Charging method and device and main battery management system controller

By dynamically adjusting the charging power, using the dual-gun charging of the main charging gun and the secondary charging gun, the problems of long charging time and low efficiency caused by low power charging piles are solved, and efficient charging of the battery is achieved.

CN118928130AInactive Publication Date: 2024-11-12SAIC GM WULING AUTOMOBILE CO LTD

Patent Information

Application Number
CN202411237404.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Low-power charging piles cannot meet the battery charging rate requirements, resulting in long charging time and low efficiency.

Method used

By judging the relationship between the sum of the maximum output power of the main charging pile and the secondary charging pile and the maximum input power of the battery, dynamically adjust the charging power to realize dual-gun charging of the main charging gun and the secondary charging gun, ensuring the optimization of charging efficiency and time.

Benefits of technology

It reduces the charging time, improves the charging efficiency, meets the maximum input power requirement of the battery, and achieves high-power charging.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118928130A_ABST
    Figure CN118928130A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a charging method and device and a main battery management system controller. The method comprises the steps that if it is judged that the sum of the maximum output power of a main charging pile and the maximum output power of an auxiliary charging pile is smaller than the maximum input power of a battery, the maximum output power of the main charging pile serves as first request power, and the first request power is sent to the main charging pile; the maximum output power of the auxiliary charging pile is used as second request power, and the second request power is sent to the auxiliary charging pile through an auxiliary battery management system controller; the main charging pile charges a power battery according to the first request power, and the auxiliary charging pile charges the power battery according to the second request power. According to the embodiment of the invention, double-gun charging of the main charging gun and the auxiliary charging gun is realized, so that the charging time is shortened, and the charging efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the field of battery technology, and in particular to a charging method, device, and main battery management system controller. Background Art

[0002] With the continuous deepening of research on battery-related technologies, the battery charging rate has been continuously improved, and the full-power charging time has been continuously shortened. However, low-power charging piles still account for a large proportion of the current market, and the output of low-power charging piles cannot meet the requirements of the battery charging rate. Therefore, when using low-power charging piles for single-gun fast charging, the charging time is long and the charging efficiency is low. Summary of the invention

[0003] In view of this, embodiments of the present application provide a charging method, a device, and a main battery management system controller for reducing charging time and improving charging efficiency.

[0004] A first aspect provides a charging method, comprising:

[0005] Determine whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery;

[0006] If it is determined that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the maximum output power of the main charging pile is used as the first requested power and the first requested power is sent to the main charging pile, and the maximum output power of the auxiliary charging pile is used as the second requested power and the second requested power is sent to the auxiliary charging pile through the auxiliary battery management system controller, so that the main charging pile charges the power battery according to the first requested power and the auxiliary charging pile charges the power battery according to the second requested power;

[0007] If it is determined that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, the difference between the maximum output power of the battery and the maximum output power of the main charging pile is used as the power provided by the auxiliary charging pile, the maximum output power of the main charging pile is used as the third requested power and the third requested power is sent to the main charging pile, the power provided by the auxiliary charging pile is used as the fourth requested power and the fourth requested power is sent to the auxiliary charging pile through the auxiliary battery management system controller, so that the main charging pile charges the power battery according to the third requested power and the auxiliary charging pile charges the power battery according to the fourth requested power.

[0008] In a possible implementation, before determining whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the method further includes:

[0009] Determine whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, and determine whether the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery;

[0010] If it is determined that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, continue to perform the step of determining whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery;

[0011] If it is determined that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, the maximum input power of the battery is used as the fifth requested power, and the fifth requested power is sent to the auxiliary charging pile through the auxiliary battery management system controller, so that the auxiliary charging pile charges the power battery according to the fifth requested power;

[0012] If it is determined that the maximum output power of the main charging pile is greater than or equal to the maximum input power of the battery, the maximum input power of the battery is used as the sixth requested power, and the sixth requested power is sent to the main charging pile so that the main charging pile charges the power battery according to the sixth requested power.

[0013] In a possible implementation, before determining whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery and determining whether the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the method further includes:

[0014] Determine whether the status of the auxiliary charging gun is connected;

[0015] If it is determined that the state of the auxiliary charging gun is the connected state, continue to execute the step of determining whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, and determining whether the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery;

[0016] If it is determined that the state of the auxiliary charging gun is not the connected state, determine whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery;

[0017] If it is determined that the pre-acquired maximum output power of the main charging pile is greater than or equal to the maximum input power of the battery, continue to perform the step of using the maximum input power of the battery as the sixth requested power, and sending the sixth requested power to the main charging pile, so that the main charging pile charges the power battery according to the sixth requested power;

[0018] If it is determined that the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, the maximum output power of the main charging pile is used as the seventh requested power, and the seventh requested power is sent to the main charging pile, so that the main charging pile charges the power battery according to the seventh requested power.

[0019] In a possible implementation, before determining whether the state of the secondary charging gun is in the connected state, the process further includes:

[0020] Obtaining the temperature and power of the power battery;

[0021] Determining the maximum input power of the battery according to the temperature and the power;

[0022] Determine whether the power level reaches a set power threshold;

[0023] If it is determined that the power level does not reach the power level threshold, determining whether the temperature reaches a set temperature threshold;

[0024] If it is determined that the temperature does not reach the temperature threshold, a query instruction is sent to the secondary battery management system controller, so that the secondary battery management system controller responds to the query instruction and sends the secondary charging gun status and the maximum output power of the secondary charging pile.

