Method and device for determining economic operation of power plant under dynamic control of water level in flood season of reservoir
By using pre-storage, pre-release, recharge and particle swarm algorithm during the flood season of the reservoir, the economic operation model of power plants is constructed and the parameters of drainage and generator sets are optimized. The problem of inaccurate economic operation evaluation of power plants in the existing technology is solved, and the problem of inaccurate evaluation of power plants in the existing technology is improved. Evaluate accuracy and calculation accuracy.
Patent Information
- Application Number
- CN202410903984.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-08
AI Technical Summary
The existing technology is difficult to fully reflect the evaluation results of the power plant economic operation, which reduces the accuracy of the evaluation of the power plant economic operation.
The dynamic control strategy of water level during the flood season of the reservoir based on pre-storage and pre-release and recharge method is adopted, and combined with the particle swarm algorithm, an economic operation model of the power plant is constructed, and the optimal scheduling status of the generator set is determined by maximizing the total power generation of hydropower stations during the foreseeable period. , optimize the discharge solution and generator set parameters.
The accuracy of the economic operation analysis of power plants was improved, the optimal output and unit number combination of hydropower stations was determined, and the risk-controlled reservoir flood control scheduling and total water consumption control were taken into account, which improved the calculation particle size.
Smart Images

Figure CN118917573A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of reservoir scheduling, and in particular to a method and device for determining the economic operation of a power plant under dynamic control of the reservoir operating water level during flood season. Background Art
[0002] "Dynamic control of flood season operating water level" in real-time scheduling of reservoirs refers to a method of determining the specific numerical value of the flood season operating water level to be dynamically controlled within the foreseeable period, within the upper and lower limit values of the designed flood season operating water level, based on the meteorological and hydrological forecast information of the reservoir basin, the water conditions at the moment, the engineering conditions and disaster information, and on the premise of meeting the reservoir's water storage, reservoir discharge capacity and flood prevention and benefit requirements. It is one of the effective methods to improve the level of water resource utilization and water supply guarantee capabilities in the basin.
[0003] In the related technologies, especially those represented by CN117592876A and CN117791737A, the economic operation data analysis of power plants usually focuses on the factors affecting costs and benefits. However, these methods are difficult to fully reflect the evaluation results of the economic operation of power plants, which reduces the accuracy of the economic operation evaluation of power plants. Summary of the invention
[0004] In view of this, the present application provides a method and device for determining the economic operation of a power plant under dynamic control of the reservoir operating water level during flood season, which can improve the accuracy of economic operation analysis.
[0005] In a first aspect, the present application provides a method for determining the economic operation of a power plant under dynamic control of the reservoir operating water level during flood season, comprising: Based on the dynamic control strategy of reservoir operating water level in flood season based on pre-storage, pre-discharge and recharging method, the flood control risk is determined, and the storage and release amount of the reservoir to resist secondary rain and flood is determined according to the flood control risk; Determine the water volume of the reservoir hydropower station according to the water storage and release volume of the reservoir to resist the secondary rain and flood, and construct an economic operation model of the power plant, wherein the economic operation model of the power plant includes maximizing the total power generation of the hydropower station within the forecast period as an objective function and at least generator set parameters, hydropower station output limit and reservoir hydropower station water volume as constraints; A particle swarm algorithm is used to perform optimization calculations on the economic operation model of the power plant to determine the optimal dispatching status of the generator sets.
[0006] Optionally, the reservoir flood season operating water level dynamic control strategy includes: Predefine a water level range for dynamic control of the operating water level during flood season, wherein the reservoir water level at the moment is within the water level range; If there is a forecast that a huge flood will occur in the forecast period, the pre-storage, pre-discharge and recharging method is used to deduce the water level at the end of the forecast period from the allowable discharge flow in the forecast period, and the discharge plan is optimized based on the water level at the end of the forecast period and the water level range; If a major flood is predicted to occur in the foreseeable future, the reservoir water level will be established as the reservoir water level at the time of the event; If it is forecasted that a small or medium-sized flood will occur in the foreseeable future, the reservoir water level will be established as the upper limit of the water level range.
[0007] Optionally, the water level at the end of the forecast period can be calculated from the allowable discharge flow during the forecast period by the following formula: ; ; ; Where: for t Allow downflow at all times; Safety flow for flood control objects; It is the inflow between the reservoir dam section and the flood control section. To face the moment, For the flood forecast period, is the amount of water that can be discharged in advance during the forecast period, For the inflow during the forecast period, To calculate the time period, To anticipate the end of the period The water level is constantly falling, is the function that converts water level into storage capacity.
