Pi-shaped steel-concrete composite beam assembly type hoisting method
Through the prefabricated lifting method of π-shaped steel-mixed composite beams, and the lifting device and steel sheathing technologies are used to solve the problems of large steel consumption and high cost in the existing pre-embedded lifting method, and the safety and reliability of bridge lifting are achieved. and recycling.
Patent Information
- Application Number
- CN202411066658.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-12
AI Technical Summary
In the existing bridge construction methods, the embedded steel plates have problems such as large steel consumption, high cost and inability to recycle by lifting lugs.
The prefabricated lifting method of π-shaped steel-concrete combination beam is adopted. The lifting device includes two hanging frames distributed along the longitudinal bridge direction and a lifting hole arranged on the bridge deck panel, and the bottom joists and upper beams are used to support the steel beams, combined with steel protection. The sleeves and retractors are lifted to reduce the squeezing effect on the bridge deck, and lift the lifting equipment through slings.
It reduces the lifting cost, realizes the recycling of steel, improves the reliability and safety of lifting, avoids steel damage, and protects the bridge panel through limiting action.
Smart Images

Figure CN118929400A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to an assembled hoisting method for a π-shaped steel-concrete composite beam. Background Art
[0002] During bridge construction, the arched steel-concrete composite beam will be prefabricated, and then the arched steel-concrete composite beam will be hoisted onto a vehicle for transportation. The arched steel-concrete composite beam includes a bridge deck of concrete structure, a left steel beam and a right steel beam, the left steel beam and the right steel beam are distributed along the transverse direction of the bridge and extend in the longitudinal direction of the bridge, the left steel beam includes a left top plate, a left vertical plate and a left bottom plate, the left top plate, the left vertical plate and the left bottom plate are connected together in an "I" shape, and the right steel beam includes a right top plate, a right vertical plate and a right bottom plate, the right top plate, the right vertical plate and the right bottom plate are connected together in an "I" shape. In order to be able to hoist, the existing method is to embed a steel plate with bolts in the bridge deck, and then install the lifting lugs on the bridge deck by nuts and bolts, and lift the lifting lugs by using equipment such as a gantry truck and slings to achieve lifting. This lifting method has the following shortcomings: in order to ensure the strength of the pre-embedded method, the steel plate area must be large, and the load-bearing capacity is insufficient, resulting in a large consumption of steel, and the bolts exposed on the bridge deck need to be cut off, which leads to high lifting costs, and the pre-embedded steel cannot be recycled. Summary of the invention
[0003] The present invention aims to provide a method for assembling and hoisting a recyclable π-shaped steel-concrete composite beam, which solves the problem of high hoisting cost in the existing method of hoisting by lifting ears.
[0004] In order to achieve the above-mentioned invention object, the present invention adopts the following technology: a π-shaped steel-concrete composite beam assembly lifting method, the π-shaped steel-concrete composite beam includes a bridge deck of concrete structure, a left steel beam and a right steel beam, the left steel beam and the right steel beam are distributed in the transverse direction of the bridge and extend in the longitudinal direction of the bridge and are connected to the lower surface of the bridge deck, and it is characterized in that it is completed by a lifting device, the lifting device includes two hangers distributed in the longitudinal direction of the bridge and two pairs of lifting holes distributed in the longitudinal direction of the bridge arranged on the bridge deck, the left steel beam and the right steel are located between the two lifting holes in the same pair of through holes, the hanger includes a bottom supporting beam, an upper cross beam and two vertical hangers, the lower ends of the two vertical hangers are connected to the The two ends and the upper end of the bottom support beam are connected to the two ends of the upper cross beam one by one, and the two vertical suspension rods are inserted into the two lifting holes in a pair of penetration holes one by one. The bottom support beam and the upper cross beam extend in the transverse direction of the bridge. The bottom support beam is used to support the lower sides of the left steel beam and the right steel beam. The upper cross beam is located above the bridge deck. The upper cross beam is provided with two lifting holes, and the lifting holes are provided with steel sheaths, and the steel sheaths are provided with hanging pins, which are connected to the lifting equipment through slings. The process of lifting the π-type steel-concrete composite beam is to lift the slings through the lifting equipment, thereby lifting the π-type steel-concrete composite beam to the set position through the bottom support beam, and then remove the lifting device. This technical solution will not produce a large squeezing effect on the bridge deck during lifting, and it is not easy to cause damage to the π-type steel-concrete composite beam. At the same time, the lifting holes can play a limiting role.