[0025] In a possible implementation, before obtaining the temperature and power of the power battery, the method further includes:

[0026] Sending a first control command to the power battery, so that the power battery responds to the first control command and connects the pre-charging circuit of the power battery with the fast-charging circuit;

[0027] Acquiring an internal voltage of the power battery and an external voltage of the power battery;

[0028] Determining whether the internal voltage is equal to the external voltage;

[0029] If it is determined that the internal voltage is equal to the external voltage, a second control command is sent to the power battery and a third control command is sent to the high-voltage distribution box, so that the power battery responds to the second control command to disconnect the pre-charging circuit and the fast-charging circuit of the power battery, and the high-voltage distribution box responds to the third control command to connect the second power channel to the first power channel.

[0030] In a possible implementation, before determining whether the state of the auxiliary charging gun is in the connected state, the method further includes:

[0031] Sending confirmation information to the secondary battery management system controller, so that the secondary battery management system controller sends an interaction status in response to the confirmation information;

[0032] Determine whether the interaction state is a completed state;

[0033] If it is determined that the interaction state is a completion state, sending access information to the secondary battery management system controller so that the secondary battery management system controller responds to the access information, and sending a fourth control command to the high-voltage distribution box so that the high-voltage distribution box responds to the fourth control command, so that the third power channel is connected to the first power channel;

[0034] If it is determined that the interaction state is not a completed state, continue to execute the step of determining whether the interaction state is a completed state.

[0035] In a possible implementation, the method further includes:

[0036] Determine whether the power battery is faulty;

[0037] If it is determined that the power battery has not failed, determining whether the first electric energy channel has failed;

[0038] If it is determined that the first power channel has not failed, determining whether the second power channel has failed and determining whether the third power channel has failed;

[0039] If it is determined that any one of the second power channel and the third power channel fails and the other power channel does not fail, a fifth control command is sent to the high-voltage distribution box, so that the high-voltage distribution box disconnects the failed power channel in response to the fifth control command;

[0040] If it is determined that the second power channel has not failed and the third power channel has not failed, the step of obtaining the temperature and power of the power battery is continued.

[0041] A second aspect provides a charging device, comprising:

[0042] A first judgment module is used to judge whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery;

[0043] a first determining module, configured to use the maximum output power of the main charging pile as the first requested power if the first determining module determines that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; and a sending module, configured to send the first requested power to the main charging pile, so that the main charging pile charges the power battery according to the first requested power;

[0044] The first determination module is also used to use the maximum output power of the secondary charging pile as the second requested power if the first determination module determines that the sum of the maximum output power of the main charging pile and the maximum output power of the secondary charging pile is less than the maximum input power of the battery; the sending module is also used to send the second requested power to the secondary charging pile through the secondary battery management system controller, so that the secondary charging pile charges the power battery according to the second requested power;

[0045] The first determination module is also used for, if the first judgment module determines that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, using the difference between the maximum output power of the battery and the maximum output power of the main charging pile as the power provided by the auxiliary charging pile, and using the maximum output power of the main charging pile as the third requested power; the sending module is also used for sending the third requested power to the main charging pile, so that the main charging pile charges the power battery according to the third requested power;

[0046] The first determination module is also used to use the power provided by the secondary charging pile as the fourth requested power; the sending module is also used to send the fourth requested power to the secondary charging pile through the secondary battery management system controller, so that the secondary charging pile charges the power battery according to the fourth requested power.

[0047] The third aspect provides a main battery management system controller, comprising: one or more processors; a memory; and one or more computer programs, wherein the one or more computer programs are stored in the memory, and the one or more computer programs include instructions, which, when executed by the main battery management system controller, enable the main battery management system controller to execute the charging method in the above-mentioned first aspect or any possible implementation of the first aspect.

[0048] The fourth aspect provides a computer-readable storage medium, which includes a stored program, wherein when the program is running, the main battery management system controller where the computer-readable storage medium is located is controlled to execute the charging method in the above-mentioned first aspect or any possible implementation of the first aspect.

[0049] In the technical solution provided in the embodiment of the present application, if it is judged that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the main charging pile charges the power battery according to the maximum output power of the main charging pile and the auxiliary charging pile charges the power battery according to the maximum output power of the auxiliary charging pile; if it is judged that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, the main charging pile charges the power battery according to the maximum output power of the main charging pile and the auxiliary charging pile charges the power battery according to the power provided by the auxiliary charging pile, thereby realizing dual-gun charging of the main charging gun and the auxiliary charging gun, thereby reducing the charging time and improving the charging efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0051] Figure 1 A structural schematic diagram of a charging system is provided for an embodiment of the present application;

[0052] Figure 2 A flowchart of a charging method provided in an embodiment of the present application;

[0053] Figure 3 A flowchart of another charging method provided in an embodiment of the present application;

[0054] Figure 4 A flow chart of a power battery detection method provided in an embodiment of the present application;

[0055] Figure 5 A flowchart of a detection method for a secondary charging gun provided in an embodiment of the present application;

[0056] Figure 6 A flowchart of a fault detection method provided in an embodiment of the present application;

[0057] Figure 7 A schematic diagram of the structure of a charging device provided in an embodiment of the present application;

[0058] Figure 8 A schematic diagram of a main battery management system controller provided in an embodiment of the present application. DETAILED DESCRIPTION

[0059] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0060] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0061] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0062] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0063] Figure 1 A schematic diagram of the structure of a charging system is provided for an embodiment of the present application, such as Figure 1 As shown, the system includes: a main battery management system controller, a secondary battery management system controller, a high-voltage distribution box, a power battery, a first power channel, a second power channel, a third power channel, a main charging gun and a secondary charging gun.

