Control partition planning layout adjustment method and device based on dwelling plot ratio

By calculating the traffic accessibility index and adjusting the building height, volume and density, the problem of ignoring the accessibility of public transportation facilities in the existing technology is solved, and the rationality and transportation convenience of urban planning are improved.

CN118917685APending Publication Date: 2024-11-08GUANGZHOU TRANSPORTATION PLANNING & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410958141.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the existing urban planning, the zoning residential floor area ratio control method ignores the accessibility of public transportation facilities, resulting in building density and height exceeding the traffic bearing capacity and reducing traffic convenience.

Method used

By calculating the planned traffic accessibility index and inputting it into the traffic accessibility-residential floor area ratio relationship regression model, the building height, volume and density are adjusted to ensure the balance between traffic accessibility and floor area ratio.

Benefits of technology

It improves the rationality of building distribution, improves traffic convenience, and ensures that the planning and layout meets traffic accessibility requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917685A_ABST
    Figure CN118917685A_ABST
Patent Text Reader

Abstract

The invention discloses a residential plot ratio-based management and control subarea planning layout adjustment method and device, and the method comprises the steps: firstly inputting obtained management and control subarea planning road facility data and track facility planning data into a traffic flow prediction model, and obtaining a traffic flow distribution result; according to a traffic flow distribution result, carrying out regional division on the management and control subareas to obtain a plurality of traffic zones; and aggregating the planned traffic reachability index of each traffic zone to obtain the planned traffic reachability index of the management and control zone, and inputting the planned traffic reachability index of the management and control zone into the traffic reachability-dwelling plot ratio relation regression model to obtain the planned dwelling plot ratio of the management and control zone. And adjusting the planning layout of the control subarea according to the planning living plot ratio. According to the invention, the planning layout in the management and control subarea can meet the traffic reachability requirement of the expected planning, so that the reasonability of the planning layout in the management and control subarea is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of urban planning, and in particular to a method and device for adjusting the planning layout of a control zone based on residential volume ratio. Background Art

[0002] The residential floor area ratio refers to the ratio of the total above-ground building area to the net land area of ​​a subdivision. It not only determines the cost structure of the developer, but also directly affects the quality of life and living comfort of future residents. In modern urban planning management, the control of residential floor area ratio in subdivisions refers to the control of the construction intensity and density of buildings by controlling the floor area ratio of different subdivisions in urban planning and construction, and by limiting the floor area ratio of buildings in each subdivision to control the height, volume and density of buildings in the area, so as to achieve the control of urban construction and planning objectives.

[0003] At present, my country is in the stage of urban renewal. Although there have been studies on the control methods of zoning residential floor area ratio, the current existing control methods often ignore the impact of public transportation facility accessibility on residence and over-optimistically estimate the carrying capacity of the floor area ratio, resulting in excessive population, exceeding the carrying capacity of public transportation facilities in the region, and reducing transportation convenience. Summary of the invention

[0004] The present invention provides a method and device for adjusting the planning layout of a control zone based on residential floor area ratio. The method calculates the planned traffic accessibility index of the control zone, and inputs the planned traffic accessibility index of the control zone into a traffic accessibility-residential floor area ratio relationship regression model to obtain the planned residential floor area ratio of the control zone, and adjusts the building height, building volume and building density in the control zone according to the planned residential floor area ratio, thereby effectively improving the rationality of the building distribution in the control zone.

[0005] An embodiment of the present invention provides a method for adjusting the planning layout of a control zone based on residential volume ratio, comprising:

[0006] Obtain the road facility data and rail facility data planned within the control zone;

[0007] Inputting the road facility data and the rail facility data into a traffic flow prediction model so that the traffic flow prediction model outputs a traffic flow distribution result of the control zone;

[0008] According to the traffic flow distribution result of the control zone, the control zone is divided into regions to obtain a number of traffic zones;

[0009] Calculate the planned traffic accessibility index of each traffic zone;

[0010] Aggregate the planned traffic accessibility indexes of all traffic zones to obtain the planned traffic accessibility index of the control zone;

[0011] Inputting the planned traffic accessibility index of the control zone into the traffic accessibility-residential floor area ratio relationship regression model, so that the traffic accessibility-residential floor area ratio relationship regression model outputs the planned residential floor area ratio of the control zone; wherein the traffic accessibility-residential floor area ratio relationship regression model is constructed based on the traffic accessibility and residential floor area ratio of several livable communities, and the livable communities are traffic communities with comprehensive traffic loads within a preset range;

[0012] According to the planned residential floor area ratio of the control zone, the planning layout within the control zone is adjusted.

