Elevator pulley replacement method and suspension body temporary support device

By using temporary support devices and lifting devices for hanging bodies in machine room elevators, the pulley replacement process is simplified, the problem of cumbersome processes during pulley replacement is solved, and a more efficient pulley replacement operation is achieved.

CN118929390APending Publication Date: 2024-11-12MITSUBISHI ELECTRIC BUILDING SOLUTIONS CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202311579345.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-05-09
Filing Date
2023-11-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the transformation of the machine-free elevator, the pulley needs to be replaced by a buffer to support the weight and suspended car, which leads to cumbersome processes and takes a lot of time.

Method used

Using a temporary support device for suspension, the temporary support device for suspension is arranged on the pulley mounting component through a pair of temporary support components and a lifting device to reduce the burden of pulley replacement operation, and realize it by lifting bolts and stops and guides. Stable support and movement of the suspension.

Benefits of technology

It effectively reduces the time for pulley replacement, avoids buffer and chain pulley support operations when replacing heavy reverse rope wheels, simplifies the process and improves replacement efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118929390A_ABST
    Figure CN118929390A_ABST
Patent Text Reader

Abstract

The invention provides an elevator pulley replacing method and a suspension body temporary supporting device, which can reduce the labor of pulley replacing operation. In a pulley replacement method, a suspension body temporary support device (31) is provided on a counterweight diversion sheave beam (19). Afterwards, in a state in which the pair of temporary support rollers (32) are in contact with the suspension body (24), the pair of temporary support rollers (32) are moved relative to the counterweight diversion sheave (21), whereby the suspension body (24) is suspended on the pair of temporary support rollers (32). The load applied from the suspension body (24) to the counterweight diversion sheave (21) is temporarily supported by a suspension body temporary support device (31).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a pulley replacement method of an elevator and a temporary support device for a suspension body. Background Art

[0002] In the conventional method for remodeling a machine room-less elevator, the counterweight return sheave is removed from the upper supporting body, and then a new hoisting machine is installed at the position of the upper supporting body where the counterweight return sheave was installed (for example, refer to Patent Document 1).

[0003] Prior art literature

[0004] Patent Literature

[0005] Patent Document 1: Japanese Patent No. 6806660 Summary of the invention

[0006] Problems to be solved by the invention

[0007] In the above-mentioned conventional machine room-less elevator reconstruction method, when replacing the counterweight return rope pulley with a new traction machine, the counterweight is supported by a buffer in the pit of the shaft in order to reduce the load applied to the counterweight return rope pulley. In addition, the load of the car is supported by the chain pulley. Therefore, it is necessary to perform the work of supporting the counterweight by the buffer and the work of suspending the car by the chain pulley, and the work of replacing the counterweight return rope pulley with the new traction machine is quite laborious.

[0008] The present disclosure has been made to solve the above-mentioned problems, and an object of the present disclosure is to provide an elevator pulley replacement method and a suspension body temporary support device that can reduce the labor of pulley replacement work.

[0009] Means for solving problems

[0010] The pulley replacement method of the elevator disclosed in the present invention comprises the following steps: setting a temporary support device for a suspension body on a pulley mounting component on which an existing pulley is mounted, wherein the temporary support device for the suspension body comprises a pair of temporary support components and a jacking device for moving the pair of temporary support components respectively; in a state where the pair of temporary support components are in contact with the suspension body, moving the pair of temporary support components relative to the existing pulley, hanging the suspension body on the pair of temporary support components, thereby temporarily supporting the load applied from the suspension body to the existing pulley by using the temporary support device for the suspension body; and removing the existing pulley from the pulley mounting component, and mounting a new pulley on the pulley mounting component.

[0011] The temporary support device for the suspension body of the elevator disclosed in the present invention comprises: a jacking device, which is arranged on a pulley mounting component on which a pulley is mounted; and a pair of temporary support components, which are mounted on the jacking device. The jacking device is operated in a state where it is arranged on the pulley mounting component, thereby moving the pair of temporary support components relative to the pulley, and the suspension body hung on the pulley is replaced by the pair of temporary support components, thereby temporarily supporting the load applied to the pulley from the suspension body.

[0012] Effects of the Invention

[0013] According to the present disclosure, the labor of replacing the pulley can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a perspective view showing the elevator according to Embodiment 1.

[0015] Figure 2 Yes means Figure 1 Front view of the counterweight counter rope pulley in the middle of replacement.

[0016] Figure 3 Yes means Figure 2 Front view of the mounting table.

[0017] Figure 4 Yes means Figure 3 Side view of the mounting table.

[0018] Figure 5 Yes means Figure 2 Front view of the mobility aid.

[0019] Figure 6 Yes means Figure 5 Side view of a mobility aid.

[0020] Figure 7 Yes means Figure 5 Top view of the mobility aid.

[0021] Figure 8 Yes means Figure 2 Front view of the stop and guide member.