[0064] like Figure 1 As shown, the main battery management system controller and the auxiliary battery management system controller can be collectively referred to as a battery management system controller, and each battery management system controller can correspond to a charging gun and a charging pile corresponding to the charging gun, wherein the charging pile corresponding to the main battery management system controller is the main charging pile, and the charging pile corresponding to the auxiliary battery management system controller is the auxiliary charging pile, the main charging gun can be used to insert the main charging gun, and the auxiliary charging gun can be used to insert the auxiliary charging pile. Each battery management system controller corresponds to a group of fast charging relays and an electric energy channel where the fast charging relays are located, wherein the fast charging relays are located on the high-voltage circuit of the electric energy channel. When the charging gun is inserted into the electric energy channel, each battery management system controller performs interactive verification with the corresponding charging pile to verify whether the charging pile is operating normally and obtain the maximum output power of the charging pile. The battery management system controller that completes the interactive verification first is the main battery management system controller.

[0065] like Figure 1As shown, the high-voltage distribution box is used to obtain the current input by each charging pile and aggregate the current, and output the aggregated current to the power battery. There are multiple relays inside the high-voltage distribution box, wherein multiple relays are used to control the conduction and disconnection of the power channel. The first power channel is located between the power battery and the high-voltage distribution box, and is used to connect the power battery and the high-voltage distribution box; the second power channel is located between the main charging gun and the high-voltage distribution box, and is used to connect the high-voltage distribution box and the main charging gun; the third power channel is located between the auxiliary charging gun and the high-voltage distribution box, and is used to connect the high-voltage distribution box and the auxiliary charging gun. The first power channel, the high-voltage distribution box, the second power channel and the third power channel constitute a fast charging circuit, wherein the fast charging circuit includes the first power channel, the high-voltage distribution box, the second power channel and the third power channel.

[0066] The power battery includes a pre-charging circuit and a pre-charging relay, and the pre-charging relay is used to control the conduction and disconnection of the pre-charging circuit.

[0067] based on Figure 1 The charging system shown, an embodiment of the present application provides a charging method. Figure 2 A flowchart of a charging method provided in an embodiment of the present application is shown in FIG. Figure 1 As shown, the method includes:

[0068] Step 102 , the main battery management system controller determines whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery. If so, execute step 104 ; if not, execute step 106 .

[0069] Step 104, the main battery management system controller uses the maximum output power of the main charging pile as the first requested power and sends the first requested power to the main charging pile, uses the maximum output power of the secondary charging pile as the second requested power and sends the second requested power to the secondary charging pile through the secondary battery management system controller, so that the main charging pile charges the power battery according to the first requested power, and the secondary charging pile charges the power battery according to the second requested power, and the process ends.

[0070] Step 106: The main battery management system controller uses the difference between the maximum input power of the battery and the maximum output power of the main charging pile as the power provided by the auxiliary charging pile.

[0071] Step 108, the main battery management system controller uses the maximum output power of the main charging pile as the third requested power and sends the third requested power to the main charging pile, uses the power provided by the auxiliary charging pile as the fourth requested power and sends the fourth requested power to the auxiliary charging pile through the auxiliary battery management system controller, so that the main charging pile charges the power battery according to the third requested power, and the auxiliary charging pile charges the power battery according to the fourth requested power, and the process ends.

[0072] In the embodiment of the present application, if it is determined that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the main charging pile charges the power battery according to the maximum output power of the main charging pile and the auxiliary charging pile charges the power battery according to the maximum output power of the auxiliary charging pile; if it is determined that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, the main charging pile charges the power battery according to the maximum output power of the main charging pile and the auxiliary charging pile charges the power battery according to the power provided by the auxiliary charging pile, thereby realizing dual-gun charging of the main charging gun and the auxiliary charging gun, thereby reducing the charging time and improving the charging efficiency.

[0073] based on Figure 1 The charging system shown, the embodiment of the present application provides another charging method. Figure 3 A flowchart of another charging method provided in an embodiment of the present application, such as Figure 3 As shown, the method includes:

[0074] Step 202: The main battery management system controller obtains the temperature and power level of the power battery.

[0075] Step 204: The main battery management system controller determines the maximum input power of the battery according to the temperature and the power level.

[0076] As an optional solution, if there is a correspondence between temperature and power and the maximum input power of the battery, the main battery management system controller can query the maximum input power of the battery corresponding to the temperature and power based on the correspondence between the temperature and power and the maximum input power of the battery, thereby determining the maximum input power of the battery.

[0077] Step 206 , the main battery management system controller determines whether the power level has reached the set power level threshold. If so, the process ends; if not, execute step 208 .

[0078] If the main battery management system controller determines that the power level has reached the power threshold, it indicates that the power battery is fully charged and there is no need to perform subsequent charging operations, and the process ends; if it determines that the power level has not reached the power threshold, it indicates that the power battery is not fully charged and subsequent charging operations are required.

[0079] Step 208 , the main battery management system controller determines whether the temperature reaches the set temperature threshold. If so, the process ends; if not, execute step 210 .

[0080] If the main battery management system controller determines that the temperature has reached the temperature threshold, it indicates that the power battery is overheated. For the safety of the power battery, the power battery cannot be charged anymore, and subsequent charging operations cannot be performed, and the process ends. If it is determined that the temperature has not reached the temperature threshold, it indicates that the temperature of the power battery is within the normal temperature range. At this time, it is safe to charge the power battery and the power battery can continue to be charged.

[0081] Step 210: The main battery management system controller sends a query instruction to the secondary battery management system controller, so that the secondary battery management system controller responds to the query instruction and sends the secondary charging gun status and the secondary charging pile maximum output power to the main battery management system controller.

[0082] Step 212 , the main battery management system controller determines whether the status of the auxiliary charging gun is connected. If so, execute step 220 ; if not, execute step 214 .

