Mill electric charge cost analysis system based on DCS (Distributed Control System)
By adopting DCS technology in the grinder electricity cost analysis system, the power meter data is collected and transmitted in real time, and the memory and transmission nodes are adjusted according to the number of differences and data type conversion methods, the instability of electricity cost analysis and data collection in the grinding system is solved. The problem of low efficiency achieves efficient and accurate electricity cost analysis.
Patent Information
- Application Number
- CN202410919620.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-10
AI Technical Summary
The existing electricity cost accounting system has problems such as instability in cost analysis and low data acquisition efficiency in the grinding system, which makes it impossible to popularize all industries and cannot accurately analyze different production processes.
A DCS-based grinder electricity cost analysis system is designed, including data acquisition module, data transmission module, DCS electricity cost calculation module and control module. By collecting power characteristic data of the electricity meter in real time, transmitting and calculating electricity bills, realizing accurate data transmission and Partition and classification storage, and adjust the number of memory and transmission nodes according to the number of differences in the same input data and the data type conversion method to ensure the stability and accuracy of the analysis results.
The stability and accuracy of the grinder electricity cost analysis system have been achieved, the problems of degraded data processing capabilities and network security risks have been overcome, and the accuracy and popularity of electricity cost analysis have been improved.
Smart Images

Figure CN118917870A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of electric power data analysis systems, and in particular to a mill electricity cost analysis system based on DCS. Background Art
[0002] At present, the electricity cost accounting system mainly reads the relevant parameters of the meter based on the intelligent distributed meter and collects them into the ERP system for data collection. The data is then stored in the database, and the data is collected and compared at fixed points according to time stages such as days, months, and years, so as to verify the basic electricity production cost. However, different production processes lead to different systems collecting data that cannot be consistent. It is necessary to customize the collection method of relevant data according to the process, and it is necessary to verify whether the original equipment supports the relevant communication protocol. This feature makes the existing electricity cost accounting system unable to be popularized in all related industries. The main purpose of this project is to solve the electricity cost accounting in the grinding system, so as to analyze the production cost and help enterprises make reasonable business decisions.
[0003] Chinese Patent Publication No.: CN116562507A discloses an electricity bill analysis method and system, which consists of an acquisition module, a calculation module, a processor and a memory, and is characterized in that, in the electricity bill analysis method provided by the present invention, basic information such as monthly electricity bill information, the maximum demand of the enterprise in that month, the electricity price information of the area where the enterprise is located, and the normal and off-peak electricity consumption periods are first obtained, and then the basic electricity bill saving space, the power-adjusting electricity bill saving space, and the electricity bill saving space are respectively calculated according to the basic information obtained, and the basic electricity bill saving space, the power-adjusting electricity bill saving space, and the electricity bill saving space are respectively calculated, and finally an analysis report is generated to summarize the saved costs. It can be seen that the electricity bill analysis method and system have the problem of unstable system operation. Summary of the invention
[0004] To this end, the present invention provides a DCS-based mill electricity cost analysis system to overcome the problem of instability of the cost analysis system in the prior art.
[0005] To achieve the above object, the present invention provides a DCS-based mill electricity cost analysis system, comprising:
[0006] A data acquisition module is used to collect the mill electricity charge characteristic data in real time, the mill electricity charge characteristic data includes the meter power characteristic data and the electricity quantity data;
[0007] A data transmission module, which is connected to the data acquisition module and is used to transmit the mill electricity fee characteristic data to a corresponding processing node, including a plurality of transmission nodes;
[0008] A DCS electricity fee calculation module, which is connected to the data transmission module and is used to determine an electricity fee pricing mode according to the mill electricity fee characteristic data, and calculate the electricity fee according to the electricity fee pricing mode;
[0009] A database, which is connected to the data acquisition module and the DCS electricity fee calculation module respectively, and is used to store the characteristic data of the mill electricity fee;
[0010] A control module, which is respectively connected to the data acquisition module, the data transmission module, the DCS electricity fee calculation module and the database, and is used to determine the memory release method according to the comparison result of the running memory capacity used for data type conversion and the amount of log data generated by the data type conversion with the storage capacity occupied by the current field to be converted, or to adjust the number of transmission nodes according to the proportion of the amount of data sent by the transmission node that is abnormal when it is determined that the stability of the cost analysis does not meet the requirements according to the proportion of the number of differences in the electricity fee calculation results of several times of the same input data;
[0011] The memory release method includes adjusting the byte amount of the data type of the stored field or adjusting the storage data volume ratio of the data compression.