[0022] Fig. 9 Yes means Figure 8 Side view of the stop and guide member.

[0023] Fig.10 Yes means Fig. 9 A top view of the stop and guide member.

[0024] Fig.11 It means in Figure 1 A front view of the state in which a pair of mounting platforms are provided on the counterweight anti-rope pulley beam.

[0025] Fig.12 Yes means Fig.11 Side view of the main parts.

[0026] Fig.13 It means in Fig.11 A front view of the state where the mobile assistive device is installed on each mounting platform.

[0027] Fig.14 Yes means Fig.13 Side view of the main parts.

[0028] Fig.15 It means in Fig.13 A front view of the state in which temporary supporting components are installed on each movable auxiliary device.

[0029] Fig.16 Yes means Fig.15 Side view of the main parts.

[0030] Fig.17 It means in Fig.15 A front view of the state where the lifting bolts are installed on each movable auxiliary tool.

[0031] Fig.18 Yes means Fig.17 Side view of the main parts.

[0032] Fig.19 It means that Fig.17 The front view of the mobile auxiliary device after being jacked up.

[0033] Fig. 20 It means to make Fig.19 A front view of the stopper and guide member after passing through the second guide member holding hole.

[0034] Description of symbols

[0035] 19: counterweight anti-ropes beam (pulley mounting component), 21: counterweight anti-ropes (pulley already installed), 24: suspension body, 31: temporary support device for suspension body, 32: temporary support roller (temporary support component), 33: lifting device, 34: lifting body, 41: mounting table, 41c: first guide holding hole, 41d: second guide holding hole, 41e: first stop holding hole (stop holding hole on mounting table side), 41f: second stop holding hole (stop holding hole on mounting table side), 42: moving auxiliary tool, 42d: gap, 42e: third stop holding hole (stop holding hole on auxiliary tool side), 42f: fourth stop holding hole (stop holding hole on auxiliary tool side), 42g: threaded hole, 43: auxiliary stop, 44: stopper and guide, 44c: groove, 45: lifting bolt. DETAILED DESCRIPTION

[0036] Hereinafter, embodiments will be described with reference to the drawings.

[0037] Implementation Method 1

[0038] Figure 1 1 is a perspective view showing an elevator according to Embodiment 1. The elevator according to Embodiment 1 is a machine room-less elevator using a 2:1 roping method. Figure 1 In the embodiment, a car 12 and a counterweight 13 are arranged in a hoistway 11. Figure 1 In the figure, the hoistway 11, the car 12 and some equipment are shown in perspective.

[0039] The counterweight 13 is disposed behind the car 12 when viewed from the landing side so as to face the back surface of the car 12 when located at the same height as the car 12 .

[0040] A first car guide rail 14a, a second car guide rail 14b, a first counterweight guide rail 15a, and a second counterweight guide rail 15b are provided in the hoistway 11.

[0041] The first car guide rail 14a and the second car guide rail 14b guide the raising and lowering of the car 12. The first counterweight guide rail 15a and the second counterweight guide rail 15b guide the raising and lowering of the counterweight 13.

[0042] An elevator hoisting machine 16 is provided at a lower portion in the hoistway 11. The elevator hoisting machine 16 includes a hoisting machine body 16a and a driving sheave 16b.

[0043] The hoisting machine body 16a has a hoisting machine motor (not shown) and a hoisting machine brake (not shown). The hoisting machine motor rotates the drive sheave 16b. The hoisting machine brake keeps the drive sheave 16b stationary. In addition, the hoisting machine brake brakes the rotation of the drive sheave 16b.

[0044] An L-shaped return sheave beam 17 is provided at the top of the hoistway 11. The return sheave beam 17 is supported by the first car guide rail 14a, the first counterweight guide rail 15a, and the second counterweight guide rail 15b.

[0045] Moreover, the return sheave beam 17 has a car return sheave beam 18 and a counterweight return sheave beam 19. The counterweight return sheave beam 19 is connected to one end portion of the car return sheave beam 18 at a right angle.

[0046] A first car return sheave 20a and a second car return sheave 20b are mounted on the car return sheave beam 18. A counterweight return sheave 21 is mounted on the counterweight return sheave beam 19.

[0047] A first car suspension pulley 22a and a second car suspension pulley 22b are provided at the lower portion of the car 12. A counterweight suspension pulley 23 is provided at the upper portion of the counterweight 13.

[0048] The elevator of Embodiment 1 has a driving sheave 16b, a first car return sheave 20a, a second car return sheave 20b, a counterweight return sheave 21, a first car suspending sheave 22a, a second car suspending sheave 22b, and a counterweight suspending sheave 23 as a plurality of pulleys.

[0049] The car 12 and the counterweight 13 are suspended in the hoistway 11 via a suspension body 24. As the suspension body 24, a plurality of ropes or a plurality of belts are used.

