Reservice offshore wind power blade recycling artificial fish reef and construction method
Through water bath cutting and concrete assembly technology, the retired offshore wind power blades are processed into artificial fish reefs, solving the problem of low recycling rate of retired blades, achieving efficient and economical resource utilization, and improving the stability and value of the fish reefs.
Patent Information
- Application Number
- CN202411093542.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-12
AI Technical Summary
The recycling technology of retired offshore wind power blades is complex, has high cost, and has low recycling rate. It lacks mature commercialization models and insufficient large-scale recycling and recycling capabilities.
The decommissioned offshore wind blades are processed into components of different shapes by using water bath cutting and opening technology, and assembled with precast concrete components to form cylindrical, circular arch, triangular and deflector-type artificial fish reefs, which are made of acrylic resin and polyurethane. Surface closure treatment of resin and epoxy resin improves the stability and durability of the material.
It improves the reuse rate of retired fan blades, reduces the manufacturing cost of artificial reefs, fully utilizes the potential value of the blades, reduces resource waste, and improves the stability and durability of the reefs.
Smart Images

Figure CN118923600A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of recycling and reusing retired offshore wind turbine blades, and in particular to an artificial fish reef and a construction method for recycling retired offshore wind turbine blades. Background Art
[0002] Although my country's wind power industry started relatively late, due to the large market size and rapid development in recent years, wind farm construction has developed rapidly along the coast of my country. The design life of wind turbines is about 20-25 years, and a large number of wind turbines in my country will face replacement. At present, there are three technical routes for decommissioning: one is to dismantle and replace them completely; the second is technical transformation of the unit and system upgrade; the third is wind turbine decommissioning, in which a large number of retired wind turbine blades will be generated. Since the chemical process of the materials used to make wind turbine blades cannot be reversed, once they are solidified and formed, they cannot return to the original material matrix properties, and they cannot be degraded without new process treatment. The parts of wind turbines that have recycling value include towers, bases, nacelles, and blades, among which 85-90% of scrapped materials have mature recycling systems, but wind turbine blades, as typical organic-inorganic composite materials, have high environmental protection requirements and poor economic efficiency. Their recycling model and technology are still in the initial stage. The treatment of retired blades will form a sustainable and stable after-sales service market and become the last link in the green and low-carbon circular development of the wind power industry chain.
[0003] Therefore, an artificial fish reef and a construction method for recycling retired offshore wind turbine blades are provided. Summary of the invention
[0005] The purpose of the present invention is to overcome the existing defects and provide an artificial fish reef and construction method for recycling retired offshore wind turbine blades, which is used to solve the problems faced by my country's current wind turbine blade recycling industry, such as complex technical processes, high costs, low recycling rates, lack of mature commercial models, and serious lack of large-scale recycling and reuse capabilities.
[0006] The technical solution to achieve the above purpose is:
[0007] One of the present invention is an artificial fish reef for recycling retired offshore wind turbine blades, including: cylindrical resource conservation type artificial fish reefs, arched resource conservation type artificial fish reefs, triangular environment improvement type artificial fish reefs and guide plate environment improvement type artificial fish reefs;
[0008] The cylindrical resource conservation artificial fish reef is made of two sections of first retired offshore wind turbine blade artificial fish reef components;
[0009] The arch-shaped resource conservation artificial fish reef is manufactured by assembling a second retired offshore wind turbine blade artificial fish reef component and a second precast concrete component according to the size parameters of the proposed artificial fish reef;
[0010] The triangular environment-improving artificial fish reef is manufactured by assembling a third retired offshore wind turbine blade artificial fish reef component and a third precast concrete component according to the size parameters of the proposed artificial fish reef;
[0011] The guide plate environment improvement type artificial fish reef is manufactured by assembling a fourth retired offshore wind turbine blade artificial fish reef component and a fourth precast concrete component according to the size parameters of the proposed artificial fish reef.
[0012] Preferably, the first artificial fish reef component of the retired offshore wind turbine blade is obtained by cutting and drilling holes in the cylindrical area of the retired offshore wind turbine blade using a water bath cutting and drilling method.
