Power grid adjustable resource adjustment capability evaluation method based on network constraint and related system
By building the operation feasible domain and adjustment limit of the power grid adjustable resources, the accuracy of the prediction of flexible resource regulation capabilities is solved, the efficiency and stability of the power grid regulation are improved, and a more scientific resource allocation plan is provided.
Patent Information
- Application Number
- CN202411212811.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-30
AI Technical Summary
The prior art is difficult to accurately evaluate and predict the regulation capabilities of flexible resources, especially under multi-type resource aggregation and network constraints, and cannot effectively support complex scenarios such as power grid peak shaving and equipment overload.
By obtaining the power grid adjustable resource data, a feasible operational domain of single resources is constructed, and cross-section and peak-shaving constraints are taken into account, the total adjustable quantity and adjustment limits are calculated, the active constraint curve is corrected, and the grid adjustable resources based on network constraints are formed. Adjustment capability assessment methods and systems.
It improves the accuracy and reliability of the evaluation, optimizes resource allocation, improves the overall regulation capability and operation stability of the power grid, and provides scientific and reasonable decision-making reference for power grid regulation.
Smart Images

Figure CN118920479A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of power system automation, and in particular relates to a method for evaluating the regulating capability of adjustable resources of a power grid based on network constraints and a related system. Background Art
[0002] Nowadays, flexible resources such as temperature-controlled loads, electric vehicles, and energy storage equipment are a good medicine to smooth out the volatility and uncertainty of new energy. Facing the diversified regulation needs of the power grid, timely and accurate grasp of the adjustable potential of flexible resources is crucial for the safe and reliable dispatch of the power grid. However, flexible resources are affected by the operating parameters of the entity being adjusted, the user's usage habits, and external environments such as temperature and humidity. Their adjustable capacity is in a continuous dynamic change process, and their adjustable capacity is also constrained by the network topology. Therefore, it is urgent to conduct research on the adjustable capacity prediction method under security constraints for the uncertainty of flexible resources, and improve the ability to accurately perceive flexible resources. In addition, there are many flexible resources and they are widely distributed. In order to make full use of the flexible resources on the demand side and reduce the complexity of regulation calculations, it is necessary to aggregate the flexible resources. In terms of resource aggregation, the flexible resources in northern Hebei currently participate in the North China peak-shaving auxiliary service market, and are aggregated according to the total amount of the region. The network topology of flexible resource access is not considered, and it is impossible to support peak-shaving in restricted sections and equipment overload scenarios.
[0003] For the aggregation of flexible resources, aggregators are usually introduced as the intermediate control layer between users and the power grid. The methods of load aggregation include aggregation based on Monte Carlo method, aggregation based on parameter identification, aggregation based on Markov chain, and aggregation based on Ford Planck theorem. At present, there are many studies on the aggregation of resources of the same type, but few on the aggregation of multiple types of resources. For different types of resources connected to the same location in the distribution network, the interaction of uncertainties between each other is not considered when resources are aggregated. At present, some research has been done at home and abroad on the prediction of the regulation capacity of single load resources, such as the evaluation and analysis of the charging demand and charging and discharging regulation potential of electric vehicles, but there are few studies on the prediction technology of the regulation capacity of the total aggregated resources, and the current research has not considered the impact of network constraints on the regulation capacity. Summary of the invention
[0004] The purpose of the present invention is to overcome the above-mentioned shortcomings, provide a method for evaluating the regulation capacity of adjustable resources of a power grid based on network constraints and a related system, construct a feasible domain of different types of resources, consider section constraints and peak-shaving constraints to correct the feasible domain of individual resources and aggregate them, form the overall regulation capacity of adjustable resources, and provide a basis for adjustable resources to participate in auxiliary decision-making for power grid regulation.
[0005] In order to achieve the above object, the present invention adopts the following technical solution:
[0006] In a first aspect, the present invention provides a method for evaluating the regulation capability of adjustable resources of a power grid based on network constraints, comprising the following steps:
[0007] Obtaining adjustable resource data in the power grid, which includes adjustable load data and energy storage data, as well as adjustable load data and energy storage data under the new energy transmission section, and the online access path of the adjustable load and the online access path of the energy storage data;
[0008] According to the adjustable resource data, construct the operational feasible domain of the single adjustable resource data;
[0009] Calculate section constraints and peak load constraints based on adjustable load data and energy storage data under the renewable energy transmission section;
[0010] According to the section constraint conditions and the peak load constraint conditions, the total adjustable amount of the load data and the energy storage data in the adjustable resource data is calculated;
[0011] According to the total adjustable amount of the load data and the energy storage data in the adjustable resource data, the upper limit value and the lower limit value of each single load data and energy storage data in the adjustable resource data are obtained;
[0012] According to the upward and downward limits of each single load data and energy storage data in the adjustable resource data, the active constraint curve of the operating feasible domain of the single adjustable resource data is corrected to complete the evaluation.
