Seaman-level maintenance capability assessment method and system for typical ship equipment faults
Through target-level decomposition and causal relationship analysis, combined with the multi-layer evaluation indicators of the ship equipment maintenance system, the problem of complexity in crew-level equipment maintenance capabilities assessment is solved, and a clear and accurate maintenance capabilities assessment is achieved.
Patent Information
- Application Number
- CN202410934450.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-11-08
AI Technical Summary
In the prior art, the evaluation method of ship equipment maintenance capability is complex, and it is difficult to accurately characterize the complex relationship between the elements of the maintenance system, resulting in the evaluation of crew-level equipment maintenance capability is not clear enough.
The target-level decomposition and causal decomposition method are used to determine multi-layer evaluation indicators based on the output, operation process, input and external environment of the ship equipment maintenance system, and the weight of each indicator is determined through causal analysis and hierarchical analysis method to realize crew-level maintenance Assessment of competence.
The crew-level maintenance capability assessment is simplified, the weak links are accurately identified, the logical division and reliability calculation of the equipment system are skipped, and the clear maintenance capability assessment results are provided.
Smart Images

Figure CN118917718A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of ship equipment maintenance and support, and in particular to a crew-level maintenance capability assessment method and system for typical ship equipment failures. Background Art
[0002] The ship equipment maintenance and support capability assessment refers to the measurement of the effectiveness of the equipment maintenance and support system in completing the support mission and achieving the expected goals under the given mission requirements and background conditions. After the ship goes to sea, the crew is the main maintenance force, so the crew-level maintenance capability has an important impact on the equipment maintenance capability of the ship at sea.
[0003] At present, the equipment integrity or mission success rate is usually used to evaluate the equipment maintenance capability. On the one hand, due to the complexity of the maintenance process and the diversity of the maintenance system structure, a single indicator is not enough to describe the complex relationship between the various elements of the maintenance system; on the other hand, the equipment decomposition process is complex, the reliability logic relationship is obscure, and there are many probability calculation formulas. Therefore, the current evaluation method of crew-level equipment maintenance capability of seagoing ships is relatively complicated. Summary of the invention
[0004] The present invention provides a crew-level maintenance capability assessment method and system for typical ship equipment failures, which are used to solve the defect that the assessment method of crew-level equipment maintenance capability of seagoing ships in the prior art is relatively complicated, and realize a simple and clear crew-level maintenance capability assessment method for typical ship equipment failures.
[0005] The present invention provides a crew-level maintenance capability assessment method for typical ship equipment failures, comprising:
[0006] Determine the first level of evaluation indicators based on the output of the crew-level ship equipment maintenance system, where the crew-level ship equipment maintenance system is pre-built according to the ship's maintenance process;
[0007] Determine the second level evaluation indicators based on the operation process of the crew-level ship equipment maintenance system;
[0008] Determine the third level evaluation indicators based on the input from the crew-level ship equipment maintenance system;
[0009] Determine the fourth level evaluation indicators based on the external environment of the crew-level ship equipment maintenance system;
[0010] The crew-level maintenance capability of ship equipment is evaluated together according to the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators and the fourth-layer evaluation indicators.
[0011] The present invention also provides a crew-level maintenance capability assessment system for typical ship equipment failures, comprising:
[0012] An evaluation indicator configuration module, used to determine the first-level evaluation indicators according to the output of the crew-level ship equipment maintenance system, wherein the crew-level ship equipment maintenance system is pre-built according to the ship's maintenance process;
[0013] The evaluation index configuration module is also used to determine the second-level evaluation index according to the operation process of the crew-level ship equipment maintenance system;
[0014] The evaluation index configuration module is also used to determine the third-level evaluation index according to the input of the crew-level ship equipment maintenance system;
[0015] The evaluation index configuration module is also used to determine the fourth-level evaluation index according to the external environment of the crew-level ship equipment maintenance system;
[0016] An evaluation module is used to evaluate the crew-level maintenance capability of ship equipment based on the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators and the fourth-layer evaluation indicators.
[0017] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, a crew-level maintenance capability assessment method for typical ship equipment failures as described in any one of the above methods is implemented.
[0018] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any of the above-described crew-level maintenance capability assessment methods for typical ship equipment failures.
[0019] The present invention also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the method for assessing crew-level maintenance capability for typical ship equipment failures as described in any one of the above methods is implemented.
[0020] The crew-level maintenance capability evaluation method and system for typical ship equipment failures provided by the present invention determines the IPO&E model of the ship equipment maintenance system through the process of crew-level maintenance of ship equipment, adopts the target hierarchical decomposition and causal relationship decomposition method to respectively determine the first-level evaluation index, the second-level evaluation index, the third-level evaluation index and the fourth-level evaluation index that are mutually related according to the output, operation process, input and external factors of the maintenance model, adopts the causal analysis method to determine each evaluation index with a causal relationship chain in the four-level evaluation index, and determines the weight corresponding to each evaluation index according to the hierarchical analysis method, and finally determines the evaluation result of the crew-level maintenance capability of the ship equipment according to each index and the weight corresponding to the index. Thus, the logical division and reliability calculation of the ship equipment system are skipped, and the crew-level maintenance capability of the ship equipment is accurately and clearly determined. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 This is one of the flow charts of the crew-level maintenance capability assessment method for typical ship equipment failures provided by the present invention;
[0023] Figure 2 It is a schematic diagram of the crew-level maintenance process of ship equipment in the crew-level maintenance capability assessment method for typical ship equipment failures provided by the present invention;
[0024] Figure 3 It is a model diagram of a crew-level ship equipment maintenance system in a crew-level maintenance capability assessment method for typical ship equipment failures provided by the present invention;
[0025] Figure 4 It is a flow chart of establishing a crew-level maintenance capability assessment index system by using target hierarchical decomposition and causal relationship in the crew-level maintenance capability assessment method for typical ship equipment failures provided by the present invention;
[0026] Figure 5 It is a structural schematic diagram of a crew-level maintenance capability assessment system for typical ship equipment failures provided by the present invention;
[0027] Figure 6 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings in the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] Combine the following Figure 1-Figure 4 The crew-level maintenance capability assessment method for typical ship equipment failures of the present invention is described as follows: Figure 1 As shown, the method includes:
[0030] Step 101, determining a first-level evaluation index according to an output of a crew-level ship equipment maintenance system, wherein the crew-level ship equipment maintenance system is pre-built according to a ship maintenance process;
[0031] Since the current evaluation method of ship equipment maintenance and support capabilities using a single perspective such as ship equipment integrity or maintenance task success rate is relatively complicated, a more valuable method is to define a series of key capability indicators to measure the maintenance and support capabilities of ship equipment from multiple perspectives.