[0008] Optionally, the discharge plan is optimized according to the water level value at the end of the forecast period and the water level range, including: If the water level at the end of the forecast period is lower than the water level range of the dynamic control of the operating water level during the flood season, the reservoir tolerance is determined, and the amount of rechargeable water is determined by using a simplified water balance formula in which the water withdrawal line is generalized as a straight line. The simplified water balance formula is expressed as follows:
[0009] In the formula, is the amount of water that can be recharged; To anticipate the end of the period The inflow flow at the time, The flow rate corresponding to the minimum water supply requirement is The flow rate during the water withdrawal process is equal to The moment of occurrence, To face the moment; If the amount of water that can be recharged is equal to the amount of water that can be released in advance within the foreseeable period or the amount of water that can be recharged is greater than the reservoir capacity difference, the discharge plan shall be maintained; If the amount of water that can be recharged is lower than the reservoir tolerance, the discharge flow will be reduced until the lower limit of the water level range for dynamic control of the operating water level during the flood season is reached.
[0010] Alternatively, if a major flood is forecast to occur in the future, the average discharge flow in the forecast period can be determined by the following formula: , ; ; Where: is the maximum value of the interval inflow between the reservoir dam section and the flood control section during the forecast period, The flow rate corresponding to the minimum water supply requirement is The safe flow rate for flood control objects, For the inflow during the forecast period, To calculate the time period, To face the moment, For flood forecast period; If there is a forecast of small or medium-sized floods in the future, the average discharge flow in the forecast period can be determined by the following formula: , ; ;
[0011] Where: To face the water level at the moment Dynamically control the upper limit water level of the operating water level during the flood season The reservoir tolerance, is the function of converting reservoir capacity into water level, The flow rate corresponding to the minimum water supply requirement is The safe flow rate for flood control objects, For the inflow during the forecast period, To calculate the time period, To face the moment, For the flood forecast period.
[0012] Optionally, determining the flood risk is performed as expressed by the following formula, ; ; Where: Design frequency protection for reservoirs the maximum permissible storage level for floods; Design frequency protection for reservoirs The maximum allowable discharge flow of flood; For the n Flood limit water level Flood control risk rate of exceeding the maximum allowable water storage level after flood control; For the n Flood limit water level Flood control risk rate of exceeding the maximum allowable discharge flow after flood control; Design frequency protection for reservoirs flood risk rate of floods; Design frequency protection for reservoirs In case of flood, the n The highest flood control water level corresponding to the flood control starting from the flood limit water level; Design frequency protection for reservoirs In case of flood, the n The highest flood control water level corresponding to the flood control starting from the flood limit water level.
[0013] Optionally, the objective function is expressed in the following formula: ; Where: For the t The number of units that can be put into operation at any time is less than or equal to the total number of units; w The number of the unit to be put into operation and is less than or equal to ; For the t Moment w The power plant number corresponding to the unit that can be put into operation; For the power plant g The output of unit No. The constraints of the generator set parameters include the unit head constraint, the unit output limit and the unit water consumption characteristics, and the constraints of the water volume of the reservoir and hydropower station include the total water volume constraint, the water volume balance constraint of the reservoir and hydropower station, the reservoir water level constraint and the initial reservoir water level constraint; The constraints of the power plant economic operation model also include the minimum downstream discharge required for downstream comprehensive utilization and the characteristic curve constraints of the reservoir and hydropower station itself.
[0014] Optionally, in the process of performing optimization calculation using the particle swarm algorithm, the population size uses the reservoir water level at the end of the time period as a decision variable.
[0015] In a second aspect, the present application provides a device for determining economic operation of a power plant under dynamic control of reservoir operating water level during flood season, comprising: The first determination module is used to determine the flood control risk based on the dynamic control strategy of the reservoir operating water level during the flood season based on the pre-storage, pre-discharge and recharging method, so as to determine the storage and release amount of the reservoir to resist the secondary rain and flood according to the flood control risk; The second determination module is used to determine the water volume of the reservoir hydropower station according to the water storage and release volume of the reservoir to resist the secondary rain and flood, and to construct an economic operation model of the power plant, wherein the economic operation model of the power plant includes maximizing the total power generation of the hydropower station within the forecast period as an objective function and at least generator set parameters, hydropower station output limit and reservoir hydropower station water volume as constraints; The third determination module is used to perform optimization calculation on the economic operation model of the power plant using a particle swarm algorithm to determine the optimal dispatching status of the generator set.
