Method for judging whether ship can pass through bridge opening or not based on electronic fence
Through electronic fence positioning technology and computer simulation, the vector model of the bridge hole and the ship's appearance profile is automatically compared, which solves the repeated labor and error problems of ships when passing through the bridge hole, improves navigation efficiency and safety, and achieves fast and accurate passage judge.
Patent Information
- Application Number
- CN202410863762.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-29
- Publication Date
- 2024-11-08
AI Technical Summary
The prior art has problems such as large amount of repeated labor, large errors, cumbersome navigation management procedures and low efficiency when a ship passes through a bridge hole, and cannot meet the needs of safety, speed and economy.
Using the determination method based on electronic fences, through digital access control system and auxiliary navigation system, electronic fence positioning technology, computer simulation technology and ranging camera, a vector model of the bridge hole and ship appearance profile is established, and traffic indicator lights are automatically compared and controlled. , determine whether the ship can pass through the bridge hole.
It realizes a rapid and accurate determination of whether a ship can pass through the bridge hole, reduces the need for repeated assessments and pilot pilots, and improves navigation efficiency and safety.
Smart Images

Figure CN118918728A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of ship navigation technology, in particular to a method for determining whether a ship can pass through a bridge hole based on an electronic fence, including an invention core digital access control system and an auxiliary technology navigation system. Background Art
[0002] Under the current technical background, before a ship passes through a bridge hole, it must first manually measure the bridge hole size data and the ship's own external contour size data. After comparing the sizes, the ship that intends to pass through the bridge hole must formulate a navigation guarantee plan for passing through the bridge hole and submit it to the navigation management department; after that, the navigation management department will hold an expert review meeting, and the expert group will form an expert opinion on whether the ship can pass through based on relevant navigation standards; after reaching the conclusion that the ship can pass through, the ship must also ask a pilot to board the ship for pilotage.
[0003] Under the existing technical background, general aviation practice involves a large amount of repetitive work and large errors; the general aviation management procedures are cumbersome and extremely inefficient, and cannot meet the needs of "safety, speed and economy". Summary of the invention
[0004] The present invention solves the problem of quickly determining whether a ship can pass through a bridge hole through a digital access control system; and solves the problem of ships moving along the central axis of the bridge hole and reducing deviations by assisting in setting up navigation systems such as navigation marks and laser navigation lights. This can achieve the purpose of machine evaluation and machine navigation for seaworthy ships passing through bridge holes without repeated assessments or pilotage.
[0005] The present invention provides a method for determining whether a ship can pass through a bridge hole based on an electronic fence, comprising the following steps: S1. Establish the horizontal axis x in the width direction of the bridge hole, the vertical axis y in the height direction of the bridge hole, and the z axis in the depth direction of the bridge hole, and take the intersection of the section at 1 / 2 of the hole width, the section at 1 / 2 of the hole depth and the highest navigable water level plane as the origin of the coordinate system; S2. Using the electronic fence positioning technology, a scalar model L1=f(x1, y1) of the hole edge positioning electronic fence is established on the reference plane, and converted into a vector model L1=f(m1, θ1) using a calculation formula; S3. Using computer simulation technology, substitute the bridge hole navigation safety distance d into L1=f(m1, θ1) to obtain the vector model L2=f(m2, θ2) of the hole positioning electronic fence L2 on the reference plane; S4. Take a picture of the ship's outline through a range-finding camera above the bridge hole, and transmit the ship's outline to the reference plane, obtain the ship's outline prediction positioning electronic fence L3 scalar model on the reference plane in advance, and convert it into a vector model L3=f(m3,θ3) using a calculation formula; S5. Establish a correlation series of the modulus values m3, m2, and m1 of L3, L1, and L2 at the same angles, and compare the sizes of m3, m2, and m1 to determine whether the modulus value of the L3 vector model for ship profile prediction and positioning can be covered by the modulus value of the L2 vector model for hole protection and positioning, and control the traffic light in front of the bridge hole to flash according to the comparison.