[0032] Therefore, this application defines and selects maintenance capability evaluation indicators for ship equipment by constructing an IPO&E model of a crew-level maintenance system for ship equipment.
[0033] Specifically, the crew-level maintenance process of ship equipment is as follows: Figure 2 As shown in the figure, on this basis, considering the actual working environment of the ship at sea, that is, the maintenance personnel, equipment spare parts, repair tools, etc. are limited during maintenance, the crew-level maintenance system IPO&E model of ship equipment is defined based on the crew-level maintenance process of ship equipment as shown in the figure. Figure 3 shown.
[0034] The inputs in the IPO&E model of the crew-level maintenance system of ship equipment include two parts: one is the faulty equipment to be repaired, and the other is the various resources required for maintenance, including onboard maintenance facilities and equipment, spare parts, maintenance technical manuals and crew members, etc. Among them, the faulty equipment to be repaired includes equipment that can be self-repaired within the scope of crew-level repair and equipment that needs to be repaired outside the scope of crew-level repair.
[0035] The maintenance process of the IPO&E model of the crew-level maintenance system for ship equipment is the specific maintenance process of faulty equipment, including four basic links: clarifying maintenance tasks, formulating maintenance plans, arranging maintenance schedules and implementing maintenance operations.
[0036] Among them, clarifying the maintenance tasks is to determine what kind of maintenance items need to be implemented on what equipment according to the phenomenon of the fault and the possible causes of the fault, and to guide the allocation of maintenance resources required for each maintenance item. Whether the maintenance tasks are clear or not will affect the utilization efficiency of maintenance resources and whether the subsequent maintenance work can be carried out in an orderly manner, that is, it will affect the maintenance capacity of ship equipment.
[0037] The formulation of a maintenance plan is to determine the specific maintenance resources required, the safety protection measures required for maintenance, and the maintenance steps based on the maintenance tasks to be completed, and form a specific maintenance task list.
[0038] The maintenance schedule is arranged based on whether all necessary maintenance resources are currently available, that is, whether the equipment, spare parts and maintenance personnel required for maintenance are occupied, whether the current maintenance work affects other maintenance work and equipment use, etc., to determine the specific time for implementing the maintenance work.
[0039] Carrying out maintenance operations means that the crew members who undertake the maintenance tasks use the allocated resources to ensure that the scheduled maintenance work is completed smoothly as planned, so as to improve the efficiency of the use of maintenance resources.
[0040] The output of the IPO&E model of the crew-level maintenance system for ship equipment (hereinafter referred to as the crew-level ship equipment maintenance system) includes visible output results and invisible output results. Among them, the visible output results are the repaired equipment and the direct cost of maintenance; the invisible output results include the value and profit created by maintenance.
[0041] That is to say, the input, maintenance process and output of the crew-level ship equipment maintenance system are all factors that affect the assessment of the crew-level maintenance capability of ship equipment, and they are correlated with each other. For example, factors that affect the maintenance of ship equipment during the maintenance process will inevitably affect the maintenance results of the ship equipment.
[0042] In addition, the crew-level ship equipment maintenance system is a complex and open system. In addition to directly related factors such as the system input, process and output, external environmental factors must also be considered, including the social environment's impact on the value orientation of maintenance, such as the different degrees of waste and pollution that may be generated by different maintenance measures, whether the maintenance process requires technical support, whether maintenance personnel receive regular skills training, and the impact of the market environment on the storage and supply strategy of maintenance spare parts.
[0043] Therefore, this application takes into account the input, maintenance process, output and external causes of the crew-level ship equipment maintenance system, which are logically related to each other and affect the crew-level maintenance capability of ship equipment, and determines the evaluation indicators for the crew-level maintenance capability of ship equipment.
[0044] Furthermore, the most commonly used method for determining evaluation indicators is the Balanced Scorecard (BSC). However, the evaluation dimensions of the BSC method lack hierarchy, and it is difficult to describe the hierarchical logic and causal relationship between the evaluation indicators. Therefore, the evaluation results of the crew-level maintenance capability of ship equipment determined by the BSC method are difficult to identify the weak links in the operation process of the crew-level ship equipment maintenance system, and therefore it is difficult to improve the subsequent maintenance of ship equipment based on the evaluation results.
[0045] Therefore, this application proposes an improved hierarchical BSC crew-level maintenance capability assessment method for typical ship equipment failures to determine the assessment indicators and assessment methods.
[0046] Specifically, Figure 4 As shown in the figure, the hierarchical BSC method follows the hierarchical logic of ship equipment maintenance "system output-system operation process-system input-external environment" (i.e., OPIE), including two basic processes: target hierarchical decomposition and causal relationship determination.
[0047] Firstly, the target hierarchical decomposition adopts an analysis strategy from macro to micro to establish the hierarchical results of the evaluation indicators, and combines the output of the crew-level ship equipment maintenance system with the micro-activities of the maintenance system layer by layer.
[0048] Specifically, according to the output results of the ship equipment system, output indicators, that is, the first-level evaluation indicators, are determined. The principle for establishing output indicators is that the indicators reflect the overall return on investment of the crew-level ship equipment maintenance system.
[0049] Optionally, equipment availability, average equipment maintenance consumption time output by the maintenance system, and maintenance costs generated per hour during equipment maintenance are selected as the first-level evaluation indicators.
[0050] Since the direct or indirect costs incurred during maintenance also affect the profits of the maintenance system operation and the overall return on investment of the maintenance system, the cost of equipment maintenance is also used as an evaluation indicator for ship maintenance capabilities.
[0051] In other feasible implementations, it may also be set to other evaluation indicators such as maintenance cost per unit time, maintenance speed per unit time, etc. that can consider the relationship between maintenance time and maintenance cost.
[0052] Step 102, determining the second-level evaluation index according to the operation process of the crew-level ship equipment maintenance system;
[0053] Investigate the operation process of the ship equipment system and determine process indicators, which are the second-level evaluation indicators. The principle for establishing process indicators is that the indicators directly reflect the overall capability and quality of the maintenance process and are related to the output of the maintenance system.
[0054] Alternatively, if Figure 4 As shown in the figure, since process indicators are directly related to the output of the maintenance system and reflect the overall capability and quality of the maintenance process, when determining the second-level evaluation indicators, relevant indicators should be selected from the four links of task determination, plan formulation, schedule scheduling and operation, such as self-repair rate, fault response time, maintenance plan accuracy, maintenance task density and rework rate.