[0050] A rope end fixing beam 25 is fixed horizontally between the upper end of the second car guide rail 14b and the upper end of the second counterweight guide rail 15b. A car side rope end fixing portion (not shown) is provided on the rope end fixing beam 25. A counterweight side rope end fixing portion 26 is provided on the counterweight return sheave beam 19.

[0051] The suspension body 24 has a first end portion and a second end portion. The first end portion is connected to the car side rope end fixing portion, and the second end portion is connected to the counterweight side rope end fixing portion 26.

[0052] The suspension body 24 is wound around the first car suspending pulley 22a, the second car suspending pulley 22b, the first car return pulley 20a, the second car return pulley 20b, the driving sheave 16b, the counterweight return sheave 21, and the counterweight suspending pulley 23 in sequence from the first end side.

[0053] The car 12 and the counterweight 13 are moved up and down in the hoistway 11 by rotating the driving sheave 16 b.

[0054] An elevator control device 27 is provided at the lower portion of the hoistway 11. The elevator control device 27 controls the operation of the car 12 by controlling the elevator traction machine 16.

[0055] Figure 2 Yes means Figure 1 1 is a front view of a state in which the counterweight return sheave 21 is replaced. The pulley in the first embodiment is the counterweight return sheave 21. In addition, the pulley mounting member in the first embodiment is the counterweight return sheave beam 19.

[0056] When replacing the counterweight return sheave 21, a temporary suspension body support device 31 is provided on the counterweight return sheave beam 19. After the replacement operation of the counterweight return sheave 21, the temporary suspension body support device 31 is removed from the counterweight return sheave beam 19.

[0057] The temporary support device 31 for the suspended body has a pair of temporary support rollers 32 as a pair of temporary support members and a jacking device 33. The suspended body 24 is hung on the pair of temporary support rollers 32. The jacking device 33 is operated by an operator, thereby moving the pair of temporary support rollers 32 relative to the counterweight return sheave 21, and the suspended body 24 is hung from the counterweight return sheave 21 to the pair of temporary support rollers 32. Thus, the jacking device 33 temporarily supports the load applied from the suspended body 24 to the counterweight return sheave 21.

[0058] Each temporary support roller 32 is a member that contacts the suspension body 24. Therefore, in order not to damage the suspension body 24, at least a portion of the outer peripheral surface of each temporary support roller 32 that contacts the suspension body 24 is a curved surface.

[0059] In addition, since the suspension body 24 contacts each temporary support roller 32 only during the replacement operation of the counterweight return sheave 21, the curvature radius of the curved surface of each temporary support roller 32 may be smaller than the curvature radius required for the pulley always included in the elevator. Therefore, the curvature radius of the curved surface of each temporary support roller 32 is smaller than the curvature radius of the pulley to be replaced, and here, smaller than the curvature radius of the counterweight return sheave 21.

[0060] The outer shape of each temporary support roller 32 in Embodiment 1 is cylindrical. The axis of each temporary support roller 32 is parallel to the rotation axis of the counterweight return sheave 21 and is horizontal.

[0061] The jacking device 33 has a pair of jacking bodies 34. The pair of jacking bodies 34 have the same structure as each other. In addition, the pair of jacking bodies 34 are arranged on the counterweight return sheave beam 19 symmetrically with the counterweight return sheave 21 interposed therebetween.

[0062] Each jack-up body 34 includes a mounting base 41 , a moving aid 42 , a plurality of auxiliary stoppers 43 , a stopper-guide member 44 , and a jack-up bolt 45 .

[0063] In the first embodiment, a pair of stopper bolts or a pair of stopper pins are used as the plurality of auxiliary stoppers 43. However, Figure 2 41. The state where the plurality of auxiliary stoppers 43 are not mounted on the mounting table 41 is shown in FIG. Fig. 20 shown.

[0064] The mounting base 41 is fixed to the counterweight return sheave beam 19 by a plurality of fixing members (not shown). As each fixing member, for example, a bolt is used.

[0065] Figure 3 Yes means Figure 2 A front view of the mounting platform 41. Figure 4 Yes means Figure 34 is a side view of the mounting platform 41. The mounting platform 41 has a pair of flat plate-shaped fixing portions 41a and a pair of flat plate-shaped holding portions 41b.

[0066] Each fixing portion 41a is fixed to the upper surface of the counterweight return sheave beam 19. Each holding portion 41b protrudes from an end portion of the fixing portion 41a at a right angle to the fixing portion 41a.

[0067] The pair of holding parts 41b are opposed to each other. In addition, the pair of holding parts 41b are parallel to each other. The pair of holding parts 41b are provided with a first guide holding hole 41c, a second guide holding hole 41d, a first stopper holding hole 41e, and a second stopper holding hole 41f.