[0006] Preferably, in step S1, the section at 1 / 2 of the hole depth, i.e., z=0, is defined as the reference plane. At this time, the three-dimensional coordinate system L=f(x, y, z) can be simplified to a two-dimensional coordinate system L=f(x, y). At the same time, the real scene reference plane is entered into the computer system under the background of the electronic fence to establish a virtual reference plane.
[0007] Preferably, the electronic fence scalar model L=f(x, y) is converted to a vector model L=f(m, θ), which can be converted by the conversion formula m= and θ = arctg(y / x) is converted into a vector data model with two factors, modulus m and angle θ, thereby obtaining the vector model L=f(m, θ).
[0008] Preferably, the method for obtaining the vector model L1=f(m1, θ1) is as follows: the electronic fence scalar model L1=f(x1, y1) is measured by using digital positioning technology, and L1=f(m1, θ1) is derived according to the above derivation formula.
[0009] Preferably, the method for obtaining the vector model L2=f(m2, θ2) is as follows: the safety distance d to be increased is substituted into the vector model L1=f(m1, θ1) by using computer simulation technology, that is, according to L2=f(m2, θ2)=f{(m1- ),θ2}formula is derived.
[0010] Preferably, the method for obtaining the vector model L3=f(m3, θ3) is as follows: based on the electronic fence of the ship outline containing the heading and size information in the reference section, a scalar model L3=f(x3, y3) for predicting the positioning of the ship outline is obtained, and the vector model L3=(m3, θ3) is derived according to the above formula.
[0011] Preferably, the value of θ is 0-π degrees. Within this value range: When the module value meets the condition of m3≤m2, the traffic indicator light 1 turns green and the ship can pass; When the module value meets the condition of m2≤m3≤m1, the traffic indicator light 1 turns yellow and the vessel needs to adjust its position before passing; If the module value exists such that m1≤m3, the traffic indicator light 1 turns red and ships are prohibited from passing.
[0012] Preferably, when the value of θ is between 0 and π, a method of taking values in n equal parts and non-continuously is adopted according to the accuracy requirement.
[0013] Preferably, the determination method is used for the passage of a moving object through a hole. In different scenarios, the hole may be a ship lock, a land bridge hole, a tunnel, etc., and the moving object may be a moving vehicle or other moving objects.
[0014] (I) Description of the Principle of the Invention The engineering principle is: using digital positioning and computer simulation technology, supplemented by corresponding mathematical deductions, respectively, on the selected reference plane, establish the bridge hole edge positioning electronic fence L1 (hereinafter referred to as hole edge positioning L1) vector model, bridge hole safety position edge positioning (virtual protection layer) electronic fence L2 (hereinafter referred to as hole protection positioning L2) vector model; then use the range-finding camera to obtain the maximum external contour of the ship in advance, and perform imaging deduction, and then obtain the maximum external contour electronic fence L3 (hereinafter referred to as ship outline prediction positioning L3) vector model of the ship that is about to pass through the bridge hole in the reference plane in advance. The computer system automatically compares the vector modulus values of L3 with L1 and L2 and makes a judgment: passage is allowed when the set conditions are met; otherwise, passage is prohibited. See attached Figure 1 "Front view of a ship passing through a bridge opening."
[0015] The mathematical principle is: whether a certain point of the ship profile is within the safety range can be determined by comparing the vector modulus of the ship profile prediction positioning L3 with the vector modulus of the hole edge positioning L1 and the hole protection positioning L2 at the same angle. See 4 "Relationship diagram of L3 with L1 and L2 when different z axes".