[0013] Preferably, the second artificial fish reef component of the retired offshore wind turbine blade is obtained by cutting and drilling holes in the semicircular area of the retired offshore wind turbine blade using a water bath cutting and drilling method;
[0014] The second precast concrete component is cast using steel bars, sulphoaluminate cement, sea sand, seawater cut through holes in a water bath, and a casting template made according to the size parameters of the precast concrete component of the arch-shaped artificial fish reef to be made;
[0015] Among them, the casting template is obtained by crushing, grinding and re-molding the residual materials produced by cutting or retired offshore wind turbine blades with excessive curvature. The seawater after water bath cutting and opening the holes needs to be precipitated and filtered before being used for the casting of the second precast concrete component.
[0016] Preferably, the third artificial fish reef component of the retired offshore wind turbine blade is obtained by cutting and drilling holes in the small curvature area of the retired offshore wind turbine blade using a water bath cutting and drilling method;
[0017] The third precast concrete component is cast using steel bars, sulphoaluminate cement, sea sand, seawater cut and opened in a water bath, and a casting template made according to the size parameters of the triangular artificial fish reef precast concrete component to be made;
[0018] Among them, the casting template is obtained by crushing, grinding and re-molding the residual materials produced by cutting or retired offshore wind turbine blades with excessive curvature. The seawater after water bath cutting and opening the holes needs to be precipitated and filtered before being used for the casting of the third precast concrete component.
[0019] Preferably, the fourth artificial fish reef component of the retired offshore wind turbine blade is obtained by cutting and drilling holes in the small curvature area of the retired offshore wind turbine blade using a water bath cutting and drilling method;
[0020] The fourth precast concrete component is cast using steel bars, sulphoaluminate cement, sea sand, seawater cut and opened in a water bath, and a casting template made according to the size parameters of the precast concrete component of the guide plate type artificial fish reef to be made;
[0021] Among them, the casting template is obtained by crushing, grinding and re-molding the waste materials produced by cutting or retired offshore wind turbine blades with excessive curvature. The seawater after water bath cutting and opening the holes needs to be precipitated and filtered before being used for the casting of the fourth precast concrete component.
[0022] A second method of the present invention is a method for recycling retired offshore wind turbine blades to construct artificial fish reefs, comprising:
[0023] Step S1, removing the embedded bolts at the root of the retired wind turbine blades;
[0024] Step S2, placing the retired wind turbine blades in a water bath cutting and hole-making device filled with seawater, cutting and hole-making the blades in water according to the optimal cutting path, and obtaining artificial fish reef components of retired offshore wind turbine blades;
[0025] Step S3, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them;
[0026] Step S4, according to the size parameters of the artificial fish reef precast concrete components to be made, the plates and components made by water bath cutting and molding are made into concrete casting templates, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and concrete casting templates are used for casting to obtain precast concrete components;
[0027] Step S5, performing surface sealing treatment on the artificial reef components and precast concrete components of the retired offshore wind turbine blades by using acrylic resin, polyurethane resin and epoxy resin coatings by a dipping method, and then performing surface treatment by a concrete spraying method;
[0028] Step S6, finally assembling the artificial fish reef components of the retired offshore wind turbine blades and the precast concrete components according to the size parameters of the proposed artificial fish reef to complete the production of the artificial fish reef.
[0029] Preferably, the method for constructing a cylindrical resource conservation artificial reef comprises:
[0030] Step S11, removing the embedded bolts at the root of the retired wind turbine blades;
[0031] Step S12, placing the retired wind turbine blade in a water bath cutting and hole-making device filled with seawater, cutting the cylindrical area of the blade into two sections with a height of 3.85 m according to the optimal cutting path and making holes therein, to obtain the first retired offshore wind turbine blade artificial fish reef component;
[0032] Step S13, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them;
[0033] Step S14, performing surface sealing treatment on the first retired offshore wind turbine blade artificial fish reef component by using acrylic resin, polyurethane resin and epoxy resin coating by dip coating, and then performing surface treatment by using concrete spraying method;
[0034] Step S15, finally assembling the two sections of the first retired offshore wind turbine blade artificial fish reef components according to the size parameters of the proposed cylindrical artificial fish reef, to complete the production of the cylindrical resource conservation type artificial fish reef.