[0068] The stopper and guide member 44 is selectively inserted into the first guide member holding hole 41c and the second guide member holding hole 41d. The stopper and guide member 44 can be attached and detached relative to the mounting table 41. The shape of the first guide member holding hole 41c and the shape of the second guide member holding hole 41d are both rectangular. The size of the first guide member holding hole 41c is the same as the size of the second guide member holding hole 41d.

[0069] In addition, the second guide holding hole 41d is farther from the fixing portion 41a than the first guide holding hole 41c. That is, when the mounting base 41 is installed on the counterweight return sheave beam 19, the second guide holding hole 41d is located farther from the counterweight return sheave beam 19 than the first guide holding hole 41c.

[0070] The center line of the first guide holding hole 41c and the center line of the second guide holding hole 41d coincide with the same straight line L1. When the fixing portion 41a is fixed to a horizontal plane, the straight line L1 is inclined with respect to the horizontal plane.

[0071] The auxiliary stopper 43 is passed through the first stopper holding hole 41e and the second stopper holding hole 41f, respectively. That is, the first stopper holding hole 41e and the second stopper holding hole 41f are stopper holding holes on the mounting table side, respectively.

[0072] The first stopper holding hole 41e and the second stopper holding hole 41f are both circular in shape. The second stopper holding hole 41f has the same size as the first stopper holding hole 41e.

[0073] The first stopper holding hole 41e is located beside the first guide holding hole 41c. The second stopper holding hole 41f is located beside the second guide holding hole 41d on the opposite side to the first stopper holding hole 41e with respect to the straight line L1.

[0074] return Figure 2In each of the lift bodies 34 , the moving tool 42 is disposed between the pair of holding portions 41 b. The moving tool 42 is supported on the mounting table 41 via a stopper and guide member 44 .

[0075] Figure 5 Yes means Figure 2 A front view of a mobile aid 42. Figure 6 Yes means Figure 5 A side view of a mobility aid 42 is shown. Figure 7 Yes means Figure 5 A top view of a mobility aid 42.

[0076] The moving aid 42 includes a pair of flat plate-shaped slit plates 42a and a connecting member 42b. The pair of slit plates 42a are opposed to each other. In addition, the pair of slit plates 42a are parallel to each other. The connecting member 42b connects the pair of slit plates 42a at one end in the longitudinal direction of the pair of slit plates 42a.

[0077] The pair of slit plates 42a are provided with temporary support member mounting holes 42c, slits 42d, third stopper holding holes 42e, and fourth stopper holding holes 42f.

[0078] The temporary supporting member mounting hole 42c is provided at the other end portion in the longitudinal direction of the pair of slit plates 42a. The temporary supporting roller 32 is mounted in the temporary supporting member mounting hole 42c.

[0079] The stopper and guide member 44 passes through the slit 42d. The slit 42d is rectangular in shape. The long sides of the slit 42d are parallel to the longitudinal direction of the pair of slit plates 42a.

[0080] The auxiliary stopper 43 is respectively passed through the third stopper holding hole 42e and the fourth stopper holding hole 42f. That is, the third stopper holding hole 42e and the fourth stopper holding hole 42f are auxiliary tool side stopper holding holes.

[0081] The third stopper holding hole 42e and the fourth stopper holding hole 42f are both circular in shape. The sizes of the third stopper holding hole 42e and the fourth stopper holding hole 42f are the same as the size of the first stopper holding hole 41e.

[0082] The third stopper holding hole 42e is located closer to the temporary support member mounting hole 42c than the fourth stopper holding hole 42f. The fourth stopper holding hole 42f is located closer to the connecting member 42b than the third stopper holding hole 42e. In addition, the fourth stopper holding hole 42f is located on the opposite side of the third stopper holding hole 42e relative to the gap 42d.

[0083] The connection member 42b is provided with a screw hole 42g, and a jack bolt 45 is screwed into the screw hole 42g.

[0084] exist Figure 2 In the embodiment of the present invention, the stopper and guide member 44 passes through the second guide member holding hole 41d and the slit 42d. The tip of the jacking bolt 45 abuts against the stopper and guide member 44.

[0085] Figure 8 Yes means Figure 2 A front view of the stop and guide member 44. Fig. 9 Yes means Figure 8 A side view of the stop and guide member 44. Fig.10 Yes means Fig. 9 A top view of the stop and guide member 44.

[0086] The stopper and guide 44 has a guide main part 44a and a pair of guide protrusions 44b. The guide main part 44a is in the shape of a rectangular parallelepiped. The pair of guide protrusions 44b protrude from the same surface of the guide main part 44a in the same direction. A groove 44c is formed between the pair of guide protrusions 44b.

[0087] When the stopper and guide member 44 is mounted on the mounting platform 41, the pair of guide member protrusions 44b are located outside the mounting platform 41 and are hooked on the edge of the first guide member holding hole 41c or the second guide member holding hole 41d. That is, the edge of the first guide member holding hole 41c or the second guide member holding hole 41d is inserted into the groove 44c.