[0013] A further improvement of the present invention is that the data of the adjustable load includes: load power upper limit L up and load power lower limit L dn ;
[0014] Energy storage data includes: charging rate C in , discharge rate C out 、Charging capacity L in , discharge capacity L out and the energy storage self-loss rate k.
[0015] A further improvement of the present invention is that, according to the adjustable resource data, a specific method for constructing an operation feasible domain of the single adjustable resource data is as follows:
[0016] When the adjustable resource data is adjustable load data, the adjustable load data is divided into adjustable characteristic data of preset levels;
[0017] According to the adjustable characteristic data of the preset level, the hourly response is taken as the standard to build the load hourly response model;
[0018] According to the load hourly response model, the constraint curve of the adjustable load data is drawn, and the graph formed by the load active constraint curves at adjacent moments is used as the operating feasible domain of the single adjustable resource data.
[0019] A further improvement of the present invention is that, according to the adjustable resource data, a specific method for constructing an operation feasible domain of the single adjustable resource data is as follows:
[0020] When the adjustable resource data is energy storage data, a constraint curve is constructed based on the energy storage data, and a graph formed by the load active power constraint curves at adjacent moments is used as the operating feasible domain of the single adjustable resource data.
[0021] A further improvement of the present invention is that the section constraint condition includes the total adjustment upper limit P of the section constraint condition. s,adjmax and the total adjustment lower limit of the section constraint condition P s,adjmin , the calculation method is as follows:
[0022] P s,adjmax =P s,tmax +P s,new -P sec -P s,ld
[0023] P s,adjmin =P s,tmin +P s,new -P sec -P s,ld
[0024] Among them, P s,new The theoretical output of new energy in the section, P sec is the section stability margin, P s,ld is the total load prediction value in the section and P s,tmin is the total minimum output of thermal power units in the section, P s,tmax is the total maximum output of thermal power units in the section;
[0025] The peak load constraints include the total upper limit of the peak load constraint P t,adjmax and the total regulation lower limit P of the peak load constraint condition t,adjmin , the calculation method is as follows:
[0026] P t,adjmax =P t,tmax +P t,new -P line -P t,ld
[0027] P t,adjmin =P t,tmin +P t,new -P line -P t,ld
[0028] Among them, P t,new Contribute to the new energy theory of the whole network, P line is the power plan of the network interconnection line, P t,ld is the total load forecast value of the whole network, P t,tmin is the total minimum output of thermal power units in the whole network, P t,tmax is the maximum output, P t,adjmax is the total regulation upper limit under the peak load constraint, P t,adjmin It is the lower limit of total regulation under the peak regulation constraint.
[0029] A further improvement of the present invention is that the step calculates the total adjustable amount of the load data and the energy storage data in the adjustable resource data according to the section constraint condition and the peak load constraint condition. The specific method is as follows:
[0030] Obtain the total regulation upper limit of the renewable energy transmission section and the total regulation upper limit of the entire network resources, and combine the section constraints and peak load constraints to obtain the upward regulation limit of the adjustable load and the upward regulation limit of the energy storage under the renewable energy transmission section;
[0031] According to the total regulation lower limit under the renewable energy transmission section and the total regulation lower limit of the entire network resources, combined with the section constraints and peak-shaving constraints, the downward regulation limit of the adjustable load under the renewable energy transmission section and the downward regulation limit of the regulation amount of energy storage are obtained.
[0032] A further improvement of the present invention is that the step obtains the upper limit and lower limit of each single load data and energy storage data in the adjustable resource data according to the total adjustable amount of the load data and energy storage data in the adjustable resource data. The specific method is as follows:
[0033] By combining the upward and downward limits of the adjustable load under the new energy transmission section and the upward and downward limits of the regulation amount of energy storage, the regulation amount of each single load data and energy storage data in the adjustable resource data is obtained.
[0034] A further improvement of the present invention is that the step is to correct the active constraint curve of the operation feasible domain of the single adjustable resource data according to the upper limit and lower limit of each single load data and energy storage data in the adjustable resource data. The specific method is as follows:
[0035] According to the operational feasible domain of the single adjustable resource data, the actual active power of the adjustable resource within a fixed time is obtained, and the change data of the actual active power is obtained;
[0036] According to the actual active power change data in each single adjustable resource data and the adjustment amount of load data and energy storage data, the operation feasible domain of the single adjustable resource data is corrected.
