Powdered coal pyrolysis and power station boiler coupling power generation system and method
Through the coupled power generation system of pulverized coal pyrolysis and power station boiler, power generation is generated using a mixture of high-temperature powder coke and low-temperature waste gas, which solves the problems of instability and low efficiency of pulverized coal combustion, and achieves efficient and safe pulverized coal pyrolysis and Power station boiler coupled to generate electricity.
Patent Information
- Application Number
- CN202411018171.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-12
AI Technical Summary
When burning on power station boilers, there are problems of delayed combustion, low-load ignition instability and reduced combustion efficiency, and traditional measures are difficult to coordinate combustion stability, safety and economy.
A coupled power generation system for pulverized coal pyrolysis and power station boiler is designed. Through the combination of coal silos, pyrolysis units, conveying pipelines and boilers, the mixture of high-temperature powder coke and low-temperature waste gas is used to generate power, and through nozzles and waste liquid pumps Equipment such as heaters optimizes combustion conditions and improves combustion efficiency and safety.
Effectively utilize the high temperature and heat sensible of powder coke, reduce the conveying temperature of powder coke, and increase the temperature of waste gas, realize the economic and safety of the coupled power generation of pulverized coal pyrolysis and power station boiler, and improve the combustion efficiency and heat utilization rate.
Smart Images

Figure CN118931571A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pulverized coal pyrolysis, and in particular relates to a pulverized coal pyrolysis and power station boiler coupling power generation system and method. Background Art
[0002] Powdered coke is a solid carbon product obtained by separating oil and gas from high-volatile coal (bituminous coal or lignite) through dry distillation and pyrolysis under medium and low temperature conditions. After the high-volatile coal undergoes dry distillation and pyrolysis, volatile matter, sulfur, nitrogen and other heteroatoms and water are released during the dry distillation process, resulting in high-quality high-temperature powdered coke with low sulfur content, high calorific value and high fixed carbon. As a clean and environmentally friendly fuel, powdered coke can be widely used in many fields such as metallurgy, chemical industry, coke, adsorbent, fertilizer, ferroalloy, industrial and civil combustion.
[0003] With the vigorous development of the powdered coke industry, the demand in existing traditional application fields can no longer meet the rapid growth of powdered coke production capacity. The insufficient digestion capacity in fields such as calcium carbide and metallurgy has become apparent. It has become a top priority to explore potential markets and cultivate emerging markets to promote the healthy and orderly development of the powdered coke industry. At the same time, with increasingly stringent environmental protection requirements, the traditional utilization of powdered coke is facing the need for transformation and upgrading.
[0004] The clean burning of high-temperature pulverized coke in pulverized coal boilers in power plants is expected to become a feasible way to solve the problem of excess pulverized coke production capacity, which is of great significance to the sustainable development of energy. Due to the advantages of high calorific value, low ash and sulfur content, pulverized coke has good environmental protection indicators when burned in power plant boilers. At the same time, the use of high-quality pulverized coke and the sensible heat brought by pulverized coke can effectively reduce the coal consumption of thermal power plants. However, when burning high-temperature pulverized coke, the safety of pulverized coke heat needs to be considered. In addition, pulverized coke has low volatile matter and its combustion performance is worse than that of pulverized coal. When burning it in a boiler, there may be problems such as delayed combustion, unstable ignition at low load, and decreased combustion efficiency. Therefore, it is necessary to consider appropriate high-temperature transportation conditions and measures to strengthen ignition and stable combustion. However, measures to strengthen ignition and measures to alleviate slagging in the furnace are contradictory. Therefore, the burning of high-temperature pulverized coke in boiler design needs to coordinate combustion stability and the relationship between combustion economy and safety.
[0005] Therefore, there is an urgent need for a pulverized coal pyrolysis and power station boiler coupled power generation system and method to effectively utilize the high-temperature sensible heat of coke powder, thereby improving the economy of pulverized coal pyrolysis and power station boiler coupled power generation. Summary of the invention
[0006] The present invention aims to solve at least one of the technical problems existing in the prior art and provide a new technical solution for a power generation system and method of coupling pulverized coal pyrolysis with a power station boiler.