[0005] Preferably, the vertical suspension rod is connected to the bottom support beam through the lower connecting pin of the suspension rod, and the vertical suspension rod is connected to the upper cross beam through the upper connecting pin of the suspension rod. When installing and disassembling the assembled hanger device, just pull out the upper and lower connecting pins of the suspension rod, which is convenient for installation and disassembly.
[0006] Preferably, the bottom supporting beam comprises two lower channel steels, the lower channel steel comprises a lower channel steel top plate, a lower channel steel side plate whose upper end is connected to one end of the lower channel steel top plate, and a lower channel steel bottom plate whose one end is connected to the lower end of the lower channel steel side plate, the vertical hanging rod is located between the lower channel steel side plates of the two lower channel steels, the vertical hanging rod and the lower channel steel top plate are located on both sides of the lower channel steel side plates, the upper ends of the two lower channel steels are welded to the upper reinforcing plate of the bottom supporting beam, and the lower ends are welded to the lower reinforcing plate of the bottom supporting beam, and the lower connecting pins of the hanging rods are simultaneously penetrated through the lower channel steel side plates of the two lower channel steels; the upper crossbeam includes The upper channel steel comprises two upper channel steels, the upper channel steel comprises an upper channel steel top plate, an upper channel steel side plate whose upper end is connected to one end of the upper channel steel top plate, and an upper channel steel bottom plate whose one end is connected to the lower end of the upper channel steel side plate. The vertical suspension rod is located between the two upper channel steels, and the vertical suspension rod and the upper channel steel top plate are located on both sides of the upper channel steel side plate. The upper ends of the two upper channel steels are welded to the upper reinforcement plate of the upper cross beam, and the lower ends are welded to the upper reinforcement plate of the upper cross beam. The connecting pins on the suspension rod are simultaneously penetrated on the upper channel steel side plates of the two upper channel steels, and the steel sheath is simultaneously penetrated on the upper channel steel side plates of the two upper channel steels. The suspension rod is reliably fixed and has good stability and structural strength.
[0007] Preferably, the two ends of the lower connecting pin of the suspension rod are correspondingly inserted into the two bottom supporting beam reinforcement blocks, and the two bottom supporting beam reinforcement blocks are correspondingly welded to the lower channel steel side plates of the two lower channel steels; the two ends of the upper connecting pin of the suspension rod are correspondingly inserted into the two upper cross beam reinforcement blocks, and the two upper cross beam reinforcement blocks are correspondingly welded to the upper channel steel side plates of the two upper channel steels. The strength of the stress-bearing part can be improved, and the strength improvement requirement can be met with less cost.
[0008] Preferably, the bottom support beam reinforcement block is located on the side of the lower channel steel side plate away from the vertical suspension rod, and the upper cross beam reinforcement block is located on the side of the upper channel steel side plate away from the vertical suspension rod, which is convenient for welding connection.
[0009] Preferably, two limit blocks are welded on the lower support beam, and the left steel beam and the right steel beam are located between the two limit blocks, so as to avoid displacement of the π-shaped steel-concrete composite beam during hoisting and damage to the vertical suspension rod, thereby improving safety during use.