[0016] (II) Implementation process of the technical solution of the present invention In order to solve the above technical problems, the present invention provides a method for determining whether a ship can pass through a bridge hole based on an electronic fence, and the technical solution adopted includes the following steps: S1. Establish the horizontal axis x in the horizontal width direction of the bridge hole, the vertical axis y in the height direction of the bridge hole, and the z axis in the depth direction of the bridge hole. Use the section at 1 / 2 of the bridge hole width, the section at 1 / 2 of the hole depth, and the intersection of the highest navigable water level plane as the coordinate system element points to establish a three-dimensional coordinate system. Define the section at 1 / 2 of the hole depth, i.e. z=0, as the reference plane. At this time, the three-dimensional coordinate system L=f(x, y, z) can be simplified to the two-dimensional coordinate system L=f(x, y); at the same time, enter the real scene reference plane into the computer system under the background of the electronic fence to establish a simulated reference plane; S2. Using the electronic fence positioning technology, a scalar model L1=f(x1, y1) of the hole edge positioning electronic fence L1 is established on the reference plane, and converted into a vector model L1=f(m1, θ1) using a calculation formula; S3. Using computer simulation technology, substitute the safe distance d of the bridge hole into L1=f(m1, θ1) to obtain the vector model L2=f(m2, θ2) of the hole position L2 on the reference plane; S4, take a picture of the ship's outline through the range-finding camera at the top of the bridge hole, and transmit the ship's outline to the reference plane to obtain the ship outline prediction positioning L3 scalar model in advance, and convert it into a vector model L3=f(m3,θ3) using the conversion formula; Explanation 1: After steps S1-S4, three electronic fences L3=f(m3, θ3), L2=f(m2, θ2), and L1=f(m1, θ1) have been virtualized on the reference plane. The position relationship between L3 and the Z axis when there is no deviation is shown in the attached figure. Figure 3 《Relationship diagram between L3 and L1 and L2 when L3 is coaxial with the z-axis》; See the attached diagram for the position relationship when there is a deviation between L3 and the z-axis Figure 4 《Diagram of the relationship between L3 and L1 and L2 at different z-axes》
[0017] Note 2: If the ship's heading deviates greatly from the z-axis (see Figure 4 As shown in the "Relationship diagram of L3 with L1 and L2 at different z-axes", even ships that can pass through the bridge hole may touch the safety position or the edge of the bridge hole. At this time, its mathematical characteristics are that the modulus m3 of the ship outline prediction positioning L3 is greater than or equal to the modulus m2 and m1 of L2 or L1 at the same angle. Assume that the coordinate origin point is the center of the circle and θ is the angle to make a ray, which intersects L3, L2, and L1 at points L, M, and N respectively. Obviously, OL, OM, and ON are the modulus m3, m2, and m1 of L3, L2, and L1 at angle θ. If the angle θ is rotated from 0 to (n / 180)π and then to π (i.e., the first and second quadrants of the coordinate system), the corresponding sequence shown in Appendix 4 "List of associated numbers of modulus values of ship outline prediction positioning and hole protection positioning and hole edge positioning vectors" can be obtained (a total of 3n points). Comparing the sizes of m3, m2, and m1 in this sequence, the corresponding judgment can be made.
[0018] S5. Compare the n ship outline prediction positioning vectors L3 at the same angle with the module values of the hole edge positioning vector model L1 and the hole protection positioning model L2, that is, compare the m3, m2, and m1 in the series of Appendix 4 "List of module values of ship outline prediction positioning, hole protection positioning, and hole edge positioning vectors" one by one to determine whether the module value of the ship outline prediction positioning L3 vector model can be covered by the module value of the hole protection positioning L2 vector model, and control the flashing of the traffic light at the top of the bridge hole according to the comparison result.
[0019] (III) Several explanations of the library construction scheme of the present invention In S1-S5 above, the electronic fence scalar model L=f(x, y) can be converted into the formula m= and θ = arctg(y / x) (hereinafter referred to as the conversion formula) is converted into a vector model L=f(m, θ). However, L2=f(m2, θ2) does not require conversion and can be obtained through computer simulation. The mapping or derivation steps are as follows: The method for obtaining the hole edge positioning vector model L1=f(m1,θ1): Use the positioning electronic fence technology to obtain the scalar model L1=f(x1,y1) according to actual measurements; convert the positioning data of the scalar model L1=f(x1,y1) into a vector data model with two factors of modulus m1 and angle θ1 through the conversion formulas m1= and θ1=arctg(y1 / x1) to obtain the vector model L1=f(m1,θ1).