[0012] Furthermore, the data acquisition module includes:
[0013] A Modbus hub is used to collect the power characteristic data of the electric meter in real time, wherein the power characteristic data of the electric meter includes instantaneous active power, instantaneous reactive power, accumulated active power and accumulated reactive power of the electric meter;
[0014] The PLC is connected to the Modbus hub and obtains the power data by polling the Modbus hub.
[0015] Furthermore, the control module is connected to the DCS electricity cost calculation module to obtain the electricity cost characteristic data of the mill, and determine whether the stability of the cost analysis meets the requirements according to the proportion of the number of differences in the electricity cost calculation results of the same input data;
[0016] Among them, if the proportion of the number of differences in the electricity charge calculation results of the same input data is greater than the preset first difference proportion, the control module determines that the stability of the cost analysis does not meet the requirements; if the proportion of the number of differences in the electricity charge calculation results of the same input data is less than or equal to the preset first difference proportion, the control module determines that the stability of the cost analysis meets the requirements.
[0017] Furthermore, the ratio of the number of differences in the electricity cost calculation results for the same input data is the ratio of the number of times different electricity cost calculation results are output after the same mill electricity cost characteristic data is input several times into the DCS electricity cost calculation module to the total number of inputs.
[0018] Furthermore, the control module is connected to the database to determine the memory release method according to the comparison result of the running memory capacity used for data type conversion and the amount of log data generated by the data type conversion and the storage capacity occupied by the current field to be converted when the proportion of the difference number of electricity fee calculation results of the same input data is greater than the preset second difference number proportion, wherein:
[0019] If the sum of the operating memory capacity used for the data type conversion and the amount of log data generated by the data type conversion is less than the storage capacity occupied by the current field to be converted, the control module determines to perform the data type conversion and reduces the byte amount of the data type of the stored field;
[0020] If the sum of the running memory capacity used for the type conversion and the amount of log data generated by the data type conversion is greater than or equal to the storage capacity occupied by the current field to be converted, the control module determines not to perform the data type conversion and increases the proportion of the storage data volume of the data compression.
[0021] Furthermore, the reduced byte amount of the stored data type is determined by the difference between the ratio of the number of differences in the electricity fee calculation results of the same input data and a preset second ratio of the number of differences.
[0022] Furthermore, the increased proportion of the amount of stored data in the data compression is determined by the difference between the proportion of the number of differences in the electricity fee calculation results of the same input data for several times and a preset second proportion of the number of differences.
[0023] Furthermore, the control module is connected to the data transmission module to adjust the number of transmission nodes according to the proportion of data with abnormalities occurring in the transmission nodes, wherein:
[0024] If the proportion of data volume in which the data sent by the transmission node is abnormal is greater than the proportion of the preset first difference times and is less than or equal to the proportion of the preset second difference times, the control module preliminarily determines that the network security risk does not meet the requirements, and obtains and calculates the proportion of data volume in which the data sent by the transmission node is abnormal to make a secondary determination of the network security risk;
[0025] Among them, if the proportion of abnormal data sent by the transmission node is greater than the preset data proportion, the control module will secondly determine that the network security risk does not meet the requirements and reduce the number of transmission nodes of the data transmission module.
[0026] Furthermore, the proportion of data volume in which abnormalities occur in data sent by the transmission nodes is a ratio of abnormal data in data sent by a number of transmission nodes to a total amount of data sent by the transmission nodes.
[0027] Furthermore, the number of reduced transmission nodes is determined by the difference between the proportion of data volume in which abnormalities occur in data sent by the transmission nodes and the proportion of preset data volume.
[0028] Compared with the prior art, the beneficial effect of the present invention lies in that the system of the present invention is provided with a data acquisition module, a data transmission module, a DCS electricity cost calculation module, a database and a control module. After the data acquisition module completes the acquisition of the mill electricity cost characteristic data, a data transmission module connected to the data acquisition module is provided to achieve accurate transmission of the mill electricity cost characteristic data; by providing it to be connected to the database, when the DCS electricity cost calculation module performs data processing, the problem of disorderly data storage during the data processing of the DCS electricity cost calculation module is overcome, and the partitioned and classified storage of the mill electricity cost characteristic data is achieved; by providing a control module, when the mill electricity cost analysis system performs data calculation, the situation that there are difference data in the analysis results of the analysis system is overcome, and real-time monitoring of data dynamics is achieved.