[0055] Step 103, determining the third level evaluation index according to the input of the crew-level ship equipment maintenance system;
[0056] Investigate the input process of the ship equipment system and determine the input indicators, which are the third type of evaluation indicators. The principle for establishing the input indicators is that the indicators reflect the impact of whether maintenance resources are sufficient and whether resource utilization is reasonable on the actual maintenance system performance.
[0057] This is because whether the maintenance resources of ship equipment are sufficient and whether the resources are used reasonably also affect the maintenance capacity of ship equipment. Specifically, the sufficiency of maintenance resources determines the completion rate of maintenance tasks, and also restricts the formulation of maintenance plans and the arrangement of maintenance schedules; whether the utilization of maintenance resources is reasonable determines the quality and cost of the maintenance work.
[0058] Alternatively, if Figure 4 As shown, for each typical failure, the spare parts, tools, equipment, technical manuals and maintenance personnel related to the failure, as well as the failure rate of the components or subsystems of the faulty equipment, the cumulative number of failures and the equipment failure rate are determined as input indicators.
[0059] Optionally, when determining the evaluation index of the cumulative number of equipment failures, it is possible to distinguish between professions, components, and subsystems, and continue to set evaluation indicators downward in a hierarchical manner.
[0060] Step 104, determining the fourth-level evaluation index according to the external environment of the crew-level ship equipment maintenance system;
[0061] Specifically, the growth environment of maintenance personnel determines their technical level, which in turn affects the handling of ship equipment failures; external environments such as equipment supply also affect the time and cost of handling ship equipment failures.
[0062] Therefore, for such external environmental factors that affect the ship's fault repair capabilities, it is also necessary to determine relevant external environmental indicators, which are the fourth type of evaluation indicators. Among them, the principle of establishing external environmental indicators is that the indicators reflect indicators related to talent growth and spare parts and equipment supply.
[0063] Alternatively, if Figure 4 As shown, the fourth-level evaluation indicators include skill training rate, equipment supply satisfaction rate, equipment replenishment interval, etc.
[0064] Optionally, the skill training rate can be further determined as a training times index and a training time index of the maintenance personnel. Furthermore, corresponding evaluation indicators can be determined according to the training times and training time of the maintenance personnel for each fault.
[0065] Optionally, the equipment supply satisfaction rate can be further determined as an equipment cost satisfaction rate index and an equipment time satisfaction rate index, etc. Furthermore, the equipment supply satisfaction rate index can be determined for each common fault type and its corresponding equipment.
[0066] Step 105: Evaluate the crew-level maintenance capability of the ship equipment based on the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators, and the fourth-layer evaluation indicators.
[0067] After determining the first-level evaluation indicators, the second-level evaluation indicators, the third-level evaluation indicators and the fourth-level evaluation indicators according to the output, operation process, input and external environment of the crew-level ship equipment maintenance system, a crew-level maintenance capability evaluation indicator system is established. According to the causal relationship between the indicators, a strategy from micro to macro is adopted to establish a clear causal relationship between the selected indicators, so as to identify and diagnose the weak links and their causes in the crew-level ship equipment maintenance system when obtaining the evaluation results of the crew-level maintenance capability of ship equipment.
[0068] Furthermore, according to the first-level evaluation indicators, the second-level evaluation indicators, the third-level evaluation indicators and the fourth-level evaluation indicators, the hierarchical analysis method is used to determine the corresponding weight for each indicator. Finally, according to the first-level evaluation indicators, the second-level evaluation indicators, the third-level evaluation indicators and the fourth-level evaluation indicators and the corresponding weight of each indicator, the evaluation result of the crew-level maintenance capability of the ship equipment is determined, so as to realize the evaluation of the crew-level maintenance capability of the ship equipment.
[0069] Among them, to determine the causal relationship between evaluation indicators, the direct causal relationship between evaluation indicators should be considered, and the indirect causal relationship is reflected through the causal relationship chain between indicators. Figure 4 As shown, usually, the fourth-layer evaluation indicators, the third-layer evaluation indicators, the second-layer evaluation indicators and the first-layer evaluation indicators are determined layer by layer in a logical order.
[0070] In addition, there are some evaluation indicators, such as indicators related to onboard personnel, which not only affect the completion of maintenance operations, but also affect the occurrence rate of failures. At this time, it is necessary to determine the causal relationship between these indicators across layers. Another example is the indicator of the rate of allocation of maintenance equipment, which can be used to reflect the operating environment of the ship maintenance system at the same time, including evaluation indicators related to equipment supply and evaluation indicators related to logistics corresponding to the equipment.
[0071] Finally, the specific content of each layer of evaluation indicators is finally defined according to the determined causal chain relationship, so that there is a causal relationship between the multiple specific evaluation indicators in the first layer to the fourth layer, thereby completing the characterization and evaluation of the crew-level maintenance capability of ship equipment according to the maintenance process of ship equipment.
[0072] The present invention determines the maintenance model of ship equipment through the process of crew-level maintenance of ship equipment, adopts the target hierarchical decomposition method to determine the first-level evaluation index, the second-level evaluation index, the third-level evaluation index and the fourth-level evaluation index that are mutually related according to the output, operation process, input and relevant links of external factors of the maintenance model, adopts the causal analysis method to determine each evaluation index with a causal relationship chain in the four-level evaluation index, and determines the weight corresponding to each evaluation index according to the hierarchical analysis method, and finally determines the evaluation result of the crew-level maintenance capability of ship equipment according to each index and the weight corresponding to the index. Thus, the logical division and reliability calculation of the ship equipment system are skipped, and the crew-level maintenance capability of the ship equipment is accurately and clearly determined.
[0073] Furthermore, through the product sum of the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators and the fourth-layer evaluation indicators and their corresponding weights, the score of each layer of evaluation indicators can be determined, and then the weak links in the current ship equipment maintenance can be determined, and improvement measures can be proposed for the weak links in the future, and the ship equipment maintenance capability after improvement can be evaluated.
[0074] In the crew-level maintenance capability assessment method for typical ship equipment failures of the present invention, the first-level assessment indicators include one or more of equipment availability, the proportion of cumulative man-hours consumed in equipment maintenance, and the average equipment maintenance cost per working hour.
[0075] In this application, the first-level evaluation indicators are specifically shown in Table 1 below:
[0076] Table 1. First-level evaluation index table
[0077]
[0078] Among them, equipment availability is the proportion of the time that ship equipment parts and components can work normally to the total cumulative time.