[0083] The status of the secondary charging gun can be used to indicate whether the secondary charging gun is in a connected state or a disconnected state. If the main battery management system controller determines that the status of the secondary charging gun is in a connected state, it indicates that the secondary charging gun has been inserted into the secondary charging pile; if it determines that the status of the secondary charging gun is not in a connected state, it indicates that the secondary charging gun is in a disconnected state and the secondary charging gun is not inserted into the secondary charging pile.

[0084] Step 214 , the main battery management system controller determines whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery. If so, execute step 218 ; if not, execute step 216 .

[0085] In the embodiment of the present application, it is assumed that the main charging gun has been inserted into the main charging pile. If the main battery management system controller determines that the maximum output power of the main charging pile is less than the maximum input power of the battery, it indicates that the maximum output power of the main charging pile can be used as the requested power during charging; if it determines that the maximum output power of the main charging pile is greater than or equal to the maximum input power of the battery, it indicates that the maximum output power of the main charging pile has exceeded the maximum input power of the battery, and the maximum input power of the battery can be used as the requested power during charging.

[0086] Step 216 : The main battery management system controller uses the maximum input power of the battery as the sixth requested power, and sends the sixth requested power to the main charging pile, so that the main charging pile charges the power battery according to the sixth requested power, and continues to execute step 202 .

[0087] Specifically, after the main charging gun is inserted into the main charging pile, the main charging pile can provide charging current to the power battery through the second power channel, the high-voltage distribution box and the first power channel to charge the power battery.

[0088] Step 218 , the main battery management system controller uses the maximum output power of the main charging pile as the seventh requested power, and sends the seventh requested power to the main charging pile, so that the main charging pile charges the power battery according to the seventh requested power, and continues to execute step 202 .

[0089] Specifically, after the main charging gun is inserted into the main charging pile, the main charging pile can provide charging current to the power battery through the third power channel, the high-voltage distribution box and the first power channel to charge the power battery, and continue to execute step 202 after charging is completed to continue monitoring the power battery.

[0090] Step 220, the main battery management system controller determines whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, and determines whether the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery. If it is determined that the maximum output power of the main charging pile is greater than or equal to the maximum input power of the battery, execute step 216; if it is determined that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, execute step 222; if it is determined that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, execute step 224.

[0091] When the main charging gun is in the connected state and the auxiliary charging gun is in the connected state, if the main battery management system controller determines that the maximum output power of the main charging pile is greater than or equal to the maximum input power of the battery, it indicates that the power battery can be charged by the main charging gun, and then continue to execute step 216; if it is determined that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, it indicates that the power battery can be charged by the main charging gun and the auxiliary charging gun, and then continue to execute step 222; if it is determined that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, it indicates that the power battery can be charged by the auxiliary charging gun, and then continue to execute step 224.

[0092] Step 222 , the main battery management system controller determines whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery. If so, execute step 226 ; if not, execute step 228 .

[0093] Step 224 , the main battery management system controller uses the maximum input power of the battery as the fifth requested power, and sends the fifth requested power to the secondary charging pile through the secondary battery management system controller, so that the secondary charging pile charges the power battery according to the fifth requested power, and continues to execute step 202 .

[0094] Step 226, the main battery management system controller uses the maximum output power of the main charging pile as the first requested power and sends the first requested power to the main charging pile, uses the maximum output power of the secondary charging pile as the second requested power and sends the second requested power to the secondary charging pile through the secondary battery management system controller, so that the main charging pile charges the power battery according to the first requested power, and the secondary charging pile charges the power battery according to the second requested power, and continues to execute step 202.

[0095] In an embodiment of the present application, the main battery management system controller sends the second requested power to the secondary charging pile through the secondary battery management system controller, which may specifically include: the main battery management system controller sends the second requested power to the secondary battery management system controller, and the secondary battery management system controller sends the second requested power to the secondary charging pile.

[0096] In the embodiment of the present application, the sum of the first requested power and the second requested power is the total requested power, and the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is the total requested power.

[0097] Step 228: The main battery management system controller uses the difference between the maximum input power of the battery and the maximum output power of the main charging pile as the power provided by the auxiliary charging pile.

[0098] Step 230, the main battery management system controller uses the maximum output power of the main charging pile as the third requested power and sends the third requested power to the main charging pile, uses the power provided by the auxiliary charging pile as the fourth requested power and sends the fourth requested power to the auxiliary charging pile through the auxiliary battery management system controller, so that the main charging pile charges the power battery according to the third requested power, and the auxiliary charging pile charges the power battery according to the fourth requested power, and continues to execute step 202.

[0099] In an embodiment of the present application, the main battery management system controller sends the fourth requested power to the secondary charging pile through the secondary battery management system controller, specifically including: the main battery management system controller sends the fourth requested power to the secondary battery management system controller, and the secondary battery management system controller sends the fourth requested power to the secondary charging pile.

[0100] In the embodiment of the present application, if it is determined that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the main charging pile charges the power battery according to the maximum output power of the main charging pile and the auxiliary charging pile charges the power battery according to the maximum output power of the auxiliary charging pile; if it is determined that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, the main charging pile charges the power battery according to the maximum output power of the main charging pile and the auxiliary charging pile charges the power battery according to the power provided by the auxiliary charging pile, thereby realizing dual-gun charging of the main charging gun and the auxiliary charging gun, thereby reducing the charging time and improving the charging efficiency.

[0101] The technical solution of the embodiment of the present application realizes the addition of power channels to achieve fast dual-gun charging when using a low-power DC charging pile, thereby meeting the maximum input power requirement of the battery and charging the power battery at high power as much as possible during the charging process, thereby reducing the charging time and improving the charging efficiency.

[0102] Figure 4 A flow chart of a power battery detection method provided in an embodiment of the present application, such as Figure 4 As shown, before step 202, the method further includes:

[0103] Step 302: The main battery management system controller sends a first control command to the power battery, so that the power battery responds to the first control command and connects the pre-charging circuit of the power battery with the fast-charging circuit.