[0088] Thus, in a state where the stopper and guide member 44 is mounted on the mounting base 41 , the stopper and guide member 44 is prevented from being displaced in the insertion direction.

[0089] The cross-sectional shape of the portion of the stopper and guide 44 that passes through the first guide holding hole 41 c or the second guide holding hole 41 d is a shape other than a circle, and is a rectangle in this case. Therefore, the rotation of the moving aid 42 caused by the load from the suspension body 24 is prevented by the stopper and guide 44 .

[0090] Next, a method for replacing the counterweight return sheave 21 will be described. When replacing the counterweight return sheave 21, a pair of jacking bodies 34 are provided on the counterweight return sheave beam 19. The installation steps of the pair of jacking bodies 34 are the same, so the installation steps of one jacking body 34 will be described.

[0091] When the jacking body 34 is arranged on the counterweight anti-ropes pulley beam 19, first, Fig.11 as well as Fig.12 As shown, a mounting platform 41 is fixed on the counterweight anti-ropes beam 19. Fig.12 In the figure, the rotating shaft of the counterweight return pulley 21 and the components supporting the rotating shaft are omitted.

[0092] Then, if Fig.13 and Fig.14 As shown, the moving aid 42 is arranged between the pair of holding portions 41 b , and a stopper and guide member 44 is mounted on the mounting table 41 and the moving aid 42 .

[0093] At this time, the stopper / guide member 44 is passed through the first guide holding hole 41 c and the slit 42 d , so that the moving tool 42 is supported by the mounting table 41 via the stopper / guide member 44 .

[0094] In addition, when viewed from the front, the moving aid 42 crosses obliquely with respect to the counterweight return sheave beam 19. In addition, when viewed from the front, the moving aid 42 crosses obliquely with respect to the suspension body 24 as well.

[0095] Afterwards, if Fig.15 and Fig.16 As shown, the temporary support roller 32 is mounted on the lower end of the moving aid 42. The temporary support roller 32 is mounted on the moving aid 42 by bolts, for example.

[0096] In this state, the pair of temporary support rollers 32 is arranged right below the counterweight return pulley 21. That is, the pair of temporary support rollers 32 faces a portion of the outer peripheral surface of the counterweight return pulley 21 where the suspension body 24 is not wound.

[0097] Afterwards, if Fig.17 and Fig.18 As shown, the jacking bolt 45 is screwed into the threaded hole 42g, and the tip of the jacking bolt 45 is pressed against the stopper and guide member 44. As a result, the moving aid 42 and the temporary support roller 32 are pulled up, and the temporary support roller 32 contacts the suspension body 24. At this time, the load from the suspension body 24 does not act on the temporary support roller 32.

[0098] Next, when the jacking bolt 45 is further screwed in, Fig.19 As shown, the temporary support roller 32 is lifted up together with the moving aid 42, and the suspension body 24 is pulled away from the counterweight return rope pulley 21. That is, the contact length of the suspension body 24 relative to the counterweight return rope pulley 21 is reduced.

[0099] Thus, by screwing in the jack bolt 45 while the tip of the jack bolt 45 is in contact with the stopper and guide 44, the stopper and guide 44 moves relatively in the gap 42d. In addition, the moving tool 42 and the temporary support roller 32 move obliquely upward relative to the mounting table 41.

[0100] The moving aid 42 is pushed up until the third stopper holding hole 42e overlaps with the first stopper holding hole 41e and the fourth stopper holding hole 42f overlaps with the second stopper holding hole 41f.

[0101] The lifting operation may be performed alternately little by little on the pair of lifting bodies 34. In addition, after the lifting operation on one lifting body 34 is completed, the lifting operation on the other lifting body 34 may be performed. In addition, when performing the lifting operation, if an electric tool such as an impact drill is used, the operation time can be shortened.

[0102] Afterwards, if Fig. 20 As shown, the auxiliary stopper 43 is passed through the first stopper holding hole 41e and the third stopper holding hole 42e. In addition, the auxiliary stopper 43 is also passed through the second stopper holding hole 41f and the fourth stopper holding hole 42f.

[0103] Furthermore, the jacking bolts 45 are removed from the moving aid 42, and the stopper and guide member 44 is removed from the mounting table 41 and the moving aid 42. Then, the stopper and guide member 44 is passed through the second guide holding hole 41d and the slit 42d.

[0104] When the two auxiliary stoppers 43 are mounted on the mounting table 41 and the moving aid 42, even if the stopper-guide member 44 is removed from the mounting table 41 and the moving aid 42, the moving aid 42 is supported on the mounting table 41 via the two auxiliary stoppers 43. Therefore, the mounting position of the stopper-guide member 44 can be changed from the first guide holding hole 41c to the second guide holding hole 41d.

[0105] In a state where the stopper-guide member 44 is removed from the mounting table 41 and the moving aid 42 , the load from the hanging body 24 is transmitted to the mounting table 41 via the temporary support roller 32 , the moving aid 42 , and the two auxiliary stoppers 43 .