[0029] Furthermore, the system of the present invention overcomes the problem of low efficiency in collecting the power characteristic data of the electric meter by setting up a data acquisition system composed of a Modbus hub and a PLC. In the process of the data acquisition system collecting the power characteristic data of the electric meter in real time, the system realizes efficient polling collection of the power characteristic data of the electric meter.
[0030] Furthermore, the system of the present invention overcomes the problem of using the same data processing method for equipment with different production processes by setting a DCS electricity fee calculation module when the DCS judges and processes the power characteristic data of the electricity meter, realizes targeted analysis of electricity fee data in different time periods, and improves the accuracy of the mill electricity fee analysis system.
[0031] Furthermore, the system of the present invention overcomes the problem of decreased data processing capability caused by the accumulation of large amounts of data by setting up a control module when the DCS judges and processes the power characteristic data of the electric meter, thereby achieving the stability of adjusting the mill electricity cost analysis results according to different situations.
[0032] Furthermore, the system of the present invention overcomes the problem of abnormal data sent by transmission nodes caused by network security risks when the mill electricity cost analysis system transmits data by adjusting the number of transmission nodes, thereby improving the accuracy of the data processing capability of the mill electricity cost system. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 The overall structural block diagram of the mill electricity cost analysis system based on DCS according to an embodiment of the present invention;
[0034] Figure 2 This is a structural block diagram of a data acquisition module of a DCS-based mill electricity cost analysis system according to an embodiment of the present invention;
[0035] Figure 3 A block diagram of the connection structure of the data acquisition module and the control module of the DCS-based mill electricity cost analysis system according to an embodiment of the present invention;
[0036] Figure 4 This is a connection structure block diagram of a data acquisition module of a DCS-based mill electricity cost analysis system according to an embodiment of the present invention, which is respectively connected to a data transmission module and a control module. DETAILED DESCRIPTION
[0037] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0038] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0039] It will be understood by those skilled in the art that, unless expressly stated, the singular forms "a", "an" and "the" used herein may also include the plural forms. It should be further understood that the term "comprising" used in this specification refers to the presence of features, integers, steps, operations, elements / components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements / components. It should be understood that when we refer to a module as being "connected" or "coupled" to another module, it may be directly connected or coupled to the other module, or there may be an intermediate unit. In addition, "connected" or "coupled" used herein may include wireless connection or wireless coupling.
[0040] See also Figure 1 , Figure 2 , Figure 3 as well as Figure 4 As shown, they are respectively an overall structural block diagram of a mill electricity cost analysis system based on DCS according to an embodiment of the present invention, a structural block diagram of a data acquisition module, a connection structural block diagram of a data acquisition module connected to a control module, and a connection structural block diagram of a data acquisition module connected to a data transmission module and a control module respectively. The mill electricity cost analysis system based on DCS according to the present invention comprises:
[0041] A data acquisition module is used to collect the mill electricity charge characteristic data in real time, the mill electricity charge characteristic data includes the meter power characteristic data and the electricity quantity data;
[0042] A data transmission module, which is connected to the data acquisition module and is used to transmit the mill electricity fee characteristic data to a corresponding processing node, including a plurality of transmission nodes;
[0043] A DCS electricity fee calculation module, which is connected to the data transmission module and is used to determine an electricity fee pricing mode according to the mill electricity fee characteristic data, and calculate the electricity fee according to the electricity fee pricing mode;
[0044] A database, which is connected to the data acquisition module and the DCS electricity fee calculation module respectively, and is used to store the characteristic data of the mill electricity fee;
[0045] A control module, which is respectively connected to the data acquisition module, the data transmission module, the DCS electricity fee calculation module and the database, and is used to determine the memory release method according to the comparison result of the running memory capacity used for data type conversion and the amount of log data generated by the data type conversion with the storage capacity occupied by the current field to be converted, or to adjust the number of transmission nodes according to the proportion of the amount of data sent by the transmission node that is abnormal when it is determined that the stability of the cost analysis does not meet the requirements according to the proportion of the number of differences in the electricity fee calculation results of several times of the same input data;
[0046] The memory release method includes adjusting the byte amount of the data type of the stored field or adjusting the storage data volume ratio of the data compression.