[0013] Furthermore, before adjusting the planning layout within the control zone according to the planned residential volume ratio of the control zone, it also includes:

[0014] Calculate the actual planned road network density of the control zone based on the construction land area and the total length of drivable roads in the road facility data;

[0015] Inputting the planned traffic accessibility index of the control zone into the traffic accessibility-road network density relationship regression model, so that the traffic accessibility-road network density relationship regression model outputs the theoretical road network density of the control zone; wherein the traffic accessibility-road network density relationship regression model is constructed based on the traffic accessibility and road network density of the several livable communities;

[0016] Calculating the difference between the actual planned road network density and the theoretical road network density, and inputting the difference into a road network density-residential floor area ratio relationship regression model to obtain a deviation value of the planned residential floor area ratio;

[0017] According to the deviation value of the planned residential floor area ratio, the planned residential floor area ratio is corrected once to obtain a corrected planned residential floor area ratio.

[0018] Furthermore, after obtaining a revised planned residential volume ratio, before adjusting the building height, building volume and building density within the zone, it also includes:

[0019] Obtain the population and job numbers planned for the control zone;

[0020] Calculate the planned job-residence ratio of the control zone based on the population and job numbers;

[0021] Determine whether the planned job-housing ratio is within a preset job-housing ratio range,

[0022] If yes, the planned residential floor area ratio after the first revision shall remain unchanged;

[0023] If not, the planned residential floor area ratio after the first correction will be corrected for the second time until the planned employment-residence ratio is within the preset employment-residence ratio range, and the planned residential floor area ratio after the second correction will be used as the final planned residential floor area ratio.

[0024] Furthermore, the construction process of the traffic flow prediction model includes:

[0025] Acquire a number of training samples; wherein the training samples are road facility data, rail facility data, and actual traffic flow data of a number of built communities;

[0026] Training the traffic flow prediction model to be trained according to the training samples to generate a trained traffic flow prediction model;

[0027] During training, the traffic flow prediction model to be trained outputs corresponding predicted traffic flow data based on the road facility data and rail facility data of the training samples; the predicted traffic flow data is compared with the actual traffic flow data corresponding to the training samples, and the loss function value is calculated; and the network parameters of the traffic flow prediction model to be trained are adjusted according to the calculated loss function value.

[0028] Furthermore, the planned traffic accessibility index of each traffic zone includes:

[0029] Taking the preset maximum walking connection distance as the restriction range, the first walking time from the current traffic area to each bus stop within the restriction range, and the second walking time from the current traffic area to each rail station within the restriction range are calculated respectively;

[0030] Calculate the first waiting time of each bus line according to the timetable data corresponding to each bus line in each bus stop;

[0031] Calculate the second waiting time of each track line according to the timetable data corresponding to each track line in each track station;

[0032] The first waiting time and the first walking time of all bus routes in the current traffic area are accumulated to obtain the first accessibility index of the current traffic area;

[0033] The second waiting time and the second walking time of all rail lines in the current traffic area are accumulated to obtain the second accessibility index of the current traffic area;

[0034] The first accessibility index and the second accessibility index are accumulated to obtain a planned traffic accessibility index of the current traffic community.

[0035] Furthermore, the planned traffic accessibility indexes of all traffic areas are aggregated to obtain the planned traffic accessibility index of the control area, including:

[0036] Obtaining the areas of all traffic zones within the control zone;

[0037] For each traffic zone, the planned traffic accessibility index of the current traffic zone is weighted by taking the area of ​​the current traffic zone as the weight;

[0038] The weighted planned traffic accessibility index of each traffic zone is accumulated to obtain the planned traffic accessibility index of the current control zone.

[0039] Furthermore, the construction of the regression model of the relationship between traffic accessibility and residential volume ratio includes:

[0040] Acquire a first data set of several suitable communities; wherein the first data set includes a traffic accessibility index and a residential volume ratio of each suitable community;

[0041] According to each of the traffic accessibility indexes and the corresponding residential floor area ratios, data fitting is performed to generate a first linear regression model for characterizing the mapping relationship between the traffic accessibility index and the residential floor area ratio, thereby obtaining the traffic accessibility-residential floor area ratio relationship regression model.

[0042] Furthermore, the construction of the traffic accessibility-road network density relationship regression model includes:

[0043] Acquire a second data set of several suitable communities; wherein the second data set includes a traffic accessibility index and a road network density of each suitable community;

[0044] According to each of the traffic accessibility indexes and the corresponding road network density, data fitting is performed to generate a second linear regression model for characterizing the mapping relationship between the traffic accessibility index and the road network density, thereby obtaining the traffic accessibility-road network density relationship regression model.