[0037] In a second aspect, the present invention provides a network constraint-based power grid adjustable resource regulation capability assessment system, comprising:
[0038] A data acquisition module is used to acquire adjustable resource data in the power grid, the adjustable resource data including adjustable load data and energy storage data, as well as adjustable load data and energy storage under the new energy transmission section, and the online access path of the adjustable load and the online access path of the energy storage data;
[0039] A feasible domain construction module is used to construct an operation feasible domain of a single adjustable resource data according to the adjustable resource data;
[0040] The constraint adjustment acquisition module is used to calculate the section constraint conditions and peak load constraint conditions according to the adjustable load data and energy storage data under the new energy transmission section;
[0041] An adjustment amount acquisition module is used to calculate the total adjustable amount of load data and energy storage data in the adjustable resource data according to section constraints and peak load constraints;
[0042] An adjustment range acquisition module is used to obtain the upper adjustment limit and the lower adjustment limit of each single load data and energy storage data in the adjustable resource data according to the total adjustable amount of the load data and energy storage data in each single adjustable resource data;
[0043] The correction module is used to correct the active constraint curve of the operating feasible domain of the single adjustable resource data according to the upper limit and lower limit of each single load data and energy storage data in the adjustable resource data to complete the evaluation.
[0044] A further improvement of the present invention is that the function of the feasible domain building module is realized by the following method:
[0045] When the adjustable resource data is adjustable load data, the adjustable load data is divided into adjustable characteristic data of preset levels;
[0046] According to the adjustable characteristic data of the preset level, the hourly response is taken as the standard to build the load hourly response model;
[0047] According to the load hourly response model, the constraint curve of the adjustable load data is drawn, and the graph enclosed by the load active power constraint curves at adjacent moments is used as the operating feasible domain of the single adjustable resource data; when the adjustable resource data is energy storage data, a constraint curve is constructed based on the energy storage data, and the graph enclosed by the load active power constraint curves at adjacent moments is used as the operating feasible domain of the single adjustable resource data.
[0048] A further improvement of the present invention is that the function of the adjustment amount acquisition module is realized by the following method:
[0049] Obtain the total regulation upper limit of the renewable energy transmission section and the total regulation upper limit of the entire network resources, and combine the section constraints and peak load constraints to obtain the upward regulation limit of the adjustable load and the upward regulation limit of the energy storage under the renewable energy transmission section;
[0050] According to the total regulation lower limit under the renewable energy transmission section and the total regulation lower limit of the entire network resources, combined with the section constraints and peak-shaving constraints, the downward regulation limit of the adjustable load under the renewable energy transmission section and the downward regulation limit of the regulation amount of energy storage are obtained.
[0051] A further improvement of the present invention is that the function of the adjustment range acquisition module is realized by the following method:
[0052] By combining the upward and downward limits of the adjustable load under the new energy transmission section and the upward and downward limits of the regulation amount of energy storage, the regulation amount of each single load data and energy storage data in the adjustable resource data is obtained.
[0053] A further improvement of the present invention is that the function of the correction module is realized by the following method:
[0054] According to the operational feasible domain of the single adjustable resource data, the actual active power of the adjustable resource within a fixed time is obtained, and the change data of the actual active power is obtained;
[0055] According to the actual active power change data in each single adjustable resource data and the adjustment amount of load data and energy storage data, the operation feasible domain of the single adjustable resource data is corrected.
[0056] In a third aspect, the present invention provides an electronic device comprising a memory and a processor, wherein the memory stores a computer program, and wherein the processor implements the steps of a method for evaluating the adjustable resource regulation capability of a power grid based on network constraints when executing the computer program.
[0057] In a fourth aspect, the present invention provides a storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the steps of a method for evaluating the adjustable resource regulation capability of a power grid based on network constraints are implemented.
[0058] Compared with the prior art, the present invention has the following beneficial effects:
[0059] The present invention can more accurately reflect the actual operation of the power grid and improve the accuracy and reliability of the evaluation by considering the adjustable load data and energy storage data under the new energy transmission section, as well as the section constraints and peak-shaving constraints. According to the correction of the upper and lower limits of each single adjustable resource data, the resource allocation can be better optimized, the overall regulation capability of the power grid can be improved, and the stability and safety of the power grid operation can be ensured. The present invention can provide more accurate reference data for power grid regulation and improve the efficiency and effect of power grid regulation by correcting the active constraint curve of the feasible domain of the operation of the single adjustable resource data. The present invention provides a basis for auxiliary decision-making of power grid regulation by forming the total regulation capability of adjustable resources, helps power grid dispatchers make more scientific and reasonable regulation decisions, and improves the level of power grid operation management. In summary, the present invention can effectively improve the overall regulation capability and operation stability of the power grid and provide strong technical support for power grid regulation by comprehensively considering network constraints and peak-shaving constraints, optimizing resource allocation, improving power grid regulation efficiency and new energy consumption capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 is a flow chart of the present invention;
[0061] Figure 2 is a system diagram of the present invention;
[0062] Figure 3 A schematic diagram of a feasible domain for operation in an embodiment;
[0063] Figure 4 A schematic diagram of Minkowski summation in an embodiment;
[0064] Figure 5 This is a system schematic diagram of Example 4. DETAILED DESCRIPTION
[0065] In order to further understand the content of the present invention, the present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the embodiments are only for explaining the present invention and are not intended to limit it.