[0035] Preferably, the method for constructing a dome-shaped resource conservation artificial reef comprises:
[0036] Step S21, removing the embedded bolts at the root of the retired wind turbine blades;
[0037] Step S22, placing the retired wind turbine blade in a water bath cutting and opening device filled with seawater, cutting the semicircular area of the blade into a circular arch with a length of 6m, a width of 6m, and a height of 3m and opening a hole according to the optimal cutting path, to obtain a second retired offshore wind turbine blade artificial fish reef component;
[0038] Step S23, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them;
[0039] Step S24, according to the size parameters of the arch-shaped artificial fish reef precast concrete component to be manufactured, the plate and the component made by water bath cutting and molding are used to make a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain a second precast concrete component;
[0040] Step S25, performing surface sealing treatment on the second retired offshore wind turbine blade artificial fish reef component and the second precast concrete component by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by using concrete spraying method;
[0041] Step S26, finally assembling the second retired offshore wind turbine blade artificial fish reef component and the second precast concrete component according to the size parameters of the proposed arch-shaped artificial fish reef, to complete the production of the arch-shaped resource conservation artificial fish reef.
[0042] Preferably, the method for constructing a triangular environment-improving artificial reef comprises:
[0043] Step S31, removing the embedded bolts at the root of the retired wind turbine blades;
[0044] Step S32, placing the retired wind turbine blade in a water bath cutting and drilling device filled with seawater, and making a plate 2 with a length of 4m and a width of 2.7m for the blade small curvature area according to the optimal cutting path and drilling holes to obtain a third retired offshore wind turbine blade artificial fish reef component;
[0045] Step S33, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them;
[0046] Step S34, according to the size parameters of the triangular artificial fish reef precast concrete component to be manufactured, the plates and components made by water bath cutting and molding are used to make a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain a third precast concrete component;
[0047] Step S35, performing surface sealing treatment on the third retired offshore wind turbine blade artificial fish reef component and the third precast concrete component by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by using concrete spraying method;
[0048] Step S36, finally assembling the third retired offshore wind turbine blade artificial fish reef component and the third precast concrete component according to the size parameters of the planned triangular artificial fish reef, to complete the production of the triangular environment improvement artificial fish reef.
[0049] Preferably, the method for constructing an artificial reef with improved guide plate environment comprises:
[0050] Step S41, removing the embedded bolts at the root of the retired wind turbine blades;
[0051] Step S42, placing the retired wind turbine blade in a water bath cutting and opening device filled with seawater, and making a plate with a length of 3m and a width of 0.5m for the blade small curvature area according to the optimal cutting path, to obtain a fourth retired offshore wind turbine blade artificial fish reef component;
[0052] Step S43, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them;
[0053] Step S44, according to the size parameters of the precast concrete component of the guide plate type artificial fish reef to be manufactured, the plate and the component made by water bath cutting and molding are made into a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain a fourth precast concrete component;
[0054] Step S45, performing surface sealing treatment on the fourth retired offshore wind turbine blade artificial fish reef component and the fourth precast concrete component by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by using concrete spraying method;
[0055] Step S46, finally assembling the fourth retired offshore wind turbine blade artificial fish reef component and the fourth precast concrete component according to the size parameters of the proposed guide plate type artificial fish reef, to complete the production of the guide plate environment improvement type artificial fish reef.
[0056] The beneficial effects of the present invention are:
[0057] 1) The present invention improves the reuse rate of retired fan blades and processes retired fan blades into artificial fish reefs, which not only provides a new blade reuse method, but also improves the use value of the blades and reduces the waste of resources;
[0058] 2) The manufacturing cost of artificial fish reefs is reduced. The main body of the fish reef in the present invention is made of concrete, and the retired blades are processed into plates to serve as parts. This design method can not only reduce the manufacturing cost of artificial fish reefs, but also improve the stability and durability of the fish reefs;
[0059] 3) The potential value of the blades is fully utilized. The retired blades are processed into plates and used as parts for artificial reefs. The material properties and structural characteristics of the blades are fully utilized to increase the value of the retired blades. Compared with the existing technology, this technical solution can better utilize the potential value of the blades. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 It is a schematic diagram of the structure of a cylindrical resource conservation artificial fish reef in the present invention;
[0061] Figure 2 It is a structural schematic diagram of the dome-shaped resource conservation artificial fish reef in the present invention;
[0062] Figure 3 This is a schematic diagram of the structure of a triangular environment-improving artificial fish reef in the present invention;
[0063] Figure 4 It is a schematic diagram of the structure of the guide plate environment improvement type artificial fish reef in the present invention;
[0064] Figure 5 It is a schematic diagram of the partitioning of retired blades in the present invention;
[0065] Figure 6 It is a flow chart of a method for recycling retired offshore wind turbine blades to build artificial fish reefs according to the present invention;
[0066] Figure 7It is a flow chart of the method for constructing a cylindrical resource conservation type artificial fish reef in the present invention;
[0067] Figure 8 It is a flow chart of the method for constructing a dome-shaped resource conservation artificial fish reef in the present invention;
[0068] Fig. 9 It is a flow chart of the method for constructing a triangular environment-improving artificial fish reef in the present invention;
[0069] Fig.10 It is a flow chart of the method for constructing an artificial fish reef with improved guide plate environment in the present invention.