[0106] After the attachment position of the stopper-guide member 44 is changed, the two auxiliary stoppers 43 are removed from the attachment table 41 and the moving aid 42. Thus, the moving aid 42 is supported by the attachment table 41 again via the stopper-guide member 44.

[0107] Next, the jacking bolt 45 is screwed into the threaded hole 42g to perform the second jacking. As a result, the suspension body 24 is further pulled away from the counterweight anti-ropes beam 19, and becomes Figure 2 status.

[0108] exist Figure 2 In the state, the height of the upper end of a pair of temporary support rollers 32 reaches the height of the upper end of the counterweight return rope pulley 21. Therefore, the load from the suspension body 24 hardly acts or completely acts on the counterweight return rope pulley 21.

[0109] In this state, the counterweight return sheave 21 is removed from the counterweight return sheave beam 19, and a new pulley is mounted on the counterweight return sheave beam 19. Then, the suspension body 24 is wound around the new pulley by the reverse procedure to the above.

[0110] New pulley is for example a new counterweight return sheave. In addition, in the renovation project of elevator, when the position of counterweight return sheave 21 is provided with a new traction machine, the new pulley is the new drive sheave of the new traction machine.

[0111] Thus, the pulley replacement method of the first embodiment includes a setting step, a temporary support step, and a replacement step. In the setting step, the suspension body temporary support device 31 is installed on the counterweight return sheave beam 19.

[0112] In the temporary support process, the pair of temporary support rollers 32 are moved relative to the counterweight return sheave 21 in a state where the pair of temporary support rollers 32 are in contact with the suspension body 24, whereby the suspension body 24 is hung on the pair of temporary support rollers 32. And the load applied from the suspension body 24 to the counterweight return sheave 21 is temporarily supported by the suspension body temporary support device 31.

[0113] In the replacement process, the counterweight return sheave 21 is removed from the counterweight return sheave beam 19 , and a new sheave is mounted on the counterweight return sheave beam 19 .

[0114] In such an elevator pulley replacement method and suspension body temporary supporting device 31, the load applied from the suspension body 24 to the counterweight return sheave 21 is temporarily supported by the suspension body temporary supporting device 31. Therefore, the work of supporting the counterweight 13 by the buffer and the work of suspending the car 12 by the chain pulley are no longer necessary, and the labor of replacing the counterweight return sheave 21 can be reduced.

[0115] Moreover, at least the portion of the outer peripheral surface of each temporary support roller 32 that contacts the suspension body 24 is a curved surface. Therefore, damage to the suspension body 24 can be suppressed.

[0116] In addition, the curvature radius of the curved surface of each temporary support roller 32 is smaller than the curvature radius of the counterweight return sheave 21. Therefore, the suspended body temporary support device 31 can be made small and light.

[0117] In addition, in each jacking body 34, by passing the stopper and guide member 44 through the first guide holding hole 41c and the slit 42d, the moving aid 42 is supported on the mounting table 41 via the stopper and guide member 44. Then, the jacking bolt 45 is screwed in with the tip of the jacking bolt 45 abutting against the stopper and guide member 44. As a result, the stopper and guide member 44 moves relatively in the slit 42d, and the moving aid 42 and the temporary support roller 32 move relative to the mounting table 41.

[0118] Therefore, the hanging body 24 can be easily re-hanged from the counterweight return sheave 21 to the pair of temporary support rollers 32 by a simple structure.

[0119] In each jacking body 34, the rotation of the moving aid 42 caused by the load from the suspension body 24 is prevented by the stopper-guide member 44. Therefore, the suspension body 24 can be stably rehung from the counterweight return sheave 21 to the pair of temporary support rollers 32.

[0120] In addition, a groove 44c into which the edge of the first guide holding hole 41c is inserted is formed in each stopper and guide member 44. Therefore, the stopper and guide member 44 is prevented from shifting in the insertion direction, and the moving tool 42 and the temporary support roller 32 can be stably moved with a simple structure.

[0121] In addition, a second guide holding hole 41d is provided in each mounting platform 41. Therefore, the stopper and guide 44 can be replaced with the second guide holding hole 41d in the middle of the operation of pulling the suspension body 24 away from the counterweight return rope pulley 21. As a result, the suspension body 24 can be pulled away from the counterweight return rope pulley 21 in stages, and the length of the moving auxiliary tool 42 can be shortened relative to the distance for moving the temporary support roller 32. In addition, the space required for the operation can be reduced.

[0122] Furthermore, when the two auxiliary stoppers 43 are mounted on the mounting table 41 and the moving aid 42, even when the stopper-guide member 44 is removed from the mounting table 41 and the moving aid 42, the moving aid 42 is supported on the mounting table 41 via the two auxiliary stoppers 43. Therefore, the mounting position of the stopper-guide member 44 can be easily changed from the first guide member holding hole 41c to the second guide member holding hole 41d.