[0066] Embodiment 1:
[0067] See also Figure 1 , a method for evaluating the regulation capability of adjustable resources of a power grid based on network constraints, comprising the following steps:
[0068] S1, obtain the adjustable resource data in the power grid, the adjustable resource data includes adjustable load data and energy storage data, as well as the adjustable load data and energy storage data under the new energy transmission section and the online access path of the adjustable load and the online access path of the energy storage.
[0069] S2, constructing an operational feasible domain of the single adjustable resource data according to the adjustable resource data.
[0070] S3, calculates section constraints and peak load constraints based on the adjustable load data and energy storage data under the renewable energy transmission section.
[0071] S4, calculating the total adjustable amount of the load data and the energy storage data in the adjustable resource data according to the section constraint conditions and the peak load constraint conditions.
[0072] S5, obtaining the upper limit value and the lower limit value of each single load data and energy storage data in the adjustable resource data according to the total adjustable amount of the load data and the energy storage data in the adjustable resource data.
[0073] S6, according to the upper and lower limits of each single load data and energy storage data in the adjustable resource data, the active constraint curve of the operation feasible domain of the single adjustable resource data is corrected to complete the evaluation.
[0074] Embodiment 2:
[0075] See also Figure 2 , a grid adjustable resource regulation capability evaluation system based on network constraints, including:
[0076] A data acquisition module is used to acquire adjustable resource data in the power grid, the adjustable resource data including adjustable load data and energy storage data, as well as adjustable load data and energy storage data under the new energy transmission section, and the online access path of the adjustable load and the online access path of the energy storage;
[0077] A feasible domain construction module is used to construct an operation feasible domain of a single adjustable resource data according to the adjustable resource data;
[0078] The constraint adjustment acquisition module is used to calculate the section constraint conditions and peak load constraint conditions according to the adjustable load data and energy storage data under the new energy transmission section;
[0079] An adjustment amount acquisition module is used to calculate the total adjustable amount of load data and energy storage data in the adjustable resource data according to section constraints and peak load constraints;
[0080] An adjustment range acquisition module is used to obtain the upper adjustment limit and the lower adjustment limit of each single load data and energy storage data in the adjustable resource data according to the total adjustable amount of the load data and energy storage data in each single adjustable resource data;
[0081] The correction module is used to correct the active constraint curve of the operating feasible domain of the single adjustable resource data according to the upper limit and lower limit of each single load data and energy storage data in the adjustable resource data to complete the evaluation.
[0082] Embodiment 3:
[0083] The method for evaluating the regulating capacity of adjustable resources of a power grid based on network constraints comprises the following steps:
[0084] Step 1: Obtain the adjustable resource data in the power grid, which includes the load power upper limit L of the adjustable load. up , Load power lower limit data L dn . The charging rate of energy storage C in , discharge rate C out 、Charging capacity L in , discharge capacity L out , energy storage self-loss rate k. Obtain the adjustable load and energy storage under each new energy transmission section, and obtain the access path of the adjustable load and energy storage.
[0085] Step 2: construct an operational feasible domain of the single adjustable resource data according to the adjustable resource data;
[0086] 1) Adjustable load data: obtain the seven-level adjustable characteristic data of the adjustable load (the seven-level adjustable characteristic data is the standard format data specified in the State Grid enterprise standard), including the total amount of upward adjustment, the total amount of downward adjustment, the response time, the first-level upward adjustment amount of the response, the first-level upward adjustment duration of the response, the first-level downward adjustment amount of the response, the first-level downward adjustment amount of the response, ..., the seventh-level upward adjustment amount of the response, the seventh-level upward adjustment duration of the response, the seventh-level downward adjustment amount of the response, and the seventh-level downward adjustment amount of the response.
[0087] The fifth level of response is the hourly response. Taking the hourly response as the standard, if the system can obtain the data of the fifth level of adjustable load response, the feasible domain of the hourly adjustable load operation is constructed according to the data; if the system can obtain the data of the fifth level of adjustable load response, but can obtain the data of other levels, the regulation capacity data of similar levels are approximated as the hourly regulation capacity data; if the seventh level of response data cannot be obtained, the load parameters are identified by analyzing the historical load power data to obtain the load hourly response model, as shown below:
[0088] Load hour level regulation capability
[0089] Load hour level regulation capability
[0090] Where T is the period of historical load power, t and t+1 are any time points with a difference of 1 hour, P t is the load power at time t.