[0070] In the figure: 1. Cylindrical resource conservation artificial reef; 2. Arched resource conservation artificial reef; 3. Triangular environment improvement artificial reef; 4. Guide plate environment improvement artificial reef; 11. First retired offshore wind turbine blade artificial reef component; 21. Second retired offshore wind turbine blade artificial reef component; 22. Second precast concrete component; 31. Third retired offshore wind turbine blade artificial reef component; 32. Third precast concrete component; 41. Fourth retired offshore wind turbine blade artificial reef component; 42. Fourth precast concrete component. DETAILED DESCRIPTION
[0071] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0072] The present invention will be further described below in conjunction with the accompanying drawings.
[0073] like Figure 1-4 As shown, an artificial fish reef for recycling retired offshore wind turbine blades includes: a cylindrical resource conservation type artificial fish reef 1, an arched resource conservation type artificial fish reef 2, a triangular environment improvement type artificial fish reef 3 and a guide plate environment improvement type artificial fish reef 4.
[0074] like Figure 1 As shown, the cylindrical resource conservation type artificial fish reef 1 is made of two sections of first retired offshore wind turbine blade artificial fish reef components 11.
[0075] In the embodiment, the first artificial fish reef component 11 of the retired offshore wind turbine blade is obtained by cutting and drilling holes in the cylindrical area of the retired offshore wind turbine blade using a water bath cutting and drilling method.
[0076] like Figure 2 As shown, the arch-shaped resource conservation artificial fish reef 2 is manufactured by assembling a second retired offshore wind turbine blade artificial fish reef component 21 and a second precast concrete component 22 according to the size parameters of the proposed artificial fish reef.
[0077] In the embodiment, the second retired offshore wind turbine blade artificial fish reef component 21 is obtained by cutting and drilling holes in the semicircular area of the retired offshore wind turbine blade using a water bath cutting and drilling method;
[0078] The second precast concrete component 22 is cast using steel bars, sulphoaluminate cement, sea sand, seawater cut and opened in a water bath, and a casting template made according to the size parameters of the precast concrete component of the arch-shaped artificial fish reef to be made;
[0079] The casting template is obtained by crushing, grinding and re-molding the residual materials produced by cutting or retired offshore wind turbine blades with excessive curvature. The seawater after water bath cutting and opening the holes needs to be precipitated and filtered before being used for casting the second precast concrete component 22.
[0080] like Figure 3 As shown, the triangular environment improvement artificial fish reef 3 is manufactured by assembling a third retired offshore wind turbine blade artificial fish reef component 31 and a third precast concrete component 32 according to the size parameters of the proposed artificial fish reef.
[0081] In the embodiment, the third retired offshore wind turbine blade artificial fish reef component 31 is obtained by cutting and drilling holes in the small curvature area of the retired offshore wind turbine blade using a water bath cutting and drilling method;
[0082] The third precast concrete component 32 is cast using steel bars, sulphoaluminate cement, sea sand, seawater cut and opened by water bath, and a casting template made according to the size parameters of the triangular artificial fish reef precast concrete component to be made;
[0083] The casting template is obtained by crushing, grinding and re-molding the waste produced by cutting or retired offshore wind turbine blades with excessive curvature. The seawater after water bath cutting and opening the holes needs to be precipitated and filtered before being used for casting the third precast concrete component 32.
[0084] like Figure 4 As shown, the guide plate environment improvement type artificial fish reef 4 is manufactured by assembling a fourth retired offshore wind turbine blade artificial fish reef component 41 and a fourth precast concrete component 42 according to the size parameters of the proposed artificial fish reef.
[0085] In the embodiment, the fourth retired offshore wind turbine blade artificial fish reef component 41 is obtained by cutting and drilling holes in the small curvature area of the retired offshore wind turbine blade using a water bath cutting and drilling method;
[0086] The fourth precast concrete component 42 is cast using steel bars, sulphoaluminate cement, sea sand, seawater cut and opened by water bath, and a casting template made according to the size parameters of the precast concrete component of the guide plate type artificial fish reef to be made;
[0087] The casting template is obtained by crushing, grinding and re-molding the residual materials produced by cutting or retired offshore wind turbine blades with excessive curvature. The seawater after water bath cutting and opening the holes needs to be precipitated and filtered before being used for the casting of the fourth precast concrete component 42.