[0016] In a third aspect, the present application provides an execution device, including a processor and a memory, wherein the processor is coupled to the memory; The memory is used to store programs; The processor is used to execute the program in the memory, so that the execution device executes the above method.
[0017] In the method disclosed in the present application, a general model of the economic operation of a power plant under the water-based electricity mode of a reservoir is constructed and efficiently solved, which not only determines the optimal output of the hydropower station, but also determines the number and combination of operating units in the power plant and the output of each operating unit; not only considers the flood control scheduling of reservoirs based on controllable risks, but also considers the re-optimization scheduling technology of the economic operation of the power plant under the control of total water consumption, thereby improving the accuracy of the economic operation analysis of the power plant and improving the calculation granularity. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The technical solution and other beneficial effects of the present application will be made apparent by describing in detail the specific implementation methods of the present application in conjunction with the accompanying drawings.
[0019] Figure 1 An operational flow chart of a method for determining economic operation of a power plant under dynamic control of reservoir operating water level during flood season provided by an exemplary embodiment is shown.
[0020] Figure 2 A logical principle diagram of a method for determining economic operation of a power plant under dynamic control of reservoir operating water level during flood season provided by an exemplary embodiment is shown.
[0021] Figure 3 A diagram of the dynamic control domain of the operating water level of the Three Gorges Reservoir during the flood season provided by an exemplary embodiment is shown.
[0022] Figure 4 A dynamic control scheduling diagram of the operating water level of the Three Gorges Reservoir during flood season provided by an exemplary embodiment is shown.
[0023] Figure 5 An exemplary embodiment provides a particle swarm algorithm iteration process for economic operation of the Three Gorges Hydropower Station.
[0024] Figure 6 A block diagram of a device for determining economic operation of a power plant under dynamic control of reservoir operating water level during flood season provided by an exemplary embodiment is shown.
[0025] Figure 7 A block diagram of the execution device provided by an exemplary embodiment is shown. DETAILED DESCRIPTION
[0026] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below. The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments described here can be implemented in an order other than that illustrated or described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or modules is not necessarily limited to those steps or modules clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products or devices. The naming or numbering of steps in this application does not mean that the steps in the method flow must be executed in the time / logical sequence indicated by the naming or numbering. The process steps that have been named or numbered can change the execution order according to the technical purpose to be achieved, as long as the same or similar technical effects can be achieved. The division of units in this application is a logical division. There may be other division methods when it is implemented in actual applications. For example, multiple units can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection between units can be electrical or other similar forms, which are not limited in this application. In addition, the units or sub-units described as separate components may or may not be physically separated, may or may not be physical units, or may be distributed in multiple circuit units, and some or all of the units may be selected according to actual needs to achieve the purpose of the present application.
[0027] Please refer to Figure 1 ,in Figure 1A flowchart of a method for determining economic operation of a power plant under dynamic control of reservoir operating water level during flood season provided by an exemplary embodiment is shown. This method is implemented through steps 102-106.
[0028] In step 102, based on the dynamic control strategy of the reservoir operating water level during the flood season based on the pre-storage, pre-discharge and recharging method, the flood control risk is determined, so that the amount of water stored and released by the reservoir to resist secondary rains and floods is determined according to the flood control risk.
[0029] Please refer to Figure 2 It can be understood that the dynamic control strategy of the reservoir water level during flood season is based on the pre-storage, pre-discharge and recharging method, which means that the design principle of the dynamic control strategy of the reservoir water level during flood season is based on the pre-storage, pre-discharge and recharging method.
[0030] As a preferred specific example, the reservoir flood season operating water level dynamic control strategy includes: Step 102A1, predefine a water level range for dynamic control of operating water level during flood season, wherein the reservoir water level at the moment is within the water level range.
[0031] In this step 102A1, it is assumed that the moment Reservoir water level Within the dynamic control range of the operating water level during the flood season, recorded as , and control the outflow flow to be equal to the inflow flow, so that the reservoir water level is , please refer to Figure 3 .
[0032] Step 102A2: If it is predicted that a huge flood will occur in the forecast period in the future, the pre-storage, pre-discharge and recharging method is used to deduce the water level value at the end of the forecast period from the allowable discharge flow in the forecast period, and the discharge plan is optimized based on the water level value at the end of the forecast period and the water level range.