[0091] Method for constructing the operational feasible domain: draw the constraint curves of the hourly upward adjustment capability, downward adjustment capability, load power upper limit, and load power lower limit of the adjustable load. The figure enclosed by the load active power constraint curves at time t and t+1 is the feasible domain.
[0092] With the load power at time t+1 as the y-axis and the load power at time t as the x-axis, the curve expression is as follows:
[0093] Upper adjustment constraint y≤x+C up
[0094] Lower adjustment constraint y ≥ xC dn
[0095] Power constraint x≥L at time t dn , x≤L up
[0096] Power constraint y≥L at time t+1 dn , y≤L up
[0097] The schematic diagram of the feasible domain is as follows: Figure 3 shown.
[0098] 2) Energy storage data: Based on the charging rate C of energy storage in , discharge rate C out 、Charging capacity L in , discharge capacity L out , and the energy storage self-loss rate k data are used to construct the constraint curve. The figure enclosed by the load active power constraint curves at the two times t and t+1 is the feasible domain.
[0099] With the energy storage charging and discharging power at time t+1 as the y-axis and the energy storage charging and discharging power at time t as the x-axis, the curve expression is as follows:
[0100] Charging constraint y≤kx+C in
[0101] Discharge constraint y ≥ kx-C out
[0102] Power constraint x≥L at time t out , x≤L in
[0103] Power constraint y≥L at time t+1 out , y≤L in
[0104] The construction method of two-dimensional feasible region is the same as that of adjustable load.
[0105] Step 3: Calculate section constraints and peak load constraints based on the adjustable load data and energy storage data under the renewable energy transmission section;
[0106] 1) According to the constraints of the new energy transmission section, according to the theoretical output P of the new energy in the section s,new , Section stability margin P sec , predicted value of total load in section P s,ld And the total minimum output P of the thermal power units in the section s,tmin , Maximum output P s,tmax , calculate the total upper limit P of the adjustable resources (adjustable load + energy storage) in the section under the section constraints s,adjmax And the total adjustment lower limit P s,adjmin .
[0107] P s,adjmax =P s,tmax +P s,new -P sec -P s,ld
[0108] P s,adjmin =P s,tmin +P s,new -P sec -P s,ld
[0109] 2) According to the peak load constraints, based on the theoretical output of new energy in the whole network P t,new , Inter-network interconnection line power plan P line , the total load forecast value of the whole network P t,ld And the total minimum output P of the thermal power units in the whole network t,tmin , Maximum output P t,tmax , calculate the total regulation upper limit P of the adjustable resources (load + energy storage) of the entire network under the peak regulation constraint t,adjmax And the total adjustment lower limit P t,adjmin .
[0110] P t,adjmax =P t,tmax +P t,new -P line -P t,ld
[0111] P t,adjmin =P t,tmin +P t,new -P line -P t,ld
[0112] Step 4: According to the section constraint conditions and the peak load constraint conditions, the load data and the energy storage data in the adjustable resource data of each unit are obtained;
[0113] The goal is to maximize the grid operation margin (the sum of the load rates of all branches in the network is the lowest), and the constraints are network constraints, power supply regulation capabilities, upper and lower limits of single adjustable load regulation, and energy storage charging and discharging limits. s,adjmax , the total adjustment limit of the whole network resources P t,adjmax To solve the equality constraints, the adjustable load and energy storage of each monomer are solved.
[0114] The sum of branch load factors
[0115] Where n line Indicates the number of power grid branches, I i and T i represents the current and thermal limits of branch i.
[0116]
[0117] U i is the voltage amplitude of the bus; is the lower limit of the bus voltage amplitude; The upper limit of the bus voltage amplitude.
[0118] Power Regulation Constraints
[0119] P g0 is the initial active power of the generator, ΔP g is the generator active power adjustment, is the lower limit of the generator active power, It is the upper limit of the active output of the generator.
[0120] Single adjustable load restraint L dn,i ≤P ld,i +ΔP i ≤L up,i
[0121] Energy storage charge and discharge constraint L out,i ≤P cn,i +ΔP i ≤L in,i
[0122] Constraints on total resource adjustment under the section
[0123] I sec is all adjustable resources under the section, ΔP i The adjustment amount for adjustable resources.
[0124] Constraints on the total amount of network resources adjusted
[0125] I all For all adjustable resources in the entire network, ΔPi The adjustment amount for adjustable resources.