[0088] like Figure 5 As shown, the shape of retired offshore wind turbine blades is usually an aerodynamic airfoil shape. According to the blade shape, the blades are divided into: cylindrical area, semicircular area, small curvature area, and tail area. The recycled blades in different sections can be used for the construction of different types of artificial reefs. The cylindrical area is used for the construction of cylindrical resource conservation type artificial reefs 1, the semicircular area is used for the construction of arched resource conservation type artificial reefs 2, the small curvature area is used for the construction of triangular environment improvement type artificial reefs 3 and guide vane environment improvement type artificial reefs 4, and the tail area is used for the manufacture of precast concrete component templates. According to the size parameters of the proposed artificial reefs, the optimal cutting path for cutting the discarded blades is determined based on the principle of zoning utilization and minimum waste.
[0089] like Figure 6 As shown, a method for recycling retired offshore wind turbine blades to construct artificial fish reefs comprises:
[0090] Step S1, removing the embedded bolts at the root of the retired wind turbine blades.
[0091] Step S2, placing the retired wind turbine blades in a water bath cutting and hole opening device filled with sea water, cutting and hole opening the blades in water according to the optimal cutting path, and obtaining artificial fish reef components of retired offshore wind turbine blades.
[0092] Step S3, crushing and pulverizing the residual material generated after water bath cutting or the retired offshore wind turbine blades with excessive curvature, and re-molding them.
[0093] Step S4, according to the size parameters of the artificial fish reef precast concrete components to be made, the plates and components are made by water bath cutting and molding to make a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain precast concrete components.
[0094] Step S5, performing surface sealing treatment on the artificial reef components and precast concrete components of retired offshore wind turbine blades by using acrylic resin, polyurethane resin and epoxy resin coatings by a dipping method, and then performing surface treatment by a concrete spraying method.
[0095] Step S6, finally assembling the artificial fish reef components of the retired offshore wind turbine blades and the precast concrete components according to the size parameters of the proposed artificial fish reef to complete the production of the artificial fish reef.
[0096] Example 1
[0097] like Figure 7 As shown, the method for constructing a cylindrical resource conservation type artificial fish reef 1 comprises:
[0098] Step S11, removing the embedded bolts at the root of the retired wind turbine blades.
[0099] Step S12, placing the retired wind turbine blade in a water bath cutting and drilling device filled with seawater, cutting the blade cylindrical area into two sections of 3.85m high according to the optimal cutting path and drilling holes, to obtain the first retired offshore wind turbine blade artificial fish reef component 11.
[0100] Step S13, crushing and pulverizing the residual material generated after water bath cutting or the retired offshore wind turbine blades with excessive curvature, and re-molding them.
[0101] Step S14, performing surface sealing treatment on the first retired offshore wind turbine blade artificial fish reef component 11 by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by using concrete spraying method.
[0102] Step S15, finally assembling the two sections of the first retired offshore wind turbine blade artificial fish reef components 11 according to the size parameters of the proposed cylindrical artificial fish reef, completing the production of the cylindrical resource conservation type artificial fish reef 1.
[0103] Example 2
[0104] like Figure 8 As shown, the method for constructing the dome-shaped resource conservation artificial reef 2 comprises:
[0105] Step S21, removing the embedded bolts at the root of the retired wind turbine blades.
[0106] Step S22, placing the retired wind turbine blade in a water bath cutting and drilling device filled with seawater, cutting the semicircular area of the blade into a circular arch with a length of 6m, a width of 6m and a height of 3m and drilling a hole according to the optimal cutting path, to obtain a second retired offshore wind turbine blade artificial fish reef component 21.
[0107] Step S23, crushing and pulverizing the residual material generated after water bath cutting or the retired offshore wind turbine blades with excessive curvature, and re-molding them.
[0108] Step S24, according to the size parameters of the arch-shaped artificial fish reef precast concrete component to be made, the plates and components are made by water bath cutting and molding to make a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain a second precast concrete component 22.
[0109] Step S25, performing surface sealing treatment on the second retired offshore wind turbine blade artificial fish reef component 21 and the second precast concrete component 22 by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by concrete spraying method.