[0010] Preferably, a reinforcing support frame is also included, the left steel beam includes a left top plate, a left vertical plate and a left bottom plate, the left top plate, the left vertical plate and the left bottom plate are connected together in an "I" shape, the right steel beam includes a right top plate, a right vertical plate and a right bottom plate, the right top plate, the right vertical plate and the right bottom plate are connected together in an "I" shape, the reinforcing support frame includes a cross support and two cross-arranged oblique supports, a left lower connecting piece is welded to the inner lower end of the left steel beam, and a left upper connecting piece is welded to the upper end, the left lower connecting piece is welded to the left vertical plate and the left bottom plate at the same time, and the left upper connecting piece is welded to the left vertical plate and the left top plate at the same time At the same time, the right steel beam is welded with a right lower connecting piece at the inner lower end and a right upper connecting piece at the upper end. The right lower connecting piece is welded with the right vertical plate and the right bottom plate at the same time, and the right upper connecting piece is welded with the right vertical plate and the right top plate at the same time; the left end of the horizontal support is detachably connected to the left lower connecting piece, and the right end is detachably connected to the right lower connecting piece. The lower end of one oblique support is detachably connected to the left lower connecting piece, and the other end is detachably connected to the right upper connecting piece. The lower end of another oblique support is detachably connected to the right lower connecting piece, and the other end is connected to the left upper connecting piece. It can avoid damage to the left and right steel beams during hoisting. Strengthening the support value can be recycled.
[0011] Preferably, the left end of the horizontal support and the lower end of one oblique support are detachably connected to the lower left connecting piece through the lower left latch, the right end of the horizontal support and the lower end of another oblique support are detachably connected to the lower right connecting piece through the lower right latch, the upper end of one oblique support is detachably connected to the upper right connecting piece through the upper right connecting pin, and the upper end of another oblique support is detachably connected to the upper left connecting piece through the upper left connecting pin. The structure is compact.
[0012] Preferably, the two ends of the steel sheath are respectively passed through two reinforcing sheets, the upper end of one reinforcing sheet is welded to the lower surface of the top plate of the upper channel steel portion of one upper channel steel, and the lower end is welded to the upper surface of the bottom plate of the upper channel steel portion of one upper channel steel, and the upper end of the other reinforcing sheet is welded to the lower surface of the top plate of the upper channel steel portion of another upper channel steel, and the lower end is welded to the upper surface of the bottom plate of the upper channel steel portion of another upper channel steel. The connection strength can be improved.
[0013] Preferably, the two ends of the suspension pin are connected to the lifting equipment through a sling, and the lower end of the sling is provided with a permanent magnet sleeve, the upper end of the permanent magnet sleeve exceeds the upper channel steel, and the lower end is located below the top plate of the upper channel steel, and a permanent magnet block is fixed on the upper side of the upper channel steel, and the permanent magnet block is located between the permanent magnet sleeves on the two slings, and the two poles of the permanent magnet block are distributed along the horizontal bridge direction, and the polarity of the permanent magnet sleeve is distributed along the vertical direction, and the polarity of the upper end of the permanent magnet sleeve on one sling is the same as the polarity of the permanent magnet block near the end of the permanent magnet sleeve on one sling, and the polarity of the upper end of the permanent magnet sleeve on the other sling is the same as the polarity of the permanent magnet block near the end of the permanent magnet sleeve on the other sling. When the sling shakes in the case of contact with the upper beam, wear can be reduced.
[0014] Beneficial effects: It can be installed and disassembled for recycling, which reduces the cost of lifting and has good reliability and safety during lifting. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the use status of the lifting device in the first embodiment of the present invention; Figure 2 It is a schematic diagram of the cross section of the bottom support beam at the connection of the vertical hanger rod; Figure 3 It is a schematic diagram of the cross section of the upper beam at the connection of the vertical suspension rod; Figure 4 It is a schematic diagram of the cross section of the upper beam at the connection of the sling; Figure 5 It is a partial schematic diagram of the lifting device in the second embodiment.