[0007] According to a first aspect of the present invention, a pulverized coal pyrolysis and power station boiler coupled power generation system is provided, comprising a coal bunker, a pyrolysis unit, a first conveying pipeline, a second conveying pipeline and a boiler, wherein the coal bunker is connected to the pyrolysis unit, one end of the first conveying pipe is connected to the pyrolysis unit, and the other end is connected to the middle of the second conveying pipeline; one end of the second conveying pipeline is connected to the pyrolysis unit, and the other end is connected to the boiler;
[0008] The coal in the coal bunker is transported to the pyrolysis unit for pyrolysis to form tar, powdered coke with a first temperature and raw coal gas; the powdered coke with the first temperature is transported along the first transport pipeline to the second transport pipeline and mixed with the raw coal gas with a second temperature in the second transport pipeline to form a mixture with a third temperature, and the mixture with the third temperature is used to be transported to the boiler for power generation; wherein the first temperature is greater than the third temperature, and the third temperature is greater than the second temperature;
[0009] The first temperature is 600°C, the second temperature is 40°C, and the third temperature is 300°C; in the mixture with the third temperature, the mass ratio of the raw coal gas to the powdered coke is 2:1.
[0010] Optionally, the pulverized coal pyrolysis and power station boiler coupled power generation system further includes a nozzle, a waste liquid pump and a third delivery pipeline;
[0011] One end of the third delivery pipeline is connected to the furnace of the boiler through the nozzle, and the other end is connected to the pyrolysis unit, and the waste liquid pump is provided on the third delivery pipeline;
[0012] The waste liquid pump is used to transport the phenol-containing wastewater generated by pyrolysis to the high-temperature area of the furnace of the boiler through a third delivery pipeline; wherein the phenol-containing wastewater enters the furnace of the boiler in a jet shape through a nozzle.
[0013] Optionally, the pulverized coal pyrolysis and power station boiler coupled power generation system further includes a heater and an air preheater;
[0014] The primary air at the outlet of the air preheater is heated by the high-temperature flue gas at the tail of the boiler at the heater to form hot primary air, which is transported to the furnace of the boiler to participate in combustion; wherein the temperature of the hot primary air is 500°C.
[0015] Optionally, the pulverized coal pyrolysis and power station boiler coupled power generation system further includes a fourth conveying pipeline, one end of the fourth conveying pipeline is connected to the coal bunker, and the other end is connected to the boiler, and part of the coal in the coal bunker is conveyed to the boiler by the fourth conveying pipeline.
[0016] According to a second aspect of the present invention, a method for coupling power generation by pyrolysis of pulverized coal and a power station boiler is provided, and the system for coupling power generation by pyrolysis of pulverized coal and a power station boiler as described in the first aspect is applied, comprising:
[0017] The coal in the coal bunker is transported to a pyrolysis unit for pyrolysis to form tar, powdered coke having a first temperature and raw coal gas;
[0018] The powdered coke having the first temperature is transported along the first transport pipeline to the second transport pipeline and mixed with the raw coal gas having the second temperature in the second transport pipeline to form a mixture having a third temperature; wherein the powdered coke is used to heat the raw coal gas;
[0019] The mixture having the third temperature is sent to a boiler to generate electricity.
[0020] Optionally, the method for coupling power generation by pyrolysis of pulverized coal and power station boiler further comprises:
[0021] Part of the coal is transported to the boiler for mixed combustion.
[0022] Optionally, the oxygen content in the raw gas is 0.3% to 0.8%.
[0023] Optionally, the hydrogen content in the raw coal gas is 55% to 60%, and the methane content is 23% to 27%.
[0024] Optionally, in the mixture having the third temperature, the mass ratio of the raw coal gas to the powdered coke is 2:1.