[0110] Step S26, finally assembling the second retired offshore wind turbine blade artificial fish reef component 21 and the second precast concrete component 22 according to the size parameters of the proposed arch-shaped artificial fish reef, completing the production of the arch-shaped resource conservation artificial fish reef 2.
[0111] Example 3
[0112] like Fig. 9 As shown, the method for constructing the triangular environment-improving artificial reef 3 comprises:
[0113] Step S31, removing the embedded bolts at the root of the retired wind turbine blades.
[0114] Step S32, placing the retired wind turbine blade in a water bath cutting and drilling device filled with seawater, and according to the optimal cutting path, making a plate 2 with a length of 4m and a width of 2.7m for the blade small curvature area and drilling holes to obtain a third retired offshore wind turbine blade artificial fish reef component 31.
[0115] Step S33, crushing and pulverizing the residual material generated after water bath cutting or the retired offshore wind turbine blades with excessive curvature, and re-molding them.
[0116] Step S34, according to the size parameters of the triangular artificial fish reef precast concrete component to be made, the plates and components made by water bath cutting and molding are made into a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain a third precast concrete component 32.
[0117] Step S35, performing surface sealing treatment on the third retired offshore wind turbine blade artificial fish reef component 31 and the third precast concrete component 32 by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by concrete spraying method.
[0118] Step S36, finally assembling the third retired offshore wind turbine blade artificial fish reef component 31 and the third precast concrete component 32 according to the size parameters of the planned triangular artificial fish reef, and completing the production of the triangular environment improvement type artificial fish reef 3.
[0119] Example 4
[0120] like Fig.10 As shown, the method for constructing the guide plate environment improvement type artificial fish reef 4 includes:
[0121] Step S41, removing the embedded bolts at the root of the retired wind turbine blades.
[0122] Step S42, placing the retired wind turbine blade in a water bath cutting and opening device filled with seawater, and making a 3m long and 0.5m wide plate for the blade small curvature area according to the optimal cutting path to obtain the fourth retired offshore wind turbine blade artificial fish reef component 41.
[0123] Step S43, crushing and pulverizing the residual material generated after water bath cutting or the retired offshore wind turbine blades with excessive curvature, and re-molding them.
[0124] Step S44, according to the size parameters of the precast concrete components of the guide plate type artificial fish reef to be manufactured, the plates and components are made by water bath cutting and molding to make a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain a fourth precast concrete component 42.
[0125] Step S45, performing surface sealing treatment on the fourth retired offshore wind turbine blade artificial fish reef component 41 and the fourth precast concrete component 42 by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by using concrete spraying method.
[0126] Step S46, finally assembling the fourth retired offshore wind turbine blade artificial fish reef component 41 and the fourth precast concrete component 42 according to the size parameters of the proposed guide plate type artificial fish reef, completing the production of the guide plate environment improvement type artificial fish reef 4.
[0127] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments may still be modified, or some or all of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for recycling retired offshore wind turbine blades into artificial fish reefs, characterized in that: include: Cylindrical resource conservation artificial reef (1), dome-shaped resource conservation artificial reef (2), triangular environment improvement artificial reef (3) and guide plate environment improvement artificial reef (4); The cylindrical resource conservation type artificial fish reef (1) is made of two sections of first retired offshore wind turbine blade artificial fish reef components (11); The arch-shaped resource conservation artificial fish reef (2) is manufactured by assembling a second retired offshore wind turbine blade artificial fish reef component (21) and a second prefabricated concrete component (22) according to the size parameters of the proposed artificial fish reef; The triangular environment-improving artificial fish reef (3) is manufactured by assembling a third retired offshore wind turbine blade artificial fish reef component (31) and a third prefabricated concrete component (32) according to the size parameters of the proposed artificial fish reef; The guide plate environment improvement type artificial fish reef (4) is manufactured by assembling a fourth retired offshore wind turbine blade artificial fish reef component (41) and a fourth prefabricated concrete component (42) according to the size parameters of the artificial fish reef to be manufactured.
2. The artificial fish reef recycling method of retired offshore wind turbine blades according to claim 1 is characterized in that: The first artificial fish reef component (11) of the retired offshore wind turbine blade is obtained by cutting and drilling holes in the cylindrical area of the retired offshore wind turbine blade using a water bath cutting and drilling method.