[0079] Optionally, for each typical ship equipment failure type, the affected components and the subsystems to which the components belong are determined, and the availability of each component or subsystem is counted.
[0080] Optionally, for each typical ship equipment failure type, the impact range of the failure is determined, so that the availability of the subsystem or the availability of the component is used as the value corresponding to the availability index used in the actual evaluation.
[0081] The proportion of cumulative working hours consumed in equipment maintenance is the ratio of working hours consumed in parts maintenance to the cumulative normal working time of parts.
[0082] Optionally, for each typical ship equipment failure type, determine the components affected by the failure and the subsystems to which the components belong, and count the cumulative man-hours consumed in the maintenance of each component or subsystem.
[0083] Optionally, for each typical ship equipment failure type, the impact range of the failure is determined, so that the cumulative maintenance man-hours consumed by the subsystem or the cumulative maintenance man-hours consumed by the parts are used as the value corresponding to the cumulative maintenance man-hours consumed in the actual evaluation.
[0084] Optionally, during actual statistics, the duration of a task deadline can be calculated as the cumulative working time of the equipment.
[0085] The average maintenance cost per working hour of equipment is the ratio of the maintenance cost of the equipment to the accumulated normal working time of the equipment, and is used to measure the maintenance cost of the equipment.
[0086] Optionally, the calculation result of the average equipment maintenance cost per working hour is mapped to the interval [0, 1] so as to weight and determine the crew-level repair capability of the ship equipment.
[0087] Optionally, the accumulated normal operation time of the equipment may be calculated in minutes, hours or days according to the service life of the equipment.
[0088] In the crew-level maintenance capability assessment method for typical ship equipment failures of the present invention, the second-level assessment indicators include one or more of the historical self-repair rate of ship equipment, fault handling response time, fault site inspection working hours, maintenance plan accuracy, maintenance plan execution rate, maintenance plan delay rate, maintenance task density, spare parts and equipment request time, spare parts and equipment shortage delay time, maintenance personnel available working time allocation ratio, schedule conflict rate, maintenance working hours, task completion rate and rework rate.
[0089] In this application, the second-level evaluation indicators are specifically shown in Table 2 below:
[0090] Table 2 Second-layer evaluation index table
[0091]
[0092]
[0093] Among them, the historical self-repair rate is the proportion of crew-level self-repair failures to the total number of failures.
[0094] Optionally, the historical self-repair rate of each specialty, component and subsystem is counted separately. For example, when counting the self-repair rate of a subsystem, the ratio of the number of self-repair failures of the subsystem to the number of all failures of the subsystem is used as the failure rate of the subsystem.
[0095] Optionally, for different typical ship failures, the scope of their failure impact is determined, and based on the scope of impact, the historical self-repair rate of a specialty, component or subsystem is used as the self-repair rate for actually evaluating the crew-level self-repair capability of ship equipment.
[0096] Optionally, the ratio of the number of crew self-repair failures to the total number of failures within a certain time range, such as a ship's mission period or a specific mission period, is determined as the historical self-repair rate for a period of time; the average values of multiple self-repair rates corresponding to multiple time ranges are used as the historical self-repair rate for actually evaluating the crew-level self-repair capability of the ship.
[0097] Optionally, the historical self-repair rate is mapped to a preset reference value interval so as to weight and determine the crew-level repair capability of the ship equipment.
[0098] Among them, the fault handling response time is the time required from the discovery of the fault to the on-site inspection by maintenance personnel.
[0099] Optionally, the fault handling response time of each specialty, component and subsystem is counted separately. For example, the average response time of multiple faults of each component is used as the fault handling response time of the component; the average of the fault handling response time of all components in each subsystem is used as the fault handling response time of the subsystem.
[0100] Optionally, the value of the fault handling response time is mapped to the same preset interval so as to weight and determine the crew-level repair capability of the ship equipment.
[0101] Among them, the fault site inspection working hours are the time required for maintenance personnel to conduct on-site inspection to confirm whether the fault can be repaired by themselves.
[0102] Optionally, the man-hours for on-site fault inspection are counted for each specialty, component, and subsystem respectively.
[0103] Optionally, the values of fault site inspection man-hours are mapped to the same preset interval so as to weight and determine the crew-level repair capability of the ship equipment.
[0104] Among them, the spare parts and equipment request time is the time it takes for maintenance personnel to request maintenance spare parts and consumables.
[0105] Optionally, the time required to request spare parts for each specialty, component and subsystem is counted separately.
[0106] Optionally, the value of the spare parts request time is mapped to the same preset interval so as to weight and determine the crew-level repair capability of the ship equipment.
[0107] In the crew-level maintenance capability assessment method for typical ship equipment failures of the present invention, the third category of assessment indicators includes one or more of the following: the failure rate of ship equipment, the failure rate of subsystems of ship equipment, the cumulative number of failures, the satisfaction rate of spare parts and equipment, the utilization rate of spare parts and equipment, the shortage rate of spare parts and equipment, the matching rate of tools and equipment, the saturation of tool and equipment tasks, the conflict rate of tools and equipment, the matching rate of onboard technical manuals, the efficiency of onboard technical manuals, the job matching degree of maintenance personnel, and the efficiency ratio of maintenance personnel. In this application, the third-level assessment indicators are specifically shown in Table 3, the third-level assessment indicator table:
[0108] Table 3. Evaluation index table of the third layer
[0109]
[0110]
[0111] The failure rate is the failure rate of the entire ship equipment. Optionally, the ratio between the number of failures that occur when the ship performs a task and the total number of tasks performed by the ship within a certain time range is used as the failure rate.
[0112] Optionally, the cumulative number of occurrences of faults is mapped to the same preset interval so as to weight and determine the crew-level repair capability of the ship equipment.
[0113] In the crew-level maintenance capability assessment method for typical ship equipment failures of the present invention, the fourth-level assessment indicators include one or more of the maintenance equipment allocation rate, the outsourced maintenance equipment ratio, the technical support ratio and the skill training rate.
[0114] In this application, the fourth-layer evaluation indicators are specifically shown in Table 4 below:
[0115] Table 4. Evaluation index table of the fourth layer
[0116]
[0117] The fourth level of evaluation indicators are external environment evaluation indicators, which reflect the impact of equipment and technicians on crew-level maintenance of ship equipment.
[0118] It should be noted that for each of the four-level evaluation indicators involving time, after statistically determining the time values corresponding to all components, subsystems or professions, they can be sorted in order from small to large or from large to small according to the size of the time values, and then mapped to the [0,1] interval so that they can be weighted calculated together with other ratio-type indicators to determine the crew-level maintenance capability assessment results of ship equipment.