[0020] The method of obtaining the Kongbao positioning vector model L2=f(m2,θ2) is as follows: Using computer simulation technology, the increased safety distance is substituted into the vector model L1=f(m1,θ1), that is, L2=f(m2,θ2)=f{(m1- ), θ2}, it can be derived.
[0021] Method for obtaining the ship outline prediction positioning vector model L3=f(m3, θ3): take a photo of the ship that intends to enter the bridge hole and transmit it to the reference plane synchronously, and then you can get the scalar model L3=f(x3, y3) of the ship outline prediction positioning. According to the above conversion formula, you can derive the vector model L3=(m3, θ3). When predicting the ship outline, in order to reduce the deviation, install a laser guide light on the top of the bridge hole. The beam of the laser guide light is V-shaped, and the sharp end is located at the center of the bridge hole and faces the direction of the sailing ship, guiding the ship to always move along the trajectory of the center axis of the bridge hole.
[0022] Explanation 3: Establishing the associated sequence of ship profile prediction positioning, hole protection positioning, and ship edge positioning modulus m3, m2, and m1 with the change of the angle θ is the key project of the present invention. In the preferred solution, according to the reasons described in Explanation 2, it is only necessary to select the corresponding points under the rays of n angles (0-n) for calculation and value taking (there are 3 points under each angle ray, a total of 3n points) according to the accuracy requirements.
[0023] (IV) Algorithm Logic of the Present Invention The system automatically compares m3 with m2 and m1 in Appendix 4 "List of vector modulus values of ship outline prediction positioning, hole protection positioning and hole edge positioning". In the series: The modulus value m3≤m2 is true, and the traffic light is green; If the modulus value m2≤m3≤m1 is true, the traffic light turns yellow and the ship should adjust its position before passing; When the module value exists such that m1≤m3, the traffic light turns red and ships are prohibited from passing. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Attached Figure 1 This is the “front view of a scene of a ship passing through a bridge hole” in an embodiment of the present invention.
[0025] Attached Figure 2 This is an overhead view of a scene of a ship passing through a bridge hole in an embodiment of the present invention.
[0026] Attached Figure 3 This is the “Relationship diagram between L3 and L1 and L2 when L3 is coaxial with the z-axis” in an embodiment of the present invention.
[0027] Attached Figure 4 This is the “Relationship diagram between L3 and L1 and L2 when the z-axis is different” in an embodiment of the present invention.
[0028] In the attached figure: 1 traffic light; 2 laser navigation light; 3 ranging camera; 4 white floating navigation mark; 5 red floating navigation mark; 6 virtual start mark; 7 virtual adjustment mark; 8. virtual entry mark. DETAILED DESCRIPTION
[0029] Step 1: Establish a three-dimensional coordinate system.
[0030] The horizontal axis x is established in the horizontal width direction of the bridge hole, the vertical axis y is established in the height direction of the bridge hole, and the z axis is established in the depth direction of the bridge hole. The intersection of the section at 1 / 2 of the bridge hole width, the section at 1 / 2 of the hole depth, and the highest navigable water level plane is used as the coordinate system element point to establish a three-dimensional coordinate system. Define the section at 1 / 2 of the hole depth, that is, z=0, as the reference plane. At this time, the three-dimensional coordinate system L=f(x, y, z) can be simplified to the two-dimensional coordinate system L=f(x, y). Enter the real scene reference plane into the computer system under the background of the electronic fence to establish a simulated reference plane, as shown in the attached figure. Figure 1 As shown in the "Front view of a ship passing through a bridge hole".
[0031] Note 4: To simplify calculation and facilitate comparison, the three related series L1=f(m1,θ1), L2=f(m2,θ2), L3=f(m3,θ3) are all established with θ as the independent variable and L as the dependent variable. The independent variable is taken from the independent variable series θ=(n / 180)π Step 2: Construct a module value library of the L1 vector model for hole edge positioning.