[0045] Furthermore, the construction of the road network density-residential volume ratio relationship regression model includes:

[0046] Acquire a third data set of several suitable communities; wherein the third data set includes the road network density and residential volume ratio of each suitable community;

[0047] According to each of the road network densities and the corresponding residential floor area ratios, data fitting is performed to generate a third linear regression model for characterizing the mapping relationship between road network density and residential floor area ratio, thereby obtaining the road network density-residential floor area ratio relationship regression model.

[0048] An embodiment of the present invention further provides a control zone planning layout adjustment device based on residential volume ratio, comprising: a data acquisition module, a traffic flow distribution result acquisition module, a traffic zone division module, a traffic zone planning traffic accessibility index calculation module, a control zone planning traffic accessibility index calculation module, a planned residential volume ratio calculation module, and a control zone planning layout adjustment module;

[0049] The data acquisition module is used to acquire the road facility data and rail facility data planned in the control zone;

[0050] The traffic flow distribution result acquisition module is used to input the road facility data and the rail facility data into the traffic flow prediction model, so that the traffic flow prediction model outputs the traffic flow distribution result of the control zone;

[0051] The traffic zone division module is used to divide the control zone into several traffic zones according to the traffic flow distribution result of the control zone;

[0052] The traffic accessibility index calculation module for traffic cell planning is used to calculate the traffic accessibility index for each traffic cell planning;

[0053] The control zone planning traffic accessibility index calculation module is used to aggregate the planning traffic accessibility indexes of all traffic communities to obtain the planning traffic accessibility index of the control zone;

[0054] The planned residential floor area ratio calculation module is used to input the planned traffic accessibility index of the control zone into the traffic accessibility-residential floor area ratio relationship regression model, so that the traffic accessibility-residential floor area ratio relationship regression model outputs the planned residential floor area ratio of the control zone; wherein the traffic accessibility-residential floor area ratio relationship regression model is constructed based on the traffic accessibility and residential floor area ratio of several livable communities, and the livable communities are traffic communities with comprehensive traffic loads within a preset range;

[0055] The control zone planning layout adjustment module is used to adjust the planning layout within the control zone according to the planned residential volume ratio of the control zone.

[0056] The following beneficial effects are achieved by implementing the present invention:

[0057] The present invention provides a method and device for adjusting the planning layout of a control zone based on residential floor area ratio. The method obtains a corresponding control zone traffic flow distribution result based on the planned road facility data and rail facility data of the control zone, and divides the control zone into regions according to the traffic flow distribution result of the control zone, thereby obtaining a number of traffic communities; further, based on the aggregation of the planned traffic accessibility index of each traffic community, a planned traffic accessibility index of the control zone is obtained, and the planned traffic accessibility index of the control zone is input into a traffic accessibility-residential floor area ratio relationship regression model trained by the current traffic accessibility and the current residential floor area ratio of the built livable community, so as to obtain the planned residential floor area ratio of the control zone output by the model; in summary, the traffic accessibility factor is used as an influencing factor of the residential floor area ratio, and the planned residential floor area ratio corresponding to the control zone under the influence of the planned traffic accessibility is solved; further, the planning layout in the control zone is adjusted according to the planned residential floor area ratio, so that the planning layout in the control zone can meet the expected planned traffic accessibility, so as to improve the rationality of the planning layout in the control zone. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solution of the present application, the drawings required for use in the implementation manner will be briefly introduced below. Obviously, the drawings described below are only some implementation manners of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0059] Figure 1 It is a flowchart of a method for adjusting the planning layout of a control zone based on residential volume ratio provided in a certain embodiment of the present application;

[0060] Figure 2 It is a structural schematic diagram of a control zoning planning layout adjustment device based on residential floor area ratio provided in a certain embodiment of the present application. DETAILED DESCRIPTION

[0061] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0062] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.

[0063] In the description of the embodiments of the present application, the technical terms "first", "second", etc. are only used to distinguish different objects, and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined.

[0064] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0065] In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of the associated objects, indicating that there may be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0066] In the description of the embodiments of the present application, the term "multiple" refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple pieces" refers to more than two pieces (including two pieces).

[0067] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.