[0119] In the crew-level maintenance capability assessment method for typical ship equipment failures of the present invention, the step of assessing the crew-level maintenance capability of ship equipment based on the first-layer assessment indicators, the second-layer assessment indicators, the third-layer assessment indicators, and the fourth-layer assessment indicators specifically includes:
[0120] Determine the weight corresponding to each of the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators, and the fourth-layer evaluation indicators based on the hierarchical analysis method;
[0121] For each of the four-level evaluation indicators, the hierarchical analysis method is used to set the weight of each evaluation indicator.
[0122] Specifically, a hierarchical model is first established, including a target layer, a criterion layer, and a solution layer. The target layer in this application is to evaluate the crew-level maintenance capability of ship equipment; the criterion layer corresponds to the first-level indicators, including the first-level evaluation indicators, the second-level evaluation indicators, the third-level evaluation indicators, and the fourth-level evaluation indicators; the solution layer corresponds to the second-level indicators, including each specific evaluation indicator in each layer of evaluation indicators.
[0123] On this basis, starting from the criterion layer, a judgment matrix is constructed for the factors of the same layer that belong to each factor of the previous layer, until the lowest layer, which is the solution layer in this application. Finally, one judgment matrix is constructed at the criterion layer, and four judgment matrices are constructed at the solution layer.
[0124] Among them, when constructing the judgment matrix, since different factors in the criterion layer have different proportions relative to the target judgment, this is because different people have different understandings of the importance of the two-by-two comparison factors. Therefore, a pairwise judgment matrix A is established to comprehensively evaluate the importance of each evaluation indicator. The element scaling method of the judgment matrix A is shown in Table 5 below:
[0125] Table 5 Element scaling method of judgment matrix
[0126] Scale meaning 1 <![CDATA[C i Elements and C j Elements are equally important]]> 3 <![CDATA[C i Elements and C j Compared with the former, the former has a slightly stronger effect]]> 5 <![CDATA[C i Elements and C j Compared with the elements, the former has a stronger influence]]> 7 <![CDATA[C i Elements and C j Compared with the elements, the former has a significantly stronger influence]]> 9 <![CDATA[C i Elements and C j Compared with the elements, the former has a much stronger influence]]> 2,4,6,8 <![CDATA[C i Elements and C j Compared with the elements, the former has an impact between the two adjacent levels mentioned above]]> 1,1 / 2,…,1 / 9 <![CDATA[C i Elements and C j Compared with the elements, the influence ratio is exactly a ij Countdown of]]>
[0127] In the table, C i Elements and C j The elements represent the two-level evaluation indicators used for pairwise comparison in the criterion layer. The judgment matrix A = [aij ] nxn Then the weight vector of the judgment matrix is calculated and the consistency is verified, where a ij C i Elements relative to C j The importance of elements, m and n are C i Elements and C j The number of elements.
[0128] If the above judgment matrix If it holds, then the consistency matrix is A, where i, j, and k refer to the different criteria layer elements used for comparison. ij =C i / C j The elements in A are represented in the form of . There are two ways to set the weights in A:
[0129] One is the sum method, which is to calculate the sum of the judgment matrix A After normalization, the weight vector is obtained:
[0130]
[0131] The second is the root method, which is to calculate the geometric mean of each row element in the judgment matrix A:
[0132] After normalization, the weight vector is obtained:
[0133]
[0134] Where n is the number of criteria layer elements.
[0135] On this basis, the judgment matrix A is verified for consistency to ensure that the final judgment matrix A meets the logic and accuracy as much as possible. The specific calculation method is as follows:
[0136] Calculate the maximum eigenvalue λ of the judgment matrix A max , let CI = λ max ,calculate The RI is queried according to Table 6:
[0137] Table 6 Average random consistency index RI standard value table
[0138] Number of indicators 1 2 3 4 5 6 7 8 9 10 RI 0 0 0.51 0.89 1.12 1.25 1.35 1.42 1.46 1.49
[0139] The result of calculating CR in the above manner is that when the calculated value of CR is less than 0.1, it is determined that the judgment matrix A passes the consistency test; if the calculated value of CR is greater than or equal to 0.1, the judgment matrix A needs to be re-adjusted and recalculated.
[0140] In a specific implementation, according to the constructed first-layer evaluation indicators to the fourth-layer evaluation indicators, combined with the actual collected ship equipment data, the following evaluation indicators are selected, and a two-level judgment matrix is constructed by expert weighting. The weight vector of each evaluation indicator is calculated and determined, and a consistency test is performed to obtain the secondary weights as shown in the following Table 7 Evaluation Indicator Weight Analysis Table:
[0141] Table 7 Evaluation index weight analysis table
[0142]
[0143]
[0144] As shown in Table 7, for this type of ship, based on the collected historical ship equipment data and the causal chain relationship between each layer of evaluation indicators, the specific evaluation indicators corresponding to the second-level indicators in Table 7 were selected from the specific evaluation indicators of the first-level evaluation indicators, the second-level evaluation indicators, the third-level evaluation indicators and the fourth-level evaluation indicator system, and the weights corresponding to the two-level indicators were determined based on the hierarchical analysis method.
[0145] Furthermore, the calculated weight value of each evaluation indicator is compared with the actual situation. For example, for the second-level evaluation indicator of equipment availability, its corresponding weight is 0.7469, and for the second-level evaluation indicator of the proportion of cumulative man-hours consumed in equipment maintenance, its corresponding weight is 0.2531, which means that for the output of the ship maintenance system, more attention is paid to whether the equipment corresponding to the equipment availability indicator is available after crew-level maintenance.
[0146] For another example, for the first-level evaluation indicators, the output of the crew-level maintenance system corresponding to the first-level evaluation indicators is the most important, followed by the maintenance process quality and overall capability of the crew-level maintenance system corresponding to the second-level evaluation indicators. Therefore, the first-level evaluation indicators and the second-level evaluation indicators have higher corresponding weights in the first-level indicators.
[0147] The calculated weight of each evaluation indicator at each level is compared with the actual situation. If the weight of each evaluation indicator corresponds to the actual situation, the weight is determined as the weight value used in evaluating the crew-level maintenance capability of ship equipment failure.
[0148] Determine the value corresponding to each of the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators, and the fourth-layer evaluation indicators of the ship equipment;
[0149] Obtain historical data of ships, determine the fault types of each type of ship equipment, and for each type of typical fault, determine the equipment involved in the fault and the impact scope of the fault. Based on the impact scope, determine the statistical values at the professional, subsystem or component level as the corresponding values of each indicator.