[0032] Through the electronic fence positioning technology, the hole edge positioning L1 scalar model L1=f(x1, y1) is measured, entered into the simulation reference plane, and converted and established using the above conversion formula. The conversion process of the preferred solution is as follows in Appendix 1: Appendix 1: List of hole edge positioning vector modulus values
[0033] Through this step, the modulus m1 of L1 at n angles is obtained.
[0034] Step 3: Establish a hole-preserving L2 vector model model value library.
[0035] Using computer simulation technology, the safe distance d (vector) of the bridge hole is substituted into L1=f(m1, θ1) to obtain and establish the corresponding L2 vector model database. Assuming that the existing "Navigation Regulations" stipulate that the safe distance between the ship's exterior and the edge of the bridge hole should be d, that is, within the electronic fence at the edge of the bridge hole, the safe distance (vector d) should be subtracted, which is equivalent to adding a virtual protective shell with a thickness of d at the edge of the bridge hole, forming a hole protection position L2 model. Its scalar function is L2=f(x2, y2)=f{(x1- )、(y1- )}, the converted vector data model is L2=f(m2,θ2)=f{(m1- The value of L2 can be obtained by computer simulation without measuring the value of L1. Once the safety distance d value is set, the L2 vector model of the hole protection positioning is also a fixed data set. As shown in Table 2 below: Appendix 2: List of Kongbao positioning vector modulus values
[0036] Through this step, the modulus m2 of L2 at the same n angles as mentioned above is obtained.
[0037] Through the above basic work, in the z=0 section, the hole edge positioning L1 vector model L1=f(m1, θ1) database and the hole protection positioning L2 vector model L2=f(m2, θ2} database have been established. If the ship outline prediction positioning L3 vector model is obtained in advance at this time, it can be compared and the conclusion of whether it can pass can be predicted in advance. The present invention predicts the ship outline prediction positioning L3 vector model when the ship enters the bridge hole in advance by taking photos multiple times in advance, and compares it with L 1、 L2 completes the comparison and draws the conclusion.
[0038] Step 4: Build an auxiliary navigation system.
[0039] Along the longitudinal direction of the middle edge of the top of the bridge arch, there are a group of traffic lights 1 (one red, yellow and green), a group of guide lights 2 that can emit fan-shaped laser beams, and a distance measuring camera 3. Figure 1Several guiding beacons are set up along the extension lines of the edge lines of the safety positions of the bridge holes on both sides. The left side is a white floating navigation beacon 4, and the right side is a red floating navigation beacon 5. The corresponding virtual navigation beacons between the red and white floats on the z-axis line between the two lines are the starting navigation beacon 6, the adjustment navigation beacon 7 and the entrance navigation beacon 8. See attached Figure 2 "Top view of a ship passing through a bridge hole" is shown.
[0040] Step 5: Construct the L3 vector model value library for ship profile prediction and positioning.
[0041] The ship is photographed by the rangefinder camera above the bridge hole, and the ship's outline is transmitted to the reference plane to form the ship outline prediction positioning L3 scalar model, and the calculation formula is used to transform and establish the vector model L3=f (m3, θ3) database. This database is a timely database, which can be obtained by taking photos when the ship passes the virtual starting mark 6, virtual adjustment mark 7, and virtual entry mark 8. The following is shown in Appendix 3: Appendix 3: List of ship profile prediction positioning vector modulus values
[0042] At this step, the system obtains the modulus m3 of L3 at n angles.
[0043] Step 6: Construct a list of association numbers between the ship's outer contour, safety positions, and the outer edge of the bridge opening (database) When the ship passes by the virtual starting mark 6, the ranging camera 3 takes a picture for the first time, and the system obtains the ship profile data L3 when the ship is at the mark 6.
[0044] Note 5: This manual uses three photos taken at the "Start", "Adjustment" and "Entrance" marks to illustrate; the number of virtual adjustment marks can be increased or decreased according to the accuracy requirements.