[0047] In implementation, the system of the present invention is provided with a data acquisition module, a data transmission module, a DCS electricity cost calculation module, a database and a control module. After the data acquisition module completes the acquisition of the mill electricity cost characteristic data, a data transmission module connected to the data acquisition module is provided to achieve accurate transmission of the mill electricity cost characteristic data; by providing it to be connected to the database, when the DCS electricity cost calculation module performs data processing, the problem of disorderly data storage in the data processing process of the DCS electricity cost calculation module is overcome, and the partition and classification storage of the mill electricity cost characteristic data is achieved; by providing a control module, when the mill electricity cost analysis system performs data calculation, the situation that there are difference data in the analysis results of the analysis system is overcome, and real-time monitoring of data dynamics is achieved;
[0048] Specifically, the power data includes peak power, peak power, average power and valley power;
[0049] Specifically, the specific process of the DCS mode judgment module determining the pricing mode of the electricity fee according to the characteristic data of the mill electricity fee is as follows: the calculation rule of the electricity fee of the Southern Power Grid is total electricity fee = (1 + adjustment coefficient) * [peak electricity quantity * (electricity fee (peak) + transmission and distribution fee (peak) + line loss fee (peak)) + peak electricity quantity * (electricity fee (peak) + transmission and distribution fee (peak) + line loss fee (peak)) + average electricity quantity * (electricity fee (average) + transmission and distribution fee (average) + line loss fee (average)) + valley electricity quantity * (electricity fee (valley) + transmission and distribution fee (valley) + line loss fee (valley))] + system operation cost + market-based shared cost + fund and surcharge unit price * total electricity quantity + billing demand * basic electricity fee;
[0050] Among them, the peak, flat and valley are the four types of tiered rules for the electricity charges of the Southern Power Grid, namely peak, peak, flat and valley. The peak period refers to the high temperature weather in Guangzhou when the highest temperature reaches 35℃ or above (based on the highest temperature of Guangzhou the next day published in the weather forecast of the news broadcast at 19:00 every night); the peak period refers to the time period from 10:00 to 12:00 and 14:00 to 19:00; the valley period refers to the time period from 0:00 to 8:00; the rest of the time is the flat period;
[0051] Among them, the billing demand is the maximum active power that lasts for more than 15 minutes in the month; the adjustment coefficient is the ratio of active power to reactive power.
[0052] Specifically, the data acquisition module includes:
[0053] A Modbus hub is used to collect the power characteristic data of the electric meter in real time, wherein the power characteristic data of the electric meter includes instantaneous active power, instantaneous reactive power, accumulated active power and accumulated reactive power of the electric meter;
[0054] A PLC connected to the Modbus hub, and polling the Modbus hub to obtain the power data;
[0055] Among them, there are 8 electricity meters collected: the main electricity meter, mill electricity meter 1, mill electricity meter 2, air compressor incoming line electricity meter, office building electricity meter, temporary board room electricity meter, canteen electricity meter and guard room electricity meter;
[0056] Specifically, the control module is connected to the DCS electricity cost calculation module to obtain the characteristic data of the mill electricity cost, and determine whether the stability of the cost analysis meets the requirements according to the proportion of the number of differences in the electricity cost calculation results of the same input data;
[0057] Among them, if the proportion of the number of differences in the electricity charge calculation results of the same input data is greater than the preset first difference proportion, the control module determines that the stability of the cost analysis does not meet the requirements; if the proportion of the number of differences in the electricity charge calculation results of the same input data is less than or equal to the preset first difference proportion, the control module determines that the stability of the cost analysis meets the requirements.
[0058] Specifically, the ratio of the number of differences in the electricity cost calculation results for the same input data is the ratio of the number of times different electricity cost calculation results are output after the same mill electricity cost characteristic data is input several times into the DCS electricity cost calculation module to the total number of inputs.
[0059] Optionally, the preset first difference frequency ratio may be in the range of [1.5%, 2.5%];
[0060] Preferably, the preferred embodiment of the preset first difference frequency ratio is 2%;
[0061] In one or more embodiments, if the difference ratio of the electricity fee calculation results of the same input data is 4%, which is greater than the preset first difference ratio of 2%, it is determined that the cost analysis stability does not meet the requirements.
[0062] Specifically, the control module is connected to the database to determine the memory release method according to the comparison result of the running memory capacity used for data type conversion and the amount of log data generated by the data type conversion and the storage capacity occupied by the current field to be converted when the proportion of the difference number of electricity fee calculation results of the same input data is greater than the preset second difference number proportion, wherein,
[0063] If the sum of the operating memory capacity used for the data type conversion and the amount of log data generated by the data type conversion is less than the storage capacity occupied by the current field to be converted, the control module determines to perform the data type conversion and reduces the byte amount of the data type of the stored field;
[0064] If the sum of the running memory capacity used for the type conversion and the amount of log data generated by the data type conversion is greater than or equal to the storage capacity occupied by the current field to be converted, the control module determines not to perform the data type conversion and increases the proportion of the storage data volume of the data compression.