[0150] Optionally, for different types of ship equipment, or different types of faults, relevant evaluation indicators related to the fault or ship equipment can be selected, and for evaluation indicators unrelated to the fault or ship model, the values corresponding to the evaluation indicators can be assigned 0.
[0151] Furthermore, statistics on typical fault repairs and spare parts consumption of a ship during a long voyage over a period of time are collected, mainly including the fault location of the ship equipment, the repair method, the number of spare parts consumed and the source of spare parts, as shown in Table 8 below:
[0152] Table 8 Typical fault repair and spare parts consumption of some major ship equipment
[0153]
[0154]
[0155] For each ship type, the faulty equipment is determined based on its common fault phenomena, thereby determining the repair and spare parts consumption of the faulty equipment as shown in Table 8.
[0156] In a specific implementation, corresponding to each evaluation index of the ship equipment determined in Table 7, historical data of the type of ship equipment is collected, and the values corresponding to each evaluation index are sorted out as shown in Table 9 below:
[0157] Table 9 Analysis of the values corresponding to the evaluation indicators
[0158]
[0159]
[0160] As shown in Table 9, by multiplying the value corresponding to each evaluation indicator by the weight corresponding to each evaluation indicator in Table 7, the crew-level maintenance capability evaluation results of typical ship equipment failures can be calculated.
[0161] It should be noted that when calculating the values of evaluation indicators such as equipment availability and the proportion of cumulative man-hours consumed in equipment maintenance, statistics are collected for a specific equipment failure, such as the equipment corresponding to abnormal diesel engine oil pressure, and the value of the evaluation indicator is determined, and the result is an evaluation result of the crew-level maintenance capability for this ship equipment failure; in other feasible calculation methods, statistics can also be collected for all equipment failures within the scope of crew-level self-repair on the entire ship and the value of the evaluation indicator can be determined, and the result is an evaluation result of the crew-level maintenance capability of the ship's overall equipment.
[0162] In the crew-level maintenance capability assessment method for typical ship equipment failures of the present invention, before the step of determining the value corresponding to each of the first-layer assessment indicators, the second-layer assessment indicators, the third-layer assessment indicators, and the fourth-layer assessment indicators of the ship equipment, the method further includes:
[0163] Collecting historical fault data of ship equipment, preprocessing the historical fault data, and removing data irrelevant to the first-layer evaluation index, the second-layer evaluation index, the third-layer evaluation index, and the fourth-layer evaluation index;
[0164] The historical fault data of ship equipment is collected to determine the corresponding value of each evaluation indicator in the four-level evaluation indicators, so as to obtain the evaluation results of the crew-level maintenance capability of ship equipment.
[0165] Since the historical fault data of ship equipment collected directly is raw data with a large amount of irrelevant data and erroneous data, data cleaning tools are used to pre-process the collected historical fault data, including deleting duplicate information, correcting erroneous information in historical fault data, merging similar items of similar data, and filling in incomplete data entries.
[0166] Optionally, the pre-processed historical fault data is integrated into a table format.
[0167] The value corresponding to each of the first-layer evaluation index, the second-layer evaluation index, the third-layer evaluation index and the fourth-layer evaluation index of the ship equipment is determined according to the preprocessed historical fault data.
[0168] The preprocessed historical fault data is taken as valid data, and the value corresponding to each indicator in the first-level evaluation indicator, the second-level evaluation indicator, the third-level evaluation indicator and the fourth-level evaluation indicator is determined according to the physical meaning corresponding to each evaluation indicator.
[0169] The crew-level maintenance capability assessment system for typical ship equipment failures provided by the present invention is described below. The crew-level maintenance capability assessment system for typical ship equipment failures described below and the crew-level maintenance capability assessment method for typical ship equipment failures described above can be referenced to each other.
[0170] like Figure 5 As shown, the crew-level maintenance capability assessment system for typical ship equipment failures includes an assessment index configuration module 501 and an assessment module 502 .
[0171] An evaluation index configuration module 501 is used to determine the first-level evaluation index according to the input of the crew-level ship equipment maintenance system, wherein the crew-level ship equipment maintenance system is pre-built according to the ship maintenance process;
[0172] Since the current evaluation method of ship equipment maintenance and support capabilities using a single perspective such as ship equipment integrity or maintenance task success rate is relatively complicated, a more valuable method is to define a series of key capability indicators to measure the maintenance and support capabilities of ship equipment from multiple perspectives.
[0173] Therefore, this application defines and selects maintenance capability evaluation indicators for ship equipment by constructing a crew-level maintenance IPO&E system model for ship equipment.
[0174] Specifically, the crew-level maintenance process of ship equipment is as follows: Figure 2 As shown in the figure, on this basis, considering the actual working environment of the ship at sea, that is, the maintenance personnel, equipment spare parts, repair tools, etc. during repair are limited, the crew-level maintenance IPO&E system model of ship equipment is defined based on the crew-level maintenance process of ship equipment as follows Figure 3 shown.
[0175] This application takes into account the input, maintenance process, output and external causes of the crew-level ship equipment maintenance system, which are logically related to each other and affect the crew-level maintenance capability of the ship equipment, and determines the evaluation indicators for the crew-level maintenance capability of the ship equipment.
[0176] Furthermore, the most commonly used method for determining evaluation indicators is the Balanced Scorecard (BSC). However, the evaluation dimensions of the BSC method lack hierarchy, and it is difficult to describe the hierarchical logic and causal relationship between the evaluation indicators. Therefore, the evaluation results of the crew-level maintenance capability of ship equipment determined by the BSC method are difficult to identify the weak links in the operation process of the crew-level ship equipment maintenance system, and therefore it is difficult to improve the subsequent maintenance of ship equipment based on the evaluation results.
[0177] Therefore, this application proposes a hierarchical BSC crew-level maintenance capability assessment method improved for typical faults to determine the assessment indicators and assessment methods.
[0178] Specifically, Figure 4 As shown, the hierarchical BSC method follows the hierarchical logic of "system output-system operation process-system input-external environment" (i.e., OPIE), including two basic processes: target hierarchical decomposition and causal relationship determination.
[0179] Firstly, the target hierarchical decomposition adopts an analysis strategy from macro to micro to establish the hierarchical results of the evaluation indicators, and combines the output of the crew-level ship equipment maintenance system with the micro-activities of the maintenance system layer by layer.