[0045] See attached Figure 4 As shown in the "Relationship diagram of L3 with L1 and L2 at different z-axes", θ is an angular variable with a variable range of 0-π degrees (i.e., the first and second quadrants of the coordinate system); it is not difficult to understand that OL (=m3) is actually the modulus value of the ship outline predicted positioning vector L3=f(m3,θ3) at this θ angle; OM (=m2) is actually the modulus value of the hole protection positioning vector L2=f(m2,θ2) at this θ angle; ON (=m1) is actually the modulus value of the hole edge positioning vector L1=f(m1,θ1) at this θ angle. Assuming that at the angle θ1, the modulus Om of the ship outline predicted positioning vector L3 is greater than the modulus OL of the hole protection positioning vector L2, and is smaller than the modulus ON of the hole edge positioning vector L1, indicating that the ship's outer contour has broken through the safety position at point M, but is still within the edge of the bridge hole.
[0046] When the value of θ changes, the modulus values m1, m2, and m3 corresponding to L1, L2, and L3 at the same angle (i.e., “θ = hole edge θ1 = hole protection θ2 = contour prediction θ3 = (n / 180)π”) are also changing, and their values can form an associated series. As shown in Appendix 4: Appendix 4 "List of correlation numbers between ship profile prediction positioning and hole protection positioning and hole edge positioning vector modulus value"
[0047] Through the above steps, a comparison database of the module values of m3, m2 and m1 at n angles is established.
[0048] Step 7: Calculate the comparison and draw corresponding conclusions.
[0049] By comparing the module values of the above series, the computer can obtain the positional relationship between any point on the ship's outer contour and the corresponding bridge hole safety position and bridge hole edge. Then the following logical judgment is made and the corresponding conclusion is generated: When m3≤m2 is true for all the n selected angles, it means that the maximum outer contour of the ship will be outside the safety position, and passage is allowed, which is displayed as a green light; When any angle sub-item under all the n selected angle items satisfies m2≤m3≤m1, it indicates that the ship will enter a safe position within the maximum outer contour, but has not yet reached the edge of the bridge hole. The ship needs to adjust its position carefully and the light will be yellow. When any angle sub-item among all the n selected angle items satisfies m3≥m1, it indicates that the ship's maximum outer contour will touch the edge of the bridge hole, and passage should be prohibited, with a red light displayed.
[0050] Step 7: Build databases for virtual adjustment mark 7 and virtual entry mark 8 respectively, compare again and generate conclusions.
[0051] When the ship reaches the virtual adjustment mark 7 and the virtual entry mark 8, the ranging camera 3 takes pictures for the second and third time respectively, and the system obtains the corresponding module values of the ship when it is at mark 7 and mark 8. The system compares again according to the above algorithm and draws the corresponding conclusion again. The database building process and judgment logic are the same as step 6.
[0052] Special note: The height of the vertical element point of this coordinate is the highest navigable water level. In most periods, ships sail below the highest navigable water level. Therefore, when building or updating the reservoir, the y value should be adjusted accordingly. The adjustment formula is: Δy (adjustment value) = y (highest navigable water level) - y (current water level). In actual implementation, the water level can be obtained in time by setting a water level gauge at the pier, or by timely updating the data by intercepting the hydrological network. For waterways in coastal areas and reservoirs with fixed water levels, the water level changes are not large and can be ignored.