[0104] In response to the first control command, the power battery closes the pre-charging relay of the power battery to connect the pre-charging circuit inside the power battery with the fast-charging circuit. The purpose of connecting the pre-charging circuit and the fast-charging circuit of the power battery is to make the internal voltage of the power battery equal to the external voltage.

[0105] Step 304: The main battery management system controller obtains the internal voltage of the power battery and the external voltage of the power battery.

[0106] After closing the pre-charge relay, the main battery management system controller needs to verify that the internal voltage and the external voltage are equal.

[0107] Step 306 , the main battery management system controller determines whether the internal voltage is equal to the external voltage. If so, execute step 58 ; if not, the process ends.

[0108] If the main battery management system controller determines that the internal voltage is equal to the external voltage, it indicates that the power battery is normal, and step 308 can be continued; if it determines that the internal voltage is not equal to the external voltage, it indicates that the power battery is faulty, and the process ends.

[0109] Step 308, the main battery management system controller sends a second control command to the power battery and sends a third control command to the high-voltage distribution box, so that the power battery responds to the second control command to disconnect the pre-charging circuit and the fast-charging circuit of the power battery, and the high-voltage distribution box responds to the third control command to connect the second power channel with the first power channel.

[0110] The power battery responds to the second control command to disconnect the pre-charging circuit of the power battery from the fast charging circuit; and responds to the third control command to connect the first power channel and the second power channel, so that the main charging gun inputs charging current to the power battery, so that the main charging gun charges the power battery. Furthermore, the main battery management system controller can also send an adjustment completion notification to the main battery management system controller.

[0111] Specifically, the power battery responds to the second control command by disconnecting the pre-charge relay of the power battery to disconnect the pre-charge circuit, thereby disconnecting the pre-charge circuit of the power battery from the fast-charge circuit; the high-voltage distribution box responds to the third control command by closing the main fast-charge relay group to connect the second power channel with the first power channel, thereby allowing the main charging gun to charge the power battery. After completing the above adjustment of the internal circuit of the power battery, an adjustment completion notification can be sent to the main battery management system controller to inform the main battery management system controller that the adjustment of the internal circuit of the power battery is completed.

[0112] In the embodiment of the present application, the power battery may be tested before charging the power battery, and the charging process of the power battery may be performed after it is detected that the power battery has no faults, thereby ensuring the safety of the charging process.

[0113] Figure 5 A flowchart of a detection method for a secondary charging gun provided in an embodiment of the present application is shown in FIG. Figure 5 As shown, before step 212, the following steps are also included:

[0114] Step 402: The main battery management system controller sends confirmation information to the secondary battery management system controller, so that the secondary battery management system controller sends the interaction status to the main battery management system controller in response to the confirmation information.

[0115] The interaction status can be used to indicate whether the interaction status is completed or uncompleted.

[0116] Step 404 , the main battery management system controller determines whether the interaction status is a completed status, if so, executes step 406 ; if not, executes step 402 .

[0117] If the main battery management system controller determines that the interaction status is a completed status, it indicates that the main battery management system controller and the secondary battery management system controller have completed the information interaction; if it determines that the interaction status is not a completed status, that is, an uncompleted status, it indicates that the main battery management system controller and the secondary battery management system controller have not completed the information interaction, then execute step 402 to continue the information interaction process.

[0118] Step 406: The main battery management system controller sends access information to the secondary battery management system controller, so that the secondary battery management system controller responds to the access information and sends a fourth control command to the high-voltage distribution box, so that the high-voltage distribution box responds to the fourth control command, so that the secondary charging gun charges the power battery.

[0119] In response to the fourth control command, the high-voltage distribution box closes the secondary fast-charging relay group to connect the third power channel to the first power channel, thereby enabling the secondary charging gun to charge the power battery.

[0120] As an optional solution, fault detection may also be performed during the execution of the above charging method. Figure 6 A flowchart of a fault detection method provided in an embodiment of the present application is shown in FIG. Figure 6 As shown, the method also includes:

[0121] Step 502 , the main battery management system controller determines whether the power battery fails. If so, the process ends; if not, execute step 504 .

[0122] Step 504 , the main battery management system controller determines whether a fault occurs in the first power channel. If so, the process ends; if not, step 506 is executed.

[0123] Step 506, the main battery management system controller determines whether the second power channel fails and determines whether the third power channel fails. If it is determined that any one of the second power channel and the third power channel fails and the other power channel does not fail, execute step 508; if it is determined that the second power channel does not fail and the third power channel does not fail, continue to execute step 202; if it is determined that the second power channel fails and the third power channel fails, the process ends.

[0124] Step 508: The main battery management system controller sends a fifth control command to the high-voltage distribution box, so that the high-voltage distribution box responds to the fifth control command and disconnects the faulty power channel.

[0125] For example, if the main battery management system controller determines that the second power channel has failed and the third power channel has not failed, the high-voltage distribution box responds to the fifth control command to disconnect the main fast charging relay group and thereby disconnect the second power channel so that the first power channel and the second power channel are no longer conductive. At this time, the first power channel and the third power channel are conductive, and the auxiliary charging gun can charge the power battery.

[0126] For another example, if the main battery management system controller determines that the second power channel has not failed and the third power channel has failed, the high-voltage distribution box responds to the fifth control command to disconnect the auxiliary fast charging relay group and thereby disconnect the third power channel so that the first power channel and the third power channel are no longer conductive. At this time, the first power channel and the second power channel are conductive, and the main charging gun can charge the power battery.

[0127] In the embodiment of the present application, during the charging process, fault detection can be performed on the power battery, the first power channel, the second power channel and the third power channel, thereby improving the safety of the charging process.