[0033] Please refer to Figure 4 As a typical specific demonstration form, the water level at the end of the forecast period is calculated from the allowable discharge flow during the forecast period, and the following formula is used to implement it: ; ; ; Where: for t Allow downflow at all times; Safety flow for flood control objects; It is the inflow between the reservoir dam section and the flood control section. To face the moment, For the flood forecast period, is the amount of water that can be discharged in advance during the forecast period, For the inflow during the forecast period, To calculate the time period, To anticipate the end of the period The water level is constantly falling, is the function that converts water level into storage capacity.
[0034] In this step 102A2, optimizing the discharge plan according to the water level value of the predicted end period and the water level range includes: Step 102A21: If the water level value at the end of the forecast period is lower than the water level range of the dynamic control of the operating water level during the flood season, determine the reservoir tolerance, and use a simplified water balance formula in which the water withdrawal line is generalized as a straight line to determine the rechargeable water volume, wherein the simplified water balance formula is expressed as the following formula:
[0035] In the formula, is the amount of water that can be recharged; To anticipate the end of the period The inflow flow at the time, The flow rate corresponding to the minimum water supply requirement is The flow rate during the water withdrawal process is equal to The moment of occurrence, To face the moment.
[0036] Here, the formula for determining the library tolerance can be: ,in, is the function that converts reservoir capacity into water level.
[0037] It can be understood that in this step 102A21, if the water level value at the end of the forecast period is higher than the lower limit of the water level range of the dynamic control of the flood season operation water level, , it means that the discharge plan is feasible; if the water level at the end of the forecast period is equal to the lower limit of the water level range of the dynamic control of the flood season operating water level , it means that the discharge scheme is the best.
[0038] Step 102A22: If the amount of water that can be recharged is equal to the amount of water that can be pre-discharged within the forecast period or the amount of water that can be recharged is greater than the reservoir tolerance, or , then maintain the discharge plan.
[0039] Step 102A23: If the amount of water available for recharging is lower than the storage tolerance, , then the discharge flow is reduced until the lower limit of the water level range of the dynamic control of the operating water level during the flood season is reached. .
[0040] Step 102A3: If the forecast at the facing moment indicates that a major flood will occur within the foreseeable period in the future, the reservoir water level is established as the reservoir water level at the facing moment.
[0041] In this case, the average leakage flow during the forecast period can be determined by the following formula , ; ; Where: is the maximum value of the interval inflow between the reservoir dam section and the flood control section during the forecast period, The flow rate corresponding to the minimum water supply requirement is The safe flow rate for flood control objects, For the inflow during the forecast period, To calculate the time period, To face the moment, For the flood forecast period.
[0042] Step 102A4: If it is predicted that a small or medium-sized flood will occur in the foreseeable future, the reservoir water level is established as the upper limit of the water level range.
[0043] In this case, the average leakage flow during the forecast period can be determined by the following formula , ; ;
[0044] Where: To face the water level at the moment Dynamically control the upper limit water level of the operating water level during the flood season The reservoir tolerance, is the function of converting reservoir capacity into water level, The flow rate corresponding to the minimum water supply requirement is The safe flow rate for flood control objects, For the inflow during the forecast period, To calculate the time period, To face the moment, For the flood forecast period.
[0045] As a better specific example, the process of determining flood risk can be: based on the maximum allowable water storage level approved by the planning (Maximum allowable discharge flow ) is the flood control index, assuming different flood limit water levels When the reservoir resists floods of different design frequencies, it adjusts the floods in the approved conventional dispatching mode and calculates different flood limit water levels. Over design frequency Flood risk rate of flood control standards , .
[0046] That is, it is executed as expressed by the following formula: ; ; Where: Design frequency protection for reservoirs the maximum permissible storage level for floods; Design frequency protection for reservoirs The maximum allowable discharge flow of flood; For the n Flood limit water level Flood control risk rate of exceeding the maximum allowable water storage level after flood control; For the n Flood limit water level Flood control risk rate of exceeding the maximum allowable discharge flow after flood control; Design frequency protection for reservoirs flood risk rate of floods; Design frequency protection for reservoirs In case of flood, the n The highest flood control water level corresponding to the flood control starting from the flood limit water level; Design frequency protection for reservoirs In case of flood, the n The highest flood control water level corresponding to the flood control starting from the flood limit water level.