[0025] A technical effect of the present invention is:
[0026] In an embodiment of the present application, the coal in the coal bunker is transported to a pyrolysis unit for pyrolysis to form tar, fine coke having a first temperature, and raw coal gas; the fine coke having a first temperature is transported along a first conveying pipeline to a second conveying pipeline and mixed with the raw coal gas having a second temperature in the second conveying pipeline to form a mixture having a third temperature, and the mixture having the third temperature is used to be transported to a boiler for power generation; wherein the first temperature is greater than the third temperature, and the third temperature is greater than the second temperature.
[0027] Therefore, the pulverized coal pyrolysis and power station boiler coupled power generation system and method can effectively utilize the high temperature sensible heat of the pulverized coal during the hot state transportation of the pulverized coal, thereby significantly improving the economic efficiency of the pulverized coal pyrolysis and power station boiler coupled power generation system. Due to the high temperature of the pulverized coal, there are great problems with the safety of transportation, and the temperature of the raw coal gas is low, so it needs to absorb heat and heat up and then burn before being sent to the boiler. While the present application effectively utilizes the high-temperature coke powder, it can also effectively utilize the raw coal gas generated in the pyrolysis process, that is, the raw coal gas is heated by the high-temperature pulverized coal, which not only reduces the transportation temperature of the pulverized coal, but also increases the temperature of the raw coal gas before it is sent to the boiler, thereby helping to maximize the heat utilization. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 This is a schematic structural diagram of a pulverized coal pyrolysis and power station boiler coupled power generation system according to an embodiment of the present invention;
[0029] Figure 2 The present invention is a schematic flow chart of a method for coupling power generation by pyrolysis of pulverized coal with a power station boiler according to another embodiment of the present invention.
[0030] In the figure: 1. coal bunker; 2. pyrolysis unit; 3. first conveying pipeline; 4. second conveying pipeline; 5. boiler; 6. nozzle; 7. heater; 8. air preheater. DETAILED DESCRIPTION
[0031] Various exemplary embodiments of the present application will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangement of components and steps, numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present application.
[0032] The embodiments of the present application will be described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and should not be construed as limitations on the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.
[0033] The term "first" or "second" in the specification and claims of this application may include one or more of the features explicitly or implicitly. In the description of this application, unless otherwise specified, "plurality" means two or more. In addition, "and / or" in the specification and claims means at least one of the connected objects, and the character " / " generally means that the objects connected before and after are in an "or" relationship.
[0034] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0035] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0036] According to a first aspect of the present invention, see Figure 1 , provides a pulverized coal pyrolysis and power station boiler coupled power generation system, comprising a coal bunker 1, a pyrolysis unit 2, a first conveying pipeline 3, a second conveying pipeline 4 and a boiler 5, wherein the coal bunker 1 is connected to the pyrolysis unit 2, one end of the first conveying pipe 3 is connected to the pyrolysis unit 2, and the other end is connected to the middle of the second conveying pipeline 4; one end of the second conveying pipeline 4 is connected to the pyrolysis unit 2, and the other end is connected to the boiler 5;
[0037] The coal in the coal bunker 1 is transported to the pyrolysis unit 2 for pyrolysis to form tar, powdered coke with a first temperature and raw coal gas; the powdered coke with the first temperature is transported along the first conveying pipeline 3 to the second conveying pipeline 4 and mixed with the raw coal gas with a second temperature in the second conveying pipeline 4 to form a mixture with a third temperature, and the mixture with the third temperature is used to be transported to the boiler 5 for power generation; wherein the first temperature is greater than the third temperature, and the third temperature is greater than the second temperature.