[0180] Specifically, it includes determining output indicators, which are the first-level evaluation indicators, based on the output results of the ship equipment system.
[0181] Optionally, equipment availability, average equipment maintenance consumption time output by the maintenance system, and maintenance costs generated per hour during equipment maintenance are selected as the first type of evaluation indicators.
[0182] Since the direct or indirect costs incurred during maintenance also affect the profits of the maintenance system operation and the overall return on investment of the maintenance system, the cost of equipment maintenance is also used as an evaluation indicator for ship maintenance capabilities.
[0183] In other feasible implementations, it may also be set to other evaluation indicators such as maintenance cost per unit time, maintenance speed per unit time, etc. that can consider the relationship between maintenance time and maintenance cost.
[0184] The evaluation index configuration module 501 is also used to determine the second-level evaluation index according to the operation process of the crew-level ship equipment maintenance system;
[0185] Inspect the operation process of the ship equipment system and determine the process indicators, which are the second-level evaluation indicators.
[0186] Alternatively, if Figure 4 As shown in the figure, since process indicators are directly related to the output of the maintenance system and reflect the overall capability and quality of the maintenance process, when determining the second-level evaluation indicators, relevant indicators should be selected from the four links of task determination, plan formulation, schedule scheduling and operation, such as self-repair rate, fault response time, maintenance plan accuracy, maintenance task density and rework rate.
[0187] The evaluation index configuration module 501 is also used to determine the third-level evaluation index according to the operation process of the crew-level ship equipment maintenance system;
[0188] Whether the maintenance resources of ship equipment are sufficient and whether the resources are used reasonably also affects the maintenance capacity of ship equipment. Specifically, the sufficiency of maintenance resources determines the completion rate of maintenance tasks and also restricts the formulation of maintenance plans and the arrangement of maintenance schedules; whether the utilization of maintenance resources is reasonable determines the quality and cost of the maintenance work.
[0189] Therefore, it is necessary to examine the input type of the ship equipment system and determine the input indicators, which are the third-level evaluation indicators.
[0190] Alternatively, if Figure 4 As shown, for each typical failure, the spare parts, tools, equipment, technical manuals and maintenance personnel related to the failure, as well as the failure rate of the components or subsystems of the faulty equipment, the cumulative number of failures and the equipment failure rate are determined as input indicators.
[0191] Optionally, when determining the evaluation index of the cumulative number of occurrences of faults, it is possible to distinguish between professions, components and subsystems and set evaluation indexes for each.
[0192] The evaluation index configuration module 501 is also used to determine the fourth type of evaluation index according to the external environment of the crew-level ship equipment maintenance system;
[0193] Specifically, the growth environment of maintenance personnel determines their technical level, which in turn affects the handling of ship equipment failures; external environments such as equipment supply also affect the time and cost of handling ship equipment failures.
[0194] Therefore, for such external environmental factors that affect the ship's fault repair capability, it is also necessary to determine relevant external environmental indicators, which are the fourth-level evaluation indicators.
[0195] Alternatively, if Figure 4 As shown, the fourth-level evaluation indicators include skill training rate, equipment supply satisfaction rate, equipment replenishment interval, etc.
[0196] Optionally, the skill training rate can be further determined as a training times index and a training time index of the maintenance personnel. Furthermore, corresponding evaluation indicators can be determined according to the training times and training time of the maintenance personnel for each fault.
[0197] Optionally, the equipment supply satisfaction rate can be further determined as an equipment cost satisfaction rate index and an equipment time satisfaction rate index, etc. Furthermore, the equipment supply satisfaction rate index can be determined for each common fault type and its corresponding equipment.
[0198] The evaluation module 502 is used to evaluate the crew-level maintenance capability of the ship equipment according to the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators and the fourth-layer evaluation indicators.
[0199] After determining the first-level evaluation indicators, the second-level evaluation indicators, the third-level evaluation indicators and the fourth-level evaluation indicators respectively according to the output, operation process, input and external environment of the ship equipment system, a strategy from micro to macro is adopted according to the causal relationship between the indicators, and a clear causal relationship is established between the selected indicators, so as to identify and diagnose the weak links and their causes in the crew-level ship equipment maintenance system when obtaining the evaluation results of the crew-level maintenance capability of the ship equipment.
[0200] Furthermore, according to the causal relationship of each indicator in the first-level evaluation indicators, the second-level evaluation indicators, the third-level evaluation indicators and the fourth-level evaluation indicators, a corresponding weight is determined for each indicator. Finally, according to the first-level evaluation indicators, the second-level evaluation indicators, the third-level evaluation indicators and the fourth-level evaluation indicators and the corresponding weight of each indicator, the evaluation result of the crew-level maintenance capability of the ship equipment is determined to realize the evaluation of the crew-level maintenance capability of the ship equipment.
[0201] Among them, to determine the causal relationship between evaluation indicators, the direct causal relationship between evaluation indicators should be considered, and the indirect causal relationship is reflected through the causal relationship chain between indicators. Figure 4 As shown, usually, the fourth-layer evaluation indicators, the third-layer evaluation indicators, the second-layer evaluation indicators and the first-layer evaluation indicators are determined layer by layer in a logical order.
[0202] In addition, there are some evaluation indicators, such as indicators related to onboard personnel, which not only affect the completion of maintenance operations, but also affect the occurrence rate of failures. At this time, it is necessary to determine the causal relationship between these indicators across layers. Another example is the indicator of the rate of allocation of maintenance equipment, which can be used to reflect the operating environment of the ship maintenance system at the same time, including evaluation indicators related to equipment supply and evaluation indicators related to logistics corresponding to the equipment.
[0203] The present invention determines the maintenance model of ship equipment through the process of crew-level maintenance of ship equipment, adopts the target hierarchical decomposition method to determine the first-level evaluation index, the second-level evaluation index, the third-level evaluation index and the fourth-level evaluation index that are mutually related according to the output, operation process, input and relevant links of external factors of the maintenance model, adopts the causal analysis method to determine each evaluation index with a causal relationship chain in the four types of evaluation indexes, and determines the weight corresponding to each evaluation index according to the hierarchical analysis method, and finally determines the evaluation result of the crew-level maintenance capability of ship equipment according to each index and the weight corresponding to the index. Thus, the logical division and reliability calculation of the ship equipment system are skipped, and the crew-level maintenance capability of the ship equipment is accurately and clearly determined.