[0068] See also Figure 1 , is a flow chart of a method for adjusting the planning layout of a control zone based on residential volume ratio provided by an embodiment of the present invention, comprising:

[0069] S1. Obtain the road facility data and rail facility data planned in the control zone;

[0070] S2. Inputting the road facility data and the rail facility data into a traffic flow prediction model, so that the traffic flow prediction model outputs a traffic flow distribution result of the control zone;

[0071] In a preferred embodiment, the process of constructing the traffic flow prediction model includes:

[0072] Acquire a number of training samples; wherein the training samples are road facility data, rail facility data, and actual traffic flow data of a number of built communities;

[0073] Training the traffic flow prediction model to be trained according to the training samples to generate a trained traffic flow prediction model;

[0074] Wherein, during training, the traffic flow prediction model to be trained outputs corresponding predicted traffic flow data according to the road facility data and rail facility data of the training sample; the predicted traffic flow data is compared with the actual traffic flow data corresponding to the training sample, the loss function value is calculated, and the network parameters of the traffic flow prediction model to be trained are adjusted according to the calculated loss function value;

[0075] Specifically, the road facility data and rail facility data acquired in step S1 are input into the trained traffic flow prediction model, and then the traffic flow distribution result of the control zone is obtained;

[0076] Specifically, the traffic flow prediction model is trained based on the road facility data, rail facility data and actual traffic flow data of several built communities, so that the traffic flow prediction model after training can accurately predict the traffic flow distribution results of the control zone.

[0077] S3. According to the traffic flow distribution result of the control zone, the control zone is divided into several traffic zones;

[0078] Specifically, after obtaining the traffic flow distribution result of the control zone, it is necessary to divide the control zone into regions according to factors such as flow size, flow direction, road connection conditions, etc. in the traffic flow distribution result, so as to obtain a number of traffic zones.

[0079] S4, calculating the planned traffic accessibility index of each traffic zone;

[0080] In a preferred embodiment, the planned traffic accessibility index of each traffic zone includes:

[0081] Taking the preset maximum walking connection distance as the restriction range, the first walking time from the current traffic area to each bus stop within the restriction range, and the second walking time from the current traffic area to each rail station within the restriction range are calculated respectively;

[0082] Calculate the first waiting time of each bus line according to the timetable data corresponding to each bus line in each bus stop;

[0083] Calculate the second waiting time of each track line according to the timetable data corresponding to each track line in each track station;

[0084] The first waiting time and the first walking time of all bus routes in the current traffic area are accumulated to obtain the first accessibility index of the current traffic area;

[0085] The second waiting time and the second walking time of all rail lines in the current traffic area are accumulated to obtain the second accessibility index of the current traffic area;

[0086] Accumulating the first accessibility index and the second accessibility index to obtain a planned traffic accessibility index of the current traffic community;

[0087] Specifically, the maximum walking connection distance limit for bus and rail stations is 640m and 960m respectively, and the walking time from each traffic community in the control zone to each bus station and each rail station within the limit is calculated;

[0088] The first walking time corresponds to the walking time of the bus station that can be reached by each traffic zone within the restricted range, and the second walking time corresponds to the walking time of the rail station that can be reached by each traffic zone within the restricted range;

[0089] Obtain the timetable data corresponding to each bus line in each bus stop within the maximum walking connection distance limit, and then, according to the departure time and arrival time of each stop in the timetable data, subtract the departure time of the previous stop from the arrival time of the current stop to obtain the waiting time between two stop stations, and calculate the waiting time between each stop point based on the above method, and accumulate the calculated waiting times to obtain the first waiting time of each bus line;

[0090] Similarly, the timetable data corresponding to each rail line in each rail station within the maximum walking connection distance limit is obtained, and then according to the departure time and arrival time of each stop in the timetable data, the departure time of the previous station is subtracted from the arrival time of the current station to obtain the waiting time between two stop stations, and the waiting time between each stop is calculated based on the above method, and then the calculated waiting times are accumulated to obtain the second waiting time of the rail line of the current traffic area;

[0091] After calculating the first waiting time of each bus line, the first walking time and the corresponding first waiting time of each bus line are accumulated to obtain the accessibility index of each bus line, and the accessibility index of each bus line is accumulated to obtain the first accessibility index of the current traffic area;

[0092] Similarly, after calculating the second waiting time of each rail line, the second walking time of each rail line and the corresponding second waiting time are accumulated to obtain the accessibility index of each rail line, and the accessibility index of each rail line is accumulated to obtain the second accessibility index of the current traffic area;

[0093] The first accessibility index and the second accessibility index are accumulated, and the corresponding table is looked up to obtain the planned traffic accessibility index of the current traffic community.