[0128] Figure 7 A schematic diagram of a charging device provided in an embodiment of the present application is shown in FIG. Figure 7 As shown, the device includes: a first judging module 11, a sending module 12 and a first determining module 13.

[0129] The first judgment module 11 is used to judge whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; the first determination module 13 is used to use the maximum output power of the main charging pile as the first requested power if the first judgment module 11 judges that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; the sending module 12 is used to send the first requested power to the main charging pile, so that the main charging pile charges the power battery according to the first requested power; the first determination module 13 is also used to use the maximum output power of the auxiliary charging pile as the second requested power if the first judgment module 11 judges that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; the sending module 12 is also used to send the second requested power to the auxiliary charging pile through the auxiliary battery management system controller, so that the auxiliary charging pile charges the power battery according to the second requested power.

[0130] The first determination module 13 is also used to use the difference between the maximum output power of the battery and the maximum output power of the main charging pile as the power provided by the secondary charging pile, and the maximum output power of the main charging pile as the third requested power if the first judgment module 11 determines that the sum of the maximum output power of the main charging pile and the maximum output power of the secondary charging pile is greater than or equal to the maximum input power of the battery; the sending module 12 is also used to send the third requested power to the main charging pile, so that the main charging pile charges the power battery according to the third requested power; the first determination module 13 is also used to use the power provided by the secondary charging pile as the fourth requested power; the sending module 12 is also used to send the fourth requested power to the secondary charging pile through the secondary battery management system controller, so that the secondary charging pile charges the power battery according to the fourth requested power.

[0131] As an optional solution, the device further includes: a second judgment module 14.

[0132] The second judgment module 14 is used to judge whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, and to judge whether the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; if it is judged that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the first judgment module 11 is triggered to continue to execute the step of judging whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery.

[0133] The first determination module 13 is also used to use the maximum input power of the battery as the fifth requested power if the second judgment module 14 determines that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery; the sending module 12 is also used to send the fifth requested power to the auxiliary charging pile through the auxiliary battery management system controller, so that the auxiliary charging pile charges the power battery according to the requested power.

[0134] The first determination module 13 is also used to use the maximum input power of the battery as the sixth requested power if the second judgment module 14 determines that the maximum output power of the main charging pile is greater than or equal to the maximum input power of the battery; the sending module 12 is also used to send the sixth requested power to the main charging pile so that the main charging pile charges the power battery according to the sixth requested power.

[0135] As an optional solution, the device further includes: a third judgment module 15 and a fourth judgment module 16 .

[0136] The third judgment module 15 is used to judge whether the state of the auxiliary charging gun is the connected state; if it is judged that the state of the auxiliary charging gun is the connected state, the second judgment module 14 is triggered to continue to execute the step of judging whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, and judging whether the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery;

[0137] The fourth judgment module 16 is used to judge whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery if the third judgment module 15 judges that the state of the auxiliary charging gun is not the connected state; if it is judged that the pre-acquired maximum output power of the main charging pile is greater than or equal to the maximum input power of the battery, trigger the first determination module 13 to continue to execute the step of using the maximum input power of the battery as the sixth requested power, and trigger the sending module 12 to execute the step of sending the sixth requested power to the main charging pile, so that the main charging pile charges the power battery according to the sixth requested power;

[0138] The first determination module 13 is also used to use the maximum output power of the main charging pile as the seventh requested power if the fourth judgment module 16 determines that the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery; the sending module 12 is also used to send the seventh requested power to the main charging pile so that the main charging pile charges the power battery according to the seventh requested power.

[0139] As an optional solution, the device further includes: a first acquisition module 17 , a second determination module 18 , a fifth judgment module 19 and a sixth judgment module 20 .

[0140] The first acquisition module 17 is used to obtain the temperature and power of the power battery; the second determination module 18 is used to determine the maximum input power of the battery according to the temperature and the power; the fifth judgment module 19 is used to judge whether the power reaches the set power threshold; the sixth judgment module 20 is used to judge whether the temperature reaches the set temperature threshold if the fifth judgment module 19 judges that the power does not reach the power threshold; the sending module 12 is also used to send a query instruction to the auxiliary battery management system controller if the sixth judgment module 20 judges that the temperature does not reach the temperature threshold, so that the auxiliary battery management system controller responds to the query instruction and sends the auxiliary charging gun status and the maximum output power of the auxiliary charging pile.

[0141] As an optional solution, the device further includes: a second acquisition module 21 and a seventh judgment module 22 .

[0142] The sending module 12 is further used to send a first control command to the power battery, so that the power battery responds to the first control command and connects the pre-charging circuit of the power battery with the fast-charging circuit;

[0143] The second acquisition module 21 is used to acquire the internal voltage of the power battery and the external voltage of the power battery;

[0144] The seventh judgment module 22 is used to judge whether the internal voltage is equal to the external voltage;

[0145] The sending module 12 is also used to send a second control command to the power battery and a third control command to the high-voltage distribution box if the seventh judgment module 22 determines that the internal voltage is equal to the external voltage, so that the power battery responds to the second control command to disconnect the pre-charging circuit and the fast-charging circuit of the power battery, and the high-voltage distribution box responds to the third control command to connect the second power channel to the first power channel.

[0146] As an optional solution, the device further includes: an eighth judgment module 23.

[0147] The sending module 12 is also used to send confirmation information to the secondary battery management system controller, so that the secondary battery management system controller sends the interaction status in response to the confirmation information; the eighth judgment module 23 is used to judge whether the interaction status is a completed state; if it is judged that the interaction status is not a completed state, continue to execute the step of judging whether the interaction status is a completed state; the sending module 12 is also used to send access information to the secondary battery management system controller if the eighth judgment module 23 judges that the interaction status is a completed state, so that the secondary battery management system controller responds to the access information and sends a fourth control command to the high-voltage distribution box, so that the high-voltage distribution box responds to the fourth control command to make the third power channel conductive with the first power channel.