[0126] Step 5: according to the total adjustable amount of the load data and the energy storage data in the adjustable resource data, obtain the upper limit value and the lower limit value of each single load data and energy storage data in the adjustable resource data;
[0127] The obtained adjustable load and energy storage adjustment amount ΔP of each monomer i Serves as an upper limit for adjustable loads and energy storage.
[0128] The lower limit of total resource regulation under the section P s,adjmin , the lower limit of the total adjustment of the whole network resources P t,adjmin To solve the equality constraints, the adjustable load and energy storage of each monomer are solved.
[0129] The obtained adjustable load and energy storage adjustment amount ΔP of each monomer i Serves as a lower limit for adjustable loads and energy storage.
[0130] Step six, according to the upper and lower limits of each individual load data and energy storage data in the adjustable resource data, the active constraint curve of the operating feasible domain of the individual adjustable resource data is corrected to complete the evaluation.
[0131] The upper and lower limits of the adjustable load and energy storage are calculated, and the active constraint curve of the constructed single load feasible domain is corrected, and the single flexibility resource feasible domain is updated.
[0132] According to the access path of adjustable resources, the adjustable resources contained in each power grid partition are determined. Based on the Minkowski summation method of the two-dimensional space feasible domain, the operation feasible domain of each power grid partition is solved.
[0133] See also Figure 4 , two adjustable resources 1 and 2 with power time coupling characteristics in two time periods (k, k+1), the feasible domain after aggregation can be expressed as the union of the area swept by the vertex of set 2 along the envelope of set 1 and set 1 itself, recorded as
[0134] The actual active power of adjustable resources is read every hour, and the flexible resources are evaluated after adjustment. According to the actual power change data, the seven-level response data of the adjustable load and the energy storage charging and discharging capacity data are corrected, and the flexible resource feasible domain is rebuilt with the updated parameters, and the above steps are repeated.
[0135] The present invention realizes a unified expression of the regulation capability and regulation rate of various types of adjustable resources by constructing a two-dimensional space feasible domain for the operation of monomer adjustable resources. The feasible domain of monomer resources is aggregated based on the Minkowski summation method to realize the regulation capability evaluation considering the interaction of different types of resources.
[0136] Embodiment 4:
[0137] See also Figure 5 As shown, the present invention also provides an electronic device 100 for a method for evaluating the adjustable resource regulation capability of a power grid based on network constraints; the electronic device 100 includes a memory 101, at least one processor 102, a computer program 103 stored in the memory 101 and executable on the at least one processor 102, and at least one communication bus 104.
[0138] The memory 101 can be used to store the computer program 103, and the processor 102 implements the steps of the method for evaluating the adjustable resource adjustment capability of the power grid based on network constraints described in Example 1 by running or executing the computer program stored in the memory 101 and calling the data stored in the memory 101. The memory 101 can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data (such as audio data) created according to the use of the electronic device 100, etc. In addition, the memory 101 can include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.
[0139] The at least one processor 102 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The processor 102 may be a microprocessor or any conventional processor, etc. The processor 102 is the control center of the electronic device 100, and uses various interfaces and lines to connect various parts of the entire electronic device 100.
[0140] The memory 101 in the electronic device 100 stores a plurality of instructions to implement a method for evaluating the adjustable resource adjustment capability of a power grid based on network constraints, and the processor 102 may execute the plurality of instructions to implement:
[0141] Obtaining adjustable resource data in the power grid, the adjustable resource data including adjustable load data and energy storage data, as well as adjustable load data and energy storage data under the new energy transmission section, and the online access path of the adjustable load data and the online access path of the energy storage data;
[0142] According to the adjustable resource data, construct the operational feasible domain of the single adjustable resource data;
[0143] According to the adjustable load data and energy storage data under the new energy transmission section, obtain the section constraint conditions and peak load constraint conditions;
[0144] According to the section constraint conditions and the peak load constraint conditions, the load data and the energy storage data in the adjustable resource data of each unit are obtained;
[0145] According to the adjustment amount of the load data and the energy storage data in each single-cell adjustable resource data, the upper adjustment limit value and the lower adjustment limit value of the load data and the energy storage data in each single-cell adjustable resource data are obtained;
[0146] According to the upward and downward limits of the load data and energy storage data in each single adjustable resource data, the active constraint curve of the operating feasible domain of the single adjustable resource data is corrected to complete the evaluation.
[0147] Embodiment 5:
[0148] If the module / unit integrated in the electronic device 100 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the process in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device that can carry the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory and read-only memory (ROM, Read-Only Memory).