[0065] Optionally, the preset second difference frequency ratio may be in the range of [4.5%, 5.5%];
[0066] Preferably, the preferred embodiment of the preset second difference frequency ratio is 5%;
[0067] In one or more embodiments, if the proportion of the difference in the electricity charge calculation results of the same input data for several times is 7%, which is greater than the preset second proportion of the difference of 5%, the memory release method is determined based on the comparison result of the running memory capacity used for the data type conversion and the amount of log data generated by the data type conversion with the storage capacity occupied by the current field to be converted.
[0068] Specifically, the reduced byte amount of the stored data type is determined by the difference between the ratio of the number of differences in the electricity fee calculation results of the same input data and a preset second ratio of the number of differences.
[0069] Specifically, the increased proportion of the stored data volume of the data compression is determined by the difference between the proportion of the number of differences in the electricity fee calculation results of the same input data for several times and a preset second proportion of the number of differences.
[0070] Specifically, the control module is connected to the data transmission module to adjust the number of transmission nodes according to the proportion of data volume abnormalities occurring in the transmission nodes, wherein:
[0071] If the proportion of data volume in which the data sent by the transmission node is abnormal is greater than the proportion of the preset first difference times and is less than or equal to the proportion of the preset second difference times, the control module preliminarily determines that the network security risk does not meet the requirements, and obtains and calculates the proportion of data volume in which the data sent by the transmission node is abnormal to make a secondary determination of the network security risk;
[0072] Among them, if the proportion of abnormal data sent by the transmission node is greater than the preset data proportion, the control module will secondly determine that the network security risk does not meet the requirements and reduce the number of transmission nodes of the data transmission module.
[0073] Specifically, the proportion of data volume in which abnormalities occur in data sent by the transmission node is a ratio of abnormal data in data sent by a number of transmission nodes to the total amount of data sent by the transmission nodes.
[0074] Specifically, the number of reduced transmission nodes is determined by the difference between the proportion of data volume in which abnormalities occur in data sent by the transmission nodes and the proportion of preset data volume.
[0075] Specifically, abnormal data includes data with missing data volume, modified data, and data format changes.
[0076] Optionally, the preset value range of the abnormal data volume ratio may be [0.5%, 1.5%];
[0077] Preferably, the preferred embodiment of the preset abnormal data volume ratio is 1%;
[0078] In one or more embodiments, if the percentage of differences in the electricity fee calculation results of the same input data is 3%, which is greater than the preset first percentage of differences and less than or equal to the preset second percentage of differences, the control module preliminarily determines that the network security risk does not meet the requirements;
[0079] In one or more embodiments, when the proportion of data volume with abnormalities sent by the transmission node exceeds 0.8% of the preset proportion of data volume with abnormalities, the number of transmission nodes is reduced by 1;
[0080] For example, if the amount of data sent by the transmission node with abnormalities accounts for 2.6%, the number of transmission nodes is reduced by 2.
[0081] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. A DCS-based mill electricity cost analysis system, characterized in that: include: A data acquisition module is used to collect the mill electricity charge characteristic data in real time, the mill electricity charge characteristic data includes the meter power characteristic data and the electricity quantity data; A data transmission module, which is connected to the data acquisition module and is used to transmit the mill electricity fee characteristic data to a corresponding processing node, including a plurality of transmission nodes; A DCS electricity fee calculation module, which is connected to the data transmission module and is used to determine an electricity fee pricing mode according to the mill electricity fee characteristic data, and calculate the electricity fee according to the electricity fee pricing mode; A database, which is connected to the data acquisition module and the DCS electricity fee calculation module respectively, and is used to store the characteristic data of the mill electricity fee; A control module, which is respectively connected to the data acquisition module, the data transmission module, the DCS electricity fee calculation module and the database, and is used to determine the memory release method according to the comparison result of the running memory capacity used for data type conversion and the amount of log data generated by the data type conversion with the storage capacity occupied by the current field to be converted, or to adjust the number of transmission nodes according to the proportion of the amount of data sent by the transmission node that is abnormal when it is determined that the stability of the cost analysis does not meet the requirements according to the proportion of the number of differences in the electricity fee calculation results of several times of the same input data; The memory release method includes adjusting the byte amount of the data type of the stored field or adjusting the storage data volume ratio of the data compression.