[0094] S5. Aggregate the planned traffic accessibility indexes of all traffic communities to obtain the planned traffic accessibility index of the control zone;

[0095] In a preferred embodiment, the planned traffic accessibility indexes of all traffic areas are aggregated to obtain the planned traffic accessibility index of the control area, including:

[0096] Obtaining the areas of all traffic zones within the control zone;

[0097] For each traffic zone, the planned traffic accessibility index of the current traffic zone is weighted by taking the area of ​​the current traffic zone as the weight;

[0098] The weighted planned traffic accessibility index of each traffic zone is accumulated to obtain the planned traffic accessibility index of the current control zone;

[0099] Specifically, after dividing into several traffic areas, the area of ​​each traffic area can be obtained according to the division result, and the planned traffic accessibility index of the current traffic area can be weighted with the area of ​​the current traffic area as the weight. By accumulating the weighted planned traffic accessibility index of each traffic area, the planned traffic accessibility index of the current control area can be obtained.

[0100] S6. Inputting the planned traffic accessibility index of the control zone into the traffic accessibility-residential floor area ratio relationship regression model, so that the traffic accessibility-residential floor area ratio relationship regression model outputs the planned residential floor area ratio of the control zone; wherein the traffic accessibility-residential floor area ratio relationship regression model is constructed based on the traffic accessibility and residential floor area ratio of several livable communities, and the livable communities are traffic communities with comprehensive traffic loads within a preset range;

[0101] In a preferred embodiment, the construction of the traffic accessibility-residential floor area ratio relationship regression model includes:

[0102] Acquire a first data set of several suitable communities; wherein the first data set includes a traffic accessibility index and a residential volume ratio of each suitable community;

[0103] According to each of the traffic accessibility indexes and the corresponding residential floor area ratios, data fitting is performed to generate a first linear regression model for characterizing the mapping relationship between the traffic accessibility index and the residential floor area ratio, thereby obtaining the traffic accessibility-residential floor area ratio relationship regression model;

[0104] Specifically, the process of determining the suitable cell is as follows:

[0105] Obtain all road saturation and track load rates corresponding to each built community in a certain area, weight all road saturation and track load rates of each built community, and obtain the comprehensive traffic load corresponding to each built community;

[0106] Screen the built communities whose comprehensive traffic load is within the preset range, so as to obtain suitable communities;

[0107] Preferably, the preset range of the comprehensive traffic load degree is between 0.75 and 0.90.

[0108] Specifically, the planned traffic accessibility index of the control zone is input into the traffic accessibility-residential floor area ratio relationship regression model, so that the traffic accessibility-residential floor area ratio relationship regression model outputs the planned residential floor area ratio of the control zone.

[0109] In a preferred embodiment, before adjusting the planning layout within the control zone according to the planned residential volume ratio of the control zone, the method further includes:

[0110] Calculate the actual planned road network density of the control zone based on the construction land area and the total length of drivable roads in the road facility data;

[0111] Inputting the planned traffic accessibility index of the control zone into the traffic accessibility-road network density relationship regression model, so that the traffic accessibility-road network density relationship regression model outputs the theoretical road network density of the control zone; wherein the traffic accessibility-road network density relationship regression model is constructed based on the traffic accessibility and road network density of the several livable communities;

[0112] Calculating the difference between the actual planned road network density and the theoretical road network density, and inputting the difference into a road network density-residential floor area ratio relationship regression model to obtain a deviation value of the planned residential floor area ratio;

[0113] According to the deviation value of the planned residential floor area ratio, the planned residential floor area ratio is corrected once to obtain a corrected planned residential floor area ratio;

[0114] Specifically, the process of calculating the actual planned road network density of the control zone includes the following three steps:

[0115] (1) Extracting the construction land area data of the control zone based on the acquired road facility data;

[0116] (2) extracting the internal expressways, main roads, secondary roads, branch roads and other road data of the control zone based on the acquired road facility data, and calculating the total length of the roads available for traffic in the control zone;

[0117] (3) Dividing the total length of the road by the construction land area to calculate the actual planned road network density of the control zone;

[0118] Next, the planned traffic accessibility index of the control zone is input into the traffic accessibility-road network density relationship regression model, so that the traffic accessibility-road network density relationship regression model outputs the theoretical road network density of the control zone;

[0119] In a preferred embodiment, the construction of the traffic accessibility-road network density relationship regression model includes:

[0120] Acquire a second data set of several suitable communities; wherein the second data set includes a traffic accessibility index and a road network density of each suitable community;

[0121] According to each of the traffic accessibility indexes and the corresponding road network density, data fitting is performed to generate a second linear regression model for characterizing the mapping relationship between the traffic accessibility index and the road network density, thereby obtaining the traffic accessibility-road network density relationship regression model.