[0038] In the embodiment of the present application, the pulverized coal pyrolysis and power station boiler coupled power generation system and method can effectively utilize the high temperature sensible heat of the pulverized coal during the hot state transportation of the pulverized coke, thereby significantly improving the economic efficiency of the pulverized coal pyrolysis and power station boiler coupled power generation system. Due to the high temperature of the pulverized coke, there are great problems with the safety of transportation, and the temperature of the raw coal gas is low, so it needs to absorb heat and heat up and then burn before being sent to the boiler. While the present application effectively utilizes the high-temperature coke powder, it can also effectively utilize the raw coal gas generated in the pyrolysis process, that is, the raw coal gas is heated by the high-temperature pulverized coke, which not only reduces the transportation temperature of the pulverized coke, but also increases the temperature of the raw coal gas before it is sent to the boiler, thereby helping to maximize the heat utilization.
[0039] For example, the coal in the coal bunker is transported to the pyrolysis unit for pyrolysis to form 600°C coke powder and 40°C raw coal gas.
[0040] Optionally, in the mixture having the third temperature, the mass ratio of the raw coal gas to the fine coke is 2: 1. This helps the raw coal gas to form a gas transport medium for the fine coke, and can safely transport the fine coke to the boiler for power generation.
[0041] Optionally, the first temperature is 600° C., the second temperature is 40° C., and the third temperature is 300° C. This helps to ensure that the powdered coke is safely transported to the boiler through raw coal gas and generates electricity.
[0042] Optionally, the pulverized coal pyrolysis and power station boiler coupled power generation system further includes a nozzle 6, a waste liquid pump (not shown in the figure) and a third delivery pipeline (not shown in the figure);
[0043] One end of the third delivery pipeline is connected to the furnace of the boiler through the nozzle 6, and the other end is connected to the pyrolysis unit. The waste liquid pump is provided on the third delivery pipeline;
[0044] The waste liquid pump is used to transport the phenol-containing wastewater generated by pyrolysis to the high-temperature area of the furnace of the boiler through the third delivery pipeline; wherein the phenol-containing wastewater enters the furnace of the boiler in a jet shape through the nozzle 6.
[0045] In the above embodiment, the high-concentration phenol-containing wastewater generated by pyrolysis is directly sent to the high-temperature area of the furnace of the boiler through the waste liquid pump, and is sent to the furnace of the boiler 1 in a jet shape through the nozzle 6 for high-temperature incineration treatment. For example, a plurality of phenol-containing wastewater nozzles are set in the furnace of the boiler near the bottom of the screen, and the phenol-containing wastewater enters the furnace through these nozzles, so that the phenolic organic matter undergoes oxidation reaction at high temperature, and finally the CO2 and H2O generated by the incineration treatment are discharged with the flue gas, thereby reducing pollutant emissions and better protecting the environment.
[0046] Optionally, the pulverized coal pyrolysis and power station boiler coupled power generation system further includes a heater 7 and an air preheater 8;
[0047] The primary air at the outlet of the air preheater 8 is heated by the high-temperature flue gas at the tail of the boiler 5 at the heater 7 to form hot primary air, which is transported to the furnace of the boiler 5 to participate in combustion; wherein the temperature of the hot primary air is 500°C.
[0048] In the above embodiment, the primary air at the outlet of the air preheater 8 is reheated by a heater 7. The heat source comes from the high-temperature flue gas at the tail end of the boiler. The primary air is further increased to about 500°C, basically reaching the ignition point of the coke powder and raw coal gas flow. It no longer enters the pulverizer but is directly sprayed into the furnace of the boiler through the nozzle at high speed to participate in the combustion. This high-temperature wind plays the role of ignition, stable combustion and entraining high-temperature flue gas to reduce the oxygen content in the combustion area.
[0049] Optionally, the pulverized coal pyrolysis and power station boiler coupled power generation system also includes a fourth conveying pipeline (not shown in the figure), one end of the fourth conveying pipeline is connected to the coal bunker 1, and the other end is connected to the boiler 5, and part of the coal in the coal bunker is transported to the boiler 5 by the fourth conveying pipeline.
[0050] In the above embodiment, the blending of pulverized coal and high-temperature pulverized coke is achieved through the fourth delivery pipeline. The blending of pulverized coke and economic coal helps to strengthen the combustion of pulverized coke and improve the burnout rate of fuel, but the NOx concentration increases significantly in the air atmosphere. A better combustion effect and pollutant control can be achieved by auxiliary oxygen control. Therefore, a better high-temperature combustion effect can be achieved by blending coal and assisting with appropriate oxygen control.