[0047] In actual operation, when determining , After that, you can draw Relationship curve and Relationship curve is used to evaluate the flood risk rate of dynamic control of operating water level in flood season in step 1. Implement dynamic control of reservoir operating water level in flood season , the pre-storage, pre-discharge and recharging method is used for flood control, and the principle of not lowering the flood control standard is followed to obtain the storage and release process of the reservoir to resist the secondary rain flood. This storage and release process will serve as the water quantity constraint of the "water-based electricity" mode for the subsequent economic operation of the power plant.
[0048] In step 104, the water volume of the reservoir hydropower station is determined based on the water storage and release volume of the reservoir to resist the secondary rain and flood, and an economic operation model of the power plant is constructed. The economic operation model of the power plant includes maximizing the total power generation of the hydropower station within the foreseeable period as an objective function and at least generator set parameters, hydropower station output limit and reservoir hydropower station water volume as constraints.
[0049] The objective function is expressed in the following formula: ; Where: For the t The number of units that can be put into operation at any time is less than or equal to the total number of units; w The number of the unit to be put into operation and is less than or equal to ; For the t Moment w The power plant number corresponding to the unit that can be put into operation; For the power plant g The output of unit No.
[0050] The constraints of the power plant economic operation model include the following: (1) Total water volume constraint:
[0051] Where: For the t The power generation flow of the hydropower station at each moment; For the t The amount of water discharged from the reservoir at any given moment; For the t Moment g Power generation flow of unit No. Forecast period The total outflow of the internal reservoir is based on the reservoir in step 1. The water release process for dynamic control of operating water levels during the flood season within the forecast period is calculated.
[0052] (2) Water balance constraints of reservoirs and hydropower stations .
[0053] (3) Reservoir water level constraints ; Where: For the t Reservoir water level at any moment; and Respectively t The minimum and maximum water levels allowed in the reservoir at all times. The minimum allowable water level here is usually the dead water level, and the maximum allowable water level is the reservoir water level process line that is dynamically controlled by the flood season operating water level.
[0054] (4) Unit head constraint ; Where: For the t Moment g Net water head of unit No. and Respectively g Minimum and maximum water heads of unit No.; For the t The water level downstream of the unit at the moment; For the t Moment g Head loss of unit No. For the g Head loss function of unit No.
[0055] (5) Unit output limitation ; Where: and Respectively t Moment g Minimum and maximum output of unit No.
[0056] (6) Water consumption characteristics of the unit ; Where: For the g The water consumption characteristic curve of unit No. reflects the relationship between the unit's power generation flow and the unit's output and water head.
[0057] (7) Total output limit of hydropower stations ; Where: For the t The hydropower station output at all times; and Respectively t The minimum and maximum output of the hydropower station at each moment.
[0058] (8) Comprehensive Utilization Constraints ; Where: The minimum downstream flow rate is determined by comprehensively considering the needs of ecology, water supply, shipping, etc. for the minimum downstream flow rate required for downstream comprehensive utilization.
[0059] (9) Initial reservoir water level constraints ; Where: is the initial reservoir water level during the forecast period; The reservoir water level at the moment is calculated based on the dynamic control of the reservoir flood season operating water level in step 102.
[0060] In addition to meeting the above constraints, the dispatching and operation of reservoirs and hydropower stations must also meet their own characteristic curve constraints, such as the reservoir water level-storage capacity relationship curve, the reservoir water level-discharge capacity curve, the downstream water level-flow relationship curve, the unit expected output limit line, and the optimal power characteristic curve of the entire plant. In addition, various variables must be non-negative variables.
[0061] The economic operation of a power plant aims to find the optimal number and combination of working units in each period under the optimal power generation criterion, as well as the distribution of active load among the working units. According to the unique conversion relationship between the key variables of reservoirs (reservoir water storage at the end of the period) and the key variables of hydropower stations (generation output and power flow of units in the period), and considering the water-based electricity model, the reservoir water storage at the end of the period is selected as the decision variable of the economic operation model of the power plant.
[0062] In step 106, a particle swarm algorithm is used to perform optimization calculations on the power plant economic operation model to determine the optimal dispatching status of the generator sets.
[0063] Please refer to Figure 5 , as a demonstration of the actual operation of the particle swarm algorithm, it can include the following process: Step 1061, set the particle swarm algorithm parameters and initialize the population. Set the three hyperparameters of the particle swarm algorithm (inertia weight =0.9, individual learning factor c 1=3.5 and group learning factor c 2=1.5) and the population size N pop =500 and the maximum number of iterations G max = 200. Real number encoding is used to encode and randomly generate N pop The decision variable of scale, i.e. the reservoir water level at the end of the period .