[0122] Next, after the actual planned road network density is calculated, the difference between the actual planned road network density and the theoretical road network density is calculated, and the difference is input into a road network density-residential floor area ratio relationship regression model to obtain a deviation value of the planned residential floor area ratio;

[0123] Specifically, the slope of the regression line of the road network density-residential floor area ratio regression model corresponds to the deviation value of the planned residential floor area ratio corresponding to each unit increase in the actual planned road network density;

[0124] According to the deviation value of the planned residential floor area ratio, the planned residential floor area ratio is corrected once until the planned residential floor area ratio is adjusted to the deviation value which approaches 0, thereby obtaining a corrected planned residential floor area ratio.

[0125] In a preferred embodiment, the construction of the road network density-residential volume ratio relationship regression model includes:

[0126] Acquire a third data set of several suitable communities; wherein the third data set includes the road network density and residential volume ratio of each suitable community;

[0127] According to each of the road network densities and the corresponding residential floor area ratios, data fitting is performed to generate a third linear regression model for characterizing the mapping relationship between road network density and residential floor area ratio, thereby obtaining the road network density-residential floor area ratio relationship regression model.

[0128] In a preferred embodiment, after obtaining a revised planned residential volume ratio and before adjusting the building height, building volume and building density in the subdistrict, the method further includes:

[0129] Obtain the population and job numbers planned for the control zone;

[0130] Calculate the planned job-residence ratio of the control zone based on the population and job numbers;

[0131] Determine whether the planned job-housing ratio is within a preset job-housing ratio range,

[0132] If yes, the planned residential floor area ratio after the first revision shall remain unchanged;

[0133] If not, the planned residential floor area ratio after the first correction is corrected for a second time until the planned employment-residence ratio is within the preset employment-residence ratio range, and the planned residential floor area ratio after the second correction is used as the final planned residential floor area ratio;

[0134] Specifically, according to the acquired planned population and job number of the control zone, the planned job-residence ratio of the control zone is calculated, and then it is determined whether the planned job-residence ratio is within a preset job-residence ratio interval. If so, the planned residential floor area ratio after the first correction is kept unchanged; if not, the planned residential floor area ratio after the first correction is gradually corrected for a second time according to a certain step length until the planned job-residence ratio is within the preset job-residence ratio interval, and the planned residential floor area ratio after the second correction is used as the final planned residential floor area ratio;

[0135] Preferably, the preset job-residence ratio should be in the range of 0.55-0.6.

[0136] S7. Adjusting the planning layout within the control zone according to the planned residential volume ratio of the control zone;

[0137] Specifically, according to the planned residential floor area ratio of the control zone, the building height within the control zone is adjusted. A higher floor area ratio requirement can allow a building to have a higher number of floors or building height to increase the building volume; on the contrary, a lower floor area ratio requirement requires limiting the height of the building to control the total volume;

[0138] Similarly, the total construction volume of the building is adjusted according to the planned residential volume ratio of the control zone. A higher volume ratio requirement can allow the building to have a larger building volume, that is, a larger total construction volume; on the contrary, a lower volume ratio requirement needs to limit the volume of the building to control the total volume;

[0139] Similarly, the density of buildings is adjusted according to the planned residential floor area ratio of the control zone. A higher floor area ratio requirement can allow a higher building density, that is, a larger number of buildings per unit area; on the contrary, a lower floor area ratio requirement requires limiting the building density to control the total volume.

[0140] See also Figure 2 , is a control zoning planning layout adjustment device based on residential volume ratio provided by a certain embodiment of the present application, comprising: a data acquisition module, a traffic flow distribution result acquisition module, a traffic community division module, a traffic community planning traffic accessibility index calculation module, a control zoning planning traffic accessibility index calculation module, a planned residential volume ratio calculation module and a control zoning planning layout adjustment module;

[0141] The data acquisition module is used to acquire the road facility data and rail facility data planned in the control zone;

[0142] The traffic flow distribution result acquisition module is used to input the road facility data and the rail facility data into the traffic flow prediction model, so that the traffic flow prediction model outputs the traffic flow distribution result of the control zone;

[0143] The traffic zone division module is used to divide the control zone into several traffic zones according to the traffic flow distribution result of the control zone;