[0016] In the figure: bridge deck 1, left steel beam 2, right steel beam 3, left top plate 4, left vertical plate 5, left bottom plate 6, right top plate 7, right vertical plate 8, right bottom plate 9, lifting hole 10, bottom support beam 11, upper cross beam 12, vertical suspension rod 13, steel sheath 15, suspension pin 16, suspension rope 17, lifting equipment 18, suspension rod lower connecting pin 19, suspension rod upper connecting pin 20, lower channel steel 21, lower channel steel top plate 22, lower channel steel side plate 23, lower channel steel bottom plate 24, bottom support beam upper reinforcing plate 25, bottom support beam lower reinforcing plate 26, bottom support beam reinforcing block 27, limit block 28, upper channel steel 29, upper channel steel top plate 30, upper channel steel side plate 31, The bottom plate 32 of the upper channel steel portion, the upper reinforcing plate 33 of the upper cross beam portion, the lower reinforcing plate 34 of the upper cross beam portion, the reinforcing block 35 of the upper cross beam portion, the reinforcing plate 36, the transverse support 37, the lower left connecting plate 38, the upper left connecting plate 39, the lower right connecting plate 40, the upper right connecting plate 41, an oblique support 42, another oblique support 43, the lower left latch 44, the lower right latch 45, the upper right connecting pin 46, the upper left connecting pin 47, the permanent magnet sleeve 48, the permanent magnet block 49, the permanent magnet sleeve 50 on one sling, the permanent magnet sleeve end 51 of the permanent magnet block close to one sling, the permanent magnet sleeve 53 on another sling, and the permanent magnet sleeve end 52 on another sling. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] Example 1, see Figures 1 to 4 A method for assembling a π-shaped steel-concrete composite beam. The π-shaped steel-concrete composite beam includes a bridge deck 1 of a concrete structure, a left steel beam 2 and a right steel beam 3. The left steel beam and the right steel beam are distributed in the transverse direction of the bridge and extend in the longitudinal direction of the bridge and are connected to the lower surface of the bridge deck. The left steel beam includes a left top plate 4, a left vertical plate 5 and a left bottom plate 6. The left top plate, the left vertical plate and the left bottom plate are connected together in an "I" shape. The left top plate is connected to the lower surface of the bridge deck. The right steel beam includes a right top plate 7, a right vertical plate 8 and a right bottom plate 9. The right top plate, the right vertical plate and the right bottom plate are connected together in an "I" shape.
[0019] The lifting device is used to complete the lifting. The lifting device includes two hangers distributed along the longitudinal direction of the bridge and two pairs of lifting holes 10 arranged on the bridge deck and distributed along the longitudinal direction of the bridge. The left steel beam and the right steel beam are located between the two lifting holes in the same pair of holes. The hanger includes a bottom support beam 11, an upper cross beam 12 and two vertical hangers 13. The lower ends of the two vertical hangers are connected to the two ends of the bottom support beam one by one, and the upper ends are connected to the two ends of the upper cross beam one by one. The two vertical hangers are passed through the two lifting holes in the pair of holes one by one. The bottom support beam and the upper cross beam extend along the transverse direction of the bridge. The bottom support beam is used to support the lower side of the left steel beam and the right steel beam. The upper cross beam is located above the bridge deck. The upper cross beam is provided with two lifting holes. The lifting holes are provided with steel sheaths 15. The steel sheaths are provided with hanging pins 16. The hanging pins are connected to the lifting equipment 18 through slings 17.
[0020] The vertical suspension rod is connected together with the bottom support beam by a connecting pin 19 under the suspension rod. The vertical suspension rod is connected together with the upper cross beam by a connecting pin 20 on the suspension rod. The bottom support beam includes two lower channel steels 21, the lower channel steels include a lower channel steel top plate 22, a lower channel steel side plate 23 whose upper end is connected to one end of the lower channel steel top plate, and a lower channel steel bottom plate 24 whose one end is connected to the lower end of the lower channel steel side plate. The vertical suspension rod is located between the lower channel steel side plates of the two lower channel steels. The vertical suspension rod and the lower channel steel top plate are located on both sides of the lower channel steel side plates. The upper ends of the two lower channel steels are welded to the upper reinforcement plate 25 of the bottom support beam part, and the lower ends are welded to the lower reinforcement plate 26 of the bottom support beam part. The lower connecting pin of the suspension rod is simultaneously penetrated through the lower channel steel side plates of the two lower channel steels; the two ends of the lower connecting pin of the suspension rod are correspondingly penetrated through two bottom support beam reinforcement blocks 27, and the two bottom support beam reinforcement blocks are correspondingly welded to the lower channel steel side plates of the two lower channel steels. The bottom support beam reinforcement block is located on the side of the lower channel steel side plate away from the vertical suspension rod. Two limit blocks 28 are welded on the lower support beam, and the left steel beam and the right steel beam are located between the two limit blocks. The upper