3. The artificial fish reef recycling method of retired offshore wind turbine blades according to claim 1 is characterized in that: The second artificial fish reef component (21) of the retired offshore wind turbine blade is obtained by cutting and drilling holes in the semicircular area of the retired offshore wind turbine blade using a water bath cutting and drilling method; The second precast concrete component (22) is cast using steel bars, sulphoaluminate cement, sea sand, seawater cut and opened by water bath, and a casting template made according to the size parameters of the precast concrete component of the arch-shaped artificial fish reef to be made; The casting template is obtained by crushing, grinding and re-molding the waste produced by cutting or retired offshore wind turbine blades with excessive curvature, and the seawater after the holes are opened by water bath cutting needs to be precipitated and filtered before being used for casting the second precast concrete component (22).
4. The artificial fish reef recycling method of retired offshore wind turbine blades according to claim 1 is characterized in that: The third retired offshore wind turbine blade artificial fish reef component (31) is obtained by cutting and drilling holes in the small curvature area of the retired offshore wind turbine blade using a water bath cutting and drilling method; The third precast concrete component (32) is cast using steel bars, sulphoaluminate cement, sea sand, seawater cut and opened by water bath, and a casting template made according to the size parameters of the triangular artificial fish reef precast concrete component to be made; The casting template is obtained by crushing and grinding the waste materials produced by cutting or retired offshore wind turbine blades with excessive curvature and then re-molding them. The seawater after the holes are opened by water bath cutting needs to be precipitated and filtered before being used for casting the third precast concrete component (32).
5. The artificial fish reef recycling method of retired offshore wind turbine blades according to claim 1 is characterized in that: The fourth retired offshore wind turbine blade artificial fish reef component (41) is obtained by cutting and drilling holes in the small curvature area of the retired offshore wind turbine blade using a water bath cutting and drilling method; The fourth precast concrete component (42) is cast using steel bars, sulphoaluminate cement, sea sand, seawater cut and opened by water bath, and a casting template made according to the size parameters of the precast concrete component of the guide plate type artificial fish reef to be made; The casting template is obtained by crushing, grinding and re-molding the waste produced by cutting or retired offshore wind turbine blades with excessive curvature, and the seawater after the holes are opened by water bath cutting needs to be precipitated and filtered before being used for casting the fourth precast concrete component (42).
6. A method for recycling retired offshore wind turbine blades to build artificial reefs, characterized in that: include: Step S1, removing the embedded bolts at the root of the retired wind turbine blades; Step S2, placing the retired wind turbine blades in a water bath cutting and hole-making device filled with seawater, cutting and hole-making the blades in water according to the optimal cutting path, and obtaining artificial fish reef components of retired offshore wind turbine blades; Step S3, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them; Step S4, according to the size parameters of the artificial fish reef precast concrete components to be made, the plates and components made by water bath cutting and molding are made into concrete casting templates, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and concrete casting templates are used for casting to obtain precast concrete components; Step S5, performing surface sealing treatment on the artificial reef components and precast concrete components of the retired offshore wind turbine blades by using acrylic resin, polyurethane resin and epoxy resin coatings by a dipping method, and then performing surface treatment by a concrete spraying method; Step S6, finally assembling the artificial fish reef components of the retired offshore wind turbine blades and the precast concrete components according to the size parameters of the proposed artificial fish reef to complete the production of the artificial fish reef.
7. The method for constructing artificial reefs by recycling retired offshore wind turbine blades according to claim 6, characterized in that: A method for constructing a cylindrical resource conservation artificial reef (1) comprises: Step S11, removing the embedded bolts at the root of the retired wind turbine blades; Step S12, placing the retired wind turbine blade in a water bath cutting and hole-making device filled with seawater, cutting the cylindrical area of the blade into two sections with a height of 3.85 m according to the optimal cutting path and making holes therein, thereby obtaining a first retired offshore wind turbine blade artificial fish reef component (11); Step S13, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them; Step S14, performing surface sealing treatment on the first retired offshore wind turbine blade artificial fish reef component (11) by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by using concrete spraying method; Step S15, finally assembling the two sections of the first retired offshore wind turbine blade artificial fish reef components (11) according to the size parameters of the proposed cylindrical artificial fish reef, thereby completing the production of the cylindrical resource conservation artificial fish reef (1).