[0064] Step 1062: Update individual extreme values and global extreme value After initializing the position and velocity of the particle swarm, each constraint is added to the objective function in the form of a penalty function, and the fitness is evaluated by the new objective function with constraints added; according to the principle of maximum power generation, the local optimal value of each particle is calculated. ; Calculate and update the Archive set (store the current non-inferior solution, be careful to prevent overflow); Calculate the congestion in the Archive set to select the global optimal particle swarm in the Archive set .
[0065] Step 1063: Update the particle's velocity and position. The particle velocity and position update formula is as follows: ; ; In the formula, m Indicates the current iteration number; j represents the particle (feasible solution) number, , is the particle group size; is the particle dimension, ,in is the number of decision variables (particle dimension); For the m Iteration No. The particle The dimensional velocity component serves as the distance and direction of the particle's next round of optimization iteration; For the m Iteration No. The particle dimensional position component, i.e., the decision variable m The result of the iteration; For the m Iteration No. The particle dimensional individual extreme value component; For the m Iteration No. dimensional global extreme value component; is the inertia weight (hyperparameter), a non-negative number used to adjust the search range of the solution space; They are the individual learning factor and the group learning factor (hyperparameters), which can be used as weights to adjust the maximum learning step size; All of them are uniformly distributed in [0,1]. m Iteration random factor, used to increase the randomness of the search.
[0066] Step 1064: Determine the calculation termination condition. If the current number of iterations is less than the maximum number of iterations G max , then repeat steps 1062-1064; otherwise, terminate the calculation, and query the optimal characteristic curve to determine the optimal number and combination of working units in each period and the distribution result of active load among the working units.
[0067] Please refer to Figure 6 , which shows a block diagram of the device for determining the economic operation of a power plant under the dynamic control of the reservoir operating water level during flood season provided by the present application. The device 200 includes: The first determination module 202 is used to determine the flood control risk based on the dynamic control strategy of the reservoir operating water level during the flood season based on the pre-storage, pre-discharge and recharging method, so as to determine the storage and release amount of the reservoir to resist the secondary rain and flood according to the flood control risk; The second determination module 204 is used to determine the water volume of the reservoir hydropower station according to the water storage and release volume of the reservoir to resist the secondary rain and flood, and to construct an economic operation model of the power plant, wherein the economic operation model of the power plant includes maximizing the total power generation of the hydropower station within the forecast period as an objective function and at least generator set parameters, hydropower station output limit and reservoir hydropower station water volume as constraints; The third determination module 206 is used to perform optimization calculation on the power plant economic operation model using a particle swarm algorithm to determine the optimal dispatching status of the generator set.
[0068] Since the above methods have been discussed in detail, the specific implementation of the above modules will not be repeated here.
[0069] Next, an execution device provided by an embodiment of the present application is introduced. Figure 7 , Figure 7 This is a schematic diagram of a structure of an execution device provided in an embodiment of the present application. The execution device 300 can be specifically manifested as an autonomous driving vehicle, a mobile phone, a tablet, a laptop computer, a desktop computer, a monitoring data processing device, etc., which is not limited here. Figure 1 The functions of the execution device in the corresponding embodiment. Specifically, the execution device 300 includes: a receiver 301, a transmitter 302, a processor 303 and a memory 304 (wherein the number of the processor 303 in the execution device 300 can be one or more, Figure 7 In the example of FIG. 3 , the processor 303 may include an application processor 3031 and a communication processor 3032. In some embodiments of the present application, the receiver 301, the transmitter 302, the processor 303 and the memory 304 may be connected via a bus or other means.
[0070] The memory 304 may include a read-only memory and a random access memory, and provides instructions and data to the processor 303. A portion of the memory 304 may also include a non-volatile random access memory (NVRAM). The memory 304 stores processor and operation instructions, executable modules or data structures, or subsets thereof, or extended sets thereof, wherein the operation instructions may include various operation instructions for implementing various operations.
[0071] The processor 303 controls the operation of the execution device. In a specific application, the various components of the execution device are coupled together through a bus system, wherein the bus system includes not only a data bus but also a power bus, a control bus, and a status signal bus, etc. However, for the sake of clarity, various buses are referred to as bus systems in the figure.