[0149] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0150] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0151] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0152] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0153] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for evaluating the adjustable resource regulation capability of a power grid based on network constraints, characterized in that: The following steps are involved: Obtaining adjustable resource data in the power grid, including adjustable load data and energy storage data, as well as adjustable load data and energy storage data under the new energy transmission section, and the online access path of the adjustable load and the online access path of the energy storage; According to the adjustable resource data, construct the operational feasible domain of the single adjustable resource data; Calculate section constraints and peak load constraints based on adjustable load data and energy storage data under the renewable energy transmission section; According to the section constraint conditions and the peak load constraint conditions, the total adjustable amount of the load data and the energy storage data in the adjustable resource data is calculated; According to the total adjustable amount of the load data and the energy storage data in the adjustable resource data, the upper limit value and the lower limit value of each single load data and energy storage data in the adjustable resource data are obtained; According to the upward and downward limits of each single load data and energy storage data in the adjustable resource data, the active constraint curve of the operating feasible domain of the single adjustable resource data is corrected to complete the evaluation.
2. The method for evaluating the adjustable resource regulation capability of a power grid based on network constraints according to claim 1, characterized in that: Adjustable load data include: load power upper limit L up and load power lower limit L dn ; Energy storage data includes: charging rate C in , discharge rate C out 、Charging capacity L in , discharge capacity L out and the energy storage self-loss rate k.
3. The method for evaluating the adjustable resource regulation capability of a power grid based on network constraints according to claim 1, characterized in that: According to the adjustable resource data, the specific method of constructing the operational feasible domain of the single adjustable resource data is as follows: When the adjustable resource data is adjustable load data, the adjustable load data is divided into adjustable characteristic data of preset levels; According to the adjustable characteristic data of the preset level, the hourly response is taken as the standard to build the load hourly response model; According to the load hourly response model, the constraint curve of the adjustable load data is drawn, and the graph formed by the load active constraint curves at adjacent moments is used as the operating feasible domain of the single adjustable resource data.
4. The method for evaluating the adjustable resource regulation capability of a power grid based on network constraints according to claim 1, characterized in that: According to the adjustable resource data, the specific method of constructing the operational feasible domain of the single adjustable resource data is as follows: When the adjustable resource data is energy storage data, a constraint curve is constructed based on the energy storage data, and a graph formed by the load active power constraint curves at adjacent moments is used as the operating feasible domain of the single adjustable resource data.
5. The method for evaluating the adjustable resource regulation capability of a power grid based on network constraints according to claim 1, characterized in that: Section constraints include the total adjustment upper limit P of section constraints s,adjmax and the total adjustment lower limit of the section constraint condition P s,adjmin , the calculation method is as follows: P s,adjmax =P s,tmax +P s,new -P sec -P s,ld P s,adjmin =P s,tmin +P s,new -P sec -P s,ld Among them, P s,new The theoretical output of new energy in the section, P sec is the section stability margin, P s,ld is the total load prediction value in the section and P s,tmin is the total minimum output of thermal power units in the section, P s,tmax is the total maximum output of thermal power units in the section; The peak load constraints include the total upper limit of the peak load constraint P t,adjmax and the total regulation lower limit P of the peak load constraint condition t,adjmin , the calculation method is as follows: P t,adjmax =P t,tmax +P t,new -P line -P t,ld P t,adjmin =P t,tmin +P t,new -P line -P t,ld Among them, P t,new Contribute to the new energy theory of the whole network, P line is the power plan of the network interconnection line, P t,ld is the total load forecast value of the whole network, P t,tmin is the total minimum output of thermal power units in the whole network, P t,tmax is the maximum output, P t,adjmax is the total regulation upper limit under the peak load constraint, P t,adjmin It is the lower limit of total regulation under the peak regulation constraint.
6. The method for evaluating the adjustable resource regulation capability of a power grid based on network constraints according to claim 1, characterized in that: Step 1: Calculate the total adjustable amount of load data and energy storage data in the adjustable resource data according to the section constraint condition and the peak load constraint condition. The specific method is as follows: Obtain the total regulation upper limit of the renewable energy transmission section and the total regulation upper limit of the entire network resources, and combine the section constraints and peak load constraints to obtain the upward regulation limit of the adjustable load and the upward regulation limit of the energy storage under the renewable energy transmission section; According to the total regulation lower limit under the renewable energy transmission section and the total regulation lower limit of the entire network resources, combined with the section constraints and peak-shaving constraints, the downward regulation limit of the adjustable load under the renewable energy transmission section and the downward regulation limit of the regulation amount of energy storage are obtained.
7. The method for evaluating the adjustable resource regulation capability of a power grid based on network constraints according to claim 6, characterized in that: According to the total adjustable amount of the load data and the energy storage data in the adjustable resource data, the upper limit value and the lower limit value of each single load data and energy storage data in the adjustable resource data are obtained. The specific method is as follows: By combining the upward and downward limits of the adjustable load under the new energy transmission section and the upward and downward limits of the regulation amount of energy storage, the regulation amount of each single load data and energy storage data in the adjustable resource data is obtained.