8. The method for constructing artificial reefs by recycling retired offshore wind turbine blades according to claim 6, characterized in that: A method for constructing a dome-shaped resource conservation artificial reef (2) comprises: Step S21, removing the embedded bolts at the root of the retired wind turbine blades; Step S22, placing the retired wind turbine blade in a water bath cutting and hole-making device filled with seawater, cutting the semicircular area of the blade into a circular arch with a length of 6m, a width of 6m and a height of 3m according to the optimal cutting path, and making a hole, thereby obtaining a second retired offshore wind turbine blade artificial fish reef component (21); Step S23, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them; Step S24, according to the size parameters of the arch-shaped artificial fish reef precast concrete component to be manufactured, the plate and the component are made by water bath cutting and molding to form a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain a second precast concrete component (22); Step S25, performing surface sealing treatment on the second retired offshore wind turbine blade artificial reef component (21) and the second precast concrete component (22) by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by using concrete spraying method; Step S26, finally assembling the second retired offshore wind turbine blade artificial fish reef component (21) and the second precast concrete component (22) according to the size parameters of the proposed arch-shaped artificial fish reef, thereby completing the production of the arch-shaped resource conservation artificial fish reef (2).
9. The method for constructing artificial reefs by recycling retired offshore wind turbine blades according to claim 6, characterized in that: A method for constructing a triangular environment-improving artificial reef (3), comprising: Step S31, removing the embedded bolts at the root of the retired wind turbine blades; Step S32, placing the retired wind turbine blade in a water bath cutting and drilling device filled with seawater, and according to the optimal cutting path, making a plate 2 with a length of 4 m and a width of 2.7 m for the blade small curvature area and drilling holes to obtain a third retired offshore wind turbine blade artificial fish reef component (31); Step S33, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them; Step S34, according to the size parameters of the triangular artificial fish reef precast concrete component to be manufactured, the plate and the component are made by water bath cutting and molding to form a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain a third precast concrete component (32); Step S35, performing surface sealing treatment on the third retired offshore wind turbine blade artificial fish reef component (31) and the third precast concrete component (32) by using acrylic resin, polyurethane resin and epoxy resin coating by a dipping method, and then performing surface treatment by a concrete spraying method; Step S36, finally assembling the third retired offshore wind turbine blade artificial fish reef component (31) and the third precast concrete component (32) according to the size parameters of the proposed triangular artificial fish reef, thereby completing the production of the triangular environment improvement type artificial fish reef (3).
10. The method for constructing artificial reefs by recycling retired offshore wind turbine blades according to claim 6, characterized in that: A method for constructing an artificial fish reef (4) with a guide plate for improving the environment, comprising: Step S41, removing the embedded bolts at the root of the retired wind turbine blades; Step S42, placing the retired wind turbine blade in a water bath cutting and opening device filled with seawater, and cutting the blade small curvature area into a plate with a length of 3 m and a width of 0.5 m according to the optimal cutting path, to obtain a fourth retired offshore wind turbine blade artificial fish reef component (41); Step S43, crushing and pulverizing the residual material or the retired offshore wind turbine blades with excessive curvature produced after water bath cutting and opening, and re-molding them; Step S44, according to the size parameters of the guide plate type artificial fish reef precast concrete component to be manufactured, the plate and the component are made by water bath cutting and molding to form a concrete casting template, and steel bars, sulphoaluminate cement, sea sand, seawater after water bath cutting and opening, and the concrete casting template are used for casting to obtain a fourth precast concrete component (42); Step S45, performing surface sealing treatment on the fourth retired offshore wind turbine blade artificial fish reef component (41) and the fourth precast concrete component (42) by using acrylic resin, polyurethane resin and epoxy resin coating by dipping method, and then performing surface treatment by using concrete spraying method; Step S46, finally assembling the fourth retired offshore wind turbine blade artificial fish reef component (41) and the fourth precast concrete component (42) according to the size parameters of the proposed guide plate type artificial fish reef, thereby completing the production of the guide plate environment improvement type artificial fish reef (4).
Citation Information
Patent Citations
Method for distribution of offshore oil platform abandoned structures and laying of artificial reefs
CN102599092A
Artificial fish reef and manufacturing method of artificial fish reef with same
CN115777596A
Method for recycling retired or damaged wind power blades to manufacture wind prevention and sand fixation barrier
CN117324350A
Method for processing and manufacturing artificial fish reef by utilizing retired wind power blades
CN118081891A
Artificial reef
CN201509499U
Cited By
Artificial fish reef and preparation method of artificial fish reef based on retired fan blades
CN121128653A