cross beam includes two upper channel steels 29, and the upper channel steel includes an upper channel steel top plate 30, an upper channel steel side plate 31 whose upper end is connected to one end of the upper channel steel top plate, and an upper channel steel bottom plate 32 whose one end is connected to the lower end of the upper channel steel side plate. The vertical hanging rod is located between the two upper channel steels, and the vertical hanging rod and the upper channel steel top plate are located on both sides of the upper channel steel side plate. The upper ends of the two upper channel steels are welded to the upper reinforcing plate 33 of the upper cross beam, and the lower ends are welded to the lower reinforcing plate 34 of the upper cross beam. The connecting pins on the hanging rods are simultaneously penetrated through the upper channel steel side plates of the two upper channel steels, and the steel sheaths are simultaneously penetrated through the upper channel steel side plates of the two upper channel steels. The two ends of the connecting pin on the suspension rod are respectively passed through the two upper cross beam reinforcement blocks 35, and the two upper cross beam reinforcement blocks are respectively welded to the upper channel steel side plates of the two upper channel steels. The upper cross beam reinforcement block is located on the side of the upper channel steel side plate away from the vertical suspension rod. The two ends of the steel sheath are respectively passed through the two reinforcement plates 36, the upper end of one reinforcement plate is welded to the lower surface of the upper channel steel top plate of one upper channel steel, and the lower end is welded to the upper surface of the upper channel steel bottom plate of one upper channel steel, and the upper end of the other reinforcement plate is welded to the lower surface of the upper channel steel top plate of another upper channel steel, and the lower end is welded to the upper surface of the upper channel steel bottom plate of another upper channel steel. The two ends of the suspension pin are connected to the lifting equipment through a sling.
[0021] It also includes a reinforced support frame, which includes a transverse support 37 and two cross-arranged oblique supports. A left lower connecting piece 38 is welded to the inner lower end of the left steel beam, and a left upper connecting piece 39 is welded to the upper end. The left lower connecting piece is welded to the left vertical plate and the left bottom plate at the same time, and the left upper connecting piece is welded to the left vertical plate and the left top plate at the same time. A right lower connecting piece 40 is welded to the inner lower end of the right steel beam, and a right upper connecting piece 41 is welded to the upper end. The right lower connecting piece is welded to the right vertical plate and the right bottom plate at the same time, and the right upper connecting piece is welded to the right vertical plate and the right top plate at the same time. The left end of the horizontal support is detachably connected to the lower left connecting piece, and the right end is detachably connected to the lower right connecting piece. The lower end of an inclined support 42 is detachably connected to the lower left connecting piece, and the other end is detachably connected to the upper right connecting piece. The lower end of another inclined support 43 is detachably connected to the lower right connecting piece, and the other end is connected to the upper left connecting piece. Specifically: the left end of the horizontal support and the lower end of one inclined support are detachably connected to the lower left connecting piece through a lower left pin 44, the right end of the horizontal support and the lower end of another inclined support are detachably connected to the lower right connecting piece through a lower right pin 45, the upper end of one inclined support is detachably connected to the upper right connecting piece through an upper right connecting pin 46, and the upper end of the other inclined support is detachably connected to the upper left connecting piece through an upper left connecting pin 47.
[0022] The process of lifting the π-shaped steel-concrete composite beam is to lift the sling through the lifting equipment, thereby lifting the π-shaped steel-concrete composite beam to the set position through the bottom support beam, and then remove the assembled hanger device. This technical solution will not produce a large squeezing effect on the bridge deck during lifting, and it is not easy to cause damage to the π-shaped steel-concrete composite beam. At the same time, the lifting hole can play a limiting role.
[0023] Embodiment 2 is different from Embodiment 1 in that: See also Figure 5 A permanent magnet sleeve 48 is sleeved on the lower end of the sling, the upper end of the permanent magnet sleeve exceeds the upper channel steel, and the lower end is located below the top plate of the upper channel steel. A permanent magnet block 49 is fixed on the upper side of the upper channel steel. The permanent magnet block is located between the permanent magnet sleeves on the two slings on the same sling pin. The two poles of the permanent magnet block are distributed along the transverse bridge direction, and the polarity of the permanent magnet sleeve is distributed along the up and down direction. The polarity of the upper end of the permanent magnet sleeve 50 on one sling is the same as the polarity of the permanent magnet sleeve end 51 of the permanent magnet block close to one sling, and the polarity of the upper end of the permanent magnet sleeve 53 on the other sling is the same as the polarity of the permanent magnet sleeve end 52 of the permanent magnet block close to the other sling.