[0148] As an optional solution, the device further includes: a ninth judgment module 24 and a tenth judgment module 25 .

[0149] The ninth judgment module 24 is used to judge whether the power battery has a fault; the tenth judgment module 25 is used to judge whether the first power channel has a fault if the ninth judgment module 24 judges that the power battery has not a fault; if it is judged that the first power channel has not a fault, judge whether the second power channel has a fault and judge whether the third power channel has a fault; if it is judged that the second power channel has not a fault and the third power channel has not a fault, trigger the first acquisition module 17 to continue to execute the step of obtaining the temperature and power of the power battery; the sending module 12 is also used to send a fifth control command to the high-voltage distribution box if the tenth judgment module 25 judges that any one of the second power channel and the third power channel has a fault and the other power channel has not a fault, so that the high-voltage distribution box responds to the fifth control command and disconnects the faulty power channel.

[0150] In the technical solution provided in the embodiment of the present application, if it is judged that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the main charging pile charges the power battery according to the maximum output power of the main charging pile and the auxiliary charging pile charges the power battery according to the maximum output power of the auxiliary charging pile; if it is judged that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, the main charging pile charges the power battery according to the maximum output power of the main charging pile and the auxiliary charging pile charges the power battery according to the power provided by the auxiliary charging pile, thereby realizing dual-gun charging of the main charging gun and the auxiliary charging gun, thereby reducing the charging time and improving the charging efficiency.

[0151] An embodiment of the present application provides a computer-readable storage medium, which includes a stored program, wherein when the program is run, a main battery management system controller where the computer-readable storage medium is located is controlled to execute an embodiment of the above-mentioned charging method.

[0152] An embodiment of the present application provides a computer program product, including a computer program / instruction, which implements an embodiment of the above-mentioned charging method when executed by a processor.

[0153] An embodiment of the present application provides a main battery management system controller, comprising: one or more processors; a memory; and one or more computer programs, wherein the one or more computer programs are stored in the memory, and the one or more computer programs include instructions, which, when executed by the main battery management system controller, enable the main battery management system controller to execute an embodiment of the above-mentioned charging method.

[0154] Figure 8 A schematic diagram of a main battery management system controller provided in an embodiment of the present application, such as Figure 8 As shown, the main battery management system controller 30 of this embodiment includes: a processor 31, a memory 32, and a computer program 33 stored in the memory 32 and executable on the processor 31. When the computer program 33 is executed by the processor 31, the charging method applied in the embodiment is implemented. To avoid repetition, they are not described one by one here.

[0155] The main battery management system controller 30 includes, but is not limited to, a processor 31 and a memory 32. Those skilled in the art will appreciate that Figure 8 It is only an example of the main battery management system controller 30 and does not constitute a limitation of the main battery management system controller 30. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the main battery management system controller 30 may also include input and output devices, network access devices, buses, etc.

[0156] The processor 31 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0157] The memory 22 may be an internal storage unit of the main battery management system controller 30, such as a hard disk or memory of the main battery management system controller 30. The memory 32 may also be an external storage device of the main battery management system controller 30, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the main battery management system controller 30. Further, the memory 32 may also include both an internal storage unit of the main battery management system controller 30 and an external storage device. The memory 32 is used to store computer programs and other programs and data required by network devices. The memory 32 may also be used to temporarily store data that has been output or is to be output.

[0158] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0159] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0160] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0161] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional units.

[0162] The above-mentioned integrated unit implemented in the form of a software functional unit can be stored in a computer-readable storage medium. The above-mentioned software functional unit is stored in a computer-readable storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) or a processor (Processor) to perform some steps of the method described in each embodiment of the present application. The aforementioned computer-readable storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), disk or optical disk and other media that can store program codes.

[0163] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the scope of protection of the present application.

Claims

1. A charging method, characterized in that: include: Determine whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; If it is determined that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the maximum output power of the main charging pile is used as the first requested power and the first requested power is sent to the main charging pile, and the maximum output power of the auxiliary charging pile is used as the second requested power and the second requested power is sent to the auxiliary charging pile through the auxiliary battery management system controller, so that the main charging pile charges the power battery according to the first requested power and the auxiliary charging pile charges the power battery according to the second requested power; If it is determined that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, the difference between the maximum output power of the battery and the maximum output power of the main charging pile is used as the power provided by the auxiliary charging pile, the maximum output power of the main charging pile is used as the third requested power and the third requested power is sent to the main charging pile, the power provided by the auxiliary charging pile is used as the fourth requested power and the fourth requested power is sent to the auxiliary charging pile through the auxiliary battery management system controller, so that the main charging pile charges the power battery according to the third requested power and the auxiliary charging pile charges the power battery according to the fourth requested power.

2. The method according to claim 1, characterized in that Before determining whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the method further includes: Determine whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, and determine whether the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; If it is determined that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, continue to perform the step of determining whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; If it is determined that the maximum output power of the main charging pile is less than the maximum input power of the battery and the maximum output power of the auxiliary charging pile is greater than or equal to the maximum input power of the battery, the maximum input power of the battery is used as the fifth requested power, and the fifth requested power is sent to the auxiliary charging pile through the auxiliary battery management system controller, so that the auxiliary charging pile charges the power battery according to the fifth requested power; If it is determined that the maximum output power of the main charging pile is greater than or equal to the maximum input power of the battery, the maximum input power of the battery is used as the sixth requested power, and the sixth requested power is sent to the main charging pile so that the main charging pile charges the power battery according to the sixth requested power.