[0144] The traffic accessibility index calculation module for traffic cell planning is used to calculate the traffic accessibility index for each traffic cell planning;

[0145] The control zone planning traffic accessibility index calculation module is used to aggregate the planning traffic accessibility indexes of all traffic communities to obtain the planning traffic accessibility index of the control zone;

[0146] The planned residential floor area ratio calculation module is used to input the planned traffic accessibility index of the control zone into the traffic accessibility-residential floor area ratio relationship regression model, so that the traffic accessibility-residential floor area ratio relationship regression model outputs the planned residential floor area ratio of the control zone; wherein the traffic accessibility-residential floor area ratio relationship regression model is constructed based on the traffic accessibility and residential floor area ratio of several livable communities, and the livable communities are traffic communities with comprehensive traffic loads within a preset range;

[0147] The control zone planning layout adjustment module is used to adjust the planning layout within the control zone according to the planned residential volume ratio of the control zone.

[0148] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A method for adjusting the layout of control zoning planning based on residential volume ratio, characterized in that: include: Obtain the road facility data and rail facility data planned within the control zone; Inputting the road facility data and the rail facility data into a traffic flow prediction model so that the traffic flow prediction model outputs a traffic flow distribution result of the control zone; According to the traffic flow distribution result of the control zone, the control zone is divided into regions to obtain a number of traffic zones; Calculate the planned traffic accessibility index of each traffic zone; Aggregate the planned traffic accessibility indexes of all traffic zones to obtain the planned traffic accessibility index of the control zone; Inputting the planned traffic accessibility index of the control zone into the traffic accessibility-residential floor area ratio relationship regression model, so that the traffic accessibility-residential floor area ratio relationship regression model outputs the planned residential floor area ratio of the control zone; wherein the traffic accessibility-residential floor area ratio relationship regression model is constructed based on the traffic accessibility and residential floor area ratio of several livable communities, and the livable communities are traffic communities with comprehensive traffic loads within a preset range; According to the planned residential floor area ratio of the control zone, the planning layout within the control zone is adjusted.

2. The method for adjusting the layout of the control zoning planning based on the residential volume ratio according to claim 1, characterized in that: Before adjusting the planning layout within the control zone according to the planned residential volume ratio of the control zone, the method further includes: Calculate the actual planned road network density of the control zone based on the construction land area and the total length of drivable roads in the road facility data; Inputting the planned traffic accessibility index of the control zone into the traffic accessibility-road network density relationship regression model, so that the traffic accessibility-road network density relationship regression model outputs the theoretical road network density of the control zone; wherein the traffic accessibility-road network density relationship regression model is constructed based on the traffic accessibility and road network density of the several livable communities; Calculating the difference between the actual planned road network density and the theoretical road network density, and inputting the difference into a road network density-residential floor area ratio relationship regression model to obtain a deviation value of the planned residential floor area ratio; According to the deviation value of the planned residential floor area ratio, the planned residential floor area ratio is corrected once to obtain a corrected planned residential floor area ratio.

3. The method for adjusting the layout of the control zoning planning based on the residential volume ratio according to claim 2 is characterized in that: After obtaining a revised planned residential plot ratio, before adjusting the building height, building volume and building density within the zone, it also includes: Obtain the population and job numbers planned for the control zone; Calculate the planned job-residence ratio of the control zone based on the population and job numbers; Determine whether the planned job-housing ratio is within a preset job-housing ratio range, If yes, the planned residential floor area ratio after the first revision shall remain unchanged; If not, the planned residential floor area ratio after the first correction will be corrected for the second time until the planned employment-residence ratio is within the preset employment-residence ratio range, and the planned residential floor area ratio after the second correction will be used as the final planned residential floor area ratio.

4. The method for adjusting the layout of the control zoning planning based on the residential volume ratio according to claim 1, characterized in that: The construction process of the traffic flow prediction model includes: Acquire a number of training samples; wherein the training samples are road facility data, rail facility data, and actual traffic flow data of a number of built communities; Training the traffic flow prediction model to be trained according to the training samples to generate a trained traffic flow prediction model; During training, the traffic flow prediction model to be trained outputs corresponding predicted traffic flow data based on the road facility data and rail facility data of the training samples; the predicted traffic flow data is compared with the actual traffic flow data corresponding to the training samples, and the loss function value is calculated; and the network parameters of the traffic flow prediction model to be trained are adjusted according to the calculated loss function value.