[0024] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for assembling a π-shaped steel-concrete composite beam, wherein the π-shaped steel-concrete composite beam comprises a bridge deck of a concrete structure, a left steel beam and a right steel beam, wherein the left steel beam and the right steel beam are distributed in the transverse direction of the bridge and extend in the longitudinal direction of the bridge and are connected to the lower surface of the bridge deck, characterized in that: The installation is completed by a lifting device, which includes two hangers distributed along the longitudinal direction of the bridge and two pairs of lifting holes arranged on the bridge deck and distributed along the longitudinal direction of the bridge. The left steel beam and the right steel beam are located between the two lifting holes in the same pair of penetration holes. The hanger includes a bottom support beam, an upper cross beam and two vertical hangers. The lower ends of the two vertical hangers are connected to the two ends of the bottom support beam one by one, and the upper ends are connected to the two ends of the upper cross beam one by one. The two vertical hangers are penetrated into the two penetration holes in the pair of penetration holes one by one. The bottom supporting beam and the upper cross beam both extend in the transverse direction of the bridge, and the bottom is detached to support the lower sides of the left steel beam and the right steel beam. The upper cross beam is located above the bridge deck, and two lifting holes are provided on the upper cross beam. Steel sheaths are passed through the lifting holes, and hanging pins are passed through the steel sheaths. The hanging pins are connected to the lifting equipment through slings. The process of lifting the π-shaped steel-concrete composite beam is to lift the slings through the lifting equipment, thereby lifting the π-shaped steel-concrete composite beam to the set position through the bottom supporting beam, and then removing the hanger device.
2. The method for assembling a π-shaped steel-concrete composite beam according to claim 1, characterized in that: The vertical suspension rod is connected with the bottom support beam through a lower connecting pin, and the vertical suspension rod is connected with the upper cross beam through an upper connecting pin.
3. The method for assembling a π-shaped steel-concrete composite beam according to claim 2, characterized in that: The bottom supporting beam comprises two lower channel steels, the lower channel steels comprise a lower channel steel top plate, a lower channel steel side plate whose upper end is connected to one end of the lower channel steel top plate, and a lower channel steel bottom plate whose one end is connected to the lower end of the lower channel steel side plate. The vertical hanging rod is located between the lower channel steel side plates of the two lower channel steels. The vertical hanging rod and the lower channel steel top plate are located on both sides of the lower channel steel side plates. The upper ends of the two lower channel steels are welded to the upper reinforcing plate of the bottom supporting beam, and the lower ends are welded to the lower reinforcing plate of the bottom supporting beam. The lower connecting pins are simultaneously penetrated through the lower channel steel side plates of the two lower channel steels. The upper crossbeam comprises two The upper channel steel comprises an upper channel steel top plate, an upper channel steel side plate whose upper end is connected to one end of the upper channel steel top plate and an upper channel steel bottom plate whose one end is connected to the lower end of the upper channel steel side plate. The vertical hanger is located between the two upper channel steels. The vertical hanger and the upper channel steel top plate are located on both sides of the upper channel steel side plate. The upper ends of the two upper channel steels are welded to the upper reinforcing plate of the upper cross beam portion and the lower ends are welded to the upper reinforcing plate of the upper cross beam portion. The upper connecting pins are simultaneously passed through the upper channel steel side plates of the two upper channel steels, and the steel sheaths are simultaneously passed through the upper channel steel side plates of the two upper channel steels.
4. The method for assembling a π-shaped steel-concrete composite beam according to claim 3 is characterized in that: The two ends of the lower connecting pin are correspondingly passed through the two bottom supporting beam reinforcement blocks, and the two bottom supporting beam reinforcement blocks are correspondingly welded to the lower channel steel side plates of the two lower channel steels; the two ends of the upper connecting pin are correspondingly passed through the two upper cross beam reinforcement blocks, and the two upper cross beam reinforcement blocks are correspondingly welded to the upper channel steel side plates of the two upper channel steels.