[0204] Figure 6 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 6As shown, the electronic device may include: a processor 610, a communication interface 620, a memory 630 and a communication bus 640, wherein the processor 610, the communication interface 620 and the memory 630 complete mutual communication through the communication bus 640. The processor 610 may call the logic instructions in the memory 630 to execute a crew-level maintenance capability evaluation method for typical ship equipment failures, the method comprising: determining a first-level evaluation index according to the output of a crew-level ship equipment maintenance system, wherein the crew-level ship equipment maintenance system is pre-built according to the maintenance process of the ship; determining a second-level evaluation index according to the operation process of the crew-level ship equipment maintenance system; determining a third-level evaluation index according to the input of the crew-level ship equipment maintenance system; determining a fourth-level evaluation index according to the external environment of the crew-level ship equipment maintenance system; and evaluating the crew-level maintenance capability of the ship equipment according to the first-level evaluation index, the second-level evaluation index, the third-level evaluation index and the fourth-level evaluation index.
[0205] In addition, the logic instructions in the above-mentioned memory 630 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.
[0206] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the crew-level maintenance capability assessment method for typical ship equipment failures provided by the above-mentioned methods, the method comprising: determining a first-level assessment indicator based on the output of a crew-level ship equipment maintenance system, wherein the crew-level ship equipment maintenance system is pre-constructed according to the ship's maintenance process; determining a second-level assessment indicator based on the operation process of the crew-level ship equipment maintenance system; determining a third-level assessment indicator based on the input of the crew-level ship equipment maintenance system; determining a fourth-level assessment indicator based on the external environment of the crew-level ship equipment maintenance system; and assessing the crew-level maintenance capability of the ship equipment based on the first-level assessment indicator, the second-level assessment indicator, the third-level assessment indicator and the fourth-level assessment indicator.
[0207] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0208] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0209] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A crew-level maintenance capability assessment method for typical ship equipment failures, characterized in that: include: Determine the first level of evaluation indicators based on the output of the crew-level ship equipment maintenance system, where the crew-level ship equipment maintenance system is pre-built according to the ship's maintenance process; Determine the second level evaluation indicators based on the operation process of the crew-level ship equipment maintenance system; Determine the third level evaluation indicators based on the input from the crew-level ship equipment maintenance system; Determine the fourth level evaluation indicators based on the external environment of the crew-level ship equipment maintenance system; The crew-level maintenance capability of ship equipment is evaluated together according to the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators and the fourth-layer evaluation indicators.
2. The crew-level maintenance capability assessment method for typical ship equipment failures according to claim 1 is characterized in that: The first-level evaluation indicators include one or more of equipment availability, the proportion of cumulative man-hours consumed in equipment maintenance, and the average equipment maintenance cost per working hour.
3. The crew-level maintenance capability assessment method for typical ship equipment failures according to claim 1 is characterized in that: The second-level evaluation indicators include one or more of the historical self-repair rate of ship equipment, fault handling response time, fault site inspection working hours, maintenance plan accuracy, maintenance plan execution rate, maintenance plan delay rate, maintenance task density, spare parts and equipment request time, spare parts and equipment shortage delay time, maintenance personnel available working hours allocation ratio, schedule conflict rate, maintenance working hours, task completion rate and rework rate.
4. The crew-level maintenance capability assessment method for typical ship equipment failures according to claim 1 is characterized in that: The third-level evaluation indicators include one or more of the failure rate of ship equipment, the failure rate of subsystems of ship equipment, the cumulative number of failures, the spare parts and equipment satisfaction rate, the spare parts and equipment utilization rate, the spare parts and equipment shortage rate, the tool and equipment matching rate, the tool and equipment task saturation, the tool and equipment conflict rate, the shipboard technical manual matching rate, the shipboard technical manual effectiveness, the maintenance personnel job matching degree, and the maintenance personnel work efficiency ratio.
5. The crew-level maintenance capability assessment method for typical ship equipment failures according to claim 1 is characterized in that: The fourth-level evaluation indicators include one or more of the maintenance equipment allocation rate, the ratio of purchased maintenance equipment, the technical support ratio and the skill training rate.
6. The crew-level maintenance capability assessment method for typical ship equipment failures according to any one of claims 1 to 5, characterized in that: The step of evaluating the crew-level maintenance capability of ship equipment according to the first-layer evaluation index, the second-layer evaluation index, the third-layer evaluation index and the fourth-layer evaluation index specifically includes: Determine the weight corresponding to each of the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators, and the fourth-layer evaluation indicators based on the hierarchical analysis method; Determine a value corresponding to each of the first-layer evaluation index, the second-layer evaluation index, the third-layer evaluation index, and the fourth-layer evaluation index of the ship equipment; The sum of the products of the value corresponding to each indicator and the weight corresponding thereto is taken as the evaluation result of the crew-level maintenance capability of the ship equipment.
7. The crew-level maintenance capability assessment method for typical ship equipment failures according to claim 6 is characterized in that: Before the step of determining the value corresponding to each of the first layer evaluation index, the second layer evaluation index, the third layer evaluation index and the fourth layer evaluation index of the ship equipment, the step further includes: Collecting historical fault data of ship equipment, preprocessing the historical fault data, and removing data irrelevant to the first-layer evaluation index, the second-layer evaluation index, the third-layer evaluation index, and the fourth-layer evaluation index; The value corresponding to each of the first-layer evaluation index, the second-layer evaluation index, the third-layer evaluation index and the fourth-layer evaluation index of the ship equipment is determined according to the preprocessed historical fault data.
8. A crew-level maintenance capability assessment system for typical ship equipment failures, applied to a crew-level maintenance capability assessment method for typical ship equipment failures as described in any one of claims 1 to 7, characterized in that: include: An evaluation indicator configuration module, used to determine the first-level evaluation indicators according to the output of the crew-level ship equipment maintenance system, wherein the crew-level ship equipment maintenance system is pre-built according to the ship's maintenance process; The evaluation index configuration module is also used to determine the second-level evaluation index according to the operation process of the crew-level ship equipment maintenance system; The evaluation index configuration module is also used to determine the third-level evaluation index according to the input of the crew-level ship equipment maintenance system; The evaluation index configuration module is also used to determine the fourth-level evaluation index according to the external environment of the crew-level ship equipment maintenance system; An evaluation module is used to evaluate the crew-level maintenance capability of ship equipment based on the first-layer evaluation indicators, the second-layer evaluation indicators, the third-layer evaluation indicators and the fourth-layer evaluation indicators.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the crew-level maintenance capability assessment method for typical ship equipment failures as described in any one of claims 1 to 7 is implemented.
10. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the crew-level maintenance capability assessment method for typical ship equipment failures as described in any one of claims 1 to 7 is implemented.