8. The method for evaluating the adjustable resource regulation capability of a power grid based on network constraints according to claim 1, characterized in that: The steps are as follows: According to the upper and lower limits of each single load data and energy storage data in the adjustable resource data, the active constraint curve of the operation feasible domain of the single adjustable resource data is corrected. The specific method is as follows: According to the operational feasible domain of the single adjustable resource data, the actual active power of the adjustable resource within a fixed time is obtained, and the change data of the actual active power is obtained; According to the actual active power change data in each single adjustable resource data and the adjustment amount of load data and energy storage data, the operation feasible domain of the single adjustable resource data is corrected.
9. A network-constrained grid adjustable resource regulation capability assessment system, characterized in that: include: A data acquisition module is used to acquire adjustable resource data in the power grid, the adjustable resource data including adjustable load data and energy storage data, as well as adjustable load data and energy storage data under the new energy transmission section, and the online access path of the adjustable load and the online access path of the energy storage; A feasible domain construction module is used to construct an operation feasible domain of a single adjustable resource data according to the adjustable resource data; The constraint adjustment acquisition module is used to calculate the section constraint conditions and peak load constraint conditions according to the adjustable load data and energy storage data under the new energy transmission section; An adjustment amount acquisition module is used to calculate the total adjustable amount of load data and energy storage data in the adjustable resource data according to section constraints and peak load constraints; An adjustment range acquisition module is used to obtain the upper adjustment limit and the lower adjustment limit of each single load data and energy storage data in the adjustable resource data according to the total adjustable amount of the load data and energy storage data in each single adjustable resource data; The correction module is used to correct the active constraint curve of the operating feasible domain of the single adjustable resource data according to the upper limit and lower limit of each single load data and energy storage data in the adjustable resource data to complete the evaluation.
10. The network constraint-based power grid adjustable resource adjustment capability evaluation system according to claim 9, characterized in that: The functionality of the feasible domain building module is implemented in the following ways: When the adjustable resource data is adjustable load data, the adjustable load data is divided into adjustable characteristic data of preset levels; According to the adjustable characteristic data of the preset level, the hourly response is taken as the standard to build the load hourly response model; According to the load hourly response model, the constraint curve of the adjustable load data is drawn, and the graph enclosed by the load active power constraint curves at adjacent moments is used as the operating feasible domain of the single adjustable resource data; when the adjustable resource data is energy storage data, a constraint curve is constructed based on the energy storage data, and the graph enclosed by the load active power constraint curves at adjacent moments is used as the operating feasible domain of the single adjustable resource data.
11. The network constraint-based power grid adjustable resource adjustment capability evaluation system according to claim 9, characterized in that: The function of the adjustment amount acquisition module is realized by the following method: Obtain the total regulation upper limit of the renewable energy transmission section and the total regulation upper limit of the entire network resources, and combine the section constraints and peak load constraints to obtain the upward regulation limit of the adjustable load and the upward regulation limit of the energy storage under the renewable energy transmission section; According to the total regulation lower limit under the renewable energy transmission section and the total regulation lower limit of the entire network resources, combined with the section constraints and peak-shaving constraints, the downward regulation limit of the adjustable load under the renewable energy transmission section and the downward regulation limit of the regulation amount of energy storage are obtained.
12. The network constraint-based power grid adjustable resource adjustment capability evaluation system according to claim 11, characterized in that: The function of the adjustment range acquisition module is realized by the following method: By combining the upward and downward limits of the adjustable load under the new energy transmission section and the upward and downward limits of the regulation amount of energy storage, the regulation amount of each single load data and energy storage data in the adjustable resource data is obtained.
13. The network constraint-based power grid adjustable resource adjustment capability evaluation system according to claim 12, characterized in that: The functions of the correction module are implemented as follows: According to the operational feasible domain of the single adjustable resource data, the actual active power of the adjustable resource within a fixed time is obtained, and the change data of the actual active power is obtained; According to the actual active power change data in each single adjustable resource data and the adjustment amount of load data and energy storage data, the operation feasible domain of the single adjustable resource data is corrected.
14. An electronic device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method for evaluating the adjustable resource regulation capability of a power grid based on network constraints as claimed in any one of claims 1 to 8 are implemented.
15. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method for evaluating the adjustable resource regulation capability of a power grid based on network constraints according to any one of claims 1 to 8 are implemented.
Citation Information
Patent Citations
New energy consumption method and system considering peak regulation and cross section double constraints
CN110119995A
Power resource aggregation method based on adjustment willingness of users capable of reducing load
CN117791617A
Distributed resource transmittable adjustment capability evaluation method considering network constraints of transformer area power distribution network
CN118367562A
Distributed energy storage scheduling method and apparatus
WO2020118734A1