[0123] In addition, in each lifting body 34, the number of the auxiliary stopper 43 may be one or more than three. For example, if the cross-sectional shape of the auxiliary stopper 43 is an ellipse, a polygon, etc., the rotation of the moving aid 42 can be prevented by one auxiliary stopper 43, and the moving aid 42 can be supported on the mounting table 41.

[0124] In addition, each temporary supporting member is not limited to the temporary supporting roller 32. That is, the shape of each temporary supporting member is not limited to a cylindrical shape, and may be a shape in which only the portion in contact with the hanging body 24 is a curved surface.

[0125] In addition, the pulley may be, for example, the driving sheave 16b, the first car return sheave 20a, the second car return sheave 20b, the first car suspending sheave 22a, the second car suspending sheave 22b, or the counterweight suspending sheave 23.

[0126] In the first embodiment, the pair of temporary support rollers 32 are pulled up relative to the counterweight return sheave 21. However, depending on the position of the pulley relative to the pulley mounting member, the position of the temporary suspension support device relative to the pulley mounting member, etc., the pair of temporary support members may be pushed up, pulled down, or pressed down relative to the pulley.

[0127] In the first embodiment, a pair of jacking bodies 34 are used for the pair of temporary support rollers 32 , but the jacking device may be configured so as to simultaneously move the pair of temporary support rollers 32 by operating one jacking bolt.

[0128] In addition, the layout of the elevator is not limited to Figure 1 For example, the elevator traction machine 16 may be disposed at the top of the hoistway 11. In addition, the counterweight 13 may be disposed on the side of the car 12 when viewed from the landing.

[0129] As mentioned above, although the preferred embodiments and the like have been described in detail, the present invention is not limited to the above-mentioned embodiments and the like, and various modifications and substitutions can be added to the above-mentioned embodiments and the like without departing from the scope described in the claims.

[0130] Hereinafter, each aspect of the present disclosure will be collectively described as a supplementary note.

[0131] (Note 1)

[0132] A method for replacing a pulley of an elevator comprises the following steps:

[0133] The temporary support device for the suspension body is installed on the pulley installation component on which the pulley is installed, wherein the temporary support device for the suspension body has a pair of temporary support components and a jacking device for moving the pair of temporary support components respectively;

[0134] In a state where the pair of temporary supporting members are in contact with the suspension body, the pair of temporary supporting members are moved relative to the installed pulley, and the suspension body is hung on the pair of temporary supporting members, thereby temporarily supporting the load applied from the suspension body to the installed pulley by the suspension body temporary supporting device; and

[0135] The existing pulley is removed from the pulley mounting member, and a new pulley is mounted on the pulley mounting member.

[0136] (Note 2)

[0137] A temporary support device for a suspension body of an elevator, comprising:

[0138] a jacking device, which is provided on a pulley mounting component on which the pulley is mounted; and

[0139] a pair of temporary support members mounted on the jacking device,

[0140] The jacking device is operated while being arranged on the pulley mounting member, thereby moving the pair of temporary supporting members relative to the pulley, and rehanging the suspension body hung on the pulley on the pair of temporary supporting members, thereby temporarily supporting the load applied to the pulley from the suspension body.

[0141] (Note 3)

[0142] According to the temporary support device for the suspension body of an elevator described in Supplementary Note 2,

[0143] At least a portion of the outer peripheral surface of each of the temporary supporting members that contacts the hanging body is a curved surface.

[0144] (Note 4)

[0145] The temporary support device for the suspension body of an elevator according to Supplementary Note 3, wherein:

[0146] The curvature radius of the curved surface is smaller than the curvature radius of the pulley.

[0147] (Note 5)

[0148] The temporary support device for the suspension body of an elevator according to any one of Supplementary Notes 2 to 4, wherein:

[0149] The lifting device comprises a pair of lifting bodies.

[0150] Each of the lifting bodies has:

[0151] A mounting platform provided with a first guide holding hole and fixed to the pulley mounting component;

[0152] a moving aid provided with a slit and a threaded hole, the temporary support member being mounted on the moving aid;

[0153] a stopper-cum-guide member passing through the first guide member holding hole and the slit; and

[0154] Jacking bolts, which are screwed into the threaded holes,

[0155] By passing the stopper and guide member through the first guide member holding hole and the slit, the moving aid is supported on the mounting table via the stopper and guide member.

[0156] By screwing the jack bolt in a state where the tip of the jack bolt abuts against the stopper-guide member, the stopper-guide member relatively moves in the gap, and the moving aid and the temporary supporting member move relative to the mounting table.

[0157] (Note 6)

[0158] The temporary support device for the suspension body of an elevator according to Supplementary Note 5, wherein:

[0159] The rotation of the moving aid caused by the load from the suspension body is prevented by the stopper-guide member.