5. The method for assembling a π-shaped steel-concrete composite beam according to claim 4, characterized in that: The bottom supporting beam reinforcement block is located on a side of the lower channel steel side plate away from the vertical suspension rod, and the upper cross beam reinforcement block is located on a side of the upper channel steel side plate away from the vertical suspension rod.
6. A method for assembling a π-shaped steel-concrete composite beam according to claim 1, 2, 3, 4 or 5, characterized in that: Two limiting blocks are welded on the lower supporting beam, and the left steel beam and the right steel beam are located between the two limiting blocks.
7. A method for assembling a π-shaped steel-concrete composite beam according to claim 1, 2, 3, 4 or 5, characterized in that: It also includes a reinforcing support frame, the left steel beam includes a left top plate, a left vertical plate and a left bottom plate, the left top plate, the left vertical plate and the left bottom plate are connected together in an "I" shape, the right steel beam includes a right top plate, a right vertical plate and a right bottom plate, the right top plate, the right vertical plate and the right bottom plate are connected together in an "I" shape, the reinforcing support frame includes a transverse support and two cross-arranged oblique supports, a left lower connecting piece is welded to the inner lower end of the left steel beam, and a left upper connecting piece is welded to the upper end, the left lower connecting piece is welded to the left vertical plate and the left bottom plate at the same time, and the left upper connecting piece is welded to the left vertical plate and the left top plate at the same time, A right lower connecting piece is welded to the inner lower end of the right steel beam, and an upper right connecting piece is welded to the upper end. The lower right connecting piece is welded to the right vertical plate and the right bottom plate at the same time, and the upper right connecting piece is welded to the right vertical plate and the right top plate at the same time; the left end of the horizontal support is detachably connected to the left lower connecting piece, and the right end is detachably connected to the right lower connecting piece, the lower end of one oblique support is detachably connected to the left lower connecting piece, and the other end is detachably connected to the right upper connecting piece, the lower end of another oblique support is detachably connected to the right lower connecting piece, and the other end is connected to the left upper connecting piece.
8. The method for assembling a π-shaped steel-concrete composite beam according to claim 7, characterized in that: The left end of the horizontal support and the lower end of an inclined support are detachably connected to the lower left connecting piece through a lower left pin, the right end of the horizontal support and the lower end of another inclined support are detachably connected to the lower right connecting piece through a lower right pin, the upper end of one inclined support is detachably connected to the upper right connecting piece through an upper right connecting pin, and the upper end of another inclined support is detachably connected to the upper left connecting piece through an upper left connecting pin.
9. A method for assembling a π-shaped steel-concrete composite beam according to claim 3, 4 or 5, characterized in that: The two ends of the steel sheath are respectively passed through two reinforcement plates, the upper end of one reinforcement plate is welded to the lower surface of the top plate of the upper channel steel part of an upper channel steel, and the lower end is welded to the upper surface of the bottom plate of the upper channel steel part of an upper channel steel, the upper end of the other reinforcement plate is welded to the lower surface of the top plate of the upper channel steel part of another upper channel steel, and the lower end is welded to the upper surface of the bottom plate of the upper channel steel part of another upper channel steel.
10. The method for assembling a π-shaped steel-concrete composite beam according to claim 9, characterized in that: The two ends of the suspension pin are respectively connected to the lifting equipment through one of the slings, and a permanent magnet sleeve is sleeved on the lower end of the sling, the upper end of the permanent magnet sleeve exceeds the upper channel steel, and the lower end is located below the top plate of the upper channel steel, and a permanent magnet block is fixed on the upper side of the upper channel steel, and the permanent magnet block is located between the permanent magnet sleeves on the two slings, and the two poles of the permanent magnet block are distributed along the transverse bridge direction, and the polarity of the permanent magnet sleeve is distributed along the up and down direction, and the polarity of the upper end of the permanent magnet sleeve on one sling is the same as the polarity of the permanent magnet block near the permanent magnet sleeve end on one sling, and the polarity of the upper end of the permanent magnet sleeve on the other sling is the same as the polarity of the permanent magnet block near the permanent magnet sleeve end on the other sling.