3. The method according to claim 2, characterized in that Before determining whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, and determining whether the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery, the method further includes: Determine whether the status of the auxiliary charging gun is connected; If it is determined that the state of the auxiliary charging gun is the connected state, continue to execute the step of determining whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, and determining whether the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; If it is determined that the state of the auxiliary charging gun is not the connected state, determine whether the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery; If it is determined that the pre-acquired maximum output power of the main charging pile is greater than or equal to the maximum input power of the battery, continue to perform the step of using the maximum input power of the battery as the sixth requested power, and sending the sixth requested power to the main charging pile, so that the main charging pile charges the power battery according to the sixth requested power; If it is determined that the pre-acquired maximum output power of the main charging pile is less than the maximum input power of the battery, the maximum output power of the main charging pile is used as the seventh requested power, and the seventh requested power is sent to the main charging pile, so that the main charging pile charges the power battery according to the seventh requested power.

4. The method according to claim 3, characterized in that Before determining whether the state of the auxiliary charging gun is in the connected state, the method further includes: Obtaining the temperature and power of the power battery; Determining the maximum input power of the battery according to the temperature and the power; Determine whether the power level reaches a set power threshold; If it is determined that the power level does not reach the power level threshold, determining whether the temperature reaches a set temperature threshold; If it is determined that the temperature does not reach the temperature threshold, a query instruction is sent to the secondary battery management system controller, so that the secondary battery management system controller responds to the query instruction and sends the secondary charging gun status and the maximum output power of the secondary charging pile.

5. The method according to claim 4, characterized in that Before obtaining the temperature and power of the power battery, the method further includes: Sending a first control command to the power battery, so that the power battery responds to the first control command and connects the pre-charging circuit of the power battery with the fast-charging circuit; Acquiring an internal voltage of the power battery and an external voltage of the power battery; Determining whether the internal voltage is equal to the external voltage; If it is determined that the internal voltage is equal to the external voltage, a second control command is sent to the power battery and a third control command is sent to the high-voltage distribution box, so that the power battery responds to the second control command to disconnect the pre-charging circuit and the fast-charging circuit of the power battery, and the high-voltage distribution box responds to the third control command to connect the second power channel to the first power channel.

6. The method according to claim 5, characterized in that Before determining whether the state of the auxiliary charging gun is in the connected state, the method further includes: Sending confirmation information to the secondary battery management system controller, so that the secondary battery management system controller sends an interaction status in response to the confirmation information; Determine whether the interaction state is a completed state; If it is determined that the interaction state is a completion state, sending access information to the secondary battery management system controller so that the secondary battery management system controller responds to the access information, and sending a fourth control command to the high-voltage distribution box so that the high-voltage distribution box responds to the fourth control command, so that the third power channel is connected to the first power channel; If it is determined that the interaction state is not a completed state, continue to execute the step of determining whether the interaction state is a completed state.

7. The method according to claim 4, characterized in that The method further comprises: Determine whether the power battery is faulty; If it is determined that the power battery has not failed, determining whether the first electric energy channel has failed; If it is determined that the first power channel has not failed, determining whether the second power channel has failed and determining whether the third power channel has failed; If it is determined that any one of the second power channel and the third power channel fails and the other power channel does not fail, a fifth control command is sent to the high-voltage distribution box, so that the high-voltage distribution box disconnects the failed power channel in response to the fifth control command; If it is determined that the second power channel has not failed and the third power channel has not failed, the step of obtaining the temperature and power of the power battery is continued.

8. A charging device, characterized in that: include: A first judgment module is used to judge whether the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; A first determination module, configured to use the maximum output power of the main charging pile as the first requested power if the first determination module determines that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; a sending module, configured to send the first requested power to a main charging pile, so that the main charging pile charges the power battery according to the first requested power; The first determination module is further configured to use the maximum output power of the auxiliary charging pile as the second requested power if the first determination module determines that the sum of the maximum output power of the main charging pile and the maximum output power of the auxiliary charging pile is less than the maximum input power of the battery; The sending module is further used to send the second requested power to the secondary charging pile through the secondary battery management system controller, so that the secondary charging pile charges the power battery according to the second requested power; The first determination module is further configured to use the difference between the maximum output power of the battery and the maximum output power of the main charging pile as the power provided by the secondary charging pile, and use the maximum output power of the main charging pile as the third requested power if the first determination module determines that the sum of the maximum output power of the main charging pile and the maximum output power of the secondary charging pile is greater than or equal to the maximum input power of the battery; The sending module is further used to send the third requested power to the main charging pile, so that the main charging pile charges the power battery according to the third requested power; The first determining module is further configured to use the power provided by the secondary charging pile as a fourth requested power; The sending module is further used to send the fourth requested power to the secondary charging pile through the secondary battery management system controller, so that the secondary charging pile charges the power battery according to the fourth requested power.

9. A main battery management system controller, characterized in that: include: one or more processors; Memory; And one or more computer programs, wherein the one or more computer programs are stored in the memory, and the one or more computer programs include instructions, which, when executed by the main battery management system controller, enable the main battery management system controller to execute the charging method described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, a main battery management system controller where the computer-readable storage medium is located is controlled to execute the charging method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Direct current charging pile multi-gun parallel charging method

    CN114889476A

  • Method and system for multi-section power distribution of direct current charging pile

    CN116729188A

  • Charging method and device of power battery, charging management system and vehicle

    CN116945967A

  • Double-gun charging control method and device, electronic equipment and readable storage medium

    CN117901697A

  • Power control method and system for battery charging and swap station, medium, apparatus, and battery charging and swap station

    US20230173940A1

Cited By

  • Power Domain Energy Rapid Recharge System

    TWI929872B