a target tunnel in a coal mine, wherein the target data includes environmental data and survey data; Performing a three-dimensional simulation on the target lane based on the target data to obtain a target lane model; receiving a walking trajectory of a target person, and generating a simulated trajectory of the walking trajectory in the target lane model; When the walking trajectory is updated, a movement simulation is performed within the target lane model based on the environment data and the simulation trajectory.

2. The underground coal mine simulation method according to claim 1, characterized in that: The step of generating a simulated trajectory of the walking trajectory in the target lane model comprises: Determine the simulated distance corresponding to the walking trajectory by simulating the transmission process of the ultra-wideband signal; The walking trajectory is virtually positioned according to the simulated distance to generate the simulated trajectory.

3. The underground coal mine simulation method according to claim 2, characterized in that: The step of determining the simulated distance corresponding to the walking track by simulating the transmission process of the ultra-wideband signal includes: Determining a transmitting time and a receiving time of simulating the ultra-wideband signal; Determining the propagation duration of the ultra-wideband signal based on the transmitting time and the receiving time; The simulated distance is determined based on the propagation speed of the ultra-wideband signal and the propagation duration.

4. The underground coal mine simulation method according to claim 2, characterized in that: The transmitting process of the simulated ultra-wideband signal includes: The attenuation and delayed transmission process of the ultra-wideband signal and the filtering and amplification signal processing are simulated.

5. The underground coal mine simulation method according to claim 1, characterized in that: The three-dimensional simulation of the target lane based on the target data to obtain a target lane model includes: Through a three-dimensional geographic information system, according to the target data, the environment of the target tunnel is simulated to generate the target tunnel model.

6. The underground coal mine simulation method according to claim 1, characterized in that: The method further comprises: Based on the environmental data, the scene and object level movement in the target lane are captured and rendered.

7. The underground coal mine simulation method according to claim 1, characterized in that , the method further comprises: Based on the simulated trajectory and the target data, a path is planned for the target person.

8. The underground coal mine simulation method according to claim 1, characterized in that: After obtaining the target data of the target tunnel in the coal mine, the method further includes: The target data is collated and formatted in a compatible manner.

9. A coal mine underground simulation device, characterized in that: include: An acquisition module, used to acquire target data of a target tunnel in a coal mine, wherein the target data includes environmental data and survey data; A three-dimensional simulation module, used for performing three-dimensional simulation on the target lane based on the target data to obtain a target lane model; A trajectory simulation module, used for receiving the walking trajectory of the target person and generating a simulation trajectory of the walking trajectory in the target lane model; A movement simulation module is used to perform movement simulation in the target lane model based on the environmental data and the simulation trajectory when the walking trajectory is updated.

10. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 8.

Citation Information

Patent Citations

  • Method for achieving coal mine roadway distribution diagram reconstruction based on multi-target movement track

    CN112664270A

  • Underground coal mine digital twinning reality simulation method and device

    CN116108673A

  • Underground roadway positioning and navigation method and device based on ultra wide band

    CN117824650A

Cited By

  • Mine space distance measurement method and system based on head-mounted device

    CN120871102A