Claims
1. A method for determining whether a ship can pass through a bridge hole based on an electronic fence, characterized in that: The following steps are involved: S1. Establish the horizontal axis x in the width direction of the bridge hole, the vertical axis y in the height direction of the bridge hole, and the z axis in the depth direction of the bridge hole, and take the intersection of the section at 1 / 2 of the hole width, the section at 1 / 2 of the hole depth and the highest navigable water level plane as the origin of the coordinate system; S2. Using the electronic fence positioning technology, a scalar model L1=f(x1, y1) of the hole edge positioning electronic fence is established on the reference plane, and converted into a vector model L1=f(m1, θ1) using a calculation formula; S3. Using computer simulation technology, substitute the bridge hole navigation safety distance d into L1=f(m1, θ1) to obtain the vector model L2=f(m2, θ2) of the hole positioning electronic fence L2 on the reference plane; S4. Take a picture of the ship's outline through a range-finding camera above the bridge hole, and transmit the ship's outline to the reference plane, obtain the ship's outline prediction positioning electronic fence L3 scalar model on the reference plane in advance, and convert it into a vector model L3=f(m3,θ3) using a calculation formula; S5. Establish a correlation series of the modulus values m3, m2, and m1 of L3, L1, and L2 at the same angles, and compare the sizes of m3, m2, and m1 to determine whether the modulus value of the L3 vector model for ship profile prediction and positioning can be covered by the modulus value of the L2 vector model for hole protection and positioning, and control the traffic light in front of the bridge hole to flash according to the comparison.
2. A method for determining whether a ship can pass through a bridge hole based on an electronic fence as claimed in claim 1, characterized in that: In step S1, the section at 1 / 2 of the hole depth, i.e., z=0, is defined as the reference plane. At this time, the three-dimensional coordinate system L=f(x, y, z) can be simplified to the two-dimensional coordinate system L=f(x, y). At the same time, the real scene reference plane is entered into the computer system under the background of the electronic fence to establish a virtual reference plane.
3. A method for determining whether a ship can pass through a bridge hole based on an electronic fence as claimed in claim 2, characterized in that: The electronic fence scalar model L=f(x, y) is converted to the vector model L=f(m, θ) by the conversion formula m= and θ = arctg(y / x) is converted into a vector data model with two factors, modulus m and angle θ, thereby obtaining the vector model L=f(m, θ).
4. A method for determining whether a ship can pass through a bridge hole based on an electronic fence as claimed in claim 3, characterized in that: The method of obtaining the vector model L1=f(m1,θ1): Use digital positioning technology to measure the electronic fence scalar model L1=f(x1,y1), and according to the above derivation formula, deduce L1=f(m1,θ1).
5. A method for determining whether a ship can pass through a bridge hole based on an electronic fence as claimed in claim 3, characterized in that: The method of obtaining the vector model L2=f(m2,θ2) is as follows: Substitute the safety distance d to be increased into the vector model L1=f(m1,θ1) using computer simulation technology, that is, according to L2=f(m2,θ2)=f{(m1- ),θ2}formula is derived.
6. A method for determining whether a ship can pass through a bridge hole based on an electronic fence as claimed in claim 3, characterized in that: The method of obtaining the vector model L3=f(m3, θ3): According to the electronic fence of the reference section of the ship contour containing the heading and size information, the scalar model L3=f(x3, y3) of the ship contour prediction positioning is obtained, and the vector model L3=(m3, θ3) is derived according to the above formula.
7. A method for determining whether a ship can pass through a bridge hole based on an electronic fence as claimed in any one of claims 4 to 6, characterized in that: The value of θ is 0-π degrees. When within this value range: When the module value meets the condition of m3≤m2, the traffic indicator light 1 turns green and the ship can pass; When the module value meets the condition of m2≤m3≤m1, the traffic indicator light 1 turns yellow and the vessel needs to adjust its position before passing; If the module value exists such that m1≤m3, the traffic indicator light 1 turns red and ships are prohibited from passing.
8. A method for determining whether a ship can pass through a bridge hole based on an electronic fence as claimed in claim 1, characterized in that: When the value of θ is between 0 and π, a method of taking values in n equal parts and non-continuously is adopted according to the accuracy requirement.
9. A method for determining whether a ship can pass through a bridge hole based on an electronic fence as claimed in claim 1, characterized in that: The determination method is used for the passage of moving objects through holes. In different scenarios, the holes may be ship locks, land bridge holes, tunnels, etc., and the moving objects may be moving vehicles or other moving objects.