[0072] The method disclosed in the above embodiment of the present application can be applied to the processor 303, or implemented by the processor 303. The processor 303 can be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 303. The above processor 303 can be a general processor, a digital signal processor (digital signal processing, DSP), a microprocessor or a microcontroller, and can further include an application specific integrated circuit (application specific integrated circuit, ASIC), a field programmable gate array (field-programmable gate array, FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The processor 303 can implement or execute the various methods, steps and logic block diagrams disclosed in the embodiments of the present application. The general processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiment of the present application can be directly embodied as a hardware decoding processor to execute, or it can be executed by a combination of hardware and software modules in the decoding processor. The software module may be located in a storage medium mature in the art, such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 304, and the processor 303 reads the information in the memory 304 and completes the steps of the above method in combination with its hardware.
[0073] The receiver 301 can be used to receive input digital or character information and generate signal input related to the relevant settings and function control of the execution device. The transmitter 302 can be used to output digital or character information through the first interface; the transmitter 302 can also be used to send instructions to the disk group through the first interface to modify the data in the disk group; the transmitter 302 can also include a display device such as a display screen.
[0074] In the embodiment of the present application, the processor 303 is used to execute Figure 1 The specific manner in which the application processor 3031 in the processor 303 performs the above steps is the same as that in the present application. Figure 1The corresponding method embodiments are based on the same concept, and the technical effects they bring are the same as those in this application. Figure 1 The corresponding method embodiments are the same. For specific contents, please refer to the description in the method embodiments shown above in this application, which will not be repeated here.
[0075] The above is only a preferred specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed in the present application should be covered within the protection scope of the present application.
Claims
1. A method for determining the economic operation of a power plant under dynamic control of the reservoir operating water level during flood season, characterized in that: include: Based on the dynamic control strategy of reservoir operating water level in flood season based on pre-storage, pre-discharge and recharging method, the flood control risk is determined, and the storage and release amount of the reservoir to resist secondary rain and flood is determined according to the flood control risk; Determine the water volume of the reservoir hydropower station according to the water storage and release volume of the reservoir to resist the secondary rain and flood, and construct an economic operation model of the power plant, wherein the economic operation model of the power plant includes maximizing the total power generation of the hydropower station within the forecast period as an objective function and at least generator set parameters, hydropower station output limit and reservoir hydropower station water volume as constraints; A particle swarm algorithm is used to perform optimization calculations on the economic operation model of the power plant to determine the optimal dispatching status of the generator sets.
2. The method according to claim 1, characterized in that The dynamic control strategy of reservoir operating water level during flood season includes: Predefine a water level range for dynamic control of the operating water level during flood season, wherein the reservoir water level at the moment is within the water level range; If there is a forecast that a huge flood will occur in the forecast period, the pre-storage, pre-discharge and recharging method is used to deduce the water level at the end of the forecast period from the allowable discharge flow in the forecast period, and the discharge plan is optimized based on the water level at the end of the forecast period and the water level range; If a major flood is predicted to occur in the foreseeable future, the reservoir water level will be established as the reservoir water level at the time of the event; If it is forecasted that a small or medium-sized flood will occur in the foreseeable future, the reservoir water level will be established as the upper limit of the water level range.
3. The method according to claim 2, characterized in that The water level at the end of the forecast period is calculated from the allowable discharge flow during the forecast period using the following formula: ; ; ; Where: for t Allow downflow at all times; Safety flow for flood control objects; It is the inflow between the reservoir dam section and the flood control section. To face the moment, For the flood forecast period, is the amount of water that can be discharged in the foreseeable period, For the inflow during the forecast period, To calculate the length of the period, To anticipate the end of the period The water level is constantly falling, is the function that converts water level into storage capacity.
4. The method according to claim 1, characterized in that: Optimize the discharge plan based on the water level value at the end of the forecast period and the water level range, including: If the water level at the end of the forecast period is lower than the water level range of the dynamic control of the operating water level during the flood season, the reservoir tolerance is determined, and the amount of rechargeable water is determined by using a simplified water balance formula in which the water withdrawal line is generalized as a straight line. The simplified water balance formula is expressed as follows: In the formula, is the amount of water that can be recharged; To anticipate the end of the period The inflow flow at the time, The flow rate corresponding to the minimum water supply requirement is The flow rate during the water withdrawal process is equal to The moment of occurrence, To face the moment; If the amount of water that can be recharged is equal to the amount of water that can be released in advance within the foreseeable period or the amount of water that can be recharged is greater than the reservoir capacity difference, the discharge plan shall be maintained; If the amount of water that can be recharged is lower than the reservoir tolerance, the discharge flow will be reduced until the lower limit of the water level range for dynamic control of the operating water level during the flood season is reached.