2. The DCS-based mill electricity cost analysis system according to claim 1 is characterized in that: The data acquisition module comprises: A Modbus hub is used to collect the power characteristic data of the electric meter in real time, wherein the power characteristic data of the electric meter includes instantaneous active power, instantaneous reactive power, accumulated active power and accumulated reactive power of the electric meter; The PLC is connected to the Modbus hub and obtains the power data by polling the Modbus hub.
3. The DCS-based mill electricity cost analysis system according to claim 1, characterized in that: The control module is connected to the DCS electricity cost calculation module to obtain the characteristic data of the mill electricity cost, and determine whether the stability of the cost analysis meets the requirements according to the proportion of the number of differences in the electricity cost calculation results of the same input data; Among them, if the proportion of the number of differences in the electricity charge calculation results of the same input data is greater than the preset first difference proportion, the control module determines that the stability of the cost analysis does not meet the requirements; if the proportion of the number of differences in the electricity charge calculation results of the same input data is less than or equal to the preset first difference proportion, the control module determines that the stability of the cost analysis meets the requirements.
4. The DCS-based mill electricity cost analysis system according to claim 3 is characterized in that: The ratio of the number of differences in the electricity fee calculation results for the same input data is the ratio of the number of times different electricity fee calculation results are output after the same mill electricity fee characteristic data is input several times into the DCS electricity fee calculation module to the total number of inputs.
5. The DCS-based mill electricity cost analysis system according to claim 4 is characterized in that: The control module is connected to the database, and is used to determine the memory release method according to the comparison result of the running memory capacity used for data type conversion and the amount of log data generated by data type conversion and the storage capacity occupied by the current field to be converted when the proportion of the difference number of electricity fee calculation results of the same input data for the several times is greater than the preset second difference number proportion, wherein, If the sum of the operating memory capacity used for the data type conversion and the amount of log data generated by the data type conversion is less than the storage capacity occupied by the current field to be converted, the control module determines to perform the data type conversion and reduces the byte amount of the data type of the stored field; If the sum of the running memory capacity used for the type conversion and the amount of log data generated by the data type conversion is greater than or equal to the storage capacity occupied by the current field to be converted, the control module determines not to perform the data type conversion and increases the proportion of the storage data volume of the data compression.
6. The DCS-based mill electricity cost analysis system according to claim 5, characterized in that: The reduced byte amount of the stored data type is determined by the difference between the ratio of the number of differences in the electricity fee calculation results of the same input data and a preset second ratio of the number of differences.
7. The DCS-based mill electricity cost analysis system according to claim 6, characterized in that: The increased proportion of the amount of stored data in the data compression is determined by the difference between the proportion of the number of times of difference in electricity fee calculation results of the same input data and a preset second proportion of the number of times of difference.
8. The DCS-based mill electricity cost analysis system according to claim 7, characterized in that: The control module is connected to the data transmission module and is used to adjust the number of transmission nodes according to the proportion of data volume abnormalities occurring in the transmission nodes, wherein: If the proportion of data volume in which the data sent by the transmission node is abnormal is greater than the proportion of the preset first difference times and is less than or equal to the proportion of the preset second difference times, the control module preliminarily determines that the network security risk does not meet the requirements, and obtains and calculates the proportion of data volume in which the data sent by the transmission node is abnormal to make a secondary determination of the network security risk; Among them, if the proportion of abnormal data sent by the transmission node is greater than the preset data proportion, the control module will secondly determine that the network security risk does not meet the requirements and reduce the number of transmission nodes of the data transmission module.
9. The DCS-based mill electricity cost analysis system according to claim 8, characterized in that: The proportion of data volume in which abnormal data is sent by the transmission node is the ratio of abnormal data in data sent by a number of transmission nodes to the total amount of data sent by the transmission nodes.
10. The DCS-based mill electricity cost analysis system according to claim 9, characterized in that: The number of reduced transmission nodes is determined by the difference between the proportion of data volume in which abnormalities occur in the data sent by the transmission nodes and the preset proportion of data volume.
Citation Information
Patent Citations
Electric power fee calculation method and device based on distributed memory calculation technology
CN112381583A
Electricity charge system based on distributed storage and distributed calculation
CN113283944A
Power acquisition system using communication manager
CN203606429U
Data collection method and system for smart meter-reading terminal
WO2023168950A1