[0160] (Note 7)

[0161] The temporary support device for the suspension body of an elevator according to Supplement 5 or 6, wherein:

[0162] The stopper-guide member has a groove formed therein into which the edge of the first guide holding hole is inserted.

[0163] (Note 8)

[0164] The temporary support device for the suspension body of an elevator according to any one of Supplementary Notes 5 to 7, wherein:

[0165] The mounting platform is provided with a second guide member holding hole for the stopper and guide member to pass through.

[0166] In a state where the mounting base is installed on the pulley mounting member, the second guide holding hole is located farther from the pulley mounting member than the first guide holding hole.

[0167] (Note 9)

[0168] The temporary support device for the suspension body of an elevator according to Supplementary Note 8, wherein:

[0169] Each of the lifting bodies also has an auxiliary stopper.

[0170] The mounting platform is provided with a mounting platform side stopper retaining hole,

[0171] The moving aid is provided with an aid side stopper retaining hole,

[0172] By passing the auxiliary stopper through the mounting table-side stopper holding hole and the tool-side stopper holding hole, the moving tool is supported by the mounting table via the auxiliary stopper even when the stopper-guide is removed from the mounting table and the moving tool.

Claims

1. A method for replacing a pulley of an elevator, comprising the following steps: The temporary support device for the suspension body is arranged on the pulley installation component on which the pulley is installed, wherein: The temporary support device for the suspension body comprises a pair of temporary support members and a jacking device for moving the pair of temporary support members respectively; In a state where the pair of temporary supporting members are in contact with the suspension body, the pair of temporary supporting members are moved relative to the installed pulley, and the suspension body is hung on the pair of temporary supporting members, thereby temporarily supporting the load applied from the suspension body to the installed pulley by the suspension body temporary supporting device; and The existing pulley is removed from the pulley mounting member, and a new pulley is mounted on the pulley mounting member.

2. A temporary support device for a suspension body of an elevator, comprising: a jacking device, which is provided on a pulley mounting component on which the pulley is mounted; and a pair of temporary support members mounted on the jacking device, The jacking device is operated while being arranged on the pulley mounting member, thereby moving the pair of temporary supporting members relative to the pulley, and rehanging the suspension body hung on the pulley on the pair of temporary supporting members, thereby temporarily supporting the load applied to the pulley from the suspension body.

3. The temporary support device for the suspension body of an elevator according to claim 2, wherein: At least a portion of the outer peripheral surface of each of the temporary supporting members that contacts the hanging body is a curved surface.

4. The temporary support device for the suspension body of an elevator according to claim 3, wherein: The curvature radius of the curved surface is smaller than the curvature radius of the pulley.

5. The temporary support device for the suspension body of an elevator according to any one of claims 2 to 4, wherein: The lifting device comprises a pair of lifting bodies. Each of the lifting bodies has: A mounting platform provided with a first guide holding hole and fixed to the pulley mounting component; a moving aid provided with a slit and a threaded hole, the temporary support member being mounted on the moving aid; a stopper and guide member passing through the first guide member holding hole and the slit; as well as Jacking bolts, which are screwed into the threaded holes, By passing the stopper and guide member through the first guide member holding hole and the slit, the moving aid is supported on the mounting table via the stopper and guide member. By screwing the jack bolt in a state where the tip of the jack bolt abuts against the stopper-guide member, the stopper-guide member relatively moves in the gap, and the moving aid and the temporary supporting member move relative to the mounting table.

6. The temporary support device for the suspension body of an elevator according to claim 5, wherein: The rotation of the moving aid caused by the load from the suspension body is prevented by the stopper-guide member.

7. The temporary support device for the suspension body of an elevator according to claim 5 or 6, wherein: The stopper-guide member has a groove formed therein into which the edge of the first guide holding hole is inserted.

8. The temporary support device for the suspension body of an elevator according to any one of claims 5 to 7, wherein: The mounting platform is provided with a second guide member holding hole for the stopper and guide member to pass through. In a state where the mounting base is installed on the pulley mounting member, the second guide holding hole is located farther from the pulley mounting member than the first guide holding hole.

9. The temporary support device for the suspension body of an elevator according to claim 8, wherein: Each of the lifting bodies also has an auxiliary stopper. The mounting platform is provided with a mounting platform side stopper retaining hole, The moving aid is provided with an aid side stopper retaining hole, By passing the auxiliary stopper through the mounting table-side stopper holding hole and the tool-side stopper holding hole, the moving tool is supported by the mounting table via the auxiliary stopper even when the stopper-guide is removed from the mounting table and the moving tool.

Citation Information

Patent Citations

  • Backpack type indirect dragging elevator

    CN216190212U

  • JP1988123569U

  • Method and device for replacing pulley of elevator

    JP2003238048A

  • Tool for replacing winding machine of elevator

    JP2004244162A

  • Elevator pulley replacing method and suspension body temporary support device

    JP2024161967A