5. The method according to claim 2, characterized in that: If a major flood is predicted to occur in the forecast period, the average discharge flow in the forecast period can be determined by the following formula: , ; ; Where: is the maximum value of the interval inflow between the reservoir dam section and the flood control section during the forecast period, The flow rate corresponding to the minimum water supply requirement is The safe flow rate for flood control objects, For the inflow during the forecast period, To calculate the length of the period, To face the moment, For flood forecast period; If there is a forecast of small or medium-sized floods in the future, the average discharge flow in the forecast period can be determined by the following formula: , ; ; Where: To face the water level at the moment Dynamically control the upper limit water level of the operating water level during the flood season The reservoir tolerance, is the function of converting reservoir capacity into water level, The flow rate corresponding to the minimum water supply requirement is The safe flow rate for flood control objects, For the inflow during the forecast period, To calculate the time period, To face the moment, For the flood forecast period.
6. The method according to claim 1, characterized in that Determining flood risk is performed as expressed by the following formula, ; ; Where: Design frequency protection for reservoirs the maximum permissible storage level for floods; Design frequency protection for reservoirs The maximum allowable discharge flow of flood; For the n Flood limit water level Flood control risk rate of exceeding the maximum allowable water storage level after flood control; For the n Flood limit water level Flood control risk rate of exceeding the maximum allowable discharge flow after flood control; Design frequency protection for reservoirs flood risk rate of floods; Design frequency protection for reservoirs In case of flood, the n The highest flood control water level corresponding to the flood control starting from the flood limit water level; Design frequency protection for reservoirs In case of flood, the n The highest flood control water level corresponding to the flood control starting from the flood limit water level.
7. The method according to claim 1, characterized in that The objective function is expressed in the following formula: ; Where: For the t The number of units that can be put into operation at any time is less than or equal to the total number of units; w The number of the unit to be put into operation and is less than or equal to ; For the t Moment w The power plant number corresponding to the unit that can be put into operation; For the power plant g The output of unit No. The constraints of the generator set parameters include the unit head constraint, the unit output limit and the unit water consumption characteristics, and the constraints of the water volume of the reservoir and hydropower station include the total water volume constraint, the water volume balance constraint of the reservoir and hydropower station, the reservoir water level constraint and the initial reservoir water level constraint; The constraints of the power plant economic operation model also include the minimum downstream discharge required for downstream comprehensive utilization and the characteristic curve constraints of the reservoir and hydropower station itself.
8. The method according to claim 1, characterized in that In the process of performing optimization calculation using the particle swarm algorithm, the population size uses the reservoir water level at the end of the time period as the decision variable.
9. A device for determining the economic operation of a power plant under dynamic control of the reservoir operating water level during flood season, characterized in that: include: The first determination module is used to determine the flood control risk based on the dynamic control strategy of the reservoir operating water level during the flood season based on the pre-storage, pre-discharge and recharging method, so as to determine the storage and release volume of the reservoir to resist the secondary rain and flood according to the flood control risk; The second determination module is used to determine the water volume of the reservoir hydropower station according to the water storage and release volume of the reservoir to resist the secondary rain and flood, and to construct an economic operation model of the power plant, wherein the economic operation model of the power plant includes maximizing the total power generation of the hydropower station within the forecast period as an objective function and at least generator set parameters, hydropower station output limit and reservoir hydropower station water volume as constraints; The third determination module is used to perform optimization calculation on the economic operation model of the power plant by using a particle swarm algorithm to determine the optimal dispatching status of the generator set.
10. An execution device, characterized in that: comprising a processor and a memory, wherein the processor is coupled to the memory; The memory is used to store programs; The processor is configured to execute the program in the memory so that the execution device executes the method according to any one of claims 1 to 8.
Citation Information
Patent Citations
Generation method of data model for guiding economic operation of thermal power plant
CN117592876A
Virtual power plant economic operation method and system considering green evidence income
CN117791737A
Optimizing and dispatching method of hydropower station
CN102867226A
Dispatching method for coordinating flood preventing risk and power generation benefit of hydropower station in flood season
CN105869065A
Seasonal regulation reservoir optimal operation method with high water volume utilization rate
CN108108838A
Cited By
Reservoir group flood season operation water level water regulation and electric regulation collaborative optimization method and system
CN122452837A