5. The method for adjusting the layout of the control zoning planning based on the residential volume ratio according to claim 1, characterized in that: The planned traffic accessibility index of each traffic zone includes: Taking the preset maximum walking connection distance as the restriction range, the first walking time from the current traffic area to each bus stop within the restriction range, and the second walking time from the current traffic area to each rail station within the restriction range are calculated respectively; Calculate the first waiting time of each bus line according to the timetable data corresponding to each bus line in each bus stop; Calculating the second waiting time of each track line according to the timetable data corresponding to each track line in each track station; The first waiting time and the first walking time of all bus routes in the current traffic area are accumulated to obtain the first accessibility index of the current traffic area; The second waiting time and the second walking time of all rail lines in the current traffic area are accumulated to obtain the second accessibility index of the current traffic area; The first accessibility index and the second accessibility index are accumulated to obtain a planned traffic accessibility index of the current traffic community.

6. The method for adjusting the layout of the control zoning planning based on the residential volume ratio according to claim 1, characterized in that: The planned traffic accessibility indexes of all traffic zones are aggregated to obtain the planned traffic accessibility index of the control zone, including: Obtaining the areas of all traffic zones within the control zone; For each traffic zone, the planned traffic accessibility index of the current traffic zone is weighted by taking the area of ​​the current traffic zone as the weight; The weighted planned traffic accessibility index of each traffic zone is accumulated to obtain the planned traffic accessibility index of the current control zone.

7. The method for adjusting the layout of the control zoning planning based on the residential volume ratio according to claim 1, characterized in that: The construction of the traffic accessibility-residential volume ratio relationship regression model includes: Acquire a first data set of several suitable communities; wherein the first data set includes a traffic accessibility index and a residential volume ratio of each suitable community; According to each of the traffic accessibility indexes and the corresponding residential floor area ratios, data fitting is performed to generate a first linear regression model for characterizing the mapping relationship between the traffic accessibility index and the residential floor area ratio, thereby obtaining the traffic accessibility-residential floor area ratio relationship regression model.

8. The method for adjusting the layout of the control zoning planning based on the residential volume ratio according to claim 2, characterized in that: The construction of the traffic accessibility-road network density relationship regression model includes: Acquire a second data set of several suitable communities; wherein the second data set includes a traffic accessibility index and a road network density of each suitable community; According to each of the traffic accessibility indexes and the corresponding road network density, data fitting is performed to generate a second linear regression model for characterizing the mapping relationship between the traffic accessibility index and the road network density, thereby obtaining the traffic accessibility-road network density relationship regression model.

9. The method for adjusting the layout of the control zoning planning based on the residential volume ratio according to claim 2, characterized in that: The construction of the road network density-residential volume ratio relationship regression model includes: Acquire a third data set of several suitable communities; wherein the third data set includes the road network density and residential volume ratio of each suitable community; According to each of the road network densities and the corresponding residential floor area ratios, data fitting is performed to generate a third linear regression model for characterizing the mapping relationship between road network density and residential floor area ratio, thereby obtaining the road network density-residential floor area ratio relationship regression model.

10. A control zoning planning layout adjustment device based on residential volume ratio, characterized in that: include: Data acquisition module, traffic flow distribution result acquisition module, traffic zone division module, traffic zone planning traffic accessibility index calculation module, control zone planning traffic accessibility index calculation module, planned residential volume ratio calculation module and control zone planning layout adjustment module; The data acquisition module is used to acquire the road facility data and rail facility data planned in the control zone; The traffic flow distribution result acquisition module is used to input the road facility data and the rail facility data into the traffic flow prediction model, so that the traffic flow prediction model outputs the traffic flow distribution result of the control zone; The traffic zone division module is used to divide the control zone into several traffic zones according to the traffic flow distribution result of the control zone; The traffic accessibility index calculation module for traffic cell planning is used to calculate the traffic accessibility index for each traffic cell planning; The control zone planning traffic accessibility index calculation module is used to aggregate the planning traffic accessibility indexes of all traffic communities to obtain the planning traffic accessibility index of the control zone; The planned residential floor area ratio calculation module is used to input the planned traffic accessibility index of the control zone into the traffic accessibility-residential floor area ratio relationship regression model, so that the traffic accessibility-residential floor area ratio relationship regression model outputs the planned residential floor area ratio of the control zone; wherein the traffic accessibility-residential floor area ratio relationship regression model is constructed based on the traffic accessibility and residential floor area ratio of several livable communities, and the livable communities are traffic communities with comprehensive traffic loads within a preset range; The control zone planning layout adjustment module is used to adjust the planning layout within the control zone according to the planned residential volume ratio of the control zone.