[0051] According to the second aspect of the present invention, see Figure 2 , provides a method for coupling power generation of pulverized coal pyrolysis and power station boiler, using the pulverized coal pyrolysis and power station boiler coupling power generation system as described in the first aspect, comprising:
[0052] Step S100, transporting the coal in the coal bunker to a pyrolysis unit for pyrolysis to form tar, fine coke with a first temperature and raw coal gas.
[0053] In step S200, the powdered coke having a first temperature is transported along the first transport pipeline to the second transport pipeline and mixed with the raw coal gas having a second temperature in the second transport pipeline to form a mixture having a third temperature; wherein the powdered coke is used to heat the raw coal gas.
[0054] In the above-mentioned embodiment, the pulverized coal pyrolysis and power station boiler coupled power generation method uses the raw coal gas produced by the pyrolysis process as the transportation medium of high-temperature pulverized coke, which can achieve the highest energy utilization efficiency of the pyrolysis and power generation processes under the premise of ensuring safety, and provide technical support and reference for the clean combustion of high-temperature pulverized coke in large pulverized coal boilers.
[0055] Step S300: transporting the mixture at the third temperature to the boiler for power generation. This helps to ensure the economy of boiler power generation and enables clean combustion of high-temperature pulverized coke in the pulverized coal boiler of a power station.
[0056] Optionally, the method for coupling power generation by pyrolysis of pulverized coal and power station boiler further comprises:
[0057] Part of the coal is transported to the boiler for mixed combustion.
[0058] In the above embodiment, the blending of coke and economic coal helps to strengthen the combustion of coke and improve the burnout rate of fuel, but the NOx concentration increases significantly in air atmosphere, and better combustion effect and pollutant control can be achieved by auxiliary oxygen control. Therefore, better high-temperature combustion effect can be achieved by blending coal and assisting with appropriate oxygen control.
[0059] Optionally, the oxygen content in the raw coal gas is 0.3% to 0.8%. Since the oxygen content in the raw coal gas is low, it can be ensured that the mixture is completely within the safe transportation range.
[0060] Optionally, the content of hydrogen in the raw coal gas is 55% to 60%, and the content of methane is 23% to 27%. The use of low-temperature raw coal gas and high-temperature powdered coke mixed can not only increase the temperature of the raw coal gas before entering the boiler, better ensure the combustion effect of the mixture, but also help to reduce the temperature of the high-temperature powdered coke, thereby ensuring the safety of hot transportation of the powdered coke.
[0061] In a specific embodiment, the hydrogen content in the raw coal gas is 55% to 60%, and the methane content is 23% to 27%. In addition, the raw coal gas also contains 5% to 8% carbon monoxide, 2% to 4% unsaturated hydrocarbons above C2, 1.5% to 3% carbon dioxide, 0.3% to 0.8% oxygen, and 3% to 7% nitrogen.
[0062] The solid-gas ratio of gas-to-solid transport is generally 2:1, which means that the gas is sufficient to transport the solid, that is, in this application, the safe and stable transportation of powdered coke can be achieved through raw coal gas.
[0063] In a specific embodiment, the density of raw gas is about 1.3 kg / Nm 3 , then one ton of coal produces 1300kg of raw coal gas and 630kg of coke powder. Using raw coal gas as the transport medium can fully meet the transport requirements. The temperature of 600℃ coke powder mixed with 40℃ raw coal gas is about 300℃, and the oxygen content in raw coal gas is low, so the mixture is completely within the safe transport range.
[0064] Optionally, in the mixture having the third temperature, the mass ratio of the raw coal gas to the fine coke is 2: 1. This helps the raw coal gas to form a gas transport medium for the fine coke, and can safely transport the fine coke to the boiler for power generation.
[0065] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present invention, but the present invention is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and essence of the present invention, and these modifications and improvements are also considered to be within the scope of protection of the present invention.
Claims
1. A power generation system of pulverized coal pyrolysis and power station boiler coupling, It is characterized in that It comprises a coal bunker, a pyrolysis unit, a first conveying pipeline, a second conveying pipeline and a boiler, wherein the coal bunker is connected to the pyrolysis unit, one end of the first conveying pipe is connected to the pyrolysis unit, and the other end is connected to the middle of the second conveying pipeline; one end of the second conveying pipeline is connected to the pyrolysis unit, and the other end is connected to the boiler; The coal in the coal bunker is transported to the pyrolysis unit for pyrolysis to form tar, powdered coke with a first temperature and raw coal gas; the powdered coke with the first temperature is transported along the first transport pipeline to the second transport pipeline and mixed with the raw coal gas with a second temperature in the second transport pipeline to form a mixture with a third temperature, and the mixture with the third temperature is used to be transported to the boiler for power generation; wherein the first temperature is greater than the third temperature, and the third temperature is greater than the second temperature; The first temperature is 600°C, the second temperature is 40°C, and the third temperature is 300°C; in the mixture with the third temperature, the mass ratio of the raw coal gas to the powdered coke is 2:
1.
2. The pulverized coal pyrolysis and power station boiler coupled power generation system according to claim 1, It is characterized in that Also includes a nozzle, a waste pump and a third delivery pipeline; One end of the third delivery pipeline is connected to the furnace of the boiler through the nozzle, and the other end is connected to the pyrolysis unit, and the waste liquid pump is provided on the third delivery pipeline; The waste liquid pump is used to transport the phenol-containing wastewater generated by pyrolysis to the high-temperature area of the furnace of the boiler through a third delivery pipeline; wherein the phenol-containing wastewater enters the furnace of the boiler in a jet shape through a nozzle.
3. The pulverized coal pyrolysis and power station boiler coupled power generation system according to claim 2, It is characterized in that Also includes heater and air preheater; The primary air at the outlet of the air preheater is heated by the high-temperature flue gas at the tail of the boiler at the heater to form hot primary air, which is transported to the furnace of the boiler to participate in combustion; wherein the temperature of the hot primary air is 500°C.
4. The pulverized coal pyrolysis and power station boiler coupled power generation system according to claim 3, It is characterized in that It also includes a fourth conveying pipeline, one end of which is connected to the coal bunker, and the other end is connected to the boiler, and part of the coal in the coal bunker is conveyed to the boiler by the fourth conveying pipeline.
5. A method for coupling power generation by pyrolysis of pulverized coal and power station boiler, It is characterized in that The pulverized coal pyrolysis and power station boiler coupled power generation system as claimed in claim 4 comprises: The coal in the coal bunker is transported to a pyrolysis unit for pyrolysis to form tar, powdered coke having a first temperature and raw coal gas; The powdered coke having the first temperature is transported along the first transport pipeline to the second transport pipeline and mixed with the raw coal gas having the second temperature in the second transport pipeline to form a mixture having a third temperature; wherein the powdered coke is used to heat the raw coal gas; The mixture having the third temperature is sent to a boiler to generate electricity.
6. The method for coupling power generation by pyrolysis of pulverized coal and power station boiler according to claim 5, It is characterized in that Also includes: Part of the coal is transported to the boiler for mixed combustion.
7. The method for coupling power generation by pyrolysis of pulverized coal and power station boiler according to claim 5, It is characterized in that The oxygen content in raw coal gas is 0.3% to 0.8%.
8. The method for coupling power generation by pyrolysis of pulverized coal and power station boiler according to claim 5, It is characterized in that The hydrogen content in raw coal gas is 55% to 60%, and the methane content is 23% to 27%.
9. The method for coupling power generation by pyrolysis of pulverized coal and power station boiler according to claim 8, It is characterized in that In the mixture having the third temperature, the mass ratio of the raw coal gas to the powdered coke is 2:1.